Operational Transformation - Excel

Description

Operational Transformation document sample

Document Sample
scope of work template
							Announcement


         Team                                       Inspection # OCD -
      Project: 6 - USC Diploma/Database Tracking System                                   2
    Phase:                          LCO                               Date:                     10/7/2006
     Module:                        OCD                              Time:                        10am
                                                                     Place:                   Leavey Library
 Exit Criteria:                                                   OVERVIEW
                                                                      Date:                     10/6/2006
 Announcement Date:                    10/5/2006                     Time:                        10am
                                                                     Place:                   Leavey Library
 Inspection Type (mark box with an "X")
      LCO (Inception)                             LCA (Elaboration)                            Construction
       X      OCD                                    OCD                                         OCD
              SSRD                                   SSRD                                        SSRD
              SSAD                                   SSAD                                        SSAD
              LCP                                    LCP                                         LCP
              FRD                                    FRD                                         FRD
              Prototype-Design                       Prototype-Design                            Prototype-Design
              Prototype-Code                         Prototype-Code                              Prototype-Code
              Test PDC                               Test PDC                                    Test PDC
 DISTRIBUTION
 Inspector                        Email/Phone                     Inspection Role
        Rucha Desai               ruchades@usc.edu                            Tester
        Imane Idbihi              idbihi@usc.edu                              Reader
       Joshua Garcha              fusionex@gmail.com                          Tester
      Shradha Sharma              shradhas@usc.edu                            Tester
        Deepa Datta               ddatta@usc.edu                              Author
           Nakul Datar            ndatar@usc.edu                           Moderator

 Moderator:

 Size of work product:                         407                       New & Modification Effort             6 hours
 Nature of work:
             % New: 30                 % Modified:       10    % Reused:       60        % Deleted:
 Reference Documents:
                                                              Easy Win Win Report
                         http://greenbay.usc.edu/csci577/fall2006/projects/team6/team06a/LCO/EWW_LCO_F06a_T06.doc


 Comments:




5/20/20115:03 PM                                                              19c0ea4d-c22a-425f-acfe-4b4ec9e5083c.xls
Individual Prep Log

       Team
     Project: 6 - USC Diploma/Database Tracking System            Inspection #:    OCD -                2
                             LCO CORE                    Date Pkg. Received:                10/6/2006
     Module:                  OCD 0.9                         Completion Date:              10/6/2006
                                                                    Inspector:             Nakul Datar
                                                                Phone number:              626-673-9284

 Inspection Type (mark box with an "X")
      LCO (Inception)                 LCA (Elaboration)                             Construction
     X    OCD                                OCD                                         OCD
          SSRD                               SSRD                                        SSRD
          SSAD                               SSAD                                        SSAD
          LCP                                LCP                                         LCP
          FRD                                FRD                                         FRD
          Prototype-Design                   Prototype-Design                            Prototype-Design
          Prototype-Code                     Prototype-Code                              Prototype-Code
          Test PDC                           Test PDC                                    Test PDC
 Inspection Preparation Effort Log:                             Name (Printed)
 Date                 From     To               Hours                               Nakul Datar
    10/6/2006           8pm - 9pm                    3          Inspection Role:
                                                                                    Moderator
                                                                Signature
                                                                                    Nakul Datar
                              Total Hours:           3




5/20/20115:03 PM                                                      19c0ea4d-c22a-425f-acfe-4b4ec9e5083c.xls
        Defect List. Cover
         Project:        T EAM       6                Moderator:                             Nakul Datar                       Inspection #:      OCD     -            2
                           L CO      CORE                                                                                                Date:     10/7/2006
        Module:            OCD

Type of inspection:           L CO       COR E        OC D

Defects found:        5 Major 1 3 Minor                       2 No. of Open Issues
Comments:



Estimated completion date:          10/7/2006 Actual completion date:       10/7/2006       Scheduled follow-up date:      10/8/2006

Total time estimated for rework by author:          2 hours        Total time expended during rework by author:                    3 hours

DEFECTS/ISSUES
                                                                                                  Activity of Defect
        Location                                                                                                          Location of        Date of
#                                  Description                        Classification          Injection (Requirements,                                  Impact         Trigger
          (s)                                                                                                            correction(s)         fix
                                                                                                 Design, Code, etc.)

    1   Page ii The version table has incorrect                    Major          Missing          Design                  Page ii        10/7/2006 N/A          N/A
                    information                               X Minor           X Wrong
                                                                   Open issue     Extra
                                                              Type         Compliance

    2 1 .   2       Missing references post-Win-Win                Major        x Missing          Design                    1.2          10/7/2006 N/A          N/A
                                                              x Minor             Wrong
                                                                   Open issue     Extra
                                                              Type         Correctness

    3 2 .   2                                                 x Major           x Missing          Requirements              2.2          10/7/2006
                    Missing expected benefit for pre-1980
                    graduates                                      Minor          Wrong
                                                                   Open issue     Extra
                                                              Type         Correctness




        5/20/20115:03 PM                                                                                                       19c0ea4d-c22a-425f-acfe-4b4ec9e5083c.xls
   Defect List
DEFECTS/ISSUES                      Inspection #:       OC D         -             2                                    Date:          10/7/2006

                                                                                           Activity of Defect
       Location                                                                                                    Location of     Date of
#                             Description                      Classification          Injection (Requirements,                                   Impact          Trigger
         (s)                                                                                                      correction(s)      fix
                                                                                          Design, Code, etc.)

    4 2 .   3     Missing information in the Benefits   x Major          x Missing         Requirements               2.3         10/7/2006                 Actual system
                                                                                                                                              Missing       will be different
                  Chain diagram                           Minor            Wrong                                                              features in   from the
                                                          Open issue       Extra                                                              the system    expected one

                                                        Type      Correctness

    5 2 .   4     Missing success critical              x Major          x Missing         Requirements               2.4         10/7/2006 Missing         Actual system
                  stakeholders                            Minor            Wrong                                                            features in     will be different
                                                                                                                                                            from the
                                                                                                                                            the system
                                                          Open issue       Extra                                                                            expected one
                                                        Type      Correctness

    6 2 .   4     Missing benefits for some of the        Major          x Missing         Requirements               2.4         10/7/2006 N/A             N/A
                  success critical stakeholders         x Minor            Wrong
                                                          Open issue       Extra
                                                        Type      Correctness

    7 2 .   5
                  Missing information from the            Major          x Missing         Design                     2.5         10/7/2006 Scope of the      Actual system
                                                                                                                                             proposed        will not be able
                  ststem boundary and                   x Minor            Wrong
                                                                                                                                               system         to incorporate
                  environment diagram
                                                          Open issue       Extra                                                              remains        features added
                                                        Type      Correctness                                                                                      later

    8 3 .   1     capability goals needed to be         x Major          x Missing         Requirements               3.1         10/7/2006                 Actual system
                                                                                                                                              Missing
                  elaborated to include specific          Minor            Wrong                                                                            will be different
                                                                                                                                              features in
                  information such as changing                                                                                                              from the
                                                          Open issue       Extra                                                              the system    expected one
                  mailing address, website usage
                  statistics report etc                 Type         Clarity




      5/20/20115:03 PM                                                                                                       19c0ea4d-c22a-425f-acfe-4b4ec9e5083c.xls
        Defect List
DEFECTS/ISSUES                       Inspection #:       OC D         -             2                                    Date:          10/7/2006


                                                                                            Activity of Defect
        Location                                                                                                    Location of     Date of
#                               Description                     Classification          Injection (Requirements,                                  Impact          Trigger
          (s)                                                                                                      correction(s)      fix
                                                                                           Design, Code, etc.)

    9    3.3.1     Missing information from the Entity   x Major          x Missing         Design                    3.3.1        10/7/2006                 Actual system
                   Relationship diagram                                                                                                        Missing       will be different
                                                           Minor            Wrong
                                                                                                                                               features in   from the
                                                           Open issue       Extra                                                              the system    expected one
                                                         Type      Correctness


10       3.3.2     Missing information from the          x Major          x Missing         Design                    3.3.2        10/7/2006
                   Business Workflow diagram                                                                                                   Missing       the client will
                                                           Minor            Wrong                                                                            see that the final
                                                                                                                                               features in
                                                           Open issue       Extra                                                              the system    system contains
                                                                                                                                                             different data
                                                         Type      Correctness


11       3.3.3                                           x Major          x Missing         Requirements              3.3.3        10/7/2006 Missing      Actual system
                   Some of the goals are missing from
                   the Level of Service table              Minor            Wrong                                                            expectations will be different
                                                                                                                                                             from the
                                                           Open issue       Extra                                                                            expected one
                                                         Type      Correctness


12       3.3.4     Section "Prototype" is not              Major          x Missing         Requirements              3.3.4        10/7/2006        N/A             N/A
                   mentioned
                                                         x Minor            Wrong

                                                           Open issue       Extra

                                                         Type      Compliance


13       3.4.2     Missing operational transformation      Major          x Missing         Requirements              3.4.2        10/7/2006 Missing         Actual system
                                                                                                                                             features in     will be different
                                                         x Minor            Wrong
                                                                                                                                             the system      from the
                                                           Open issue       Extra                                                                            expected one

                                                         Type      Correctness

        5/20/20115:03 PM                                                                                                      19c0ea4d-c22a-425f-acfe-4b4ec9e5083c.xls
   Defect List

14 4 . 0   Section "Easy Win Win Results" is     Major        x Missing   Requirements   4.0       10/7/2006     N/A           N/A
           not mentioned
                                               x Minor          Wrong

                                                 Open issue     Extra

                                               Type      Compliance




   5/20/20115:03 PM                                                                            19c0ea4d-c22a-425f-acfe-4b4ec9e5083c.xls
Defect List




5/20/20115:03 PM   19c0ea4d-c22a-425f-acfe-4b4ec9e5083c.xls
Detailed Report

     Project: T E A M - 6                                      Inspection #: OCD - 2
                   L CO         CORE               Inspection Meeting Date:    10/7/2006
     Module:       OCD                                             Moderator:         Nakul Datar

Type of Inspection:              L CO     CORE           OCD

Defects found in inspected article:                   (M = Missing, W = Wrong, E = Extra)
Defect Type                       Major                          Minor              Total
                        M         W        E            M         W       E
Clarity                     1                                                                 1
Compliance                                                 2            1                     3
Consistency
Correctness                 6                              4                                  10
Level of Detail
Traceability
Assign/Init
Alg/Method
Checking
Func/Class/Obj
Interface/ O-O Mess.
Relationship
Timing/Serial




                total    7         0           0          6           1           0          14
Open Issue Status
Category       Open Issue Description                                                 Assignee




Comments:




Report Date:        1 0- 0 7- 2 0 0 6

Report Preparer (if other than Moderator):          Imane Idbihi




5/20/20115:03 PM                                                                19c0ea4d-c22a-425f-acfe-4b4ec9e5083c.xls
Inspection Summary Report

      Project: T E A M - 6                                       Inspection #: O CD -                        2
               L C O CORE                            Inspection Meeting Date:      10/7/2006
      Module: O C D                               Follow-up Completion Date:       10/8/2006
Type of Inspection:  LCO CORE                     OCD
Size of work product:                                     # of Participants           6
Nature of work     30      % New     10 % Modified     60 % Reused            % Deleted
                              Total Time Expended in Person Hours (X.X) 48 hours
               Planning    Overview Preparation Meeting Third hour Rework     Follow-up   Total       Name
    Reader:                     2        3        2                                             7   Imane Idbihi
     Tester:                    1        2        2                                             5   Rucha Desai
    Tester:                     2        3        2                                             7   Joshua Garcia
    Tester:                     1        2        2                                             5   Shradha Sharma
   Author:         1            1        3        2                    3                       11   Deepa Datta
 Moderator:        1            1        3        2                               1               8 Nakul Datar
   Others:                                                                                        0
Check all organizations attending Inspection Meeting:
    x Systems Engineering            x Software Test                x Software Quality Assurance
    x Software Development           x S/W Engineering                 Other
# Defects found:          7 Major    7 Minor    # Defects reworked:     7 Major           7 Minor
# of criticality of Major defects:                0 Critical         2 High           3 Medium
Assessment of Defect Introduction by Phase and Activities
                Inception        Elaboration     Construction                     Transition           Don't Know
 Requirements:              9
       Design:              5
        Code:
         Test:
Issues:             Closed             Open
Comments:




Discrepancy Reports, Change Requests, or Waivers:



STATUS: x Passed                                      Moderator's Signature:

               Re-inspection required                          SQA Signature:

Distribution: (Distribution List for COPIES of the Summary Report)
                 Prof. Brown                                                    Chief Moderator
                 Nakul Datar                                                    Development Manager
                 Nakul Datar                                                    Team Leader
                 Nakul Datar                                                    Moderator




5/20/20115:03 PM                                                              19c0ea4d-c22a-425f-acfe-4b4ec9e5083c.xls
Inspection Summary Report


Report Date:       10/8/2006   Report Preparer:   Imane Idbihi




5/20/20115:03 PM                                           19c0ea4d-c22a-425f-acfe-4b4ec9e5083c.xls

						
Related docs
Other docs by udg20022
Operations Management Postal
Views: 10  |  Downloads: 0
Operations Investment Bank
Views: 7  |  Downloads: 0
Operations in Mall Management - PowerPoint
Views: 49  |  Downloads: 1
Operations Management 5Th Edition
Views: 111  |  Downloads: 0
Operations Funding Proposal
Views: 4  |  Downloads: 0
Operational Security Management - PDF
Views: 42  |  Downloads: 0
Operations Management Chapter 5
Views: 40  |  Downloads: 0
Operational Risk Management Usmc Pft
Views: 281  |  Downloads: 0