The meeting was called to order by Jim Volbrecht, Chairperson, at 6:30 PM. In attendance: Supervisor
Debbie Smith, Supervisor Jeff Whyte, Supervisor Chuck Zabrowski, Supervisor Toby Myers, Treasurer
Larry Gibson, and Clerk Polly Jensen. See attached list of others present

Jim Volbrecht stated the fire committee recommended a post frame on concrete.

The board discussed what they had learned about the advantages and disadvantages of a post frame
building.
Jim feel the town is only getting ½ the benefit with the above recommendation. With the posts in the ground
it will increase the wind resistance and places the building weight on the ground. The town will also save
$7700 in concrete and time of construction will decrease.
Don Hess from Midwest was present to answer question on the post treatment process.
Jeff Whyte talked to the owners of the building on Truax and all were happy with their post frame buildings.
Chuck Zabrowski is concerned that a post in the ground will be ok for 40-50 years. Don Hess says yes the
post will be ok
Toby Myers talked to builder of the Cornell fire station and he recommends a ladder frame but if the town
decides to go with a post frame he would place the post in the ground and tie the post into the concrete.
Ken Kruschke is convinced the posts won’t rot or contaminate the ground water. If the building is sitting on
a slab of concrete it is all floating as one.
Deb Smith was in favor of the post frame from the start, 1 ½ years ago. Deb is concerned with financial
responsiblility the board has to the town for the cost of the station. She believes this is the best building for
the money we have.
Jim Volbrecht called Jonathan Stone at the Fairchild fire station. Their station is a post frame in the ground
and was built 12 years ago. They have not sheathings and used interlocking fastners.
Jim Volbrecht made a motion to build the fire station using the post frame construction with the posts in the
ground and to rescind the ladder frame resolution approved earlier. Jeff Whyte seconded the motion.
Voting: Jim Volbrecht-yes, Jeff Whyte-yes, Deb Smith-yes, Toby Myers-yes, Chuck Zabrowski-yes
Resolution #10-2009-2010
Be it resolved that the Town Board of the Town of Union, Eau Claire County to build the fire station using
the post frame construction with the posts in the ground and to rescind the ladder frame resolution approved
earlier.
Offered: Volbrecht                                     Passed: May 28, 2009

Jim Volbrecht made a motion to have a steel roof with visible screw fasteners. Toby Myers seconded the
motion. Voting: Jim Volbrecht-yes, Jeff Whyte-yes, Deb Smith-yes, Toby Myers-yes, Chuck Zabrowski-yes
Resolution #11-2009-2010
Be it resolved that the Town Board of the Town of Union, Eau Claire County to have a steel roof with
visible screw fasteners.
Offered: Volbrecht                                  Passed: May 28, 2009

Jim Volbrecht made a motion to approve the addition of a mop sink, truck fills ½” between bay 1&2 and
Bay 3&4, and have owner installed water heaters. Jeff Whyte seconded the motion. Unanimously approved
Resolution #12-2009-2010
Be it resolved that the Town Board of the Town of Union, Eau Claire County to approve the addition of a
mop sink, truck fills 1½” pipe between bay 1&2 and Bay 3&4, and have owner installed water heaters.
Offered: Volbrecht                                  Passed: May 28, 2009

                                                       1
MMs in floor heat is most detailed will leave it in.
Specifications for bids – have line item bids very detailed.

Jim Volbrecht made a motion to approve steel sub ceiling in the offices, break room, and training room.
Chuck Zabrowski seconded the motion. Unanimously approved
Resolution #13-2009-2010
Be it resolved that the Town Board of the Town of Union, Eau Claire County to approve steel sub ceiling in
the offices, break room, and training room.
Offered: Volbrecht                                 Passed: May 28, 2009

Adjourn 7:15 PM