Word Document

Addendum Co location form A

Click to download
Reviews
Shared by: Ohio
Stats
views:
17
rating:
not rated
reviews:
0
posted:
6/18/2008
language:
English
pages:
0
Ohio Office of Information Technology MARCS Program Office th 2323 West 5 Avenue, Ste 150 Columbus, Ohio 43204 614.995.0060 voice 614.995.0067 fax www.oit.ohio.gov OIT MARCS TOWER SITE CO-LOCATION APPLICATION Application Date: MARCS Site Name/Number: Date Received by MARCS: Applicant Information Agency Name: Contact Name: Billing Address: City/State/Zip: Telephone: Fax: E-mail: Submitted by: Name/address/ Phone/e-mail/ fax Proposed Use of Site: Equipment Information FIXED Equipment Manufacture Model FCC Type Acceptance TX Frequency RX Frequency TX Power System #1 System #2 MARCS Co-location Application – MPP-17 Form “A” Page 1 Ohio Office of Information Technology MARCS Program Office th 2323 West 5 Avenue, Ste 150 Columbus, Ohio 43204 614.995.0060 voice 614.995.0067 fax www.oit.ohio.gov Equipment Information MARCS Shelter Rack Space (Dimensions) AC Power Loads BTU Loads Telecom Interconnect Special Needs System #1 System #2 Site Plan Shelter/Cabinet Size Manufacturer Telecom Interconnect Additional Utilities Additional Fence Additional Needs Antennae Information Manufacturer Model Mounting Height Antennae Mount Manuf. Antenna Mount Model Azimuth ERP (Watts) Downtilt Lightning Suppression Manufacturer Lightning Suppression Model MARCS Co-location Application – MPP-17 Form “A” Page 2 Ohio Office of Information Technology MARCS Program Office th 2323 West 5 Avenue, Ste 150 Columbus, Ohio 43204 614.995.0060 voice 614.995.0067 fax www.oit.ohio.gov Equipment Information Transmission Line Manufacturer Model Size System #1 System #2 Type of Technology: Power Requirements: A meeting between MARCS site engineering team and engineering team of applicant shall be required prior to installation of any equipment at existing MARCS facilities. Plans shall include general specifications, a site plan incorporating both the proposed equipment and the existing MARCS facilities, tower/site elevations, antenna details, shelter plans (including foundations and/or caissons), utilities and a grounding plan. A structure analysis shall be required for antenna placement. An intermod study shall be required All costs for tower co-location shall be the responsibility of the applicant. More information may be required. NOTE: Co-locators are not permitted to connect into MARCS UPS Co-Locator Signatures Submitted by: Title: Date: Ohio MARCS Approval Approved by: Title: Date: MARCS Co-location Application – MPP-17 Form “A” Page 3

Related docs
premium docs
Other docs by Ohio
Stock Subscription Package
Views: 660  |  Downloads: 110
edens_1a-all
Views: 126  |  Downloads: 1
Final Demand For Payment
Views: 474  |  Downloads: 20
Planand Agreement of Merger Between N and N
Views: 206  |  Downloads: 6
Background Check Permission (Comprehensive)
Views: 420  |  Downloads: 29
Duke Rebuilding from Ruins: Tsunami Paper
Views: 503  |  Downloads: 6
Employee Discipline Aids
Views: 1719  |  Downloads: 90
brown-all
Views: 314  |  Downloads: 1
Minutes of First Directors Meeting
Views: 268  |  Downloads: 9
Form 2441 Child and Dependent Care Expenses
Views: 330  |  Downloads: 2
Annual Vehicle Lease Table
Views: 644  |  Downloads: 5