Litter Dry Stack Structure Design Worksheet Three Walls One End Open

Click to download
U.S. Department of Agriculture Natural Resources Conservation Service GA-ENG-313B Sheet 1 of 1 March 2005 LITTER DRY STACK STRUCTURE DESIGN WORKSHEET (THREE WALLS – ONE END OPEN) Conservation District: ____________________ Field Office: ____________________________ Cooperator: ___________________________ Location: ______________________________ VL Wb hm hw hs he Ax Lm Li LT FBe = = = = = = = = = = = Volume of litter stored (Form GA-ENG-313A, Item “Operation Storage Requirement.”): ________ ft3 Width of building (dimension from inside of post to inside of post): _________ ft. Max height of pile (Max. 7 ft.): _____________ ft. Height of wall (Max for wooden wall = 5 ft): ft. Height of pile at side walls (Normally equal to the wall height): _____________ ft. Height to gable end closure wall (12 or 14 ft depending on design chosen): __________ ft. Cross sectional area of pile (calculate below) Length of litter pile (calculate below) Length of building (initial calculation) including freeboard (FBe). Total length; Li rounded to accommodate post spacing Horizontal freeboard between toe of pile and open end of building. Recommend 30 degrees from the vertical on all exposed sides to prevent windblown rainfall from impacting on the containment area. Push Wall Open End he 1.5 Wall hw hs 1 1.5 Wall hw hs hm Ax hm 1 1.5 hw 1 30o 60 o hs Lm Li FBe Wb END VIEW Ax = hm Wb- 1.5(hm-hs)2 = ______ x ______ - [ 1.5 x (_____-_____)2] = _________ ft2 FBe = 7 ft for 12 ft high support posts OR 8 ft for 14 ft high support posts = __________ ft Lm = VL / Ax + (0.75 x hm) = (________ / _______) + ( 0.75 x _____ ) = ________ft. Li = Lm + FBe = _________ + _______ = _________ft. Post Spacing: ________ ft. c-c LT = __________ ft. (Round Li to accommodate post spacing. Round to closest even spacing.) Floor area = LT x Wb = _______ x ________ = __________ ft2 Designed by: ______________________________________________ Date: ____________________ Checked by: _______________________________________________ Date: ____________________ Approved by: ______________________________________________ Date: ____________________

Related docs
Other docs by NASSdocs
Sun_CI_Guidelines_Overview
Views: 332  |  Downloads: 13
Web Site Development Contract
Views: 5955  |  Downloads: 1142
ACCESTPO
Views: 35  |  Downloads: 1
BADM1103F07Ch05
Views: 160  |  Downloads: 5
Phy Mini-Invest
Views: 119  |  Downloads: 1
Linux Installation Class
Views: 313  |  Downloads: 25
Amacom - Accounting Demystified
Views: 293  |  Downloads: 29
AAI_Conference
Views: 112  |  Downloads: 0
20011205_EditorsChoice
Views: 36  |  Downloads: 0
Creating a boot disk
Views: 208  |  Downloads: 11
Buidling a Hedge fund to last
Views: 409  |  Downloads: 48
Feehan_ Christine - Dark 09 - Dark Guardian
Views: 386  |  Downloads: 29
BADM1103F07Ch14
Views: 194  |  Downloads: 7
Capstone Global Finance _2002_
Views: 374  |  Downloads: 9