Acrobat PDF

OR FS ERFO FDR Elk River Road Bid Schedule A

Click to download
Reviews
Shared by: FHA
Stats
views:
11
rating:
not rated
reviews:
0
posted:
6/19/2008
language:
English
pages:
0
TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS State: OR County: CURRY SISKIYOU NATIONAL FOREST Opened at: VANCOUVER, WA By: BARBARA ALLEN Date: 04/01/03 I certify that this Bid Tabulation accurately reflects the bids received, publicly opened for this solicitation, with a mistake-in-bid correction. Signed: Julee Mctaggart Date: _____5/17/03 ___ Date: _5/12/2003 _____ Title: Contracting Officer Contract Awarded to: STIMPEL-WIEBELHAUS ASSOCIATES Contractor STIMPEL-WIEBELHAUS ASSOCIATES P O BOX 492335 REDDING, CA 96049-2335 TIDEWATER CONTRACTORS, INC. 16156 HWY. 101 SOUTH P O BOX 1956 BROOKINGS, OR 97415 JOHNSON ROCK PRODUCTS, INC. P O BOX 1250 COOS BAY, OR 97420 OREGON MT. CONSTRUCTORS P O BOX 377 WEAVERVILLE, CA 96073 LASKEY-CLIFTON CORP P O BOX 50 REEDSPORT, OR 97467 Engineer's Estimate Bid Amount 1,592,666.00 Responsive 1,631,929.00 1,697,482.85 1,932,865.00 2,000,297.65 1,688,790.00 Page 1 TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS Date: 05/12/03 Item No. 15101 Item Unit Item Description Quantity Unit Price 135,000.00 130,000.00 168,934.46 180,000.00 179,500.00 207,000.00 Amount LPSM Mobilization STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE ALL 135,000.00 130,000.00 168,934.46 180,000.00 179,500.00 207,000.00 15201 LPSM Construction survey and staking STIMPEL-WIEBELHAUS ASSOCIATES ALL TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE LPSM Quality control and assurance system STIMPEL-WIEBELHAUS ASSOCIATES ALL TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE LPSM Contractor testing STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE LPSM Construction schedule STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 35,000.00 30,000.00 51,935.59 18,000.00 17,935.00 30,000.00 35,000.00 30,000.00 51,935.59 18,000.00 17,935.00 30,000.00 15303 37,000.00 10,000.00 45,207.39 20,000.00 38,000.00 50,000.00 37,000.00 10,000.00 45,207.39 20,000.00 38,000.00 50,000.00 15401 ALL 25,000.00 30,000.00 22,293.92 15,000.00 5,425.00 20,000.00 25,000.00 30,000.00 22,293.92 15,000.00 5,425.00 20,000.00 15501 ALL 5,000.00 3,000.00 8,451.73 2,500.00 2,500.00 5,000.00 5,000.00 3,000.00 8,451.73 2,500.00 2,500.00 5,000.00 Page 2 TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS Date: 05/12/03 Item No. 15703 Item Unit Item Description Quantity Unit Price 9.00 12.00 52.24 12.00 10.25 20.00 Amount m Silt fence STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE each Bales, straw STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE LPSM Clearing and grubbing STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE each Removal of pipe culvert STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE m Removal of guardrail STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 200 1,800.00 2,400.00 10,448.00 2,400.00 2,050.00 4,000.00 15708 500 20.00 13.00 11.68 18.00 17.00 20.00 10,000.00 6,500.00 5,840.00 9,000.00 8,500.00 10,000.00 20102 ALL 6,200.00 25,000.00 16,021.21 20,000.00 26,250.00 8,000.00 6,200.00 25,000.00 16,021.21 20,000.00 26,250.00 8,000.00 20301 8 220.00 300.00 265.40 1,000.00 800.00 500.00 1,760.00 2,400.00 2,123.20 8,000.00 6,400.00 4,000.00 20302 20 10.00 50.00 6.37 40.00 28.40 50.00 200.00 1,000.00 127.40 800.00 568.00 1,000.00 Page 3 TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS Date: 05/12/03 Item No. 20401 Item Unit Item Description Quantity Unit Price 14.50 12.00 22.16 30.00 23.75 12.00 Amount m3 Roadway excavation STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE m3 Keyed riprap, class 5 STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE each Energy dissipator STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE each Riprap headwall , grouted STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 5,000 72,500.00 60,000.00 110,800.00 150,000.00 118,750.00 60,000.00 25103 3,650 36.00 47.00 43.17 36.00 65.00 50.00 131,400.00 171,550.00 157,570.50 131,400.00 237,250.00 182,500.00 25109 1 1,100.00 1,500.00 400.87 1,000.00 700.00 800.00 1,100.00 1,500.00 400.87 1,000.00 700.00 800.00 25112 2 1,100.00 1,500.00 580.81 1,600.00 2,150.00 2,500.00 2,200.00 3,000.00 1,161.62 3,200.00 4,300.00 5,000.00 25501 A m2 Mechanically stabilized earth wall , welded wire-faced, type 1 STIMPEL-WIEBELHAUS ASSOCIATES 860 413.00 TIDEWATER CONTRACTORS, INC. 385.00 JOHNSON ROCK PRODUCTS, INC. 378.56 OREGON MT. CONSTRUCTORS 550.00 LASKEY-CLIFTON CORP 485.00 ENGINEER'S ESTIMATE 350.00 355,180.00 331,100.00 325,561.60 473,000.00 417,100.00 301,000.00 Page 4 TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS Date: 05/12/03 Item No. 25501 B Item Unit Item Description Quantity Unit Price Amount m2 Mechanically stabilized earth wall , welded wire-faced, type 2 STIMPEL-WIEBELHAUS ASSOCIATES 800 413.00 TIDEWATER CONTRACTORS, INC. 415.00 JOHNSON ROCK PRODUCTS, INC. 399.83 OREGON MT. CONSTRUCTORS 500.00 LASKEY-CLIFTON CORP 525.00 ENGINEER'S ESTIMATE 350.00 m2 Geogrid reinforced earth fill STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE m2 Rockery wall STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 330,400.00 332,000.00 319,864.00 400,000.00 420,000.00 280,000.00 26101 60 235.00 250.00 284.26 200.00 890.00 250.00 14,100.00 15,000.00 17,055.60 12,000.00 53,400.00 15,000.00 26201 200 120.00 130.00 106.72 90.00 145.00 250.00 24,000.00 26,000.00 21,344.00 18,000.00 29,000.00 50,000.00 30802 t Roadway aggregate method 1 STIMPEL-WIEBELHAUS ASSOCIATES 2,600 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE t Minor hot asphalt concrete STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 20.00 20.00 22.54 26.00 18.10 25.00 52,000.00 52,000.00 58,604.00 67,600.00 47,060.00 65,000.00 40201 1,270 65.00 70.00 72.69 70.00 79.35 80.00 82,550.00 88,900.00 92,316.30 88,900.00 100,774.50 101,600.00 Page 5 TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS Date: 05/12/03 Item No. 60201 A Item Unit Item Description Quantity Unit Price 125.00 150.00 93.15 160.00 129.10 180.00 Amount m 600 millimeter pipe culvert STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 84 10,500.00 12,600.00 7,824.60 13,440.00 10,844.40 15,120.00 60201 B m 600 millimeter pipe culvert , downdrain STIMPEL-WIEBELHAUS ASSOCIATES 4 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 210.00 100.00 110.80 220.00 365.00 180.00 840.00 400.00 443.20 880.00 1,460.00 720.00 60202 m 1800 millimeter span, 1200 millimeter rise pipe arch culvert STIMPEL-WIEBELHAUS ASSOCIATES 15 310.00 TIDEWATER CONTRACTORS, INC. 600.00 JOHNSON ROCK PRODUCTS, INC. 601.91 OREGON MT. CONSTRUCTORS 600.00 LASKEY-CLIFTON CORP 422.85 ENGINEER'S ESTIMATE 400.00 each Inlet STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 4,650.00 9,000.00 9,028.65 9,000.00 6,342.75 6,000.00 60403 1 2,500.00 2,000.00 1,462.91 1,300.00 1,400.00 1,200.00 2,500.00 2,000.00 1,462.91 1,300.00 1,400.00 1,200.00 60505 m2 Geocomposite sheet drain system STIMPEL-WIEBELHAUS ASSOCIATES 160 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 13.00 45.00 13.15 13.50 56.40 25.00 2,080.00 7,200.00 2,104.00 2,160.00 9,024.00 4,000.00 Page 6 TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS Date: 05/12/03 Item No. 60507 Item Unit Item Description Quantity Unit Price 42.00 75.00 41.51 50.00 22.70 40.00 Amount m 150 millimeter outlet pipe , steel STIMPEL-WIEBELHAUS ASSOCIATES 72.0 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE each Spillway assembly , 600 mm STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 3,024.00 5,400.00 2,988.72 3,600.00 1,634.40 2,880.00 60601 1 900.00 300.00 243.11 350.00 200.00 500.00 900.00 300.00 243.11 350.00 200.00 500.00 60602 each Pipe anchor assembly, 600 millimeter STIMPEL-WIEBELHAUS ASSOCIATES 4 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE m Guardrail system G4, type IV, class A (wood posts) STIMPEL-WIEBELHAUS ASSOCIATES 244.00 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE each Terminal section type tangent STIMPEL-WIEBELHAUS ASSOCIATES 12 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 275.00 200.00 185.12 275.00 205.00 200.00 1,100.00 800.00 740.48 1,100.00 820.00 800.00 61701 50.00 78.00 53.50 80.00 54.50 80.00 12,200.00 19,032.00 13,054.00 19,520.00 13,298.00 19,520.00 61702 2,050.00 2,000.00 2,123.23 2,100.00 2,270.00 2,500.00 24,600.00 24,000.00 25,478.76 25,200.00 27,240.00 30,000.00 Page 7 TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS Date: 05/12/03 Item No. 61902 Item Unit Item Description Quantity Unit Price 2,225.00 2,200.00 2,655.40 3,750.00 1,800.00 2,500.00 Amount Each Gate STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 2 4,450.00 4,400.00 5,310.80 7,500.00 3,600.00 5,000.00 62201 A hour Hydraulic excavator, 1.1 m3 minimum capacity STIMPEL-WIEBELHAUS ASSOCIATES 8 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE hour Loader/backhoe, wheel type tractor, 35 kW minimum STIMPEL-WIEBELHAUS ASSOCIATES 8 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 126.00 130.00 133.04 200.00 134.60 120.00 1,008.00 1,040.00 1,064.32 1,600.00 1,076.80 960.00 62201 B 72.00 100.00 108.08 150.00 70.30 80.00 576.00 800.00 864.64 1,200.00 562.40 640.00 62201 C hour Tractor, crawler (dozer), universal blade, 80 kW minimum, with winch and cable STIMPEL-WIEBELHAUS ASSOCIATES 8 85.00 680.00 TIDEWATER CONTRACTORS, INC. 110.00 880.00 JOHNSON ROCK PRODUCTS, INC. 124.17 993.36 OREGON MT. CONSTRUCTORS 200.00 1,600.00 LASKEY-CLIFTON CORP 84.70 677.60 ENGINEER'S ESTIMATE 120.00 960.00 hour Truck, highway, dump body, rear, 7.6 m3 minimum capacity STIMPEL-WIEBELHAUS ASSOCIATES 8 69.00 TIDEWATER CONTRACTORS, INC. 80.00 JOHNSON ROCK PRODUCTS, INC. 58.11 OREGON MT. CONSTRUCTORS 100.00 LASKEY-CLIFTON CORP 72.75 ENGINEER'S ESTIMATE 80.00 62201 D 552.00 640.00 464.88 800.00 582.00 640.00 Page 8 TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS Date: 05/12/03 Item No. 62202 Item Unit Item Description Quantity Unit Price Amount hour Power tool, saw, chain, gasoline powered, 600 mm bar length (without operator) STIMPEL-WIEBELHAUS ASSOCIATES 8 12.00 96.00 TIDEWATER CONTRACTORS, INC. 15.00 120.00 JOHNSON ROCK PRODUCTS, INC. 6.70 53.60 OREGON MT. CONSTRUCTORS 75.00 600.00 LASKEY-CLIFTON CORP 11.35 90.80 ENGINEER'S ESTIMATE 15.00 120.00 hour General labor STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 62301 8 39.00 44.00 40.21 70.00 40.40 45.00 312.00 352.00 321.68 560.00 323.20 360.00 62503 slry unit Seeding, hydraulic method (government furnished) STIMPEL-WIEBELHAUS ASSOCIATES 4.00 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE slry unit Mulching, hydraulic method STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE each Object markers, type 2 STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 350.00 300.00 736.63 250.00 260.00 300.00 1,400.00 1,200.00 2,946.52 1,000.00 1,040.00 1,200.00 62506 4.00 500.00 350.00 519.97 310.00 330.00 300.00 2,000.00 1,400.00 2,079.88 1,240.00 1,320.00 1,200.00 63306 A 8 200.00 75.00 10.62 35.00 70.00 50.00 1,600.00 600.00 84.96 280.00 560.00 400.00 Page 9 TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS Date: 05/12/03 Item No. 63306 B Item Unit Item Description Quantity Unit Price 200.00 110.00 39.81 95.00 115.00 125.00 Amount each Object markers, type 3 STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 4 800.00 440.00 159.24 380.00 460.00 500.00 63401 A m Pavement markings type B, broken white STIMPEL-WIEBELHAUS ASSOCIATES 700 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE m Pavement markings type B, solid white STIMPEL-WIEBELHAUS ASSOCIATES 1,400 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE each Barricade type I STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE each Barricade type III STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 1.80 3.00 2.79 2.00 5.65 2.00 1,260.00 2,100.00 1,953.00 1,400.00 3,955.00 1,400.00 63401 B 2.75 3.00 2.79 2.00 5.65 2.00 3,850.00 4,200.00 3,906.00 2,800.00 7,910.00 2,800.00 63505 A 30 45.00 35.00 53.08 60.00 30.00 40.00 1,350.00 1,050.00 1,592.40 1,800.00 900.00 1,200.00 63505 B 4 150.00 130.00 185.78 230.00 140.00 200.00 600.00 520.00 743.12 920.00 560.00 800.00 Page 10 TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS Date: 05/12/03 Item No. 63506 Item Unit Item Description Quantity Unit Price 22.00 20.00 26.54 20.00 15.00 30.00 Amount each Cone type 700 millimeter STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE m2 Construction sign STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE fix hr rate Flagger STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE each Warning light type A STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE each Warning light type C STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 20 440.00 400.00 530.80 400.00 300.00 600.00 63507 21.0 350.00 165.00 230.63 325.00 237.80 150.00 7,350.00 3,465.00 4,843.23 6,825.00 4,993.80 3,150.00 63509 240 44.00 44.00 44.00 44.00 44.00 44.00 10,560.00 10,560.00 10,560.00 10,560.00 10,560.00 10,560.00 63521 A 4 22.00 20.00 31.85 50.00 100.00 40.00 88.00 80.00 127.40 200.00 400.00 160.00 63521 B 20 38.00 20.00 31.85 50.00 100.00 40.00 760.00 400.00 637.00 1,000.00 2,000.00 800.00 Page 11 TABULATION Bid Schedule A Project No.: OR FS ERFO 97-18(4) Project Name: FDR 5325, ELK RIVER ROAD OF BIDS Date: 05/12/03 Item No. 65510 Item Unit Item Description Quantity Unit Price 100.00 80.00 64.85 95.00 75.00 80.00 Amount m Rock dowels STIMPEL-WIEBELHAUS ASSOCIATES TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 390.0 39,000.00 31,200.00 25,291.50 37,050.00 29,250.00 31,200.00 65802 m3 Pumped grout , glass fiber reinforced STIMPEL-WIEBELHAUS ASSOCIATES 410.0 TIDEWATER CONTRACTORS, INC. JOHNSON ROCK PRODUCTS, INC. OREGON MT. CONSTRUCTORS LASKEY-CLIFTON CORP ENGINEER'S ESTIMATE 315.00 400.00 325.67 380.00 345.00 350.00 129,150.00 164,000.00 133,524.70 155,800.00 141,450.00 143,500.00

premium docs
Other docs by FHA
Sample emergency procedures
Views: 335  |  Downloads: 9
Users marcsigal Desktop term papers publications
Views: 219  |  Downloads: 0
0206 Inst SS-4 (PR) (PDF) Instrucciones
Views: 303  |  Downloads: 5
THE BLIND DETECTIVE
Views: 410  |  Downloads: 0
Board Resolution Authorizing New Borrowing
Views: 153  |  Downloads: 2
Manufacturers business plan financials
Views: 376  |  Downloads: 13
BUSINESS PURCHASE PROPOSAL
Views: 959  |  Downloads: 14
Strengths and weaknesses checklist
Views: 518  |  Downloads: 10
Batmobile Front
Views: 508  |  Downloads: 6
Temporary help checklist
Views: 305  |  Downloads: 5
Shareholders Resolution Approving Agreement
Views: 159  |  Downloads: 11