First Gulf Bank Pest Analysis - Excel

Document Sample
First Gulf Bank Pest Analysis - Excel Powered By Docstoc
					        Printged on 4/18/2011                                                                                                                                                                                                                                                                                                                                                                                Page 1 of 41


           A                B           C             D           E           F                                          G                                                 H                    I                  J                                K                                               L                              M                 N                        O                  P                   Q
         State          Region       State Id   Funding      AG Id        Output Id                                 Output Title                              Output code (1–103 + 401–409)   Output         Output Type                    Standard Output                           Output Unit of Measure #1              Total Actual      Actual 02-03 #1       Actual Jul 03- Mar 04 Actual Apr-Jun 04 Expected 04–05
                                                stream                                                                                                                                        Code                                                                                                                                #1                                          #1                   #1              #1


1

2
     Queensland       State-wide WLEPA02        NHT                            2      Peer review consultation/meeting of profiles                                        402                 RA2.1    Resource assessment                                                    Number of biophysical studies completed
                                                                                                                                                                                                                             Investigations (survey, inventory and mapping, and data analysis)                                           17                      0                     0                 0                     5
3
     Queensland       State-wide WLEPA02        NHT                                                                                                                                                               #N/A                            #N/A                                            #N/A
4
     Queensland       State-wide WLEPA02        NHT                                                                                                                                                               #N/A                            #N/A                                            #N/A
5
     Queensland       State-wide WLEPA02        NHT                                                                                                                                                               #N/A                            #N/A                                            #N/A
6
     Queensland       State-wide WLEPA02        NHT                                                                                                                                                               #N/A                            #N/A                                            #N/A
7
     Queensland       State-wide WLEPA02        NHT                            1      Wetlands Management Profiles -- Drafted 5 Wetlands Management Profiles               83                  P1.1    Planning              Improved codes of practice or guidelines                                                                  5
                                                                                                                                                                                                                                                                             Number of best management practice codes or guidelines completed                    0                     0                 0                     5
8
     Queensland       State-wide WLEPA02        NHT                            3      Expenditure of hiring staff                                                         408                 RA2.1    Resource assessment                                                    Number of biophysical studies completed
                                                                                                                                                                                                                             Investigations (survey, inventory and mapping, and data analysis)                                         4,669                     0                     0                 0                  4,669
9
     Queensland       State-wide WLEPA02        NHT                            4      Project plan developed for branch business plan and project proposal.               407                 RA2.1    Resource assessment                                                    Number of biophysical studies completed
                                                                                                                                                                                                                             Investigations (survey, inventory and mapping, and data analysis)                                            1                      0                     0                 0                     1
10
     Queensland       State-wide WLEPA02        NHT                            5      Database for wetland regional ecosystem interrogation                                92                 RA1.1    Resource assessment   Setting or monitoring resource condition targets Number of studies completed                                 1                      0                     0                 0                     1
11
     Queensland       State-wide WLEPA02        NHT                            0      Promotional articles                                                                  8                 CB1.2    Capacity building     Awareness raising                                                                                           2                      0
                                                                                                                                                                                                                                                                             Number of written products such as brochures, newsletters, posters or fact sheets developed               0                 0                     2
12

13




        C:\Docstoc\Working\pdf\95db2dfa-3026-4b34-99dc-4f213eef1f71.xls | Outputs | printed 4/18/2011 11:08 AM                                                                                                                                                                                                                                                                                               page 1 of 41
      Printged on 4/18/2011                                                                                                                                                                                                                                                                                                                                                           Page 2 of 41


            R                 S             T              U              V                                W                   X               Y                        Z                 AA                AB                AC                AD           AE          AF           AG                       AH                           AI             AJ                    AK
     Actual 04-05 #1       Expected   Actual Jul-  Expected          Actual 2005-             Output Unit of Measure #2   Total Actual   Actual 02-03 #2       Actual Jul 03- Mar 04 Actual Apr-Jun 04 Expected 04–05   Actual 04-05 #2       Expected   Actual Jul-  Expected    Actual 2005- Reasons for overall variance (max       Category of       Is output     Comment
                            Jul-Dec   Dec 2005 #1 2005-06 #1            06 #1                                                  #2                                       #2                   #2              #2                                Jul-Dec   Dec 2005 #2 2005-06 #2      06 #2     180 characters)                         Primary       complete (i.e. no
                            2005 #1                                                                                                                                                                                                            2005 #2                                                                                 Reason for      more action
                                                                                                                                                                                                                                                                                                                                       Overall        required)? Y/N
1
                                                                                                                                                                                                                                                                                                                                       Variance
2
                       2                                        15              15 Area (ha) surveyed                                0                     0                     0                 0                0                     0                                   0              0                                     0             0          y                                        0
3
                                                                                                          #N/A                                                                                                                                                                                                                     0             0
4
                                                                                                          #N/A                                                                                                                                                                                                                     0             0
5
                                                                                                          #N/A                                                                                                                                                                                                                     0             0
6
                                                                                                          #N/A                                                                                                                                                                                                                     0             0
7
                       5                                                            -                                                0                     0                     0                 0                0                     0                                                                                                                 y                                        0
8
                  4,669                                                             Area (ha) surveyed                               0                     0                     0                 0                0                     0                                                                                        0             0          y                                        0
9
                       1                                                            Area (ha) surveyed                               0                     0                     0                 0                0                     0                                                                                        0             0          y                                        0
10
                       1                                                            Number of sites monitored                        0                     0                     0                 0                0                     0                                                                                        0             0          y                                        0
11
                       2                                                            Estimated number of recipients                   4                     0                     0                 0                4                     4                                                                                                      0          y                                        0
12

13




      C:\Docstoc\Working\pdf\95db2dfa-3026-4b34-99dc-4f213eef1f71.xls | Outputs | printed 4/18/2011 11:08 AM                                                                                                                                                                                                                                                                          page 2 of 41
State          State - RegionRegion                       Funding Stream
                                             Funding Program                             MAT CategoryMAT Rating RCT Rating PrimaryMfT Output Selection No Type
                                                                          Primary Activity Type                                                                      Output
               ACT                           NAP
Australian Capital Territory Australian Capital Territory Foundation funding
                                                                          Capacity building
                                                                                         Adoption of improved practices Evidence ofLand salinity
                                                                                                        (5) Target achieved or exceeded
                                                                                                                       (5)               target achieved or exceeded Still to be coded
                                                                                                                                                               0
New South WalesNAT                           NHT
                             Cross-jurisdictional         Priority action On-ground activities
                                                                                         Capacity building Progress, and on track ofSoil condition
                                                                                                        (4)            (4) Evidence progress                   1     Capacity building
               NAT
Northern Territory                           NLP
                             External Territories         Regional investment
                                                                          Planning                      (3) Progress, but not on track Rivers and wetlands 2
                                                                                         On-ground activities          (3) Evidence of no progress                   Capacity building
Queensland NAT               Multi-lateral NAP/NHT        Regional competitive
                                                                          Resource assessment
                                                                                         Planning                      (2) Evidence ofNutrients in aquatic 3
                                                                                                                                         regress
                                                                                                        (2) No progress, but some progress was expectedenvironments  Capacity building
South AustraliaNAT           Multi-regional NAP/NLP                       *** tba
                                                          Multi-lateral activities ***   Resource assessment
                                                                                                        (1) No progress, but none expected at thisassess environments
                                                                                                                                        Turbidity to time
                                                                                                                       (1) Insufficient evidence in aquatic 4        Capacity building
Tasmania       NAT           State-wide      NHT/NLP      NIS State-wide                                ***tba***      ***tba***        Surface water salinity5      Capacity building
Victoria       NSW                            Gwydir
                             Border Rivers -NAP/NHT/NLPNAP Multi-regional                                                               Native vegetation      6     Capacity building
               NSW
Western Australia            Central West NUF             NIS Facilitator and co-ordinator                                                                     7
                                                                                                                                        Significant native species   Capacity building
Multi-lateral NSW                            ***tba***
                             Hawkesbury - Nepean          National Landcare Program                                                                            8
                                                                                                                                        Significant invasive species Capacity building
Other          NSW           Hunter - Central Rivers      ***tba***                                                                                            9
                                                                                                                                        Estuarine, coastal and marineCapacity building
               NSW           Lachlan                                                                                                                          10
                                                                                                                                        Other supporting activities  Capacity building
               NSW           Lower Murray Darling                                                                                       ***tba***             11     Capacity building
               NSW           Murray                                                                                                                           12     Capacity building
               NSW           Murrumbidgee                                                                                                                     13     Capacity building
               NSW           Namoi                                                                                                                            14     Capacity building
               NSW           Northern Rivers                                                                                                                  15     Capacity building
               NSW           Southern Rivers                                                                                                                  16     Capacity building
               NSW           State-wide                                                                                                                       17     Capacity building
               NSW           Sydney Metro                                                                                                                     18     Capacity building
               NSW           Western                                                                                                                          19     Capacity building
               NT            Daly                                                                                                                             20     On-ground activities
               NT            Darwin Katherine                                                                                                                 21     On-ground activities
               NT            Mary river                                                                                                                       22     On-ground activities
               NT            Northern Territory                                                                                                               23     On-ground activities
               NT            Ord                                                                                                                              24     On-ground activities
               QLD           Border Rivers-Balonne-Maranoa                                                                                                    25     On-ground activities
               QLD           Burdekin                                                                                                                         26     On-ground activities
               QLD           Burnett - Mary                                                                                                                   27     On-ground activities
               QLD           Cape York                                                                                                                        28     On-ground activities
               QLD           Condamine                                                                                                                        29     On-ground activities
               QLD           Desert Channels                                                                                                                  30     On-ground activities
               QLD           Fitzroy                                                                                                                          31     On-ground activities
               QLD           Mackay - Whitsunday                                                                                                              32     On-ground activities
               QLD           Northern Gulf                                                                                                                    33     On-ground activities
               QLD           South East Queensland and Western Catchments Group                                                                               34     On-ground activities
               QLD           South West                                                                                                                       35     On-ground activities
               QLD           Southern Gulf                                                                                                                    36     On-ground activities
               QLD           Torres Strait                                                                                                                    37     On-ground activities
               QLD           Wet Tropics                                                                                                                      38     On-ground activities
               SA            Alinytjara Wilurara                                                                                                              39     On-ground activities
               SA            Eyre Peninsula                                                                                                                   40     On-ground activities
               SA            Kangaroo Island                                                                                                                  41     On-ground activities
State   State - RegionRegion        Funding ProgramFunding Stream
                                                                Primary Activity Type
                                                                              MAT CategoryMAT Rating   RCT Rating   PrimaryMfT                Output
                                                                                                                                 Output Selection No Type
        SA            Mount Lofty Ranges                                                                                             42       On-ground activities
        SA            Northern and Yorke Agricultural District                                                                       43       On-ground activities
        SA            Arid Lands                                                                                                     44       On-ground activities
        SA            SA Murray Darling Basin                                                                                        45       On-ground activities
        SA            South East                                                                                                     46       On-ground activities
        TAS           North Tasmania                                                                                                 47       On-ground activities
        TAS           North West                                                                                                     48       On-ground activities
        TAS           South Tasmania                                                                                                 49       On-ground activities
        TAS           Tasmanian NAP Region                                                                                           50       On-ground activities
        VIC           Corangamite                                                                                                    51       On-ground activities
        VIC           East Gippsland                                                                                                 52       On-ground activities
        VIC           Glenelg Hopkins                                                                                                53       On-ground activities
        VIC           Goulburn Broken                                                                                                54       On-ground activities
        VIC           Mallee                                                                                                         55       On-ground activities
        VIC           North Central                                                                                                  56       On-ground activities
        VIC           North East                                                                                                     57       On-ground activities
        VIC           Port Phillip                                                                                                   58       On-ground activities
        VIC           West Gippsland                                                                                                 59       On-ground activities
        VIC           Wimmera                                                                                                        60       On-ground activities
        WA            Avon                                                                                                           61       On-ground activities
        WA            Northern Agricultural                                                                                          62       On-ground activities
        WA            Rangelands                                                                                                     63       On-ground activities
        WA            South Coast                                                                                                    64       On-ground activities
        WA            South West                                                                                                     65       On-ground activities
        WA            Swan                                                                                                           66       On-ground activities
                                                                                                                                     67       On-ground activities
                                                                                                                                     68       On-ground activities
                                                                                                                                     69       On-ground activities
                                                                                                                                     70       On-ground activities
                                                                                                                                     71       On-ground activities
                                                                                                                                     72       On-ground activities
                                                                                                                                     73       On-ground activities
                                                                                                                                     74       On-ground activities
                                                                                                                                     75       On-ground activities
                                                                                                                                     76       On-ground activities
                                                                                                                                     77       On-ground activities
                                                                                                                                     78       On-ground activities
                                                                                                                                     79       On-ground activities
                                                                                                                                     80       On-ground activities
                                                                                                                                     81       On-ground activities
                                                                                                                                     82       Planning
                                                                                                                                     83       Planning
State   State - RegionRegion               Funding Stream
                               Funding Program          Primary Activity Type
                                                                      MAT CategoryMAT Rating   RCT Rating   PrimaryMfT                Output
                                                                                                                         Output Selection No Type
                                                                                                                              84      Planning
                                                                                                                              85      Planning
                                                                                                                              86      Planning
                                                                                                                              87      Planning
                                                                                                                              88      Planning
                                                                                                                              89      Resource assessment
                                                                                                                              90      Resource assessment
                                                                                                                              91      Resource assessment
                                                                                                                              92      Resource assessment
                                                                                                                              93      Resource assessment
                                                                                                                              94      Resource assessment
                                                                                                                              95      Resource assessment
                                                                                                                              96      Resource assessment
                                                                                                                              97      Resource assessment
                                                                                                                              98      Resource assessment
                                                                                                                              99      Resource assessment
                                                                                                                             100      Resource assessment
                                                                                                                             101      Resource assessment
                                                                                                                             102      Resource assessment
                                                                                                                             103      Resource assessment
                                                                                                                             401      Capacity building
                                                                                                                             402      Capacity building
                                                                                                                             403      Capacity building
                                                                                                                             404      Capacity building
                                                                                                                             405      Capacity building
                                                                                                                             406      Institutional Establishment/Maintenance
                                                                                                                             407      Institutional Establishment/Maintenance
                                                                                                                             408      Institutional Establishment/Maintenance
Standard Output          Output Unit of Measure #1             Output Unit ofMAT Year #2 RCT Year
                                                                                 Measure                                 New_Output_Type
                                                                                                           New_Output_Code                               New_OUM1 New_OUM2 Category_of_Primary_Reason_f
                                                                                                                                        New_Standard_Output
Still to be coded        Still to be coded                                     *
                                                               Still to be coded**tba***     ***tba***     CB1.1                        Awareness raising
                                                                                                                         Capacity building                                              events in
                                                                                                                                                                        Number of participantssuch as demonstrations,
                                                                                                                                                         Number of awareness raising Financial person-days
Awareness raising activities
                         Number of demonstrations                              2003-04       2003-04
                                                               Number of participants in person-days       CB1.2         Capacity building
                                                                                                                                        Awareness raising                               Technical
                                                                                                                                                         Number of written products such as brochures, newsletters, po
                                                                                                                                                                        Estimated number of recipients
Awareness raising activities
                         Number of field days                                  2004-05       2004-05
                                                               Number of participants in person-days       CB1.3         Capacity building
                                                                                                                                        Awareness raisingNumber of displays for use at Environmental regional meeting
                                                                                                                                                                        -               events such as
Awareness raising activities
                         Number of study tours                                 2005-06       2005-06
                                                               Number of participants in person-days       CB1.4         Capacity building
                                                                                                                                        Awareness raisingNumber of media opportunities resulting in articles in newspap
                                                                                                                                                                        -               Managerial
Awareness raising activities                                   N               2006-07       2006-07
                         Number of other non-training forums umber of participants in person-days          CB1.5                        Awareness raising
                                                                                                                         Capacity building               Number of websites developed or significantly enhanced
                                                                                                                                                                        -               Other
Awareness raising activities
                         Number of brochures developed Quantity distributed    2007-08       2007-08       CB2.1                        Skills and training
                                                                                                                         Capacity building                                              Still to be seminars or
                                                                                                                                                         Number of training sessions, workshops,person-days other ski
                                                                                                                                                                        Number of participants incoded
Awareness raising activities
                         Number of newsletters developed Quantity distributed  2008-09       2008-09       CB2.2                        Skills and training
                                                                                                                         Capacity building                              Quantity distributed
                                                                                                                                                         Number of workbooks, course notes or other key materials dev
                         Number of displays developed
Awareness raising activities                                   Quantity distributed
                                                                               2009-10       2009-10       CB3.1                        Establishing new institutional arrangements documents produced
                                                                                                                         Capacity building               Number of key -organisational
                                                                               2010-11
                         Number of other non-training products or materials developed 2010-11
Awareness raising activities                                   Quantity distributed                        CB3.2                        Establishing new institutional arrangements
                                                                                                                         Capacity building                              -
                                                                                                                                                         Number of formally documented collaborative arrangements de
Awareness raising activities
                         Number of media opportunities         Not applicable 2011-12        2011-12       CB3.3                        Establishing new institutional arrangements effective collaboration negotiated
                                                                                                                         Capacity building                              -
                                                                                                                                                         Number of arrangements for
Awareness raising activities
                         Number of websites developed          Not applicable 2012-13        2012-13       CB4.1                        Organisational Number of governance tools developed
                                                                                                                         Capacity building               learning       -
                                                               Not applicable 2013-14        2013-14
Facilitation motivation and support FTE active community support positions (facilitators or coordinators) CB4.2
                         Number of activities                                                                                           Organisational Number of significant knowledge evaluation events held
                                                                                                                         Capacity building               learning       -
                         Number of activities                  Not applicable 2014-15
Facilitation motivation and support community groups or community projects assisted          2014-15       CB4.3                        Organisational Number of organisational learning reviews completed
                                                                                                                         Capacity building               learning       -
                                                                               2015-16 +     2015-16
Skills and training activities
                         Number of training sessions held Number of participants in person-days            CB4.4                        Organisational Number new databases developed
                                                                                                                         Capacity building               learning       -
                         Number of workshops held
Skills and training activities                                                               2016-17
                                                               Number of participants in person-days       CB5.1         Capacity building
                                                                                                                                        Community SupportNumber of community groups OR projects assisted
                                                                                                                                                                        -
                         Number of seminars held
Skills and training activities                                                               2017-18
                                                               Number of participants in person-days       OG1.1         On-ground                       Number of conservation protected
                                                                                                                                        Conservation by agreements Area (ha) covenants or other agreements attach
Skills and training activities                                 Number of                     2018-19
                         Number of other skills and training events heldparticipants in person-days        OG1.2         On-ground                       Number of voluntary conservation
                                                                                                                                        Conservation by agreements Area (ha) protectedagreements negotiated
                         Number of workbooks developed Quantity distributed
Skills and training activities                                                               2019-20       OG10.1        On-ground                                        management drain
                                                                                                                                                         Area improvedLength (km) of of surface or groundwater
                                                                                                                                        Works related to the(ha) of land treated through surface drainage
                         Number of course notes developedQuantity distributed
Skills and training activities                                                               2020-21       OG10.2        On-ground                                        management drain
                                                                                                                                                         Area improvedLength (km) of of surface or groundwater
                                                                                                                                        Works related to the(ha) of land treated through sub-surface drainage
                         Number of other key materials developed distributed
Skills and training activities                                 Quantity                      2021-22       OG10.3        On-ground                                        management drain improved
                                                                                                                                                         Area improvedLength (km) of of surface or groundwater
                                                                                                                                        Works related to the(ha) of land treated through improvements to existing dra
                         Number
Conservation by agreements of legal conservation covenants (hectares) legal agreements
                                                               Area and other covered        2022-23       OG10.4        On-ground                       Area improved- management of surface or groundwater
                                                                                                                                        Works related to the(ha) of land treated for rising groundwater through ground
                         Number
Conservation by agreements of voluntary conservation agreementsArea (hectares) covered       2023-24       OG11.1        On-ground                                      -
                                                                                                                                                         Length (m) of stream bank stabilised with engineering works
                                                                                                                                        Works for improving waterway health
Indigenous vegetation protected by fencing                     Not applicable                2024-25
                         Area (hectares) of terrestrial indigenous vegetation protected by fencing         OG11.2        On-ground                                      -
                                                                                                                                                         Length (m) of stream bed stabilised
                                                                                                                                        Works for improving waterway health
Indigenous vegetation protected by fencing                     Not applicable                2025-26
                         Area (hectares) of coastal indigenous vegetation protected by fencing             OG11.3        On-ground                                      Length
                                                                                                                                                         Number of off-stream (km) of stream bank sites installed
                                                                                                                                        Works for improving waterway health(alternative) watering protected from stoc
Indigenous vegetation protected by fencing                                                   2026-27
                         Area (hectares) of riparian indigenous vegetation protected by riparian vegetation protected
                                                               Streambank length (km) of fencing           OG11.4        On-ground                                      -
                                                                                                                                                         Length (kilometres) of
                                                                                                                                        Works for improving waterway health in-stream habitat established
Indigenous vegetation enhanced/rehabilitated                   Not applicable                2027-28
                         Area (hectares) of terrestrial indigenous vegetation enhanced/rehabilitated       OG11.5        On-ground                       Number of fish - health
                                                                                                                                        Works for improving waterwaybarriers modified and/ or removed
Indigenous vegetation enhanced/rehabilitated                   Not applicable                2028-29
                         Area (hectares) of coastal indigenous vegetation enhanced/rehabilitated           OG12.1        On-ground                       Number of qualitysewage plants effluent removed or contained b
                                                                                                                                        Works for improving waternewVolume (ML) of constructed
Indigenous vegetation enhanced/rehabilitated                                                 2029-30
                         Area (hectares) of riparian indigenous vegetation enhanced/rehabilitated          OG12.2        On-ground
                                                               Streambank length (km) of riparian vegetation enhanced/rehabilitated     Works for improving watersewage plants improved withremoved or contained
                                                                                                                                                         Number of quality
                                                                                                                                                                        Volume (ML) of effluent better treatment proce
                         Area (hectares) planted to terrestrial indigenous species
Revegetation with indigenous vegetation                        Not applicable                2030-31 +     OG12.3        On-ground                                      Volume (ML) of effluent removed or sewage pla
                                                                                                                                                         Number of quality
                                                                                                                                        Works for improving waterhuman effluent disposal sites other thancontained b
Revegetation with indigenous vegetation                        Not applicable
                         Area (hectares) planted to coastal indigenous species                             OG12.4        On-ground                                      Volume (ML) of effluent removed or contained
                                                                                                                                                         Number of quality
                                                                                                                                        Works for improving watereffluent control works for animal waste establishedb
Revegetation with indigenous vegetation                        Streambank length                           OG12.5
                         Area (hectares) planted to riparian indigenous species (km) of riparian vegetation protected    On-ground                                      Volume (ML) of effluent control works establish
                                                                                                                                                         Number of quality
                                                                                                                                        Works for improving waterother effluent or farm runoff removed or contained b
Revegetation with exotic vegetation                            perennial pastures
                         Area (hectares) of terrestrial exotic Not applicable                              OG12.6        On-ground                                      Kg
                                                                                                                                                         Number of qualityof material control devices constructed
                                                                                                                                        Works for improving waterstormwater qualityprevented from entering waterwa
Revegetation with exotic vegetation                            Not applicable
                         Area (hectares) of coastal exotic perennial pastures                              OG12.7        On-ground                                      Area
                                                                                                                                                         Number of quality of wetlands
                                                                                                                                        Works for improving waterconstructedconstructed wetlands
Revegetation with exotic vegetation                            Not applicable
                         Area (hectares) of riparian exotic perennial pastures                             OG13.1        On-ground                                      Number improved
                                                                                                                                                         Area (ha) of water use efficiency irrigation practices have bee
                                                                                                                                        Works related to improving land whereof land managers using improved irriga
Revegetation with exotic vegetation                            plantation
                         Area (hectares) of terrestrial exotic Not applicable                              OG13.2        On-ground                                      Volume (ML) of water saved per
                                                                                                                                                         Number of on-farms reuse systems constructedyear
                                                                                                                                        Works related to improving water use efficiency
Revegetation with exotic vegetation                            Not applicable
                         Area (hectares) of coastal exotic plantation                                      OG13.3        On-ground                                      Volume (ML) of have saved per year
                                                                                                                                                         Number of land managers who water adopted on-farm water sa
                                                                                                                                        Works related to improving water use efficiency
Revegetation with exotic vegetation                            Not applicable
                         Area (hectares) of riparian exotic plantation                                     OG13.4        On-ground                                      channel improved
                                                                                                                                                         Length (km) of Volume (ML) of water saved applicable
                                                                                                                                        Works related to improving water use efficiency or piped if per year
Revegetation with exotic vegetation                            Not applicable                              OG13.5
                         Area (hectares) of other terrestrial exotic or mixed indigenous/exotic vegetation planted       On-ground                                      Volume (ML) of water saved per year
                                                                                                                                                         Number of groundwater bores capped
                                                                                                                                        Works related to improving water use efficiency
Revegetation with exotic vegetation                            Not applicable                              OG13.6
                         Area (hectares) of other coastal exotic or mixed indigenous/exotic vegetation planted           On-ground                                        stormwater of water saved
                                                                                                                                                         Number of newVolume (ML)reuse
                                                                                                                                        Works related to improving water use efficiency systems per year
Revegetation with exotic vegetation                            Not applicable                              OG2.1
                         Area (hectares) of other riparian exotic or mixed indigenous/exotic vegetation planted          On-ground                                      -
                                                                                                                                                         Area (ha) of by fencing
                                                                                                                                        Native vegetation protectedcoastal native vegetation protected by fencing
Riparian and waterway Length (km) of stream bank stabilised
                          health                               Number of structures                        OG2.2         On-ground                                      -
                                                                                                                                                         Area (ha) of by fencing
                                                                                                                                        Native vegetation protectedwetland native vegetation protected by fencing
Riparian and waterway Length (km) of stream bed stabilised
                          health                               Number of structures                        OG2.3         On-ground                                      Streambank length (km) of riparian vegetation
                                                                                                                                                         Area (ha) of by fencing
                                                                                                                                        Native vegetation protectedriparian native vegetation protected by fencing p
Standard Output         Output Unit of Measure #1             Output Unit ofMAT Year #2 RCT Year
                                                                               Measure                                   New_Output_Type
                                                                                                             New_Output_Code                          New_OUM1 New_OUM2 Category_of_Primary_Reason_f
                                                                                                                                      New_Standard_Output
Riparian and waterway Number of off-stream (alternative) watering sites installed
                         health                               Not applicable                                 OG2.4       On-ground                                    -
                                                                                                                                                      Area (ha) of by fencing
                                                                                                                                      Native vegetation protectedterrestrial native vegetation protected by fencing
Riparian and waterway Length of in-stream habitat established
                         health                               Number of large woody debris                   OG3.1       On-ground                                    -
                                                                                                                                                      Area (ha) of coastal native vegetation enhanced/rehabilitated
                                                                                                                                      Native vegetation enhanced/rehabilitated (include improved fire management
Riparian and waterway Number of fish barriers addressed Not applicable
                         health                                                                              OG3.2       On-ground                                    -
                                                                                                                                                      Area (ha) of wetland native vegetation enhanced/rehabilitated
                                                                                                                                      Native vegetation enhanced/rehabilitated (include improved fire management
Riparian and waterway Length (km) of stream opened up to fish passage
                         health                               Not applicable                                 OG3.3       On-ground                                    Streambank length improved fire management
                                                                                                                                                      Area (ha) of riparian native vegetation enhanced/rehabilitated
                                                                                                                                      Native vegetation enhanced/rehabilitated (include (km) of riparian vegetation e
Riparian and waterway Number of off-river stock watering points established
                         health                               Not applicable                                 OG3.4       On-ground                                    -
                                                                                                                                                      Area (ha) of terrestrial native vegetation enhanced/rehabilitated
                                                                                                                                      Native vegetation enhanced/rehabilitated (include improved fire management
Wetlands health protected or(hectares) of wetland protected applicable
                        Area enhanced                         Not                                            OG4.1       On-ground                                    Area (include native pastures under this catego
                                                                                                                                                      Area (ha) vegetation(ha) of this vegetation
                                                                                                                                      Revegetation with native of native plantation established that are locally occu
Wetlands health protected or(hectares) of wetland enhanced/rehabilitated
                        Area enhanced                         Not applicable                                 OG4.2       On-ground                                    Area (include native pastures
                                                                                                                                                      Area (ha) vegetationcoastal native species under this catego
                                                                                                                                      Revegetation with native planted to (ha) of this vegetation that are locally occu
Wetlands health protected or(hectares) of wetlands with reinstated connectivity
                        Area enhanced                         Not applicable                                 OG4.3       On-ground                                    Area (include native pastures
                                                                                                                                                      Area (ha) vegetationwetland native species under this catego
                                                                                                                                      Revegetation with native planted to (ha) of this vegetation that are locally occu
Management of significant species or ecological communities applicable
                        Area (hectares) of habitat management Not                                            OG4.4       On-ground                                    Area (include native pastures
                                                                                                                                                      Area (ha) vegetationriparian native species under this catego
                                                                                                                                      Revegetation with native planted to (ha) of this vegetation that are locally occu
                                                                                                             OG4.5
Management of significant species or ecological communities applicable significant species/community protection On-ground
                        Area (hectares) protected by fencing specifically for
                                                              Not                                                                                                     -
                                                                                                                                                      Stream bank length (km) of riparian pastures under this catego
                                                                                                                                      Revegetation with native vegetation (include native vegetation enhanced/reha
Management of significant speciesindividuals translocated Not applicable
                                                              or
                        Number of or ecological communitiesestablished                                       OG4.6       On-ground                                    Area (include vegetation that
                                                                                                                                                      Area (ha) vegetationterrestrialnative species are locally occu
                                                                                                                                      Revegetation with native planted to (ha) of thisnativepastures under this catego
Management of significant speciessuccessful individuals bred through an established breeding programOG5.1
                                                              Not
                        Number of or ecological communities applicable                                                   On-ground                                    -
                                                                                                                                                      Area (ha) vegetation
                                                                                                                                      Revegetation with exotic of exotic plantation established
Management of significant speciesseedbanks managed Weight (kg) of seeds collected
                        Number of or ecological communities                                                  OG5.2       On-ground                                    -
                                                                                                                                                      Area (ha) vegetation
                                                                                                                                      Revegetation with exotic of exotic vegetation established
Significant pest plant control (hectares) of pest plant control
                        Area                                                                                 OG5.3
                                                              Type of pest plant (e.g. blackberry, boxthorn etc)         On-ground                                    -
                                                                                                                                                      Area (ha) vegetation
                                                                                                                                      Revegetation with exotic of exotic perennial pastures established
Significant pest vertebrate control                           Type
                        Area (hectares) of pest animal control of pest animal (e.g.rabbits, foxes)           OG5.4       On-ground                                    -
                                                                                                                                                      Area (ha) vegetation
                                                                                                                                      Revegetation with exotic of exotic, non-perennial special purpose pastures es
Soil management                                               Number of through engineering works
                        Area (hectares) of land treated for soil erosion sites                               OG6.1       On-ground                                    -
                                                                                                                                                      Area (ha) of wetlands with
                                                                                                                                      Wetlands health protected or enhanced connectivity reinstated
Soil management                                               Number of through exclusion fencing
                        Area (hectares) of land treated for soil erosion sites                               OG7.1       On-ground                                    -
                                                                                                                                                      Area (ha) protected or fencing specifically for significant specie
                                                                                                                                      Management of significant species by ecological communities
Soil management                                               Not applicable
                        Area (hectares) of treatment for acid sulfate soils                                  OG7.2       On-ground                                    Number of individuals bred
                                                                                                                                                      Number of species programs developed
                                                                                                                                      Management of significantbreeding or ecological communities
Soil management                                               Not applicable                                 OG7.3
                        Area (hectares) of soil treatment for other than erosion, salinity or acid sulfate soils         On-ground                                    Number programs developed
                                                                                                                                                      Number of species or ecological communities
                                                                                                                                      Management of significanttranslocationof individuals translocated or establishe
Salinity control measures (hectares) of land treated for rising groundwater through surface drainage OG7.4
                        Area                                  Length (km) of drain                                       On-ground                                    -
                                                                                                                                                      Number of species or ecological
                                                                                                                                      Management of significantseedbanks developed communities
Salinity control measures (hectares) of land treated for rising groundwater through sub-surface drainage
                        Area                                  Length (km) of drain                           OG8.1       On-ground                                    -
                                                                                                                                                       plant, animal and disease control
                                                                                                                                      Significant pestArea (ha) of pest plant control measures implemented
Salinity control measures (hectares) of land treated for rising groundwater through groundwater pumping
                        Area                                  Not applicable                                 OG8.2       On-ground                                    -
                                                                                                                                                       plant, animal and disease control
                                                                                                                                      Significant pestNumber of weed seed wash down facilities established or reno
Salinity control measures (hectares) of land treated by salt evaporation ponds
                        Area                                  Not applicable                                 OG8.3       On-ground                                    -
                                                                                                                                                       plant, animal and disease control
                                                                                                                                      Significant pestArea (ha) of pest animal control (vertebrates) measures implem
Water contaminant management                                  Number of by sewage plant
                        Volume (ML) of effluent removed or contained sewage plants                           OG8.4       On-ground                                    -
                                                                                                                                                       plant, animal and disease control
                                                                                                                                      Significant pestArea (ha) of pest control (invertebrates) measures implemente
Water contaminant management                                  Number of sewage plants
                        Amount (tonnes) of effluent removed or contained by sewage plant                     OG8.5       On-ground                                    -
                                                                                                                                                       plant, animal and disease control
                                                                                                                                      Significant pestArea (ha) of plant disease control measures implemented
                                                                                                             OG9.1
                        Volume (ML) of effluent removed or contained human effluent disposal sites other than sewage On-ground
Water contaminant management                                  Number of by human effluent disposal other than sewage plant
                                                                                                                         plant                                        -
                                                                                                                                                      Area management and and/ soil treatments
                                                                                                                                      Works related to soil(ha) of land treatedother or protected from soil erosion by
Water contaminant management                                                                                 OG9.2
                                                              Number of human human disposal sites other than sewage On-ground
                        Amount (tonnes) of effluent removed or contained by effluent effluent disposal other than sewage plant
                                                                                                                         plant                                        -
                                                                                                                                                      Area management and for soil erosion through exclusion fenc
                                                                                                                                      Works related to soil(ha) of land treatedother soil treatments
                                                                                                             OG9.3
                        Volume (ML) of effluent removed or contained properties with dairy effluent control measures On-ground
Water contaminant management                                  Number of by dairy effluent control measures                                                            -
                                                                                                                                                      Area management and other soil treatments
                                                                                                                                      Works related to soil(ha) of acid sulphate soils identified and treated/protected
Water contaminant management                                                                                 OG9.4
                                                              Number of properties with dairy control control measures On-ground
                        Amount (tonnes) of effluent removed or contained by dairy effluent effluent measures                                                          -
                                                                                                                                                      Area management and other soil treatments
                                                                                                                                      Works related to soil(ha) of soil treatment for other than erosion or acid sulpha
Water contaminant management                                  Number of by feedlot effluent control works P1.1
                        Volume (ML) of effluent removed or contained properties with feedlot effluent control works      Planning                     Number of best management practice codes or guidelines com
                                                                                                                                      Improved codes of practice or -guidelines
Water contaminant management                                                                                 P2.1
                        Amount (tonnes) of effluent removed or contained by feedlot effluent effluent works works
                                                              Number of properties with feedlot control control          Planning                                     -
                                                                                                                                      Regional plansNumber of regional strategies or investment plans accredited
Water contaminant management                                  Number of by other effluent control works P2.2
                        Volume (ML) of effluent removed or contained properties with other effluent control works        Planning                                     -
                                                                                                                                      Regional plansNumber of regional strategies or investment plans reviewed or
Water contaminant management                                  Number of properties with other control controlP3.1
                        Amount (tonnes) of effluent removed or contained by other effluent effluent works works          Planning                     Number of catchment or sub-catchment plans or strategies com
                                                                                                                                      Sub-regional plans              -
                        Number of                             Number of
Water contaminant management stormwater quality control devices constructed wetlands                         P3.2        Planning                     Number of property or reserve management plans completed
                                                                                                                                      Sub-regional plans              -
Water contaminant management new stormwater reuse systems added
                        Number of                             Not applicable                                 P4.1        Planning                     Number plans Number of species or communities covered by
                                                                                                                                      Resource management of recovery or management plans for threatened spec
Water use efficiency Area (hectares) of land using improved irrigation practices                             P4.2
                                                              Number of land managers using improved irrigation practicesPlanning                     Number plans -
                                                                                                                                      Resource management of other resource management plans completed
Water use efficiency Volume (ML) of water saved               Number of on-farms reuse systems               P5.1        Planning                                     -
                                                                                                                                      Other plans Number of other biophysical, economic or socially related plan
Water use efficiency Volume (ML) of water saved                                                              RA1.1       Resource assessment                            condition sites
                                                                                                                                                      Number of studies completed monitored
                                                              Number of land managers using on-farm water saving practice by drainageSetting or monitoring resourceNumber oftargets
                                                                                                                                       diversion
Water use efficiency Volume (ML) of water saved using off-farm(km) ofmechanisms                              RA1.2
                                                              Length water channel improved or piped if applicable                    Setting         Number of new monitoring programs established
                                                                                                                         Resource assessment or monitoring resource- condition targets
Bore capping                                                  Not
                        Number of groundwater bores capped applicable                                        RA1.3                    Setting         Number of existing monitoring programs enhanced
                                                                                                                         Resource assessment or monitoring resource- condition targets
Improved practice codes or guidelines management practice codes developed
                        Number of best                        Not applicable                                 RA2.1                    Investigations (survey, inventory and mapping, and data analysis)
                                                                                                                         Resource assessment                          Area (ha) surveyed
                                                                                                                                                      Number of biophysical studies completed
Improved practice codes or guidelines management practice guidelines developed
                        Number of best                        Not applicable                                 RA2.2                    Investigations (survey, inventory /economic studies completed survey sampl
                                                                                                                         Resource assessment                          Size of population covered by the
                                                                                                                                                      Number of social and mapping, and data analysis)
Standard Output         Output Unit of Measure #1            Output Unit ofMAT Year #2 RCT Year
                                                                             Measure                                  New_Output_Type
                                                                                                        New_Output_Code                            New_OUM1 New_OUM2 Category_of_Primary_Reason_f
                                                                                                                                   New_Standard_Output
Integrated catchment or sub-catchment plansplans developed applicable
                        Number of catchment                  Not                                        RA2.3                      Investigations (survey, inventory and mapping, and data analysis)
                                                                                                                      Resource assessment                         -
                                                                                                                                                   Number of reports completed
                        Number of sub-catchment plans developed
Integrated catchment or sub-catchment plans                  Not applicable                             RA3.1                      Decision        Number         -
                                                                                                                      Resource assessment support tools of models developed
                        Number of property management plansapplicable
Property management plans                                    Not completed                              RA3.2                      Decision        Number         -
                                                                                                                      Resource assessment support tools of information management systems developed
                         and action statements               Not applicable
Species recovery plansNumber of endangered species recovery plans developed                             RA3.3                      Decision        Number         -
                                                                                                                      Resource assessment support tools of other decision support tools developed
Species recovery plansNumber of endangered species action statements developed
                         and action statements               Not applicable                             RA4.1                      Research                       -
                                                                                                                                                   Number of research
                                                                                                                      Resource assessment and development studies and development studies completed
                        Number of studies
Baseline, trend or condition studies for targets             Not applicable
                        Number of sites monitored
Baseline, trend or condition studies for targets             Not applicable
Decision support tools Number of models developed            Not applicable
                                                             Not applicable
Decision support tools Number of information management systems developed
                                                             Not developed
Decision support tools Number of other decision support tools applicable
                        inventory and mapping and data Area (hectares) surveyed
Investigations (survey, Number of vegetation studies analysis)
                        inventory and mapping and            Area (hectares) surveyed
Investigations (survey, Number of salinity studies data analysis)
                        inventory and mapping and            Area (hectares) surveyed
Investigations (survey, Number of species studies data analysis)
                        inventory and studies                Area (hectares) surveyed
Investigations (survey, Number of soilmapping and data analysis)
                        inventory and mapping and            Area (hectares) surveyed
Investigations (survey, Number of marine studies data analysis)
                        inventory and mapping studies        Area (hectares) surveyed
Investigations (survey, Number of groundwaterand data analysis)
                        inventory and mapping and data aquatic(hectares) surveyed
                                                             Area studies
Investigations (survey, Number of surface water / inland analysis)
                        inventory and mapping and            Area (hectares) surveyed
Investigations (survey, Number of social studies data analysis)
                        inventory and mapping and data analysis)
Investigations (survey, Number of other studies              Area (hectares) surveyed
                        Number of research and development studies undertaken
Research and development studies                             Not applicable
                        Instances of significant growth in/increased access to info technology capacity
Information and Knowledge Infrastructure                     Not applicable
                        Activity in knowledge                Not applicable
Information and Knowledge Infrastructure evaluation (science/technical panels, board activity, critical workshops)
                        Number Development                   Not applicable
Relationship and Organisationalof documented collaborative arrangements (MOUs, joint projects, data sharing arrangements)
                        Number Development                   Not applicable
Relationship and Organisationalof organisations involved in collaborative negotiations towards improved relationships
                        Number Development                   Not or learning
Relationship and Organisationalof organisational development applicable reviews (performance reviews, capacity building, planning, logic analyses, evaluation processes)
                        Number of program types for whichNot applicable
Project Development/Leveraging Investment                     projects and proposals were developed
                        Number Operations                    Not applicable
Organisational Establishment orof necessary business documents produced (constitution, business plan)
                        Expenditure ($) on hiring, securing Not applicabledevelopment of PDs
Office administration, HR                                    premises and
ry_of_Primary_Reason_for_Overall_Variance


nmental


be coded




mproved




 bank protected from stock


nt removed or contained by sewage plant
nt removed or contained by sewage plant
nt removed or contained by effluent control works
nt removed or contained by effluent control works
nt removed or contained by effluent control works
ed from entering waterway per years

gers using improved irrigation practices
saved per year
saved per year
saved per year
saved per year
saved per year


m) of riparian vegetation protected
ry_of_Primary_Reason_for_Overall_Variance




m) of riparian vegetation enhanced/rehabilitated

ation that are locally occurring natives
ation that are locally occurring natives
ation that are locally occurring natives
ation that are locally occurring natives

ation that are locally occurring natives




translocated or established




communities covered by the plan




ered by the survey sample
ry_of_Primary_Reason_for_Overall_Variance
Output_   Old Code    Output     Standard      Output Unit of       Output Unit of        Output Unit of
Code                  Type       Output        Measure #1           Measure #2            Measure #2 -
                                                                                          Grouped




CB1.1             1             Awareness raising activities
                      Capacity building                             Number                 Number of participants at demonstrations in person-day
                                               Number of demonstrations of participants in person-days
CB1.1             2             Awareness raising activities days
                      Capacity building        Number of field                             Number of participants at field days in person-days
                                                                    Number of participants in person-days
CB1.1             3             Awareness raising activities tours
                      Capacity building        Number of study                             Number of participants on study tours in person-days
                                                                    Number of participants in person-days
CB1.1             4             Awareness raising activities non-trainingof participants in person-days
                      Capacity building        Number of other      Number forums          Number of participants at other non-training forums in p
CB1.2             5             Awareness raising activities
                      Capacity building                             Quantity distributed Quantity of brochures distributed
                                               Number of brochures developed
CB1.2             6             Awareness raising activities
                      Capacity building                             Quantity distributed Quantity of newsletters distributed
                                               Number of newsletters developed
CB1.2             8             Awareness raising activities non-training distributed Quantity of other non-training products or materials distr
                      Capacity building        Number of other      Quantity products or materials developed
CB1.3             7             Awareness raising activities
                      Capacity building                             Quantity distributed Quantity of displays distributed
                                               Number of displays developed
CB1.4             9             Awareness raising activities
                      Capacity building                             Not applicable
                                               Number of media opportunities               Not applicable
CB1.5            10             Awareness raising activities
                      Capacity building                             developed
                                               Number of websites Not applicable           Not applicable
CB2.1            13             Skills         Number of training sessions held
                      Capacity buildingand training activities                             Number of participants at training sessions in person-da
                                                                    Number of participants in person-days
CB2.1            14             Skills         Number of workshops held of participants in person-days
                      Capacity buildingand training activities      Number                 Number of participants at workshops in person-days
CB2.1            15             Skills         Number of seminarsNumber of participants in person-days
                      Capacity buildingand training activities       held                  Number of participants at seminars in person-days
CB2.1            16             Skills         Number of other skills and training eventsNumber of participants at other skills and training events
                      Capacity buildingand training activities                              held
                                                                    Number of participants in person-days
CB2.2            17             Skills         Number of workbooks developed
                      Capacity buildingand training activities      Quantity distributed Quantity of workbooks distributed
CB2.2            18             Skills         Number of course notes developed
                      Capacity buildingand training activities      Quantity distributed Quantity of course notes distributed
CB2.2            19             Skills         Number of other keyQuantity distributed Quantity of other key materials distributed
                      Capacity buildingand training activities       materials developed
CB3.1            83                            Number of or guidelinesapplicable
                                                                    Not                    Not applicable
                      Planning Improved practice codes best management practice guidelines developed
CB3.2            83                            Number of or guidelinesapplicable
                                                                    Not                    Not applicable
                      Planning Improved practice codes best management practice guidelines developed
CB3.3            83                            Number of or guidelinesapplicable
                                                                    Not                    Not applicable
                      Planning Improved practice codes best management practice guidelines developed
CB4.1            92             Decision support tools              Not applicable         Not developed
                      Resource assessment Number of information management systems applicable
CB4.2           102             Investigations (survey, inventory and (hectares) dataArea
                                                                    Area                    analysis)
                      Resource assessment Number of other studiesmapping andsurveyed (hectares) surveyed by other studies
CB4.3           102             Investigations (survey, inventory and (hectares) dataArea
                                                                    Area                    analysis)
                      Resource assessment Number of other studiesmapping andsurveyed (hectares) surveyed by other studies
CB4.4            92             Decision support tools              Not applicable         Not developed
                      Resource assessment Number of information management systems applicable
CB5.1            12             Facilitation motivation of community groups or community projects assisted
                      Capacity building                             Not applicable
                                               Number and support activities               Not applicable
CB5.2            11             Facilitation motivation of FTE active community supportNot applicable
                      Capacity building                             Not applicable
                                               Number and support activities                positions (facilitators or coordinators)
OG1.1            20              activities    by agreements        Area (hectares) covered (hectares) of legal conservation covenants and oth
                                                                                           Area
                      On-ground Conservation Number of legal conservation covenants and other legal agreements
OG1.2            21              activities    by agreements         conservation agreements
                                                                                           Area
                      On-ground Conservation Number of voluntaryArea (hectares) covered (hectares) of voluntary conservation agreements c
OG10.1           61              activities    Area (hectares) of land treated for rising groundwater through surface drainage
                      On-ground Salinity control measures           Length (km) of drain Length (km) of surface drain
OG10.2           62              activities    Area (hectares) of land treated for rising groundwater through sub-surface drainage
                      On-ground Salinity control measures           Length (km) of drain Length (km) of sub-surface drain
OG10.3           62              activities    Area (hectares) of land treated for rising groundwater through sub-surface drainage
                      On-ground Salinity control measures           Length (km) of drain Length (km) of sub-surface drain
OG10.4           63              activities    Area (hectares) of land treated for rising groundwater through groundwater pumping
                      On-ground Salinity control measures           Not applicable         Not applicable
OG11.1           40              activities    Length (km) of stream bank stabilised
                      On-ground Riparian and waterway health        Number of structuresNumber of stream bank structures installed
OG11.2           41              activities    Length (km) of stream bed stabilised
                      On-ground Riparian and waterway health        Number of structuresNumber of stream bed structures installed
OG11.3           42              activities    Number of off-stream (alternative) watering sites installed
                      On-ground Riparian and waterway health        Not applicable         Not applicable
OG11.4           43              activities    Length of in-stream habitat established Number of large woody debris installed
                      On-ground Riparian and waterway health        Number of large woody debris
OG11.5           44              activities    Number of fish barriers addressed
                      On-ground Riparian and waterway health        Not applicable         Not applicable
OG11.5           45              activities    Length (km) of stream opened up to fish passage
                      On-ground Riparian and waterway health        Not applicable         Not applicable
OG12.1           65              activities    Volume (ML) of effluent removed or containedNumber of sewage plants
                      On-ground Water contaminant management Number of sewage plants by sewage plant
OG12.1           66              activities    Amount (tonnes) of effluent of sewage containedof sewage plants
                      On-ground Water contaminant management Number removed orplants       Number by sewage plant
OG12.2           65              activities    Volume (ML) of effluent removed or containedNumber of sewage plants
                      On-ground Water contaminant management Number of sewage plants by sewage plant
OG12.2           66              activities    Amount (tonnes) of effluent of sewage containedof sewage plants
                      On-ground Water contaminant management Number removed orplants       Number by sewage plant
OG12.3           67              activities    Volume (ML) of effluent removed or contained disposal siteseffluent disposal sites other than plan
                                                                                           Number of human other than sewage plant
                      On-ground Water contaminant management Number of human effluent by human effluent disposal other than sewage sew
OG12.3           68              activities    Amount (tonnes) of effluent of human effluent disposal sites other than sewage plant
                                                                                           Number by human effluent disposal other than sewage
                      On-ground Water contaminant management Number removed or containedof human effluent disposal sites other than sew
OG12.4           69              activities    Volume (ML) of effluent removed or contained by of effluent control measures
                                                                                           with dairy properties with dairy effluent
                      On-ground Water contaminant management Number of propertiesNumber dairy effluent control measures control measure
OG12.4           70              activities    Amount (tonnes) of effluent of propertiesNumber by dairy control measures
                                                                                           with dairy properties with dairy effluent control measure
                      On-ground Water contaminant management Number removed or containedof effluenteffluent control measures
OG12.4           71              activities    Volume (ML) of effluent removed or contained by of properties with feedlot effluent control works
                                                                                           with feedlot effluent control works
                      On-ground Water contaminant management Number of propertiesNumber feedlot effluent control works
OG12.4           72              activities    Amount (tonnes) of effluent of propertiesNumber by feedlot effluent control works
                                                                                           with feedlot effluent control works
                      On-ground Water contaminant management Number removed or containedof properties with feedlot effluent control works
OG12.4      73              activities   Volume (ML) of effluent removed or contained by of effluent control works
                                                                                      with other properties control works
                 On-ground Water contaminant management Number of propertiesNumber other effluent with other effluent control works
OG12.4      74              activities   Amount (tonnes) of effluent of propertiesNumber by other control control works
                                                                                      with other properties with works
                 On-ground Water contaminant management Number removed or containedof effluenteffluent other effluent control works
OG12.5      73              activities   Volume (ML) of effluent removed or contained by of effluent control works
                                                                                      with other properties control works
                 On-ground Water contaminant management Number of propertiesNumber other effluent with other effluent control works
OG12.5      74              activities   Amount (tonnes) of effluent of propertiesNumber by other control control works
                                                                                      with other properties with works
                 On-ground Water contaminant management Number removed or containedof effluenteffluent other effluent control works
OG12.6      75              activities   Number of stormwater quality control devicesNumber of
                 On-ground Water contaminant management Number of constructed wetlandsconstructed wetlands
OG12.7      75              activities   Number of stormwater quality control devicesNumber of
                 On-ground Water contaminant management Number of constructed wetlandsconstructed wetlands
OG13.1      77              activities   Area (hectares) of land usingof land managers using land managers using improved irrigation prac
                 On-ground Water use efficiency                                      Number of improved irrigation practices
                                                              Number improved irrigation practices
OG13.2      78              activities   Volume               Number                 Number of on-farms reuse systems
                 On-ground Water use efficiency (ML) of water saved of on-farms reuse systems
OG13.3      79              activities   Volume               Number                 Number of on-farm water using practice by drainage p
                 On-ground Water use efficiency (ML) of water saved of land managers using land managerssaving on-farm water saving d
OG13.4      80              activities   Volume               Length (km) of channel improved of channel improved
                                                                                     Length mechanisms
                 On-ground Water use efficiency (ML) of water saved using off-farm water (km) or piped if applicable or piped
OG13.5      81              activities                        Not applicable
                 On-ground Bore capping Number of groundwater bores capped           Not applicable
OG13.6      76              activities   Number of new stormwater reuse systems added
                 On-ground Water contaminant management Not applicable               Not applicable
OG2.1       23              activities   Area (hectares) of by fencing
                                                              Not applicable         Not applicable
                 On-ground Indigenous vegetation protected coastal indigenous vegetation protected by fencing
OG2.2       47              activities   Area (hectares) of wetland
                                                              Not applicable
                 On-ground Wetlands health protected or enhanced protected           Not applicable
OG2.3       24              activities   Area (hectares) of by fencing
                                                              Streambank length (km) of riparian vegetationof riparian indigenous vegetatio
                                                                                     Streambank length (km) protected
                 On-ground Indigenous vegetation protected riparian indigenous vegetation protected by fencing
OG2.4       22              activities   Area (hectares) of by fencing
                                                              Not applicable         Not applicable
                 On-ground Indigenous vegetation protected terrestrial indigenous vegetation protected by fencing
OG3.1       26              activities   Area (hectares) of coastal indigenous vegetation enhanced/rehabilitated
                                                              Not applicable
                 On-ground Indigenous vegetation enhanced/rehabilitated              Not applicable
OG3.2       48              activities   Area (hectares) of wetland
                                                              Not applicable         Not applicable
                 On-ground Wetlands health protected or enhanced enhanced/rehabilitated
OG3.3       27              activities   Area (hectares) of riparian indigenous vegetation enhanced/rehabilitated
                                                              Streambank             Streambank length (km) enhanced/rehabilitated
                 On-ground Indigenous vegetation enhanced/rehabilitated length (km) of riparian vegetationof riparian indigenous vegetatio
OG3.4       25              activities   Area (hectares) of terrestrial indigenous vegetation enhanced/rehabilitated
                                                              Not applicable
                 On-ground Indigenous vegetation enhanced/rehabilitated              Not applicable
OG4.1       28              activities   with (hectares) vegetation
                                                              Not applicable         Not applicable
                 On-ground Revegetation Area indigenous planted to terrestrial indigenous species
OG4.1       29              activities   with (hectares) vegetation
                                                              Not applicable         Not species
                 On-ground Revegetation Area indigenous planted to coastal indigenous applicable
OG4.1       30              activities   with (hectares) vegetation
                                                              Streambank length (km) of riparian vegetation protected
                                                                                     Streambank
                 On-ground Revegetation Area indigenous planted to riparian indigenous species length (km) of riparian revegetation
OG4.2       29              activities   with (hectares) vegetation
                                                              Not applicable         Not species
                 On-ground Revegetation Area indigenous planted to coastal indigenous applicable
OG4.3       30              activities   with (hectares) vegetation
                                                              Streambank length (km) of riparian vegetation protected
                                                                                     Streambank
                 On-ground Revegetation Area indigenous planted to riparian indigenous species length (km) of riparian revegetation
OG4.4       30              activities   with (hectares) vegetation
                                                              Streambank length (km) of riparian vegetation protected
                                                                                     Streambank
                 On-ground Revegetation Area indigenous planted to riparian indigenous species length (km) of riparian revegetation
OG4.5       30              activities   with (hectares) vegetation
                                                              Streambank length (km) of riparian vegetation protected
                                                                                     Streambank
                 On-ground Revegetation Area indigenous planted to riparian indigenous species length (km) of riparian revegetation
OG4.6       28              activities   with (hectares) vegetation
                                                              Not applicable         Not applicable
                 On-ground Revegetation Area indigenous planted to terrestrial indigenous species
OG5.1       34              activities   with (hectares) of terrestrial exotic
                                                              Not                    Not
                 On-ground Revegetation Area exotic vegetation applicable plantation applicable
OG5.1       35              activities   with (hectares) of coastal exotic plantation applicable
                                                              Not
                 On-ground Revegetation Area exotic vegetation applicable            Not
OG5.1       36              activities   with (hectares) of riparian exotic plantation applicable
                                                              Not
                 On-ground Revegetation Area exotic vegetation applicable            Not
OG5.2       33              activities   with (hectares) of riparian exotic perennial pastures
                                                              Not
                 On-ground Revegetation Area exotic vegetation applicable            Not applicable
OG5.2       34              activities   with (hectares) of terrestrial exotic
                                                              Not                    Not
                 On-ground Revegetation Area exotic vegetation applicable plantation applicable
OG5.2       35              activities   with (hectares) of coastal exotic plantation applicable
                                                              Not
                 On-ground Revegetation Area exotic vegetation applicable            Not
OG5.3       31              activities   with (hectares) of terrestrial exotic
                                                              Not                    Not applicable
                 On-ground Revegetation Area exotic vegetation applicable perennial pastures
OG5.3       32              activities   with (hectares) of coastal exotic perennial pastures
                                                              Not
                 On-ground Revegetation Area exotic vegetation applicable            Not applicable
OG5.3       33              activities   with (hectares) of riparian exotic perennial pastures
                                                              Not
                 On-ground Revegetation Area exotic vegetation applicable            Not applicable
OG5.4       37              activities   with (hectares) of other terrestrial
                                                              Not                    Not applicable
                 On-ground Revegetation Area exotic vegetation applicableexotic or mixed indigenous/exotic vegetation planted
OG5.4       38              activities   with (hectares) of other coastal exotic or Not applicable
                                                              Not
                 On-ground Revegetation Area exotic vegetation applicable            mixed indigenous/exotic vegetation planted
OG5.4       39              activities   with (hectares) of other riparian exotic or Not applicable
                                                              Not
                 On-ground Revegetation Area exotic vegetation applicable            mixed indigenous/exotic vegetation planted
OG6.1       49              activities   Area (hectares) of wetlands
                                                              Not applicable         Not applicable
                 On-ground Wetlands health protected or enhanced with reinstated connectivity
OG7.1       51              activities   of significant species or ecological communities
                                                              Not applicable         Not applicable
                 On-ground Management Area (hectares) protected by fencing specifically for significant species/community protection
OG7.2       53              activities   of significant species individuals bred through an
                                                              Not applicable         Not applicable
                 On-ground Management Number of successfulor ecological communities established breeding program
OG7.3       52              activities   of significant species translocated or established
                                                              Not applicable
                 On-ground Management Number of individualsor ecological communities Not applicable
OG7.4       54              activities   of significant species or ecological seeds Weight
                                                              Weight (kg)            collected
                 On-ground Management Number of seedbanks managed of communities (kg) of seeds collected
OG8.1       55              activities   Area (hectares)      Type of control        Type of pest plant (e.g. blackberry, boxthorn etc)
                 On-ground Significant pest plant control of pest plantpest plant (e.g. blackberry, boxthorn etc)
OG8.1    55.01              activities   Area (hectares)      Not applicable
                 On-ground Significant pest plant control of boxthorns control       Not applicable
OG8.1    55.02              activities   Area (hectares)      Not cactus control Not applicable
                 On-ground Significant pest plant control of wheelapplicable
OG8.1    55.03              activities   Area (hectares)      Not applicable
                 On-ground Significant pest plant control of blackberry control      Not applicable
OG8.1    55.04              activities   Area (hectares)      Not creeper control Not applicable
                 On-ground Significant pest plant control of bridal applicable
OG8.1    55.05              activities   Area (hectares)      Not applicable         Not
                 On-ground Significant pest plant control of broad-leaved weed control applicable
OG8.1    55.06              activities   Area (hectares)      Not applicable
                 On-ground Significant pest plant control of woody weed control Not applicable
OG8.1    55.07              activities   Area (hectares)      Not applicable         Not
                 On-ground Significant pest plant control of Salvinia molesta control applicable
OG8.2       55              activities   Area (hectares)      Type of control        Type of pest plant (e.g. blackberry, boxthorn etc)
                 On-ground Significant pest plant control of pest plantpest plant (e.g. blackberry, boxthorn etc)
OG8.2    55.01              activities   Area (hectares)      Not applicable
                 On-ground Significant pest plant control of boxthorns control       Not applicable
OG8.2    55.02              activities   Area (hectares)      Not cactus control Not applicable
                 On-ground Significant pest plant control of wheelapplicable
OG8.2    55.03              activities   Area (hectares)      Not applicable
                 On-ground Significant pest plant control of blackberry control      Not applicable
OG8.2    55.04              activities   Area (hectares)      Not creeper control Not applicable
                 On-ground Significant pest plant control of bridal applicable
OG8.2    55.05              activities   Area (hectares)      Not applicable         Not
                 On-ground Significant pest plant control of broad-leaved weed control applicable
OG8.2   55.06              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of woody weed control Not applicable
OG8.2   55.07              activities   Area (hectares)       Not applicable        Not
                On-ground Significant pest plant control of Salvinia molesta control applicable
OG8.3      56              activities   Area (hectares) of pest animal control      Type of pest animal
                On-ground Significant pest vertebrate control Type of pest animal (e.g.rabbits, foxes) (e.g.rabbits, foxes)
OG8.3   56.01              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of cane toad control       Not applicable
OG8.3   56.02              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of cat control             Not applicable
OG8.3   56.03              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of deer control            Not applicable
OG8.3   56.04              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of fox control             Not applicable
OG8.3   56.05              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of goat control            Not applicable
OG8.3   56.06              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of hare control            Not applicable
OG8.3   56.07              activities   Area (hectares) of rabbit control
                On-ground Significant pest vertebrate control Not applicable        Not applicable
OG8.3   56.08              activities   Area (hectares) of yellow-throated          Not applicable
                On-ground Significant pest vertebrate control Not applicable minor control
OG8.3   56.09              activities   Area (hectares) of pigs applicable
                On-ground Significant pest vertebrate control Notcontrol            Not applicable
OG8.3    56.1              activities   Area (hectares) of hooved animal            (Camel, Donkeym Horse and Buffalo)
                On-ground Significant pest vertebrate control Not applicablecontrol Not applicable
OG8.4      56              activities   Area (hectares) of pest animal control      Type of pest animal
                On-ground Significant pest vertebrate control Type of pest animal (e.g.rabbits, foxes) (e.g.rabbits, foxes)
OG8.4   56.01              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of cane toad control       Not applicable
OG8.4   56.02              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of cat control             Not applicable
OG8.4   56.03              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of deer control            Not applicable
OG8.4   56.04              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of fox control             Not applicable
OG8.4   56.05              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of goat control            Not applicable
OG8.4   56.06              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of hare control            Not applicable
OG8.4   56.07              activities   Area (hectares) of rabbit control
                On-ground Significant pest vertebrate control Not applicable        Not applicable
OG8.4   56.08              activities   Area (hectares) of yellow-throated          Not applicable
                On-ground Significant pest vertebrate control Not applicable minor control
OG8.4   56.09              activities   Area (hectares) of pigs applicable
                On-ground Significant pest vertebrate control Notcontrol            Not applicable
OG8.4    56.1              activities   Area (hectares) of hooved animal            (Camel, Donkeym Horse and Buffalo)
                On-ground Significant pest vertebrate control Not applicablecontrol Not applicable
OG8.5      55              activities   Area (hectares)       Type of control       Type of pest plant (e.g. blackberry, boxthorn etc)
                On-ground Significant pest plant control of pest plantpest plant (e.g. blackberry, boxthorn etc)
OG8.5   55.01              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of boxthorns control       Not applicable
OG8.5   55.02              activities   Area (hectares)       Not cactus control Not applicable
                On-ground Significant pest plant control of wheelapplicable
OG8.5   55.03              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of blackberry control      Not applicable
OG8.5   55.04              activities   Area (hectares)       Not creeper control Not applicable
                On-ground Significant pest plant control of bridal applicable
OG8.5   55.05              activities   Area (hectares)       Not applicable        Not
                On-ground Significant pest plant control of broad-leaved weed control applicable
OG8.5   55.06              activities   Area (hectares)       Not applicable
                On-ground Significant pest plant control of woody weed control Not applicable
OG8.5   55.07              activities   Area (hectares)       Not applicable        Not
                On-ground Significant pest plant control of Salvinia molesta control applicable
OG9.1      57              activities   Area                  Number of sites       Number of soil erosion engineering sites
                On-ground Soil management (hectares) of land treated for soil erosion through engineering works
OG9.2      58              activities   Area                  Number of sites       Number of soil erosion fencing
                On-ground Soil management (hectares) of land treated for soil erosion through exclusion exclusion fencing sites
OG9.3      59              activities   Area                  Not applicable        Not applicable
                On-ground Soil management (hectares) of treatment for acid sulfate soils
OG9.4      60              activities   Area                  Not applicable         than erosion,
                On-ground Soil management (hectares) of soil treatment for otherNot applicablesalinity or acid sulfate soils
Other       0   Other     Other         Other                 Other                 Other
P1.1       82                           Number of or guidelinesapplicable
                                                              Not                   Not applicable
                Planning Improved practice codes best management practice codes developed
P1.1       83                           Number of or guidelinesapplicable
                                                              Not                   Not applicable
                Planning Improved practice codes best management practice guidelines developed
P2.1       84                           Number of catchment plans developed Not applicable
                                                              Not applicable
                Planning Integrated catchment or sub-catchment plans
P2.2       84                           Number of catchment plans developed Not applicable
                                                              Not applicable
                Planning Integrated catchment or sub-catchment plans
P3.1       84                           Number of catchment plans developed Not applicable
                                                              Not applicable
                Planning Integrated catchment or sub-catchment plans
P3.1       85                           Number of sub-catchment plans
                                                              Not applicable        Not
                Planning Integrated catchment or sub-catchment plans developed applicable
P3.2       86                           Number plans          Not applicable
                Planning Property managementof property management plans completed  Not applicable
P4.1       87                           Number of endangered species
                                                              Not applicable        plans developed
                Planning Species recovery plans and action statementsrecovery Not applicable
P4.1       88                           Number of endangered species
                                                              Not applicable        Not applicable
                Planning Species recovery plans and action statementsaction statements developed
P4.2       86                           Number plans          Not applicable
                Planning Property managementof property management plans completed  Not applicable
P5.1       86                           Number plans          Not applicable
                Planning Property managementof property management plans completed  Not applicable
RA1.1      89             Baseline, trend or condition studies for targets
                Resource assessment Number of studies Not applicable                Not applicable
RA1.1      90             Baseline, trend or condition studies forapplicable
                Resource assessment Number of sites monitored Not targets           Not applicable
RA1.2     102             Investigations (survey, inventory and (hectares) dataArea
                                                              Area                    analysis)
                Resource assessment Number of other studiesmapping andsurveyed (hectares) surveyed by other studies
RA1.3     102             Investigations (survey, inventory and (hectares) dataArea
                                                              Area                    analysis)
                Resource assessment Number of other studiesmapping andsurveyed (hectares) surveyed by other studies
RA2.1      94             Investigations (survey, inventory and mapping andsurveyed (hectares) surveyed by vegetation studies
                                                              Area (hectares) dataArea
                Resource assessment Number of vegetation studies                      analysis)
RA2.1      95             Investigations (survey, inventory and mapping and dataArea
                                                              Area                    analysis)
                Resource assessment Number of salinity studies(hectares) surveyed (hectares) surveyed by salinity studies
RA2.1      96             Investigations (survey, inventory studies
                                                              Area (hectares) dataAreaanalysis)
                Resource assessment Number of species and mapping andsurveyed (hectares) surveyed by species studies
RA2.1      97             Investigations (survey, inventory and (hectares) dataArea
                                                              Area                    analysis)
                Resource assessment Number of soil studies mapping andsurveyed (hectares) surveyed by soil studies
RA2.1      98             Investigations (survey, inventory and mapping and dataArea
                                                              Area                    analysis)
                Resource assessment Number of marine studies(hectares) surveyed (hectares) surveyed by marine studies
RA2.1      99             Investigations (survey, inventory and studies
                                                              Area (hectares) dataAreaanalysis)
                Resource assessment Number of groundwatermapping andsurveyed (hectares) surveyed by groundwater studies
RA2.1     100             Investigations (survey, inventory and mapping and dataArea
                                                              Area inland aquatic studies
                                                                                      analysis)
                Resource assessment Number of surface water /(hectares) surveyed (hectares) surveyed by surface water / inland aqua
RA2.1   102             Investigations (survey, inventory and (hectares) dataArea
                                                           Area                analysis)
              Resource assessment Number of other studiesmapping andsurveyed (hectares) surveyed by other studies
RA2.2   101             Investigations (survey, inventory and mapping and dataArea
                                                           Area                analysis)
              Resource assessment Number of social studies (hectares) surveyed (hectares) surveyed by social studies
RA2.3   102             Investigations (survey, inventory and (hectares) dataArea
                                                           Area                analysis)
              Resource assessment Number of other studiesmapping andsurveyed (hectares) surveyed by other studies
RA3.1    91             Decision support tools             Not applicable
              Resource assessment Number of models developed                  Not applicable
RA3.2    92             Decision support tools             Not applicable     Not developed
              Resource assessment Number of information management systems applicable
RA3.3    93             Decision support tools             Not applicable     Not applicable
              Resource assessment Number of other decision support tools developed
RA4.1   103             Research and development studies development studiesapplicable
                                                           and
              Resource assessment Number of research Not applicable           Not undertaken
Output_    Output_Type      Standard_O Output_Unit_of_Measure_1#
Code                        utput

     401                                     Instances of Infrastructure
           Capacity building Information and Knowledgesignificant growth in/increased access to info technology capacity
     402                                     Activity in knowledge evaluation (science/technical panels, board activity, critical workshops)
           Capacity building Information and Knowledge Infrastructure
     403                                     Number of documented collaborative arrangements (MOUs, joint projects, data sharing arrangements
           Capacity building Relationship and Organisational Development
     404                                     Number of organisations involved
           Capacity building Relationship and Organisational Development in collaborative negotiations towards improved relationships
     405                                     Number of organisational development or learning reviews (performance reviews, capacity building, pl
           Capacity building Relationship and Organisational Development
     406                      Project Development/Leveraging Investment
                                             Number
           Institutional Establishment/Maintenance of program types for which projects and proposals were developed
     407                      OrganisationalNumber
                                              Establishment or Operations
           Institutional Establishment/Maintenance of necessary business documents produced (constitution, business plan)
     408                      Office administration,
                                             Expenditure
           Institutional Establishment/Maintenance HR ($) on hiring, securing premises and development of PDs
CB1.1                                        Number of awareness raising events such as demonstrations, field days or study tours conducted
           Capacity building Awareness raising
CB1.1                                        Number of awareness raising events such as demonstrations, field days or study tours conducted
           Capacity building Awareness raising
CB1.1                                        Number of awareness raising events such as demonstrations, field days or study tours conducted
           Capacity building Awareness raising
CB1.1                                        Number of awareness raising events such as demonstrations, field days or study tours conducted
           Capacity building Awareness raising
CB1.2                                        Number of written products such as brochures, newsletters, posters or fact sheets developed
           Capacity building Awareness raising
CB1.2                                        Number of written products such as brochures, newsletters, posters or fact sheets developed
           Capacity building Awareness raising
CB1.2                                        Number of written products such as brochures, newsletters, posters or fact sheets developed
           Capacity building Awareness raising
CB1.3                                        Number of displays for use at events such as regional meetings developed
           Capacity building Awareness raising
CB1.4                                        Number of media opportunities resulting in articles in newspapers or on radio or television created
           Capacity building Awareness raising
CB1.5                                        Number of websites developed or significantly enhanced
           Capacity building Awareness raising
CB2.1                                        Number of training sessions, workshops, seminars or other skills and training events conducted
           Capacity building Skills and training
CB2.1                                        Number of training sessions, workshops, seminars or other skills and training events conducted
           Capacity building Skills and training
CB2.1                                        Number of training sessions, workshops, seminars or other skills and training events conducted
           Capacity building Skills and training
CB2.1                                        Number of training sessions, workshops, seminars or other skills and training events conducted
           Capacity building Skills and training
CB2.2                                        Number of workbooks, course notes or other key materials developed
           Capacity building Skills and training
CB2.2                                        Number of workbooks, course notes or other key materials developed
           Capacity building Skills and training
CB2.2                                        Number of workbooks, course notes or other key materials developed
           Capacity building Skills and training
CB3.1                                        Number of key organisational
           Capacity building Establishing new institutional arrangements documents produced
CB3.2                                        Number of formally documented collaborative arrangements developed
           Capacity building Establishing new institutional arrangements
CB3.3                                        Number of arrangements for
           Capacity building Establishing new institutional arrangements effective collaboration negotiated where a formal agreement does not exi
CB4.1                                         learning
           Capacity building OrganisationalNumber of governance tools developed
CB4.2                                         learning
           Capacity building OrganisationalNumber of significant knowledge evaluation events held
CB4.3                                         learning
           Capacity building OrganisationalNumber of organisational learning reviews completed
CB4.4                                         learning
           Capacity building OrganisationalNumber new databases developed
CB5.1                                        Number
           Capacity building Community Support of community groups OR projects assisted
CB5.2                                        Number
           Capacity building Community Support of FTE active community support positions (facilitators or coordinators)
OG1.1      On-ground                         Number of conservation covenants or other agreements attached to title negotiated
                              Conservation by agreements
OG1.2      On-ground                         Number of voluntary conservation agreements negotiated
                              Conservation by agreements
OG10.1     On-ground                         to the improved treated through surface drainage
                              Works related Area (ha) of landmanagement of surface or groundwater
OG10.2     On-ground                         to the improved treated through sub-surface drainage
                              Works related Area (ha) of landmanagement of surface or groundwater
OG10.3     On-ground                         to the improved treated through improvements to existing
                              Works related Area (ha) of landmanagement of surface or groundwater drainage systems
OG10.4     On-ground                         to the improved treated for rising groundwater through
                              Works related Area (ha) of landmanagement of surface or groundwatergroundwater pumping
OG11.1     On-ground                         Length (m) of stream bank stabilised with engineering works
                              Works for improving waterway health
OG11.2     On-ground                         Length (m) of stream bed stabilised
                              Works for improving waterway health
OG11.3     On-ground                         Number of off-stream (alternative) watering sites installed
                              Works for improving waterway health
OG11.4     On-ground                         Length (kilometres) of
                              Works for improving waterway healthin-stream habitat established
OG11.5     On-ground                         Number of fish barriers
                              Works for improving waterway health modified and/ or removed
OG11.5     On-ground                         Number of fish barriers
                              Works for improving waterway health modified and/ or removed
OG12.1     On-ground                         Number of new sewage plants constructed
                              Works for improving water quality
OG12.1     On-ground                         Number of new sewage plants constructed
                              Works for improving water quality
OG12.2     On-ground                         Number of sewage
                              Works for improving water quality plants improved with better treatment processes
OG12.2     On-ground                         Number of sewage
                              Works for improving water quality plants improved with better treatment processes
OG12.3     On-ground                         Number of human
                              Works for improving water qualityeffluent disposal sites other than sewage plant constructed
OG12.3     On-ground                         Number of human
                              Works for improving water qualityeffluent disposal sites other than sewage plant constructed
OG12.4     On-ground                         Number of effluent
                              Works for improving water quality control works for animal waste established on properties
OG12.4     On-ground                         Number of effluent
                              Works for improving water quality control works for animal waste established on properties
OG12.4     On-ground                         Number of effluent
                              Works for improving water quality control works for animal waste established on properties
OG12.4     On-ground                         Number of effluent
                              Works for improving water quality control works for animal waste established on properties
OG12.4   On-ground                  Number of effluent
                     Works for improving water quality control works for animal waste established on properties
OG12.4   On-ground                  Number of effluent
                     Works for improving water quality control works for animal waste established on properties
OG12.5   On-ground                  Number of other effluent or farm runoff control works established on properties
                     Works for improving water quality
OG12.5   On-ground                  Number of other effluent or farm runoff control works established on properties
                     Works for improving water quality
OG12.6   On-ground                  Number of stormwater quality control devices constructed
                     Works for improving water quality
OG12.7   On-ground                  Number of constructed wetlands
                     Works for improving water quality
OG13.1   On-ground                  to improving water use improved
                     Works related Area (ha) of land whereefficiency irrigation practices have been adopted
OG13.2   On-ground                  to improving water use efficiency
                     Works related Number of on-farms reuse systems constructed
OG13.3   On-ground                  to improving water use efficiency
                     Works related Number of land managers who have adopted on-farm water saving practice by drainage diversion
OG13.4   On-ground                  to improving water use improved
                     Works related Length (km) of channel efficiency or piped if applicable
OG13.5   On-ground                  to improving water use bores capped
                     Works related Number of groundwaterefficiency
OG13.6   On-ground                  to improving water use efficiency
                     Works related Number of new stormwater reuse systems
OG2.1    On-ground                  Area (ha) of coastal native
                     Native vegetation protected by fencing vegetation protected by fencing
OG2.2    On-ground                  Area (ha) of wetland native vegetation protected by fencing
                     Native vegetation protected by fencing
OG2.3    On-ground                  Area (ha) of riparian native vegetation protected by fencing
                     Native vegetation protected by fencing
OG2.4    On-ground                  Area (ha) of terrestrial native vegetation protected by fencing
                     Native vegetation protected by fencing
OG3.1    On-ground                  Area (ha) of coastal native (include improved fire management
                     Native vegetation enhanced/rehabilitated vegetation enhanced/rehabilitated practice under this category)
OG3.2    On-ground                  Area (ha) of wetland native vegetation enhanced/rehabilitated
                     Native vegetation enhanced/rehabilitated (include improved fire management practice under this category)
OG3.3    On-ground                  Area (ha) of riparian native vegetation enhanced/rehabilitated
                     Native vegetation enhanced/rehabilitated (include improved fire management practice under this category)
OG3.4    On-ground                  Area (ha) of terrestrial native vegetation enhanced/rehabilitated
                     Native vegetation enhanced/rehabilitated (include improved fire management practice under this category)
OG4.1    On-ground                  Area (ha) vegetation (include native pastures under this category, for mixed planting use native or exo
                     Revegetation with nativeof native plantation established
OG4.1    On-ground                  Area (ha) vegetation (include native pastures under this category, for mixed planting use native or exo
                     Revegetation with nativeof native plantation established
OG4.1    On-ground                  Area (ha) vegetation (include native pastures under this category, for mixed planting use native or exo
                     Revegetation with nativeof native plantation established
OG4.2    On-ground                  Area (ha) vegetation (include native pastures under this category, for mixed planting use native or exo
                     Revegetation with nativeplanted to coastal native species
OG4.3    On-ground                  Area (ha) vegetation (include native pastures
                     Revegetation with nativeplanted to wetland native species under this category, for mixed planting use native or exo
OG4.4    On-ground                  Area (ha) vegetation (include native pastures
                     Revegetation with nativeplanted to riparian native species under this category, for mixed planting use native or exo
OG4.5    On-ground                  Stream bank length (km) of riparian pastures enhanced/rehabilitated
                     Revegetation with native vegetation (include nativevegetationunder this category, for mixed planting use native or exo
OG4.6    On-ground                  Area (ha) vegetation (include native species
                     Revegetation with nativeplanted to terrestrial native pastures under this category, for mixed planting use native or exo
OG5.1    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic plantation established
OG5.1    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic plantation established
OG5.1    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic plantation established
OG5.2    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic vegetation established
OG5.2    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic vegetation established
OG5.2    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic vegetation established
OG5.3    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic perennial pastures established
OG5.3    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic perennial pastures established
OG5.3    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic perennial pastures established
OG5.4    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic, non-perennial special purpose pastures established
OG5.4    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic, non-perennial special purpose pastures established
OG5.4    On-ground                  Area (ha) vegetation
                     Revegetation with exotic of exotic, non-perennial special purpose pastures established
OG6.1    On-ground                  Area (ha) of wetlands with
                     Wetlands health protected or enhanced connectivity reinstated
OG7.1    On-ground                  Area (ha) protected or ecological communities
                     Management of significant speciesby fencing specifically for significant species/ ecological community protection
OG7.2    On-ground                  Number of breeding or ecological communities
                     Management of significant species programs developed
OG7.3    On-ground                  Number of translocation programs developed
                     Management of significant species or ecological communities
OG7.4    On-ground                  Number of seedbanks ecological
                     Management of significant species ordeveloped communities
OG8.1    On-ground                  Area (ha) of pest plant control measures implemented
                     Significant pest plant, animal and disease control
OG8.1    On-ground                  Area (ha) of pest plant control measures implemented
                     Significant pest plant, animal and disease control
OG8.1    On-ground                  Area (ha) of pest plant control measures implemented
                     Significant pest plant, animal and disease control
OG8.1    On-ground                  Area (ha) of pest plant control measures implemented
                     Significant pest plant, animal and disease control
OG8.1    On-ground                  Area (ha) of pest plant control measures implemented
                     Significant pest plant, animal and disease control
OG8.1    On-ground                  Area (ha) of pest plant control measures implemented
                     Significant pest plant, animal and disease control
OG8.1    On-ground                  Area (ha) of pest plant control measures implemented
                     Significant pest plant, animal and disease control
OG8.1    On-ground                  Area (ha) of pest plant control measures implemented
                     Significant pest plant, animal and disease control
OG8.2    On-ground                  Number of weed seed wash down
                     Significant pest plant, animal and disease controlfacilities established or renovated
OG8.2    On-ground                  Number of weed seed wash down
                     Significant pest plant, animal and disease controlfacilities established or renovated
OG8.2    On-ground                  Number of weed seed wash down
                     Significant pest plant, animal and disease controlfacilities established or renovated
OG8.2    On-ground                  Number of weed seed wash down
                     Significant pest plant, animal and disease controlfacilities established or renovated
OG8.2    On-ground                  Number of weed seed wash down
                     Significant pest plant, animal and disease controlfacilities established or renovated
OG8.2    On-ground                  Number of weed seed wash down
                     Significant pest plant, animal and disease controlfacilities established or renovated
OG8.2   On-ground                     Number of weed seed wash down
                       Significant pest plant, animal and disease controlfacilities established or renovated
OG8.2   On-ground                     Number of weed seed wash down
                       Significant pest plant, animal and disease controlfacilities established or renovated
OG8.3   On-ground                     Area (ha) of pest animal control (vertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.3   On-ground                     Area (ha) of pest animal control (vertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.3   On-ground                     Area (ha) of pest animal control (vertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.3   On-ground                     Area (ha) of pest animal control (vertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.3   On-ground                     Area (ha) of pest animal control (vertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.3   On-ground                     Area (ha) of pest animal control (vertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.3   On-ground                     Area (ha) of pest animal control (vertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.3   On-ground                     Area (ha) of pest animal control (vertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.3   On-ground                     Area (ha) of pest animal control (vertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.3   On-ground                     Area (ha) of pest animal control (vertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.3   On-ground                     Area (ha) of pest animal control (vertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.4   On-ground                     Area (ha) of pest control (invertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.4   On-ground                     Area (ha) of pest control (invertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.4   On-ground                     Area (ha) of pest control (invertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.4   On-ground                     Area (ha) of pest control (invertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.4   On-ground                     Area (ha) of pest control (invertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.4   On-ground                     Area (ha) of pest control (invertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.4   On-ground                     Area (ha) of pest control (invertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.4   On-ground                     Area (ha) of pest control (invertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.4   On-ground                     Area (ha) of pest control (invertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.4   On-ground                     Area (ha) of pest control (invertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.4   On-ground                     Area (ha) of pest control (invertebrates) measures implemented
                       Significant pest plant, animal and disease control
OG8.5   On-ground                     Area (ha) of plant disease control measures implemented
                       Significant pest plant, animal and disease control
OG8.5   On-ground                     Area (ha) of plant disease control measures implemented
                       Significant pest plant, animal and disease control
OG8.5   On-ground                     Area (ha) of plant disease control measures implemented
                       Significant pest plant, animal and disease control
OG8.5   On-ground                     Area (ha) of plant disease control measures implemented
                       Significant pest plant, animal and disease control
OG8.5   On-ground                     Area (ha) of plant disease control measures implemented
                       Significant pest plant, animal and disease control
OG8.5   On-ground                     Area (ha) of plant disease control measures implemented
                       Significant pest plant, animal and disease control
OG8.5   On-ground                     Area (ha) of plant disease control measures implemented
                       Significant pest plant, animal and disease control
OG8.5   On-ground                     Area (ha) of plant disease control measures implemented
                       Significant pest plant, animal and disease control
OG9.1   On-ground                     to soil management and and/ soil treatments
                       Works related Area (ha) of land treated otheror protected from soil erosion by engineering works
OG9.2   On-ground                     to soil management and for soil erosion through
                       Works related Area (ha) of land treated other soil treatments exclusion fencing
OG9.3   On-ground                     to soil management and other identified and
                       Works related Area (ha) of acid sulphate soilssoil treatments treated/protected
OG9.4   On-ground                     to soil management and other soil than erosion or acid sulphate soils
                       Works related Area (ha) of soil treatment for othertreatments
Other   Other                         [Your output measure]
P1.1    Planning                      Number of best management practice codes or guidelines completed
                       Improved codes of practice or guidelines
P1.1    Planning                      Number of best management practice codes or guidelines completed
                       Improved codes of practice or guidelines
P2.1    Planning       Regional plansNumber of regional strategies or investment plans accredited
P2.2    Planning       Regional plansNumber of regional strategies or investment plans reviewed or revised
P3.1    Planning                      Number of catchment or sub-catchment plans or strategies completed
                       Sub-regional plans
P3.1    Planning                      Number of catchment or sub-catchment plans or strategies completed
                       Sub-regional plans
P3.2    Planning                      Number of property or reserve management plans completed
                       Sub-regional plans
P4.1    Planning                      Number plans
                       Resource managementof recovery or management plans for threatened species or ecological communities complete
P4.1    Planning                      Number plans
                       Resource managementof recovery or management plans for threatened species or ecological communities complete
P4.2    Planning                      Number plans
                       Resource managementof other resource management plans completed
P5.1    Planning       Other plans Number of other biophysical, economic or socially related plans completed
RA1.1                  Setting        Number of studies completed
        Resource assessment or monitoring resource condition targets
RA1.1                  Setting        Number of studies completed
        Resource assessment or monitoring resource condition targets
RA1.2                  Setting        Number of new condition programs established
        Resource assessment or monitoring resource monitoringtargets
RA1.3                  Setting        Number of existing monitoring programs enhanced
        Resource assessment or monitoring resource condition targets
RA2.1                  Investigations (survey, inventory and mapping, and data analysis)
        Resource assessment           Number of biophysical studies completed
RA2.1                  Investigations (survey, inventory and mapping, and data analysis)
        Resource assessment           Number of biophysical studies completed
RA2.1                  Investigations (survey, inventory and mapping, and data analysis)
        Resource assessment           Number of biophysical studies completed
RA2.1                  Investigations (survey, inventory and mapping, and data analysis)
        Resource assessment           Number of biophysical studies completed
RA2.1                  Investigations (survey, inventory and mapping, and data analysis)
        Resource assessment           Number of biophysical studies completed
RA2.1                  Investigations (survey, inventory and mapping, and data analysis)
        Resource assessment           Number of biophysical studies completed
RA2.1                  Investigations (survey, inventory and mapping, and data analysis)
        Resource assessment           Number of biophysical studies completed
RA2.1                  Investigations (survey, inventory and mapping, and data analysis)
        Resource assessment           Number of biophysical studies completed
RA2.2                  Investigations (survey, inventory/economic studies completed
        Resource assessment           Number of social and mapping, and data analysis)
RA2.3                  Investigations (survey, inventory and mapping, and data analysis)
        Resource assessment           Number of reports completed
RA3.1                  Decision support tools of models developed
        Resource assessment           Number
RA3.2                  Decision support tools of information management systems developed
        Resource assessment           Number
RA3.3                  Decision support tools of other decision support tools developed
        Resource assessment           Number
RA4.1                  Research and Number of research and development studies completed
        Resource assessment           development studies
Output_Unit_of_M Output_Description
easure_2#

-
-
-
-
-
Not applicable
Not applicable
Not applicable
                     An awareness-raising event is an event designed to pass on information and improve knowledge and understanding. To calc
Number of participants in person-days
                     An awareness-raising event is an event designed to pass on information and improve knowledge and understanding. To calc
Number of participants in person-days
                     An awareness-raising event is an event designed to pass on information and improve knowledge and understanding. To calc
Number of participants in person-days
                     An awareness-raising event is an event designed to pass on information and improve knowledge and understanding. To calc
Number of participants in person-days
                      recipients
Estimated number ofIncludes less formal written material such as brochures, newsletters, posters and fact sheets. Formal documents such as rep
                      recipients
Estimated number ofIncludes less formal written material such as brochures, newsletters, posters and fact sheets. Formal documents such as rep
                      recipients
Estimated number ofIncludes less formal written material such as brochures, newsletters, posters and fact sheets. Formal documents such as rep
-                    Covers displays developed for use at events such as regional meetings, agricultural shows or other community events
-                    Includes articles in newspapers and magazines, items on radio or in television programs
-                    Websites developed to provide information related to regional natural resource management
                     Structured activities
Number of participants in person-days designed to improve existing skills or develop new ones. Training sessions MAY lead to or contribute to
                     Structured activities
Number of participants in person-days designed to improve existing skills or develop new ones. Training sessions MAY lead to or contribute to
                     Structured activities
Number of participants in person-days designed to improve existing skills or develop new ones. Training sessions MAY lead to or contribute to
                     Structured activities
Number of participants in person-days designed to improve existing skills or develop new ones. Training sessions MAY lead to or contribute to
Quantity distributed Use CB2.2 when materials are developed to be used by others or for training events to be run by your project in a future repo
Quantity distributed Use CB2.2 when materials are developed to be used by others or for training events to be run by your project in a future repo
Quantity distributed Use CB2.2 when materials are developed to be used by others or for training events to be run by your project in a future repo
-                    Include only major documents required to establish an organisation or business process such as a constitution, business plan
-                    Includes written agreements such as MOUs, joint project undertakings, data sharing agreements etc
-                    Include only significant negotiations for cooperation or collaboration with new potential partners. This is a similar output to CB
-                    Eg. decision-support tools for developing investment priorities
-                    Includes Science or Technical Panel assessment of targets, community or Board prioritisation workshops, other critical works
-                    Eg. reviews/ studies, significant evaluation processes
-                    Include stakeholder databases, consultant or product supply databases and other organisational management databases. S
-                    Refers to facilitation and type activities. Facilitators can report the number of groups or projects they have assisted in each s
-                    Number of facilitators or coordinators positions funded through the project
Area (ha) protected Legal agreements would normally be attached to the title of land. Negotiated means to the formal agreement stage
Area (ha) protected Voluntary agreements are not attached to title of the land. Negotiated means to the formal agreement stage
Length (km) of drain -
Length (km) of drain -
                     improved
Length (km) of drain -
-                    -
-                    For engineering approaches eg use of gabions only. Where banks have been stabilised with vegetation use OG4.4. Include d
-                    -
                     If bank protected from stock
Length (km) of stream you have erected fencing to exclude stock from a waterway and by doing so have protected some native vegetation, record
-                    -
-                    Where modification significantly reduces barrier to fish passage
-                    Where modification significantly reduces barrier to fish passage
                     Effluent removed or contained can include
Volume (ML) of effluent removed or contained by sewage plant effluent re-used when in accordance with best management practice
                     Effluent removed or contained can include
Volume (ML) of effluent removed or contained by sewage plant effluent re-used when in accordance with best management practice
                     Effluent removed or contained can include
Volume (ML) of effluent removed or contained by sewage plant effluent re-used when in accordance with best management practice
                     Effluent removed or contained can include
Volume (ML) of effluent removed or contained by sewage plant effluent re-used when in accordance with best management practice
                     Includes facilities installed for the emptying works
Volume (ML) of effluent removed or contained by effluent controlof holding tanks on boats to prevent discharge of sewage to waterways
                     Includes facilities installed for the emptying works
Volume (ML) of effluent removed or contained by effluent controlof holding tanks on boats to prevent discharge of sewage to waterways
                     Includes dairies, feedlots, piggeries control works
Volume (ML) of effluent removed or contained by effluentand chicken farms
                     Includes dairies, feedlots, piggeries control works
Volume (ML) of effluent removed or contained by effluentand chicken farms
                     Includes dairies, feedlots, piggeries control works
Volume (ML) of effluent removed or contained by effluentand chicken farms
                     Includes dairies, feedlots, piggeries control works
Volume (ML) of effluent removed or contained by effluentand chicken farms
                     Includes dairies, feedlots, piggeries control works
Volume (ML) of effluent removed or contained by effluentand chicken farms
                     Includes dairies, feedlots, piggeries control works
Volume (ML) of effluent removed or contained by effluentand chicken farms
                     Includes activities to prevent pesticide and nutrient
Volume (ML) of effluent removed or contained by effluent control works runoff
                     Includes activities to prevent pesticide and nutrient
Volume (ML) of effluent removed or contained by effluent control works runoff
                     The amount of material prevented from
Kg of material prevented from entering waterway per years entering waterways would be the amount collected by the type of device used
                     -
Area of constructed wetlands
                     -
Number of land managers using improved irrigation practices
                     -
Volume (ML) of water saved per year
                     -
Volume (ML) of water saved per year
                     -
Volume (ML) of water saved per year
                     -
Volume (ML) of water saved per year
                     -
Volume (ML) of water saved per year
-                    Coastal land is defined as land that is either within one kilometre: (a) landward of the open coast high water mark; or (b) arou
-                    Wetland is defined as land where “an excess of water is the dominant factor determining the nature of soil development and t
                     Measure both vegetation stream bank. Riparian land is defined as “any land which adjoins, directly influences‟ or is influence
Streambank length (km) of riparian sides of theprotected
-                    Terrestrial is defined as any land not included in the above three categories. See above for definition of „native‟
-                    See above for definition of „coastal‟ and „native‟
-                    See above for definition of „wetland‟ and „native‟
                     See above for definition of „riparian‟ and „native‟.
Streambank length (km) of riparian vegetation enhanced/rehabilitated Measure both sides of the stream bank, if applicable
-                    See above for definition of „terrestrial‟ and “native‟
                     Plantations are defined as intensively managed stands of trees of either native or exotic species intended for harvest, created
Area (ha) of this vegetation that are locally occurring natives
                     Plantations are defined as intensively managed stands of trees of either native or exotic species intended for harvest, created
Area (ha) of this vegetation that are locally occurring natives
                     Plantations are defined as intensively managed stands of trees of either native or exotic species intended for harvest, created
Area (ha) of this vegetation that are locally occurring natives
                     See above definitions of „coastal‟ and „locally occurring natives‟
Area (ha) of this vegetation that are locally occurring natives
                     See above definitions of „wetland‟ and „locally occurring natives‟
Area (ha) of this vegetation that are locally occurring natives
                     See above definitions of „riparian‟ and „locally occurring natives‟
Area (ha) of this vegetation that are locally occurring natives
-                    Please use this category whenever you have reported activity under OG4.4 (except in States where the protocol of „one outpu
                     See above for locally occurring natives
Area (ha) of this vegetation that arethe definitions of „terrestrial‟ and locally occurring natives‟
-                    Plantations are defined as intensively managed stands of trees of either native or exotic species intended for harvest, created
-                    Plantations are defined as intensively managed stands of trees of either native or exotic species intended for harvest, created
-                    Plantations are defined as intensively managed stands of trees of either native or exotic species intended for harvest, created
-                    -
-                    -
-                    -
-                    Care should be taken to ensure pasture species used to not pose a threat as a potential environmental weed
-                    Care should be taken to ensure pasture species used to not pose a threat as a potential environmental weed
-                    Care should be taken to ensure pasture species used to not pose a threat as a potential environmental weed
-                    Include exotic annual pasture species, for example those used in rehabilitating saline areas
-                    Include exotic annual pasture species, for example those used in rehabilitating saline areas
-                    Include exotic annual pasture species, for example those used in rehabilitating saline areas
-                    Refers to wetlands where connectivity to the river and / or other wetland systems has been reinstated or substantially enhanc
-                    Includes fencing to exclude feral predators (eg. cats and foxes), native browsers (eg. Possums), 4WD‟s, etc, and to enhance
                     Ensure
Number of individuals bred that the species being bred is noted in the output description field (in both Part C of the Project Schedule and reportin
                     Ensure that the species being
Number of individuals translocated or established translocated has noted in the output description field (in both Part C of the Project Schedule an
-                    -
-                    Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                    Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                    Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                    Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                    Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                    Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                    Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                    Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                    -
-                    -
-                    -
-                    -
-                    -
-                    -
-                  -
-                  -
-                  Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                  Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                  Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                  Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                  Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                  Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                  Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                  Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                  Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                  Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                  Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and re
-                  Ensure that the species being controlled is noted in the output description field (in Part C of the Project Schedule and reportin
-                  Ensure that the species being controlled is noted in the output description field (in Part C of the Project Schedule and reportin
-                  Ensure that the species being controlled is noted in the output description field (in Part C of the Project Schedule and reportin
-                  Ensure that the species being controlled is noted in the output description field (in Part C of the Project Schedule and reportin
-                  Ensure that the species being controlled is noted in the output description field (in Part C of the Project Schedule and reportin
-                  Ensure that the species being controlled is noted in the output description field (in Part C of the Project Schedule and reportin
-                  Ensure that the species being controlled is noted in the output description field (in Part C of the Project Schedule and reportin
-                  Ensure that the species being controlled is noted in the output description field (in Part C of the Project Schedule and reportin
-                  Ensure that the species being controlled is noted in the output description field (in Part C of the Project Schedule and reportin
-                  Ensure that the species being controlled is noted in the output description field (in Part C of the Project Schedule and reportin
-                  Ensure that the species being controlled is noted in the output description field (in Part C of the Project Schedule and reportin
-                  Includes actions taken to prevent the spread of plant diseases such as phytophthora. Ensure that the species being controlle
-                  Includes actions taken to prevent the spread of plant diseases such as phytophthora. Ensure that the species being controlle
-                  Includes actions taken to prevent the spread of plant diseases such as phytophthora. Ensure that the species being controlle
-                  Includes actions taken to prevent the spread of plant diseases such as phytophthora. Ensure that the species being controlle
-                  Includes actions taken to prevent the spread of plant diseases such as phytophthora. Ensure that the species being controlle
-                  Includes actions taken to prevent the spread of plant diseases such as phytophthora. Ensure that the species being controlle
-                  Includes actions taken to prevent the spread of plant diseases such as phytophthora. Ensure that the species being controlle
-                  Includes actions taken to prevent the spread of plant diseases such as phytophthora. Ensure that the species being controlle
-                  With work such as rehabilitation of gullies by filling in and reshaping of the sides, count the actual number of ha treated. With
-                  Includes areas fenced to control stock and/ or enable revegetation treatment
-                  Includes areas mapped and/ or treated with soil ameliorants and/ or treated with works
-                  Includes activities such as spreading lime, gypsum or clay
                   This
[Your output measure] category is to be used only in the unlikely event that your activity does not fit into any of the above categories. You must
-                  All guidelines/ codes/ protocols eg. sustainable farming, rabbit control, private forestry, greenhouse, environmental etc. If the
-                  All guidelines/ codes/ protocols eg. sustainable farming, rabbit control, private forestry, greenhouse, environmental etc. If the
-                  Strategies/ plans developed by regional NRM groups/ catchment management authorities to achieve accreditation status and
-                  Significant review or revision of regional level strategies/ plans such as the rolling annual review of investment plans/strategie
-                  Plans/ strategies at catchment(s) or sub-catchment(s) scale, which do not reach full regional level eg. action or management
-                  Plans/ strategies at catchment(s) or sub-catchment(s) scale, which do not reach full regional level eg. action or management
-                  Plans at whole farm/ property or reserve scale eg. farm/ reserve plans or management plans for particular issues eg. weeds,
                   Management covered by the plan
Number of species or communitiesof specific species or ecological communities eg. interim recovery plans or recovery plans for threatened specie
                   Management covered by the plan
Number of species or communitiesof specific species or ecological communities eg. interim recovery plans or recovery plans for threatened specie
-                  Management of a particular NRM asset, issue or threat, including at a statewide level eg. estuarine management, State Wee
-                  Can include monitoring and evaluation plans, research and development plans, sustainable development plans or a commun
                   Studies
Number of sites monitored undertaken specifically to enable the setting of resource condition targets in a regional plan. All other studies belong
                   Studies
Number of sites monitored undertaken specifically to enable the setting of resource condition targets in a regional plan. All other studies belong
-                  Use where there was no existing monitoring program
-                  Use where an existing monitoring program has been significantly expanded or enhanced
Area (ha) surveyed Eg. studies of vegetation, salinity, soil, groundwater, marine areas
Area (ha) surveyed Eg. studies of vegetation, salinity, soil, groundwater, marine areas
Area (ha) surveyed Eg. studies of vegetation, salinity, soil, groundwater, marine areas
Area (ha) surveyed Eg. studies of vegetation, salinity, soil, groundwater, marine areas
Area (ha) surveyed Eg. studies of vegetation, salinity, soil, groundwater, marine areas
Area (ha) surveyed Eg. studies of vegetation, salinity, soil, groundwater, marine areas
Area (ha) surveyed Eg. studies of vegetation, salinity, soil, groundwater, marine areas
Area (ha) surveyed Eg. studies of vegetation, salinity, soil, groundwater, marine areas
                     -
Size of population covered by the survey sample
-                    These could include a synthesis of previous studies or meta-analysis of previous studies
-                    -
-                    Systems to hold natural resource information. See CB4.4 for other databases. Includes addition of new modules to existing s
-                    For governance related decision-making tools, use CB4.1
-                    Includes completion of the research report
ion and improve knowledge and understanding. To calculate person-days, multiply the number of participants by the amount of a day or days the event ran for (use only h
ion and improve knowledge and understanding. To calculate person-days, multiply the number of participants by the amount of a day or days the event ran for (use only h
ion and improve knowledge and understanding. To calculate person-days, multiply the number of participants by the amount of a day or days the event ran for (use only h
ion and improve knowledge and understanding. To calculate person-days, multiply the number of participants by the amount of a day or days the event ran for (use only h
posters and fact sheets. Formal documents such as reports and plans should be reported under CB3.1 or the Planning or Resource Assessment categories
posters and fact sheets. Formal documents such as reports and plans should be reported under CB3.1 or the Planning or Resource Assessment categories
posters and fact sheets. Formal documents such as reports and plans should be reported under CB3.1 or the Planning or Resource Assessment categories
gs, agricultural shows or other community events


 w ones. Training sessions MAY lead to or contribute to formal qualifications like a TAFE certificate but need not necessarily do so. To calculate person-days see CB1.1
 w ones. Training sessions MAY lead to or contribute to formal qualifications like a TAFE certificate but need not necessarily do so. To calculate person-days see CB1.1
 w ones. Training sessions MAY lead to or contribute to formal qualifications like a TAFE certificate but need not necessarily do so. To calculate person-days see CB1.1
 w ones. Training sessions MAY lead to or contribute to formal qualifications like a TAFE certificate but need not necessarily do so. To calculate person-days see CB1.1
 training events to be run by your project in a future reporting period. If developed for a event you‟re currently running, use CB2.1
 training events to be run by your project in a future reporting period. If developed for a event you‟re currently running, use CB2.1
 training events to be run by your project in a future reporting period. If developed for a event you‟re currently running, use CB2.1
 r business process such as a constitution, business plan, strategic plan, implementation/ operational plan, policy and procedures manual, reporting templates etc
 s, data sharing agreements etc
with new potential partners. This is a similar output to CB3.2 but applies where the agreement is not formally documented

 ity or Board prioritisation workshops, other critical workshops etc

es and other organisational management databases. See RA3.2 for larger information systems related to Resource Assessment
mber of groups or projects they have assisted in each six month period (however, when reporting an annual total each group or project should only be counted once)

gotiated means to the formal agreement stage
 means to the formal agreement stage




ave been stabilised with vegetation use OG4.4. Include development of properly constructed stock crossings and stock access points. Count both sides of a stream if appli

 doing so have protected some native vegetation, record the amount of vegetation protected under OG2.3




ccordance with best management practice
ccordance with best management practice
ccordance with best management practice
ccordance with best management practice
to prevent discharge of sewage to waterways
to prevent discharge of sewage to waterways
 the amount collected by the type of device used




landward of the open coast high water mark; or (b) around all bays, estuaries, coastal lakes, lagoons or islands; and tidal waters of coastal rivers to the limit of mangroves
t factor determining the nature of soil development and the types of plant and animal communities living at the soil surface” [Definition taken from DEH website] See above
any land which adjoins, directly influences‟ or is influenced by a body of water”. [Land and Water Australia] See above for definition of „native‟. Measure both sides of the s
 gories. See above for definition of „native‟


of the stream bank, if applicable

her native or exotic species intended for harvest, created by the regular placement of seedlings or seeds, or by regeneration of native vegetation [adapted from National Fo
her native or exotic species intended for harvest, created by the regular placement of seedlings or seeds, or by regeneration of native vegetation [adapted from National Fo
her native or exotic species intended for harvest, created by the regular placement of seedlings or seeds, or by regeneration of native vegetation [adapted from National Fo




OG4.4 (except in States where the protocol of „one output code for each output description‟ would exclude use). Measure both sides of the stream bank, if applicable

her native or exotic species intended for harvest, created by the regular placement of seedlings or seeds, or by regeneration of native vegetation [adapted from National Fo
her native or exotic species intended for harvest, created by the regular placement of seedlings or seeds, or by regeneration of native vegetation [adapted from National Fo
her native or exotic species intended for harvest, created by the regular placement of seedlings or seeds, or by regeneration of native vegetation [adapted from National Fo




hreat as a potential environmental weed
hreat as a potential environmental weed
hreat as a potential environmental weed




 nd systems has been reinstated or substantially enhanced via engineering, management or vegetative means. See also OG2.2 and OG3.2
 e browsers (eg. Possums), 4WD‟s, etc, and to enhance management capability
field (in both Part C of the Project Schedule and reporting templates)
escription field (in both Part C of the Project Schedule and reporting templates)

ption field (in both Part C of the Project Schedule and reporting templates) and whether the control measure is „eradication‟ versus „containment‟
ption field (in both Part C of the Project Schedule and reporting templates) and whether the control measure is „eradication‟ versus „containment‟
ption field (in both Part C of the Project Schedule and reporting templates) and whether the control measure is „eradication‟ versus „containment‟
ption field (in both Part C of the Project Schedule and reporting templates) and whether the control measure is „eradication‟ versus „containment‟
ption field (in both Part C of the Project Schedule and reporting templates) and whether the control measure is „eradication‟ versus „containment‟
ption field (in both Part C of the Project Schedule and reporting templates) and whether the control measure is „eradication‟ versus „containment‟
ption field (in both Part C of the Project Schedule and reporting templates) and whether the control measure is „eradication‟ versus „containment‟
ption field (in both Part C of the Project Schedule and reporting templates) and whether the control measure is „eradication‟ versus „containment‟
ption field (in both Part C of the Project Schedule and reporting templates)
ption field (in both Part C of the Project Schedule and reporting templates)
ption field (in both Part C of the Project Schedule and reporting templates)
ption field (in both Part C of the Project Schedule and reporting templates)
ption field (in both Part C of the Project Schedule and reporting templates)
ption field (in both Part C of the Project Schedule and reporting templates)
ption field (in both Part C of the Project Schedule and reporting templates)
ption field (in both Part C of the Project Schedule and reporting templates)
ption field (in both Part C of the Project Schedule and reporting templates)
ption field (in both Part C of the Project Schedule and reporting templates)
ption field (in both Part C of the Project Schedule and reporting templates)
ption field (in Part C of the Project Schedule and reporting templates)
ption field (in Part C of the Project Schedule and reporting templates)
ption field (in Part C of the Project Schedule and reporting templates)
ption field (in Part C of the Project Schedule and reporting templates)
ption field (in Part C of the Project Schedule and reporting templates)
ption field (in Part C of the Project Schedule and reporting templates)
ption field (in Part C of the Project Schedule and reporting templates)
ption field (in Part C of the Project Schedule and reporting templates)
ption field (in Part C of the Project Schedule and reporting templates)
ption field (in Part C of the Project Schedule and reporting templates)
ption field (in Part C of the Project Schedule and reporting templates)
 s phytophthora. Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and reporting templates)
 s phytophthora. Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and reporting templates)
 s phytophthora. Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and reporting templates)
 s phytophthora. Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and reporting templates)
 s phytophthora. Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and reporting templates)
 s phytophthora. Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and reporting templates)
 s phytophthora. Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and reporting templates)
 s phytophthora. Ensure that the species being controlled is noted in the output description field (in both Part C of the Project Schedule and reporting templates)
of the sides, count the actual number of ha treated. With other works, such as the construction of contour banks, count the number of ha protected from erosion




   does not fit into any of the above categories. You must provide a detailed written description of the output to explain why it cannot fit into an existing output category and
 l, private forestry, greenhouse, environmental etc. If the review is a considerable review of existing codes or guidelines, at your discretion that can be counted
 l, private forestry, greenhouse, environmental etc. If the review is a considerable review of existing codes or guidelines, at your discretion that can be counted
nagement authorities to achieve accreditation status and the first regional investment funding
as the rolling annual review of investment plans/strategies
o not reach full regional level eg. action or management plans, a river management strategy, roadside management, weed management, catchment salinity control. Include
o not reach full regional level eg. action or management plans, a river management strategy, roadside management, weed management, catchment salinity control. Include
 s or management plans for particular issues eg. weeds, grazing, vegetation, drainage. Includes reviews of existing plans that generate enhancement of plans or strategies
m recovery plans or recovery plans for threatened species, endangered species action statements. Includes reviews of existing plans that generate enhancement of plans
m recovery plans or recovery plans for threatened species, endangered species action statements. Includes reviews of existing plans that generate enhancement of plans
a statewide level eg. estuarine management, State Weeds Strategy, wind erosion strategy, a wetland management plan, or regional fire management plan. Includes review
ment plans, sustainable development plans or a community capacity building plan. Includes reviews of existing plans that generate enhancement of plans or strategies (no
dition targets in a regional plan. All other studies belong under RA2
dition targets in a regional plan. All other studies belong under RA2
tabases. Includes addition of new modules to existing systems
 the amount of a day or days the event ran for (use only half day or full day units) and round totals to the nearest whole number
 the amount of a day or days the event ran for (use only half day or full day units) and round totals to the nearest whole number
 the amount of a day or days the event ran for (use only half day or full day units) and round totals to the nearest whole number
 the amount of a day or days the event ran for (use only half day or full day units) and round totals to the nearest whole number
anning or Resource Assessment categories
anning or Resource Assessment categories
anning or Resource Assessment categories




necessarily do so. To calculate person-days see CB1.1
necessarily do so. To calculate person-days see CB1.1
necessarily do so. To calculate person-days see CB1.1
necessarily do so. To calculate person-days see CB1.1




and procedures manual, reporting templates etc




each group or project should only be counted once)




stock access points. Count both sides of a stream if applicable. For example, stabilising the banks on each side of a one-kilometre length of stream would mean two kilom
nd tidal waters of coastal rivers to the limit of mangroves or the tidal limit whichever is closer to the sea. [Adapted from NSW coastal policy]. Native vegetation is any vege
l surface” [Definition taken from DEH website] See above for definition of „native‟
bove for definition of „native‟. Measure both sides of the stream bank, if applicable




generation of native vegetation [adapted from National Forest Policy - see NPI website] „Locally occurring natives‟ is native vegetation that is indigenous to a given area, in
generation of native vegetation [adapted from National Forest Policy - see NPI website] „Locally occurring natives‟ is native vegetation that is indigenous to a given area, in
generation of native vegetation [adapted from National Forest Policy - see NPI website] „Locally occurring natives‟ is native vegetation that is indigenous to a given area, in




easure both sides of the stream bank, if applicable

generation of native vegetation [adapted from National Forest Policy - see NPI website]
generation of native vegetation [adapted from National Forest Policy - see NPI website]
generation of native vegetation [adapted from National Forest Policy - see NPI website]




ee also OG2.2 and OG3.2




adication‟ versus „containment‟
adication‟ versus „containment‟
adication‟ versus „containment‟
adication‟ versus „containment‟
adication‟ versus „containment‟
adication‟ versus „containment‟
adication‟ versus „containment‟
adication‟ versus „containment‟
the Project Schedule and reporting templates)
the Project Schedule and reporting templates)
the Project Schedule and reporting templates)
the Project Schedule and reporting templates)
the Project Schedule and reporting templates)
the Project Schedule and reporting templates)
the Project Schedule and reporting templates)
the Project Schedule and reporting templates)
count the number of ha protected from erosion




lain why it cannot fit into an existing output category and sent it to the MandE coordinator in your State or Territory who will review the new outputs.
elines, at your discretion that can be counted
elines, at your discretion that can be counted


 nt, weed management, catchment salinity control. Includes reviews of existing plans that generate enhancement of plans or strategies
 nt, weed management, catchment salinity control. Includes reviews of existing plans that generate enhancement of plans or strategies
g plans that generate enhancement of plans or strategies
ws of existing plans that generate enhancement of plans or strategies
ws of existing plans that generate enhancement of plans or strategies
nt plan, or regional fire management plan. Includes reviews of existing plans that generate enhancement of plans or strategies
 ns that generate enhancement of plans or strategies (not for the management of an organisation – see CB3.1)
of a one-kilometre length of stream would mean two kilometres of bank have been stabilised.
ed from NSW coastal policy]. Native vegetation is any vegetation species that existed before European settlement including trees, saplings, shrubs, scrub, understorey, gro




es‟ is native vegetation that is indigenous to a given area, including trees, shrubs, understorey plants and some specified grasslands
es‟ is native vegetation that is indigenous to a given area, including trees, shrubs, understorey plants and some specified grasslands
es‟ is native vegetation that is indigenous to a given area, including trees, shrubs, understorey plants and some specified grasslands
ory who will review the new outputs.
ncluding trees, saplings, shrubs, scrub, understorey, groundcover or plants in a wetland [Adapted from the Native Vegetation Act 2003]

				
DOCUMENT INFO
Description: First Gulf Bank Pest Analysis document sample