Template Vorlage LANXESS

Reviews
Shared by: RobbiePaul
Stats
views:
48
rating:
not rated
reviews:
0
posted:
7/1/2009
language:
English
pages:
0
Copper Recovery From Dobijanje bakra iz rudničkih voda i jalovišta po novom postupku Heap Leachates razvijenom od strane Aero Akva Inžinjering-a By a New Process Developed By Aero Akva Ingeneering (AAI) Nr. 1 S. Neumann Ova prezentacija opisuje jedan a new process This presentation describes novi postupak za dobijanje bakra iz for the recovery of copper from • jalovišta - heap leachates • rudničkih otpadnih voda - mining waste waters • otpadnog bakra - copper wastes itd. -etc. - tehnologija je razvijena od strane -the technology was developed AEROAKVA INŽENJERING d.o.o. by by assistance of i Nr. 2 S. Neumann Scope of the process: Okvir procesa : a) Troškovno isplativo dobijanje bakra iz rudnih ostataka Ore Residues b) Proizvodnja bakarnog praha visoke čistoće b) Production of Copper Powder with high Purity c) Environmental c) Zaštita okoline Protection d) Process d) Postupakbased on Selective Ion Exchange Technology zasnovan na tehnologiji selektivne jonske izmene combined with Advanced-Cu-Cementation kombinovan sa unapređenom cementacijom bakra a) Cost - Efficient Recovery of Copper from Nr. 3 S. Neumann Postrojenje za dobijanje bakra Copper Recovery Plant Bazen & Bufferza taloženje i Oxidation oksidaciju Pond Dobijanje Cu Cu recovery IX Acid Kiselina Ore Residue Rudni ostatak (> 0.15 % Cu) (> 0.15% Cu) (Potential: (Potencijali: Millions of širom milioni tonaTons Worldwide) sveta) Well System Sistem bunara Nr. 4 S. Neumann Cementation Reaktor za Reactor cementaciju „Cementation“ Reaction: "Cementaciona" reakcija: Fe + Cu2+ Fe2+ + Cu . M Air Vazduh Heap leachate Ulazna sirovina 1-2 g/L Cu, 4 – 5 g/L Fe, … pH = 2 - 3 Fe H2O Dryer Sušač 20 – 40 g/L Cu 20 – 40 g/L Fe Air Vazduh H2SO4 10% IX IX IX TP207 TP207 TP207 Filter Nuč Nutsche filter FeSO4 Rastvor Solution FeSO4 Rezervoar Acid za koncentrovanu Centrate kiselinu Tank > 98% Cu >99.3 % Cu Vraćanje Landfill Back to na otpad Nr. 5 S. Neumann ZAOKRUŽENI PROCES PREČIŠĆAVANJA RUDNIČKE VODE I DOBIJANJE BAKARNOG PRAHA A - RUDNIČKA VODA B - ELUAT POSLE REGENERACIJE C - BAKARNI PRAH D - RASTVOR SA BOGATIM SADRŽAJEM Fe E - IZLAZ NEUTRALISAN I PREČIŠĆEN RASTVOR AAI Demonstration Plant in Bor, Serbia (I) "AAI" - "AQUA-BOR" postrojenje u Boru, Srbija (I) Oppen Copper Pit with Ore Residues Otvoreni kop sa ostacima rude bakra Buffer and Oxidation Ponds Bazeni za taloženje i oksidaciju Nr. 7 S. Neumann AAI Demonstration Plant in Bor, Serbia (II) "AAI" - "AQUA-BOR" postrojenje u Boru, Srbija (II) Demonstration Plant Building Zgrada postrojenja Nr. 8 S. Neumann AAI "AQUA-BOR" postrojenje Serbia (III) "AAI" - Demonstration Plant in Bor, u Boru, Srbija (III) Three Ion Exchange Columns containing Lewatit TP 207 HD207 Tri kolone za jonsku izmenu koji sadrže Lewatit TP HD Nr. 9 S. Neumann AAI "AQUA-BOR" postrojenje Serbia (IV) "AAI" - Demonstration Plant in Bor, u Boru, Srbija (IV) RezervoarAcid Tank, Centrate Tank, Sulfuric za sumpornu kiselinu, rezervoar sa koncentratom, Reaktor za cementaciju i Mashine Cementation Reactor and Dryingpostrojenje za sušenje Nr. 10 S. Neumann "AAI" - "AQUA-BOR" AAI Demonstration Plant postrojenje in Bor, Serbia (V) u Boru, Srbija (V) Cementation Reactors Reaktori za cementaciju Filter Nutsches Nuč filteri Nr. 11 S. Neumann Tehnički podaci postrojenja (I): Technical Data of Demonstration Plant (I): Podaci za ulaznu sirovinu: Feed stream related data: Zapreminska stopa protoka: Volumetric flow rate: Sadašnja sirovinska koncentracija bakra: Actual feed concentration of copper: Sadašnja sirovinska koncentracija gvožđa: Actual feed concentration of iron: pH faktor feed stream: pH of the ulazne sirovine: Podaci o jonskoj izmeni: IX-related data: Broj JI kolona: Number of IX columns: Zapreminski nivo smole po koloni: Resin bed volume per column: Količina of installed resin volume in total: Amount ukupno instaliranog nivoa smola: type of resin: Tip smole: age of instalirane smole: Starost the resin installed: Plant o performansama Podaciperformance data: postrojenja: volume of water treated per ciklusu: Zapremina prerade vode pocycle: bed volumes treated per cycle: Količina BV-a obrađenih po ciklusu operating capacity: Proizvodni kapacitet: Regeneration data: Podaci o regeneraciji: Concentration Koncentracija of H2SO4 for regen.: H2SO4 za regeneraciju Amount of acid per regen.: Količina kiseline po regeneraciji Concentration of Cu in regenerate: Količina Cu u regeneratu Operation mode of column: Režim rada kolone: 30 to 50 m³/hr 0.4 do 0.5 g/L .4 to 0.5 g/L do 2.5 g/L up to 2.5 g/L 2 30 do 50 m3/čas 2 3 3 5 m³5 m3 ( 1 BV ) 15 15 m³ m3 Lewatit ® TP ® TP 207 HD Lewatit 207 HD 0.5 years (June (juni 2006) 0,5 godina 2006) 300 300 do m³ m3 to 400 400 60 - 80 BV BV 60 - 80 30 to 40 g 40 Cu per L L smole 30 do of g Cu po of resin (also i30 todo 20 g/L gvožđa ) ( 30 20 g/L of Fe) 10% 10% 2 BV 2 BV 10 to 20 g/L 10 do 20 g/L co-current. samoprotočni Nr. 12 S. Neumann Technical Data of Demonstration Plant (II): Tehnički podaci postrojenja (II): Product proizvodu: Podaci o related data: Purity of copper 99,3% up to 99.9% Čistoća bakra: 98% do 99.5% Size of granules 50 to 400 µm particle sizečestica Veličina granula 50 do 400 µm veličina Production rate of demonstration plant up to 300 t/a Proizvodni kapacitet postrojenja za demonstrac. do 300 t/godišnje Specific cost of copper production 1500 Euro per ton Cena koštanja proizvedenog bakra 1500 EUR po toni Okviri ekonomičnosti Economic scope Profitabilnost Profitability Amortisation Amortizacija > 20% > 20% 5 years 5 godina Nr. 13 S. Neumann Benefits compared to competing processes: Uporedne prednosti u odnosu na konkurentne postupke: Critria Kriterijum Profitable at Profitabilan sa Processing solids with Prerada rude sa Purity of Copper Čistoća bakra Suspended Solids In Liqhid Izdvajanje taloga iz Feed Stream sirovine tečne ulazne Conventional Process Standarni postupak 2000 t/a >>2000 t/godišnje > 0.5% Cu 75 % max AAI Process AAI-jev postupak > 200 t/a > 200 t/godišnje > o.15 Cu >0.15 Cu > 99.3% >98% Cu critical kritično not critical nije kritično Nr. 14 S. Neumann Conclusions / Outlook Zaključci / Pregeled - Nova tehnologija je dokazala rentabilnost u postrojenju za - A new technology has been proofed viable demonstraciju širokog okvira u Boru, Srbija. Serbia, Bor in a large scale demonstration plant in - Može se proizvoditi bakar dobrog kvaliteta i dobre profitabilnosti. - Copper can be produced with quality and good profitability - Rude, i posebno rudni ostaci iand solid wastes with sa niskom - Especially ores, residues otpad u čvrstom stanju a low copper content sadržajem bakra, su sada dostupne za efikasno izdvajanje. are now accessible for efficient exploitation - Zaštita okoline ukomponovana je sa profitabilnim poslovnim - Environmental protection is combined with profitable business poduhvatom. - New projects wanted ! - Traže se novi projekti! - Portable pilot plant available to carry out on site test - Mobilno pilot postrojenje u stanju da vrši probni test na terenu. - Business dostupan ( videti AAI - Multi Media CD ). - Biznis planplan available (see AAI – Multi Media CD) Nr. 15 S. Neumann Mobilno pilot Mobile pilot plant postrojenje za vršenje to test probnog testa dobijanja copper recovery onbakra na terenu. site. Nr. 16 S. Neumann Contact: KONTAKT: Aero Akva Engineering Safarikova 6 Beograd, Serbia Tel.: +381-11-33-44-231 Fax.: +381-11-32-36-365 E-mail: aai@yubc.net Lanxess Deutschland GmbH Kaiser Wilhelm Allee 1 51369 Leverkusen, Germany Tel.: +49-214-30-66243 Fax.: +49-214-30-26629 E-mail: lewatit.eu@lanxess.com Nr. 17 S. Neumann

Related docs
PM Vorlage Template
Views: 1  |  Downloads: 0
PM Vorlage Template MUW
Views: 0  |  Downloads: 0
PM Vorlage Template MUW
Views: 0  |  Downloads: 0
WiA Template
Views: 16  |  Downloads: 0
Typo3 Layout und Template
Views: 54  |  Downloads: 6
Template DER PATHOLOGE
Views: 8  |  Downloads: 0
Template DER PATHOLOGE
Views: 4  |  Downloads: 0
Free Template Microsoft
Views: 60  |  Downloads: 4
Template
Views: 111  |  Downloads: 3
TextBridgePro 98 Macro Template
Views: 0  |  Downloads: 0
template, inc.
Views: 2  |  Downloads: 1
template
Views: 2  |  Downloads: 0
Template
Views: 3  |  Downloads: 0
Template
Views: 2  |  Downloads: 0
premium docs
Other docs by RobbiePaul
Dirty Joke A Couple Taking Golf Lessons
Views: 943  |  Downloads: 13
Demand For Payment
Views: 246  |  Downloads: 5
Employee Arbitration Agreement NOT DONE
Views: 196  |  Downloads: 0
Transmittal Letter to SEC Enclosing Form D 2
Views: 197  |  Downloads: 1
crowell-all
Views: 204  |  Downloads: 1
Scot Richardson bio
Views: 304  |  Downloads: 0
Credit-Collection Letter Serious
Views: 439  |  Downloads: 10