Docstoc

OSHA Compliance Plan - Lead Abatement, Renovation, and Maintenance

Document Sample
OSHA Compliance Plan - Lead Abatement, Renovation, and Maintenance Powered By Docstoc
					                                                                            Attachment 3
  OSHA Compliance Plan - Lead Abatement, Renovation, and Maintenance Jobs


(to meet requirements of 29 CFR 1926.62)
FACILITY/DEPARTMENT:
Date Reviewed__________(required by OSHA every 6 mos.) Signature
List all expected abatement or repair tasks that involve lead or lead-based paint:

 Task   Describe Task                             Authorized Staff /      Training Rec’d.,
 No.                                              LBP Supervisor          incl. Respirator

        (Edit these examples:)
        Replacement of __________________
        Paint removal on__________________
        Encapsulation of__________________
        Paint film stabilization of___________
        Friction surface treatment of_______
        Impact surface treatment of________
        Dust removal/custodial_____________
List work procedures and exposure controls (incl. ppe and equipment):

 Task   Describe work practice and exposure controls, or attach NIBS O&M Guidelines.
 No.




Air Monitoring Data

 Task   Describe representative personal sampling data (add wipes, bulks, or clearances if
 No.    appropriate. Reference memos.




REQUIRED BY DISTRICT OF COLUMBIA

 List each LBP activity, date, amount removed:




                                            23-18

				
Jun Wang Jun Wang Dr
About Some of Those documents come from internet for research purpose,if you have the copyrights of one of them,tell me by mail vixychina@gmail.com.Thank you!