NCTA RFP SECTION III Price Proposal
Document Sample


NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 1 --- Title
Price Proposal By:
PRICE PROPOSAL OUTLINE
Price Proposal Worksheet Tabs
Schedule # Name
1 Title
2 Instructions & Overview
3 ETC Effective Lane Count
4 ETC Subsystem Pricing Summary
5 ETC Subsystem Lease-Purchase
6 Transponder Price
7 ETC Subsystem Component Prices
7.1 ETC Subsystem Spare Parts Listing
7.2 ETC Subsystem Warranty
8 ETC Subsystem Maintenance
9 Labor Rates
10 Progress Payments
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 1 1 Title
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 2 --- Instructions & Overview
This page provides notes and instructions for completing the Price Proposal forms.
1 Quantities: Quantities for some items are provided and other items are left for the Proposer to
fill in. If the quantities provided must be changed in order to provide a complete and compliant
proposal, please make that change. The submitted Price Proposal must be reflective of the
Proposer's System.
2 Prices: Enter prices in the unit price column that corresponds with the item and quantities.
3 General: Proposer accepts all responsibility for use of the excel workbook provided in
conjunction with this RFP, or Proposer may use the forms provided with the RFP.
i - Proposer is provided a copy of this spreadsheet as a courtesy and by using this file,
Proposer accepts all responsibility and risks for the workbook, formulas, entries and the result
of Price Proposal.
ii - Proposer is implicitly making a proposal compliant with the full Scope of Work and all the
Functional Requirements of this RFP. In the event that a pay item or some type of
compensation is not identified in the Price Proposal which is ultimately accepted by NCTA, the
successful Proposer may not ask for additional compensation.
4 Description of Schedules:
Schedule 1 --- Title Tab
This tab contains the mandatory block for the Contractor's name, and presents the outline.
Schedule 2 --- Instructions & Overview Tab
This tab gives instructions and general overview of the price proposal.
Schedule 3 --- ETC Effective Lane Tab
This tab shows the tabulation of toll lanes between the various toll zones and effective ETC
lanes.
Schedule 4 --- ETC Subsystem Pricing Summary Tab
This tab is the cost summary sheet for both Purchase and Lease-Purchase. The costs listed
are carried over from other tabs.
Schedule 5 --- ETC Subsystem Lease-Purchase Tab
Proposer enters monthly ETC Subsystem Lease-Purchase price in this tab. The Lease-
Purchase price shall include everything except the transponder costs.
Schedule 6 --- Transponder Prices Tab
The detailed transponder information and prices (both interior and exterior) shall be entered in
this tab. The estimated transponder quantity is provided by year.
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 2 2 Instructions
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 2 --- Instructions & Overview (continued)
Schedule 7 --- ETC Subsystem Component Price Tab
This tab contains all the cost components for the ETC Subsystem Purchase, except the
maintenance pricing. Some cost accounts are carried over from other tabs.
Schedule 7.1 --- ETC Subsystem Spare Parts Listing Tab
Proposer shall provide a detailed spare parts listing with prices in this tab.
Schedule 7.2 --- ETC Subsystem Warranty Tab
The one year warranty costs for all 65 effective lanes are entered in this tab.
Schedule 8 --- ETC Subsystem Maintenance Tab
The ongoing maintenance costs are entered in this tab.
Schedule 9 --- Labor Rates Tab
Proposer shall provide 5-year service labor rate in this tab.
Schedule 10 --- Progress Payments Tab
This tab shows the progress payments.
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 3 2 Instructions
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 3 --- ETC Effective Lane Count
Effective
Toll Zone Travel Shoulders
Plaza Locations Toll Zones Lane Note
Number Lane > 10'
Count
Triangle Parkway / NC 540 Interchange Year 1
Mainline Zone 6 NB 6-1 1 4 2 6 To be
Mainline Zone 6 SB 6-2 1 3 2 5 installed
Ramp - Triangle Parkway to NC 540 NB 6-3 1 2 2 4 in 2011
Ramp - NC 540 to Triangle Parkway WB 6-4 1 1 1 2 and will
Triangle Parkway / NC 540 Interchange begin
Ramp - NC 540 to Triangle Parkway WB 7-1 1 2 1 3 operations
Ramp - Triangle Parkway to NC 540 SB 7-2 1 2 1 3 with
Hopson Road Interchange Triangle
WB On-Ramp 8-1 1 1 1 2 Parkway
EB Off-Ramp 8-2 1 1 1 2 opening
Total Lanes Installed in Year 1 27
Mainline Between NC 55 and US 1
NB 1-1 1 3 2 5
Year 2
SB 1-2 1 3 2 5
To be
Old US 1 Interchange
installed
NB Off-Ramp 2-1 1 1 1 2
during
SB Off-Ramp 2-2 1 1 1 2
2012 and
Mainline Between Old US 1 and US 64
will begin
NB 3-1 1 3 2 5
operations
SB 3-2 1 3 2 5
with
US 64 Interchange
Western
NB On-Ramp 4-1 1 2 0 2
Wake
SB Off-Ramp 4-2 1 1 0 2
Mainline Between Green Level Road and NC 55
Freeway
NB 5-1 1 3 2 5 opening
SB 5-2 1 3 2 5
Total Lanes Installed in Year 2 38
Total Project Toll Zones and Lanes 18 39 25 65
Notes:
(1) The current schedule for the Project indicates the that the Triangle Parkway will be the first section of the
Triangle Expressway that is completed and open to traffic. The Western Wake Freeway will open to traffic
the following year. This schedule is subject to change, however these assumptions must be used in
providing pricing.
(2) The effective lane counts include shoulders which will also be equipped with the ETC Subsystem
components.
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 4 3 ETC Lane Count
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 4 --- ETC Subsystem Pricing Summary
Price Proposal By: 0
Purchase Price
1 ETC Subsystem Component $0 A
2 Maintenance Service $0 B
3 Transponders $0 C
4 Total Purchase Contract $0
Lease-Purchase Price
5 ETC Subsystem Lease Contract 5-Year Total $0 D
6 Transponders $0 C
7 Total Lease-Purchase Contract $0
Notes:
A. The ETC subsystem total is carried over from Schedule 7 ETC Subsystem
Component Price, Line 29.
B. The maintenance costs total is carried over from Schedule 8 ETC Subsystem
Maintenance, Line 6.
C. The transponders costs are carried over from Schedule 6 Transponder Prices,
Line 19.
D. The total 5-year lease-purchase costs are carried over from Schedule 5 ETC
Subsystem Lease-Purchase, Line 7.
5
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 4 ETC Subsystem Pricing Summary
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 5 --- ETC Subsystem Lease-Purchase Pricing
Price Proposal By: 0
Effective Lanes: 65
Item Description Lanes (1) Monthly Fee Per Lane Annual Price
1 ETC Subsystem Lease-Purchase Year 1 27 $0
2 ETC Subsystem Lease-Purchase Year 2 65 $0
3 ETC Subsystem Lease-Purchase Year 3 65 $0
4 ETC Subsystem Lease-Purchase Year 4 65 $0
5 ETC Subsystem Lease-Purchase Year 5 65 $0
6 ETC Subsystem Lease-Purchase Year 6 38 $0
7 Subtotal-ETC Subsystem Lease-Purchase (2) $0 D
Notes:
(1) Lanes: The initial year and the final year of operations will include only part of the total system
as indicated in the total lanes shown above. In year one it is expected that the Triangle Parkway
will open for revenue collection and the expected number of effective lanes will be 27. Years 2
through 5 will have a full Triangle Expressway component of 65 lanes. Year six will include only
the additional 38 lanes commissioned with the opening of the Western Wake Freeway in year 2.
(2) General Lease/Purchase Pricing: The Lease-Purchase pricing will be comprised of and be all
inclusive of the ETC Subsystem and the maintenance support. The Transponders will be
purchased separately as ordered and received. The Lease payments will begin upon
commissioning the system as ready for revenue collection.
D. The lease-purchase Total Price is carried over to Schedule 4 ETC Subsystem Pricing
Summary, Line 5.
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 6/23/2009 5 ETC Subsystem Lease-Purchase
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 6 --- Transponder Features & Prices
Price Proposal By: 0
Input Transponder Types & Features
Audio Feedback
NonFeedback Interior Exterior
Interior
Type / Model
Non-Transferable Sticker
Transferable Hardcase
Transponder
Waterproof
Battery Powered
Other Features:
_____________
Other Features:
_____________
Other Features:
_____________
Other Features:
_____________
Barcode Required √ √ √
Read/Write Required √ √ √
Note:
(1) The white blocks are for vendors to provide additional information on the
transponders they are proposing.
Input Transponder Unit Prices
Audio Feedback
NonFeedback Interior Exterior
Interior
Year 1
Year 2
Year 3
Year 4
Year 5
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 7 6 Transponder Prices
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 6 --- Transponder Features & Prices (continued)
Price Proposal By: 0
Transponder
Contract Year Unit Price Subtotal
Quantity (1)
NonFeedback Interior
1 Year 1 135,000 $0.00 $0
2 Year 2 45,500 $0.00 $0
3 Year 3 45,500 $0.00 $0
4 Year 4 45,500 $0.00 $0
5 Year 5 45,500 $0.00 $0
6 Subtotal 317,000 $0
Audio Feedback Interior
7 Year 1 10,000 $0.00 $0
8 Year 2 2,500 $0.00 $0
9 Year 3 2,500 $0.00 $0
10 Year 4 2,500 $0.00 $0
11 Year 5 2,500 $0.00 $0
12 Subtotal 20,000 $0
Exterior
13 Year 1 5,000 $0.00 $0
14 Year 2 2,000 $0.00 $0
15 Year 3 2,000 $0.00 $0
16 Year 4 2,000 $0.00 $0
17 Year 5 2,000 $0.00 $0
18 Subtotal 13,000 $0
19 Total 350,000 $0 C
Notes:
(2) The quantities for the transponders are estimates of the quantities required but will be
used for evaluation only. The prices provided are for the life of the contract regardless of
actual quantities used.
(3) The Proposer must use the quantities provided. NCTA wishes to price both a
feedback and non-feedback transponders.
(4) NCTA reserves the right to evaluate use the pricing proposals in the most
advantageous manner to achieve the best business case for the NCTA.
C. The "Total for Pricing Comparisons" is carried over to Schedule 4 ETC
Subsystem Pricing Summary, Lines 3 and 6.
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 8 6 Transponder Prices
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 7 --- ETC Subsystem Component Prices
Price Proposal By: 0
Effective Lanes: 65
Item Description Quantity Unit Unit Price Total Price
ETC Subsystem and Equipment
1 ETC Antenna - Type 1(Must indicate Model) Each $0
2 ETC Antenna - Type 2(Must indicate Model) Each $0
3 ETC Reader - Type 1(Must indicate Model) Each $0
4 ETC Reader - Type 2(Must indicate Model) Each $0
5 ETC Other Equipment (Must describe) Each $0
6 ETC Other Equipment (Must describe) Each $0
7 ETC Subsystem Software Each $0
8 ETC Subsystem Installation Support 65 Each $0
9 ETC Subsystem Documentation 1 LS $0
10 ETC Subsystem As-Built Documentation 1 LS $0
11 Subtotal-ETC Roadside $0
Transponder Support Equipment
12 Portable Transponder Tester 3 Each $0
13 Portable Transponder Reader 3 Each $0
14 Other Transponder Support Equipment Each $0
15 Subtotal-Transponder Support $0
Notes:
(1) NCTA has provided in the Pricing Form above the ability to propose multiple Types of
Antenna and Readers. This is provided as a convenience only and is not a requirement.
However, if multiple types of antennas and readers are proposed, the Proposer must provide the
pricing and explain their purpose in the technical proposal.
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 9 7 ETC Subsystem Component Price
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 7 --- ETC Subsystem Component Prices (continued)
Item Description Quantity Unit Unit Price Total Price
PM & Testing
16 Project Management 1 LS $0
17 Factory Acceptance Test Support 1 LS $0
18 Site Acceptance Testing Support 18 Toll Zone $0
19 Final Acceptance Testing Support 18 Toll Zone $0
20 Final Acceptance Reporting and Approval 1 LS $0
21 ETC Subsystem Training 1 LS $0
22 Subtotal-PM & Testing $0
Spare Parts Inventory
23 Subtotal-Spare Parts $0 i
ETC Subsystem Warranty
24 Subtotal-Warranty $0 ii
Additional Components
25 $0
26 $0
27 $0
28 Subtotal-Additional Components $0
29 ETC Subsystem Component Price Total $0 A
Notes:
(2) The Proposers must include the pricing for all components, software and services required to
deliver the ETC Subsystem. If the Proposer needs to add lines or change lines to ensure a
complete pricing proposal then that is what should be done.
A. The ETC Subsystem Component Price total is carried over to Schedule 4 ETC Subsystem
Pricing Schedule, Line 1.
i. The ETC Subsystem Spare Parts total is carried over from Schedule 7.1 Spare Parts Listing,
Line 16.
ii. The Warranty costs are carried over from Schedule 7.2 ETC Subsystem Warranty, Line 3.
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 10 7 ETC Subsystem Component Price
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 7.1 --- ETC Subsystem Spare Parts Listing
Price Proposal By: 0
Warranty
Delivery
Item Description Period Unit Quantity Unit Price Total Price
Lead Time
(months)
1 $0
2 $0
3 $0
4 $0
5 $0
6 $0
7 $0
8 $0
9 $0
10 $0
11 $0
12 $0
13 $0
14 $0
15 $0
16 Total Spare Parts Pricing $0 i
Notes:
(1) The diagnostic tools required for maintenance must be included with the spare parts.
i. The spare parts total is carried over to Schedule 7 ETC Subsystem Component Pricing,
Line 23.
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 11 7.1 Spare Parts Listing
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 7.2 --- ETC Subsystem Warranty
Price Proposal By: 0
System Operations
# of Lanes For Monthly Warranty Total Warranty per Annual Warranty
Year after
Warranty Cost per Lane Month Cost
Acceptance
1 Year 1 27 $0 $0
2 Year 2 38 $0 $0
3 Total Warranty Costs $0 ii
Note:
(1) 27 lanes on Triangle Parkway will be open to traffic in Year 1; and 38 lanes on
Western Wake Freeway will be open to traffic in Year 2.
ii. The total warranty costs are carried over to Schedule 7 ETC Subsystem
Component Price, Line 24.
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 12 7.2 ETC Subsystem Warranty
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 8 --- ETC Subsystem Maintenance
Price Proposal By: 0
System Operations Monthly
# of Lanes For Total Maintenance Annual
Year after Maintenance Cost
Maintenance per Month Maintenance Cost
Acceptance per Lane
1 Year 2 27 $0 $0
2 Year 3 65 $0 $0
3 Year 4 65 $0 $0
4 Year 5 65 $0 $0
5 Year 6 65 $0 $0
6 Total Maintenance Costs $0 B
Note:
B. The total maintenance costs are carried over to Schedule 4 ETC Subsystem
Pricing Summary, Line 2.
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 13 8 ETC Subsystem Maintenance
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 9 --- Labor Rates
Price Proposal By: 0
Labor Category Year 1 Year 2 Year 3 Year 4 Year 5
1 Project Manager
2 Maintenance Supervisor
3 Maintenance Technician
4 Installation Technician
5 Installation Supervisor
6 Tester
7 Systems Engineer
8 Systems Analyst
9 Tech Writer
10 Programmer
11 Other (Provide Detail Listing)
12
13
14
Notes:
(1) These are suggested classifications. Proposers should use their own classifications and
add, change or delete as needed.
(2) These rates would be used for additional work, providing estimates, etc. and do not
contribute to the overall price proposal found in Schedule 4. The rates will be used in the
overall evaluation of the price proposal. The rates shall be total hourly rates (with benefits).
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 14 9 Labor Rates
NCTA Triangle Expressway Price Proposal
ETC Technology RFP
North Carolina Turnpike Authority
ETC Technology RFP Price Proposal
Schedule 10 --- Progress Payments
Project Phase Phase I Phase I Phase II Phase II Phase III
DDD FAT Site Final
Project Progress Milestone NTP
Acceptance Acceptance Acceptance Acceptance
ETC Subsystem Hardware 5% 20% 25% 40% 10%
ETC Subsystem Software 5% 20% 25% 40% 10%
ETC Subsystem Installation Support 5% 85% 10%
ETC Subsystem Design and Documentation 5% 85% 10%
ETC Subsystem As-Built Records 100%
Factory Acceptance Tests 90% 10%
Site Acceptance Testing 90% 10%
Final Acceptance Testing 100%
Final Acceptance Reporting and Approval 100%
ETC Subsystem Training 50% 50%
ETC Subsystem Warranty 100%
Begin monthly payments to length of contract after one
ETC Subsystem Maintenance
year Warranty
Note:
(1) This schedule is for information only. The ETC Subsystem purchase payments will follow the
Roadside Toll Collection System payment schedule. See the NCTA Toll Collection System RFP
for more information.
b26b3ba2-253a-4553-90b5-d369d67eb8b7.xls 15 10 Progress Payments