         FEASIBILITY STUDY
PROJECT PROPOSALS AND DESCRIPTIONS




               NOVI SAD
               United Nations Environment Programme (UNEP)
               Balkans Task Force (BTF)




                         FEASIBILITY STUDIES
                    PROJECT PROPOSAL – SUMMARY SHEET




   City:                          Novi Sad

   Location:                      NIS Oil Refinery

   Problem definition:            Due to the damage of storage tanks and oil pipe lines
                                  during the conflict, large quantities of crude oil and oil
                                  products leaked into the soil and groundwater at the oil
                                  refinery. This contamination is creating a potential health
                                  risk to the workers of the oil refinery due to evaporation of
                                  volatile hydrocarbons to the atmosphere. There is also a
                                  potential risk that this contamination will reach and
                                  contaminate the infiltration galleries of the Novi Sad
                                  Waterworks. Groundwater contamination by oil products is
                                  at present mainly taking place due to the presence of free
                                  phase oil on the groundwater table.

   Project title (NS.1):          Remediation of free phase oil on the groundwater
                                  table.

   Proposed approach:                Additional sampling and delimitation
                                     In-situ test
                                     In-situ remediation

   Duration of work:              30 months (approximately)

   Priority:                      1




(GCUKDKNKV[ 5VWF[    0QXK 5CF                                                                     
               United Nations Environment Programme (UNEP)
               Balkans Task Force (BTF)




                         FEASIBILITY STUDIES
                    PROJECT PROPOSAL – SUMMARY SHEET




City:                           Novi Sad

Location:                       NIS Oil Refinery

Problem definition:             Due to the damage of storage tanks and oil pipe lines
                                during the conflict, large quantities of crude oil and oil
                                products leaked into the soil and groundwater at the oil
                                refinery. This contamination is creating a potential health
                                risk to the workers of the oil refinery due to evaporation of
                                volatile hydrocarbons to the atmosphere. There is also a
                                potential risk that the contaminated groundwater will reach
                                and contaminate the infiltration galleries of the Novi Sad
                                Waterworks. The contaminated groundwater is at present
                                contaminating the Danube River upstream the infiltration
                                galleries, which are abstracting water below the riverbed.

Project title (NS.2):           Preventing oil contaminated groundwater at the oil
                                refinery to reach the Danube river and thereby the
                                infiltration galleries through the southern border of the
                                oil refinery (Contaminated groundwater at the southern
                                border)

Proposed approach:                 Additional sampling and delimitation
                                   In-situ test
                                   In-situ remediation

Duration of work:               30 months (approximately)

Priority:                       2




(GCUKDKNKV[ 5VWF[    0QXK 5CF                                                                   
               United Nations Environment Programme (UNEP)
               Balkans Task Force (BTF)




                         FEASIBILITY STUDIES
                    PROJECT PROPOSAL – SUMMARY SHEET




   City:                        Novi Sad

   Location:                    NIS Oil Refinery

   Problem definition:          Due to the damage of storage tanks and oil pipe lines
                                during the conflict, large quantities of crude oil and oil
                                products leaked into the soil and groundwater at the oil
                                refinery. This contamination is creating a potential health
                                risk to the workers of the oil refinery due to evaporation of
                                volatile hydrocarbons to the atmosphere. There is also a
                                potential risk that the contaminated groundwater will reach
                                and contaminate the infiltration galleries of the Novi Sad
                                Waterworks. The contaminated groundwater is at present
                                contaminating the Danube River upstream the infiltration
                                galleries, which are abstracting water below the riverbed.

   Project title (NS.3):        Preventing oil contaminated groundwater at the oil
                                refinery to reach the infiltration galleries through the
                                eastern border of the oil refinery (Contaminated
                                groundwater at the eastern border)

   Proposed approach:              Additional sampling and delimitation

                                   In-situ test

                                   In-situ remediation

   Duration of work:            30 months (approximately)

   Priority:                    1




(GCUKDKNKV[ 5VWF[    0QXK 5CF                                                                   
               United Nations Environment Programme (UNEP)
               Balkans Task Force (BTF)




                         FEASIBILITY STUDIES
                    PROJECT PROPOSAL – SUMMARY SHEET




   City:                        Novi Sad

   Location:                    NIS Oil Refinery

   Problem definition:          Due to the damage of storage tanks and oil pipe lines
                                during the conflict, large quantities of crude oil and oil
                                products leaked into the soil and groundwater at the oil
                                refinery. This contamination is creating a potential health
                                risk to the workers of the oil refinery due to evaporation of
                                volatile hydrocarbons to the atmosphere. There is also a
                                potential risk that this contamination will reach and
                                contaminate the infiltration galleries of the Novi Sad
                                Waterworks. To determine the potential risks from the oil
                                contamination of the oil refinery, a monitoring programme is
                                required.

   Project title (NS.4):        Groundwater monitoring programme on the oil refinery
                                to determine short and long-term effects on the
                                groundwater resources of past oil spills (and proposed
                                remediation).

                                (Groundwater monitoring programme on the refinery).

   Proposed approach:           Establishment of monitoring programme for the
                                groundwater resources at the oil refinery. Sampling and
                                analyses of groundwater.

   Duration of work:            30 months (approximately)

   Priority:                    1




(GCUKDKNKV[ 5VWF[    0QXK 5CF                                                                   
               United Nations Environment Programme (UNEP)
               Balkans Task Force (BTF)




                         FEASIBILITY STUDIES
                    PROJECT PROPOSAL – SUMMARY SHEET




   %KV[                        Novi Sad

   .QECVKQP                    Area outside the oil refinery, around Ratno ostrvo
                                (water catchment)

   2TQDNGO FGHKPKVKQP          Soil contamination with various petroleum products
                                threatens ground and drinking water quality in the Ratno
                                ostrvo water catchment area. There needs to be an early-
                                warning system, to know, whether there is a serious and
                                immediate threat for the drinking water quality.

   2TQLGEV VKVNG 
05        Groundwater    monitoring    programme    outside   the
                                refinery

   2TQRQUGF CRRTQCEJ              )TQWPFYCVGT CPCN[UGU 
OQPVJN[ QT DKOQPVJN[
                                   )GQRJ[UKECN ECORCKIP
                                   )C\ ECORCKIP KPENWFGF OCRRKPI

   &WTCVKQP QH YQTM             ;GCTU

   2TKQTKV[                    




(GCUKDKNKV[ 5VWF[    0QXK 5CF                                                              
               United Nations Environment Programme (UNEP)
               Balkans Task Force (BTF)




                         FEASIBILITY STUDIES
                    PROJECT PROPOSAL – SUMMARY SHEET




   %KV[                        0QXK 5CF

   .QECVKQP                    0+5 1KN 4GHKPGT[

   2TQDNGO FGHKPKVKQP          5QKN EQPVCOKPCVKQP YKVJ QKN CPF QKN RTQFWEVU VJTGCVGPU
                                ITQWPF CPF FTKPMKPI YCVGT SWCNKV[ CPF JGCNVJ QH TGHKPGT[
                                YQTMGTU )TQWPFYCVGT TGOGFKCVKQP YKVJ TGICTF VQ QKN
                                EQPUVKVWGPVU KU JCTFN[ UWEEGUUHWN KH EQPVCOKPCVGF UQKN
                                CEVU CU C RGTOCPGPV RQNNWVCPV UQWTEG

   2TQLGEV VKVNG 
05        4GOGFKCVKQP QH JKIJN[ EQPVCOKPCVGF UQKN

   2TQRQUGF CRRTQCEJ              &GVCKNGF OCRRKPI QH UQKN EQPVCOKPCVKQP
                                   'ZECXCVKQP QH UGTKQWUN[ EQPVCOKPCVGF UQKN
                                   5QKN TGOGFKCVKQP WUKPI VJGTOCN VTGCVOGPV HQT JKIJN[
                                    EQPVCOKPCVGF UQKN CPF OKETQDKQNQIKECN
                                    VTGCVOGPV 
DKQRKNGU HQT NGUU EQPVCOKPVCVGF UQKN
                                   4GHKNNKPI QH GZECXCVGF CTGCU

   &WTCVKQP QH YQTM             ;GCTU

   2TKQTKV[                     VQ 




(GCUKDKNKV[ 5VWF[    0QXK 5CF                                                               
               United Nations Environment Programme (UNEP)
               Balkans Task Force (BTF)




                         FEASIBILITY STUDIES
                    PROJECT PROPOSAL – SUMMARY SHEET




   %KV[                        0QXK 5CF

   .QECVKQP                    0+5 1KN 4GHKPGT[

   2TQDNGO FGHKPKVKQP               QH VJG RKRG UGEVKQPU KP VJG  O NQPI QKN
                                YCUVGYCVGT CPF QKNRQNNWVGF TCKP YCVGT EQNNGEVKQP
                                U[UVGOU CTG DTQMGP QT FCOCIGF 6JG NGCMCIG HTQO VJG
                                FCOCIGF RKRGU KU UGXGTG RQNNWVKPI VJG ITQWPF YCVGT
                                VJTGCVGPKPI VJG FTKPMKPI YCVGT YGNNU DGNQPIKPI VQ VJG
                                EKV[ QH 0QXK 5CF

   2TQLGEV VKVNG 
05        4GRCKT QH VJG RKRGNKPG U[UVGO HQT QKNYCUVGYCVGT

   2TQRQUGF CRRTQCEJ              2TGRCTCVKQP CPF RNCPPKPI
                                   %NGCPKPI CPF KPURGEVKQP QH RKRGNKPGU
                                   4GRCKT CPF TGRNCEGOGPV QH RKRGNKPGU

   &WTCVKQP QH YQTM             OQPVJU

   2TKQTKV[                    




(GCUKDKNKV[ 5VWF[    0QXK 5CF                                                           

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:10
posted:5/24/2011
language:English
pages:8