LO S AN G EL E S CO M M UN IT Y CO LL EG E D I S T RICT
DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT PROPOSITION A/AA BOND PROGRAM
PUNCH LIST FORM
DATE: PROJECT: CONTRACT NO.: CONTRACTOR: COLLEGE PROJECT MANAGER: DESIGN CONSULTANT: This is the PUNCH LIST prepared by the College Project Manager during the check inspection held on on this PUNCH LIST MUST BE CORRECTED prior to acceptance of the contract. . All items
ITEM NUMBER
LOCATION
DESCRIPTION OF CORRECTIVE ITEMS
College Project Manager
Date
cc:
Program Manager Inspector of Record Contractor Design Consultant
Page 1 of 1 Rev1.02.26.03
Form CC-0010 unlocked