SHUTDOWN CHECKLIST 2010

Document Sample
SHUTDOWN CHECKLIST 2010 Powered By Docstoc
					                        SHUTDOWN CHECKLIST


LOCATION:__________________________                     DATE:_____________

All water heaters OFF                                   YES_______ NO_______

All water fountains UNPLUGGED, where feasible           YES_______ NO_______

Classroom refrigerators (OFF, UNPLUGGED,                YES_______ NO_______
DOOR PROPPED OPEN)

Coffee Pots, Microwaves OFF & UNPLUGGED                 YES_______ NO________

Vending/Coke machines OFF & UNPLUGGED                   YES_______ NO_______

Computers, Monitors, Printers OFF                       YES_______ NO_______

Activboard-projector OFF                                YES_______ NO_______

All copy machines, duplication machines OFF             YES_______ NO_______

All lights turned OFF                                   YES_______ NO_______

Security lighting (OFF in daytime?)                     YES_______ NO_______

PA system turned OFF & UNPLUGGED                        YES_______ NO_______

All doors to restrooms PROPPED OPEN                     YES_______ NO_______

All cabinets with access to plumbing should be left OPEN YES_______ NO_______

Unnecessary kitchen equipment turned OFF                YES_______ NO_______

Turn off commodes/urinals which run constantly          YES_______ NO_______

Mobile (Trailers) classrooms heat/air modified          YES_______ NO_______

Due consideration should be given to areas such as field houses-concession buildings-
libraries served by programmable thermostats. Thermostats will need to be adjusted up
or down dependent upon weather conditions.

Shutdown checklist completed by:_________________________________________
*****Once completed submit a copy to the Energy Manager!!!

*(THE ABOVE IS NOT INCLUSIVE…MUST BE ADAPTED TO LOCATION.

				
DOCUMENT INFO