					State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: 06/01/07 WORK PERFORMED BY : Elijah Electric Date of Report : 06/04/07 Cont. Job No.: Contract No. Cont. RPT NO. EE1163 CCO NO.

DESCRIPTION OF WORK: ROUTE CONDUIT AROUND CONTROL HOUSE PERIMETER DUE TO NO SPACING EQUIPMENT Equip No. TK-15 TK-10 EQUIPMENT CLASS/MAKE TRUCK TRUCK Code Hours/ Units 48 32 Hrly/Dly Rate $15.32 $19.09 Delay Factor Extended Amount $735.36 $610.88 P.R. No. ELC TY HUTCHINSON ELC DENNIS PETROVICK LBR JOSE MORENO LABOR

LABORERS, FOREMANS, etc. Hours Reg 48 16 32 O.T. Hourly Rate Reg $51.56 $51.56 $44.00 O.T. Extended Amount $2,474.88 $824.96 $1,408.00

Equipment Sub-Total
MATERIAL and/or WORK done by specialists Description MATERIAL PER ATTACHMENT A Units 1 Unt Cst 1766.93

$1,346.24
Labor Surcharge Total Subsistence Reg. 17%

Sub-Total
O.T. 16%

$4,707.84
$800.33

$1,766.93

Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (33%) Markup on Equipment (17%) $5,508.17 $1,346.24 $1,766.93 $1,817.70 $228.86 $265.04

Material & Specialist Sub-Total

$1,766.93

Markup on Material (15%)

Total This Report

$10,932.94

a56b77b0-0dbf-414a-8fce-c01d9defbbb6.xlsForce Account Analysis

6/27/200911:21 AM

Sheet1

DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75

10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10

TOTAL 85 86 6 85 11 85 67 6000

EQUIPMENT

10 11 10

8 8

8 8 8 0

8 8 8 0

6 6 6 450

6 6 6 1500

7 7 7 600

9.5 9.5 9.5 0

6.5 6.5 6.5 600

10 10 10 1800

MATERIAL

250

500