									     Oak Ridge
National Laboratory
   Status Report
            Presented By:
             Greg Larson
Oak Ridge National Laboratory (ORNL)
             UT-Battelle
     Analytical Services Program
          ASP 2009 Workshop
         September 14-17, 2009
              Jackson, WY
    Oak Ridge Reservation (ORR)
• There are 3 major operating sites:
   – Y-12 National Security Complex (B&W Y-12)
      • Defense Program
   – East Tennessee Technology Park (ETTP)
      • D&D to privatize
   – Oak Ridge National Laboratory (ORNL)
      • DOE’s largest and most diversified multi-program national
        laboratory
          –   Science and Technology
          –   Energy Resources
          –   Environmental Quality
          –   National Security
    Environmental Protection and Waste
         Services Division (EPWSD)
•   Environmental Protection Services
        Environmental Compliance (Guidance to UT-B)
        Water Quality (NPDES)
        Air Quality (CAA, NESHAP)
        Solid and Hazardous Waste (RCRA, TSCA)
        Environmental Sampling/Data Evaluation
        NEPA Compliance
•   Laboratory Waste Services
        Hazardous and Mixed Waste Management
        Radioactive Waste Management
        Waste Handling and Waste Facility Operations
        Pollution Prevention
        Hazardous Material Spill Response
•   Environmental Management Programs (Legacy)
        Legacy Material Disposition Initiative (LMDI)
        Interfacing with DOE ORO EM contractor Bechtel Jacobs Company (BJC)
        Short- and Long-term Stewardship
        ORNL Integrated Facilities Disposition Project (IFDP)
•   Operations and Quality Support
        Analytical Services Program
        Waste Certification Program QA
        Performance Planning and Assessment
                    UT-B ORNL
    Analytical Services Program (ASP) Update
FY09 Topics:
• Six Sigma Review Process
• Performance Metrics Developed
• Weekly Sample Status Meetings; ASC,
  Samplers, Safety, Transportation, etc.
     – Review Sampling/Analytical Data Issues
•    Sample Project Walkdown/Work Planning
•    Lab Selection/Justification
•    Onsite Transportation/Shipment Offsite
•    Incoming Data; Completeness Reviews
     (did we get what we asked for)
                    UT-B ORNL
Analytical Services Program (ASP) Update (cont’d)
   • Increased Lab Communication/Interface
     – Consolidate sample volume/mass based
       upon requested analyte suite
   • Unknowns
     – Handheld Field Instrument; First Defender
     – Partial Process Knowledge; Tentative Proper
       Shipping Name
     – Unknown Rad; no PK; 2 phase sampling;
       onsite gross alpha/gross beta, and/or
       gamma spec; support sample activity calcs
                                             UT-B Analytical Service Program
                                                 Metrics Flow Diagram
                                                                                                   Sample
                                                                                                Documentation
                                                                                                 Released for
                                                                                                  Sampling


                  ORNL UT-B                                                                                   Sep 2009
ID    Analytical Services Program Metrics     Duration
           (Request -> Ship Offsite)                     1   2   3   4   5   6   7      8       9   10   11     12       13   14   15   16   17   18   19   20   21   22   23


1    Sample Request Received                     0d
     Analytical Services Coordinator (ASC)
2                                                2d
     Assigned
     Duration Sample Documentation
3                                               16d
     Completed/Released
4    Lab Selection/Justification                 3d
     Transportation Request Submitted
5                                                3d
     (ORNL-19 or ORNL-28)
6    Transportation Request Approved             4d

7    Job Hazard Evaluation (JHE)                 4d
     Sample Documentation Completed
8                                               11d
     (SPRF, JHE (Work Plan), SI, Trans)
     Sample Requestor Reviews/Approves
9                                                3d
     Sample Documentation
10   Sampling Scheduled/Completed                2d

11   Samples Shipped Offsite w/i 24 hrs          2d




                   ORNL UT-B                                                         Sep 2009
ID    Analytical Services Program Metrics     Duration
      (Analytical Date Rec’d -> Database)                1   2   3   4   5   6   7      8       9   10   11     12       13   14   15

     Analytical Data Received w/i TAT
1                                                0d
     (e.g. 3, 7, 14, or 28 day, etc.)
2    Completeness Screen                         3d
     Sample Requestor Hardcopy Receipt
3                                                3d
     Acknowledgement
     ASP Database Upload
4                                                3d
     (SP Query Database; pdf files)
    Contracting Analytical Support

• Basic Ordering Agreement (BOA) with several contract full service
  laboratories
• Almost all analytical support is provided by BOA laboratories;
  limited onsite usage
• Initial contract award in FY07 with 4 option years (waste)
     FY10; going into 3rd option year
• Laboratory selection performed and documented on each sample
  request; depend on analytical suite. Factors considered:
     Cost (# samples, analyses, TAT, deliverable requested)
     Past performance (PT results, DOECAP audit results; Audit findings,
      QA/QC issues to questions, and invoicing; technical expertise;
      QA/QC; NRC license; etc.)
     Other issues (sample volume required, NRC license, facility safety
      basis, reporting issues, timeliness of response)
     Special Analytical Needs

• High level Rad samples
• No-Rad Added (NRA) Determination
• Total PCBs and individual Aroclors; RL < 2 ppm
• Isotopes covering range of the Nuclide Chart
• NESHAP requires low minimum detection
  limits
• Unusual matrices (HEPA filters, paint chips,
  etc.)
    Pros And Cons With Current
        Offsite Laboratories
Pros
• Flexible
• Willing to tackle difficult matrices
• Competitive prices
Cons
• Limited NRC license
• Slow billing cycle
• Some instances of slow response; >48 hrs
  concerning questions
  Difficulties with On-site Labs

• Data deliverables (results only); special
  request for detailed reports
• Generally, TAT is 28 days or more
• Cost; variable not fixed
• Limited resources; competing priorities
     Future Analytical Needs

• Monitoring and surveillance activities to
  remain steady over the next few years
• Spallation Neutron Source (SNS)
• Demolition activities (Central Campus)
  – IFDP
  – ARRA (3026; 2000 Complex)
• Campus Revitalization
  – New Construction
           UT-B ORNL
    Waste Management Update
FY09 Topics:
• Legacy Materials Disposition Initiative (LMDI)
• Integrated Facilities Disposition Project (IFDP)
   – ARRA Funding Accelerate Bldg. 3026 and 2000
     Complex D&D
• Newly Generated Waste Transition Completed
     (EM -> SC)
• Waste Generation & Disposition Year-To-Date
   FY09 LMDI Funded Central Campus Projects Overview


Locations of FY09 LMDI Chemical & Legacy Material Cleanout Projects
  Integrated Facilities Disposition
           Project (IFDP)
• D&D Central Campus Hot Cell Facilities and
  Build Replacement Facilities near HFIR.
• Replace ORNL liquid and gaseous waste water
  treatment systems, clear out the old facilities
  and clean up the underlying contaminated
  soils and groundwater.
• Work will ramp up most of the work between
  2010 and 2015 and finish up by 2018.
              Newly Generated Waste (NGW)
                   Transition Planning
• NGW transfer of responsibilities in FY 2009 (from DOE-EM to DOE-SC)
   – Operational Changes
       • Continued relocation of LWS operations to Hazardous Waste
         Management Area (HWMA – 7600 area)
       • Spill response capabilities moved from 3621 to 7666/7668
       • Mixed waste accumulation/storage moved from 7085 to 7654
       • Drummed low-level radioactive waste staging moved from 7075 to
         7654
       • Location of hazardous waste consolidated accumulation/storage area
         changed from 7013 to 7652
       • Last 7013 hazardous waste shipment performed
   – New bulk (boxed) ASA-3 Low-Level Radioactive Waste Staging area
     (7020) in place to replace ASA-2 (7110)
                                                                                ORNL UT-B Waste Generation
                                                                  Hazardous Waste                                                                                                                                                          Mixed Waste
                                                   90                                                                                                                                              90
                                                   80                                                                                                                                              80
                                                   70                                                                                                                                              70
                                                                                                                                            FY09 Forecast,




                                                                                                                                                               m³ (cumulative)
                                m³ (cumulative)




                                                   60                                                                                                                                              60
                                                                                                                                            Rev. 1, 4, & 5:
                                                   50                                                                                                                                              50
                                                                                                                                            80 m³
                                                   40                                                                                                                                              40                                                                                                             FY09 Forecast,
                                                   30                                                                                                                                              30                                                                                                             Rev. 2, Rev. 4:
                                                   20                                                                                                                                              20
                                                                                                                                                                                                                                                                                                                  40 m³
                                                   10                                                                                                                                              10
                                                    0                                                                                                                                              0
                                                        FY01     FY02    FY03     FY04     FY05     FY06     FY07     FY08           FY09                                                                 FY01         FY02         FY03         FY04          FY05       FY06       FY07     FY08       FY09
    Waste Generated/Shipped                              82.8    55.7    54.3     43.5     31.0     37.6     34.9      85.2 *        63.6           Waste Generated/Shipped                                17.2        23.2          2.3          21.2         61.5       29.6       10.6      87    *   28.4
    Generated/Not Shipped                                                                                                             9             Generated/Not Shipped                                                                                                                                 4

* Includes 3 m³ shipped to commercial vendor in FY09                                                                                                 * Includes 2 m³ transferred to BJC in FY09

                                                                Low Level Waste                                                                                                                                                  TRU Waste
                                             2500                                                                                                                                                       40.0

                                             2000
                                                                                                                                                                                                                                                                                                                 FY09 Forecast*,
                                                                                                                                                                                                        30.0                                                                                                     Rev. 3, 5:
              m³ (cumulative)




                                                                                                                                                                                                                                                                                                                 18 m³



                                                                                                                                                                                 m³ (cumulative)
                                             1500

                                                                                                                                                                                                        20.0
                                             1000
                                                                                                                                          FY09 Forecast
                                                  500                                                                                     700 m³
                                                                                                                                                                                                        10.0

                                                   0
                                                        FY01    FY02    FY03    FY04     FY05     FY06     FY07     FY08     FY09
                                                                                                                                                                                                         0.0
Waste Generated - HFIR D&D                              1564                                                                                                                                                      FY01        FY02         FY03      FY04        FY05       FY06       FY07    FY08       FY09
Waste Generated/Shipped                                 912     959     644     1036     953.7    821      732      646 *    275                     RH Waste Generated/Picked Up                                  5          1.7          1.7           3.3          0          0     3.2     22.5       6.4
Generated/Not Shipped                                                                                                           19                   CH Waste Generated/Picked Up                                 21.3        17.3         1.7       15.2         12.1      21.3       1.5     15.0       8.0

 *Includes 242 m³ transferred to BJC in FY09                                                                                                       *FY09 Forecast includes 7 m³ of CH and 11 m³ of RH



                                                                              Data Date: 8/19/2009
         Waste Shipping – FY 2009 YTD
• 26 waste shipments of newly generated waste YTD to off-site vendor waste
  treatment and disposal facilities
    – 14 Hazardous Waste shipments via 48 manifests to Clean Harbors Environmental
      Services facilities
    – 2 Mixed Waste shipments via 4 manifests to Permafix Company facilities
    – 3 Mixed Waste shipments via 4 manifests to Energy Solutions Clive, UT
    – 6 Low Level Radioactive Waste shipments via 13 manifests to Energy Solutions
      Clive, UT / Oak Ridge Bear Creek Facilities
    – 1 Low Level Radioactive Waste shipments to NNSA Nevada Test Site


• 196 waste containers planned to ship between now and end of September,
  2009 to reduce waste inventory/FY 2010 mortgage

• 19 containers of Transuranic waste transferred to Bechel Jacobs Company for
  storage/disposal via Transuranic Waste Processing Center
          ORNL DOECAP
   TSDF and Laboratory Auditors
• 3 DOECAP TSDF auditors qualified in following
  disciplines:
    1 Waste Operations
    3 Radiological Control
    2 Transportation Management
• 1 DOECAP Laboratory auditor qualified in following
  discipline:
    Hazardous & Radioactive Material Management
    Additional Auditor submitted qualification for review
• FY09 Audit Participation:
    4 TSDF Audits supporting following disciplines:
        3 – Waste Operations and
        2 – Rad Control
  Future of ORNL with DOECAP
• ORNL is committed to:
  Continue using DOECAP and Mixed Analyte
   Performance Evaluation Program (MAPEP)
   resources; and
  Continue supporting DOECAP

								