Proposal to be based on

Reviews
Shared by: LeePenny
Stats
views:
0
rating:
not rated
reviews:
0
posted:
6/23/2009
language:
English
pages:
0
Non-Prevailing Wage Cost Project Bid Schedule: 1) Mobilization and Demobilization 2) Repair a two to eight foot section of four inch diameter clay sewer pipe in the City right of way, less than five feet deep with a cleanout installed: 3) Repair a two to eight foot section of four inch diameter clay sewer pipe in the City right of way, over six feet deep with a cleanout installed (shoring needed): 4) Removal and replacement 10’ to 20’ in length x 4’ width x 4” thick of City sidewalk: 5) Removal and replacement 20’ to 40’ in length x 4’ width x 4” thick of City sidewalk: $ _______ $ _______ /per work order /each $ _______ /each. $ _______ $ _______ $ _______ _______ /sq. ft. /sq. ft. /each % 6) Install one half a scoop/1/4 yard of top soil in the parkway that will support new grass (two inches over the parkway excavation): 7) Repair landscaping water sprinklers, actual cost for parts and labor @ cost plus percentage: All costs for labor, equipment, and materials required to establish traffic control shall be included.

Related docs
a proposal for
Views: 147  |  Downloads: 5
ENC Proposal [based
Views: 1  |  Downloads: 0
A Proposal for a Code Generator based on XML
Views: 13  |  Downloads: 1
Proposal - ecdlcorgza
Views: 17  |  Downloads: 4
proposal process
Views: 101  |  Downloads: 10
request for proposal
Views: 34  |  Downloads: 4
Format of the Proposal
Views: 200  |  Downloads: 17
FUNDING PROPOSAL FOR
Views: 29  |  Downloads: 8
thesis proposal
Views: 63  |  Downloads: 5
Proposal
Views: 5224  |  Downloads: 190
Other docs by LeePenny