Tower Crane Foundation ApprovalCompletion Certificate

Reviews
Tower Crane Foundation Approval/Completion Certificate Site Details: Crane Details Make: Height under Hook: Base Type: Model: Job Length: Maximum Point Load: Foundation/Grillage Design Document and Drawing References: Design Carried Out By: Company: Foundation/Grillage Design Approval Design Approved By: Signature Date: NOTE: A separate approval/completion certificate is required for each tower crane Permit To Erect I confirm the tower crane foundation has been constructed to the specifications detailed above, the foundation anchors/base pads are level and plumb as specified, and that the tower crane may be erected. Signature: Date: Name: Position: NOTE: The tower crane cannot be erected until the completed form is returned to the Operations Department

Related docs
tower crane safety powerpoint presentations
Views: 1207  |  Downloads: 90
In the Control Tower
Views: 1  |  Downloads: 0
Crane_-machine-
Views: 76  |  Downloads: 14
crane retailers
Views: 47  |  Downloads: 2
CN_Tower
Views: 4  |  Downloads: 0
Other docs by LeePenny
Remedies Table
Views: 331  |  Downloads: 16
Caldera Systems Inc Ammendments and By laws
Views: 167  |  Downloads: 0
BUSINESS THANK YOU LETTER
Views: 2856  |  Downloads: 64
Property Analysis
Views: 3096  |  Downloads: 373
Coach Inc Ammendments and By laws
Views: 282  |  Downloads: 0
CorpDocs-Adopt Articles and Appoint Directors
Views: 248  |  Downloads: 7
Minutes of Special Meeting of Directors
Views: 196  |  Downloads: 5
Service providers business plan
Views: 776  |  Downloads: 56