CV Farid by pengtt

VIEWS: 58 PAGES: 4

									                           CURRICULUM VITAE


Name                  :       Farid V. Credi
Job Title             :       Technical Director- Partner
Age                   :       47 years

Academic Qualifications

Bachelor of Science in Electrical Engineering from Cairo University in 1975.
General grade: Excellent
Project’s grade: Excellent

Languages

Excellent command, spoken and written, of Arabic, English & French languages.

Work Experience
Mr. Farid Credi is the Technical Director in charge of the construction operation and
management of all the projects handled by the firm.

He spent 20 years of his career with Dar Al Handasah Consultants, where he was
appointed as Associate of the firm and Head of the power and telecommunication
section.

Professional Experience

1996 up till      Technical Director: RAM SYSTEMS, Cairo.
now               In charge of the construction operation and management of all the
                  projects handled by the firm (refer to company profile for list of
                  projects).

1993 to 1996      Senior Electrical Engineer: Dar Al-Handasah Consultants, Cairo.
                  Responsible for the Electrical Department. Duties include supervising
                  a team of Engineers to design, supervise and manage various projects
                  starting from data collection and design concept stage until the follow-
                  up of site construction and testing and handing-over of the project to
                  the Client.

                  PROJECTS INCLUDED:
                     Multipurpose Opera House, Istanbul, Turkey. A 1000 seat
                       multipurpose hall with large foyer and related facilities and
                       common areas. Installations include stage lighting and sound
                       systems, audio visual systems, simultaneous interpretation and
                       miscellaneous security systems.
   Main sound system upgrading in the Holy Makkah Haram
    to include the complete replacement of the existing sound
    system central control room and various speakers and
    microphone systems this to achieve the optimum intelligibility
    and full coverage in the various areas of the Holy Haram.
   Holy Makkah Haram – New CCTTV system project
    included the installation of 700 indoor and outdoor CCTV
    cameras, 92 monitors and complete networks to cover the
    entire Makkah Haram premises.
   Buraydah Grand Mosque, Quassin, Saudi Arabia complete
    Sound System Design for 600m2 Mosque indoor and outdoor.
   Prophets Mosque in Medina, Saudi Arabia. Design of a
    redundant stand-by Sound System to cover the whole premises
    of the Holy Mosque
   O’Hare New International terminal, Chicago complete
    design and supervision of the sound system, security systems
    and special installations for the new International terminal at
    O’Hare airport with a total project cost of 600 million us
    Dollars.
   Power Plant for the New North Cam in Doha with a total
    power generation capacity of 12 MVA using Diesel generating
    sets at 11 kV output voltage complete with the distribution MV
    switchgear and complete MV and LV networks for the project
    with a total value over 30 Million QR.
   New Beirut International Airport, Beirut, Lebanon. 6
    million Passengers to include the complete design of the Power
    distribution and special systems networks.
   Holy Makkah Haram upgrading of the Main Power Supply
    networks, project included the complete power supply
    Medium voltage networks with a total capacity of 50 MVA to
    ensure full redundancy and 100 percent power availability at
    all times, the work included the design of the various MV and
    LV switchgears to serve the existing LV networks all to be
    executed without any interruption to the existing power supply
    to the Holly Haram installations.
   New Doha International Airport to include the design of the
    Power distribution networks the main Power Substations and
    the Emergency diesel Plant as well as the indoor and outdoor
    lighting systems, the special and low current systems in the
    Airport.
   Daewoo Motor Egypt Main Plant in 6th of October City to
    include the design of the main 22 kV substation and network
    with a total capacity of 12 MVA, the power distribution inside
    the plant, the lighting design of the plant and the low current
    systems including the ancillary buildings and the general
    Administration building with a total value of 75 million L.E
   Meridien Sharm El Sheikh complete design of the electrical
    installations for the 5 star resort to include the Main Substation
    22 kV with 10 MVA capacity, LV and MV networks, lighting
                     design indoor and outdoor as well as the design of all low
                     current and special systems works.
                     The duties included the site supervision and the project
                     management of the project till final handing over to the
                     Client.



1991 - 1993   Senior Electrical Engineer: seconded to Perkins & Will, Chicago,
              O’Hare New International terminal, Chicago.
              Design Supervision and management of the low current and special
              system for 1.1 million square fact terminal with construction cost of
              US$ 620 million

1986 - 1991   Senior Electrical Engineer: Dar Al-Handasah Consultants, Cairo.
              Responsible for the design, preparation of tender documents and
              follow-up of construction of electrical infrastructure works and
              electrical installations in buildings. Main projects include:

                 
                    Jabal Qubies Car parks – Phase 2, Makkah, Saudi Arabia.
                     One tunnel car park (175 cars) and one multi-storey car park
                     (320 cars).
                    American University Rare Book Library, Cairo, Egypt. A
                     multi-storey building to accommodate library, classrooms,
                     conference rooms, offices and related facilities.
                    Al-Beach hotel, Turkey. A 400 room five stars Hotel. Duties
                     included the review of the electrical and low current systems
                     design.
                    Military infantry Brigade –North Camp, Qatar. A military
                     camp consisting of several buildings with a total built up area
                     of 114000 m2 and spread over a site area of 600 ha.
                     Infrastructure electrical works include a 10 MW base load
                     power plant, an 11Kv and a LV underground cable distribution
                     network.
                    Air Defense Operation Centers, Jordan. Two underground
                     centers complete with own base load and emergency power
                     generation and security and alarm systems.
                    Emiri Armored Arm, Qatar. A military camp consisting of
                     several buildings with a total built-up area of 34000 m2.

1985 - 1986   Senior Electrical Engineer: Dar Al-Handasah Consultants,
              London.
              Responsible for the design, preparation of tender documents and
              follow-up of construction of electrical installations relating to street
              and tunnel lighting and preparation of master plan for rural and urban
              electrification projects. Main projects include: -
                   Street lighting feasibility study for the capital area of the
                       Sultanate of Oman.
                   Riyadh –Qasimi Road, Saudi Arabia. Design of the street
                     lighting for 20 km of roads.
                    Al-Salam Road, Saudi Arabia. Preparation of technical
                     reports for the street lighting installation for 5 km of roads.
                    Nador – Hoceima, Morocco. Rural and urban electrification
                     studies and master plan.

1984 - 1985   Senior Electrical Engineer: Dar Al-Handasah Consultants, Cairo.
              Responsible for the design, preparation of tender documents and
              follow-up of construction of electrical infrastructure works and
              electrical installations in buildings and electrical installations relating
              to street and tunnel lighting. Main projects include: -
                   Arab Pharmaceutical Manufacturing Complex, Al-
                      Salalem, Jordan. Complete upgrading of 10000 m2 plant.
                   Jabal Qubais Car Park, Makkah, Saudi Arabia. Two tunnel
                      car parks, 350 cars capacity.
                   Upgrading of the Royal Palaces in Amman, Jordan.
                   A multi-purpose storage complex, Bahrain. A military camp
                      with storage facilities for ammunition, tanks and vehicles.

1976 - 1986   Electrical Engineer: Dar Al Handasah Consultants, Cairo.
              Participated in the design of electrical installations for buildings as
              well as the supervision of the work of a team of draughtsman. Main
              projects include: -
                   Karachi Sheraton Hotel, Pakistan. A 450-bedroom five-star
                      luxury hotel.
                   SNTV, Algeria. Bus maintenance and repair workshop
                      complex.
                   Sheikh Khaled Residential Building, Ra Al-Khaimah. A multi-
                      storey residential building with a shopping center.
                   Shabsough Multi-storey Garage in Amman, Jordan. A multi-
                      storey car park in the business center of Amman with a
                      capacity of 400 cars and a shopping center.
                   Sheikh Mishaal Villa, Ras Al-Khaimah. A one-storey villa
                      with a total built-up area of 600 m2.

1976 - 1977   Assistant Engineer: Thomson CGR, Cairo.
              Worked on the installations and maintenance of a versatile radio
              diagnostic unit.

1975 - 1976   Electrical Installation Engineer: Page Europe Company, Cairo.
              Worked on the installation of a complete of a complete microwave
              link from Suez to Alexandria for the Summed Project.

								
To top