MN Guide Preliminary Engineer Report Checklist
Document Sample


Preliminary Engineer Report (PER) should address the following:
[Bulletins 1780-2, -3, -4, and -5]
Item Description Yes No
1. Project Planning Area:
A. Location.
B. Environmental Resources Present.
C. Growth Areas and Population
Trends.
2. Existing Facilities:
A. Location map.
B. History.
C. Condition of Facilities.
D. Financial Status of any Existing
Facilities.
3. Need for the Project:
A. Health.
B. Sanitary.
C. System Operation and Management
(O&M).
D. Growth.
4. Alternatives Considered:
A. Description.
B. Design criteria.
C. Map.
D. Environmental impacts.
E. Land requirements.
F. Construction problems.
G. Cost estimates.
H. Advantages/disadvantages.
5. Selection of an Alternative.
6. Present worth (Life cycle).
7. Project Design.
8. Total Project Cost Estimate.
9. Annual Operating Budget with
income based on 12-month
consecutive average of actual bills.
10. Was projected revenue well
documented with breakdown of
usage and identification of large
users?
11. O&M projections appear realistic.
12. Existing Proposed Other Debt
Repayments.
13. Reserves, O&M, Debt Service,
Rev. 1/05
Short-Lived Asset and additional
reserves.
14. Conclusions and Recommendations.
Rev. 1/05