					Project Scope                                                                            CDL
                                                                      Project Scope

Instructions:

Step 1: Document what’s in:
   1. Critical functions required
   2. Inputs to the application or process
   3. Outputs from the system or process
   4. Any additional requirements (such as integration requirements)
Step 2: Document what’s out. Specify any known limitations to the areas noted above.
Step 3: Document the methodology for managing scope change.

Included
Required Functions




Expected Inputs




Outputs/Outcomes




Other




                                                                      Project Scope


Template date: 7/31/06                                                                 Page 1
Project Scope                                                  CDL


Not Included (Limitations)
Functions


Inputs


Outputs/Outcomes


Other




Changes to the Scope must be handled in the following way:




Template date: 7/31/06                                       Page 2

				