Docstoc

ipr

Document Sample
ipr Powered By Docstoc
					                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Kirovohrad, Volkov St.
street)
Type of ownership                            Municipal
Area, hectares                               3,53
Possible usage of land (purpose)             Commercial use
Construction project available               -
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          -
Estimated cost, UAH                          8657400,00
Water supply: (yes/no)                       Yes
Distance to source point, m                  0,1
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  680 m to the north-east
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               -
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    -
Contact person, (position, full name)        Director of Urban Development and
                                             Capital Construction Department of
                                             Kirovohrad City Council
                                             Volodymyr A. IVANCHENKO
Phone, fax, e-mail                           +38 (0522) 24-39-87
Number of residents                          244700
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Kirovohrad, Volkov St.
street)
Type of ownership                            Municipal
Area, hectares                               2,07
Possible usage of land (purpose)             Commercial use
Construction project available               -
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          -
Estimated cost, UAH                          5066853,00
Water supply: (yes/no)                       Yes
Distance to source point, m
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  380 m to the north-east
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               -
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    -
Contact person, (position, full name)        Director of Urban Development and
                                             Capital Construction Department of
                                             Kirovohrad City Council
                                             Volodymyr A. IVANCHENKO
Phone, fax, e-mail                           +38 (0522) 24-39-87
Number of residents                          244700
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Kirovohrad, Volkov St.
street)
Type of ownership                            Municipal
Area, hectares                               1,43
Possible usage of land (purpose)             Commercial use
Construction project available               -
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          -
Estimated cost, UAH                          34611690,00
Water supply: (yes/no)                       Yes
Distance to source point, m                  -
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  750 m to the north-east
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               -
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    -
Contact person, (position, full name)        Director of Urban Development and
                                             Capital Construction Department of
                                             Kirovohrad City Council
                                             Volodymyr A. IVANCHENKO
Phone, fax, e-mail                           +38 (0522) 24-39-87
Number of residents                          244700
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Kirovohrad, Volkov St.
street)
Type of ownership                            Municipal
Area, hectares                               0,6846
Possible usage of land (purpose)             Commercial use
Construction project available               -
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          -
Estimated cost, UAH                          1272288,00
Water supply: (yes/no)                       Yes
Distance to source point, m                  -
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               -
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    -
Contact person, (position, full name)        Director of Urban Development and
                                             Capital Construction Department of
                                             Kirovohrad City Council
                                             Volodymyr A. IVANCHENKO
Phone, fax, e-mail                           +38 (0522) 24-39-87
Number of residents                          244700
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Znamyanka, Frunze St. (between the
street)                                    former bakery and Energetykiv St.) near
                                           the railway station
Type of ownership                          Municipal
Area, hectares                             1,0
Possible usage of land (purpose)           Commercial use
Construction project available             -
Conditions of investment attraction        Direct investment
Price (UAH / sq. m)                        -
Estimated cost, UAH                        -
Water supply: (yes/no)                     Yes
Distance to source point, m                0,1
Sewage system: (yes/no)                    Yes
Distance to sewage point, m                0,1
Gas supply: (yes/no)                       Yes
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     Yes
Power, kV                                  -
Distance to source point, m                Approx. 100
Distance to railroad track, km             0,5
Distance to Kirovohrad, km                 by railway -51
                                           by highway – 40
Distance to highway, km                    0,005 km to Kyiv – Luhansk – Izvaryno
                                           highway
Miscellaneous information                  -
Contact person, (position, full name)      Chief of the Department of State Land
                                           Resources Committee in Znamyanka
                                           Аlla А. GRYTSYUK
Phone, fax, e-mail                         +38 (05233) 7-40-83
Number of residents                        31059
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Oleksandriya, Lenin Ave. (adjacent to a
street)                                      computer centre), city centre
Type of ownership                            Municipal
Area, hectares                               0,03
Possible usage of land (purpose)             Land plot is suitable for building of an
                                             administrative and trade centre
Construction project available               -
Conditions of investment attraction          Sale of a tenant-right for the land plot for
                                             10 years via auction
Price (UAH / sq. m)                          -
Estimated cost, UAH                          Normative monetary valuation of a land
                                             plot for sale - 98231,54 UAH
                                             Expert evaluation of tenant-right -
                                             341006,08 UAH
Water supply: (yes/no)                       Yes
Distance to source point, m                  50
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  50
Gas supply: (yes/no)                         Yes
Pressure                                     -
Distance to source point, m                  50
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  50
Distance to railroad track, km               2
Distance to Kirovohrad, km                   75
Distance to highway, km                      -
Miscellaneous information                    -
Contact person, (position, full name)        Oleksandriya City Mayor
                                             Stepan K.TSAPIUK
Phone, fax, e-mail                           +38 (05235) 7-13-40
                                             rada@alexandria.kr.ua
Number of residents                          93400
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Oleksandriya, 6-gо Grudnya St. (opposite
street)                                      of the dwelling house # 91)
Type of ownership                            Municipal
Area, hectares                               0,1
Possible usage of land (purpose)             Land plot is suitable for building of an
                                             exhibition hall
Construction project available               -
Conditions of investment attraction          Sale of a tenant-right for 10 years via
                                             аuction
Price (UAH / sq. m)                          -
Estimated cost, UAH                          Normative monetary valuation of the
                                             land plot for sale - 315492,45 UAH
                                             Expert evaluation of tenant-right for the
                                             land plot - 554551,32 UAH
Water supply: (yes/no)                       Yes
Distance to source point, m                  100
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  100
Gas supply: (yes/no)                         Yes
Pressure                                     -
Distance to source point, m                  100
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  100
Distance to railroad track, km               3
Distance to Kirovohrad, km                   75
Distance to highway, km                      -
Miscellaneous information                    -
Contact person, (position, full name)        Oleksandriya City Mayor
                                             Stepan K.TSAPIUK
Phone, fax, e-mail                           +38 (05235) 7-13-40
                                             rada@alexandria.kr.ua
Number of residents                          93400
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district, Oleksandriya, near Dnipropetrovsk
street)                                    highway, near the intersection with Kyiv-
                                           Dnipropetrovsk highway
Type of ownership                          Municipal
Area, hectares                             0,7
Possible usage of land (purpose)           Land plot is suitable for the construction
                                           of multi-fuel filling station
Construction project available             -

Conditions of investment attraction        Sale of a tenant-right
Price (UAH / sq. m)                        -
Estimated cost, UAH                        -
Water supply: (yes/no)                     Yes
Distance to source point, m                Not more than 100
Sewage system: (yes/no)                    Yes
Distance to sewage point, m                Not more than 100
Gas supply: (yes/no)                       Yes
Pressure                                   -
Distance to source point, m                Not more than 100
Power supply: (yes/no)                     Yes
Power, kV                                  -
Distance to source point, m                Not more than 100
Distance to railroad track, km             2
Distance to Kirovohrad, km                 7
Distance to highway, km                    -
Miscellaneous information                  -
Contact person, (position, full name)      Oleksandriya City Mayor
                                           Stepan K.TSAPIUK
Phone, fax, e-mail                         +38 (05235) 7-13-40
                                           rada@alexandria.kr.ua
Number of residents                        93400
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district, Oleksandriya, Eastern Industrial Area,
street)                                    near Zavod Avtoshtamp CJSC, 1
                                           Yohanson Str.
Type of ownership                          Municipal
Area, hectares                             4,0
Possible usage of land (purpose)           Land plot is suitable for construction of
                                           an industrial enterprise
Construction project available             -
Conditions of investment attraction        Sale of a tenant-right
Price (UAH / sq. m)                        -
Estimated cost, UAH                        -
Water supply: (yes/no)                     Yes
Distance to source point, m                200
Sewage system: (yes/no)                    Yes
Distance to sewage point, m                200
Gas supply: (yes/no)                       -
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     Yes
Power, kV                                  -
Distance to source point, m                200
Distance to railroad track, km             0.5
Distance to Kirovohrad, km                 70
Distance to highway, km                    -
Miscellaneous information                  -
Contact person, (position, full name)      Oleksandriya City Mayor
                                           Stepan K.TSAPIUK
Phone, fax, e-mail                         +38 (05235) 7-13-40
                                           rada@alexandria.kr.ua
Number of residents                        93400
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Svitlovodsk, on the corner of Pavlova and
street)                                    B.Boyko Streets

Type of ownership                          State
Area, hectares                             0,4277
Possible usage of land (purpose)           Land category – land for residential and
                                           public construction.
                                           Purpose – construction of a trade centre.
                                           Terms of allotment – alienation via
                                           auction
Construction project available             -
Conditions of in vestment attraction       Sale of ownership right via auction
                                           (Decision of Svitlovodsk City Council of
                                           December 23, 2008, #1097)
                                           A winner of the land auction is obliged
                                           to:
                                              develop soil investigation
                                           documentation concerning availability
                                           of a fertile soil layer at his/her own
                                           expense;
                                              work out a project of fertile soil layer
                                           removal, transportation and preservation,
                                           in case such a layer is found;
                                              receive permission at his/her own
                                           expense and recover losses caused by the
                                           perennial planting uproot;
                                              obtain specifications to transfer or
                                           preserve municipal networks;
                                              complete construction of the object by
                                           January 1, 2013;
                                              make improvement of the adjoining
                                           land in accordance with an execution
                                           plan so that condition of this land would
                                           not be worse than it was before
                                           construction.
Price (UAH / sq. m)                        323,09
Estimated cost, UAH                        1 381 855,59 UAH – initial cost
Water supply: (yes/no)                     Yes
Distance to source point, m                -
Sewage system: (yes/no)                    Yes
Distance to sewage point, m             -
Gas supply: (yes/no)                    No
Pressure                                -
Distance to source point, m             -
Power supply: (yes/no)                  Yes
Power, kV                               -
Distance to source point, m             -
Distance to railroad track, km          -
Distance to Kirovohrad, km              -
Distance to highway, km                 0,003
Miscellaneous information               -
Contact person, (position, full name)   Head of the Department of City
                                        Economy, Resources and Development
                                        of Svitlovodsk City Council Executive
                                        Committee
                                        Iryna M. RADCHENKO
Phone, fax, e-mail                      +8 (05236) 2-27-14
Number of residents                     55700
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Promyslova St., Bobrynets, Bobrynets
street)                                      District
Type of ownership                            Municipal
Area, hectares                               0,2282
Possible usage of land (purpose)             Entrepreneurial activity-commercial
                                             activity
Construction project available               -
Conditions of investment attraction          Accomplishment of adjoining territory
                                             and making contribution to Bobrynets
                                             infrastructure development
Price (UAH / sq. m)                          Auction
Estimated cost, UAH                          90 000
Water supply: (yes/no)                       No
Distance to source point, m                  80
Sewage system: (yes/no)                      No
Distance to sewage point, m                  300
Gas supply: (yes/no)                         No
Pressure                                     2 MPa
Distance to source point, m                  60
Power supply: (yes/no)                       No
Power, kV                                    380
Distance to source point, m                  30
Distance to railroad track, km               4
Distance to Kirovohrad, km                   50
Distance to highway, km                      Adjacent
Miscellaneous information                    -
Contact person, (position, full name)        Leading Specialist
                                             Mykola M. PROTSENKO
Phone, fax, e-mail                           +38 (05257) 3 41 88
Number of residents                          11000
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   109 Ordzhonikidze St., Bobrynets
street)
Type of ownership                            Private
Area, hectares                               4900 m2
Possible usage of land (purpose)             For placement of production facilities
Construction project available               -
Conditions of investment attraction          Accomplishment of adjoining territory
Price (UAH / sq. m)                          Negotiable
Estimated cost, UAH                          -
Water supply: (yes/no)                       Yes
Distance to source point, m                  10 m
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  -
Gas supply: (yes/no)                         Yes
Pressure                                     2 MPa
Distance to source point, m                  30 m
Power supply: (yes/no)                       Yes
Power, kV                                    Own complete transformer substation -
                                             250 kV
Distance to source point, m                  50 m
Distance to railroad track, km               -
Distance to Kirovohrad, km                   54
Distance to highway, km                      Distance to Bobrynets bypass road –
                                             1 km
Miscellaneous information                    Building is located in the downtown and
                                             is adjacent to the Ukrposhta district
                                             department building
Contact person, (position, full name)        Director of Panasyuk V.V. Farm
                                             Enterprise
                                             Mykola V. PANASYUK
Phone, fax, e-mail                           +38 (050) 696 72 08
                                             +38 (097) 461 48 58
Number of residents                          11 000
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Vytyazivka Village Council, Bobrynets
street)                                      District
Type of ownership                            State
Area, hectares                               17,8
Possible usage of land (purpose)             For fishery management
Construction project available               -
Conditions of investment attraction          Auction
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  500
Distance to railroad track, km               8,5
Distance to Kirovohrad, km                   80
Distance to highway, km                      25
Miscellaneous information                    -
Contact person, (position, full name)        Head of the State Committee for Land
                                             Resources in Bobrynets District
                                             Oleh V. HONCHARUK
Phone, fax, e-mail                           +38 (05257) 3 41 93
Number of residents                          1194
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Volodymyro-Illinka Village Council,
street)                                      Bobrynets District
Type of ownership                            State
Area, hectares                               48,3
Possible usage of land (purpose)             For fishery management
Construction project available               -
Conditions of investment attraction          Auction
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  300
Distance to railroad track, km               60
Distance to Kirovohrad, km                   100
Distance to highway, km                      45
Miscellaneous information                    -
Contact person, (position, full name)        Head of the State Committee for Land
                                             Resources in Bobrynets District
                                             Oleh V. HONCHARUK
Phone, fax, e-mail                           +38 (05257) 3 41 93
Number of residents                          292
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Fediyivka Village Council, Bobrynets
street)                                      District
Type of ownership                            State
Area, hectares                               163,6
Possible usage of land (purpose)             For livestock breeding and grazing
Construction project available               -
Conditions of investment attraction          Auction
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       Yes
Distance to source point, m                  50
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  50
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  600
Distance to railroad track, km               14
Distance to Kirovohrad, km                   91
Distance to highway, km                      36
Miscellaneous information                    -
Contact person, (position, full name)        Head of the State Committee for Land
                                             Resources in Bobrynets District
                                             Oleh V. HONCHARUK
Phone, fax, e-mail                           +38 (05257) 3 41 93
Number of residents                          614
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Hayvoron (industrial zone)
street)
Type of ownership                            Municipal
Area, hectares                               4,5
Possible usage of land (purpose)             Industrial construction, at the investor's
                                             discretion
Construction project available               -
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       Yes
Distance to source point, m                  300
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  300
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    5 kV
Distance to source point, m                  300
Distance to railroad track, km               0,5
Distance to Kirovohrad, km                   240
Distance to highway, km                      30 km to Кyiv – Оdesa highway
Miscellaneous information                    This land plot is allotted for industrial
                                             construction by the decision of City
                                             Council
Contact person, (position, full name)        Hayvoron City Mayor
                                             Petro M. RUDENKO
Phone, fax, e-mail                           +38 (05254) 2-17-35
                                             +38 (05254) 2-10-96
Number of residents                          15 500
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Hayvoron District, village Khashchuvate
street)
Type of ownership                            Private
Area, hectares                               2,06
Possible usage of land (purpose)             Vegetable storage facility, industrial
                                             buildings
Construction project available               -
Conditions of investment attraction          Loan, share in capital
Price (UAH / sq. m)                          Subject to negotiation
Estimated cost, UAH                          0,5 mln. UAH
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               0,7 km away from Khashchuvate
                                             7 km away from Hayvoron
Distance to Kirovohrad, km                   240
Distance to highway, km                      30 to Kyiv-Оdesa highway
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Hayvoron District
                                             Consumer Society
                                             Oleksiy P. KHMARUK
Phone, fax, e-mail                           +38 (05254) 2-29-59
                                             +38 (05254) 2-13-44
Number of residents                          2150



        In addition:

  Area of the vegetable store facility– 2 hectares
  Including vegetable depot 30 х 24 m with storage capacity of 1000 tons
  Fruit depot 30 х 24 m with storage capacity of 500-800 tons
  Vegetable depot – 24 х 12 m with storage capacity of 500 tons
  Storehouses – 24 х 12 m
Storehouses 100 х 7,8 m (possible use - pigs fattening)
Shed 24 х 12 m; shed 45 х 12 m
Storehouses 63 х 10 m
Office and utility rooms 18 х 6,9 m
Storehouses 9,9 х 11 m
Housing for automatic weighing
Storehouses with cellar 7,8 х 16,4 m
Storehouses 28 х 9 m
The premises may be used for industrial purposes as well as for preservation and
processing of agricultural products, pigs fattening and as a mill.
Housing for automatic weighing, office and personnel service rooms are available
at the entrance to vegetable stores. Water supply is local (a well).
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Hayvoron
street)
Type of ownership                            Private
Area, hectares                               2
Possible usage of land (purpose)             Manufacture of bricks and building
                                             materials or any other production at the
                                             investor's discretion
Construction project available               -
Conditions of investment attraction          Loan, share in capital
Price (UAH / sq. m)                          Negotiable
Estimated cost, UAH                          500 000
Water supply: (yes/no)                       Yes
Distance to source point, m                  -
Sewage system: (yes/no)                      Yes
Distance to sewage point, m
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               3 km to Hayvoron
                                             5 km to the village of Khashchuvate
Distance to Kirovohrad, km                   240
Distance to highway, km                      30 km to Kyiv-Odesa highway
Miscellaneous information                    -
Contact person, (position, full name)        Deputy Chairman of Hayvoron District
                                             State Administration
                                             Ivan M. ARKHYPENKO
Phone, fax, e-mail                           +38 (05254) 2-19-95
Number of residents                          15500
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Hayvoron
street)
Type of ownership                            Private
Area, hectares                               1,1
Possible usage of land (purpose)             At the investor’s discretion
Construction project available               Yes
Conditions of investment attraction          Share in capital
Price (UAH / sq. m)                          Negotiable
Estimated cost, UAH                          -
Water supply: (yes/no)                       Available
Distance to source point, m                  On the territory
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  On the territory
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Available
Power, kV                                    3,5
Distance to source point, m                  On the territory
Distance to railroad track, km               1
Distance to Kirovohrad, km                   240
Distance to highway, km                      30 km to Kyiv – Оdеsа highway
Miscellaneous information                    -
Contact person, (position, full name)        Private entrepreneur
                                             Vasyl H. BONDAR
Phone, fax, e-mail                           +38 (05254) 5-05-35
                                             +38 (050) 523-09-15
Number of residents                          15500
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Holovanivsk, Holovanivsk District
street)
Type of ownership                            State
Area, hectares                               0,5
Possible usage of land (purpose)             Construction of a gas station
Construction project available               -
Conditions of investment attraction          Search of investors to stimulate the
                                             development of investment potential of
                                             road service
Price (UAH / sq. m)                          30
Estimated cost, UAH                          200
Water supply: (yes/no)                       No
Distance to source point, m                  500
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     No
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    No
Distance to source point, m                  50-100
Distance to railroad track, km               -
Distance to Kirovohrad, km                   177
Distance to highway, km                      20-50
Miscellaneous information                    -
Contact person, (position, full name)        Chief of the Department for Land
                                             Resources of Holovanivsk District
                                             Ihor F.RYBAK
Phone, fax, e-mail                           +38 (05252) 2-18-60,
                                             +38 (05252) 2-18-01,
                                             +38 (05252) 2-23-50,
                                             golv@golov.kw.ukrtel.net
Number of residents                          approximately 7 thousand
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   v. Pishchanyi Brid,
street)                                      Dobrovelychkivka District
Type of ownership                            State
Area, hectares                               21,6
Possible usage of land (purpose)             Non-agricultural lands – service facilities
                                             and yards
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          17,05
Estimated cost, UAH                          3 682 800
Water supply: (yes/no)                       Yes
Distance to source point, m                  On the territory
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    400
Distance to source point, m                  On the territory
Distance to railroad track, km               4
Distance to Kirovohrad, km                   90
Distance to highway, km                      0,5
Miscellaneous information                    -
Contact person, (position, full name)        First Deputy Chairman of
                                             Dobrovelychkivka District State
                                             Administration
                                             Serhii I. KHRUSHCH
Phone, fax, e-mail                           +38 (05253) 5-14-31
                                             +38 (05253) 5-14-38
                                             +38 (05253) 5-12-37
                                             dobrov@dv.kw.ukrtel.net
Number of residents                          3017
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Papanin St., village Tyshkivka
street)                                      Dobrovelychkivka District
Type of ownership                            Municipal
Area, hectares                               0,1
Possible usage of land (purpose)             Service facilities
                                             Commercial use
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          50,0
Estimated cost, UAH                          50 000
Water supply: (yes/no)                       Yes
Distance to source point, m                  1000
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  1000
Distance to railroad track, km               55
Distance to Kirovohrad, km                   120
Distance to highway, km                      75
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Tyshkivka Village Council
                                             Petro V. KULISH
Phone, fax, e-mail                           +38 (05253) 55-2-42
                                             +38 (05253) 55-1-46
Number of residents                          3502
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Gorky St., village Tyshkivka
street)                                      Dobrovelychkivka District
Type of ownership                            Municipal
Area, hectares                               0,35
Possible usage of land (purpose)             Service facilities
                                             Commercial use
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          50,0
Estimated cost, UAH                          50 000
Water supply: (yes/no)                       Yes
Distance to source point, m                  100
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  1000
Distance to railroad track, km               55
Distance to Kirovohrad, km                   120
Distance to highway, km                      75
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Tyshkivka Village Council
                                             Petro V. KULISH
Phone, fax, e-mail                           +38 (05253) 55-2-42
                                             +38 (05253) 55-1-46
Number of residents                          3502
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Chkalov St., village Tyshkivka
street)                                      Dobrovelychkivka District
Type of ownership                            Municipal
Area, hectares                               0,3
Possible usage of land (purpose)             Commercial use
                                             Service facilities
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          50,0
Estimated cost, UAH                          150 000
Water supply: (yes/no)                       Yes
Distance to source point, m                  100
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  1000
Distance to railroad track, km               55
Distance to Kirovohrad, km                   120
Distance to highway, km                      75
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Tyshkivka Village Council
                                             Petro V. KULISH
Phone, fax, e-mail                           +38 (05253) 55-2-42
                                             +38 (05253) 55-1-46
Number of residents                          3502
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   village Tyshkivka
street)                                      Dobrovelychkivka District
Type of ownership                            State
Area, hectares                               0,1
Possible usage of land (purpose)             Service facilities
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          50,0
Estimated cost, UAH                          50 000
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  1000
Distance to railroad track, km               55
Distance to Kirovohrad, km                   120
Distance to highway, km                      75
Miscellaneous information                    -
Contact person, (position, full name)        First Deputy Chairman of
                                             Dobrovelychkivka District State
                                             Administration
                                             Serhii I. KHRUSHCH
Phone, fax, e-mail                           +38 (05253) 5-14-31
                                             +38 (05253) 5-14-38
                                             +38 (05253) 5-12-37
                                             dobrov@dv.kw.ukrtel.net
Number of residents                          3502
                          INVESTMENT PROPOSAL
                     of the land offered for implementation
                             of an investment project

Land location (name of locality, district, 1, Kotovskogo St., urban settlement
street)                                    Dobrovelychkivka, Dobrovelychkivka
                                           District
Type of ownership                          Municipal
Area, hectares                             2,0
Possible usage of land (purpose)           Industry, transport, communication,
                                           power engineering, defense and other
                                           purposes
Construction project available             -
Conditions of investment attraction        Lease with buy-out option
Price (UAH / sq. m)                        17,47
Estimated cost, UAH                        349 400
Water supply: (yes/no)                     Yes
Distance to source point, m                1000
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       -
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     No
Power, kV                                  10
Distance to source point, m                500
Distance to railroad track, km             27
Distance to Kirovohrad, km                 120
Distance to highway, km                    35
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Dobrovelychkivka
                                           Settlement Council
                                           Anatoliy L. TUSHCHENKO
Phone, fax, e-mail                         + 38 (05253) 5-12-68
Number of residents                        6820
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Lenin      St.,    urban       settlement
street)                                    Dobrovelychkivka, Dobrovelychkivka
                                           District
Type of ownership                          Municipal
Area, hectares                             0,02
Possible usage of land (purpose)           Housing and civil engineering
Construction project available             Yes, unfinished construction of an
                                           apartment building
Conditions of investment attraction        Lease with buy-out option
Price (UAH / sq. m)                        22,63
Estimated cost, UAH                        4526
Water supply: (yes/no)                     No
Distance to source point, m                200
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       -
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     No
Power, kV                                  10
Distance to source point, m                200
Distance to railroad track, km             27
Distance to Kirovohrad, km                 120
Distance to highway, km                    35
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Dobrovelychkivka
                                           Settlement Council
                                           Anatoliy L. TUSHCHENKO
Phone, fax, e-mail                         +38 (05253) 5-12-68
Number of residents                        6820
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district, Promyslova St.,
street)                                    urban settlement Dobrovelychkivka
                                           Dobrovelychkivka District
Type of ownership                          Municipal
Area, hectares                             1,5
Possible usage of land (purpose)           Use of land for industrial facilities
Construction project available             -
Conditions of investment attraction        Lease with buy-out option
Price (UAH / sq. m)                        12,08
Estimated cost, UAH                        181200
Water supply: (yes/no)                     No
Distance to source point, m                500
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     No
Power, kV                                  10
Distance to source point, m                500
Distance to railroad track, km             27
Distance to Kirovohrad, km                 120
Distance to highway, km                    35
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Dobrovelychkivka
                                           Settlement Council
                                           Anatoliy L. TUSHCHENKO
Phone, fax, e-mail                         +38 (05253) 5-12-68
Number of residents                        6820
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district, Village Maryivka,
street)                                    Dobrovelychkivka District,
                                           (contour 351)
Type of ownership                          State
Area, hectares                             0,9
Possible usage of land (purpose)           Agricultural lands, industrial facilities,
                                           stock-farm
Construction project available             -
Conditions of investment attraction        Lease with buy-out option
Price (UAH / sq. m)                        According to evaluation
Estimated cost, UAH                        According to evaluation
Water supply: (yes/no)                     No
Distance to source point, m                -
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     No
Power, kV                                  -
Distance to source point, m                -
Distance to railroad track, km             27
Distance to Kirovohrad, km                 120
Distance to highway, km                    35
Miscellaneous information                  -
Contact person, (position, full name)      First Deputy Chairman of
                                           Dobrovelychkivka District State
                                           Administration
                                           Serhii I. KHRUSHCH
Phone, fax, e-mail                         +38 (05253) 5-14-31
                                           +38 (05253) 5-14-38
                                           +38 (05253) 5-12-37
                                           dobrov@dv.kw.ukrtel.net
Number of residents                        6820
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district, Village Maryivka,
street)                                    Dobrovelychkivka District
                                           (contour 382а)
Type of ownership                          State
Area, hectares                             0,1
Possible usage of land (purpose)           Agricultural lands, industrial facilities
Construction project available             -
Conditions of investment attraction        Lease with buy-out option
Price (UAH / sq. m)                        According to evaluation
Estimated cost, UAH                        According to evaluation
Water supply: (yes/no)                     No
Distance to source point, m                -
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     No
Power, kV                                  -
Distance to source point, m                -
Distance to railroad track, km             27
Distance to Kirovohrad, km                 120
Distance to highway, km                    35
Miscellaneous information                  -
Contact person, (position, full name)      First Deputy Chairman of
                                           Dobrovelychkivka District State
                                           Administration
                                           Serhii I. KHRUSHCH
Phone, fax, e-mail                         +38 (05253) 5-14-31
                                           +38 (05253) 5-14-38
                                           +38 (05253) 5-12-37
                                           dobrov@dv.kw.ukrtel.net
Number of residents                        6820
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Urban settlement Dobrovelychkivka
street)                                      Dobrovelychkivka District
Type of ownership                            State
Area, hectares                               2,7
Possible usage of land (purpose)             Agricultural lands, industrial facilities
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          According to evaluation
Estimated cost, UAH                          According to evaluation
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               35,0
Distance to Kirovohrad, km                   140,0
Distance to highway, km                      45,0
Miscellaneous information                    -
Contact person, (position, full name)        First Deputy Chairman of
                                             Dobrovelychkivka District State
                                             Administration
                                             Serhii I. KHRUSHCH
Phone, fax, e-mail                           +38 (05253) 5-14-31
                                             +38 (05253) 5-14-38
                                             +38 (05253) 5-12-37
                                             dobrov@dv.kw.ukrtel.net
Number of residents                          6820
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district, Urban settlement Dobrovelychkivka
street)                                    Dobrovelychkivka District, (contour
                                           378)
Type of ownership                          State
Area, hectares                             2,0
Possible usage of land (purpose)           Agricultural lands, industrial facilities
Construction project available             -
Conditions of investment attraction        Lease with buy-out option
Price (UAH / sq. m)                        According to evaluation
Estimated cost, UAH                        According to evaluation
Water supply: (yes/no)                     No
Distance to source point, m                -
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     No
Power, kV                                  -
Distance to source point, m                -
Distance to railroad track, km             27,0
Distance to Kirovohrad, km                 120,0
Distance to highway, km                    35,0
Miscellaneous information                  -
Contact person, (position, full name)      First Deputy Chairman of
                                           Dobrovelychkivka District State
                                           Administration
                                           Serhii I. KHRUSHCH
Phone, fax, e-mail                         +38 (05253) 5-14-31
                                           +38 (05253) 5-14-38
                                           +38 (05253) 5-12-37
                                           dobrov@dv.kw.ukrtel.net
Number of residents                        6820
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Urban settlement Dobrovelychkivka
street)                                      Dobrovelychkivka District (contour 268)
Type of ownership                            State
Area, hectares                               0,6
Possible usage of land (purpose)             Industrial facilities and yards
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          According to evaluation
Estimated cost, UAH                          According to evaluation
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               27,0
Distance to Kirovohrad, km                   120,0
Distance to highway, km                      35,0
Miscellaneous information                    -
Contact person, (position, full name)        First Deputy Chairman of
                                             Dobrovelychkivka District State
                                             Administration
                                             Serhii I. KHRUSHCH
Phone, fax, e-mail                           +38 (05253) 5-14-31
                                             +38 (05253) 5-14-38
                                             +38 (05253) 5-12-37
                                             dobrov@dv.kw.ukrtel.net
Number of residents                          6820
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Urban settlement Dobrovelychkivka
street)                                      Dobrovelychkivka District (contour 152)
Type of ownership                            State
Area, hectares                               2,0
Possible usage of land (purpose)             Agriculture, industrial facilities and
                                             yards
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          According to evaluation
Estimated cost, UAH                          According to evaluation
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               27
Distance to Kirovohrad, km                   120
Distance to highway, km                      35
Miscellaneous information                    -
Contact person, (position, full name)        First Deputy Chairman of
                                             Dobrovelychkivka District State
                                             Administration
                                             Serhii I. KHRUSHCH
Phone, fax, e-mail                           +38 (05253) 5-14-31
                                             +38 (05253) 5-14-38
                                             +38 (05253) 5-12-37
                                             dobrov@dv.kw.ukrtel.net
Number of residents                          6820
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Urban settlement Dobrovelychkivka
street)                                      Dobrovelychkivka District (contour 260)
Type of ownership                            State
Area, hectares                               2,0
Possible usage of land (purpose)             Industrial facilities and yards
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          According to evaluation
Estimated cost, UAH                          According to evaluation
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               27
Distance to Kirovohrad, km                   120
Distance to highway, km                      35
Miscellaneous information                    -
Contact person, (position, full name)        First Deputy Chairman of
                                             Dobrovelychkivka District State
                                             Administration
                                             Serhii I. KHRUSHCH
Phone, fax, e-mail                           +38 (05253) 5-14-31
                                             +38 (05253) 5-14-38
                                             +38 (05253) 5-12-37
                                             dobrov@dv.kw.ukrtel.net
Number of residents                          6820
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Urban settlement Dobrovelychkivka
street)                                      Dobrovelychkivka District (contour 283)
Type of ownership                            State
Area, hectares                               0,5
Possible usage of land (purpose)             Industrial facilities and yards
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               27
Distance to Kirovohrad, km                   120
Distance to highway, km                      35
Miscellaneous information                    -
Contact person, (position, full name)        First Deputy Chairman of
                                             Dobrovelychkivka District State
                                             Administration
                                             Serhii I. KHRUSHCH
Phone, fax, e-mail                           +38 (05253) 5-14-31
                                             +38 (05253) 5-14-38
                                             +38 (05253) 5-12-37
                                             dobrov@dv.kw.ukrtel.net
Number of residents                          6820
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   25, Shevchenko St., Pomichna,
street)                                      Dobrovelychkivka District
Type of ownership                            Municipal
Area, hectares                               0,54
Possible usage of land (purpose)             Placement of business premises
Construction project available               Yes, office building
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          46,19
Estimated cost, UAH                          249426
Water supply: (yes/no)                       Yes
Distance to source point, m                  50
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  100
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  100
Distance to railroad track, km               1
Distance to Kirovohrad, km                   90
Distance to highway, km                      8
Miscellaneous information                    -
Contact person, (position, full name)        Pomichna Mayor, Dorovelychkivka
                                             District
                                             Mykola M. ANTOSHYK
Phone, fax, e-mail                           +38 (05253) 27 2 60
Number of residents                          9860
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   104, Peremogy St., Pomichna,
street)                                      Dobrovelychkivka District
Type of ownership                            Municipal
Area, hectares                               0,48
Possible usage of land (purpose)             Placement of business premises, other
                                             commercial buildings
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          53,85
Estimated cost, UAH                          258 480
Water supply: (yes/no)                       Yes
Distance to source point, m                  50
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  100
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  100
Distance to railroad track, km               1
Distance to Kirovohrad, km                   90
Distance to highway, km                      8
Miscellaneous information                    -
Contact person, (position, full name)        Pomichna Mayor, Dorovelychkivka
                                             District
                                             Mykola M. ANTOSHYK
Phone, fax, e-mail                           +38 (05253) 27 2 60
Number of residents                          9860
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   4, Enhels St., Pomichna,
street)                                      Dobrovelychkivka District
Type of ownership                            Municipal
Area, hectares                               1,72
Possible usage of land (purpose)             Placement of business premises etc.
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          47,68
Estimated cost, UAH                          820096
Water supply: (yes/no)                       Yes
Distance to source point, m                  50
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  100
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  100
Distance to railroad track, km               1
Distance to Kirovohrad, km                   90
Distance to highway, km                      8
Miscellaneous information                    -
Contact person, (position, full name)        Pomichna Mayor, Dorovelychkivka
                                             District
                                             Mykola M. ANTOSHYK
Phone, fax, e-mail                           +38 (05253) 27 2 60
Number of residents                          9860
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   17, A.Synytskogo St., Pomichna,
street)                                      Dobrovelychkivka District
Type of ownership                            State
Area, hectares                               0,09
Possible usage of land (purpose)             Placement of business premises
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          13,08
Estimated cost, UAH                          11772
Water supply: (yes/no)                       Yes
Distance to source point, m                  50
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  50
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  50
Distance to railroad track, km               0,5
Distance to Kirovohrad, km                   90
Distance to highway, km                      8
Miscellaneous information                    -
Contact person, (position, full name)        Chief of a railway junction of Pomichna
                                             Station
                                             Vasyl A. KHARTI
Phone, fax, e-mail                           22 08 (railway),
                                             via +38 (05253) 27-2-34
Number of residents                          9860
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Village Ivanivka
street)                                      Dolynska District
Type of ownership                            Municipal
Area, sq. m                                  33 500
Possible usage of land (purpose)             For creation of infrastructure of green
                                             tourism development; housing
Construction project available               -
Conditions of investment attraction          Investor's own funds
Price (UAH / sq. m)                          Auction
Estimated cost, UAH                          500-700
Water supply: (yes/no)                       No
Distance to source point, m                  Water well
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         Yes
Pressure                                     -
Distance to source point, m                  7000
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  20
Distance to railroad track, km               12
Distance to Kirovohrad, km                   80
Distance to highway, km                      12
Miscellaneous information                    500 m away from the Veseli Bokovenky
                                             reserve park
Contact person, (position, full name)        Chairperson of Ivanivka Village Council
                                             Lyudmyla V.KORNYEVA
Phone, fax, e-mail                           +38 (05234) 5-36-39
Number of residents                          711
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Dolynska District, Dolynska, North-
street)                                      Eastern industrial zone
Type of ownership                            Municipal
Area, hectares                               25,0
Possible usage of land (purpose)             For creation of production capacities
Construction project available               -
Conditions of investment attraction          Investor’s own funds
Price (UAH / sq. m)                          Auction
Estimated cost, UAH                          700
Water supply: (yes/no)                       No
Distance to source point, m                  1000
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         Yes
Pressure
Distance to source point, m                  50
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  20
Distance to railroad track, km               1
Distance to Kirovohrad, km                   80
Distance to highway, km                      0,5
Miscellaneous information                    -
Contact person, (position, full name)        Chief of the Department of Town
                                             Planning and Architecture of District
                                             State Administration
                                             Viktor G.KUZMENKO
Phone, fax, e-mail                           +38 (05234) 5-10-38
Number of residents                          20000
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Pervozvanivka Village Council,
street)                                      Kirovohrad District
Type of ownership                            State
Area, hectares                               2 land plots of 0,6 hectares each
Possible usage of land (purpose)             Gas station, camping site, service center,
                                             car wash, café, commercial
                                             establishment
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          81
Estimated cost, UAH                          486 000
Water supply: (yes/no)                       Yes
Distance to source point, m                  200
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         Yes
Pressure                                     Medium
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  100
Distance to railroad track, km               15
Distance to Kirovohrad, km                   1,5
Distance to highway, km                      0,01
Miscellaneous information                    -
Contact person, (position, full name)        Deputy Head of State Land Resources
                                             Committee in Kirovohrad District
                                             Yevhen L. PYETKOV
Phone, fax, e-mail                           +38 (0522) 56-98-33
                                             +38 (0522) 56-34-64
Number of residents                          2211
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Village Velyka Severynka, Kirovohrad
street)                                      District
Type of ownership                            State
Area, hectares                               0,5
Possible usage of land (purpose)             Café , trading object
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          81
Estimated cost, UAH                          405 000
Water supply: (yes/no)                       Yes
Distance to source point, m                  500
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  200
Distance to railroad track, km               0,015
Distance to Kirovohrad, km                   1,5
Distance to highway, km                      0,01
Miscellaneous information                    -
Contact person, (position, full name)        Deputy Head of State Land Resources
                                             Committee in Kirovohrad District
                                             Yevhen L. PYETKOV
Phone, fax, e-mail                           +38 (0522) 56-98-33
                                             +38 (0522) 56-34-64
Number of residents                          726
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Village Gruzke, Kirovohrad District
street)
Type of ownership                            Private
Area, hectares                               49,0
Possible usage of land (purpose)             Horticulture
Construction project available               In the process of development
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       Artesian well
Distance to source point, m                  500
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         -
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       -
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               10
Distance to Kirovohrad, km                   18
Distance to highway, km                      4
Miscellaneous information                    -
Contact person, (position, full name)        Manager of Zolota Bdzhola Farming
                                             Enterprise
                                             Yaroslav A. KOSHLATYI
Phone, fax, e-mail                           +38 (0522) 24-10-79
                                             +38 (0522) 22-77-39
                                             Zlatomed@list.ru
Number of residents                          1177
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Village Gruzke, Kirovohrad District
street)
Type of ownership                            Private
Area, hectares                               22,0
Possible usage of land (purpose)             Horticulture
Construction project available               In the process of development
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       Artesian well
Distance to source point, m                  500
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         -
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       -
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               10
Distance to Kirovohrad, km                   18
Distance to highway, km                      4
Miscellaneous information                    -
Contact person, (position, full name)        Manager of "Zolota Bdzhola" Farming
                                             Enterprise
                                             Yaroslav A. KOSHLATYI
Phone, fax, e-mail                           +38 (0522) 24-10-79
                                             +38 (0522) 22-77-39
                                             Zlatomed@list.ru
Number of residents                          1177
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Urban settlement Kompaniyivka,
street)                                      5, Kalinin St. (near the Village Council)
Type of ownership                            Private
Area, hectares                               1,0761
Possible usage of land (purpose)             Resumption of operation of a milk
                                             receiving centre; milk processing
Construction project available               The land plot includes:
                                             1.Dairy plant А: area – 383,1 sq. m,
                                             height – 5,0 m, volume – 1915 cu. m;
                                             2.Administrative premises: area –
                                             116,3 sq. m, height – 4,2 m, capacity –
                                             488 cu. m;
                                             3. Dairy plant В: area – 525,5 m, height
                                             – 9,0 m, volume – 4730 cu. m;
                                             4.Cellar: area – 37,8 sq. m
                                             5.Transformer: area – 27,5 sq. m
                                             6.Toilet: area – 10,1 sq. m
                                             7.Car wash: area – 80,6 sq.m
                                             8.Draining pits: total area - 92,4 sq.m
                                             9.Boiler-house: area – 118,1 sq.m
Conditions of investment attraction          Loan, share in capital
Price (UAH / sq. m)                          (rental fee for land ) 32,45 UAH for
                                             1 sq. m
Estimated cost, UAH                          110 thousand UAH minimum
Water supply: (yes/no)                       On the land plot
Distance to source point, m                  -
Sewage system: (yes/no)                      On the land plot
Distance to sewage point, m                  -
Gas supply: (yes/no)                         Yes
Pressure                                     Medium
Distance to source point, m                  10
Power supply: (yes/no)                       On the land plot
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               -
Distance to Kirovohrad, km                   35
Distance to highway, km                      2
Miscellaneous information                    -
Contact person, (position, full name)        Manager of enterprise
                                             Yuriy M. TKACHUK
                      Chairman of Kompaniyivka Settlement
                      Council
                      Oleksandr A. MASLIUKOV
Phone, fax, e-mail    Head: +38 (050) 457-31-62
                      +38 (05240) 2-11-97,
                      Settlement Council: +38 (05240)2-12-65
Number of residents   4256
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Urban settlement Kompaniyivka
street)                                    Kalinin St. (near the brand name shop of
                                           Коlоs Production-Agricultural
                                           Cooperative)
Type of ownership                          Municipal
Area, hectares                             0,083
Possible usage of land (purpose)           Shop, café
Construction project available             -
Conditions of investment attraction        Investor’s own funds
Price (UAH / sq. m)                        Via auction.
                                           Price (UAH/sq.m) – up to 12 % of expert
                                           evaluation price
Estimated cost, UAH                        Approximate monetary valuation -
                                           4587,6 UAH
Water supply: (yes/no)                     No
Distance to source point, m                20
Sewage system: (yes/no)                    No
Distance to sewage point, m                20
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                100
Power supply: (yes/no)                     Yes
Power, kV                                  -
Distance to source point, m                20
Distance to railroad track, km             -
Distance to Kirovohrad, km                 30
Distance to highway, km                    500
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Kompaniyivka Settlement
                                           Council
                                           Oleksandr A. MASLIUKOV
Phone, fax, e-mail                         +38 (05240) 2-11-97,
                                           +38 (05240)2-12-65
Number of residents                        4256
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Urban settlement Kompaniyivka
street)                                    Kalinin St. (near the pond and the Коzаk
                                           store)
Type of ownership                          Municipal
Area, hectares                             0,045
Possible usage of land (purpose)           Store, cafe
Construction project available             -
Conditions of investment attraction        Investor’s own funds
Price (UAH / sq. m)                        Via auction.
                                           Price (UAH/sq.m) – up to 12 % of expert
                                           evaluation price
Estimated cost, UAH                        Approximate monetary valuation
                                           2487,15 UAH
Water supply: (yes/no)                     No
Distance to source point, m                100
Sewage system: (yes/no)                    No
Distance to sewage point, m                100
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                200
Power supply: (yes/no)                     Yes
Power, kV                                  -
Distance to source point, m                20
Distance to railroad track, km             -
Distance to Kirovohrad, km                 30
Distance to highway, km                    500
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Kompaniyivka Settlement
                                           Council
                                           Oleksandr A. Masliukov
Phone, fax, e-mail                         +38 (05240) 2-11-97,
                                           +38 (05240)2-12-65
Number of residents                        4256
                          INVESTMENT PROPOSAL
                     of the land offered for implementation
                             of an investment project

Land location (name of locality, district, Village Khmelyove, Mala Vyska
street)                                    District, 623rd km of Znamyanka-Lviv
                                           Highway
Type of ownership                          Municipal
Area, hectares                             0,25
Possible usage of land (purpose)           Construction of a gas station
Construction project available             -
Conditions of investment attraction        Direct investment
Price (UAH / sq. m)                        29
Estimated cost, UAH                        72500
Water supply: (yes/no)                     No
Distance to source point, m                -
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     Yes
Power, kV                                  -
Distance to source point, m                300
Distance to railroad track, km             25
Distance to Kirovohrad, km                 75
Distance to highway, km                    1,5
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Khmelyove Village Council
                                           Viktor A. KOMAKHA
Phone, fax, e-mail                         +38 (05258) 3-83-80
Number of residents                        2500
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Mala Vyska, Novomyrhorod Road,
street)                                      83 km.
Type of ownership                            Municipal
Area, hectares                               0,25
Possible usage of land (purpose)             Production, storage and sale of building
                                             materials
Construction project available               -
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          53
Estimated cost, UAH                          132 500
Water supply: (yes/no)                       Yes (Malovyskivsky Dairy Factory JSC)
Distance to source point, m                  50
Sewage system: (yes/no)                      Yes (Malovyskivsky Dairy Factory JSC)
Distance to sewage point, m                  20
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  50
Distance to railroad track, km               1
Distance to Kirovohrad, km                   65
Distance to highway, km                      0
Miscellaneous information                    -
Contact person, (position, full name)        Mayor of Mala Vyska
                                             Yurii L.HULDAS
Phone, fax, e-mail                           +38 (05258) 5-14-54
Number of residents                          12000
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Mala Vyska, between the buildings
street)                                      No.83 and No.85, 40 Rokiv Zhovtnia St.
Type of ownership                            Municipal
Area, hectares                               0,66
Possible usage of land (purpose)             Building of a workshop for agricultural
                                             products processing
Construction project available               -
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          57
Estimated cost, UAH                          376200
Water supply: (yes/no)                       Yes
Distance to source point, m                  20
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  0
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  30
Distance to railroad track, km               2
Distance to Kirovohrad, km                   63
Distance to highway, km                      0
Miscellaneous information                    -
Contact person, (position, full name)        Mayor of Mala Vyska
                                             Yurii L.HULDAS
Phone, fax, e-mail                           +38 (05258) 5-14-54
Number of residents                          12000
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Southern part of Mala Vyska
street)
Type of ownership                            Municipal
Area, hectares                               23,9
Possible usage of land (purpose)             Construction of an industrial plant
Construction project available               -
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          -
Estimated cost, UAH                          Not calculated
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  100
Distance to railroad track, km               0,05
Distance to Kirovohrad, km                   63
Distance to highway, km                      0,07
Miscellaneous information                    -
Contact person, (position, full name)        Mayor of Mala Vyska
                                             Yurii L.HULDAS
Phone, fax, e-mail                           +38 (05258) 5-14-54
Number of residents                          12000
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Industrial zone, urban settlement
street)                                      Smoline, Mala Vyska District
Type of ownership                            State
Area, hectares                               14,6
Possible usage of land (purpose)             Construction of an industrial plant
Construction project available               -
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          -
Estimated cost, UAH                          Not calculated
Water supply: (yes/no)                       Yes
Distance to source point, m                  500
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  500
Gas supply: (yes/no)                         Yes
Pressure                                     -
Distance to source point, m                  800
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  800
Distance to railroad track, km               0,02
Distance to Kirovohrad, km                   87
Distance to highway, km                      0,05
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Mala Vyska District State
                                             Administration
                                             Vasyl H.ZHURAVEL
Phone, fax, e-mail                           +38 (05258) 5-15-80
Number of residents                          9100
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Industrial zone, urban settlement
street)                                      Smoline, Mala Vyska District
Type of ownership                            State
Area, hectares                               4,8
Possible usage of land (purpose)             Construction of an industrial plant
Construction project available               -
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          -
Estimated cost, UAH                          Not calculated
Water supply: (yes/no)                       Yes
Distance to source point, m                  200
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         Yes
Pressure                                     -
Distance to source point, m                  600
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  600
Distance to railroad track, km               0,02
Distance to Kirovohrad, km                   87
Distance to highway, km                      0,03
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Mala Vyska District State
                                             Administration
                                             Vasyl H.ZHURAVEL
Phone, fax, e-mail                           +38 (05258) 5-15-80
Number of residents                          9100
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Industrial zone, urban settlement
street)                                    Smoline, Mala Vyska District
                                           A boiler-house is available on the
                                           territory
Type of ownership                          Municipal
Area, hectares                             3,8
Possible usage of land (purpose)           Construction of an industrial plant
Construction project available             -
Conditions of investment attraction        Direct investment
Price (UAH / sq. m)                        -
Estimated cost, UAH                        Not calculated
Water supply: (yes/no)                     Yes
Distance to source point, m                0
Sewage system: (yes/no)                    Yes
Distance to sewage point, m                0
Gas supply: (yes/no)                       Yes
Pressure                                   -
Distance to source point, m                0
Power supply: (yes/no)                     Yes
Power, kV                                  -
Distance to source point, m                -
Distance to railroad track, km             0
Distance to Kirovohrad, km                 87
Distance to highway, km                    0
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Smoline Settlement Council
                                           Mykola M. МAZURA
Phone, fax, e-mail                         +38 (05258) 5-45-25
Number of residents                        9100
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Village Novoandriyivka, 44, Lenin St.
street)                                      Novhorodka District
Type of ownership                            Municipal
Area, hectares                               0,38
Possible usage of land (purpose)             Re-equipment of two-storey building of
                                             a kindergarten into an industrial facility
                                             provided that sanitary code requirements
                                             will be met
Construction project available               -
Conditions of investment attraction          Investor’s own funds
Price (UAH / sq. m)                          100
Estimated cost, UAH                          40000
Water supply: (yes/no)                       Yes
Distance to source point, m                  On site
Sewage system: (yes/no)                      No
Distance to sewage point, m                  It is possible to build local treating
                                             facilities directly on the territory of the
                                             facility

Gas supply: (yes/no)                         No
Pressure                                     Medium
Distance to source point, m                  25
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  Supplied to the building
Distance to railroad track, km               22
Distance to Kirovohrad, km                   30
Distance to highway, km                      3 km away from Kirovohrad-Kryvyi
                                             Rih-Zaporizhya highway
Miscellaneous information                    The territory is enclosed by the metal
                                             fence. A paved driveway is available.
Contact person, (position, full name)        Chairman of Novoandriivka Village
                                             Council
                                             Volodymyr I. BRATUKHIN
Phone, fax, e-mail                           +38 (05241) 9-45-31
Number of residents                          554
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   village Rybchyne, Novhorodka District
street)
Type of ownership                            Municipal
Area, hectares                               0,58
Possible usage of land (purpose)             Re-equipment of the former school
                                             building at the investor’s discretion
                                             provided that sanitary code requirements
                                             will be met
Construction project available               -
Conditions of investment attraction          Investor’s own funds
Price (UAH / sq. m)                          80
Estimated cost, UAH                          20000
Water supply: (yes/no)                       Yes (well)
Distance to source point, m                  8
Sewage system: (yes/no)                      No
Distance to sewage point, m                  It is possible to build local treating
                                             facilities directly on the territory of the
                                             object

Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  Supplied to the building
Distance to railroad track, km               28
Distance to Kirovohrad, km                   24
Distance to highway, km                      2 km away from Kirovohrad-Kryvyi
                                             Rih-Zaporizhya highway
Miscellaneous information                    The territory is enclosed by the metal
                                             fence. Paved driveway is available. In
                                             addition, a housing of a canteen with
                                             dimensions of 9х12 m is also available
                                             on the territory
Contact person, (position, full name)        Chairman of Novoandriyivka Village
                                             Council
                                             Volodymyr I. BRATUKHIN
Phone, fax, e-mail                           +38 (05241) 9-45-31
Number of residents                          205
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   1, Naberezhna St., urban village
street)                                      Novoarkhanhelsk
Type of ownership                            Municipal
Area, hectares                               0,4
Possible usage of land (purpose)             Apartment building
Construction project available               -
Conditions of investment attraction
Price (UAH / sq. m)                          17,42
Estimated cost, UAH                          69667
Water supply: (yes/no)                       Yes
Distance to source point, m                  30
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  120
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    100
Distance to source point, m                  100-150
Distance to railroad track, km               -
Distance to Kirovohrad, km                   120
Distance to highway, km                      6
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Novoarkhanhelsk
                                             Settlement Council
                                             Mykola D. LYASKOVSKYI,
                                             Land manager
                                             Serhiy B. DETYNENKO
Phone, fax, e-mail                           +38 (05255) 2-24-39
                                             +38 (05255) 2-22-01
Number of residents                          7205
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   48, Chkalov St., urban settlement
street)                                      Novoarkhanhelsk
Type of ownership                            Municipal
Area, hectares                               0,69
Possible usage of land (purpose)             Pharmacy building
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          16,5
Estimated cost, UAH                          113841
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    60
Distance to source point, m                  100
Distance to railroad track, km               -
Distance to Kirovohrad, km                   120
Distance to highway, km                      3
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Novoarkhanhelsk
                                             Settlement Council
                                             Mykola D. LYASKOVSKYI,
                                             Land manager
                                             Serhiy B. DETYNENKO
Phone, fax, e-mail                           +38 (05255) 2-24-39
                                             +38 (05255) 2-22-01
Number of residents                          7205
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, v. Ivanivka Novoarkhanhelsk District
street)
Type of ownership                          State
Area, hectares                             17,6 (outbuildings of the former
                                           breeding complex)
Possible usage of land (purpose)           At investor’s discretion
Construction project available             -
Conditions of investment attraction        Lease with subsequent buy-out
Price (UAH / sq. m)                        10% of the monetary value
Estimated cost, UAH                        Negotiable
Water supply: (yes/no)                     No
Distance to source point, m                200
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                500
Power supply: (yes/no)                     No
Power, kV                                  35
Distance to source point, m                200
Distance to railroad track, km             35
Distance to Kirovohrad, km                 112
Distance to highway, km                    24
Miscellaneous information                  -
Contact person, (position, full name)      Head of Ivanivka Village Council
                                           Vasyl L. KUZNETSOV
Phone, fax, e-mail                         +38 (05255) 40-2-41
Number of residents                        626
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   v. Martynivka, Novoarkhanhelsk
street)                                      District, Kirovohrad Region
Type of ownership                            Municipal
Area, hectares                               18,0
Possible usage of land (purpose)             At investor’s discretion
Construction project available               -
Conditions of investment attraction          Lease with subsequent buy-out
Price (UAH / sq. m)                          Up to 10 % of expert monetary
                                             evaluation
Estimated cost, UAH                          Negotiable
Water supply: (yes/no)                       Yes – a well
Distance to source point, m                  20
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         -
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    Power transmission line -10 thousand kV
Distance to source point, m                  20
Distance to railroad track, km               50
Distance to Kirovohrad, km                   120
Distance to highway, km                      15
Miscellaneous information                    Paved driveway
Contact person, (position, full name)        Head of Martynivka Village Council
                                             Vasyl I. BABCHUK
Phone, fax, e-mail                           +38 (05255) 2-19-47
                                             martsrada@na.kw.ukrtel.net
Number of residents                          320
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   v. Nadlak, Lelekivska Str.,
street)                                      Novoarkhanhelsk District
Type of ownership                            State
Area, hectares                               7,2
Possible usage of land (purpose)             At investor’s discretion
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          Up to 10% of expert monetary
                                             evaluation
Estimated cost, UAH                          Negotiable
Water supply: (yes/no)                       Yes
Distance to source point, m                  200
Sewage system: (yes/no)                      No
Distance to sewage point, m                  No
Gas supply: (yes/no)                         No
Pressure                                     No
Distance to source point, m                  No
Power supply: (yes/no)                       Yes
Power, kV                                    380
Distance to source point, m                  30
Distance to railroad track, km               35
Distance to Kirovohrad, km                   100
Distance to highway, km                      12
Miscellaneous information                    -
Contact person, (position, full name)        Head of Nadlak Village Council
                                             Larysa H. KOZHUSHKO
Phone, fax, e-mail                           +38 (05255) 2-61-42
Number of residents                          1533
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Shevchenko Str., v. Pidvysoke,
street)                                      Novoarkhanhelsk District
Type of ownership                            Municipal
Area, hectares                               6,1
Possible usage of land (purpose)             At investor’s discretion
Construction project available               -
Conditions of investment attraction          On a leasehold basis
Price (UAH / sq. m)                          Up to 10 % of expert monetary
                                             evaluation
Estimated cost, UAH                          Negotiable
Water supply: (yes/no)                       No
Distance to source point, m                  100
Sewage system: (yes/no)                      No
Distance to sewage point, m                  No
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  No
Power supply: (yes/no)                       150
Power, kV                                    150
Distance to source point, m                  50
Distance to railroad track, km               56
Distance to Kirovohrad, km                   150
Distance to highway, km                      10
Miscellaneous information                    -
Contact person, (position, full name)        Head of Pidvysoke Village Council
                                             Oleksandr A. OCHERETNII
Phone, fax, e-mail                           +38 (05255) 43-1-86
Number of residents                          1814
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   v. Nadlak, Lelekivska Str.,
street)                                      Novoarkhanhelsk District
Type of ownership                            State
Area, hectares                               7,5
Possible usage of land (purpose)             At investor’s discretion
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          Up to 10% of expert monetary
                                             evaluation
Estimated cost, UAH                          Negotiable
Water supply: (yes/no)                       Yes
Distance to source point, m                  500
Sewage system: (yes/no)                      No
Distance to sewage point, m                  No
Gas supply: (yes/no)                         No
Pressure                                     No
Distance to source point, m                  No
Power supply: (yes/no)                       Yes
Power, kV                                    380
Distance to source point, m                  40
Distance to railroad track, km               35
Distance to Kirovohrad, km                   100
Distance to highway, km                      12
Miscellaneous information                    -
Contact person, (position, full name)        Head of Nadlak Village Council
                                             Larysa H. KOZHUSHKO
Phone, fax, e-mail                           +38 (05255) 2-61-42
Number of residents                          1533
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   v. Tymofiyivka, Myru Str.,
street)                                      Novoarkhanhelsk District
Type of ownership                            State
Area, hectares                               9,1
Possible usage of land (purpose)             At investor’s discretion
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          Up to 10% of expert monetary
                                             evaluation
Estimated cost, UAH                          Negotiable
Water supply: (yes/no)                       No
Distance to source point, m                  400
Sewage system: (yes/no)                      No
Distance to sewage point, m                  No
Gas supply: (yes/no)                         No
Pressure                                     No
Distance to source point, m                  No
Power supply: (yes/no)                       Yes
Power, kV                                    380
Distance to source point, m                  50
Distance to railroad track, km               45
Distance to Kirovohrad, km                   95
Distance to highway, km                      8
Miscellaneous information                    -
Contact person, (position, full name)        Head of Nadlak Village Council
                                             Larysa H. KOZHUSHKO
Phone, fax, e-mail                           +38 (05255) 2-61-42
Number of residents                          341
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Industrial site of the closed mine
street)                                    "Novomyrhorodska", Novomyrhorod
                                           District
Type of ownership                          State
Area, hectares                             25,0
Possible usage of land (purpose)           The land is suitable for implementation
                                           of investment projects in production of
                                           poultry, pork, processing of agricultural
                                           products, fuel production etc.
Construction project available             No
Conditions of investment attraction        -
Price (UAH / sq. m)                        -
Estimated cost, UAH                        -
Water supply: (yes/no)                     No
Distance to source point, m                The land plot is adjacent to a municipal
                                           water supply system (capacity -
                                           2000 m3/24 hours)
Sewage system: (yes/no)                    Municipal treating facilities are located
                                           close by
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                6 km to high-pressure gas pipeline
Power supply: (yes/no)                     Yes
Power, kV                                  154 kV and 35 kV power lines are
                                           available on the territory
Distance to source point, m                -
Distance to railroad track, km             -
Distance to Kirovohrad, km                 65
Distance to highway, km                    The land plot is adjacent to the
                                           Gorodyshche – Ustynivka road
Miscellaneous information                  -
Contact person, (position, full name)      Novomyrhorod Mayor
                                           Yakiv B. NEMYROVSKYI
Phone, fax, e-mail                         +38 (05256) 4-30-38,
                                           +38 (05256) 4-29-67
Number of residents                        12200
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   1,5 km away from village Pupurivka,
street)                                      Novomyrhorod District
Type of ownership                            State
Area, hectares                               16,0
Possible usage of land (purpose)             The land is suitable for implementation
                                             of investment projects in production of
                                             poultry, pork, processing of agricultural
                                             products.
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  3 km to high-pressure gas pipeline right-
                                             of-way project to Mala Vyska
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  3 km to 154 kV power line
Distance to railroad track, km               0,3
Distance to Kirovohrad, km
Distance to highway, km                      The land is adjacent to the
                                             Novomyrhorod–Kirovohrad road, 8 km
                                             from    southern    outskirts    of
                                             Novomyrhorod
Miscellaneous information
Contact person, (position, full name)        Chairman of Purpurivka Village Council
                                             Mykola S. NOVOSAD
Phone, fax, e-mail                           +38 (05256) 4-25-01
Number of residents                          412
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Situated on the southern outskirts of
street)                                      Novomyrhorod
Type of ownership                            State
Area, hectares                               15,0
Possible usage of land (purpose)             The land is suitable for construction of
                                             greenhouses, poultry factory, and
                                             agricultural product processing facilities.
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       No
Distance to source point, m                  The land is adjacent to water supply
                                             system (capacity 2000 m3/24 hours)
Sewage system: (yes/no)                      No
Distance to sewage point, m                  Adjacent to urban sewage system
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  1,5 km to high-pressure gas pipeline
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  Adjacent to 35 kV power line
Distance to railroad track, km               5,5
Distance to Kirovohrad, km                   -
Distance to highway, km                      The land is adjacent to the Horodyshche-
                                             Ustynivka road
Miscellaneous information                    -
Contact person, (position, full name)        Novomyrhorod Mayor
                                             Yakiv B. NEMYROVSKYI
Phone, fax, e-mail                           +38 (05256) 4-30-38,
                                             +38 (05256) 4-29-67
Number of residents                          12200
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   1 km away from outskirts of the village
street)                                      Likareve, Novomyrhorod District
Type of ownership                            State
Area, hectares                               10,0
Possible usage of land (purpose)              The land is suitable for implementation
                                              of an investment project in extraction of
                                              facing stone
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       -
Distance to source point, m                  -
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         -
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       -
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               15
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    Non-operational labradorite quarry site.
                                             Estimated resources – 1 700 000 cu. m
Contact person, (position, full name)        Novomyrhorod Mayor
                                             Yakiv B. NEMYROVSKYI
Phone, fax, e-mail                           +38 (05256) 4-30-38,
                                             +38 (05256) 4-29-67
Number of residents                          216
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Southern outskirts of Novomyrhorod
street)
Type of ownership                            State
Area, hectares                               30,0
Possible usage of land (purpose)             The land is suitable for implementation
                                             of an investment project in production of
                                             facing bricks.
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       -
Distance to source point, m                  -
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         -
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       -
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               -
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    Non-operational brick factory site.
                                             Novomyrhorod loam deposit has
                                             resources acc. to the categories A+B+C
                                             = 6,7 million cu. m
Contact person, (position, full name)        Novomyrhorod Mayor
                                             Yakiv B. NEMYROVSKYI
Phone, fax, e-mail                           +38 (05256) 4-30-38,
                                             +38 (05256) 4-29-67
Number of residents                          12200
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Novomyrhorod
street)
Type of ownership                            State
Area, hectares                               1,5
Possible usage of land (purpose)             The land is suitable for placement of
                                             small-size industrial enterprise which
                                             does not require waste treatment
                                             facilities
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       -
Distance to source point, m                  -
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         Yes
Pressure                                     medium-pressure gas pipeline
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               The land is adjacent to Novomyrhorod
                                             railway station
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    -
Contact person, (position, full name)        Novomyrhorod Mayor
                                             Yakiv B. NEMYROVSKYI
Phone, fax, e-mail                           +38 (05256) 4-30-38,
                                             +38 (05256) 4-29-67
Number of residents                          12200
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Eastern outskirts of village Yosypivka,
street)                                      Novomyrhorod District
Type of ownership                            State
Area, hectares                               10,0
Possible usage of land (purpose)             The land is suitable for placement of
                                             enterprises for meat production and
                                             processing
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       Yes
Distance to source point, m                  -
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  1 km to gas-distribution station
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  -
Distance to railroad track, km               8
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    -
Contact person, (position, full name)        Chairperson of Yosypivka           Village
                                             Council
                                             Valentyna G. SNISARENKO
Phone, fax, e-mail                           +38 (05256) 4-25-21
                                             +38 (05256) 97-1-30
Number of residents                          580
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Eastern outskirts of the village
street)                                      Tyshkivka, Novomyrhorod District
Type of ownership                            State
Area, hectares                               10,0
Possible usage of land (purpose)              The land is suitable for placement of
                                              enterprises for meat production and
                                              processing
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       Yes
Distance to source point, m                  -
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  500 m to the gas-distribution station
Power supply: (yes/no)                       Yes
Power, kV                                    10
Distance to source point, m                  -
Distance to railroad track, km               6
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    -
Contact person, (position, full name)        Chairperson of Tyshkivka Village
                                             Council
                                             Mykola I. ODHOKOZ
Phone, fax, e-mail                           +38 (05256) 97-4-73
Number of residents                          970
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Western outskirts of the village
street)                                      Osytnyazhka, Novomyrhorod District
Type of ownership                            State
Area, hectares                               30,0
Possible usage of land (purpose)             The land is suitable for placement of an
                                             enterprise for agricultural products
                                             processing or a brick factory
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       -
Distance to source point, m                  -
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  The loam deposit is adjacent to the future
                                             gas pipeline right-of-way
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  Adjacent to 110 kV power line
Distance to railroad track, km               8
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    -
Contact person, (position, full name)        Chairperson of Osytnyazhka Village
                                             Council
                                             Serhii A. HORBATIUK
Phone, fax, e-mail                           +38 (05256) 4-25-12
Number of residents                          830
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   To the west of the village Kamyanka,
street)                                      Novomyrhorod District
Type of ownership                            State
Area, hectares                               8,0
Possible usage of land (purpose)             The land is suitable for implementation
                                             of the project in extraction of facing
                                             stone; requires additional geological
                                             survey
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       -
Distance to source point, m                  -
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       -
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               5
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    The land includes the surveyed
                                             labradorite occurrence
Contact person, (position, full name)        Chairman of Kamyanka Village Council
                                             Pavlo I. SAMOILENKO
Phone, fax, e-mail                           +38 (05256) 4-25-24
Number of residents                          630
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Southern outskirts of the village
street)                                      Vasylivka, Novomyrhorod district
Type of ownership                            State
Area, hectares                               20,0
Possible usage of land (purpose)             The land is suitable for placement of an
                                             enterprise for cattle-growing (the village
                                             has over 100 hectares of unused natural
                                             pastures)
Construction project available               -
Conditions of investment attraction
Price (UAH / sq. m)
Estimated cost, UAH
Water supply: (yes/no)                       Yes
Distance to source point, m
Sewage system: (yes/no)
Distance to sewage point, m
Gas supply: (yes/no)                         No
Pressure
Distance to source point, m
Power supply: (yes/no)                       Yes
Power, kV                                    10 power line
Distance to source point, m
Distance to railroad track, km               22
Distance to Kirovohrad, km
Distance to highway, km
Miscellaneous information
Contact person, (position, full name)        Chairman of Dibrivka Village Council
                                             Valeriy P. BETSENKO
Phone, fax, e-mail                           +38 (05256) 4-11-04
Number of residents                          78
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Northern outskirts of the village
street)                                      Veselivka, Novomyrhorod District
Type of ownership                            State
Area, hectares                               8,0
Possible usage of land (purpose)             The land is suitable for setting-up of a
                                             mining company
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       -
Distance to source point, m                  -
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       -
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               -
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    Part of Panchivske deposit of primary
                                             kaolin. Previously surveyed resources –
                                             3 million cu. m. Bed thickness – approx.
                                             10 m, average occurrence depth – 20 m.
Contact person, (position, full name)        Chairman of Veselivka Village Council
                                             Halyna V. VOLOSHYNA
Phone, fax, e-mail                           +38 (05256) 96-6-26
                                             +38 (05256) 4-25-14
Number of residents                          186
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Eastern outskirts of the village
street)                                      Zhovtneve, Novomyrhorod District
Type of ownership                            State
Area, hectares                               20,0
Possible usage of land (purpose)             The land is suitable for placement of an
                                             enterprise for swine-breeding
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       Yes
Distance to source point, m                  -
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    10 power line
Distance to source point, m                  -
Distance to railroad track, km               30
Distance to Kirovohrad, km                   -
Distance to highway, km                      -
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Zhovtneve Village Council
                                             Ivan V. KARPULEVSKYI
Phone, fax, e-mail                           +38 (05256) 96-4-16
Number of residents                          332
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Novoukrayinka, Novoukrayinka District,
street)                                    12 Tolstogo Str.(former club of a sugar
                                           plant)
Type of ownership                          State
Area, hectares                             0,025
Possible usage of land (purpose)           Religious building
Construction project available             -
Conditions of investment attraction        Direct investment
Price (UAH / sq. m)                        33,17
Estimated cost, UAH                        83 000 UAH/hectare
Water supply: (yes/no)                     Yes
Distance to source point, m                15
Sewage system: (yes/no)                    Yes
Distance to sewage point, m                10
Gas supply: (yes/no)                       -
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     Yes
Power, kV                                  20
Distance to source point, m                25
Distance to railroad track, km             2
Distance to Kirovohrad, km                 70
Distance to highway, km                    3
Miscellaneous information                  -
Contact person, (position, full name)      Head of Department of Economy and
                                           Infrastructure Development of the
                                           Novoukrainka District State
                                           Administration
                                           Oleksandr V. ANTONENKO
Phone, fax, e-mail                         +38 (05251) 2-21-95
                                           novoukr@nu.kw.ukrtel.net
Number of residents                        17800
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Novoukrayinka, Novoukrayinka District,
street)                                    Mayakovskyi Str.(area of a dismantled
                                           brick factory)
Type of ownership                          State
Area, hectares                             8,2
Possible usage of land (purpose)           Light industry facility
Construction project available             -
Conditions of investment attraction        Direct investment
Price (UAH / sq. m)                        34,79
Estimated cost, UAH                        286 000 UAH/hectare
Water supply: (yes/no)                     Yes
Distance to source point, m                100
Sewage system: (yes/no)                    Yes
Distance to sewage point, m                50
Gas supply: (yes/no)                       -
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     Yes
Power, kV                                  200
Distance to source point, m                50
Distance to railroad track, km             5
Distance to Kirovohrad, km                 70
Distance to highway, km                    25
Miscellaneous information                  -
Contact person, (position, full name)      Head of Department of Economy and
                                           Infrastructure Development of the
                                           Novoukrainka District State
                                           Administration
                                           Oleksandr V. ANTONENKO
Phone, fax, e-mail                         +38 (05251) 2-21-95
                                           novoukr@nu.kw.ukrtel.net
Number of residents                        17800
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Novoukrayinka, Novoukrayinka District,
street)                                    48 Kurchatov Str (area of a dismantled
                                           dairy plant)
Type of ownership                          State
Area, hectares                             14,5
Possible usage of land (purpose)           Construction of an industrial facility
Construction project available             -
Conditions of investment attraction        Direct investment
Price (UAH / sq. m)                        35,68
Estimated cost, UAH                        435 000 UAH/hectares
Water supply: (yes/no)                     Yes
Distance to source point, m                80
Sewage system: (yes/no)                    Yes
Distance to sewage point, m                80
Gas supply: (yes/no)                       -
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     Yes
Power, kV                                  400
Distance to source point, m                360
Distance to railroad track, km             0,4
Distance to Kirovohrad, km                 70
Distance to highway, km                    0,1
Miscellaneous information                  -
Contact person, (position, full name)      Head of Department of Economy and
                                           Infrastructure Development of the
                                           Novoukrainka District State
                                           Administration
                                           Oleksandr V. ANTONENKO
Phone, fax, e-mail                         +38 (05251) 2-21-95
                                           novoukr@nu.kw.ukrtel.net
Number of residents                        17800
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Novoukrayinka, Novoukrayinka District,
street)                                    Kurchatov Str.(area behind the
                                           Raisilhospkhimiya)
Type of ownership                          State
Area, hectares                             21,0
Possible usage of land (purpose)           Construction of an industrial facility
Construction project available             -
Conditions of investment attraction        Direct investment
Price (UAH / sq. m)                        35,68
Estimated cost, UAH                        435 000 UAH/hectares
Water supply: (yes/no)                     Yes
Distance to source point, m                80
Sewage system: (yes/no)                    Yes
Distance to sewage point, m                80
Gas supply: (yes/no)                       -
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     Yes
Power, kV                                  400
Distance to source point, m                360
Distance to railroad track, km             0,15
Distance to Kirovohrad, km                 70
Distance to highway, km                    0,1
Miscellaneous information                  -
Contact person, (position, full name)      Head of Department of Economy and
                                           Infrastructure Development of the
                                           Novoukrainka District State
                                           Administration
                                           Oleksandr V. ANTONENKO
Phone, fax, e-mail                         +38 (05251) 2-21-95
                                           novoukr@nu.kw.ukrtel.net
Number of residents                        19800
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Novoukrayinka, Novoukrayinka District,
street)                                    40 Kurchatov Str. (area of a former
                                           mobile mechanized column - 135)
Type of ownership                          State
Area, hectares                             6,4
Possible usage of land (purpose)           Construction of a grain reception station
Construction project available             -
Conditions of investment attraction        Direct investment
Price (UAH / sq. m)                        25,97
Estimated cost, UAH                        167 500 UAH/hectares
Water supply: (yes/no)                     Yes
Distance to source point, m                180
Sewage system: (yes/no)                    Yes
Distance to sewage point, m                125
Gas supply: (yes/no)                       -
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     Yes
Power, kV                                  600
Distance to source point, m                100
Distance to railroad track, km             0,04
Distance to Kirovohrad, km                 65
Distance to highway, km                    0,15
Miscellaneous information                  -
Contact person, (position, full name)      Head of Department of Economy and
                                           Infrastructure Development of the
                                           Novoukrainka District State
                                           Administration
                                           Oleksandr V. ANTONENKO
Phone, fax, e-mail                         +38 (05251) 2-21-95
                                           novoukr@nu.kw.ukrtel.net
Number of residents                        19800
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Urban settlement Oleksandrivka,
street)                                      9, Budyonnoho St.
Type of ownership                            Municipal
Area, hectares                               1,5
Possible usage of land (purpose)             Building of a dwelling house
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          Commercial
Estimated cost, UAH                          -
Water supply: (yes/no)                       No
Distance to source point, m                  150-200
Sewage system: (yes/no)                      No
Distance to sewage point, m                  250
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  100-150
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  10-50
Distance to railroad track, km               3
Distance to Kirovohrad, km                   50
Distance to highway, km                      1
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Oleksandrivka Settlement
                                             Council
                                             Vasyl O. ZAKHAROV
Phone, fax, e-mail                           +38 (05242) 3-22-39
Number of residents                          10000
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Urban settlement Oleksandrivka
street)                                      34, Shevchenko St.
Type of ownership                            Municipal
Area, hectares                               1,5
Possible usage of land (purpose)             Building of a dwelling house
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          commercial
Estimated cost, UAH                          -
Water supply: (yes/no)                       No
Distance to source point, m                  150-200
Sewage system: (yes/no)                      No
Distance to sewage point, m                  250
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  200-400
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  100-200
Distance to railroad track, km               3
Distance to Kirovohrad, km                   50
Distance to highway, km                      1,0-3,5
Miscellaneous information                    -
Contact person, (position, full name)        Regional Directorate of State Specialized
                                             Finance Institution "State Fund for
                                             Promotion of Youth Housing
                                             Construction"
                                             Director – Igor I. ZRAYEV
Phone, fax, e-mail                           +38 (0522) 35-40-04
Number of residents                          10000
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   10, Volodarskoho St., urban settlement
street)                                      Oleksandrivka
Type of ownership                            Municipal
Area, hectares                               1,5
Possible usage of land (purpose)             Construction of dwelling houses and
                                             buildings for social and cultural purposes
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          Commercial
Estimated cost, UAH                          -
Water supply: (yes/no)                       No
Distance to source point, m                  10
Sewage system: (yes/no)                      No
Distance to sewage point, m                  20
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  10-25
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  20-100
Distance to railroad track, km               2
Distance to Kirovohrad, km                   50
Distance to highway, km                      1,0-2,5
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Oleksandrivka Settlement
                                             Council
                                             Vasyl O. ZAKHAROV
Phone, fax, e-mail                           +38 (05242)3-22-39
Number of residents                          10000
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality,        Urban settlement Oleksandrivka
district, street)                       91, Shevchenko St.
Type of ownership                       Municipal
Area, hectares                          7.0
Possible usage of land (purpose)        Entrepreneurship
Construction project available          -
Conditions of investment attraction     -
Price (UAH / sq. m)                     Commercial
Estimated cost, UAH                     -
Water supply: (yes/no)                  No
Distance to source point, m             -
Sewage system: (yes/no)                 No
Distance to sewage point, m             -
Gas supply: (yes/no)                    No
Pressure                                -
Distance to source point, m             100-250
Power supply: (yes/no)                  No
Power, kV                               -
Distance to source point, m             10-100
Distance to railroad track, km          2
Distance to Kirovohrad, km              50
Distance to highway, km                 0,1-1
Miscellaneous information               -
Contact person, (position, full name)   Chairman of Oleksandrivka Settlement
                                        Council
                                        Vasyl O. ZAKHAROV
Phone, fax, e-mail                      +38 (05242)3-22-39
Number of residents                     10000
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Urban settlement Pavlysh, Onufriivka
street)                                      District
Type of ownership                            State
Area, hectares                               58,6
Possible usage of land (purpose)             Construction of a plant for corn seeds
                                             processing and production of starch
                                             products and fodder
Construction project available               -
Conditions of investment attraction          100% investments
Price (UAH / sq. m)                          Monetary evaluation has not been done
Estimated cost, UAH                          1 500 000
Water supply: (yes/no)                       Artesian well
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  1000
Power supply: (yes/no)                       Yes
Power, kV                                    35/10 kV
Distance to source point, m                  -
Distance to railroad track, km               1
Distance to Kirovohrad, km                   105
Distance to highway, km                      The land is near the Оleksandriya –
                                             Poltava road
Miscellaneous information                    Raw material sources: annual production
                                             of corn in Onufriivka District amounts
                                             26 140 tons. Manpower resources
                                             availability: Onufriivka District’s
                                             settlements are situated in 4-9 km. Their
                                             inhabitants will provide the industrial
                                             plant with necessary manpower
                                             resources
Contact person, (position, full name)        Deputy Chairman of Onufriivka District
                                             State Administration
                                             Ihor V. DUDNIK
Phone, fax, e-mail                           +38 (05238) 9-10-31
                                             oda@on.kw.ukrtel.net
Number of residents                          5000
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Village Novyi Starodub, Petrove
street)                                    District, Novyi Starodub Village Council
                                           (700 m away from the village)
Type of ownership                          State
Area, hectares                             8,1
Possible usage of land (purpose)           For placement of an enterprise for farm
                                           products processing
Construction project available             -
Conditions of investment attraction        Direct investment
Price (UAH / sq. m)                        -
Estimated cost, UAH                        -
Water supply: (yes/no)                     No
Distance to source point, m                There is a possibility of artesian well
                                           drilling
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     No
Power, kV                                  380
Distance to source point, m                100
Distance to railroad track, km             25 km to Oleksandriya station
Distance to Kirovohrad, km                 100
Distance to highway, km                    Near the road
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Novyi Starodub Village
                                           Council
                                           Mykola I. TSARENKO
Phone, fax, e-mail                         +38 (05237) 9-41-30
Number of residents                        3460
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Village Novyi Starodub, Petrove
street)                                      District, Novyi Starodub Village Council
Type of ownership                            state
Area, hectares                               6,0
Possible usage of land (purpose)             Placement of an enterprise for
                                             agricultural products processing
Construction project available               -
Conditions of investment attraction          Direct investment
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       No
Distance to source point, m                  There is a possibility of artesian well
                                             drilling
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    380
Distance to source point, m                  100
Distance to railroad track, km               25 km to Оleksandriya station
Distance to Kirovohrad, km                   100
Distance to highway, km                      Near the road
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Novyi Starodub Village
                                             Council
                                             Mykola I. TSARENKO
Phone, fax, e-mail                           +38 (05237) 9-41-30
Number of residents                          3460
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Petrove District, Petrove Settlement
street)                                    Council, urban settlement Petrove,
                                           Litvinov St., near the house No.1А
Type of ownership                          State
Area, hectares                             0,1
Possible usage of land (purpose)           Placement of an object for commercial
                                           purpose
Construction project available             -
Conditions of investment attraction        Long-term lease
Price (UAH / sq. m)                        -
Estimated cost, UAH                        -
Water supply: (yes/no)                     Yes
Distance to source point, m                200
Sewage system: (yes/no)                    Yes
Distance to sewage point, m                100
Gas supply: (yes/no)                       Yes
Pressure                                   Medium pressure
Distance to source point, m                200
Power supply: (yes/no)                     Yes
Power, kV                                  380
Distance to source point, m                150
Distance to railroad track, km             28 km to Ryadove station,
                                           40 km to Оleksandriya station
Distance to Kirovohrad, km                 120
Distance to highway, km                    0,1
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Petrove Settlement Council
                                           Yevhen I. SUBBOTNIY
Phone, fax, e-mail                         +38 (05237) 9-72-60
Number of residents                        7691
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district, village Iskrivka, Petrove District
street)
Type of ownership                          State
Area, hectares                             2,0 hectares and 5,5 hectares of loam
                                           deposit (reserves for 30 years)
Possible usage of land (purpose)           Construction of a red brick factory
Construction project available             -
Conditions of investment attraction        Long-term lease. State registration of the
                                           company on the territory of the Village
                                           Council. Involvement of local labor
                                           resources
Price (UAH / sq. m)                        -
Estimated cost, UAH                        -
Water supply: (yes/no)                     No
Distance to source point, m                500 (water body)
Sewage system: (yes/no)                    No
Distance to sewage point, m                2000
Gas supply: (yes/no)                       Yes
Pressure                                   Medium
Distance to source point, m                2000
Power supply: (yes/no)                     Yes
Power, kV                                  380
Distance to source point, m                200
Distance to railroad track, km             12 km to Ryadove station,
                                           2 km to the TsGZK JSC railway station
                                           which makes it possible to deliver all
                                           cargoes to the Grekovata station
Distance to Kirovohrad, km                 130
Distance to highway, km                    9
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Iskrivka Village Council
                                           Mykola B. PLATOSHYN
Phone, fax, e-mail                         +38 (05237) 9-28-22
Number of residents                        1070
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   village Iskrivka, Petrove District
street)
Type of ownership                            State
Area, hectares                               15,0
Possible usage of land (purpose)             For placement of a recreation centre
Construction project available               -
Conditions of investment attraction          Long-term lease.
                                             State registration of the company on the
                                             territory of the village council.
                                             Involvement of local labor resources
Price (UAH / sq. m)                          -
Estimated cost, UAH                          -
Water supply: (yes/no)                       No
Distance to source point, m                  200 m (water body)
Sewage system: (yes/no)                      No
Distance to sewage point, m                  No
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  4000
Power supply: (yes/no)                       Yes
Power, kV                                    380
Distance to source point, m                  300
Distance to railroad track, km               12 km to Ryadove station,
                                             0,6 km to the TsGZK JSC railway line
                                             which makes it possible to deliver all
                                             cargoes to the Grekovata station
Distance to Kirovohrad, km                   130
Distance to highway, km                      0,2
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Iskrivka Village Council
                                             Mykola B. PLATOSHYN
Phone, fax, e-mail                           +38 (05237) 9-28-22
Number of residents                          1070
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Petrove District, Checheliyivka Village
street)                                    Council at a distance of 5 km from
                                           village Oleksandrivka
Type of ownership                          State
Area, hectares                             120,0
Possible usage of land (purpose)           For creation of a fishery
Construction project available             -
Conditions of investment attraction        Long-term lease
Price (UAH / sq. m)                        -
Estimated cost, UAH                        -
Water supply: (yes/no)                     No
Distance to source point, m                10000
Sewage system: (yes/no)                    No
Distance to sewage point, m                10000
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     No
Power, kV                                  30
Distance to source point, m                5000
Distance to railroad track, km             25 km to Oleksandriya station
                                           18 km to Ryadove station
Distance to Kirovohrad, km                 105
Distance to highway, km                    5
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Checheliyivka Village
                                           Council
                                           Serhiy P. DYACHENKO
Phone, fax, e-mail                         +38 (05237)99-54-42
Number of residents                        511
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Petrove District, Checheliyivka Village
street)                                    Council at a distance of 1,5 km from
                                           urban settlement Balakhivka
Type of ownership                          State
Area, hectares                             26,0
Possible usage of land (purpose)           For creation of a health-improving and
                                           entertainment complex
Construction project available             -
Conditions of investment attraction        Long-term lease
Price (UAH / sq. m)                        -
Estimated cost, UAH                        -
Water supply: (yes/no)                     No
Distance to source point, m                1000
Sewage system: (yes/no)                    No
Distance to sewage point, m                1000
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     No
Power, kV                                  30
Distance to source point, m                1000
Distance to railroad track, km             20 km to Oleksandriya station
Distance to Kirovohrad, km                 100
Distance to highway, km                    1
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Checheliyivka Village
                                           Council
                                           Serhiy P. DYACHENKO
Phone, fax, e-mail                         +38 (05237)99-54-42
Number of residents                        511
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Svitlovodsk District, Ozerska Village
street)                                      Council, village Oleksiyivka, Frunze St.
Type of ownership                            Municipal
Area, hectares                               0,5
Possible usage of land (purpose)             Shop, café, hotel
Construction project available               -
Conditions of investment attraction
Price (UAH / sq. m)                          min. 22
Estimated cost, UAH                          min. 110 000
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV
Distance to source point, m                  5
Distance to railroad track, km               -
Distance to Kirovohrad, km                   120
Distance to highway, km                      1,5
Miscellaneous information
Contact person, (position, full name)        Chairman of Ozerska Village Council
                                             Vitaliy O. FEDORUS
Phone, fax, e-mail                           +38 (05236) 5-17-48
Number of residents                          45
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Svitlovodsk District, village Podorozhne
street)
Type of ownership                            State
Area, hectares                               1,5
Possible usage of land (purpose)             Industry
Construction project available               -
Conditions of investment attraction
Price (UAH / sq. m)                          min. 23
Estimated cost, UAH                          min. 345 000
Water supply: (yes/no)                       Yes
Distance to source point, m                  10
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV
Distance to source point, m                  10
Distance to railroad track, km               -
Distance to Kirovohrad, km                   110
Distance to highway, km                      1,0
Miscellaneous information
Contact person, (position, full name)        Chief of Department of Regional
                                             Development, Architecture, Urban
                                             Planning and Communal Services of
                                             Svitlovodsk District State Administration
                                             Vasyl D. MARCHENKO
Phone, fax, e-mail                           +38 (05236) 2-88-21
Number of residents                          1530
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Ulyanovka District, Bohdanivka Village
street)                                      Council, within the village boundaries
Type of ownership                            State
Area, hectares                               0,15
Possible usage of land (purpose)             For construction of a consumer services
                                             centre
Construction project available               -
Conditions of investment attraction          Sale for ownership via land auction
Price (UAH / sq. m)                          6,1
Estimated cost, UAH                          8000
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  60
Distance to railroad track, km               -
Distance to Kirovohrad, km                   -
Distance to highway, km                      2
Miscellaneous information                    -
Contact person, (position, full name)        Chairperson of Bohdanivka Village
                                             Council
                                             Svitlana M. SILKINA
Phone, fax, e-mail                           +38 (05259) 2-53-45
Number of residents                          513
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Ulyanovka District, Vilkhivka Village
street)                                      Council, within the village boundaries
Type of ownership                            State
Area, hectares                               0,8
Possible usage of land (purpose)             For construction of a gas station
Construction project available               -
Conditions of investment attraction          Sale of ownership right via land auction
Price (UAH / sq. m)                          14,4
Estimated cost, UAH                          100000
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               -
Distance to Kirovohrad, km                   -
Distance to highway, km                      Near Kyiv-Odesa highway
Miscellaneous information                    Arable land
Contact person, (position, full name)        Chairman of Vilkhivka Village Council
                                             Oleg B. MELNYCHUK
Phone, fax, e-mail                           +38 (05259) 2-51-45
Number of residents                          1120
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Ulyanovka District, Synytsivka Village
street)                                      Council
Type of ownership                            State
Area, hectares                               0,5
Possible usage of land (purpose)             For construction of a granary
Construction project available               -
Conditions of investment attraction          -
Price (UAH / sq. m)                          5,8
Estimated cost, UAH                          25 000
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       No
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               -
Distance to Kirovohrad, km                   -
Distance to highway, km                      7,0
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Synytsivka Village Council
                                             Ihor B. BELINSKYI
Phone, fax, e-mail                           +38 (05259) 2-63-45
Number of residents                          415
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Ulyanovka District, Synytsivka Village
street)                                    Council, coastal strip of Valeriya-В
                                           Private Enterprise
Type of ownership                          State
Area, hectares                             2
Possible usage of land (purpose)           For construction of a recreation centre
Construction project available             -
Conditions of investment attraction        -
Price (UAH / sq. m)                        1,2
Estimated cost, UAH                        20000
Water supply: (yes/no)                     Possible
Distance to source point, m                -
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     No
Power, kV                                  -
Distance to source point, m                -
Distance to railroad track, km             -
Distance to Kirovohrad, km                 -
Distance to highway, km                    8
Miscellaneous information                  Arable land
Contact person, (position, full name)      Chairman of Synytsivka Village Council
                                           Ihor B. BELINSKYI
Phone, fax, e-mail                         +38 (05259) 2-63-45
Number of residents                        415
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district, Ulyanovka District, Kamyanyi Brid
street)                                    Village Council, outside the village
                                           boundaries
Type of ownership                          state
Area, hectares                             4,5
Possible usage of land (purpose)           Institutions for social and cultural
                                           purposes
Construction project available             -
Conditions of investment attraction        Sale of ownership right via land auction
Price (UAH / sq. m)                        1,2
Estimated cost, UAH                        45000
Water supply: (yes/no)                     Yes
Distance to source point, m                30
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     Yes
Power, kV                                  380 kV
Distance to source point, m                30
Distance to railroad track, km             18
Distance to Kirovohrad, km                 -
Distance to highway, km                    20
Miscellaneous information                  Former yard
Contact person, (position, full name)      Chairman of Kamyanyi Brid Village
                                           Council
                                           Vitaliy O. BILOUS
Phone, fax, e-mail                         +38 (05259) 2-43-42
Number of residents                        1022
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district, Ulyanovka District, Kamyanyi Brid
street)                                    Village Council, outside the boundaries
                                           of the village
Type of ownership                          State
Area, hectares                             49,4
Possible usage of land (purpose)           Recreation centre
Construction project available             -
Conditions of investment attraction        Sale of ownership right via land auction
Price (UAH / sq. m)                        0,12
Estimated cost, UAH                        50000
Water supply: (yes/no)                     No
Distance to source point, m                -
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     Yes
Power, kV                                  380 kV
Distance to source point, m                100
Distance to railroad track, km             20
Distance to Kirovohrad, km                 -
Distance to highway, km                    22
Miscellaneous information                  Village Petrivka (former settlement)
Contact person, (position, full name)      Chairman of Kamyanyi Brid Village
                                           Council
                                           Vitaliy O. BILOUS
Phone, fax, e-mail                         +38 (05259) 2-43-42
Number of residents                        1022
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district, Ulyanovka District, Kamyanyi Brid
street)                                    Village Council, outside the boundaries
                                           of the village
Type of ownership                          State
Area, hectares                             24,9
Possible usage of land (purpose)           Garden
Construction project available             -
Conditions of investment attraction        Sale of ownership right via land auction
Price (UAH / sq. m)                        0,35
Estimated cost, UAH                        75 000
Water supply: (yes/no)                     No
Distance to source point, m                -
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     No
Power, kV                                  -
Distance to source point, m                30
Distance to railroad track, km             14
Distance to Kirovohrad, km                 -
Distance to highway, km                    16
Miscellaneous information                  Reserve lands (pastures)
Contact person, (position, full name)      Chairman of Kamyanyi Brid Village
                                           Council
                                           Vitaliy O. BILOUS
Phone, fax, e-mail                         +38 (05259) 2-43-42
Number of residents                        1022
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Ulyanovka District, Yosypivka Village
street)                                    Council, outside the boundaries of the
                                           village
Type of ownership                          State
Area, hectares                             0,12
Possible usage of land (purpose)           For building of a sales outlet
Construction project available             -
Conditions of investment attraction        Sale of ownership right via land auction
Price (UAH / sq. m)                        11,5
Estimated cost, UAH                        12000
Water supply: (yes/no)                     No
Distance to source point, m                -
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     Yes
Power, kV                                  -
Distance to source point, m                -
Distance to railroad track, km             -
Distance to Kirovohrad, km                 -
Distance to highway, km                    -
Miscellaneous information                  -
Contact person, (position, full name)      Chairman of Yosypivka Village Council
                                           Serhii B. BERSHADSKYI
Phone, fax, e-mail                         +38 (05259) 2-81-42
Number of residents                        1475
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Ulyanovka District, Hrushkivka Village
street)                                      Council, outside the village boundaries
Type of ownership                            State
Area, hectares                               0,16
Possible usage of land (purpose)             Building of the Kyivstar transmission
                                             tower
Construction project available               -
Conditions of investment attraction          Sale of ownership right via land auction
Price (UAH / sq. m)                          23
Estimated cost, UAH                          32000
Water supply: (yes/no)                       No
Distance to source point, m                  150
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       -
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               -
Distance to Kirovohrad, km                   -
Distance to highway, km                      3
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Hrushkivka Village Council
                                             Pylyp F. KOZLOVSKYI
Phone, fax, e-mail                           +38 (05259) 2-71-45
Number of residents                          1022
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Ulyanovka District, Hrushkivka Village
street)                                      Council, outside the village boundaries
Type of ownership                            State
Area, hectares                               0,46
Possible usage of land (purpose)             For building of a sales outlet
Construction project available               -
Conditions of investment attraction          Sale of ownership right via land auction
Price (UAH / sq. m)                          2,3
Estimated cost, UAH                          9200
Water supply: (yes/no)                       No
Distance to source point, m                  150
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       -
Power, kV                                    -
Distance to source point, m                  -
Distance to railroad track, km               -
Distance to Kirovohrad, km                   -
Distance to highway, km                      3
Miscellaneous information                    -
Contact person, (position, full name)        Chairman of Hrushkivka Village Council
                                             Pylyp F. KOZLOVSKYI
Phone, fax, e-mail                           +38 (05259) 2-71-45
Number of residents                          1022
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Ulynovka District, Ulyanovka Town
street)                                      Council, within the town boundary
Type of ownership                            State
Area, hectares                               8
Possible usage of land (purpose)             For processing industry plant
Construction project available               -
Conditions of investment attraction          Lease with subsequent buy-out
Price (UAH / sq. m)                          1,44
Estimated cost, UAH                          100000
Water supply: (yes/no)                       No
Distance to source point, m                  -
Sewage system: (yes/no)                      No
Distance to sewage point, m                  -
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    -
Distance to source point, m                  50
Distance to railroad track, km               15
Distance to Kirovohrad, km                   -
Distance to highway, km                      1
Miscellaneous information                    Industrial land. 50 thousand UAH are
                                             required to elaborate and make technical
                                             documentation
Contact person, (position, full name)        Chairman of Ulyanovka Town Council
                                             Oleh V. ANTOSHKO
Phone, fax, e-mail                           +38 (05259) 2-18-85,
                                             +38 (05259) 2-23-63
Number of residents                          6800
                           INVESTMENT PROPOSAL
                      of the land offered for implementation
                              of an investment project

Land location (name of locality, district, Ulyanovka District, Danylova Balka
street)                                    Village Council, outside the village
                                           boundaries
Type of ownership                          State
Area, hectares                             1,0
Possible usage of land (purpose)           Road service complex
Construction project available             -
Conditions of investment attraction        -
Price (UAH / sq. m)                        11,5
Estimated cost, UAH                        100 000
Water supply: (yes/no)                     No
Distance to source point, m                within 1 km
Sewage system: (yes/no)                    No
Distance to sewage point, m                -
Gas supply: (yes/no)                       No
Pressure                                   -
Distance to source point, m                -
Power supply: (yes/no)                     -
Power, kV                                  -
Distance to source point, m                within 1 km
Distance to railroad track, km             10
Distance to Kirovohrad, km                 -
Distance to highway, km                    At the roadside of Kyiv-Odesa highway
Miscellaneous information                  -
Contact person, (position, full name)      Chairperson of Danylova Balka Village
                                           Council
                                           Viktor V. IVASHKEVYCH
Phone, fax, e-mail                         +38 (05259) 2-31-45
Number of residents                        1004
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Village Dokuchayeve, Ustynivka District
street)
Type of ownership                            State
Area, hectares                               1,6
Possible usage of land (purpose)             At the investor's discretion
Construction project available               -
Conditions of investment attraction          Lease; lease with subsequent buy-out.
Price (UAH / sq. m)                          up to 10% of expert evaluation price
Estimated cost, UAH                          Subject to negotiation
Water supply: (yes/no)                       Yes
Distance to source point, m                  150
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  150
Gas supply: (yes/no)                         Yes
Pressure                                     Medium
Distance to source point, m                  20
Power supply: (yes/no)                       Yes
Power, kV                                    250
Distance to source point, m                  100
Distance to railroad track, km               7
Distance to Kirovohrad, km                   101
Distance to highway, km                      9
Miscellaneous information                    Facilities available – storage requiring
                                             renovation
Contact person, (position, full name)        Chairperson of Dokuchayeve Village
                                             Council
                                             Ihor O. SIKORAKA
Phone, fax, e-mail                           +38 (05239) 3-12-31,
                                             +38 (05239) 3-12-42
Number of residents                          1178
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Village Dokuchayeve, Ustynivka District
street)
Type of ownership                            State
Area, hectares                               15,5
Possible usage of land (purpose)             At the investor's discretion
Construction project available               -
Conditions of investment attraction          Lease
Price (UAH / sq. m)                          Up to 10% of expert evaluation price
Estimated cost, UAH                          Subject to negotiation
Water supply: (yes/no)                       Yes
Distance to source point, m                  150
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  150
Gas supply: (yes/no)                         Yes
Pressure                                     Medium
Distance to source point, m                  20
Power supply: (yes/no)                       Yes
Power, kV                                    250
Distance to source point, m                  100
Distance to railroad track, km               7
Distance to Kirovohrad, km                   101
Distance to highway, km                      9
Miscellaneous information                    Facilities available – service yard of the
                                             building department, truck area, repair
                                             shop (roof requires renovation), 2
                                             livestock-farming facilities; use of part
                                             of the land is possible at the investor's
                                             discretion
Contact person, (position, full name)        Chairperson of Dokuchayeve Village
                                             Council
                                             Ihor O. SIKORAKA
Phone, fax, e-mail                           +38 (05239) 3-12-31,
                                             +38 (05239) 3-12-42
Number of residents                          1178
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Village Dokuchayeve, Ustynivka District
street)
Type of ownership                            State
Area, hectares                               0,9
Possible usage of land (purpose)             At the investor's discretion (land is
                                             located near the highway and is suitable
                                             for placement of a gas station).
Construction project available               -
Conditions of investment attraction          Lease with buy-out option
Price (UAH / sq. m)                          Up to 10% of expert evaluation price
Estimated cost, UAH                          Subject to negotiation
Water supply: (yes/no)                       Yes
Distance to source point, m                  150
Sewage system: (yes/no)                      Yes
Distance to sewage point, m                  150
Gas supply: (yes/no)                         Yes
Pressure                                     Medium
Distance to source point, m                  400
Power supply: (yes/no)                       Yes
Power, kV                                    250
Distance to source point, m                  400
Distance to railroad track, km               7
Distance to Kirovohrad, km                   101
Distance to highway, km                      9
Miscellaneous information                    Buildings available – remains of the
                                             former gas storage facility.
Contact person, (position, full name)        Chairperson of Dokuchayeve Village
                                             Council
                                             Ihor O. SIKORAKA
Phone, fax, e-mail                           +38 (05239) 3-12-31,
                                             +38 (05239) 3-12-42
Number of residents                          1178
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Village Dokuchayeve, Ustynivka District
street)
Type of ownership                            State
Area, hectares                               11,2
Possible usage of land (purpose)             At the investor's discretion
Construction project available               -
Conditions of investment attraction          Lease; lease with subsequent buy-out
Price (UAH / sq. m)                          Up to 10% of expert evaluation price
Estimated cost, UAH                          Subject to negotiation
Water supply: (yes/no)                       No
Distance to source point, m                  450
Sewage system: (yes/no)                      No
Distance to sewage point, m                  500
Gas supply: (yes/no)                         Yes
Pressure                                     low
Distance to source point, m                  400
Power supply: (yes/no)                       Yes
Power, kV                                    150
Distance to source point, m                  500
Distance to railroad track, km               7
Distance to Kirovohrad, km                   101
Distance to highway, km                      9
Miscellaneous information                    Buildings available – poultry-house re-
                                             equipped for storage facility (requires
                                             renovation)
Contact person, (position, full name)        Chairperson of Dokuchayeve Village
                                             Council
                                             Ihor O. SIKORAKA
Phone, fax, e-mail                           +38 (05239) 3-12-31,
                                             +38 (05239) 3-12-42
Number of residents                          1178
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   village Medove, Ustynivka District
street)
Type of ownership                            State
Area, hectares                               2
Possible usage of land (purpose)             At the investor's discretion
Construction project available               -
Conditions of investment attraction          Lease
Price (UAH / sq. m)                          Up to 10% of expert evaluation price
Estimated cost, UAH                          Subject to negotiation
Water supply: (yes/no)                       -
Distance to source point, m                  -
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         -
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    250
Distance to source point, m                  10
Distance to railroad track, km               9
Distance to Kirovohrad, km                   103
Distance to highway, km                      11
Miscellaneous information                    Facilities – tractor brigade service yard
Contact person, (position, full name)        Chairperson of Dokuchayeve Village
                                             Council
                                             Ihor O. SIKORAKA
Phone, fax, e-mail                           +38 (05239) 3-12-31,
                                             +38 (05239) 3-12-42
Number of residents                          1178
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   Village Malchevske, Ustynivka District
street)
Type of ownership                            State
Area, hectares                               26
Possible usage of land (purpose)             At the investor's discretion
Construction project available               -
Conditions of investment attraction          Lease
Price (UAH / sq. m)                          Up to 10% of expert evaluation price
Estimated cost, UAH                          Subject to negotiation
Water supply: (yes/no)                       -
Distance to source point, m                  200
Sewage system: (yes/no)                      -
Distance to sewage point, m                  -
Gas supply: (yes/no)                         -
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    250
Distance to source point, m                  100
Distance to railroad track, km               4,5
Distance to Kirovohrad, km                   94
Distance to highway, km                      16
Miscellaneous information                    Buildings – repair shop and tractor
                                             brigade service yard, livestock farming
                                             facilities (the land can be used partly at
                                             the investor's discretion)
Contact person, (position, full name)        Chairperson of Dokuchayeve Village
                                             Council
                                             Ihor O. SIKORAKA
Phone, fax, e-mail                           +38 (05239) 3-12-31,
                                             +38 (05239) 3-12-42
Number of residents                          1178
                            INVESTMENT PROPOSAL
                       of the land offered for implementation
                               of an investment project

Land location (name of locality, district,   village Malchevske, Ustynivka District
street)
Type of ownership                            State
Area, hectares                               1,6
Possible usage of land (purpose)             At the investor's discretion
Construction project available               -
Conditions of investment attraction          Lease
Price (UAH / sq. m)                          Up to 10% of expert evaluation price
Estimated cost, UAH                          Subject to negotiation
Water supply: (yes/no)                       No
Distance to source point, m                  150
Sewage system: (yes/no)                      No
Distance to sewage point, m                  150
Gas supply: (yes/no)                         No
Pressure                                     -
Distance to source point, m                  -
Power supply: (yes/no)                       Yes
Power, kV                                    250
Distance to source point, m                  100
Distance to railroad track, km               4,5
Distance to Kirovohrad, km                   94
Distance to highway, km                      16
Miscellaneous information                    Buildings – remains of livestock farming
                                             facilities.
Contact person, (position, full name)        Chairperson of Dokuchayeve Village
                                             Council
                                             Ihor O. SIKORAKA
Phone, fax, e-mail                           +38 (05239) 3-12-31,
                                             +38 (05239) 3-12-42
Number of residents                          1178

				
DOCUMENT INFO