Moray Estate Asset Management Plan - PowerPoint
Description
Moray Estate Asset Management Plan document sample
Document Sample


Dan Finch
Moray Offshore Renewables Ltd
MORAY FIRTH OFFSHORE RENEWABLES Ltd.
DELIVERING ROUND 3
Inverness 2nd February 2010
Introduction
1. Presenting the partnership
2. Committed to deliver
3. The Moray Firth (Zone 1) key issues
4. Delivery plan
5. Key challenges for Round 3
6. How to contact us?
3 Moray Offshore Renewables Ltd
Presenting the Partnership…
The Partnership The strengths
EDP Renewables:
• #4 in renewables worldwide with a total installed capacity ~6 GW Strong and
• €2.0 bn per annum development budget 1 Clear
• Presence in 9 countries on 3 continents Commitment
• €1.6 bn IPO, largest in Europe in 2008
SeaEnergy Renewables: Unique
• Scottish based world class team with decades of offshore Oil&Gas 2 Deepwater
experience– development, construction, installation, O&M Capabilities
• Conceived, developed and delivered the Beatrice Demonstrator Project
• Two sites awarded in Scottish Territorial Waters Round (1,825 MW)
Proven track record
3 for Delivery and
The Crown Estate:
Operating at Scale
• Decades of experience as Stewards of the UK Seas and Coastline
• Top quality professionals from the offshore and energy sector
4 Moray Offshore Renewables Ltd
EDPR: a pure wind player with a sound asset base…
USA
Poland
Belgium
2,530
-
427 France
57
120
18,062 Romania
13
211 1,466
62
36 -
Portugal 1,221 159
682
596 Spain
Brazil 128
2,109
574
477
14
4,999
-
1,509
Gross MW
Installed Under Pipeline +
Capacity Construction Prospects
MW Installed Capacity
5,577 1,293 28,587
MW Under Construction
MW Pipeline + Prospects
5 Moray Offshore Renewables Ltd
SeaEnergy Renewables: the partner of choice in
offshore power generation
Business goals
•To be at the forefront in the application of
marine renewable technologies
•To be the recognized leader in marine
renewable energy
•To develop a portfolio of 3-5 GW in 3-5
years, generating within 10 years
•To own net interests of 1GW within 5
years
•To create enterprise value of >£500
million within 5 years
6 Moray Offshore Renewables Ltd
…Committed to Deliver…
The Crown Estate
• Commitment to deliver UK R3
• Experience in Stakeholder management
EDP Renewables SeaEnergy Renewables
• 700+ professional fully dedicated • Dedicated to offshore
to wind renewables
• Financial commitment of €2 • Engineering and Offshore
bn/year for wind farm construction project management skills
• #1 client of Vestas and in the top- • Fabrication, installation and O&M
3 of Enercon, Gamesa and GE expertise offshore
• Best-in-class energy yield with a • Experience in licensing and
30 people strong team with more permitting in offshore Scotland
than 10 years of experience • Proven stakeholder management
• Engineering & Construction success
capability
• O&M team of 150 professionals
and State of the art Control &
Operation Center
Supply Chain
• Local and highly specialised professionals
to complement and accelerate program roll-
out
• Sourcing know-how from the oil & gas
sector
7 Moray Offshore Renewables Ltd
1
…the Moray Firth (Zone 1)
Zone 1 potential development areas Zone 1 key constraints
Cumulative & In-combination impacts
with STW
• Marine Mammals, Birds, Nature
Conservation, Radar & Aviation,
Shipping, Fisheries
Grid
• Onshore & Offshore
Impact on SAC & SPA features
Potential key spatial conflicts:
• Fisheries, MOD (inc radar), Shipping,
aviation
Key figures
Seabed features and soils
Capacity: 1,300MW • Water depths, wrecks, UXO,
Area: 530 km2 sandwaves, & Soils
Avg. depth: 35-55m Ports/Harbours
Avg. shore distance: 26 km
Oil & Gas
Development budget: ~ £40m
8 Moray Offshore Renewables Ltd
Delivery Plan…
Programme Summary
Activity 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Key milestones • Commence consenting
• Sign ZDA activities in 2009 to protect
the schedule
• Apply for consent
• Gain consent • Early engagement of supply
chain to secure delivery
• Financial Close
• Grid connection required • Realistic durations for
Technical
offshore scope including
weather downtime
• FEED & Concept Selection
• Detailed design
• Dedicated vessel spreads
for each development within
Procurement the zone
• Engage Supply Chain
• Grid connection required in
• Award Major Contracts
2016
Onshore fabrication
• 150 MW first generation Q2
Offshore installation
2016
Operations
• First generation
• 1,3 GW fully operational Q3
2020
• Zone fully operational
9 Moray Offshore Renewables Ltd
Key Challenges for UK Round 3
Challenges Our Approach
1. Supply Chain
• High resource competition, availability of people, vessels Early Engagement and
and primary equipment Leverage on EDPR logistics
• Constrained current capacity for development of Support and procurement scale
Bases, Ports and Harbours
2. Funding & Finance
Board Commitment and Focus
• Provide long-term and scale commitment with high
on Project Viability
uncertainty
3. Grid Early Application and Full
Collaboration with 3rd Parties
• Lack of suitable connection to grid
4. Environment Engagement and transparency
• Establishing cumulative & in-combination environmental with Stakeholders
impact (regional and beyond)
5. Operations & Maintenance Leverage on EDPR 15 years
• Scale, distance from shore, operation & maintenance and 6000+ WTGs experience
10 Moray Offshore Renewables Ltd
How to contact us?
Current points of contact
1. MORL office is located in Edinburgh
• An additional office in the Inverness area is planned
• A dedicated web portal is under preparation
2. Supplier candidates
• Provide your contact details to supplychain@edprenovaveis.com
3. Press and communication
Please contact rafael.solis@edprenovaveis.com
11 Moray Offshore Renewables Ltd
Moray Offshore Renewables Ltd