Operating Agreement Member Run
Description
Operating Agreement Member Run document sample
Document Sample


PJM Manuals Nov 2010
Revision History / Plans
Current
Manual Description Effective Date Last 60 days Next 60 days
Revision
Control Center Requirements [m01] presents requirements for Potential changes to add details / clarity for TO matrix; Future - 3.
control centers of signatories to the Operating Agreement of PJM. Providing clarity on what TOs must have real-time Security Analysis
The manual describes the telecommunication linkages to the PJM
OI and recommended characteristics of these control center
M01 computer systems and the facilities housing these systems. It also 17 1-Jan-10
summaries the computer services and systems at the PJM
Control Center, the standards for billing quality MWH meters, and
meter accuracy standards.
Transmission Operations [m03] discusses specific transmission Proposed changes to Load shed procedures. Quarterly update;
M03 conditions and procedures for the management of Transmission 37 18-Jun-10 Future - 2. Telemetered status for SPS – M03
Facilities within the PJM Control Area.
Energy Management System Model Updates and Quality Assurance Section 2.2: Added physical location of substation equipment to list of
[m3a] These documents are the primary source for specific data to be submitted to PJM
requirements and implementation details
Appendix A: Temporary ratings process added
M03a 5 3-May-10
Appendix C: Added discussion on modeling and monitoring very low
impedance equipment
Pre-Scheduling Operations [m10] describes PJM and PJM Member N/A
pre-scheduling activities that set the stage for the scheduling and
M10 dispatching phases of the PJM Control Area Operation. 25 1-Jan-10
Scheduling Operations [m11] provides information on the day Change to Manual M-11 to eliminate the need for a verbal phone N/A
ahead and hourly scheduling activities that are performed by the call from PJM to the asset owner confirming Tier 2 assignments.
M11 PJM OI and PJM Members. The manual describes the rules and 45 23-Jun-10
procedures for scheduling resources.
Dispatching Operations [m12] describes activities that occur in the Annual Review / Regulation language changes / Wind Changes - Future - 4. Publish requirements for Frequency Only Reg
real-time operation of the PJM and PJM Western Region and also published 10/1/10 Signal/Testing requirements
the PJM Energy Market. The Manual describes how the PJM OI
M12 dispatchers manage Capacity Resources and monitor transmission 21 1-Oct-10
facilities. It also describes how the PJM OI provides Ancillary
Services.
Emergency Operations [m13] focuses on how the PJM and the PJM • Wind procedures (mirror tariff language & M12 language) ; - Annual Day Ahead Operating Reserve % update
Members are expected to respond to emergency conditions.
published 10/1/10
Emergency conditions include: an abnormal electrical system
M13 condition requiring manual or automatic action, a fuel shortage, or a 41 1-Oct-10
condition that requires implementation of emergency procedures as
defined in the PJM Manuals.
Generator Operational Requirements [m14d] focuses on the • Wind procedures (mirror tariff language & M12 language) ; - Attachment C: reworded Voice/All Call request form; 7.1.2 AVR;
generator markets and operations requirements for generating 6.3.3 Test Energy restated; Future - 1. Telemetered status for Voltage
published 10/1/10
entities to connect to the PJM system and their responsibilities as
M14D 19 1-Oct-10 Regulators
signatories to the Operating Agreement of the PJM Interconnection.
Rules and Procedures for Determination of Generating Capability N/A
[m21] "Green Book" provides uniformity for planning, operating,
M21 accounting and reporting purposes.signatories to the Operating 9 1-May-10
Agreement of the PJM Interconnection.
System Restoration [m36] System Restoration is one of a series of Annual Review changes / RC updates - section 3.1.9 / added USFL N/A
manuals within the PJM Energy Market Set of Manuals that focuses table / updated table 1 / updated attachment F - - published
M36 on how PJM and the PJM Member Companies will respond to 13 1-Nov-10
system disturbance conditions and/or system blackout situations. 11/1/10
N/A
Reliability Coordination [m37]focuses on PJM authority,
responsibility and duties as Reliability Coordinator and how PJM
Members are expected to respond. The manual discusses
M37
requirements to monitor facilities, how PJM defines and monitors
6 1-Jan-10
System Operating Limits (SOL) and an Interconnected Reliability
Operating Limit (IROL), implementation of Transmission Loading
Relief (TLR) procedures, and PJM's coordination efforts with
neighboring Reliability Coordinators.
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 1 5/20/2011
PJM Manuals Nov 2010
Revision History / Plans
Current
Manual Description Effective Date Last 60 days Next 60 days
Revision
N/A
Operations Planning [m38] focuses on the PJM processes
of coordinating seasonal assessments, the reporting,
M38 4 1-Jan-10
analyzing and approving generation and transmission
outages, and coordinating the analysis results with PJM
members and external Reliability Coordinators.
M39 Nuclear Interface Manual [m39] 2 7-Sep-10 NPIR updates N/A
M40 Certification and Training Requirements [m40] 10 23-Jun-10 N/A
M41 Interchange 3 24-Nov-08 N/A
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 2 5/20/2011
PJM Manuals Oct 2010
Revision History / Plans
Current
Manual Description Effective Date Last 60 days Next 60 days
Revision
Control Center Requirements [m01] presents requirements for Annual Review Potential changes to add details / clarity for TO matrix
control centers of signatories to the Operating Agreement of PJM.
The manual describes the telecommunication linkages to the PJM
OI and recommended characteristics of these control center
M01 computer systems and the facilities housing these systems. It also 17 1-Jan-10
summaries the computer services and systems at the PJM
Control Center, the standards for billing quality MWH meters, and
meter accuracy standards.
Transmission Operations [m03] discusses specific transmission Annual Review Proposed changes to Load shed procedures
conditions and procedures for the management of Transmission Updates to sections on relay maintenance to provide additional
Facilities within the PJM Control Area.
M03 37 18-Jun-10 clarity
Changes to Section 5.
Energy Management System Model Updates and Quality Assurance Appendix A „TERM Processing‟ was revised as follows: BES Definition revision
[m3a] These documents are the primary source for specific - Re-named „Processing Ratings in TERM‟.
requirements and implementation details
- An explanation of new TERM Bulk Upload capability scheduled
for implementation 2Q10 was included.
M03a 5 3-May-10 Appendix C „Bulk Electric System (BES) Implementation‟ revised
as follows:
- Added special modeling discussion to the Electrical Models
section.
- Minor edits to improve readability.
Pre-Scheduling Operations [m10] describes PJM and PJM Member N/A
pre-scheduling activities that set the stage for the scheduling and
M10 dispatching phases of the PJM Control Area Operation. 25 1-Jan-10
Scheduling Operations [m11] provides information on the day Change to Manual M-11 to eliminate the need for a verbal phone N/A
ahead and hourly scheduling activities that are performed by the call from PJM to the asset owner confirming Tier 2 assignments.
M11 PJM OI and PJM Members. The manual describes the rules and 45 23-Jun-10
procedures for scheduling resources.
Dispatching Operations [m12] describes activities that occur in the IRC & Blackstart Changes Annual Review / Proposed Regulation language changes / Wind
real-time operation of the PJM and PJM Western Region and also Changes - to publish this week
the PJM Energy Market. The Manual describes how the PJM OI
M12 dispatchers manage Capacity Resources and monitor transmission 20 5-Oct-09
facilities. It also describes how the PJM OI provides Ancillary
Services.
Emergency Operations [m13] focuses on how the PJM and the PJM • Updated diagram in Exhibit 1 (Emergency Levels) • Wind procedures (mirror tariff language & M12 language) ; - to
Members are expected to respond to emergency conditions. • Updated language in Load management (Section 5) to match publish this week
Emergency conditions include: an abnormal electrical system
condition requiring manual or automatic action, a fuel shortage, or a
language in Section 2
condition that requires implementation of emergency procedures as • Updated table in Attachment E
defined in the PJM Manuals. • Updated table in Attachment F
• Completed 2010 Annual Review of the EOP manual
o Section 2 Capacity Emergencies, page 27, Step 7A (Real-Time):
Voltage Reduction
o Section 2.4.2: Minimum Generation Alert, page 32 updated text
M13 39 1-Jan-10
box:
o Updated 6.1 Reporting System Disturbances to the Department
of Energy, page 79
o Updated 6.4 Fuel Limitation Reporting, page 81
o All UDS entries changed to SCED.
o All Scheduling Coordinator entries changed to Master
Coordinator.
o All PJM CA entries changed to PJM RTO.
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 3 5/20/2011
PJM Manuals Oct 2010
Revision History / Plans
Current
Manual Description Effective Date Last 60 days Next 60 days
Revision
Generator Operational Requirements [m14d] focuses on the • Revised Attachment D, E, and F to remove redundancy and • Wind communication model
generator markets and operations requirements for generating reorder.
entities to connect to the PJM system and their responsibilities as
signatories to the Operating Agreement of the PJM Interconnection.
• Modified Attachment E to change requirement to submit
M14D 18 1-Jun-10 completed PJM Leading and/or Lagging Test Form R to PJM within
30 calendar days after completion of the testing (changed from 10
days).
Rules and Procedures for Determination of Generating Capability N/A
[m21] "Green Book" provides uniformity for planning, operating,
M21 accounting and reporting purposes.signatories to the Operating 9 1-May-10
Agreement of the PJM Interconnection.
System Restoration [m36] System Restoration is one of a series of Annual Review upcoming Annual Review changes / RC updates - section 3.1.9 / added USFL
manuals within the PJM Energy Market Set of Manuals that focuses table / updated table 1 / updated attachment F - to publish this after
M36 on how PJM and the PJM Member Companies will respond to 12 1-Jan-10
system disturbance conditions and/or system blackout situations. the MRC next week
N/A
Reliability Coordination [m37]focuses on PJM authority,
responsibility and duties as Reliability Coordinator and how PJM
Members are expected to respond. The manual discusses
M37
requirements to monitor facilities, how PJM defines and monitors
6 1-Jan-10
System Operating Limits (SOL) and an Interconnected Reliability
Operating Limit (IROL), implementation of Transmission Loading
Relief (TLR) procedures, and PJM's coordination efforts with
neighboring Reliability Coordinators.
N/A
Operations Planning [m38] focuses on the PJM processes
of coordinating seasonal assessments, the reporting,
M38 4 1-Jan-10
analyzing and approving generation and transmission
outages, and coordinating the analysis results with PJM
members and external Reliability Coordinators.
M39 Nuclear Interface Manual [m39] 1 1-Apr NPIR updates N/A
Certification and Training Requirements [m40] Annual Review of Manual; Adding additional detail to Section 1.4 N/A
Compliance Monitoring of Certification Adding additional clarity to
Section 2.6 Training Requirements for DR Resources Supplying
M40 10 23-Jun-10 Regulation or Synchronized Reserve; New Section 2.7 Training
Requirements for Storage Resouces Supplying Regulation or
Synchronized Reserve. Miscellaneous clarifying changes to
Section 4
M41 Interchange 3 24-Nov-08 Update sections for NAESB changes N/A
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 4 5/20/2011
PJM Manuals Sep 2010
Revision History / Plans
Current
Manual Description Effective Date Last 60 days Next 60 days
Revision
Control Center Requirements [m01] presents requirements for Annual Review Potential changes to add details / clarity for TO matrix
control centers of signatories to the Operating Agreement of PJM.
The manual describes the telecommunication linkages to the PJM
OI and recommended characteristics of these control center
M01 computer systems and the facilities housing these systems. It also 17 1-Jan-10
summaries the computer services and systems at the PJM
Control Center, the standards for billing quality MWH meters, and
meter accuracy standards.
Transmission Operations [m03] discusses specific transmission Annual Review CIP Review
conditions and procedures for the management of Transmission Updates to sections on relay maintenance to provide additional
Facilities within the PJM Control Area.
M03 37 18-Jun-10 clarity
Changes to Section 5.
Energy Management System Model Updates and Quality Assurance Appendix A „TERM Processing‟ was revised as follows: BES Definition revision
[m3a] These documents are the primary source for specific - Re-named „Processing Ratings in TERM‟.
requirements and implementation details
- An explanation of new TERM Bulk Upload capability scheduled
for implementation 2Q10 was included.
M03a 5 3-May-10 Appendix C „Bulk Electric System (BES) Implementation‟ revised
as follows:
- Added special modeling discussion to the Electrical Models
section.
- Minor edits to improve readability.
Pre-Scheduling Operations [m10] describes PJM and PJM Member N/A
pre-scheduling activities that set the stage for the scheduling and
M10 dispatching phases of the PJM Control Area Operation. 25 1-Jan-10
Scheduling Operations [m11] provides information on the day Change to Manual M-11 to eliminate the need for a verbal phone N/A
ahead and hourly scheduling activities that are performed by the call from PJM to the asset owner confirming Tier 2 assignments.
M11 PJM OI and PJM Members. The manual describes the rules and 45 23-Jun-10
procedures for scheduling resources.
Dispatching Operations [m12] describes activities that occur in the IRC & Blackstart Changes Annual Review / Proposed Regulation language changes / Wind
real-time operation of the PJM and PJM Western Region and also Changes
the PJM Energy Market. The Manual describes how the PJM OI
M12 dispatchers manage Capacity Resources and monitor transmission 20 5-Oct-09
facilities. It also describes how the PJM OI provides Ancillary
Services.
Emergency Operations [m13] focuses on how the PJM and the PJM • Updated diagram in Exhibit 1 (Emergency Levels) • Wind procedures (mirror tariff language & M12 language) ; update
Members are expected to respond to emergency conditions. • Updated language in Load management (Section 5) to match revise attachment C
Emergency conditions include: an abnormal electrical system
condition requiring manual or automatic action, a fuel shortage, or a
language in Section 2
condition that requires implementation of emergency procedures as • Updated table in Attachment E
defined in the PJM Manuals. • Updated table in Attachment F
• Completed 2010 Annual Review of the EOP manual
o Section 2 Capacity Emergencies, page 27, Step 7A (Real-Time):
Voltage Reduction
o Section 2.4.2: Minimum Generation Alert, page 32 updated text
M13 39 1-Jan-10
box:
o Updated 6.1 Reporting System Disturbances to the Department
of Energy, page 79
o Updated 6.4 Fuel Limitation Reporting, page 81
o All UDS entries changed to SCED.
o All Scheduling Coordinator entries changed to Master
Coordinator.
o All PJM CA entries changed to PJM RTO.
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 5 5/20/2011
PJM Manuals Sep 2010
Revision History / Plans
Current
Manual Description Effective Date Last 60 days Next 60 days
Revision
Generator Operational Requirements [m14d] focuses on the • Revised Attachment D, E, and F to remove redundancy and • Wind communication model
generator markets and operations requirements for generating reorder.
entities to connect to the PJM system and their responsibilities as
signatories to the Operating Agreement of the PJM Interconnection.
• Modified Attachment E to change requirement to submit
M14D 18 1-Jun-10 completed PJM Leading and/or Lagging Test Form R to PJM within
30 calendar days after completion of the testing (changed from 10
days).
Rules and Procedures for Determination of Generating Capability N/A
[m21] "Green Book" provides uniformity for planning, operating,
M21 accounting and reporting purposes.signatories to the Operating 9 1-May-10
Agreement of the PJM Interconnection.
System Restoration [m36] System Restoration is one of a series of Annual Review upcoming Annual Review changes / RC updates - section 3.1.9 / added USFL
manuals within the PJM Energy Market Set of Manuals that focuses table / updated table 1 / updated attachment F
M36 on how PJM and the PJM Member Companies will respond to 12 1-Jan-10
system disturbance conditions and/or system blackout situations.
N/A
Reliability Coordination [m37]focuses on PJM authority,
responsibility and duties as Reliability Coordinator and how PJM
Members are expected to respond. The manual discusses
M37
requirements to monitor facilities, how PJM defines and monitors
6 1-Jan-10
System Operating Limits (SOL) and an Interconnected Reliability
Operating Limit (IROL), implementation of Transmission Loading
Relief (TLR) procedures, and PJM's coordination efforts with
neighboring Reliability Coordinators.
N/A
Operations Planning [m38] focuses on the PJM processes
of coordinating seasonal assessments, the reporting,
M38 4 1-Jan-10
analyzing and approving generation and transmission
outages, and coordinating the analysis results with PJM
members and external Reliability Coordinators.
M39 Nuclear Interface Manual [m39] 1 1-Apr NPIR updates N/A
Certification and Training Requirements [m40] Annual Review of Manual; Adding additional detail to Section 1.4 N/A
Compliance Monitoring of Certification Adding additional clarity to
Section 2.6 Training Requirements for DR Resources Supplying
M40 10 23-Jun-10 Regulation or Synchronized Reserve; New Section 2.7 Training
Requirements for Storage Resouces Supplying Regulation or
Synchronized Reserve. Miscellaneous clarifying changes to
Section 4
M41 Interchange 3 24-Nov-08 Update sections for NAESB changes N/A
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 6 5/20/2011
PJM Manuals Aug 2010
Revision History / Plans
Current
Manual Description Effective Date Last 60 days Next 60 days
Revision
Control Center Requirements [m01] presents requirements for Annual Review Potential changes to add details / clarity for TO matrix
control centers of signatories to the Operating Agreement of PJM.
The manual describes the telecommunication linkages to the PJM
OI and recommended characteristics of these control center
M01 computer systems and the facilities housing these systems. It also 17 1-Jan-10
summaries the computer services and systems at the PJM
Control Center, the standards for billing quality MWH meters, and
meter accuracy standards.
Transmission Operations [m03] discusses specific transmission Annual Review CIP Review
conditions and procedures for the management of Transmission Updates to sections on relay maintenance to provide additional
Facilities within the PJM Control Area.
M03 37 18-Jun-10 clarity
Changes to Section 5.
Energy Management System Model Updates and Quality Assurance Appendix A „TERM Processing‟ was revised as follows: BES Definition revision
[m3a] These documents are the primary source for specific - Re-named „Processing Ratings in TERM‟.
requirements and implementation details
- An explanation of new TERM Bulk Upload capability scheduled
for implementation 2Q10 was included.
M03a 5 3-May-10 Appendix C „Bulk Electric System (BES) Implementation‟ revised
as follows:
- Added special modeling discussion to the Electrical Models
section.
- Minor edits to improve readability.
Pre-Scheduling Operations [m10] describes PJM and PJM Member N/A
pre-scheduling activities that set the stage for the scheduling and
M10 dispatching phases of the PJM Control Area Operation. 25 1-Jan-10
Scheduling Operations [m11] provides information on the day Change to Manual M-11 to eliminate the need for a verbal phone
ahead and hourly scheduling activities that are performed by the call from PJM to the asset owner confirming Tier 2 assignments.
M11 PJM OI and PJM Members. The manual describes the rules and 45 23-Jun-10
procedures for scheduling resources.
Dispatching Operations [m12] describes activities that occur in the IRC & Blackstart Changes Annual Review / Proposed Regulation language changes
real-time operation of the PJM and PJM Western Region and also
the PJM Energy Market. The Manual describes how the PJM OI
M12 dispatchers manage Capacity Resources and monitor transmission 20 5-Oct-09
facilities. It also describes how the PJM OI provides Ancillary
Services.
Emergency Operations [m13] focuses on how the PJM and the PJM • Updated diagram in Exhibit 1 (Emergency Levels) • Wind procedures (mirror tariff language & M12 language) ; update
Members are expected to respond to emergency conditions. • Updated language in Load management (Section 5) to match revise attachment C
Emergency conditions include: an abnormal electrical system
condition requiring manual or automatic action, a fuel shortage, or a
language in Section 2
condition that requires implementation of emergency procedures as • Updated table in Attachment E
defined in the PJM Manuals. • Updated table in Attachment F
• Completed 2010 Annual Review of the EOP manual
o Section 2 Capacity Emergencies, page 27, Step 7A (Real-Time):
Voltage Reduction
o Section 2.4.2: Minimum Generation Alert, page 32 updated text
M13 39 1-Jan-10
box:
o Updated 6.1 Reporting System Disturbances to the Department
of Energy, page 79
o Updated 6.4 Fuel Limitation Reporting, page 81
o All UDS entries changed to SCED.
o All Scheduling Coordinator entries changed to Master
Coordinator.
o All PJM CA entries changed to PJM RTO.
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 7 5/20/2011
PJM Manuals Aug 2010
Revision History / Plans
Current
Manual Description Effective Date Last 60 days Next 60 days
Revision
Generator Operational Requirements [m14d] focuses on the • Revised Attachment D, E, and F to remove redundancy and • Wind communication model
generator markets and operations requirements for generating reorder.
entities to connect to the PJM system and their responsibilities as
signatories to the Operating Agreement of the PJM Interconnection.
• Modified Attachment E to change requirement to submit
M14D 18 1-Jun-10 completed PJM Leading and/or Lagging Test Form R to PJM within
30 calendar days after completion of the testing (changed from 10
days).
Rules and Procedures for Determination of Generating Capability N/A
[m21] "Green Book" provides uniformity for planning, operating,
M21 accounting and reporting purposes.signatories to the Operating 9 1-May-10
Agreement of the PJM Interconnection.
System Restoration [m36] System Restoration is one of a series of Annual Review upcoming Annual Review changes / RC updates / SRWG review changes
manuals within the PJM Energy Market Set of Manuals that focuses
M36 on how PJM and the PJM Member Companies will respond to 12 1-Jan-10
system disturbance conditions and/or system blackout situations.
N/A
Reliability Coordination [m37]focuses on PJM authority,
responsibility and duties as Reliability Coordinator and how PJM
Members are expected to respond. The manual discusses
M37
requirements to monitor facilities, how PJM defines and monitors
6 1-Jan-10
System Operating Limits (SOL) and an Interconnected Reliability
Operating Limit (IROL), implementation of Transmission Loading
Relief (TLR) procedures, and PJM's coordination efforts with
neighboring Reliability Coordinators.
N/A
Operations Planning [m38] focuses on the PJM processes
of coordinating seasonal assessments, the reporting,
M38 4 1-Jan-10
analyzing and approving generation and transmission
outages, and coordinating the analysis results with PJM
members and external Reliability Coordinators.
• Section 1.1: Background – updated reference to manuals. NPIR updates
• Section 2.1: Outage Coordination – updated maintenance
notification requirements for facilities impact Nuclear Plant or off-
site station light and power source.
M39
• Attachment B: Updated Peach Bottom NPIR to reflect new
Cooper 230kV substation between Nottingham and Graceton.
• Attachment C: Updated Peach Bottom NPIR revision.
Nuclear Interface Manual [m39] 1 1-Apr
Certification and Training Requirements [m40] Annual Review of Manual; Adding additional detail to Section 1.4 N/A
Compliance Monitoring of Certification Adding additional clarity to
Section 2.6 Training Requirements for DR Resources Supplying
M40 10 23-Jun-10 Regulation or Synchronized Reserve; New Section 2.7 Training
Requirements for Storage Resouces Supplying Regulation or
Synchronized Reserve. Miscellaneous clarifying changes to
Section 4
M41 Interchange 3 24-Nov-08 Update sections for NAESB changes N/A
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 8 5/20/2011
PJM Manuals July 2010
Revision History / Plans
Current
Manual Description Effective Date Last 60 days Next 60 days
Revision
Control Center Requirements [m01] presents requirements for Annual Review Potential changes to add details / clarity for TO matrix
control centers of signatories to the Operating Agreement of PJM.
The manual describes the telecommunication linkages to the PJM
OI and recommended characteristics of these control center
M01 computer systems and the facilities housing these systems. It also 17 1-Jan-10
summaries the computer services and systems at the PJM
Control Center, the standards for billing quality MWH meters, and
meter accuracy standards.
Transmission Operations [m03] discusses specific transmission Annual Review N/A
conditions and procedures for the management of Transmission Updates to sections on relay maintenance to provide
Facilities within the PJM Control Area.
additional clarity
Changes to Section 5.
• Section 5 – Formatting, corrections and additions where
appropriate within Index Tables.
• Section 5 – Clear designation via „[SPS]‟ denotation of Special
Protection Schemes within PJM.
• Section 5 – Removed separate Voltage Setpoints based upon
LTC‟s being in Auto or Manual mode for Dresden Nuclear Voltage
Limits within the Voltage Control at Nuclear Stations section of
Operating Procedures for PJM RTO.
• Section 5 – Added distinct Voltage Drop %‟s and Limits for
Susquehanna when only one start-up transformer is in service or
M03 37 18-Jun-10 when both are in service within the Voltage Control at Nuclear
Stations section of Operating Procedures for PJM RTO.
• Section 5 – Added 138kV Voltage limits for Beaver Valley #1 &
#2 within the Voltage Control at Nuclear Stations section of
Operating Procedures for PJM RTO.
• Section 5 – Removed 500kV CB Derate for the „5020‟ 500kV line
CB Derate Table due to breaker replacement within the Operating
Procedures for PS Transmission Zone.
• Section 5 -- Nottingham - Graceton 230 kV Line Limitations. Due
to relay changes, revised “does not” to “will” in regard to
contingency changes at Conowingo upon opening Bus Tie CB
within the Operating Procedures for the BC Transmission Zone.
• Section 5 – Steel City – Hosensack 500kV Line Reclosing
Limitation. Clarified description of reclosing limitation and
associated procedure within the Operating Procedures for the PL
Energy Management System Model Updates and Quality Assurance Appendix A „TERM Processing‟ was revised as follows:
[m3a] These documents are the primary source for specific - Re-named „Processing Ratings in TERM‟.
requirements and implementation details
- An explanation of new TERM Bulk Upload capability scheduled
for implementation 2Q10 was included.
M03a 5 3-May-10 Appendix C „Bulk Electric System (BES) Implementation‟ revised
as follows:
- Added special modeling discussion to the Electrical Models
section.
- Minor edits to improve readability. N/A
Pre-Scheduling Operations [m10] describes PJM and PJM Member N/A
pre-scheduling activities that set the stage for the scheduling and
M10 dispatching phases of the PJM Control Area Operation. 25 1-Jan-10
Scheduling Operations [m11] provides information on the day As a result of added automation, Mr. Keech will review a change to Manual M-11
ahead and hourly scheduling activities that are performed by the to eliminate the need for a verbal phone call from PJM to the asset owner
M11 PJM OI and PJM Members. The manual describes the rules and 45 23-Jun-10
procedures for scheduling resources.
confirming Tier 2 assignments.
Dispatching Operations [m12] describes activities that occur in the IRC & Blackstart Changes Proposed Regulation language changes
real-time operation of the PJM and PJM Western Region and also
the PJM Energy Market. The Manual describes how the PJM OI
M12 dispatchers manage Capacity Resources and monitor transmission 20 5-Oct-09
facilities. It also describes how the PJM OI provides Ancillary
Services.
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 9 5/20/2011
PJM Manuals July 2010
Revision History / Plans
Current
Manual Description Effective Date Last 60 days Next 60 days
Revision
Emergency Operations [m13] focuses on how the PJM and the PJM Updated (corrected) Load Management sections of M13 on the • Updated language in Load management sections
Members are expected to respond to emergency conditions. following pages: 24 (in Section 2), 57 and 62 (in Section 5) and • Updated table in Attachment F
Emergency conditions include: an abnormal electrical system
condition requiring manual or automatic action, a fuel shortage, or a
130 and 132 (in Attachment G). • Completed 2010 Annual Review of the EOP manual
condition that requires implementation of emergency procedures as o Section 2 Capacity Emergencies, page 27, Step 7A (Real-Time): Voltage
defined in the PJM Manuals. Reduction
o Section 2.4.2: Minimum Generation Alert, page 32 updated text box:
M13 39 1-Jan-10 o Updated 6.1 Reporting System Disturbances to the Department of Energy, page
79
o Updated 6.4 Fuel Limitation Reporting, page 81
o All UDS entries changed to SCED.
o All Scheduling Coordinator entries changed to Master Coordinator.
o All PJM CA entries changed to PJM RTO.
Generator Operational Requirements [m14d] focuses on the • Revised Attachment D, E, and F to remove redundancy and • Wind communication model
generator markets and operations requirements for generating reorder.
entities to connect to the PJM system and their responsibilities as
signatories to the Operating Agreement of the PJM Interconnection.
• Modified Attachment E to change requirement to submit
M14D 18 1-Jun-10 completed PJM Leading and/or Lagging Test Form R to PJM
within 30 calendar days after completion of the testing (changed
from 10 days).
Rules and Procedures for Determination of Generating Capability N/A
[m21] "Green Book" provides uniformity for planning, operating,
M21 accounting and reporting purposes.signatories to the Operating 9 1-May-10
Agreement of the PJM Interconnection.
System Restoration [m36] System Restoration is one of a series of Annual Review upcoming Annual Review changes / RC updates
manuals within the PJM Energy Market Set of Manuals that focuses
M36 on how PJM and the PJM Member Companies will respond to 12 1-Jan-10
system disturbance conditions and/or system blackout situations.
N/A
Reliability Coordination [m37]focuses on PJM authority,
responsibility and duties as Reliability Coordinator and how PJM
Members are expected to respond. The manual discusses
M37
requirements to monitor facilities, how PJM defines and monitors
6 1-Jan-10
System Operating Limits (SOL) and an Interconnected Reliability
Operating Limit (IROL), implementation of Transmission Loading
Relief (TLR) procedures, and PJM's coordination efforts with
neighboring Reliability Coordinators.
N/A
Operations Planning [m38] focuses on the PJM processes
of coordinating seasonal assessments, the reporting,
M38 4 1-Jan-10
analyzing and approving generation and transmission
outages, and coordinating the analysis results with PJM
members and external Reliability Coordinators.
• Section 1.1: Background – updated reference to manuals.
Manual 39: Plant Specific NPIR Revision History • Section 2.1: Outage Coordination – updated maintenance notification
Section 2.1: Outage Coordination – modified language to clarify requirements for facilities impact Nuclear Plant or off-site station light and power
outage coordination process. source.
Section 2.3: Notification for Loss of Calculation Capability – added • Attachment B: Updated Peach Bottom NPIR to reflect new Cooper 230kV
30 minute timeframe to notify Nuclear Station of loss of EMS. substation between Nottingham and Graceton.
Section 2.4.1: Communications – modified language to clarify real- • Attachment C: Updated Peach Bottom NPIR revision.
M39 time communication process.
Section 2.6 System Restoration – highlighted urgency if the
nuclear plant has lost both offsite and onsite AC power
Attachment C: Plant Specific NPIR Revision History – updated to
include approval date for plant specific Nuclear Plant Interface
Requirements.
Nuclear Interface Manual [m39] 1 1-Apr
Certification and Training Requirements [m40] Annual Review of Manual; Adding additional detail to Section 1.4 N/A
Compliance Monitoring of Certification Adding additional clarity to
Section 2.6 Training Requirements for DR Resources Supplying
M40 10 23-Jun-10 Regulation or Synchronized Reserve; New Section 2.7 Training
Requirements for Storage Resouces Supplying Regulation or
Synchronized Reserve. Miscellaneous clarifying changes to
Section 4
M41 Interchange 3 24-Nov-08 Update sections for NAESB changes N/A
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 10 5/20/2011
PJM Manuals May 2010
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Control Center Requirements [m01] presents requirements for Annual Review Potential changes to add details / clarity for TO matrix
control centers of signatories to the Operating Agreement of PJM.
The manual describes the telecommunication linkages to the PJM
OI and recommended characteristics of these control center
M01 computer systems and the facilities housing these systems. It also 17 1-Jan-10
summaries the computer services and systems at the PJM
Control Center, the standards for billing quality MWH meters, and
meter accuracy standards.
Transmission Operations [m03] discusses specific transmission Annual Review N/A
conditions and procedures for the management of Transmission Updates to sections on relay maintenance to provide
Facilities within the PJM Control Area.
additional clarity
Changes to Section 5.
• Section 5 – Formatting, corrections and additions where
appropriate within Index Tables.
• Section 5 – Clear designation via „[SPS]‟ denotation of Special
Protection Schemes within PJM.
• Section 5 – Removed separate Voltage Setpoints based upon
LTC‟s being in Auto or Manual mode for Dresden Nuclear Voltage
Limits within the Voltage Control at Nuclear Stations section of
Operating Procedures for PJM RTO.
• Section 5 – Added distinct Voltage Drop %‟s and Limits for
Susquehanna when only one start-up transformer is in service or
M03 36 1-Jan-10 when both are in service within the Voltage Control at Nuclear
Stations section of Operating Procedures for PJM RTO.
• Section 5 – Added 138kV Voltage limits for Beaver Valley #1 &
#2 within the Voltage Control at Nuclear Stations section of
Operating Procedures for PJM RTO.
• Section 5 – Removed 500kV CB Derate for the „5020‟ 500kV line
CB Derate Table due to breaker replacement within the Operating
Procedures for PS Transmission Zone.
• Section 5 -- Nottingham - Graceton 230 kV Line Limitations. Due
to relay changes, revised “does not” to “will” in regard to
contingency changes at Conowingo upon opening Bus Tie CB
within the Operating Procedures for the BC Transmission Zone.
• Section 5 – Steel City – Hosensack 500kV Line Reclosing
Limitation. Clarified description of reclosing limitation and
associated procedure within the Operating Procedures for the PL
Energy Management System Model Updates and Quality Assurance Appendix A „TERM Processing‟ was revised as follows:
[m3a] These documents are the primary source for specific - Re-named „Processing Ratings in TERM‟.
requirements and implementation details
- An explanation of new TERM Bulk Upload capability scheduled
for implementation 2Q10 was included.
M03a 4 5-May-09 Appendix C „Bulk Electric System (BES) Implementation‟ revised
as follows:
- Added special modeling discussion to the Electrical Models
section.
- Minor edits to improve readability. N/A
Pre-Scheduling Operations [m10] describes PJM and PJM Member N/A
pre-scheduling activities that set the stage for the scheduling and
M10 dispatching phases of the PJM Control Area Operation. 25 1-Jan-10
Scheduling Operations [m11] provides information on the day As a result of added automation, Mr. Keech will review a change to Manual M-11
ahead and hourly scheduling activities that are performed by the to eliminate the need for a verbal phone call from PJM to the asset owner
M11 PJM OI and PJM Members. The manual describes the rules and 44 1-Jan-10
procedures for scheduling resources.
confirming Tier 2 assignments.
Dispatching Operations [m12] describes activities that occur in the IRC & Blackstart Changes Proposed Regulation language changes
real-time operation of the PJM and PJM Western Region and also
the PJM Energy Market. The Manual describes how the PJM OI
M12 dispatchers manage Capacity Resources and monitor transmission 20 5-Oct-09
facilities. It also describes how the PJM OI provides Ancillary
Services.
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 11 5/20/2011
PJM Manuals May 2010
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Emergency Operations [m13] focuses on how the PJM and the PJM Updated (corrected) Load Management sections of M13 on the • Updated language in Load management sections
Members are expected to respond to emergency conditions. following pages: 24 (in Section 2), 57 and 62 (in Section 5) and • Updated table in Attachment F
Emergency conditions include: an abnormal electrical system
condition requiring manual or automatic action, a fuel shortage, or a
130 and 132 (in Attachment G). • Completed 2010 Annual Review of the EOP manual
condition that requires implementation of emergency procedures as o Section 2 Capacity Emergencies, page 27, Step 7A (Real-Time): Voltage
defined in the PJM Manuals. Reduction
o Section 2.4.2: Minimum Generation Alert, page 32 updated text box:
M13 39 1-Jan-10 o Updated 6.1 Reporting System Disturbances to the Department of Energy, page
79
o Updated 6.4 Fuel Limitation Reporting, page 81
o All UDS entries changed to SCED.
o All Scheduling Coordinator entries changed to Master Coordinator.
o All PJM CA entries changed to PJM RTO.
Generator Operational Requirements [m14d] focuses on the Consolidate Reactive Testing procedures, eliminating redundancy. • Revised Attachment D, E, and F to remove redundancy and reorder.
generator markets and operations requirements for generating • Modified Attachment E to change requirement to submit completed PJM Leading
entities to connect to the PJM system and their responsibilities as
M14D signatories to the Operating Agreement of the PJM Interconnection.
17 1-Jan-10 and/or Lagging Test Form R to PJM within 30 calendar days after completion of
the testing (changed from 10 days).
Rules and Procedures for Determination of Generating Capability N/A
[m21] "Green Book" provides uniformity for planning, operating,
M21 accounting and reporting purposes.signatories to the Operating 8 1-Jan-10
Agreement of the PJM Interconnection.
System Restoration [m36] System Restoration is one of a series of Annual Review upcoming Annual Review changes / RC updates
manuals within the PJM Energy Market Set of Manuals that focuses
M36 on how PJM and the PJM Member Companies will respond to 12 1-Jan-10
system disturbance conditions and/or system blackout situations.
N/A
Reliability Coordination [m37]focuses on PJM authority,
responsibility and duties as Reliability Coordinator and how PJM
Members are expected to respond. The manual discusses
M37
requirements to monitor facilities, how PJM defines and monitors
6 1-Jan-10
System Operating Limits (SOL) and an Interconnected Reliability
Operating Limit (IROL), implementation of Transmission Loading
Relief (TLR) procedures, and PJM's coordination efforts with
neighboring Reliability Coordinators.
N/A
Operations Planning [m38] focuses on the PJM processes
of coordinating seasonal assessments, the reporting,
M38 4 1-Jan-10
analyzing and approving generation and transmission
outages, and coordinating the analysis results with PJM
members and external Reliability Coordinators.
• Section 1.1: Background – updated reference to manuals.
Manual 39: Plant Specific NPIR Revision History • Section 2.1: Outage Coordination – updated maintenance notification
Section 2.1: Outage Coordination – modified language to clarify requirements for facilities impact Nuclear Plant or off-site station light and power
outage coordination process. source.
Section 2.3: Notification for Loss of Calculation Capability – added • Attachment B: Updated Peach Bottom NPIR to reflect new Cooper 230kV
30 minute timeframe to notify Nuclear Station of loss of EMS. substation between Nottingham and Graceton.
Section 2.4.1: Communications – modified language to clarify real- • Attachment C: Updated Peach Bottom NPIR revision.
M39 time communication process.
Section 2.6 System Restoration – highlighted urgency if the
nuclear plant has lost both offsite and onsite AC power
Attachment C: Plant Specific NPIR Revision History – updated to
include approval date for plant specific Nuclear Plant Interface
Requirements.
Nuclear Interface Manual [m39] 0 1-Apr
Certification and Training Requirements [m40] Annual Review of Manual; Adding additional detail to Section 1.4 N/A
Compliance Monitoring of Certification Adding additional clarity to
Section 2.6 Training Requirements for DR Resources Supplying
M40 9 1-Jan-10 Regulation or Synchronized Reserve; New Section 2.7 Training
Requirements for Storage Resouces Supplying Regulation or
Synchronized Reserve. Miscellaneous clarifying changes to
Section 4
M41 Interchange 3 24-Nov-08 Update sections for NAESB changes N/A
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 12 5/20/2011
PJM Manuals Apr 2010
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Control Center Requirements [m01] presents requirements for • add "SIS Outage Process" to Manual Annual Review
control centers of signatories to the Operating Agreement of PJM. • Updated language in Section 4.2.3 for 3 part communications
The manual describes the telecommunication linkages to the PJM OI
and recommended characteristics of these control center computer
and use of the term “directives” with the new DEFINITION
systems and the facilities housing these systems. It also summaries • Section 2.7 - change to within 2 hours
M01 17 1-Jan-10
the computer services and systems at the PJM Control Center, the • Update Attachment B Data Submittals
standards for billing quality MWH meters, and meter accuracy • add language for Transmission owner notification to PJM
standards. of EMS / SE outage
Transmission Operations [m03] discusses specific transmission • update the "time to initiate actions" tables Annual Review Updates to
conditions and procedures for the management of Transmission • edit language for post contingency high voltage control sections on relay maintenance to provide additional clarity
Facilities within the PJM Control Area.
• add reference to AEP BES facilities (TOP-004 R1) Changes to Section 5.
• edit language for post contingency high voltage control • • Section 5 – Formatting, corrections and additions where appropriate within Index
add language for voltage schedule exemption (VAR-001/002) Tables.
• Section 5 – Clear designation via „[SPS]‟ denotation of Special Protection
Schemes within PJM.
• Section 5 – Removed separate Voltage Setpoints based upon LTC‟s being in
Auto or Manual mode for Dresden Nuclear Voltage Limits within the Voltage
Control at Nuclear Stations section of Operating Procedures for PJM RTO.
• Section 5 – Added distinct Voltage Drop %‟s and Limits for Susquehanna when
only one start-up transformer is in service or when both are in service within the
Voltage Control at Nuclear Stations section of Operating Procedures for PJM RTO.
• Section 5 – Added 138kV Voltage limits for Beaver Valley #1 & #2 within the
M03 36 1-Jan-10 Voltage Control at Nuclear Stations section of Operating Procedures for PJM RTO.
• Section 5 – Removed 500kV CB Derate for the „5020‟ 500kV line CB Derate
Table due to breaker replacement within the Operating Procedures for PS
Transmission Zone.
• Section 5 -- Nottingham - Graceton 230 kV Line Limitations. Due to relay
changes, revised “does not” to “will” in regard to contingency changes at
Conowingo upon opening Bus Tie CB within the Operating Procedures for the BC
Transmission Zone.
• Section 5 – Steel City – Hosensack 500kV Line Reclosing Limitation. Clarified
description of reclosing limitation and associated procedure within the Operating
Procedures for the PL Transmission Zone.
• Section 5 – Corrected line voltage for the Erie South – Warren 230kV line within
the Seneca Stability Procedures of the Operating Procedures for FE Transmission
Zone. Previously designated as a 345kV line.
• Section 5 – Clarified the Deptford 230kV Breaker Relay to apply to the Deptford
Energy Management System Model Updates and Quality Assurance Appendix A „TERM Processing‟ was revised as follows:
[m3a] These documents are the primary source for specific - Re-named „Processing Ratings in TERM‟.
requirements and implementation details
- An explanation of new TERM Bulk Upload capability scheduled for
M03a 4 5-May-09 implementation 2Q10 was included.
Appendix C „Bulk Electric System (BES) Implementation‟ revised as follows:
- Added special modeling discussion to the Electrical Models section.
- Minor edits to improve readability.
Pre-Scheduling Operations [m10] describes PJM and PJM Member • add language for changes to winter capacity testing requirement
pre-scheduling activities that set the stage for the scheduling and
M10 dispatching phases of the PJM Control Area Operation. 25 1-Jan-10
Scheduling Operations [m11] provides information on the day ahead
and hourly scheduling activities that are performed by the PJM OI
M11 and PJM Members. The manual describes the rules and procedures 44 1-Jan-10
for scheduling resources.
Dispatching Operations [m12] describes activities that occur in the IRC & Blackstart Changes
real-time operation of the PJM and PJM Western Region and also
the PJM Energy Market. The Manual describes how the PJM OI
M12 dispatchers manage Capacity Resources and monitor transmission 20 5-Oct-09
facilities. It also describes how the PJM OI provides Ancillary
Services.
Emergency Operations [m13] focuses on how the PJM and the PJM • Update Section 5.5 – IROL Load Dump Procedure Updated (corrected) Load Management sections of M13 on the following pages:
Members are expected to respond to emergency conditions. • Update Attachment N – IROL Load Dump Table (Dover, 24 (in Section 2), 57 and 62 (in Section 5) and 130 and 132 (in Attachment G).
Emergency conditions include: an abnormal electrical system
condition requiring manual or automatic action, a fuel shortage, or a
Vineland, etc.)
condition that requires implementation of emergency procedures as • Update DSR language (Long and Short Lead time)
M13 defined in the PJM Manuals. 39 1-Jan-10 • Update DASR language to 6.88%
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 13 5/20/2011
PJM Manuals Apr 2010
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Generator Operational Requirements [m14d] focuses on the • add language for voltage schedule exemption (VAR-001/002) Consolidate Reactive Testing procedures, eliminating redundancy.
generator markets and operations requirements for generating section 7.1.2
entities to connect to the PJM system and their responsibilities as
• GOs should not be permitting their fuel inventory for Critical
M14D signatories to the Operating Agreement of the PJM Interconnection. 17 1-Jan-10
Blackstart CTs to fall below 10 hours. If they do, they should notify
PJM and we should place in Max Emergency.
Rules and Procedures for Determination of Generating Capability • add language for changes to winter capacity testing requirement
[m21] "Green Book" provides uniformity for planning, operating,
accounting and reporting purposes.signatories to the Operating
M21 Agreement of the PJM Interconnection. 8 1-Jan-10
System Restoration [m36] System Restoration is one of a series of • GOs should not be permitting their fuel inventory for Critical Annual Review upcoming
manuals within the PJM Energy Market Set of Manuals that focuses Blackstart CTs to fall below 10 hours. If they do, they should notify
on how PJM and the PJM Member Companies will respond to
system disturbance conditions and/or system blackout situations.
PJM and we should place in Max Emergency.
M36 12 1-Jan-10
Reliability Coordination [m37]focuses on PJM authority,
responsibility and duties as Reliability Coordinator and how PJM
M37 Members are expected to respond. The manual discusses 6 1-Jan-10
requirements to monitor facilities, how PJM defines and monitors
System Operating Limits (SOL) and an Interconnected Reliability
Operating Limit (IROL), implementation of Transmission Loading
Relief (TLR) procedures, and PJM's coordination efforts with
neighboring Reliability Coordinators.
Operations Planning [m38] focuses on the PJM processes
M38 of coordinating seasonal assessments, the reporting, 4 1-Jan-10
analyzing and approving generation and transmission
outages, and coordinating the analysis results with PJM
members and external Reliability Coordinators.
Manual 39: Plant Specific NPIR Revision History
Section 2.1: Outage Coordination – modified language to clarify outage
coordination process.
Section 2.3: Notification for Loss of Calculation Capability – added 30 minute
timeframe to notify Nuclear Station of loss of EMS.
Section 2.4.1: Communications – modified language to clarify real-time
M39 communication process.
Section 2.6 System Restoration – highlighted urgency if the nuclear plant has lost
both offsite and onsite AC power
Attachment C: Plant Specific NPIR Revision History – updated to include
approval date for plant specific Nuclear Plant Interface Requirements.
Nuclear Interface Manual [m39] 0 1-Apr
Certification and Training Requirements [m40] • add language for NERC certification requirements for PJM Annual Review of Manual; Adding additional detail to Section 1.4 Compliance
Transmission owner operators Monitoring of Certification Adding additional clarity to Section 2.6 Training
Requirements for DR Resources Supplying Regulation or Synchronized Reserve;
M40 9 1-Jan-10
New Section 2.7 Training Requirements for Storage Resouces Supplying
Regulation or Synchronized Reserve. Miscellaneous clarifying changes to
Section 4
M41 Interchange 3 24-Nov-08 Update sections for NAESB changes
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 14 5/20/2011
PJM Manuals Mar 2010
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Control Center Requirements [m01] presents requirements for • add "SIS Outage Process" to Manual Updates to Attachment C to correspond with secure website for
control centers of signatories to the Operating Agreement of PJM. • Updated language in Section 4.2.3 for 3 part communications and transmission owner requirements
The manual describes the telecommunication linkages to the PJM
OI and recommended characteristics of these control center
use of the term “directives” with the new DEFINITION Annual Review
computer systems and the facilities housing these systems. It also • Section 2.7 - change to within 2 hours Draft procedures for PJM handoff to member companies under
M01 17 1-Jan-10
summaries the computer services and systems at the PJM • Update Attachment B Data Submittals catastrophic failure scenario
Control Center, the standards for billing quality MWH meters, and • add language for Transmission owner notification to PJM
meter accuracy standards.
of EMS / SE outage
Transmission Operations [m03] discusses specific transmission • update the "time to initiate actions" tables Annual Review
conditions and procedures for the management of Transmission • edit language for post contingency high voltage control Updates to sections on relay maintenance to provide additional
Facilities within the PJM Control Area.
• add reference to AEP BES facilities (TOP-004 R1) clarity
• edit language for post contingency high voltage control •
add language for voltage schedule exemption (VAR-001/002)
M03 36 1-Jan-10
Energy Management System Model Updates and Quality
Assurance [m3a] These documents are the primary source for Appendix A „TERM Processing‟ was revised as follows:
specific requirements and implementation details
- Re-named „Processing Ratings in TERM‟.
- An explanation of new TERM Bulk Upload capability scheduled for
M03a 4 5-May-09 implementation 2Q10 was included.
Appendix C „Bulk Electric System (BES) Implementation‟ revised as
follows:
- Added special modeling discussion to the Electrical Models section.
- Minor edits to improve readability.
Pre-Scheduling Operations [m10] describes PJM and PJM Member • add language for changes to winter capacity testing requirement
pre-scheduling activities that set the stage for the scheduling and
M10 dispatching phases of the PJM Control Area Operation. 25 1-Jan-10
Scheduling Operations [m11] provides information on the day
ahead and hourly scheduling activities that are performed by the
M11 PJM OI and PJM Members. The manual describes the rules and 44 1-Jan-10
procedures for scheduling resources.
Dispatching Operations [m12] describes activities that occur in the Annual Review
real-time operation of the PJM and PJM Western Region and also IRC Changes
the PJM Energy Market. The Manual describes how the PJM OI
M12 dispatchers manage Capacity Resources and monitor transmission 20 5-Oct-09
facilities. It also describes how the PJM OI provides Ancillary
Services.
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 15 5/20/2011
PJM Manuals Mar 2010
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Emergency Operations [m13] focuses on how the PJM and the • Update Section 5.5 – IROL Load Dump Procedure Annual Review
PJM Members are expected to respond to emergency conditions. • Update Attachment N – IROL Load Dump Table (Dover, Updated (corrected) Load Management sections of
Emergency conditions include: an abnormal electrical system
condition requiring manual or automatic action, a fuel shortage, or a
Vineland, etc.) M13 on the following pages: 24 (in Section 2), 57 and 62 (in Section
condition that requires implementation of emergency procedures as • Update DSR language (Long and Short Lead time) 5) and 130 and 132 (in Attachment G).
M13 defined in the PJM Manuals. 39 1-Jan-10 • Update DASR language to 6.88%
Generator Operational Requirements [m14d] focuses on the • add language for voltage schedule exemption (VAR-001/002) Consolidate Reactive Testing procedures, eliminating redundancy.
generator markets and operations requirements for generating section 7.1.2
entities to connect to the PJM system and their responsibilities as
signatories to the Operating Agreement of the PJM Interconnection.
• GOs should not be permitting their fuel inventory for Critical
M14D 17 1-Jan-10
Blackstart CTs to fall below 10 hours. If they do, they should notify
PJM and we should place in Max Emergency.
Rules and Procedures for Determination of Generating Capability • add language for changes to winter capacity testing requirement
[m21] "Green Book" provides uniformity for planning, operating,
accounting and reporting purposes.signatories to the Operating
M21 Agreement of the PJM Interconnection. 8 1-Jan-10
System Restoration [m36] System Restoration is one of a series of • GOs should not be permitting their fuel inventory for Critical Annual Review
manuals within the PJM Energy Market Set of Manuals that focuses Blackstart CTs to fall below 10 hours. If they do, they should notify
on how PJM and the PJM Member Companies will respond to
system disturbance conditions and/or system blackout situations.
PJM and we should place in Max Emergency.
M36 12 1-Jan-10
Reliability Coordination [m37]focuses on PJM authority,
responsibility and duties as Reliability Coordinator and how PJM
M37 Members are expected to respond. The manual discusses 6 1-Jan-10
requirements to monitor facilities, how PJM defines and monitors
System Operating Limits (SOL) and an Interconnected Reliability
Operating Limit (IROL), implementation of Transmission Loading
Relief (TLR) procedures, and PJM's coordination efforts with
neighboring Reliability Coordinators.
Operations Planning [m38] focuses on the PJM processes
M38 of coordinating seasonal assessments, the reporting, 4 1-Jan-10
analyzing and approving generation and transmission
outages, and coordinating the analysis results with PJM
members and external Reliability Coordinators.
Manual 39: Plant Specific NPIR Revision History
Section 2.1: Outage Coordination – modified language to clarify
outage coordination process.
Section 2.3: Notification for Loss of Calculation Capability – added 30
minute timeframe to notify Nuclear Station of loss of EMS.
Section 2.4.1: Communications – modified language to clarify real-
M39 time communication process.
Section 2.6 System Restoration – highlighted urgency if the nuclear
plant has lost both offsite and onsite AC power
Attachment C: Plant Specific NPIR Revision History – updated to
include approval date for plant specific Nuclear Plant Interface
Requirements.
Nuclear Interface Manual [m39] 0 1-Apr
Certification and Training Requirements [m40] • add language for NERC certification requirements for PJM
M40 9 1-Jan-10
Transmission owner operators
M41 Interchange 3 24-Nov-08 Update sections for NAESB changes
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 16 5/20/2011
PJM Manuals
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Control Center Requirements [m01] presents requirements for • add "SIS Outage Process" to Manual
control centers of signatories to the Operating Agreement of PJM. • Updated language in Section 4.2.3 for 3 part communications
The manual describes the telecommunication linkages to the PJM OI
and recommended characteristics of these control center computer
and use of the term “directives” with the new DEFINITION
systems and the facilities housing these systems. It also summaries • Section 2.7 - change to within 2 hours
M01 15 1-Jun-09
the computer services and systems at the PJM Control Center, the • Update Attachment B Data Submittals
standards for billing quality MWH meters, and meter accuracy • add language for Transmission owner notification to
standards.
PJM of EMS / SE outage
Transmission Operations [m03] discusses specific transmission • update the "time to initiate actions" tables
conditions and procedures for the management of Transmission • edit language for post contingency high voltage control
Facilities within the PJM Control Area.
• add reference to AEP BES facilities (TOP-004 R1)
• edit language for post contingency high voltage control
• add language for voltage schedule exemption (VAR-001/002)
M03 34 22-May-09
Energy Management System Model Updates and Quality Assurance
M03a [m3a] These documents are the primary source for specific 4 5-May-09
requirements and implementation details
Pre-Scheduling Operations [m10] describes PJM and PJM Member • add language for changes to winter capacity testing requirement
pre-scheduling activities that set the stage for the scheduling and
M10 dispatching phases of the PJM Control Area Operation. 23 2-Jan-08
Scheduling Operations [m11] provides information on the day ahead
and hourly scheduling activities that are performed by the PJM OI
M11 and PJM Members. The manual describes the rules and procedures 42 1-Jun-31
for scheduling resources.
Dispatching Operations [m12] describes activities that occur in the
real-time operation of the PJM and PJM Western Region and also
the PJM Energy Market. The Manual describes how the PJM OI
M12 dispatchers manage Capacity Resources and monitor transmission 19 30-Jun-09
facilities. It also describes how the PJM OI provides Ancillary
Services.
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 17 5/20/2011
PJM Manuals
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Emergency Operations [m13] focuses on how the PJM and the PJM • Update Section 5.5 – IROL Load Dump Procedure
Members are expected to respond to emergency conditions. • Update Attachment N – IROL Load Dump Table (Dover,
Emergency conditions include: an abnormal electrical system
condition requiring manual or automatic action, a fuel shortage, or a
Vineland, etc.)
condition that requires implementation of emergency procedures as • Update DSR language (Long and Short Lead time)
M13 defined in the PJM Manuals. 37 30-Jun-09 • Update DASR language to 6.88%
Generator Operational Requirements [m14d] focuses on the • add language for voltage schedule exemption (VAR-001/002)
generator markets and operations requirements for generating section 7.1.2
entities to connect to the PJM system and their responsibilities as
signatories to the Operating Agreement of the PJM Interconnection.
• GOs should not be permitting their fuel inventory for
M14D 15 1-Apr-09
Critical Blackstart CTs to fall below 10 hours. If they do, they
should notify PJM and we should place in Max Emergency.
Rules and Procedures for Determination of Generating Capability • add language for changes to winter capacity testing requirement
[m21] "Green Book" provides uniformity for planning, operating,
accounting and reporting purposes.signatories to the Operating
M21 Agreement of the PJM Interconnection. 7 1-Jun-08
System Restoration [m36] System Restoration is one of a series of • GOs should not be permitting their fuel inventory for Critical
manuals within the PJM Energy Market Set of Manuals that focuses Blackstart CTs to fall below 10 hours. If they do, they should notify
on how PJM and the PJM Member Companies will respond to
system disturbance conditions and/or system blackout situations.
PJM and we should place in Max Emergency.
M36 10 30-Jun-09
Reliability Coordination [m37]focuses on PJM authority,
responsibility and duties as Reliability Coordinator and how PJM
M37 Members are expected to respond. The manual discusses 4 26-Jun-09
requirements to monitor facilities, how PJM defines and monitors
System Operating Limits (SOL) and an Interconnected Reliability
Operating Limit (IROL), implementation of Transmission Loading
Relief (TLR) procedures, and PJM's coordination efforts with
neighboring Reliability Coordinators.
Operations Planning [m38] focuses on the PJM processes
of coordinating seasonal assessments, the reporting,
M38 3 26-Jun-09
analyzing and approving generation and transmission
outages, and coordinating the analysis results with PJM
members and external Reliability Coordinators.
M39 Nuclear Interface Manual [m39] 0 N/A
Certification and Training Requirements [m40] • add language for NERC certification requirements for PJM
M40 7 1-Aug-09
Transmission owner operators
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 18 5/20/2011
PJM Manuals
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Control Center Requirements [m01] presents requirements for • Removed Attachment B – Nuclear Protocols to be published • add "SIS Outage Process" to Manual
control centers of signatories to the Operating Agreement of PJM. 10/1/09 • Updated language in Section 4.2.3 for 3 part communications and
The manual describes the telecommunication linkages to the PJM OI
and recommended characteristics of these control center computer
• Added Attachment B – Annual Data Submissions for use of the term “directives” with the new DEFINITION
systems and the facilities housing these systems. It also summaries Transmission Owners • Section 2.7 - change to within 2 hours
M01 the computer services and systems at the PJM Control Center, the 15 1-Jun-09 • Added Section 2.7 – Backup Capability Requirements for • Update Attachment B Data Submittals
standards for billing quality MWH meters, and meter accuracy Transmission Owners • add language for Transmission owner notification to PJM of
standards.
• Updated language in Section 4.2.3 for 3 part communications EMS / SE outage
and use of the term “directives”
Transmission Operations [m03] discusses specific transmission • Section 5 – Voltage Control at Nuclear Stations: Updated TMI • update the "time to initiate actions" tables
conditions and procedures for the management of Transmission voltage limits. • edit language for post contingency high voltage control
Facilities within the PJM Control Area.
• Section 5 – Index of Operating Procedures for Baltimore Gas and • add reference to AEP BES facilities (TOP-004 R1) •
Electric (BGE) Transmission Zone: Updated Single edit language for post contingency high voltage control •
Breaker/Double Breaker Ratings limitations table to include add language for voltage schedule exemption (VAR-001/002)
Conastone 500-3 transformer
• Section 5 – Index of Operating Procedure for Commonwealth
Edison (ComEd) Transmission Zone: Added SPOG 4-30,
Transformer Operations at 138 kV Tie Line Breaker Substations.
Updated Byron SPOG
• Section 5 – Index of Operating Procedures for PECO
Transmission Zone: Changed wording to Phillips Island in
Linwood Special Protection Scheme
• Section 5 – Index of Operating Procedures for FE Transmission
M03 34 22-May-09 Zone: Updated Seneca Pump Operations procedure, updates
include renaming of FERD to FE TSO and correction to second
pump operation
• Section 5 – Index of Operationg Procedures for American
Electric Power (AEP) Transmission Zone: Updated Rockport
Operating Guide to include Special Protection Scheme (SPS) and
section for Carrier Communication Failure. Renamed Section for
Single Phase Operation to (SPO). Updated Conesville 345kV
Plant Operating Guidelines based on installation of 345/138kV
autotransformer T-7.
• Attachment E: Automatic Sectionalizing Schemes: Included
Belmont, Bedington, Cabot, Yukon and Wylie schemes that were
left out of Attachment E in error. PJM has been operating to AP
automatic sectionalizing schemes since the 2002 AP integration.
Energy Management System Model Updates and Quality Assurance Proposed - additional detail in section 2.4 - PJM Congestion
M03a [m3a] These documents are the primary source for specific 4 5-May-09 Management Facilities
requirements and implementation details
Pre-Scheduling Operations [m10] describes PJM and PJM Member - Annual Review • add language for changes to winter capacity testing requirement
pre-scheduling activities that set the stage for the scheduling and - Reformatted manual to assist in NERC Compliance.
dispatching phases of the PJM Control Area Operation.
- Section 2.1: Outage Reporting Overview - Incorporated note box
to provide clarity regarding outage reporting for intermittent
M10 23 2-Jan-08 resources.
- Section 6: Winter Net Capability Test Exemption - Modified
section for the purpose of providing clarity based on PJM SOS
member feedback.
Scheduling Operations [m11] provides information on the day ahead N/A
and hourly scheduling activities that are performed by the PJM OI
M11 and PJM Members. The manual describes the rules and procedures 42 1-Jun-31
for scheduling resources.
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 19 5/20/2011
PJM Manuals
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Dispatching Operations [m12] describes activities that occur in the Annual Review of Manual 12
real-time operation of the PJM and PJM Western Region and also
the PJM Energy Market. The Manual describes how the PJM OI
M12 dispatchers manage Capacity Resources and monitor transmission 19 30-Jun-09
facilities. It also describes how the PJM OI provides Ancillary
Services.
Emergency Operations [m13] focuses on how the PJM and the PJM • Updated Attachment E • Update Section 5.5 – IROL Load Dump Procedure
Members are expected to respond to emergency conditions. • New Section 5.5 – IROL Load Dump Procedure • Update Attachment N – IROL Load Dump Table (Dover, Vineland,
Emergency conditions include: an abnormal electrical system
condition requiring manual or automatic action, a fuel shortage, or a
• New Attachment N – IROL Load Dump Table etc.)
condition that requires implementation of emergency procedures as • New High Voltage / Low Load Procedure – New Section 2.4.8 • Update DSR language (Long and Short Lead time)
M13 defined in the PJM Manuals. 37 30-Jun-09 • Clarified language on Sabotage Reporting in Section 4.2 • Update DASR language to 6.88%
• Updated Attachment G with estimated time to implement
• Update Attachment J – EOP-004 Reporting Responsibilities
Generator Operational Requirements [m14d] focuses on the TBD - added language for generator relay coordination and • add language for voltage schedule exemption (VAR-001/002)
generator markets and operations requirements for generating proposed solar panel metering section 7.1.2
entities to connect to the PJM system and their responsibilities as
M14D signatories to the Operating Agreement of the PJM Interconnection. 15 1-Apr-09 • GOs should not be permitting their fuel inventory for Critical
Blackstart CTs to fall below 10 hours. If they do, they should notify
PJM and we should place in Max Emergency.
Rules and Procedures for Determination of Generating Capability • add language for changes to winter capacity testing requirement
[m21] "Green Book" provides uniformity for planning, operating,
accounting and reporting purposes.signatories to the Operating
M21 Agreement of the PJM Interconnection. 7 1-Jun-08
System Restoration [m36] System Restoration is one of a series of • Additional language on annual communications system testing • GOs should not be permitting their fuel inventory for Critical
manuals within the PJM Energy Market Set of Manuals that focuses • Additional language on coordination with Internal TOPs Blackstart CTs to fall below 10 hours. If they do, they should notify
on how PJM and the PJM Member Companies will respond to
system disturbance conditions and/or system blackout situations.
• Additional clarifying language on TO/TOP responsibilities PJM and we should place in Max Emergency.
M36 10 30-Jun-09
• Updated SOL definition and violation criteria.
• Updated links to Joint Operating Agreements.
Reliability Coordination [m37]focuses on PJM authority,
responsibility and duties as Reliability Coordinator and how PJM
M37 Members are expected to respond. The manual discusses 4 26-Jun-09
requirements to monitor facilities, how PJM defines and monitors
System Operating Limits (SOL) and an Interconnected Reliability
Operating Limit (IROL), implementation of Transmission Loading
Relief (TLR) procedures, and PJM's coordination efforts with
neighboring Reliability Coordinators.
N/A
Operations Planning [m38] focuses on the PJM processes
of coordinating seasonal assessments, the reporting,
M38 3 26-Jun-09
analyzing and approving generation and transmission
outages, and coordinating the analysis results with PJM
members and external Reliability Coordinators.
M39 Nuclear Interface Manual [m39] 0 N/A New manual to address NUC-001 standard.
Certification and Training Requirements [m40] 1) Added language for Small Generation Plant Operator • add language for NERC certification requirements for PJM
Certification Exemptions to Section 1. Transmission owner operators
M40 7 1-Aug-09
2) Made changes to Master Dispatcher training in Section 4
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 20 5/20/2011
PJM Manuals
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Control Center Requirements [m01] presents requirements for Annual Review • Removed Attachment B – Nuclear Protocols to be published
control centers of signatories to the Operating Agreement of PJM. 10/1/09
The manual describes the telecommunication linkages to the PJM OI
and recommended characteristics of these control center computer
• Added Attachment B – Annual Data Submissions for Transmission
systems and the facilities housing these systems. It also summaries Owners
M01 the computer services and systems at the PJM Control Center, the 15 1-Jun-09 • Added Section 2.7 – Backup Capability Requirements for
standards for billing quality MWH meters, and meter accuracy Transmission Owners
standards.
• Updated language in Section 4.2.3 for 3 part communications and
use of the term “directives”
Transmission Operations [m03] discusses specific transmission • Section 5 – Voltage Control at Nuclear Stations: Updated TMI
conditions and procedures for the management of Transmission voltage limits.
Facilities within the PJM Control Area.
• Section 5 – Index of Operating Procedures for Baltimore Gas and
Electric (BGE) Transmission Zone: Updated Single Breaker/Double
Breaker Ratings limitations table to include Conastone 500-3
transformer
• Section 5 – Index of Operating Procedure for Commonwealth
Edison (ComEd) Transmission Zone: Added SPOG 4-30,
Transformer Operations at 138 kV Tie Line Breaker Substations.
Updated Byron SPOG
• Section 5 – Index of Operating Procedures for PECO Transmission
Zone: Changed wording to Phillips Island in Linwood Special
M03 34 22-May-09
Protection Scheme
• Section 5 – Index of Operating Procedures for FE Transmission
Zone: Updated Seneca Pump Operations procedure, updates
include renaming of FERD to FE TSO and correction to second
pump operation
• Section 5 – Index of Operationg Procedures for American Electric
Power (AEP) Transmission Zone: Updated Rockport Operating
Guide to include Special Protection Scheme (SPS) and section for
Carrier Communication Failure. Renamed Section for Single Phase
Operation to (SPO). Updated Conesville 345kV Plant Operating
Guidelines based on installation of 345/138kV autotransformer T-7.
• Attachment E: Automatic Sectionalizing Schemes: Included
Energy Management System Model Updates and Quality Assurance Proposed - additional detail Yukon and Wylie schemes that
Belmont, Bedington, Cabot, in section 2.4 - PJM Congestion were left
M03a [m3a] These documents are the primary source for specific 4 5-May-09 Management Facilities
requirements and implementation details
Pre-Scheduling Operations [m10] describes PJM and PJM Member - Annual Review
pre-scheduling activities that set the stage for the scheduling and - Reformatted manual to assist in NERC Compliance.
dispatching phases of the PJM Control Area Operation.
- Section 2.1: Outage Reporting Overview - Incorporated note box to
provide clarity regarding outage reporting for intermittent resources.
M10 23 2-Jan-08 - Section 6: Winter Net Capability Test Exemption - Modified section
for the purpose of providing clarity based on PJM SOS member
feedback.
Scheduling Operations [m11] provides information on the day ahead Revised Section 2: Overview of Two-Settlement System section to N/A
and hourly scheduling activities that are performed by the PJM OI reflect Balancing Operating Reserve construct change as
and PJM Members. The manual describes the rules and procedures
for scheduling resources.
approved by FERC (ER08-1569); Revised Section 2: Overview of
Two-Settlement System to incorporate revisions to allow
generators with negative offers to set price in the Day-Ahead
Market during a Minimum Generation event, as approved by the
M11 42 1-Jun-31
Markets & Reliability Committee on July 30, 2009; Revised Section
10: Overview of Demand Response Participation to incorporate
enhancement to DSR economic aggregation rules for resources
providing Ancillary Services, as approved by the Markets &
Reliability Committee on July 30, 2009
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 21 5/20/2011
PJM Manuals
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Dispatching Operations [m12] describes activities that occur in the Section 4 - Revision included throughout manual to consolidate Annual Review of Manual 12
real-time operation of the PJM and PJM Western Region and also references and language related to black start resources; Section
the PJM Energy Market. The Manual describes how the PJM OI
dispatchers manage Capacity Resources and monitor transmission
4 – New language to outline NERC standards cost recovery
M12 facilities. It also describes how the PJM OI provides Ancillary
19 30-Jun-09 guidelines; Made updates to reserves section of Section 4 –
Services. changes secondary to supplemental; Added language to
Attachment B for wind operations / curtailments
Emergency Operations [m13] focuses on how the PJM and the PJM Updated date for 2009 Reserve Requirements ; Updated • Updated Attachment E
Members are expected to respond to emergency conditions. Contingency Control Notes in Section 2 for Wind ; Removed • New Section 5.5 – IROL Load Dump Procedure
Emergency conditions include: an abnormal electrical system
condition requiring manual or automatic action, a fuel shortage, or a
NERC and DOE reports and replaced with links to NERC • New Attachment N – IROL Load Dump Table
condition that requires implementation of emergency procedures as standards ;Completed comprehensive annual review of the entire • New High Voltage / Low Load Procedure – New Section 2.4.8
M13
defined in the PJM Manuals.
37 30-Jun-09
manual • Clarified language on Sabotage Reporting in Section 4.2
• Updated Attachment G with estimated time to implement
• Update Attachment J – EOP-004 Reporting Responsibilities
Generator Operational Requirements [m14d] focuses on the TBD - added language for generator relay coordination and proposed
generator markets and operations requirements for generating solar panel metering
M14D entities to connect to the PJM system and their responsibilities as 15 1-Apr-09
signatories to the Operating Agreement of the PJM Interconnection.
System Restoration [m36] System Restoration is one of a series of Annual review, updated references to transmission owner • Additional language on annual communications system testing
manuals within the PJM Energy Market Set of Manuals that focuses restoration documentation which has been updated for changes in • Additional language on coordination with Internal TOPs
on how PJM and the PJM Member Companies will respond to
system disturbance conditions and/or system blackout situations.
the transmission system as well as changes found during the • Additional clarifying language on TO/TOP responsibilities
M36 10 30-Jun-09 annual drills; paragraph numbering for easier reference;
References to the table at Attachment F – transmission owner
restoration documentation
Annual Review; Reformatted to assist in compliance tracking • Updated SOL definition and violation criteria.
• Updated links to Joint Operating Agreements.
Reliability Coordination [m37]focuses on PJM authority,
responsibility and duties as Reliability Coordinator and how PJM
M37 Members are expected to respond. The manual discusses 4 26-Jun-09
requirements to monitor facilities, how PJM defines and monitors
System Operating Limits (SOL) and an Interconnected Reliability
Operating Limit (IROL), implementation of Transmission Loading
Relief (TLR) procedures, and PJM's coordination efforts with
neighboring Reliability Coordinators.
Annual review; Reformatted to assist in compliance tracking N/A
Operations Planning [m14d] focuses on the PJM processes
of coordinating seasonal assessments, the reporting,
M38 3 26-Jun-09
analyzing and approving generation and transmission
outages, and coordinating the analysis results with PJM
members and external Reliability Coordinators.
M39 Nuclear Interface Manual 0 N/A draft posted New manual to address NUC-001 standard.
Annual Review; Modified Certification requirement for LCC 1) Added language for Small Generation Plant Operator Certification
operators to require certification prior to operator taking shift as of Exemptions to Section 1.
M40 Certification and Training Requirements 7 1-Aug-09 7/1/2010; Added description of Systematic Approach to Training 2) Made changes to Master Dispatcher training in Section 4
(SAT) method utilized by PJM to Section 4
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 22 5/20/2011
PJM Manuals
Revision History / Plans
Current Effective
Manual Description Last 60 days Next 60 days
Revision Date
Control Center Requirements [m01] presents requirements for Annual Review metering requirements (matrix); communications testing (matrix);
control centers of signatories to the Operating Agreement of PJM. directives (SOS); backup capability requirements and testing (matrix)
The manual describes the telecommunication linkages to the PJM
OI and recommended characteristics of these control center
M01 computer systems and the facilities housing these systems. It also 15 1-Jun-09
summaries the computer services and systems at the PJM
Control Center, the standards for billing quality MWH meters, and
meter accuracy standards.
Transmission Operations [m03] discusses specific transmission BES clarifications (matrix); SPS telemetry (matrix); TO BES
conditions and procedures for the management of Transmission monitoring (matrix); voltage control language (matrix); relay change
M03 Facilities within the PJM Control Area. 34 22-May-09
communication and appropriatte technical details (matrix); add PSS
to eDart; SOL Methodology; SPS CIP review
Pre-Scheduling Operations [m10] describes PJM and PJM Member Winter capacity test exemption
pre-scheduling activities that set the stage for the scheduling and
M10 dispatching phases of the PJM Control Area Operation. 23 2-Jan-08
Scheduling Operations [m11] provides information on the day Revised Section 2: Overview of Two-Settlement System section to reflect
ahead and hourly scheduling activities that are performed by the Balancing Operating Reserve construct change as approved by FERC (ER08-
PJM OI and PJM Members. The manual describes the rules and 1569); Revised Section 2: Overview of Two-Settlement System to incorporate
procedures for scheduling resources. revisions to allow generators with negative offers to set price in the Day-Ahead
Market during a Minimum Generation event, as approved by the Markets &
M11 42 1-Jun-31 Reliability Committee on July 30, 2009; Revised Section 10: Overview of Demand
Response Participation to incorporate enhancement to DSR economic
aggregation rules for resources providing Ancillary Services, as approved by the
Markets & Reliability Committee on July 30, 2009
Dispatching Operations [m12] describes activities that occur in the Section 4 - Revision included throughout manual to consolidate references and BES clarifications (matrix)
real-time operation of the PJM and PJM Western Region and also language related to black start resources; Section 4 – New language to outline
the PJM Energy Market. The Manual describes how the PJM OI NERC standards cost recovery guidelines; Made updates to reserves section of
M12 19 30-Jun-09
Section 4 – changes secondary to supplemental; Added language to Attachment
dispatchers manage Capacity Resources and monitor transmission
facilities. It also describes how the PJM OI provides Ancillary B for wind operations / curtailments
Services.
Emergency Operations [m13] focuses on how the PJM and the Updated date for 2009 Reserve Requirements ; Updated Contingency Control Load shed changes (matrix); updated attachment E; IROL load shed
PJM Members are expected to respond to emergency conditions. Notes in Section 2 for Wind ; Removed NERC and DOE reports and replaced with table (matrix); low load emergency procedure (SOS); timing on
Emergency conditions include: an abnormal electrical system links to NERC standards ;Completed comprehensive annual review of the entire
condition requiring manual or automatic action, a fuel shortage, or a manual emergency procedures (matrix); TO provide evidence of load
M13 37 30-Jun-09 shedding plan; annual UFLS data request; EOP-003 Load Shed
condition that requires implementation of emergency procedures as
defined in the PJM Manuals. Request; M13 section 2 page 30; Interconnected frequency Bias
System Restoration [m36] System Restoration is one of a series of Annual review, updated references to transmission owner restoration Language to clarify roles and responsibilites (matrix); critical load
manuals within the PJM Energy Market Set of Manuals that focuses documentation which has been updated for changes in the transmission system methodology (matrix)s
M36 on how PJM and the PJM Member Companies will respond to 10 30-Jun-09 as well as changes found during the annual drills; paragraph numbering for easier
system disturbance conditions and/or system blackout situations. reference; References to the table at Attachment F – transmission owner
restoration documentation
Generator Operational Requirements [m14d] focuses on the relay coordination (matrix); ; AVR-30 minutes - RFC & SERC review;
generator markets and operations requirements for generating reactive test proces
M14D entities to connect to the PJM system and their responsibilities as 15 1-Apr-09
signatories to the Operating Agreement of the PJM Interconnection.
Energy Management System Model Updates and Quality
M3a Assurance [m3a] These documents are the primary source for 4 5-May-09
specific requirements and implementation details
Annual Review; Modified Certification requirement for LCC operators to require
certification prior to operator taking shift as of 7/1/2010; Added description of
M40 Certification and Training Requirements 7 1-Aug-09 Systematic Approach to Training (SAT) method utilized by PJM to Section 4
Certification requirement for small generators operators
eea97db9-0437-4834-bc3e-a1e0ba3ce2f7.xls 23 5/20/2011