									                                            ARRA Contract
                                      Budget Workbook Instructions

  I.   General Instructions for Completing the Spreadsheets in this Workbook

             This workbook contains spreadsheets for the Schedule of Deliverables and Due Dates, Gantt Chart,
             budget forms for the prime contractor and subcontractors, and a List of Contacts. Specific instructions
             for each of the spreadsheets in this workbook are below.


             The electronic version of these documents shows cells of different color. Fill in only the non-colored
             cells for each of the spreadsheets. Do NOT enter data in the blue cells. Blue cells contain formulas or
             data transferred from other worksheets. Blue cells and many of the yellow cells (headings) are
             protected to prevent accidental changes. Please do not attempt to change formulas and references in
             the worksheets unless you are familiar with the operation of the worksheets and you are well-versed in
             MS Excel software.




 II.   Instructions for Exhibit A Attachment A-1, Schedule of Deliverables and the Gantt Chart

 Go     A.   Schedule of Deliverables and Due Dates (Tab: Att A-1 Schedule)
             For each Administrative Task, insert the planned start and completion dates. Please note that it will
             take approximately four months from the date that you complete and turn in these forms to Sparkey until
             there is a final, approved agreement. Pick a start date accordingly so you won't have to rebuild the
             schedule.


             For each Technical Task, insert in the appropriate columns, the name of the task as it is titled in the
             Scope of Work (Exhibit A), the name of the deliverables associated with each task as they are titled in
             the Scope of Work, and the planned start and completion dates. (Note: Dates will display in a red bold
             font if they fall on the weekend. Please correct for this.) Delete or insert rows as necessary. Because
             the task names (up to number 20) are linked with the budget forms, once they are typed onto the
             Schedule, they will carry forward to the budgets. If your project contains more than 20 tasks, you will
             have to link the additional cells or type them into the budget forms.

             For the Final Report Administrative Tasks (1.6, 1.6.1, & 1.6.2), you can either enter the overall start /
             finish dates in task 1.6 or enter the detailed start / finish dates in tasks 1.6.1 & 1.6.2.

             The Critical Project Reviews (and associated CPR Reports) are only shown for example purposes.
             Delete the examples and place CPRs in the appropriate project tasks.


             Do not insert any information in the columns labeled "ARRA Funds" and "Leverage Funds." These cells
             are linked to the budget forms and will automatically fill in once the budget forms are complete.


 Go     B. GANTT Chart (Tab: Att A-1 GANTT) - OPTIONAL
           Starting with Budget template release 04-2008, the Gantt Chart is optional in the contract package. If
           you wish to provide the Gantt Chart as a part of the package, use Excel's <Unhide> feature to reveal
           the Gantt Chart worksheet in this workbook.
           For each Task, insert the planned start and end dates as listed on the Schedule of Deliverables and
           Due Dates. The start and end dates for the overall administrative tasks will be automatically entered
           from the schedule of deliverables. Headings and GANTT bar shadings are automatically
           completed as you enter start and end dates.



04-2008                                                Page 1 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls          Instructions With Links
                                         ARRA Contract
                                   Budget Workbook Instructions
           Note that the print format is to print the entire Gantt Chart. You may only need a small part of it. Use
           the RED FORMAT BAR at the bottom of the chart as a reference to reduce the print area of your chart.
           (Hint: The bar starts catty-corner to the latest date column in the Gantt Chart.)


           If you have an alternate means of creating a Gantt Chart (such as Microsoft Project), then you may use
           it. However, please make it print one landscape sheet and provide it in a separate electronic file. It
           must be compatible with Energy Commission software programs.

 III. Instructions For Exhibit B Attachments (Budget Forms)

 Go   A.   Budget Summary (Tab: Att B-1 Summary)

           Do not enter any data in this spreadsheet. These are the total task budgets, and the amounts will
           automatically fill in once information is entered on the individual task budgets.

           ARRA Budget (Tabs: Att B-2 - Prime ARRA, Att B-2 - Sub#1 ARRA, etc. if more than one
 Go   B.
           subcontractor)

           Prime and Subcontractor Budget Worksheets: The Prime Contractor and Subcontractors must
      Go
           submit information on all the Exhibit B Budget Attachment forms.

           Generally, fill in the ARRA reimbursable amounts for each Task.

           For Subcontractors, indicate whether they are "Key" and / or Disabled Veteran Business Enterprise
           (DVBE) in the checkboxes.

           Mark the "Key Sub." checkbox if this subcontractor is considered a key subcontractor to the contract.
           Note: All DVBE subcontractors are considered Key subcontractors; mark this key checkbox, too, if
           you've marked the DVBE checkbox.




04-2008                                             Page 2 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls       Instructions With Links
                                        ARRA Contract
                                  Budget Workbook Instructions


          • Instruction Specific to Rows in Attachment B-2
          For Task 1.1, Kick-off Meeting, and Task 1.3, Final Meeting, budget for the number of technical and
          administrative personnel who will be attending the meeting with ARRA staff in Sacramento.

          For Task 1.2, CPR Meetings, and Task 1.11, Conduct PAC Meetings, do not enter travel amounts in
          these rows if travel for these administrative tasks is directly associated with a specific technical
          task. Enter travel expense in those technical tasks.

          Tasks 1.5 and 1.9 do not require funding, which is why the budgets for these tasks are listed as zero.

          For Task 1.6, the Final Report, budget for 1 month for your top technical person and/or best technical
          writer.

          Tasks 1.7 and 1.8 are not reimbursable with ARRA funds. Leverage funds must be used for them.




04-2008                                            Page 3 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls      Instructions With Links
                                            ARRA Contract
                                      Budget Workbook Instructions
            • Instruction Specific to Columns in Attachment B-2
            The Prime Contractor and Subcontractors must provide details of the following expenditures on the
            corresponding tables in worksheet tab "Att B-5 - Project Operating Expense:"
            - For all pre-approved travel contained in the amounts listed in the "Travel" column
            - For any amounts over $5,000 listed in the "Equipment" column (refer to Exhibit G
                Definitions and Exhibit D Special Terms & Conditions)
            - For all contract amounts in either of the columns "Materials" and "Miscellaneous"

            For more information on travel and state reimbursement rates, see this link at the Energy Commission
            Contracts Office website:
            http://www.energy.ca.gov/contracts/TRAVEL_PER_DIEM.PDF


            Do not fill in the column " Subcontractors." This information will fill in automatically from the
            Subcontractor worksheets.

            Regarding the column "Profit":
            • Contractor profit cannot exceed 10% of the ARRA funds allocated to the Task.
            • Prime Contractor cannot derive profit on subcontractor invoices.
            • Subcontractors can derive profit on task work they perform, and their profit cannot exceed
            10% of the ARRA funds allocated to them on the Task.
            • Subcontractors cannot derive profit on sub-subcontractor invoices.


            • Calculating Amounts for the "Fringe Benefit", "Indirect Overhead", "G&A", and
               "Profit" Columns:
            1. The Budget Amounts in these columns shall Leverage the rate ceilings (percentages) on Exhibit B,
            Attachment B-4 (Calculation of Fringe Benefits, Indirect Overhead, General Administrative Expenses,
            and Profit).

            For example, let's assume the Fringe Benefit amount is calculated by multiplying the rate ceiling
            percentage in Attachment B-4 and direct labor. (Your formula for calculating fringe benefit may be
            different.) If the fringe benefit rate is 25%, the amount in the Fringe Benefit column shall be 0.25 times
            Direct Labor for the task.

            2. If there is more than one rate ceiling (i.e., escalating rates each year) in Attachment B-4, use the
            average of these rates for completing the Budget amounts. (It is acknowledged that -- although not
            completely accurate -- this methodology should be close to the actual number and that it would be too
            onerous to otherwise calculate the Budget using multiple rates.)

            For example, if we follow the same calculation as above for the fringe benefit amount, and the Fringe
            Benefit ceiling rate went from 25% to 26% to 28% in a 3-year period, then the amount in the Fringe
            Benefit column shall be (25 + 26 + 28) / 3 = 26.34% times Direct Labor for the task.


            Personnel Hourly Rates (Tabs: Att B-3 - Prime Rates, Att B-3 - Sub#1 Rates, etc. if more than
 Go    C.
            one subcontractor)

         Exhibit B Attachment B-3 Prime Rates Worksheets: In the first two columns, list the names and
         job classifications for everyone from the Prime Contractor (or Subcontractor on its form) that
         may be directly billed to this project. If names are not known, leave them blank and list just the
      Go
         job classifications. Individuals added after the Agreement is awarded must fall into one of the
         classifications and rates listed, so include all classifications that could be directly billed to this
         project.




04-2008                                                Page 4 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls          Instructions With Links
                                          ARRA Contract
                                    Budget Workbook Instructions
           For each person or job classification, first list their current unloaded hourly ceiling rate in the "Current
           Hourly Rates ($)" column. In the remaining columns, enter the rates for each year of the Agreement
           through to the Contract Term End Date (use the start and end dates of your organization's fiscal year for
           each period). If awarded an Agreement from a solicitation, the rates in your proposal become part of
           the signed Agreement and may not be changed. The Energy Commission will reimburse actual
           rates up to the ceilings specified in this Exhibit. Your actual billable rates can not exceed the
           rates specified in this exhibit.

           • Projected rates are acceptable and expected.
           • Average rates for different employees within a classification are not acceptable. If
             different employees are paid at different rates, then list out these employees separately.
           • Enter the total hours on the contract for each employee or position.


          Calculation of Fringe Benefits, Indirect Overhead, General Administrative Expenses, and Profit
 Go    D. Rates (Tabs: Att B-4 - Prime Costs Calc, Att B-4 - Sub#1 Costs Calc, etc. if more than one
          subcontractor)

           In the first table, provide fringe, indirect overhead, G&A and profit rates (%). Profit cannot exceed 10%
           of the ARRA funds allocated to the Contractor / Subcontractor on the project. Add columns on separate
           pages, if appropriate, to add your own unique additional costing categories.


           In the second table, list the budget expense items to which the indirect costs or fees are applied for
           fringe benefits, indirect overhead, G&A, and Profit (select from the list on the worksheet). The Prime
           Contractor may not apply profit to subcontractor invoices, nor may subcontractors apply profit to sub-
           subcontractor invoices. All levels of subcontractors can take a profit on their own work.


           In the third table, list items you include in each category (Fringe Benefits, Indirect Overhead, and G&A).


           Note: If your accounting systems and rate structures have been audited by an external agency, please
           provide a copy of their acceptance/approval of your rates and fees.

           Except as provided for in the contract, Contractor shall use the Federal OMB Circulars A-87, A-21, A-
           122 or FAR Part 31 in determining allowable and unallowable costs.
           Go Here for Guidance on Calculating Indirect Rates


 Go    E. Project Operating Expense Detail (Tabs: Att B-5 - Proj Oper Exp )


           If the ARRA budget forms for the Prime Contractor and all Subcontractors contain amounts in the
           columns listed "Travel," "Equipment," "Materials," and "Miscellaneous," then you must provide details of
           those expenditures that are to be pre-approved on the corresponding tables in this worksheet. (See
           notes in section III.B. above.)

           Task numbers must be entered for all items on each table. The task numbers do not carry forward from
           other worksheets because not all tasks will have funds allocated to these areas.

           List both ARRA funds and Leverage funds that are being used in the appropriate columns. A listing of
           Leverage fund expenditures will assist with overall budget management.

                                                   Pre-approved Travel List

04-2008                                              Page 5 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls        Instructions With Links
                                          ARRA Contract
                                    Budget Workbook Instructions

          For Pre-approved Travel, include at least 3 meetings: the kick-off meeting, critical project review
          meetings, and the final meeting. Also include any other trips that you can identify. Along with the
          purpose, include the destination, names (or titles) of people taking the trip, and the amount for each trip.

          Assign a Trip Number to each trip for reference when invoicing. (Use these trip numbers as a reference
          when filling out invoices for reimbursement.)

          If there are separate trips in each task (for separate purposes), then list them on separate rows in the
          table. Multiple trips within a task for the same purpose can be listed once with a comment on the
          number of trips involved.

          Examples:
          1) three separate trips in task 3 to San Francisco, Los Angeles, and San Diego @ $500 each should be
          listed on three separate rows.
          2) Two trips to Sacramento for PAC Meetings in Task 4 @ $500 each should be described as "PAC
          Meetings - Sacramento (2 trips)" at $1000 total for the task. NOTE: Give these grouped trips a range of
          trip numbers, e.g.: 4-1 and 4-2 .

          Any trips not identified here will need prior written approval by the Commission Contract Manager.
          Please note that travel is reimbursed at state rates.


          For more information on travel and state reimbursement rates, see this link at the Energy Commission
          Contracts Office website:
          http://www.energy.ca.gov/contracts/TRAVEL_PER_DIEM.PDF

                                                          Equipment

          List all equipment that will be purchased partly or in full with ARRA funds by both the Prime and the
          Subcontractors. Include the name, a description, the purpose and the amount of each piece of
          equipment. (Refer to Exhibit D Special Terms & Conditions for an explanation of equipment.) If
          possible, funds other than those from ARRA (including Leverage funds) should be used to purchase
          equipment. A UCC.1 form will be filed with the Secretary of State's Office by the Commission Contracts
          Officer at the start of the Agreement.


                                                            Materials
          Fill out the information requested, and in the "description" field, provide a general (not detailed)
          description of the particulars of the material expenditures.

                                                 Miscellaneous Expenditures




04-2008                                              Page 6 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls        Instructions With Links
                                           ARRA Contract
                                     Budget Workbook Instructions
            Fill out the information requested, and In the "description" field, provide a general (not detailed)
            description of the particulars of the miscellaneous expenditures.



          Contract Leverage Worksheet: The Prime Contractor and all Subcontractors must submit
          information about Leverage funding on the Exhibit B, Attachment B-6 Contract Leverage budget
Go     F.
          form. (Insert columns for additional subcontractors as needed.) Generally, fill in the Leverage-
          dollar amounts for each Task.

            Rows
            Tasks 1.5 and 1.9 do not require funding, which is why the budgets for these tasks are listed as zero.


            Tasks 1.7 and 1.8 are not reimbursable with ARRA funds. Leverage funds must be used for these
            tasks.

 Go    G. Additional Notes Worksheet

            If there are additional notes or commentary that is needed for any parts of the Exhibit B Budget
            Attachments, add them here.



            Direct Labor by Task (Tabs: Att B-5 - Prime Task Labor, Att B-5 - Sub#1 Task Labor, etc. if more
 Go    H.
            than one subcontractor) -- OPTIONAL

            Starting with Budget template release 04-2008, the Per-Task Labor tabs are optional in the contract
            package. If you wish to provide the Gantt Chart as a part of the package, use Excel's <Unhide> feature
            to reveal the Gantt Chart worksheet in this workbook. Total Hours for each employee or position are
            entered on the Labor Costs Worksheet.

            In the first two columns, the names and job classifications as listed on the Personnel Hourly Rates and
            Benefits worksheet are autofilled here. (See C, above)

            Insert the number of hours that each person/position listed will work on the corresponding tasks.


 IV. Instructions for Exhibit F, List of Contacts, (Tab: Exh F - List of Contacts)

         Insert the name, address, phone number, fax number, and e-mail address of the Contractor's Project
      Go Manager, Contracts Administrator, Accounting Invoicing Contact, and Legal Notice Recipient in the
         spaces provided.


            The name and contact information for the Commission Contract Manager shall be entered by the CCM.


            The Commission Contract Officer is assigned after the contract package is handed in to the Contracts
            Office. Select from the dropdown list of Contract Officers (This will be entered by Energy Commission
            personnel.)




04-2008                                               Page 7 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls         Instructions With Links
                                           ARRA Contract
                                     Budget Workbook Instructions

  I.   General Instructions for Completing the Spreadsheets in this Workbook

             This workbook contains spreadsheets for the Schedule of Deliverables and Due Dates, Gantt Chart,
             budget forms for the prime contractor and subcontractors, and a List of Contacts. Specific instructions
             for each of the spreadsheets in this workbook are below.


             The electronic version of these documents shows cells of different color. Fill in only the non-colored
             cells for each of the spreadsheets. Do NOT enter data in the blue cells. Blue cells contain formulas or
             data transferred from other worksheets. Blue cells and many of the yellow cells (headings) are
             protected to prevent accidental changes. Please do not attempt to change formulas and references in
             the worksheets unless you are familiar with the operation of the worksheets and you are well-versed in
             MS Excel software.

             Budget requirements are based on ARRA-, Energy Commission-, and CA State Contracting Rules.

 II.   Instructions for Exhibit A Attachment A-1, Schedule of Deliverables and the Gantt Chart

        A.   Schedule of Deliverables and Due Dates (Tab: Att A-1 Schedule)
             For each Administrative Task, insert the planned start and completion dates. Please note that it will
             take approximately four months from the date that you complete and turn in these forms to Sparkey until
             there is a final, approved agreement. Pick a start date accordingly so you won't have to rebuild the
             schedule.


             For each Technical Task, insert in the appropriate columns, the name of the task as it is titled in the
             Scope of Work (Exhibit A), the name of the deliverables associated with each task as they are titled in
             the Scope of Work, and the planned start and completion dates. (Note: Dates will display in a red bold
             font if they fall on the weekend. Please correct for this.) Delete or insert rows as necessary. Because
             the task names (up to number 20) are linked with the budget forms, once they are typed onto the
             Schedule, they will carry forward to the budgets. If your project contains more than 20 tasks, you will
             have to link the additional cells or type them into the budget forms.

             For the Final Report Administrative Tasks (1.6, 1.6.1, & 1.6.2), you can either enter the overall start /
             finish dates in task 1.6 or enter the detailed start / finish dates in tasks 1.6.1 & 1.6.2.

             The Critical Project Reviews (and associated CPR Reports) are only shown for example purposes.
             Delete the examples and place CPRs in the appropriate project tasks.


             Do not insert any information in the columns labeled "ARRA Funds" and "Leverage Funds." These cells
             are linked to the budget forms and will automatically fill in once the budget forms are complete.


        B. GANTT Chart (Tab: Att A-1 GANTT) - OPTIONAL
           Starting with Budget template release 04-2008, the Gantt Chart is optional in the contract package. If
           you wish to provide the Gantt Chart as a part of the package, use Excel's <Unhide> feature to reveal
           the Gantt Chart worksheet in this workbook.
           For each Task, insert the planned start and end dates as listed on the Schedule of Deliverables and
           Due Dates. The start and end dates for the overall administrative tasks will be automatically entered
           from the schedule of deliverables. Headings and GANTT bar shadings are automatically
           completed as you enter start and end dates.




                                                    Page 8 of 30                                          RFP 500-08-503
o: rg 3/24/09                         Attachment 16, Stage 2 Budget Instructions                                  TIBC II
                                         ARRA Contract
                                   Budget Workbook Instructions
            Note that the print format is to print the entire Gantt Chart. You may only need a small part of it. Use
            the RED FORMAT BAR at the bottom of the chart as a reference to reduce the print area of your chart.
            (Hint: The bar starts catty-corner to the latest date column in the Gantt Chart.)


            If you have an alternate means of creating a Gantt Chart (such as Microsoft Project), then you may use
            it. However, please make it print one landscape sheet and provide it in a separate electronic file. It
            must be compatible with Energy Commission software programs.

 III. Instructions For Exhibit B Attachments (Budget Forms)

       A.   Budget Summary (Tab: Att B-1 Summary)

            Do not enter any data in this spreadsheet. These are the total task budgets, and the amounts will
            automatically fill in once information is entered on the individual task budgets.

            ARRA Budget (Tabs: Att B-2 - Prime ARRA, Att B-2 - Sub#1 ARRA, etc. if more than one
       B.
            subcontractor)

            Prime and Subcontractor Budget Worksheets: The Prime Contractor and Subcontractors must
            submit information on all the Exhibit B Budget Attachment forms.

            Generally, fill in the ARRA reimbursable amounts for each Task.

            For Subcontractors, indicate whether they are "Key" and / or Disabled Veteran Business Enterprise
            (DVBE) in the checkboxes.

            Mark the "Key Sub." checkbox if this subcontractor is considered a key subcontractor to the contract.
            Note: All DVBE subcontractors are considered Key subcontractors; mark this key checkbox, too, if
            you've marked the DVBE checkbox.




                                                  Page 9 of 30                                        RFP 500-08-503
o: rg 3/24/09                       Attachment 16, Stage 2 Budget Instructions                                TIBC II
                                         ARRA Contract
                                   Budget Workbook Instructions

           • Instruction Specific to Rows in Attachment B-2
           For Task 1.1, Kick-off Meeting, and Task 1.3, Final Meeting, budget for the number of technical and
           administrative personnel who will be attending the meeting with ARRA staff in Sacramento.

           For Task 1.2, CPR Meetings, and Task 1.11, Conduct PAC Meetings, do not enter travel amounts in
           these rows if travel for these administrative tasks is directly associated with a specific technical
           task. Enter travel expense in those technical tasks.

           Tasks 1.5 and 1.9 do not require funding, which is why the budgets for these tasks are listed as zero.

           For Task 1.6, the Final Report, budget for 1 month for your top technical person and/or best technical
           writer.

           Tasks 1.7 and 1.8 are not reimbursable with ARRA funds. Leverage funds must be used for them.

           • Instruction Specific to Columns in Attachment B-2
           The Prime Contractor and Subcontractors must provide details of the following expenditures on the
           corresponding tables in worksheet tab "Att B-5 - Project Operating Expense:"
           - For all pre-approved travel contained in the amounts listed in the "Travel" column
           - For any amounts over $5,000 listed in the "Equipment" column (refer to Exhibit G
               Definitions and Exhibit D Special Terms & Conditions)
           - For all contract amounts in either of the columns "Materials" and "Miscellaneous"


           For more information on travel and state reimbursement rates, see this link at the Energy Commission
           Contracts Office website:
           http://www.energy.ca.gov/contracts/TRAVEL_PER_DIEM.PDF

           Do not fill in the column " Subcontractors." This information will fill in automatically from the
           Subcontractor worksheets.

           Regarding the column "Profit":
           • Contractor profit cannot exceed 10% of the ARRA funds allocated to the Task.
           • Prime Contractor cannot derive profit on subcontractor invoices.
           • Subcontractors can derive profit on task work they perform, and their profit cannot exceed
           10% of the ARRA funds allocated to them on the Task.
           • Subcontractors cannot derive profit on sub-subcontractor invoices.




                                                  Page 10 of 30                                           RFP 500-08-503
o: rg 3/24/09                        Attachment 16, Stage 2 Budget Instructions                                   TIBC II
                                          ARRA Contract
                                    Budget Workbook Instructions
            • Calculating Amounts for the "Fringe Benefit", "Indirect Overhead", "G&A", and
               "Profit" Columns:
            1. The Budget Amounts in these columns shall Leverage the rate ceilings (percentages) on Exhibit B,
            Attachment B-4 (Calculation of Fringe Benefits, Indirect Overhead, General Administrative Expenses,
            and Profit).

            For example, let's assume the Fringe Benefit amount is calculated by multiplying the rate ceiling
            percentage in Attachment B-4 and direct labor. (Your formula for calculating fringe benefit may be
            different.) If the fringe benefit rate is 25%, the amount in the Fringe Benefit column shall be 0.25 times
            Direct Labor for the task.

            2. If there is more than one rate ceiling (i.e., escalating rates each year) in Attachment B-4, use the
            average of these rates for completing the Budget amounts. (It is acknowledged that -- although not
            completely accurate -- this methodology should be close to the actual number and that it would be too
            onerous to otherwise calculate the Budget using multiple rates.)

            For example, if we follow the same calculation as above for the fringe benefit amount, and the Fringe
            Benefit ceiling rate went from 25% to 26% to 28% in a 3-year period, then the amount in the Fringe
            Benefit column shall be (25 + 26 + 28) / 3 = 26.34% times Direct Labor for the task.


            Personnel Hourly Rates (Tabs: Att B-3 - Prime Rates, Att B-3 - Sub#1 Rates, etc. if more than
       C.
            one subcontractor)

            Exhibit B Attachment B-3 Prime Rates Worksheets: In the first two columns, list the names and
            job classifications for everyone from the Prime Contractor (or Subcontractor on its form) that
            may be directly billed to this project. If names are not known, leave them blank and list just the
            job classifications. Individuals added after the Agreement is awarded must fall into one of the
            classifications and rates listed, so include all classifications that could be directly billed to this
            project.

            For each person or job classification, first list their current unloaded hourly ceiling rate in the "Current
            Hourly Rates ($)" column. In the remaining columns, enter the rates for each year of the Agreement
            through to the Contract Term End Date (use the start and end dates of your organization's fiscal year for
            each period). If awarded an Agreement from a solicitation, the rates in your proposal become part of
            the signed Agreement and may not be changed. The Energy Commission will reimburse actual
            rates up to the ceilings specified in this Exhibit. Your actual billable rates can not exceed the
            rates specified in this exhibit.

            • Projected rates are acceptable and expected.
            • Average rates for different employees within a classification are not acceptable. If
              different employees are paid at different rates, then list out these employees separately.
            • Enter the total hours on the contract for each employee or position.




                                                  Page 11 of 30                                            RFP 500-08-503
o: rg 3/24/09                        Attachment 16, Stage 2 Budget Instructions                                    TIBC II
                                         ARRA Contract
                                   Budget Workbook Instructions
          Calculation of Fringe Benefits, Indirect Overhead, General Administrative Expenses, and Profit
       D. Rates (Tabs: Att B-4 - Prime Costs Calc, Att B-4 - Sub#1 Costs Calc, etc. if more than one
          subcontractor)

           In the first table, provide fringe, indirect overhead, G&A and profit rates (%). Profit cannot exceed 10%
           of the ARRA funds allocated to the Contractor / Subcontractor on the project. Add columns on separate
           pages, if appropriate, to add your own unique additional costing categories.


           In the second table, list the budget expense items to which the indirect costs or fees are applied for
           fringe benefits, indirect overhead, G&A, and Profit (select from the list on the worksheet). The Prime
           Contractor may not apply profit to subcontractor invoices, nor may subcontractors apply profit to sub-
           subcontractor invoices. All levels of subcontractors can take a profit on their own work.


           In the third table, list items you include in each category (Fringe Benefits, Indirect Overhead, and G&A).


           Note: If your accounting systems and rate structures have been audited by an external agency, please
           provide a copy of their acceptance/approval of your rates and fees.

           Except as provided for in the contract, Contractor shall use the Federal OMB Circulars A-87, A-21, A-
           122 or FAR Part 31 in determining allowable and unallowable costs.


       E. Project Operating Expense Detail (Tabs: Att B-5 - Proj Oper Exp )


           If the ARRA budget forms for the Prime Contractor and all Subcontractors contain amounts in the
           columns listed "Travel," "Equipment," "Materials," and "Miscellaneous," then you must provide details of
           those expenditures that are to be pre-approved on the corresponding tables in this worksheet. (See
           notes in section III.B. above.)

           Task numbers must be entered for all items on each table. The task numbers do not carry forward from
           other worksheets because not all tasks will have funds allocated to these areas.

           List both ARRA funds and Leverage funds that are being used in the appropriate columns. A listing of
           Leverage fund expenditures will assist with overall budget management.




                                                 Page 12 of 30                                         RFP 500-08-503
o: rg 3/24/09                       Attachment 16, Stage 2 Budget Instructions                                 TIBC II
                                         ARRA Contract
                                   Budget Workbook Instructions
                                                   Pre-approved Travel List

           For Pre-approved Travel, include at least 3 meetings: the kick-off meeting, critical project review
           meetings, and the final meeting. Also include any other trips that you can identify. Along with the
           purpose, include the destination, names (or titles) of people taking the trip, and the amount for each trip.

           Assign a Trip Number to each trip for reference when invoicing. (Use these trip numbers as a reference
           when filling out invoices for reimbursement.)

           If there are separate trips in each task (for separate purposes), then list them on separate rows in the
           table. Multiple trips within a task for the same purpose can be listed once with a comment on the
           number of trips involved.

           Examples:
           1) three separate trips in task 3 to San Francisco, Los Angeles, and San Diego @ $500 each should be
           listed on three separate rows.
           2) Two trips to Sacramento for PAC Meetings in Task 4 @ $500 each should be described as "PAC
           Meetings - Sacramento (2 trips)" at $1000 total for the task. NOTE: Give these grouped trips a range of
           trip numbers, e.g.: 4-1 and 4-2 .

           Any trips not identified here will need prior written approval by the Commission Contract Manager.
           Please note that travel is reimbursed at state rates.


           For more information on travel and state reimbursement rates, see this link at the Energy Commission
           Contracts Office website:
           http://www.energy.ca.gov/contracts/TRAVEL_PER_DIEM.PDF

                                                           Equipment

           List all equipment that will be purchased partly or in full with ARRA funds by both the Prime and the
           Subcontractors. Include the name, a description, the purpose and the amount of each piece of
           equipment. (Refer to Exhibit G Definitions and Exhibit D Special Terms & Conditions for an explanation
           of equipment.) If possible, funds other than those from ARRA (including Leverage funds) should be
           used to purchase equipment. A UCC.1 form will be filed with the Secretary of State's Office by the
           Commission Contracts Officer at the start of the Agreement.




                                                 Page 13 of 30                                          RFP 500-08-503
o: rg 3/24/09                       Attachment 16, Stage 2 Budget Instructions                                  TIBC II
                                         ARRA Contract
                                   Budget Workbook Instructions
                                                             Materials
           Fill out the information requested, and in the "description" field, provide a general (not detailed)
           description of the particulars of the material expenditures.

                                                  Miscellaneous Expenditures
           Fill out the information requested, and In the "description" field, provide a general (not detailed)
           description of the particulars of the miscellaneous expenditures.



          Contract Leverage Worksheet: The Prime Contractor and all Subcontractors must submit
          information about Leverage funding on the Exhibit B, Attachment B-6 Contract Leverage budget
       F.
          form. (Insert columns for additional subcontractors as needed.) Generally, fill in the Leverage-
          dollar amounts for each Task.

           Rows
           Tasks 1.5 and 1.9 do not require funding, which is why the budgets for these tasks are listed as zero.


           Tasks 1.7 and 1.8 are not reimbursable with ARRA funds. Leverage funds must be used for these
           tasks.

       G. Additional Notes Worksheet

           If there are additional notes or commentary that is needed for any parts of the Exhibit B Budget
           Attachments, add them here.



 IV. Instructions for Exhibit F, List of Contacts, (Tab: Exh F - List of Contacts)

           Insert the name, address, phone number, fax number, and e-mail address of the Contractor's Project
           Manager, Contracts Administrator, Accounting Invoicing Contact, and Legal Notice Recipient in the
           spaces provided.


           The name and contact information for the Commission Contract Manager shall be entered by the CCM.


           The Commission Contract Officer is assigned after the contract package is handed in to the Contracts
           Office. Select from the dropdown list of Contract Officers (This will be entered by Energy Commission
           personnel.)




                                                  Page 14 of 30                                          RFP 500-08-503
o: rg 3/24/09                        Attachment 16, Stage 2 Budget Instructions                                  TIBC II
                                                                   Exhibit A
                                                                Attachment A-1
                                                    Schedule of Deliverables and Due Dates
                                                              Insert Name of Prime Contractor Here
 Project                                                                                                                   Planned
                                                                                                          Planned Start                              Leverage
 or Task                Task Name                                     Deliverable(s)                                      Completion   ARRA Funds
                                                                                                              Date                                    Funds
 Number                                                                                                                      Date
                                           Administration                                                  9/27/2006      10/27/2006
   A.1     Attend Kick-off Meeting           An Updated Schedule of Deliverables                           9/27/2006      10/27/2006     #REF!                  0
                                             An Updated Gantt Chart (optional)
                                             An Updated List of Leverage Funds
                                             An Updated List of Permits
                                             Schedule for Recruiting PAC Members (optional)
                Commission Contract Manager
                                             Final report Instructions
                                Deliverables
   A.2     CPR Meetings                      CPR Report(s)                                                                               #REF!                  0
                                                   CPR deliverables identified in this Scope of Work

                 Commission Contract Manager
                                                   Agenda and a List of Expected Participants
                                      Deliverables
                                                   Schedule for Written Determination
                                                   Written Determination
                                                   Written documentation of meeting agreements and
   A.3    Final Meeting                                                                                                                  #REF!                  0
                                                   all pertinent information
                                                   Schedule for completing closeout activities
   A.4    Monthly Progress Reports                 Monthly Progress Reports                                                              #REF!                  0
          Test Plans, Technical Reports and
   A.5                                                                                                        N/A            N/A                 0              0
          Interim Deliverables
   A.6    Final Report                                                                                                                   #REF!                  0
    A.6.1            Final Report Outline                      Draft Outline of the Final Report                                         #REF!                  0
                                                               Final Outline of the Final Report
    A.6.2                Final Report                                  Draft Final Report                                                #REF!                  0
                                                                         Final Report
                                                   A letter regarding Leverage Funds or stating that no
   A.7    Identify and Obtain Leverage Funds                                                                                                     0              0
                                                   Leverage Funds are provided
                                                   Letter(s) for New Leverage Funds
                                                   A copy of each Leverage Fund commitment letter
                                                   Letter that Leverage Funds were Reduced (if
                                                   applicable)
                                                   A letter documenting the Permits or stating that no
   A.8    Identify and Obtain Required Permits                                                                                                   0              0
                                                   Permits are required
                                                   Updated list of Permits as they change during the
                                                   Term of the Agreement
                                                   Updated schedule for acquiring Permits as it
                                                   changes during the Term of the Agreement
                                                   A copy of each approved Permit
                                                                              Page 15 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls                                    Att A-1 - Schedule
                                                                    Exhibit A
                                                                 Attachment A-1
 Project                                             Schedule of Deliverables and Due Dates
                                                                                   Planned Start
                                                                                                                         Planned
                                                                                                                                                       Leverage
 or Task                 Task Name                                      Deliverable(s)                                  Completion       ARRA Funds
                                                                                                            Date                                        Funds
 Number                                                                                                                    Date
                                                   Administration
                                                    A Letter requesting exemption from the Electronic
   A.9     Electronic File Format                                                                           N/A             N/A                    0              0
                                                    File Format (if applicable)
  A.10     Establish the PAC (Optional)             Draft List of PAC Members                                                              #REF!                  0
                                                    Final List of PAC Members
                                                    Letters of acceptance, or other comparable
                                                    documentation of commitment for each PAC Member
  A.11     Conduct PAC Meetings (Optional)          Draft PAC Meeting Schedule                                                             #REF!                  0
                                                    Final PAC Meeting Schedule
                                                    PAC Meeting Agenda(s) with Back-up Materials for
                                                    Agenda Items
                                                    Written PAC meeting summaries, including
                                                    recommended resolution of major PAC issues
                                                                                                        Administrative Tasks Sub-Total     #REF!       $          -
                                                  Technical Tasks                                          #NUM!           #NUM!
   1.0     Name of Project 1                                                                                                               #REF!                  0
   1.1     Name of Task 1.1                           1. Name of Deliverable for Task 1.1                                                  #REF!                  0
                                                      1. Name of Deliverable for Task 1.2
   1.2     Name of Task 1.2                                                                                                                #REF!                  0
                                                      2. Name of Deliverable for Task 1.2
               Critical Project Review (example only) 1st Critical Project Review Report
           Name of Task 1.3                           1. Name of Deliverable for Task 1.3
   2.0     Name of Project 2                                                                                                               #REF!                  0
   2.1     Name of Task 2.1                           1. Name of Deliverable for Task 2.1                                                  #REF!                  0
   2.2     Name of Task 2.2                           1. Name of Deliverable for Task 2.2                                                  #REF!                  0
   2.3     Name of Task 2.3                           1. Name of Deliverable for Task 2.3                                                  #REF!                  0
                Critical Project Review(example only) 2nd Critical Project Review Report
                                                                                                            Technical Tasks Sub-Total      #REF!       $          -
                                                                                                                                Total      #REF!       $          -




                                                                               Page 16 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls                                     Att A-1 - Schedule
                                                  Exhibit B
                                              Att B-1 Summary

Summary Project Budget                                      ARRA
                                                                        Task Leverage
                                                         Reimbursable                 Total Task Costs
Insert Name of Prime Contractor Here                                        Funds
                                                          Task Costs

    0.0      Administration                                 #REF!                    0       #REF!

             Project Technical Activities

    1.0      Name of Project 1                              #REF!                    0       #REF!

    2.0      Name of Project 2                              #REF!                    0       #REF!

   #REF!     #REF!                                          #REF!                    0       #REF!

   #REF!     #REF!                                          #REF!                    0       #REF!

                     Technical Activities Subtotals             #REF!                0            #REF!

                                                          Total ARRA    Total Leverage    Total Project
                                                             Cost           Funds             Cost
                             Project Totals                 #REF!                     0      #REF!




                                                    Page 17 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls          Att B-1 Summary
                                                                                                    Exhibit B
                                                                                              Att B-2 - Prime ARRA

    Budget for ARRA Reimbursement
                                                            Personal Services                                     Project Operating Expenses                                             Indirect Costs
          to Prime Contractor                                                                                                                                                                                                 ARRA
                                                                                                                                                                                                                           Reimbursable
Insert Name of Prime Contractor Here                                                                                                                          Sub-        Indirect                                          Task Costs
                                                                                                                                                                                                                   1
                                                       Direct Labor       Fringe Benefits   Materials       Equipment       Travel             Misc.                                         G&A          Profit
                                                                                                                                                           contractors   Overhead

   1.0    Project Administration Activities

   A.1    Attend Kick-off Meeting                                                                                                                            #REF!                                                            #REF!

   A.2    CPR Meetings                                                                                                                                       #REF!                                                            #REF!

   A.3    Final Meeting                                                                                                                                      #REF!                                                            #REF!

   A.4    Monthly Progress Reports                                                                                                                           #REF!                                                            #REF!

          Test Plans, Technical Reports and Interim
   A.5
          Deliverables

   A.6    Final Report                                                0                0                0               0            0                 0     #REF!                   0                0                0      #REF!

  A.6.1   Final Report Outline                                                                                                                               #REF!                                                            #REF!

  A.6.2   Final Report                                                                                                                                       #REF!                                                            #REF!

   A.7    Identify and Obtain Leverage Funds

   A.8    Identify and Obtain Required Permits

   A.9    Electronic File Format

   A.10   Establish the PAC (Optional)                                                                                                                       #REF!                                                            #REF!

   A.11   Conduct PAC Meetings (Optional)                                                                                                                    #REF!                                                            #REF!

          Administration Activities Subtotals                         0                0                0               0            0                 0     #REF!                   0                0                0      #REF!

          Project Technical Activities (Delete or add rows as necessary)

   1.0    Name of Project 1                                                                                                                                  #REF!                                                            #REF!

   1.1    Name of Task 1.1                                                                                                                                   #REF!                                                            #REF!

   1.2    Name of Task 1.2                                                                                                                                   #REF!                                                            #REF!

   2.0    Name of Project 2                                                                                                                                  #REF!                                                            #REF!

   2.1    Name of Task 2.1                                                                                                                                   #REF!                                                            #REF!

   2.2    Name of Task 2.2                                                                                                                                   #REF!                                                            #REF!

   2.3    Name of Task 2.3                                                                                                                                   #REF!                                                            #REF!




                                                                                                         Page 18 of 30
 3abdc785-686d-4bb9-af48-586cd51af080.xls                                                           Att B-2 - Prime ARRA
                                                                                                 Exhibit B
                                                                                           Att B-2 - Prime ARRA

    Budget for ARRA Reimbursement
                                                         Personal Services                                     Project Operating Expenses                                             Indirect Costs
          to Prime Contractor                                                                                                                                                                                              ARRA
                                                                                                                                                                                                                        Reimbursable
Insert Name of Prime Contractor Here                                                                                                                       Sub-        Indirect                                          Task Costs
                                                                                                                                                                                                                1
                                                    Direct Labor       Fringe Benefits   Materials       Equipment       Travel             Misc.                                         G&A          Profit
                                                                                                                                                        contractors   Overhead

  #REF!   #REF!

  #REF!   #REF!                                                                                                                                           #REF!                                                            #REF!

  #REF!   #REF!                                                                                                                                           #REF!                                                            #REF!

  #REF!   #REF!                                                                                                                                           #REF!                                                            #REF!

  #REF!   #REF!                                                                                                                                           #REF!                                                            #REF!

  #REF!   #REF!                                                                                                                                           #REF!                                                            #REF!

  #REF!   #REF!                                                                                                                                           #REF!                                                            #REF!

  #REF!   #REF!                                                                                                                                           #REF!                                                            #REF!

  #REF!   #REF!                                                                                                                                           #REF!                                                            #REF!

  #REF!   #REF!                                                                                                                                           #REF!                                                            #REF!

  #REF!   #REF!                                                                                                                                           #REF!                                                            #REF!

  #REF!   #REF!                                                                                                                                           #REF!                                                            #REF!

               Technical Activities Subtotals                      0                0                0               0            0                 0         #REF!               0                0                0          #REF!


                                                                                                                                                          Major                                                        Total ARRA
                                                                                                                                                                       Indirect
                      Prime Contractor              Direct Labor       Fringe Benefits   Materials       Equipment       Travel             Misc.        Subcon-                          G&A          Profit         Reimburs- able
                                                                                                                                                                      Overhead
                                                                                                                                                         tractors                                                          Cost
                  ARRA Reimbursable Totals                         0                0                0               0            0                 0     #REF!                   0                0                0     #REF!
                     Percent of the Total             #REF!                #REF!          #REF!           #REF!          #REF!          #REF!             #REF!        #REF!             #REF!         #REF!               #REF!
                                                                                                                                                          #REF!           Total overhead & profit =                 0


          (1) Prime Contractor profit not allowed on Subcontractor invoices and profit cannot exceed 10% of the ARRA funds allocated to the Task.




                                                                                                       Page 19 of 30
 3abdc785-686d-4bb9-af48-586cd51af080.xls                                                         Att B-2 - Prime ARRA
                                                                                                      Exhibit B
                                                                                                 Att B-2 - Sub ARRA
     Budget for ARRA Reimbursement
                                                               Personal Services                                     Project Operating Expenses                                                 Indirect Costs
       to Major Subcontractor #1 (1)
                                                                                                                                                                                                                                ARRA Reimburs-
      DVBE Sub                                                                                                                                                                                                                  ableTask Costs
                                                                                                                                                                 Sub-            Indirect                                         for Sub #1
Insert Name of Subcontractor                              Direct Labor       Fringe Benefits   Materials       Equipment       Travel             Misc.                                             G&A          Profit 1
                                                                                                                                                              contractors       Overhead


    1.0      Project Administration Activities

    A.1      Attend Kick-off Meeting                                                                                                                                                                                                        0

    A.2      CPR Meetings                                                                                                                                                                                                                   0

    A.3      Final Meeting                                                                                                                                                                                                                  0

    A.4      Monthly Progress Reports                                                                                                                                                                                                       0

             Test Plans, Technical Reports and Interim
    A.5
             Deliverables

    A.6      Final Report                                                0                 0               0               0            0                 0                 0               0                0              0               0

   A.6.1     Final Report Outline                                                                                                                                                                                                           0

   A.6.2     Final Report                                                                                                                                                                                                                   0

    A.7      Identify and Obtain Leverage Funds

    A.8      Identify and Obtain Required Permits

    A.9      Electronic File Format

   A.10      Establish the PAC (Optional)                                                                                                                                                                                                   0

   A.11      Conduct PAC Meetings (Optional)                                                                                                                                                                                                0

             Administration Activities Subtotals                         0                 0               0               0            0                 0                 0               0                0              0               0

             Project Technical Activities (Delete or add rows as necessary)

    1.0      Name of Project 1                                                                                                                                                                                                              0

    1.1      Name of Task 1.1                                                                                                                                                                                                               0

    1.2      Name of Task 1.2                                                                                                                                                                                                               0

    2.0      Name of Project 2                                                                                                                                                                                                              0

    2.1      Name of Task 2.1                                                                                                                                                                                                               0

    2.2      Name of Task 2.2                                                                                                                                                                                                               0

    2.3      Name of Task 2.3                                                                                                                                                                                                               0

                   Technical Activities Subtotals                        0                 0               0               0            0                 0                 0               0                0              0               0




                                                                                                              Page 20 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls                                                                   Att B-2 - Sub ARRA
                                                                                                   Exhibit B
                                                                                              Att B-2 - Sub ARRA
     Budget for ARRA Reimbursement
                                                            Personal Services                                     Project Operating Expenses                                                  Indirect Costs
       to Major Subcontractor #1 (1)
                                                                                                                                                                                                                              ARRA Reimburs-
      DVBE Sub                                                                                                                                                                                                                ableTask Costs
                                                                                                                                                               Sub-            Indirect                                         for Sub #1
Insert Name of Subcontractor                           Direct Labor       Fringe Benefits   Materials       Equipment       Travel             Misc.                                              G&A          Profit 1
                                                                                                                                                            contractors       Overhead

                                                                                                                                                                                                                               Major Sub #1
                                                                                                                                                           Minor Subcon-       Indirect                                           ARRA
                      Major Subcontractor #1           Direct Labor       Fringe Benefits   Materials       Equipment       Travel             Misc.                                              G&A          Profit
                                                                                                                                                              tractors        Overhead                                          Reimburs-
                                                                                                                                                                                                                                able Cost
                    ARRA Reimbursable Totals                          0                 0               0               0             0                0                  0               0                0              0                   0
                        Percent of the Total             #DIV/0!             #DIV/0!        #DIV/0!          #DIV/0!        #DIV/0!        #DIV/0!            #DIV/0!          #DIV/0!           #DIV/0!       #DIV/0!           #DIV/0!
                                                                                                                               Total project expenses =                   0       Total overhead & profit =               0


             (1) Subcontractor profit is not allowed on Sub-subcontractor invoices and profit cannot exceed 10% of the ARRA funds allocated to the Task.




                                                                                                           Page 21 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls                                                                Att B-2 - Sub ARRA
                                                                                   Exhibit B
                                                                             Att B-3 - Prime Rates

Insert Name of Prime Contractor Here
                                                                                       Projected Hourly Rates ($) *
                                             Dates:   From:              From:              From:               From:             From:              Projected Total
                                                       To:                To:                 To:                To:               To:
                                                                                                                                                     Hours Worked
Name                       Job Classification/Title   ($) Ceiling Rate   ($) Ceiling Rate   ($) Ceiling Rate   ($) Ceiling Rate   ($) Ceiling Rate
Employee Name #1 (or
"TBD")                     Employee Title #1




* Your actual billable rates cannot exceed the ceiling rates specified in this exhibit.
* As a reminder, this sheet lists unloaded (that is, before fringe benefits or any other overhead) rates.




                                                                                       Page 22 of 30
        3abdc785-686d-4bb9-af48-586cd51af080.xls                                   Att B-3 - Prime Rates
                                                                                   Exhibit B
                                                                              Att B-3 - Sub Rates

Insert Name of Subcontractor
                                                                                    Projected Hourly Rates ($)
                                          Dates:   From:              From:              From:              From:              From:
                                                                                                                                                  Projected Total
                                                    To:                To:                To:                To:                To:
                                                                                                                                                  Hours Worked
Name                    Job Classification/Title   ($) Ceiling Rate   ($) Ceiling Rate   ($) Ceiling Rate   ($) Ceiling Rate   ($) Ceiling Rate
Sub#1 Employee Name
(or "TBD")          Sub#1 Employee Title




* Your actual billable rates cannot exceed the rates specified in this exhibit.
* As a reminder, this sheet lists unloaded (that is, before fringe benefits or any other overhead) rates.




                                                                                     Page 23 of 30
        3abdc785-686d-4bb9-af48-586cd51af080.xls                                  Att B-3 - Sub Rates
                                               Exhibit B
                                     Att B-4 - Prime Costs Calc

 Insert Name of Prime Contractor Here

                                                                            Percentage Rate

 Time intervals from the start of the project            Fringe     Indirect                      Profit (P)
 through the Contract Term End Date. (Use your Benefits Overhead                     General &      (10%
 organization's Fiscal Year start / end dates.)            (FB)       (OH)    Administrative (GA)   Max)
   From:        1/0/00         To:          1/0/00          %          %                %            0%
   From:                       To:                          %          %                %            0%
   From:                       To:                          %          %                %            0%
   From:                       To:                          %          %                %            0%
   From:                       To:                          %          %                %            0%
 Note: Use the categories that you typically use in your standard business practice.


                                          List the budget expense items to which the indirect costs or fees are
                                                        applied. Use the following abbreviations:
                                                 DL = Direct Labor, FB = Fringe Benefits, M = Materials,
     Expense Items in the Budget
                                          EQ = Equipment, T = Travel, MS = Miscellaneous, S = Subcontracts,
           Spreadsheets
                                                OH = Indirect Overhead, G&A = General & Administrative
                                           (For example, if the Fringe Benefits percentage is applied to Direct
                                              Labor expense, you would list DL in the Fringe Benefits line.)
 Fringe Benefits
 Indirect Overhead
 General & Administrative
 Profit*




 List items you include in each category (e.g., vacation, retirement plan, telephone, secretarial, rent/lease,
 insurance, etc.). If vacation, holidays, or sick leave are included, do not double count in your hourly rate
 calculations.

            Fringe Benefits                       Indirect Overhead                  General & Administrative




 * Prime Contractor profit not allowed on Subcontractor invoices.
                                            Page 24 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls B-4 - Prime Costs Calc
                                       Att
                                               Exhibit B
                                       Att B-4 - Sub Costs Calc


  Insert Name of Subcontractor

                                                                            Percentage Rate

  Time intervals from the start of the project           Fringe     Indirect                      Profit (P)
  through the Contract Term End Date. (Use your Benefits Overhead                   General &       (10%
  organization's Fiscal Year start / end dates.)           (FB)       (OH)    Administrative (GA)   Max)
    From:        1/0/00         To:         1/0/00          %          %               %             0%
    From:                       To:                         %          %               %             0%
    From:                       To:                         %          %               %             0%
    From:                       To:                         %          %               %             0%
    From:                       To:                         %          %               %             0%
  Note: Use the categories that you typically use in your standard business practice.


                                          List the budget expense items to which the indirect costs or fees are
                                                        applied. Use the following abbreviations:
                                                 DL = Direct Labor, FB = Fringe Benefits, M = Materials,
                                          EQ = Equipment, T = Travel, MS = Miscellaneous, S = Subcontracts,
                                                OH = Indirect Overhead, G&A = General & Administrative
      Expense Items in the Budget          (For example, if the Fringe Benefits percentage is applied to Direct
             Spreadsheets                     Labor expense, you would list DL in the Fringe Benefits line.)
  Fringe Benefits
  Indirect Overhead
  General & Administrative
  Profit*




  List items you include in each category (e.g., vacation, retirement plan, telephone, secretarial, rent/lease,
  insurance, etc.). If vacation, holidays, or sick leave are included, do not double count in your hourly rate
  calculations.

             Fringe Benefits                       Indirect Overhead                 General & Administrative




  *Subcontractor profit is not allowed on Sub-subcontractor invoices.

                                              Page 25 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xlsAtt B-4 - Sub Costs Calc
                                                                  Exhibit B
                                                           Att B-5 - Proj Oper Exp
                                                                  Pre-approved Travel List *
                                                                                                         Amount
                                                                                                             ARRA             Leverage
Task No.         Trip Number                     Trip Purpose                   Destination     Who          Funds             Funds
         2             2-1           Trip to Sacramento for Kickoff Meeting
                                         Four trips to Sacramento for PAC
         2       3-1 through 3-4
                                             Meetings @ $300 per trip




Total:                                                                                                               $0                  $0

* Travel is reimbursed at state rates.


                                                                            Equipment
                                                                                                                     Amount
              Contractor / Sub                                                                               ARRA             Leverage
Task No.           Name                         Name of Equip.                  Description    Purpose       Funds             Funds




Total:                                                                                                               $0                  $0



                                                                            Material(s)
                                                                                                                     Amount
              Contractor / Sub                                                                               ARRA             Leverage
Task No.           Name                                        Description of Material(s)                    Funds             Funds




Total:                                                                                                               $0                  $0



                                                                Miscellaneous Expenditures
                                                                                                                     Amount
              Contractor / Sub                                                                               ARRA             Leverage
Task No.           Name                                      Description of Expenditures                     Funds             Funds




Total:                                                                                                               $0                  $0



                                                  Page 26 of 30
    3abdc785-686d-4bb9-af48-586cd51af080.xls Att B-5 - Proj Oper Exp
                                                                        Exhibit B
                                                              Att B-6 - Leverage Funding
                                                                   Insert Name of
                                                                                                    Other          Other          Other         Total Task
                                                                       Prime      Insert Name of
                     Contractor / Subcontractor Name:                Contractor    Subcontractor
                                                                                                   Leverage       Leverage       Leverage       Leverage
                                                                                                   Funding        Funding        Funding          Funds
                                                                        Here
                       Project Administration Activities

              A.1      Attend Kick-off Meeting                                                                                                               0

              A.2      CPR Meetings                                                                                                                          0

              A.3      Final Meeting                                                                                                                         0

              A.4      Monthly Progress Reports                                                                                                              0

                       Test Plans, Technical Reports and Interim
              A.5
                       Deliverables

              A.6      Final Report                                              0             0              0              0              0                0

                 A.6.1 Final Report Outline                                                                                                                  0

                 A.6.2 Final Report                                                                                                                          0

              A.7      Identify and Obtain Leverage Funds                                                                                                    0

              A.8      Identify and Obtain Required Permits                                                                                                  0

              A.9      Electronic File Format

              A.10     Establish the PAC (Optional)                                                                                                          0

              A.11     Conduct PAC Meetings (Optional)                                                                                                       0

                       Administration Activities Subtotals                       0             0              0              0              0                0

                       Project Technical Activities (Delete rows as necessary)

              1.0      Name of Project 1                                                                                                                     0

              1.1      Name of Task 1.1                                                                                                                      0

              1.2      Name of Task 1.2                                                                                                                      0




                                                                            Page 27 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls                             Att B-6 - Leverage Funding
                                                                      Exhibit B
                                                            Att B-6 - Leverage Funding
                                                              Insert Name of
                                                                                               Other          Other          Other         Total Task
                                                                  Prime      Insert Name of
                     Contractor / Subcontractor Name:           Contractor    Subcontractor
                                                                                              Leverage       Leverage       Leverage       Leverage
                                                                                              Funding        Funding        Funding          Funds
                                                                   Here
              2.0     Name of Project 2                                                                                                                 0

              2.1     Name of Task 2.1                                                                                                                  0

              2.2     Name of Task 2.2                                                                                                                  0

              2.3     Name of Task 2.3                                                                                                                  0

             #REF!    #REF!                                                                                                                             0

             #REF!    #REF!                                                                                                                             0

             #REF!    #REF!                                                                                                                             0

             #REF!    #REF!                                                                                                                             0

             #REF!    #REF!                                                                                                                             0

             #REF!    #REF!                                                                                                                             0

             #REF!    #REF!                                                                                                                             0

             #REF!    #REF!                                                                                                                             0

             #REF!    #REF!                                                                                                                             0

             #REF!    #REF!                                                                                                                             0

             #REF!    #REF!                                                                                                                             0

             #REF!    #REF!                                                                                                                             0

                           Technical Activities Subtotals                  0              0              0              0              0                0
                              Leverage Funds Totals                        0              0              0              0              0                0
                                Percent of the Total             #DIV/0!        #DIV/0!       #DIV/0!        #DIV/0!        #DIV/0!         #DIV/0!




                                                                       Page 28 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls                        Att B-6 - Leverage Funding
                                                               Exhibit B
                                                      Att B-7 - Additional Notes


                      Exhibit / Attachment Name
                   (e.g., Exhibit B, Attachment B-3
                            Sub #2 Rates)                                          Note




                                                                Page 29 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls                  Att B-7 - Additional Notes
                                                   Exhibit F
                                               List of Contacts
Commission Contract Manager:                           Contractor Contract Manager:

                                                       <name>
California Energy Commission                           <address line 1>
1516 Ninth Street, MS - 43                             <address line 2>
Sacramento, CA 95814                                   <address line 3>
Phone:                                                 Phone:
Fax:                                                   Fax:
e-mail:                                                e-mail:


Commission Contracts Officer:                          Contractor Contract Administrator:

                                                       <name>
California Energy Commission                           <address line 1>
1516 Ninth Street, MS - 18                             <address line 2>
Sacramento, CA 95814                                   <address line 3>
Phone:                                                 Phone:
Fax:        (916) 654-4423                             Fax:
e-mail:                                                e-mail:
   Deliver confidential deliverables to this
                location only.

Invoices, Progress Reports and                         Contractor Accounting
Non-Confidential Deliverables to:                      Invoicing Contact:
Donna Green
Accounting Office                                      <name>
California Energy Commission                           <address line 1>
1516 Ninth Street, MS - 2                              <address line 2>
Sacramento, CA 95814                                   <address line 3>
Phone:      (916) 654-3904                             Phone:
Fax:        (916) 653-1435                             Fax:
e-mail:     dgreen@energy.state.ca.us                  e-mail:


Commission Legal Notices:                              Contractor Legal Notices:

Cheryl Raedel                                          <name>
Manager, Contracts Office                              <address line 1>
California Energy Commission                           <address line 2>
1516 Ninth Street, MS -18                              <address line 3>
Sacramento, CA 95814
Phone:      (916) 654-4392                             Phone:
Fax:        (916) 654-4423                             Fax:
e-mail:     craedel@energy.state.ca.us                 e-mail:




                                             Page 30 of 30
3abdc785-686d-4bb9-af48-586cd51af080.xls Exh F List of Contacts

								