WEEKLY MATERIAL SCHEDULE ( 12/12/2005 – 18/12/2005 )
MATERIAL DAYS IN A WEEK
12/12/2005 13/12/2005 14/12/2005 15/12/2005 16/12/2005 17/12/2005 18/12/2005
Sand 9.99 m.c 9.99 m.c 9.99 m.c 9.99 m.c 9.99 m.c 9.99 m.c -
Concrete - - - - - 17 m.c -
Steel 530 kg 530 kg 530 kg 530 kg 530 kg 530 kg -
Brick 266.42 m.s 266.42 m.s 266.42 m.s 266.42 m.s 266.42 m.s 266.42 m.s -
Aggregates - - - - - - -
Roof 199.76 m.s 199.76 m.s 199.76 m.s 199.76 m.s 199.76 m.s 199.76 m.s -
Tile - - - - - - -
Wood 88 m.s 88 m.s 88 m.s 88 m.s 88 m.s 88 m.s -
Cement 3.34 m.c 3.34 m.c 3.34 m.c 3.34 m.c 3.34 m.c 3.34 m.c -
Insulation - - - - - - -
WEEKLY MATERIAL CHART
(12/12/2005-18/12/2005)
Roof (M.S)
600 Wood (M.S)
500 Sand (M.C)
TOTAL OF MATERIAL
400 Steel (KG)
300 Cement (M.C)
200 Brick (M.S)
100
Concrete
0 MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY
(M.C)
DAY IN WEEK