Lane Closing Template

Reviews
Shared by: RobbiePaul
Stats
views:
1
rating:
not rated
reviews:
0
posted:
7/1/2009
language:
English
pages:
0
AUTHORIZED LANE CLOSINGS ON THE GARDEN STATE PARKWAY FOR THE WEEK BEGINNING Monday June 15, 2009 PREPARED BY THE TRAFFIC OPERATIONS DIVISION Municipality Montvale Montvale Montvale Montvale Saddle Brook Elmwood Park Elmwood Park Clifton Clifton Clifton Clifton Bloomfield Bloomfield Bloomfield Bloomfield Bloomfield Bloomfield Bloomfield East Orange East Orange East Orange East Orange East Orange Irvington Irvington Hillside Union Union Union Clark Woodbridge Woodbridge Woodbridge Woodbridge Woodbridge Woodbridge Woodbridge Woodbridge Sayreville Sayreville Old Bridge Aberdeen County Bergen Bergen Bergen Bergen Bergen Bergen Bergen Passaic Passaic Passaic Passaic Essex Essex Essex Essex Essex Essex Essex Essex Essex Essex Essex Essex Essex Essex Union Union Union Union Union Cancel Middlesex Middlesex Middlesex Middlesex Middlesex Middlesex Middlesex Middlesex Middlesex Middlesex Monmouth Date 6/15-18 6/15-19 6/15 & 19 6/15 & 19 6/15-18 6/15-18 6/15-18 6/15-18 6/15-18 6/15-17 6/15-17 6/15-18 6/15-18 6/16-18 6/15-18 6/18 6/18 6/17 & 18 6/17 & 18 6/17 & 18 6/15 & 16 6/15 & 16 6/16-18 6/16-18 6/16-18 6/18 6/16-18 6/15-18 6/15-18 6/16 6/17 6/16 6/17 6/15-19 6/15 6/18 6/17 6/16 6/15-19 6/15-19 6/16 & 17 6/15 & 18 Location 172.3 to 167.3 172 to 125 Montvale S.A. Montvale S.A. 160 to 150 159 to 156.1 159 to 156.1 156 to 159 156 to 159 155.1 to 152 155.1 to 152 150.7 to 148.6 150.7 to 148.6 150 to 160 150 to 160 150 to 154.4 150 to 154.4 149 to 149.7 148 to 151.2 148 to 151.2 148 to 151.2 148 to 151.2 146.7 to 143.6 144.1 to 144.3 144.3 to 144.1 142.6 to 140.2 141.5 to 143 141.3 to 138.1 141.3 to 138.1 136.2 to 136.6 130.9 to 128 130.7 to 129.6 130.7 to 129.6 130 to 125 Exit 129 Entrance 129 129.9 to 129.6 127.9 to 126 125 to 172 125 to 130 121.6 to 125.6 119.9 to 120.9 Dir SB SB NB SB SB SB SB NB NB SB SB SB SB NB NB NB NB NB NB NB NB NB SB NB SB SB NB SB SB NB SB SB SB SB SB NB SB SB NB NB NBI NBI Lanes 1 Left Lane Off Roadway Partial Ramp Partial Ramp Right Shoulder 1 Right Lane 2 Right Lanes 1 Right Lane 2 Right Lanes 1 Right Lane 2 Right Lanes 1 Right Lane 2 Right Lanes Right Shoulder Right Shoulder 1 Right Lane 2 Right Lanes 1 Right Lane 1 Right Lane 2 Right Lanes 1 Left Lane 2 Left Lanes 1 Right Lane Right Shoulder Right Shoulder 1 Right Lane Right Shoulder 1 Right Lane 3 Right Lanes Right Shoulder 1 Left Lane 1 Left Lane 2 Left Lanes Off Roadway Partial Ramp Partial Ramp 1 Right Lane 1 Right Lane Off Roadway Off Roadway 2 Left Lanes 1 Right Lane Duration 11 p.m. - 4 a.m. 7 a.m. - 6 p.m. 7 a.m. - 3:30 p.m. 7 a.m. - 3:30 p.m. 6 p.m. - 6 a.m. 9 p.m. - 6 a.m. 10 p.m. - 5 a.m. 9 p.m. - 6 a.m. 10 p.m. - 5 a.m. 9 p.m. - 6 a.m. 10 p.m. - 5 a.m. 9 p.m. - 6 a.m. 10 p.m. - 5 a.m. 9 a.m. - 4 p.m. 6 p.m. - 6 a.m. 9 p.m. - 6 a.m. 10 p.m. - 5 a.m. 9 p.m. - 6 a.m. 9 p.m. - 6 a.m. 10 p.m. - 5 a.m. 9 p.m. - 6 a.m. 10 p.m. - 5 a.m. 10 a.m. - 2 p.m. 10 a.m. - 3 p.m. 10 a.m. - 3 p.m. 9:30 a.m. - 2 p.m. 10 a.m. - 3 p.m. 7 p.m. - 6 a.m. 10 p.m. - 5 a.m. 9:30 a.m. - 2 p.m. 8 p.m. - 5 a.m. 12:01 a.m. - 5 a.m. 9 a.m. - 3 p.m. 10 p.m. - 5 a.m. 9 p.m. - 5 a.m. 9 p.m. - 11:59 p.m. 9:30 a.m. - 2 p.m. 7 a.m. - 6 p.m. 9 a.m. - 3 p.m. 8 p.m. - 5 a.m. 7 p.m. - 5 a.m. Work to be Completed GSP/Crack sealing KS Engineers/Outfall mapping JF Creamer/Replace guide rail JF Creamer/Replace guide rail JF Creamer/Replace guide rail Ferreira/Traffic shift(or left lane) Ferreira/Traffic shift(or left lanes) Ferreira/Traffic shift(or left lane) Ferreira/Traffic shift(or left lanes) Tilcon/Mill & pave Tilcon/Mill & pave Sanzari/Strip seals @ 148.7(or left lane) Sanzari/Strip seals @ 148.7(or left lanes) JF Creamer/Replace guide rail JF Creamer/Replace guide rail Tilcon/Mill & pave(work in w/Sanzari) Tilcon/Mill & pave(work in w/Sanzari) TranSystems/Deck cores(work in w/ Sanzari) Sanzari/Mill & pave 149.2 & 151.1 Sanzari/Mill & pave 149.2 & 151.1 Sanzari/Mill & pave 149.2 & 151.1 Sanzari/Mill & pave 149.2 & 151.1 GSP/Tree removal Union Paving/Deliver material OHSS 11(work inw/GSP) Union Paving/Deliver material OHSS 11 GSP/Lenses & reflectors Union Paving/Deliver material OHSS 11 Sanzari/Plug joints @ 138.3(or left lane) Sanzari/Plug joints @ 138.3(or left lanes) GSP/Lenses & reflectors GM Bishop/Remove catch & brackets GM Bishop/Remove catch & brackets LS Engineers/Bridge Inspection GM Bishop/Remove catch & brackets GM Bishop/Remove catch & brackets GM Bishop/Remove catch & brackets GSP/Relamping KS Engineers/Outfall mapping LS Engineers/Bridge Inspection KConti/Mill, spall & pave KConti/Spall repair 9:30 a.m. - 11:59 a.m. GSP/CCTV installation Municipality Aberdeen County Monmouth Date 6/15 & 18 Location 119.9 to 120.9 Dir NBO Lanes 1 Left Lane Duration 8 p.m. - 5 a.m. Work to be Completed KConti/Spall repair Municipality Holmdel Holmdel Middletown Middletown Middletown Middletown Tinton Falls Tinton Falls Tinton Falls Wall Wall Wall Wall Wall Wall Wall Wall Wall Wall Wall Brick Brick Brick Toms River Toms River Toms River So. Toms River So. Toms River So. Toms River Beachwood Beachwood Beachwood Beachwood Beachwood Lacey Lacey Lacey Lacey Barnegat Barnegat Barnegat Barnegat Port Republic Port Republic Port Republic Port Republic Port Republic Galloway Egg Harbor County Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Monmouth Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Ocean Atlantic Atlantic Atlantic Atlantic Atlantic Atlantic Atlantic Date 6/16 & 17 6/16 6/16-18 6/15-17 6/15-17 6/15-17 6/18 6/18 6/16-18 6/15-18 6/15-19 6/15-18 6/19 6/15-18 6/16 6/16-19 6/15-18 6/16 6/16-18 6/15-18 6/16 & 19 6/16 & 17 6/16-18 6/17 6/16-17 6/15 & 16 6/17 & 18 6/16 6/15 6/16-18 6/19 6/17 6/18 6/17 6/15 6/16-18 6/19 6/15-18 6/15 6/16-18 6/17 6/15 & 16 6/17 6/18 6/15 & 16 6/18 & 19 6/15-19 6/15-19 Location 117.1 to 119 117 to 119 110.8 to 112.3 110.8 to 112.3 110.4 to 108.9 110.4 to 108.9 107.7 to 109.5 107.7 to 109.5 102.2 to 102.4 Int 98 Service Rd Dir NBO NBI NBO NBO SBO SBO NBO NBO NB NB SB SB SB SB SB SB SB NB NB NB NB NB NB SB SB NB SB SB SB SB SB SB SB SB NB NB NB NB NB SB NB NB SB SB SB NB NB SB NB Lanes 1 Left Lane 1 Left Lane 1 Right Lane 1 Right Lane 1 Left Lane 2 Left Lanes 1 Left Lane 2 Left Lanes 1 Left Lane Right Shoulder Partial Ramp 2 Left Lanes 2 Left Lanes 1 Right Lane Right Shoulder Right Shoulder Right Shoulder 1 Left Lane 1 Left Lane 1 Left Lane 2 Right Lanes 3 Right Lanes 3 Right Lanes Right Shoulder 1 Left Lane 1 Left Lane 1 Left Lane 1 Right Lane Right Shoulder Right Shoulder Right Shoulder Right Shoulder Right Shoulder Right Shoulder 1 Left Lane Right Shoulder Right Shoulder Right Shoulder 1 Left Lane 1 Toll Lane Right Shoulder 1 Left Lane 1 Left Lane 1 Left Lane 1 Left Lane 1 Right Lane 1 Right Lane Off Roadway Off Roadway Duration 9:30 p.m. - 2 p.m. 10 p.m. - 5 a.m. 10 p.m. - 4 p.m. 6 p.m. - 5 a.m. 8 p.m. - 7 a.m. 9 p.m. - 7 a.m. 8 p.m. - 5 a.m. 8 p.m. - 5 a.m. 2 p.m. - 11 p.m. 7 a.m. - 4 p.m. 7 a.m. - 4 p.m. 10 p.m. - 7 a.m. 12:01 a.m. - 7 a.m. 7 p.m. - 8 a.m. 1 p.m. - 4 p.m. 12:01 p.m. - 4 p.m. 7 a.m. - 10 a.m. 9 p.m. - 6 a.m. 3 p.m. - 6 a.m. 12:01 p.m. - 7 p.m. 9 p.m. - 6 a.m. 12:01 a.m. - 5 a.m. 11 p.m. - 5 a.m. 5 a.m. - 8 a.m. 11 p.m. - 5 a.m. 9 a.m. - 2 p.m. 11 p.m. - 7 a.m. 11 p.m. - 7 a.m. 5 a.m. - 3 p.m. 12:01 p.m. - 3 p.m. 7 a.m. - 3 p.m. 7 a.m. - 10 a.m. 5 a.m. - 3 p.m. 5 a.m. - 3 p.m. 11 p.m.- 6 a.m. 12:01 p.m. - 3 p.m. 7 a.m. - 3 p.m. 7 a.m. - 10 a.m. 11 p.m.- 6 a.m. 7 a.m. - continuous 7 a.m. - 3:30 p.m. 9 p.m. - 5 a.m. 7 p.m. - 7 a.m. 8 p.m. - 7 a.m. 11 p.m. - 7 a.m. 10 p.m. - 7 a.m. 12:01 a.m. - 7 a.m. 9 a.m. - 3 p.m. 9 a.m. - 3 p.m. Work to be Completed GSP/Landscaping GSP/Crack sealing Agate/Punch list(or left lane) Agate/Punch list(or left lane) KConti/Mill, spall & pave KConti/Mill, spall & pave KConti/Mill spall & pave KConti/Mill spall & pave Craig Test Boring/Geotechnical drilling CJ Hesse/Earthwork & pole relocation CJ Hesse/Wiring CJ Hesse/Install parapet CJ Hesse/Install parapet CJ Hesse/Install parapet CJ Hesse/Wiring CJ Hesse/Wiring CJ Hesse/Wiring CJ Hesse/Mill & pave CJ Hesse/Install parapet Craig Test Boring/Geotechnical drilling CJ Hesse/Mil & pave(or 2 left lanes) CJ Hesse/Mil & pave(or 2 left lanes) CJ Hesse/Mill & pave(or 2 left lanes) Craig Test Boring/Geotechnical drilling GSP/Deck repair GSP/Tree removal Midlantic/Shift traffic Midlantic/Shift traffic Adesta/Duct relocation Midlantic/DGA shoulder(or left shoulder) Midlantic/DGA shoulder(or left shoulder) Midlantic/DGA shoulder(or left shoulder) Adesta/Duct relocation Adesta/Duct relocation GSP/Guide rail repair(work in w/Midlantic) Midlantic/DGA shoulder(or left shoulder) Midlantic/DGA shoulder(or left shoulder) Midlantic/DGA shoulder(or left shoulder) Midlantic/DGA shoulder GSP/Repair concrete(Lane 4 closed till 7 am on 6/19) Entance 98 98.8 to 97.4 98.8 to 97.4 98 to 97.4 97.3 to 96.9 97.3 to 96.9 97.3 to 96.9 96.6 to 98.7 96.5 to 97.7 94.3 to 94.8 93.5 to 98.7 92.6 to 98.7 92.6 to 98.7 86.8 to 86.6 86 to 84.3 83.6 to 87 81 to 75 81 to 75 80.6 to 80.5 80 to 75 80 to 75 80 to 75 80.3 to 80.2 79.1 to 78.9 77.1 to 80 75 to 80 75 to 80 75 to 80 74.7 to 80 Barnegat Tolls 68.7 to 68.8 66 to 69 50 to 48.3 50 to 48.3 50 to 48.3 48.1 to 49.9 48.1 to 49.9 40 to 38 38 to 40 Monmouth 6/15,17 & 18 Craig Test Boring/Geotechnical drilling GSP/Guide rail repair Agate/Drainage(or right lane) Agate/Drainage(or right lane) Agate/Drainage(or right lane) Agate/Drainage & sheeting(or left lane) Agate/Drainage & sheeting(or left lane) LS Engineers/Bridge Inspection LS Engineers/Bridge Inspection Municipality County Date Location Dir Lanes Duration Work to be Completed LONG TERM SHIFTS Municipality Union Union Wall Barnegat Barnegat Bass River Port republic County Union Union Monmouth Ocean Ocean Burlington Atlantic Location 143.7 to 143.1 142.6 to 143.15 97.4 to 97.7 67.9 to 67.1 67.1 to 67.9 50.0 to 48.2 48.2 to 49.9 Dir SB NB NB SB NB SB NB Shift Center Shift Center Shift Right Shoulder Right Shoulder Right Shoulder Right Shift Right Shift Duration August 2009 August 2009 June 2009 April 2010 April 2010 June 2009 June 2009 Contractor Union Paving Construction Union Paving Construction C.J. Hesse Construction Midlantic Construction Midlantic Construction Agate Construction Agate Construction Red indicates evening/overnight closings John Gavaghan Parkway Operations

Related docs
Lane Closing Template
Views: 5  |  Downloads: 0
Lane Closing Template
Views: 0  |  Downloads: 0
Lane Closing Template
Views: 0  |  Downloads: 0
Closing Book Template
Views: 0  |  Downloads: 0
Tutors' Lane
Views: 21  |  Downloads: 0
The Education of Eric Lane
Views: 13  |  Downloads: 0
Long-Lane-Primary-School
Views: 1  |  Downloads: 0
Kings Lane Portion of Street Closing
Views: 0  |  Downloads: 0
Word Template for Lane Geology Cabinets
Views: 2  |  Downloads: 0
no closing cost
Views: 40  |  Downloads: 2
Brochure LANE WABrochure Template
Views: 0  |  Downloads: 0
premium docs
Other docs by RobbiePaul
NOTICE OF MEETING
Views: 281  |  Downloads: 5
Of claim of title to real property
Views: 246  |  Downloads: 4
House_Rules
Views: 328  |  Downloads: 5
Aviso De 3-Dias PSRS Remediar
Views: 282  |  Downloads: 0
30_day_Notice_To_Move_Out
Views: 493  |  Downloads: 20
Estoppel_Certificate-Tenant_to_Purchaser
Views: 415  |  Downloads: 19
Consulting agreement[0]
Views: 198  |  Downloads: 2
Aurangabad_en2006Inst_level
Views: 149  |  Downloads: 0
Transcript of Test Ban Treaty
Views: 131  |  Downloads: 0
National Industrial Recovery Act Info
Views: 281  |  Downloads: 3
Transcript of Zimmermann Telegram
Views: 145  |  Downloads: 0