					                                                                                      RF Optimisation



Safe harbor
• Neither the information nor any opinion expressed in this presentation constitutes an offer, or invitation to make an offer, or to buy any security issued by the company. This presentation contains
predictions, estimates or other information regarding the Company's operations which are forward looking in nature. While these forward looking statements represent our best current judgment on what the
future holds, they are subject to risks and uncertainties that could cause actual results to differ materially and may involve risk and uncertainty. This presentation is prepared for general purposes only and
does not have any regard to the specific investment objectives, financial situation and particular needs of any specific person. No liability for any loss will arise with the company as a result of the action
taken on the basis of information contained herein.

•For a discussion of the risks and uncertainties that may cause results to differ, you should review GTL’s filings with stock exchanges, including the annual report and quarterly disclosures.
Network Planning, Design & Optimisation
Core Offerings




                                          2
Imperatives for Optimisation



 RF optimisation remains one of the key challenges in any network.



  Identifying potential faults in the network and resolving them before
  they affect network performance.



  Rectifying causes of faults affecting network performance.




  Leads to efficient use of the spectrum.




                                                                          3
Optimisation Overview




                        4
Need for optimisation

Network issues that may generate a requirement


   Perceived reduction in network quality.

                   Indications from network performance monitoring.

                   Subscriber's experience of using the network.


        Maximising the use of existing infrastructure.

                   Operators wants to ensure the best returns on investment.



    Introduction of new services.

                     Maximise existing resources to accommodate new services such as GPRS.

                     Change in original design parameters.
                                                 ▪ Flawed original design in format.
                                                 ▪ Original design information has changed.

                                                                                              5
Network Lifecycle



                               Licence
                                Award


                Swap                           Network
              Management
                                               Planning
   (If required)           Network Lifecycle




            Continuous                         Network
            Optimisation
                                                Rollout
                              Pre Launch
                              Optimisation




                                                          6
RF Optimisation




                             Optimisation
          Pre Launch Virtual Continuous Centre   Swap
          Optimisation      Optimisation       Management

                                                          (If required)
                               - BTS upgrade

                  Virtual Optimisation Centre
                             - BTS re-homing

                               - BSC re-parenting

                               - Transmission Re-engineering




                                                                          7
Pre Launch Optimisation



   Pre Launch
   Optimisation            Objectives



                             High rate of integrations


   Continuous
   Optimisation            Low traffic (Pre-launch or launch)



                          Predominantly drive data dependant


     Swap
   Management



                                                                8
Optimisation Process – Single site verification


                                Site
  Pre Launch                Identification
  Optimisation



                              RF Site                      Coverage
                               Audit                      Verification


  Continuous
  Optimisation                                                            Reconfiguration



                                                      Parameter
                                                      verification

                                                                         Fail
    Swap                                                                        Problem
  Management                                                                    Analysis

                                                Site             Pass
                                             Acceptance

                                                                                      9
Optimisation Process – Drive Test Based


                        Cluster           Site                            Site
  Pre Launch         Identification   Identification                   Acceptance
  Optimisation


                       Cluster                            Cluster
                     Stimulation                        Preparation


  Continuous
  Optimisation                                          Drive Test




                                                       Data Analysis            Reconfiguration


                                                                         Fail
    Swap                                                                           Problem
  Management                                                                       Analysis

                                         Cluster               Pass
                                         Analysis

                                                                                          10
Cluster Analysis
                                         Determine clusters for acceptance

               Drive Test                Characterise performance
                Results
                                         Ensure correct site configuration
                                                        •   Parameter Setting
                                                        •   Neighbors
                                                        •   Powered
                                                        •   Stable
                                         Drive tests
 OMC                        Simulation
 Data                                    Process data
                               Data
                                                        •Call statistics
                                                        •Key measurement events
                                                        • Neighbor analysis
                                                        •Key measurement data

                                         Analysis

                                         Remodelling

                                         Reconfiguration
                                                        • Parameters
                                                        • Neighbors
                                                        • Report Hardware
                                                        Requirements
                                                                                11
Cluster Reconfiguration


  Pre Launch
  Optimisation                 Hardware                  Cell parameter
                              Optimisation                optimisation

                            Antenna Reorientation         Handover parameters

                              Antenna Down tilt              Power planning

                             Antenna Relocation       Neighbour list reconfiguration
  Continuous
  Optimisation            Antenna Height adjustment        Frequency planning

                             Masthead Amplifiers




     Swap
                                      Performance Monitoring
   Management



                                                                                       12
Pre Launch Optimization


                                     What GTL can do for         On Site
  Pre Launch           Off Site
  Optimisation                              you
                                                                Cluster
                    Parameter
                                                             Identification
                     Analysis
                                                                Cluster
                  Process Creation                            Preparation

                                                             Drive Testing
  Continuous       KPI Definition
  Optimisation                                               Drive Analysis
                   KPI Reporting

                   Functionality                               Modelling
                      Asses
                                                              Network
                      Training                               Reconfigure

    Swap                                                   Cluster Monitoring
  Management     Config Management

                                                           Model Calibration


                                                                           13
KPI’s to be Monitored
Based on performance of a Network & Cell   (TBD : To Be Decided)


 Network                                                           KPI Deciding
                   KPI          Target                 Type           Factor
                  CSR (%)         93%               Performance


                  CSSR (%)        95%               Performance
                                                                       TBD upon
                  DCR (%)          5%               Performance
                                                                    checking trend
  Network /                                                         to maintain the
 Town Level                                                         performance of
                TCH Blocking       2%               Performance       the network
                                                                    and to improve

                  SDCCH
                                   3%               Performance
                  Blocking


                  CSR (%)         90%               Performance


                  CSSR (%)        92%               Performance
                                                                      TBD upon
                                                                   checking trend
  Cell Level      DCR (%)         10%               Performance    to maintain the
                                                                   performance of
                TCH Blocking
                                                                     the network
                                   4%               Performance
                                                                   and to improve

               SDCCH Blocking      6%               Performance

                                                                                      14
KPI’s to be Monitored
Based on performance of a Network & Cell    (TBA : To Be Accepted)


 Network                                                             KPI Deciding
                   KPI             Target              Type             Factor
              Downlink Rx Qual       TBA             Performance


               Uplink Rx Qual        TBA             Performance
                                                                         TBD upon
                    FER                              Performance
                                                                      checking trend
 Network /                           TBA
                                                                      to maintain the
Town Level                                                            performance of
                Data Through
                                                     Performance        the network
                    output           TBA
                                                                      and to improve

                    Data
                                     TBA             Performance
                Accessibility

                                     TBA
              Downlink Rx Qual                       Performance

                                     TBA
               Uplink Rx Qual                        Performance
                                                                        TBD upon
                                     TBA                             checking trend
 Cell Level         FER                              Performance     to maintain the
                                                                     performance of
               Data Through          TBA                               the network
                                                     Performance
                   output                                            and to improve

              Data Accessibility     TBA             Performance


                                                                                        15
Reports

                 Deliverables
  Pre Launch
  Optimisation   Pre Launch Optimization

                   Cell / Cluster Drive Test and Analysis Report.

                    Quality issues identification and RX lev, RX Qual, TCH Blocking,
                    SDCCH Drop,HO Issues, Call drop problems, and call set up
                    issues analysis.
  Continuous
  Optimisation      Cell / Cluster Optimisation Report.

                    RF parameters audit and tuning : neighbour site list, power
                    parameters, HO parameters, etc.


                    Antenna engineering tuning.

    Swap
  Management        Cell / cluster Optimisation and tuning to reach acceptance criteria.




                                                                                    16
Reports

                 Traffic Statistics Analysis Report.

  Pre Launch
                 Network Analysis and Optimisation Report.
  Optimisation

                 Cell, cluster, Network drive test reports from post processing tool.


                 RF coverage and quality assessment report.


  Continuous     Radio and system Parameters audit and tuning report.
  Optimisation
                 Optimisation Report.


                 Acceptance Report.

    Swap
                 Interference Measurement.
  Management

                 Updated network site database.


                                                                                        17
Continuous Optimisation


  Pre Launch                      Objectives
  Optimisation

                          Maintaining the traffic rate within medium to low


                            To achieve more stability in neighbour/ pilot

  Continuous
  Optimisation                   Minimisation of integration Issues


                                     Reducing operational cost


    Swap                     Predominantly OMC R Stats and Counters
  Management



                                                                              18
Continuous Optimisation


                  Customer Faults      Trouble Tickets
  Pre Launch
                                                            Network           Service Level
  Optimisation        CM Data            Call Trace       Performance             OMC
                                                            Targets              Status

                  Drive Test Results       Alarms




  Continuous
  Optimisation                    Fault
                                                                        Performance
                                Resolution




                                                      Cell
                                                 Prioritisation
    Swap
  Management
                           Fault                                            Reports



                                                                                        19
Optimisation Process – Drive Test Based
                          Determine clusters for acceptance

                          Characterise performance
  Pre Launch
  Optimisation            Ensure correct site configuration
                                              •   Parameter Setting
                                              •   Neighbors
                                              •   Powered
                                              •   Stable

                          Drive tests
  Continuous              Process data
  Optimisation                                •Call statistics
                                              •Key measurement events
                                              • Neighbor analysis
                                              •Key measurement data

                          Analysis

                          Remodelling
    Swap
  Management              Reconfiguration
                                                  • Parameters
                                                  • Neighbors
                                                  • Report Hardware
                                                  Requirements
                                                                        20
Cluster Reconfiguration


  Pre Launch
  Optimisation                 Hardware                  Cell parameter
                              Optimisation                optimisation

                            Antenna Reorientation         Handover parameters

                              Antenna Down tilt              Power planning

  Continuous                 Antenna Relocation       Neighbour list reconfiguration
  Optimisation            Antenna Height adjustment        Frequency planning

                             Masthead Amplifiers




    Swap
  Management                          Performance Monitoring



                                                                                       21
Continuous Optimization


  Pre Launch            Off site     What GTL can do         On Site
  Optimisation                          for you

                        Audit                           OMC Reporting


                   Benchmarking
                                                       Cell Prioritisation
  Continuous       Process Control
  Optimisation
                      Config                           Fault Resolution
                    Management

                    KPI Definition                       Drive testing


                    KPI Reporting
    Swap                                                    Change
                    Functionality                         recommend
  Management
                       Asses

                      Training                             Network
                                                          Reconfigure

                                                                         22
KPI’s to be Monitored
Based on performance of a Network & Cell   (TBD : To Be Decided)


  Network                                                          KPI Deciding
                    KPI          Target                Type           Factor
                   CSR (%)         93%              Performance


                   CSSR (%)        95%              Performance
                                                                       TBD upon
                   DCR (%)         5%               Performance
                                                                    checking trend
   Network /                                                        to maintain the
  Town Level                                                        performance of
                 TCH Blocking      2%               Performance       the network
                                                                    and to improve

                   SDCCH
                                   3%               Performance
                   Blocking


                   CSR (%)         90%              Performance


                   CSSR (%)        92%              Performance
                                                                      TBD upon
                                                                   checking trend
  Cell Level       DCR (%)         10%              Performance    to maintain the
                                                                   performance of
                 TCH Blocking
                                                                     the network
                                   4%               Performance
                                                                   and to improve

                SDCCH Blocking     6%               Performance


                                                                                      23
KPI’s to be Monitored
Based on performance of a Network & Cell     (TBA : To Be Accepted)


  Network                                                             KPI Deciding
                     KPI            Target               Type            Factor
                Downlink Rx Qual      TBA              Performance


                 Uplink Rx Qual       TBA              Performance
                                                                          TBD upon
                      FER                              Performance
                                                                       checking trend
   Network /                          TBA
                                                                       to maintain the
  Town Level                                                           performance of
                 Data Through
                                                       Performance       the network
                     output           TBA
                                                                       and to improve

                     Data
                                      TBA              Performance
                  Accessibility

                                      TBA
                Downlink Rx Qual                       Performance

                                      TBA
                 Uplink Rx Qual                        Performance
                                                                         TBD upon
                                      TBA                             checking trend
  Cell Level          FER                              Performance    to maintain the
                                                                      performance of
                 Data Through
                                      TBA                               the network
                     output                            Performance
                                                                      and to improve

               Data Accessibility     TBA              Performance


                                                                                         24
Reports

                        Deliverables
  Pre Launch
  Optimisation
                 Continuous Optimisation


                   Radio network measurement and analysis report


                           Containing signal strength, Quality, Time advance,Path loss,
  Continuous               Frequency distribution, Neighbour selection.
  Optimisation
                   BSS/ RAN parameter adjustment report


                           Neighbour optimisation parameter, BTS/ MS power control,
                           Intracell handover, Hierarchy cell structure & cell load sharing.
    Swap
  Management



                                                                                               25
Reports

                 Worst cell optimization report
  Pre Launch
  Optimisation           TCH Blocking, SDCCH Blocking, Signal Strength, Bad Quality,
                         Timing Advance, Sudden Loss, Other Reasons.


                 Coverage Analysis report



  Continuous             Drive test, Worst cell, site survey,Antenna rigging.
  Optimisation

                 Capacity Analysis & Recommendation Report


                         Dynamic full and half rate, Cell load sharing,Hierarchy cell structure,
                         Dynamic allocation of SDCCH.
    Swap
  Management



                                                                                              26
Swap Management


  Pre Launch
  Optimisation    Objectives



                     High rate of integrations

  Continuous
  Optimisation
                  High traffic (Pre-Cut and Post Cut)



                  Predominantly drive data dependant

    Swap
  Management



                                                        27
Swap Management


  Pre Launch
  Optimisation    Swap Planning



                            Default Parameter

  Continuous
  Optimisation              Parameter Mapping



                    Validation of Neighbour, BSIC and MAIO

    Swap
  Management



                                                             28
Swap Process – Pre / Post verification


                               Site
   Pre Launch              Identification
   Optimisation



                             RF Site                      Coverage
                              Audit                      Verification


   Continuous
   Optimisation                                                          Reconfiguration



                                                     Parameter
                                                     verification

                                                                        Fail
     Swap                                                                      Problem
   Management                                                                  Analysis

                                               Site             Pass
                                            Acceptance

                                                                                     29
Swap Process – Cluster Based


                       Cluster           Site                            Site
  Pre Launch        Identification   Identification                   Acceptance
  Optimisation


                      Cluster                            Cluster
                    Stimulation                        Preparation


  Continuous
  Optimisation                                         Drive Test




                                                      Data Analysis            Reconfiguration


                                                                        Fail
    Swap                                                                          Problem
  Management                                                                      Analysis

                                        Cluster               Pass
                                        Analysis

                                                                                             30
Cluster Analysis
                                             Determine clusters for acceptance
                   Drive Test
                    Results                  Characterise performance

                                             Ensure correct site configuration
                                                            •   Parameter Setting
                                                            •   Neighbors
                                                            •   Powered
                                                            •   Stable

 OMC                                         Drive tests
                                Simulation
 Data                              Data      Process data

                                                            •Call statistics
                                                            •Key measurement events
                                                            • Neighbor analysis
                                                            •Key measurement data
                                             Analysis

                                             Remodelling

                                             Reconfiguration
                                                            • Parameters
                                                            • Neighbors
                                                            • Report Hardware
                                                            Requirements
                                                                                    31
Cluster Reconfiguration


  Pre Launch
  Optimisation                 Hardware                  Cell parameter
                              Optimisation                optimisation

                            Antenna Reorientation         Handover parameters

                              Antenna Down tilt              Power planning

  Continuous                 Antenna Relocation       Neighbour list reconfiguration
  Optimisation            Antenna Height adjustment

                             Masthead Amplifiers




    Swap
  Management                          Performance Monitoring



                                                                                       32
Swap Optimization


  Pre Launch                            What GTL can do for         On Site
                          Off Site
  Optimisation                                 you
                                                                   Cluster
                       Parameter
                                                                Identification
                        Analysis
                                                                   Cluster
                     Process Creation                            Preparation

  Continuous          KPI Definition
                                                                Drive Testing
  Optimisation
                                                                Drive Analysis
                      KPI Reporting

                      Functionality                               Modelling
                         Asses
                                                                 Network
                         Training                               Reconfigure
    Swap
  Management                                                  Cluster Monitoring
                    Config Management

                                                              Model Calibration


                                                                              33
KPI’s to be Monitored
Based on performance of a Network & Cell    (TBA : To Be Accepted)


  Network                                                            KPI Deciding
                    KPI          Target                 Type            Factor
                   CSR (%)        Improve             Performance


                   CSSR (%)       Improve             Performance
                                                                         TBD upon
                   DCR (%)        Improve             Performance
                                                                      checking trend
   Network /                                                          to maintain the
  Town Level                                                          performance of
                 TCH Blocking     Improve             Performance       the network
                                                                      and to improve

                   SDCCH
                                  Improve             Performance
                   Blocking

                                  Improve
                   CSR (%)                            Performance

                                  Improve
                   CSSR (%)                           Performance
                                                                        TBD upon
                                  Improve                            checking trend
  Cell Level       DCR (%)                            Performance    to maintain the
                                                                     performance of
                 TCH Blocking
                                  Improve                              the network
                                                      Performance
                                                                     and to improve

                SDCCH Blocking    Improve             Performance

                                                                                        34
KPI’s to be Monitored
Based on performance of a Network & Cell

  Network                                                     KPI Deciding
                     KPI             Target       Type           Factor
                Downlink Rx Qual      Improve   Performance


                 Uplink Rx Qual       Improve   Performance
                                                                  TBD upon
                      FER             Improve   Performance
                                                               checking trend
   Network /                                                   to maintain the
  Town Level                                                   performance of
                 Data Through
                                      Improve   Performance      the network
                     output
                                                               and to improve

                      Data
                                      Improve   Performance
                  Accessibility

                                      Improve
                Downlink Rx Qual                Performance

                                      Improve
                 Uplink Rx Qual                 Performance
                                                                 TBD upon
                                      Improve                 checking trend
  Cell Level          FER                       Performance   to maintain the
                                                              performance of
                 Data Through
                                      Improve                   the network
                     output                     Performance
                                                              and to improve

                Data Accessibility    Improve   Performance

                                                                                 35
Reports

                      Deliverables
  Pre Launch     Swap Management
  Optimisation
                 Swap Planning Report.


                 Parameter mapping report


                 Pre Drive Test Report
  Continuous
  Optimisation   Verification of RF Coverage, parameters audit and tuning : neighbour site list,
                 Power parameters, HO parameters, etc.

                 Cutover Drive Test Report

                 Validation of RF Coverage, parameters audit and tuning : neighbour
                  site list, power parameters, HO parameters, etc.
    Swap
  Management     Post Drive Test Report.

                 Improvement of RF Coverage, parameters audit and tuning : neighbour
                  site list, power parameters, HO parameters, etc.

                                                                                               36
Subjects to Investigate
                          Non-Working sites/sectors or TRX’s

   Pre Launch             In-active Radio network features like frequency hopping
   Optimisation
                          •Disabled GPRS

                          Overshooting sites – coverage overlaps

                          •Coverage holes
   Continuous
   Optimisation           C/I, C/A analysis

                          High Interference Spots

                          Drop Calls


     Swap                 Capacity Problems
   Management
                          Other Interference Sources

                          Missing Neighbors

                                                                                    37
Subjects to Investigate

                          One-way neighbors

   Pre Launch
                          Ping-Pong Handovers
   Optimisation
                          Not happening handovers

                          Footprint and performance of the site as per design
                           criteria

                          Faulty Installations
   Continuous
   Optimisation
                          Sites not operational


                          •Faulty TRX

                          BA list error

     Swap
                          •BSIC, HSN, MAIO Plan
   Management
                          Hopping ON or OFF



                                                                                38
Recommendations
                   Defining missing neighbor relations

  Pre Launch      Proposing new sites or sector additions
  Optimisation
                   Proposing antenna azimuth changes

                      Proposing antenna tilt changes

                     Proposing antenna type changes
  Continuous
  Optimisation        BTS Equipment/Filter change

                   Re-tuning of interfered frequencies

                          Adjusting HO Margins


    Swap            Adjusting accessibility parameters
  Management
                       Changing power parameters

                             MHA/TMA adds

                                                            39
Virtual Optimisation Centre


                      Remote Analytics for Design, Planning & Optimisation
   Pre Launch
                      to achieve minimal startup time, consistent use of
   Optimisation
                      process and tools and concentrated expertise in one
                      location

                      State of the art VPO Centre vital stats:

                       Floor space:                        2000 Sq. Ft.
   Continuous          Seating capacity:                   50
   Optimisation        Internet speed:                      2 Mbps
                       No. of RF engineers:                50
                       Total man years experience:         10 Years
                       Tools used for VPO:                 Asset
                                                           Connect
                                                           PL4 & MIPT
     Swap
   Management



                                                                             40
Virtual Optimisation Centre


   Pre Launch
   Optimisation
                            Activities         Off shore   On shore


                       Benchmarking
                       Data Collection
   Continuous
   Optimisation        RF and Transmission Planning
                       Transmission Network Verification
                       RF / Line of Sight Surveys
                       CW Testing and Model Tuning
                       Nominal Cell Planning
     Swap
   Management          Frequency Scanning
                       Optimisation


                                                                      41
Virtual Optimisation Centre

                                     Benefits
   Pre Launch
   Optimisation    Low fixed Cost regardless of the project location.

                   Fast Delivery Cycle and Quick deployment of project.

                   Cost effective especially for high cost areas.

   Continuous      Flexible service packages to meet unique customer needs.
   Optimisation
                   Ideal solution for high-risk or hard to access areas.

                   Expertise availability guaranteed.

                                  Core expertise group available to service multiple project.
     Swap
   Management                     Quick take off without tine lag to mobilize.


                                  Uniform applications on tolls through standard processes.

                                                                                                42
Value Proposition

    Risk Sharing - KPI & SLA Based Commitments

    End to End RF solution provider

    RF Planning, Design and Optimisation done for
    31 networks

     –   Experience across 15 geographies
     –   Covering 2G, 2.5G, 3G technologies
     –   Across standards such as GSM, Edge/GPRS,
         CDMA, UMTS and WiMAX

    Long Standing relations With OEMs At Global
    Level

    Unique combination of tasks carried out Offshore
    and Onshore that give cost efficiencies

    Technology and vendor agnostic skill set

                                                       43
Case Studies & Capabilities




                              44
Case Study 1

                                                                On many occasions, it has been found that improper RF
                                                                cabling gave rise to wrong BCCH - Sector combination.
                                                                Corrections were initiated and post correction verifications have
                                                                been performed.
    About the Client :                                          To find coverage footprint and associated quality plt, drive
    Hutchison Essar (Hutch), is a leading GSM network           tests were executed with two MS (MS 1-Hutch Idle mode &
    operator in India having GSM wireless operations with       MS 2 – Hutch Dedicated mode) simultaneously.
    a pan Indian footage. The network has been growing
    at a very high pace to address competition with more        This were done in and around 6km radius centering the site as
    coverage and capacity. This entails Hutch to roll out       per Hutch specification.
    new sites in remote areas of UP. While expanding,
    Hutch wanted to have their network optimised                From this drive-test data, GTL prepared coverage and quality
                                                                plot for newly commissioned site. Results were submitted to
    Business Challenge :                                        Hutch. After achieving required results, sites were put on air
                                                                for commercial purposes.
    Hutch found RF Group of GTL a competent partner to
    perform on their behalf optimization activities with        Value Delivered :
    quality deliverables. In the process GTL got the
    responsibility of around 240 sites (170 existing & 70       GTL successfully completed the optimisation activity for
    new sites) to be completed during October 2005 to           the project covered 170 existing sites and 70 new sites during
    March 2006.                                                 Oct’05 to Mar’06.
                                                                All sites were either in Highways or in remote locations of
    Project Scope :                                             eastern part of UP covering Kanpur, Lucknow, Varanasi,
                                                                Allahabad and Gorakhpur.
    GTL was to optimize new roll out cell sites in the
    network to achieve desired results viz. call origination,
    call termination, intra-cell handover, and coverage.




                                                                                                                             45
Case Study 2


                                                              Project Scope :
                                                              SoW conferred and accepted by GTL have been as follows:
    About the Client :                                        Perform pre swap drive test for all 41 sites.
    Hutch is one of the leading gsm operator in India         Prepared proficient database for Nokia
    having licenses spanning all over India. Hutch is         Add and delete Neighbor list.
    working with gsm 900 band and wants to expand their       Verification of antenna locations and azimuth.
    network as the demand grow. So to meet quality and        Verifies existing Frequency Plan, recommend the changes
    coverage there is need to swap old ZTE system with        required.
    some new updated system, which can support the            Download the database to OMC and verify the dump.
    gsm, gprs, edge and easily upgraded to 3G.                Perform Drive Tests for sites verification on Swap night.
    Hutch selected Nokia as OEM for the core part of their    Perform the post swap drive test for all 45 sites.
    network.                                                  Conduct Acceptance Test Procedure (ATP) with end customer.
                                                              Nominal Cell Planning for New 417 sites
    Business Challenge :                                      RF survey, LOS survey and Drive Test for New Sites.
    Nokia wanted to have resources in the outsourcing         MW radio link planning for MW transmission links.
    domain increase their strength. As GTL had done lots      Provide a solution for the Hutch subscriber’s complaints.
    of work with Nokia in India so GTL seems to be            Preparation of 2 Mbit/s transmission plan including link capacity
    perfectly poised to rise to the need. We became           calculations, timeslot allocation and ET planning
    partner of choicer for Nokia to perform RF tasks in the   Maintain the Network quality by daily monitoring KPI.
    swap roll out process. From March 2005 to Till Date
    for performed allocated tasks creditably. A few points    Value Delivered :
    of project:                                               All swaps are mostly conducted at night there is around 6 sites
     GSM 900 Networks.                                        swap per day. As soon as swap sites bring on air our drive test
    45 sites to be swap from ZTE to Nokia.                    is ask to conduct the site verification drive test at each cell the
    342 New Nokia Ultra BTS                                   test includes database verification, sector swapping, handover
    Coverage includes cities and boundaries.                  testing, neighbor list verification, call termination. After
    Network with 19 BSC’s and two switch AXE 10 from          finishing the swap now optimization is started on network level,
    Nokia.-                                                   to meet the KPI daily statistic report are generated with the
    CSSR ≥94%, SDCCH Drop ≥2%, Handover success               help of Business object and results are discussed with the
    rate ≥ 94%, Call drop rate ≤ 2.5%.                        customer and also suggest the necessary changes.

                                                                                                                             46
GTL's Network Customer Engagement




      Government Of                 Power Grid
       Maharashtra                    Corp




                                                 47
International Presence
                               Europe:
                                UK
                               France
                                                       Middle East:                Asia–Pacific:
                               Ireland
                                                       UAE                         Malaysia
                               Sweden
                                                       KSA                         Thailand
                               Switzerland
                                                       Oman                        China
   Americas:                                                                       Taiwan
                                                       Qatar
   US                                                                              Indonesia
                                                       Kuwait
                                                                                   Australia
                                                                                   Singapore
                                                                                   Philippines
                                                                                   New Zealand



                                                                      South Asia
                                                                      India
                                                                      Nepal
                                      Africa:                         Bhutan
                                                                      Maldives
                                      Nigeria
                                                                      Sri Lanka
                                      South Africa
                                                                      Bangladesh
                                      Guinea Conakry
                                      Mauritius


        International Office
        Projects Undertaken


                                     © Copy right GTL Limited 2008                                 48
Thank you