Home Builder Proposal

Document Sample
Home Builder Proposal Powered By Docstoc
					The whole is greater than the sum of the parts:
    Proposal for Southern
   Development to adopt a
Building Information Modeling
methodology for home design.

    Presented on Jan. 12, 2007 by:
         Robert Kendall AIA
         Matthew J. Waychoff
     Agenda

1.   What is BIM?
2.   Who is using it?
3.   How do we get there?
4.   What if it works?
5.   Where should we start?
6.   How can Micea help?
7.   Other discussion
     topics…
                              Example image from Argos.com
1

    What is:
    Building Information Model(ing)?
                “A BIM is a shared knowledge resource for information about a
    Data        facility forming a reliable basis for decisions during its entire
                life-cycle from earliest conception to demolition.” NBIMS.

    Info        BIM as a noun:
                • a shared digital representation of the physical and functional
                characteristics of a facility
    Knowledge
                BIM as a verb:
                • collaboration by different stakeholders at different phases of the
    Wisdom      life cycle of a facility to insert, extract, update or modify
                information in the BIM to support and reflect the roles of that
                stakeholder
1


    Other emerging buzzwords:

         buildingSMART



                              Integrated Practice



         Virtual Design and
          Construction
1


    BIM XD:
       2D = Length & Width
       3D = Height
       4D = Time
       5D = Cost
       6D = ???
       XD = BIM


                              Example image from Keymark.com
2


    Who is using BIM?               AECO+
       Architects
       Engineers
       Construction Contractors
       Building Owners and Operators
       Design and Technology Consultants
       Others…
2


    Who is using BIM?




           http://www.facilityinformationcouncil.org/bim/members.php
2


    Who is using BIM?
    General Services Administration
       The General Services Administration (GSA) has established for all
        major projects (prospectus-level) receiving design funding in Fiscal
        Year 2007 and beyond, GSA will REQUIRE spatial program BIMs be
        the minimum requirements for submission to Office of Chief Architect
        (OCA) for Final Concept approvals by the Public Buildings Service
        (PBS) Commissioner and the Chief Architect.




               http://www.facilityinformationcouncil.org/bim/pdfs/NBIMS_Awareness_Handout.pdf
3


    How do we get there?
       strategic and incremental adoption of
        3D, 4D, BIM technologies
3




       How do we
        get there?
4


    What if it works?
       Reduce the need for re-gathering or re-
        formatting information
       (open discussion)
5


    Where should we start?
       Visualization                                 Coordination
       Simulation                                    Collision Detection/Avoidance
       Optimize Architectural Programming            Partial Trade Coordination
       Design Development                            Construction Sequencing Planning/Phasing
                                                       Plans/
       Collision Detection/Avoidance
                                                      Logistics
       Design Validation
                                                      Marketing Presentations
       Scope Clarification
                                                      Options Analysis
       Collision Detection/Avoidance
                                                      Walk-throughs and Fly-throughs
       Design Validation
                                                      Virtual Mock-Ups
       Construction Sequencing Planning/Phasing
        Plans/                                        Sight Line Studies
       Construction Administration



    Benefits of BIM
5


    Options management = Master Sets:




                           Facades…



    Structural
    options…
5


    Lots configuration:




    Electronic
    Rack Sets…            Permit Sets…
5


    Visualization:




    Exteriors…       Interiors…
5


    Marketing materials:




    Brochures…      Web content…
6


    How can Micea help?
       Can establish policy to phase in 3D, 4D, and BIM adoption for
        all major projects
       Can lead 3D-4D-BIM pilot application on current capital projects
       Will provide expert support and assessment for ongoing capital
        projects to incorporate 3D, 4D, and BIM technologies
       Always assessing industry readiness and technology maturity
       Developing Home Builder-specific incentives for 3D-4D-BIM
       Developing solicitation and contractual language for 3D-4D-BIM
        services
       Creating partnerships with BIM vendors, professional
        associations, open standard organizations, and
        academic/research institutions
6


    Bill of Materials = VisionRez:
6


    Framing = hsbCad LT:
6


    Visualization = 3ds Max:
    Proposal for Southern
   Development to adopt a
Virtual Design & Construction
  method for home building.

    Presented on Jan. 12, 2008 by:
         Robert Kendall AIA
         Matthew J. Waychoff
7


    Other discussion topics…
Things to know:



   spatial program validation
   4D phasing
   laser scanning
   energy and sustainability
   courts design validation
What if we don’t change?
   Individuals in business and individual project teams will continue to
    repetitively create and re-create local, non re-usable, non-
    interoperable solutions to the same problems.
   Businesses will continue to take longer than necessary to get to
    market with new products and services because it will take far longer
    than necessary for parties collaborating on a project to share their
    ideas and communicate specific results.
   Information will continue to be entered/re-entered an average of seven
    times rather than entered correctly once and used many times.
   Many more resources than necessary will be consumed during the life
    of a facility because the combined performance of materials and
    components wasn’t known until a facility was built and operated for
    many years.




           http://www.facilityinformationcouncil.org/bim/pdfs/NBIMS_Awareness_Handout.pdf
Industry Foundation Classes (IFC) Server:
 General AEC industry standard
 modellers?




! None are specific to residential !
Home building industry specific
solutions?




! Either too expensive, not enough
features, or no one knows it !
Synthesis vs. Analysis:
   the information contained in the model shall be interoperable to allow computer
    to computer exchanges
   the exchange be based on open standards
   the requirements for exchange must be capable of being defined in contractual
    language

				
DOCUMENT INFO
Description: Home Builder Proposal document sample