Non-Prevailing Wage Cost Project Bid Schedule:
1) Mobilization and Demobilization 2) Repair a two to eight foot section of four inch diameter clay sewer pipe in the City right of way, less than five feet deep with a cleanout installed: 3) Repair a two to eight foot section of four inch diameter clay sewer pipe in the City right of way, over six feet deep with a cleanout installed (shoring needed):
4) Removal and replacement 10’ to 20’ in length x 4’ width x 4” thick of City sidewalk: 5) Removal and replacement 20’ to 40’ in length x 4’ width x 4” thick of City sidewalk:
$ _______ $ _______
/per work order /each
$ _______
/each.
$ _______ $ _______ $ _______ _______
/sq. ft. /sq. ft. /each %
6) Install one half a scoop/1/4 yard of top soil in the parkway that will support new grass (two inches over the parkway excavation): 7) Repair landscaping water sprinklers, actual cost for parts and labor @ cost plus percentage:
All costs for labor, equipment, and materials required to establish traffic control shall be included.