									     INTEGRATED SOLDIER SYSTEM PROJECT

      Click to edit Master title style
 •   Click to edit Master text styles
 •   Second level
 •   Third level
 •   Fourth level
 •   Fifth level
                Cycle #1
      Engineering Program Overview
PROJECT D’ÉQUIPEMENT INTEGRÉ DU SOLDAT
                                    1
           Project Management Office ISSP / Bureau de projet PEIS
          BRIEFING PURPOSE
     Click to edit Master title style
• Overview of the Cycle #1 System
   • Click to edit Master text styles
  Acceptance program and activities
   • Second level
• Important technical issues
   • Third level
• Overview of the Performance Specification
   • Fourth level
  (PS)
   • Fifth level



                                                                  2
         Project Management Office ISSP / Bureau de projet PEIS
    Click to edit Master title style
•   Click to edit Master text styles
•   Overview of the Cycle #1
    Second level
•       System Acceptance
    Third level
•   Fourth level
     program and activities
•   Fifth level



                                                                  3
         Project Management Office ISSP / Bureau de projet PEIS
                    Engineering Program Overview
                Click to edit Master title style
            M0 M1            M?                                                        M?             M?



          •   Click to edit Master text styles                                    M < 9 months


          •             Sub-systems/Components qualification test
              Second level                                              SAT      Definition
P(Bid)                                                                           Completed
          •   Third level
                    FDR
     Bid  •   Fourth level
                Kick-off
                Meeting
                                                                FCA/TRR    FQR/PCA
     Eval     (SRR/PDR)                                      Note: ~ 32 Prototypes required for SAT

          •   Fifth level  M = Month
                                                                                   Implementation
         Contract          FCA = Functional Configuration Audit
          Award            FDR= Final Design Review
                           FQR = Formal Qualification Review
                           PCA = Physical Configuration Audit                                              M?
                           PDR = Preliminary Design Review
                           SAT = System Acceptance Test
                           SRR = System Requirement Review
                           TRR = Test Readiness Review
                                                                                                           4
                               Project Management Office ISSP / Bureau de projet PEIS
                Technical Bid Evaluation
        Click to edit Master title style
• The Tech Bid Eval is to Confirm the Bidders’ compliance to the
  requirements
   • Click Methods
• Evaluationto edit Master text styles
    – Statement of compliance – Yes or No
    • Proof of compliance methods:
    – Second level
        •   Description of compliance – Analysis
    • Third level
        •   Certificate of compliance
        •   Technical Demonstration (Technical Performance Evaluation)
    • Fourth level
        •   User Acceptance Performance Evaluation
        •   Combination of the above
•   • Fifth level
    Contractor to confirm if requirement is implemented as part of
    prototype baseline, and if not, how it will be integrated – Very
    little room will be left for unknowns (eg. Bilingual interface)


                                                                            5
                   Project Management Office ISSP / Bureau de projet PEIS
                    Engineering Program Overview
                Click to edit Master title style
            M0 M1            M?                                                        M?             M?



          •   Click to edit Master text styles                                    M < 9 months


          •             Sub-systems/Components qualification test
              Second level                                              SAT      Definition
P(Bid)                                                                           Completed
          •   Third level
                    FDR
     Bid  •   Fourth level
                Kick-off
                Meeting
                                                                FCA/TRR    FQR/PCA
     Eval     (SRR/PDR)                                      Note: ~ 32 Prototypes required for SAT

          •   Fifth level  M = Month
                                                                                   Implementation
         Contract          FCA = Functional Configuration Audit
          Award            FDR= Final Design Review
                           FQR = Formal Qualification Review
                           PCA = Physical Configuration Audit                                              M?
                           PDR = Preliminary Design Review
                           SAT = System Acceptance Test
                           SRR = System Requirement Review
                           TRR = Test Readiness Review
                                                                                                           6
                               Project Management Office ISSP / Bureau de projet PEIS
      System Requirement Review
     Click to edit Master title style
• Confirm requirement baseline
• Review and confirm ratedstyles
  • Click to edit Master text requirement for
  which contractor has complied
  • Second level
• Review and confirm requirements allocation
  • Third level
• Confirm and clarify the verification method
  • Fourth level
• Result of SRR is the agreed “Functional
  • Fifth level
  Baseline” and a “Preliminary Allocated
  Baseline”

                                                                   7
          Project Management Office ISSP / Bureau de projet PEIS
                    Engineering Program Overview
                Click to edit Master title style
            M0 M1            M?                                                        M?             M?



          •   Click to edit Master text styles                                    M < 9 months


          •             Sub-systems/Components qualification test
              Second level                                              SAT      Definition
P(Bid)                                                                           Completed
          •   Third level
                    FDR
     Bid  •   Fourth level
                Kick-off
                Meeting
                                                                FCA/TRR    FQR/PCA
     Eval     (SRR/PDR)                                      Note: ~ 32 Prototypes required for SAT

          •   Fifth level  M = Month
                                                                                   Implementation
         Contract          FCA = Functional Configuration Audit
          Award            FDR= Final Design Review
                           FQR = Formal Qualification Review
                           PCA = Physical Configuration Audit                                              M?
                           PDR = Preliminary Design Review
                           SAT = System Acceptance Test
                           SRR = System Requirement Review
                           TRR = Test Readiness Review
                                                                                                           8
                               Project Management Office ISSP / Bureau de projet PEIS
           Final Design Review
     Click to edit Master title style
• Final allocated baseline documentation
• Verification plan and text styles qualification
   • Click to edit Master preliminary
  documentation
   • Second level
• ICDs and design documentation?
   • Third level
• Close-outlevel
   • Fourth of requirements already qualified
   • Fifth level



                                                                   9
          Project Management Office ISSP / Bureau de projet PEIS
                    Engineering Program Overview
                Click to edit Master title style
            M0 M1            M?                                                        M?             M?



          •   Click to edit Master text styles                                    M < 9 months


          •             Sub-systems/Components qualification test
              Second level                                              SAT      Definition
P(Bid)                                                                           Completed
          •   Third level
                    FDR
     Bid  •   Fourth level
                Kick-off
                Meeting
                                                                FCA/TRR    FQR/PCA
     Eval     (SRR/PDR)                                      Note: ~ 32 Prototypes required for SAT

          •   Fifth level  M = Month
                                                                                   Implementation
         Contract          FCA = Functional Configuration Audit
          Award            FDR= Final Design Review
                           FQR = Formal Qualification Review
                           PCA = Physical Configuration Audit                                              M?
                           PDR = Preliminary Design Review
                           SAT = System Acceptance Test
                           SRR = System Requirement Review
                           TRR = Test Readiness Review
                                                                                                           10
                               Project Management Office ISSP / Bureau de projet PEIS
     Sub-systems/Components
           Qualification title
    Click to edit Mastertest style
• Complete qualification test on components and
   • Click to edit Master text styles
  sub-systems
   • Second level
• Complete functional test
   • Third level
• SAT dry run testing
   • Fourth level
• Driven by contractor to bring evidence at FCA
   • Fifth level
  and TRR


                                                                   11
          Project Management Office ISSP / Bureau de projet PEIS
                    Engineering Program Overview
                Click to edit Master title style
            M0 M1            M?                                                        M?             M?



          •   Click to edit Master text styles                                    M < 9 months


          •             Sub-systems/Components qualification test
              Second level                                              SAT      Definition
P(Bid)                                                                           Completed
          •   Third level
                    FDR
     Bid  •   Fourth level
                Kick-off
                Meeting
                                                                FCA/TRR    FQR/PCA
     Eval     (SRR/PDR)

          •   Fifth level  M = Month
                                                             Note: ~ 32 Prototypes required for SAT
                                                                                   Implementation
         Contract          FCA = Functional Configuration Audit
          Award            FDR= Final Design Review
                           FQR = Formal Qualification Review
                           PCA = Physical Configuration Audit                                              M?
                           PDR = Preliminary Design Review
                           SAT = System Acceptance Test
                           SRR = System Requirement Review
                           TRR = Test Readiness Review
                                                                                                           12
                               Project Management Office ISSP / Bureau de projet PEIS
              Test Readiness Review
•     Click to edit Master title style
    The functional baseline will have between 1000 and 2000 requirements
•   Each requirements have to be “verified” to confirm Contractor has met his
    contractual obligations – compliance to contract
• • Click to edit Master text styles
    Possible verification Methods
     – Analysis
  • –Second level
        Demo
     – Inspection
  • –Third level
        Test
• Possible verification environment
  • –Fourth level
        Lab
     – Field
• • Possible Verification Level
     Fifth level
     – Component (CSCI, HWCI)
                                                   SAT
     – Sub-System
     – System


                                                                           13
                Project Management Office ISSP / Bureau de projet PEIS
                 Test Readiness Review (2)
         Click to edit Master title style
• Requirements to be verified at SAT will only represent a
  portion of the total functional baseline:
   – Requirements that can only be verified properly in the “target operating
    • Click to edit Master text styles
      environment”
   –• Requirements that have to be verified within a given context
       Second level
   – Example of requirements that have to be proven in a concurrent fashion:
    • Third levelof thirty (30) ISS communication suites must be capable of operating as a single
      • “A minimum group
        ISS communications network for voice and data where 66% of nodes are separated by 2 radio

    • Fourth level network must automatically update network topology in response to
        hops”
      • “The ISS communications
        movement by groups of soldiers and individual soldiers to maintain reachability between ISS
    • Fifth level
      • nodes.”
        • “The ISS communications network must be able to relay voice communications a minimum of 2
          radio hops for Voice COI extension”




                                                                                             14
                     Project Management Office ISSP / Bureau de projet PEIS
            Test Readiness Review (3)
       Click to edit Master title style
• Purpose of System TRR is to confirm readiness level of the
   • Click edit Master text styles
  contractor to perform SAT. It includes:
   – Confirm approval of SAT Plan and Procedures by the Crown
   • Confirm logistics aspects are ready for SAT
   – Second level
   – Confirm pre-requisite components and sub-system level requirements
   • have beenlevel (FCA)
     Third verified
   – Confirm SAT “dry-runs” have been successfully performed
   • Fourth level
   • Fifth level



                                                                        15
               Project Management Office ISSP / Bureau de projet PEIS
                    Engineering Program Overview
                Click to edit Master title style
            M0 M1            M?                                                        M?             M?



          •   Click to edit Master text styles                                    M < 9 months


          •             Sub-systems/Components qualification test
              Second level                                              SAT      Definition
P(Bid)                                                                           Completed
          •   Third level
                    FDR
     Bid  •   Fourth level
                Kick-off
                Meeting
                                                                FCA/TRR    FQR/PCA
     Eval     (SRR/PDR)

          •   Fifth level  M = Month
                                                             Note: ~ 32 Prototypes required for SAT
                                                                                   Implementation
         Contract          FCA = Functional Configuration Audit
          Award            FDR= Final Design Review
                           FQR = Formal Qualification Review
                           PCA = Physical Configuration Audit                                              M?
                           PDR = Preliminary Design Review
                           SAT = System Acceptance Test
                           SRR = System Requirement Review
                           TRR = Test Readiness Review
                                                                                                           16
                               Project Management Office ISSP / Bureau de projet PEIS
       System Acceptance Test (SAT)
       Click to edit Master title style
• DND to identify in RFP:
   – which requirements we expect (impose) to be verified at SAT
   – Method to be used to verify each requirement (or leave it open to
   • Click to edit Master text styles
     Contractor choice)
   • Which requirement the Contractor is not responsible to verify
   – Second level
     (exception)
   • Third level
      • eg. RadHaz

   • Fourth level
   • Fifth level



                                                                         17
                Project Management Office ISSP / Bureau de projet PEIS
       System Acceptance Test (SAT) (2)
        Click to edit Master title style
• DND to Develop and submit at RFP time a SAT Baseline
  Qualification Plan which will contain:
     –
    • Requirements to be Master text styles
       Click to edit tested at SAT
     – Test Environment
    • Context – based on scenarios to be provided to Contractors
     – Second level
        • one tactical scenario
    • Third level
        • 2-3 system scenarios
     –
    • Scenarios Master Event List (MEL) expected to be executed at SAT
       Fourth level
     – Actual tactical scenario will be scaled to serve the purpose
•   • Fifth level
    Contractor to:
    – Develop final and complete SAT Qual Plan and Procedures for Crown
      approval
    – Execute SAT (DND witnesses) and write report

                                                                          18
                 Project Management Office ISSP / Bureau de projet PEIS
                    Engineering Program Overview
                Click to edit Master title style
            M0 M1            M?                                                        M?             M?



          •   Click to edit Master text styles                                    M < 9 months


          •             Sub-systems/Components qualification test
              Second level                                              SAT      Definition
P(Bid)                                                                           Completed
          •   Third level
                    FDR
     Bid  •   Fourth level
                Kick-off
                Meeting
                                                                FCA/TRR    FQR/PCA
     Eval     (SRR/PDR)

          •   Fifth level  M = Month
                                                             Note: ~ 32 Prototypes required for SAT
                                                                                   Implementation
         Contract          FCA = Functional Configuration Audit
          Award            FDR= Final Design Review
                           FQR = Formal Qualification Review
                           PCA = Physical Configuration Audit                                              M?
                           PDR = Preliminary Design Review
                           SAT = System Acceptance Test
                           SRR = System Requirement Review
                           TRR = Test Readiness Review
                                                                                                           19
                               Project Management Office ISSP / Bureau de projet PEIS
    Click to edit Master title style
•   Click to edit Master text styles
•       Important Technical
    Second level
•   Third level    Issues
•   Fourth level
•   Fifth level



                                                                  20
         Project Management Office ISSP / Bureau de projet PEIS
         Important Technical issues (1)
     Click to edit Master title style
    • Military GPS vs Commercial GPS
•       • For Cycle
                  editconsidering the objective of fielding a basic system
     Click towill #1, usingframe, the army styles to accept asystem
          which      be
                          Master text is prepared
          within a short time
                              commercial GPS
•       • Embedded military
     Second level GPS is highlyinterface to DAGR be an alternative
        • Currently considering rewarding
                                          desirable and will
                                                              as
                                                                 rewarded.


•    Third level
    • Frequency Band constraints
•    Fourth level 225-450 MHz
        • Mandatory band:
        • Desirable additional bands:
•    Fifth ••level MHz
              902-928
              1210-1415 MHz
            • 2360-2473 MHz




                                                                        21
               Project Management Office ISSP / Bureau de projet PEIS
           Important Technical issues (2)
      Click to edit Master title style
    • Security posture of ISSP
       •   The army has officially recognized that ISSP operates within an
           UNCLASS domain based on:
•   Click• to edit Master texttostyles within the ISSP
            Sensitivity of the information     be exchanged
            domain
•   Second level
          • The time perishability of the information

•     • The ISS-S will
    Third level be an UNCLASS System
      • Despite this formal decision, it is recognize that the information that will
•       be handled by
    Fourth level ISSP is sensitive and security measures are being taken
        to ease Certification & Accreditation (C&A) process and future
        integration activities with LCSS
•   Fifth level
      • Active collaboration is on-going with DLCSPM (LCSS) to address
           information exchange between LCSS and ISSP
    • WES Integration
       •   Crown will take responsibility for integration
       •   Contractor will be requested to support using a Task Authorization
           mechanism
                                                                              22
               Project Management Office ISSP / Bureau de projet PEIS
    Click to edit Master title style
•          QUESTIONS?
    Click to edit Master text styles
•   Second level
•
           CONCERNS?
    Third level
•            ISSUES?
    Fourth level
•   Fifth level



                                                                   23
          Project Management Office ISSP / Bureau de projet PEIS
    Click to edit Master title style
•   Click to edit Master text styles
•              Performance
    Second level
•            Specifications
    Third level
•   Fourth level
•   Fifth level



                                                                   24