PROJECT NAME

Document Sample
PROJECT NAME Powered By Docstoc
					        (PROJECT NAME)
               Bid Opening:
               (date & time)




PUBLIC WORKS DEPARTMENT
    602 S. Main Street, Joplin Missouri 64801
Phone: 417-624-0820 Ext. 530    FAX: 417-625-4738
                        TABLE OF CONTENTS

Notice to Contractors

Special Provisions

Proposal

City Contract

Performance Bond

Payment Bond

Wage Rates
            NOTICE TO CONTRACTORS
      Notice is hereby given that the Director of Public Works of the City of Joplin,
Missouri, will accept sealed bids for the following improvements in the City of Joplin,
Missouri:
                                  (PROJECT NAME)

        This work consists of construction of _________________________.                Plans
and specifications are on file in the office of the Director of Public Works located at City
Hall, 602 S. Main Street. Bids must be in the hands of said Director of Public Works
before 10:00 A.M. on the _____ day of _______, 20___ at which time will be opened by
the Director of Public Works at the Joplin City Hall, 602 S. Main Street, Joplin MO
64801 in the 4th Floor Conference Room.
        Specifications will follow 2005 City Standards. These standards can be
downloaded online at http://www.joplinmo.org/publicworks by clicking on the link at the
bottom of the page or may be picked up in person at 602 S. Main Street, 4 th floor
Engineering Department. Bona fide general contractors may secure copies of the
proposed Contract Documents from the office of the Director of Public Works.
        The wage rates applicable to this project have been predetermined as required
by law and are set forth in the construction specifications and are to be considered as a
part of this Notice to Contractors.
        Payment for this project will be made to the contractor in cash.
        A bid bond or certified check for five percent of the total bid amount must
accompany each bid. The successful bidder will be required to furnish an indemnity
bond in the amount of his bid and shall before entering on the work of said contract be
licensed as a contractor of the City of Joplin, Missouri. The Director of Public Works
reserves the right to reject any or all bids.
        The City of Joplin hereby notifies all bidders that it will affirmatively insure that in
any contract entered into pursuant to this advertisement, Disadvantaged Business
Enterprises will be afforded full opportunity to submit bids in response to this invitation
and will not be discriminated against on the grounds of race, color, sex, or national
origin in consideration for an award. Also, the contractor will be required to have an
approved Affirmative Action Program. Attention of bidders is particularly called to the
requirement that an Affirmative Action Program must be adopted by the contractor and
approved by the Affirmative Action Committee of the City of Joplin before the contract
may be executed.

                                            DAVID K. HERTZBERG, PE
                                            DIRECTOR OF PUBLIC WORKS

                          - END NOTICE TO CONTRACTORS -

PUBLISH JOPLIN GLOBE 5 DAYS: (LIST ALL FIVE DAYS)
                 SPECIAL PROVISIONS
                                 PROJECT:       (NAME OF PROJECT)

  1. The contractor will deposit with the City prior to release of the final payment of
     the following sums in cash:

     Engineering Fee:     Seven percent (7%) of total contract amount.
     Publications:        $1500.00

     The above fees are identified as separate bid items in the proposal and are paid
     to the Department of Public Works during the progress of the work

  2. Wage rates for this project shall be in accordance with wage rate determination
     made by the Missouri Department of Labor and Industrial Relations on file in the
     Department of Public Works.

  3. Contractors are cautioned that unbalanced bids can be rejected.

  4. The City will issue a notice to proceed after the signing of the contract.

  5. All work shall be in accordance with the City of Joplin Standard Specifications
     unless otherwise noted.

  6. (LIST ALL OTHER SPECIFICATIONS THAT APPLY TO THE PROJECT)




DIVISION OF ENGINEERING
DEPARTMENT OF PUBLIC WORKS
                                         PROPOSAL
THE UNDERSIGNED hereby proposes to furnish the labor and material for:

                                      (PROJECT NAME)

in the City of Joplin, Missouri, according to Estimate No_____, Plan No. _____, and the general
specifications for such work on file in the office of the City Engineer and Director of Public
Works, together with the terms and conditions to be stipulated in the general contract forms, now
adopted by the City of Joplin, as advertised to be let on the ______ day of _____, 20___, at the
following prices to-wit:
                 ITEM                 QTY         UNIT         UNIT PRICE            TOTAL
 1                                    100          SY
 2                                    100          EA
 3                                     1           LS
                                                               SUB TOTAL
                                                      7% ENGINEERING FEE
                                                         PUBLICATION FEE            $1500.00
                                                          PROJECT TOTAL
The undersigned agrees to enter into a contract within fifteen (10) days from notice of award
should this proposal be accepted, and enter into bonds with good and sufficient securities, to
complete this work within _____(written)________ (Numeric) calendar days. A penalty of
______________ Dollars ($_______) per calendar day thereafter shall be instituted, the amount
to be deducted from the contract price. In order to pay all labor employed and material used in
connection with this work and to adjust all claims or liens that may arise in consequence of said
work, to the satisfaction of the Director of Public Works, above said bonds shall also indemnify
and save harmless the said City from all damages or injuries to any person or persons, either in
the employ of the contractor, his agents, servants or employees. In the event of the failure of the
undersigned to enter into such contract within ten days of the award, then the deposit or certified
check of five percent (5%) of the total bid amount as surety is therefor forfeited to the City of
Joplin.

Dated _________ day of _______________________, 20_____.

COMPANY _______________________________________________

Address _____________________________________________________________________

Signature ______________________________________________

(Print Name) ___________________________________________
                               CITY CONTRACT NO. _______

       THIS CONTRACT, made and entered this ______ day of ________________, 20___,
by and between the City of Joplin, A Municipal Corporation, Party of the First Part, And

                                         CONTRACTOR
                                            Address

Contractor, Party of the Second Part,

     WITNESSETH: The said party of the second part hereby agrees with said party of
     the first part to furnish at his own cost and expense all labor, material, machinery,
     plant equipment, transportation and other things that may be required therefore and
     to do the work in a first-class and workmanlike manner, and to pay for all labor and
     material, and settle all damages and judgments by reason of negligence or
     unauthorized acts of themselves, agents or employees, and execute in connection
     herewith      a     good      and    sufficient  bond     in     the    amount     of
     ___________________________________________AND                 NO/100      DOLLARS
     ($____________); approved by the proper officer, as a guarantee to said City for:


                                              PROJECT

And to perform the same in accordance with specifications and all the provisions of the Joplin
City Code of 1998, as amended, and according to the City Engineer's Plan No_______ and
Estimate No. ________ on file in the office of the Director of Public Works. All of which are by
reference made and part of this contract and to perform said work for the following prices to-wit:

                  ITEM                  QTY       UNIT        UNIT PRICE            TOTAL
 1                                      100        SY
 2                                      100        EA
 3                                       1         LS
                                                               SUB TOTAL
                                                      7% ENGINEERING FEE
                                                         PUBLICATION FEE           $1500.00
                                                          PROJECT TOTAL
     It is stipulated that not less than the prevailing hourly rate of wages as found by the
     Department of Labor and Industrial Relations of the State of Missouri shall be paid to all
     workmen performing work under this contract. In the event that the second party fails to pay
     each workman a sum equal to the stipulated prevailing wage rates, the second party shall pay
     unto the City as a penalty, the sum of ten dollars ($10.00) per day for each workman who is
     paid less than such stipulated rate for work done under this contract.
     The Director of Public Works shall give the party of the second part notice in writing to
     commence said work, and the same shall be completed on or within __________ ( )
     calendar days after commencing work on the project. Should the party of the second part fail
     to complete said work on or before said date or such additional time allowed by the said date
   or such party of the first part, a penalty of ___________________AND ___0/100 DOLLARS
   ($__________) per calendar day shall be deducted from the contract amount until said work
   is completed to the satisfaction of the Director of Public Works.

          The second party agrees to keep posted in a prominent and easily accessible place at the
site where the work is being performed, by it or each sub-contractor, a clearly legible statement
of all prevailing wages pertaining to workmen engaged in the performance of this contract.

       It is further stipulated that the second party will produce records of the wages paid to
workmen employed in construction under this contract for the inspection of the Director of
Public Works or members of his department.

        It is further stipulated and agreed that before final payment is made or tax bills finally
issued, that the second party provide an affidavit to the first party, stating that under this contract
he has fully complied with the prevailing wage law.

        Upon completion of the work in accordance with the terms and conditions herein, party
of the second part hereby agrees to pay to the Department of Public Works a sum equal to seven
percent (7%) of the price of said work to reimburse the party of the first part for the cost of
engineering, the sum of $800.00 for the cost of publications, the sum of $00.00 for the cost of
abstracting and the sum of $00.00 for the cost of preparing tax bills.

        And when the work embraced in this contract is fully completed agreeable to the
specifications and stipulations thereof and accepted by said City and upon certification to the
Director of Finance, the contractor will be paid in cash.

        IN WITNESS WHEREOF, the said City of Joplin, acting by and through the Director of
Public Works, and the said party of the second part, having subscribed these presents the day and
year first above written.
                                             CITY OF JOPLIN

                                               By _____________________________________
                                                     Party of the First Part

                                               (CONTRACTOR)

Approved as to form this ________ day

of _________________________, 20___.
                                               By _____________________________________
                                                        Party of the Second Part
_________________________________
Brian W. Head, City Attorney                      Federal ID No._________________________
                      CONTRACTOR'S BOND NO. _____ (contract number)
                                      FOR CITY CONTRACTS

                                     PERFORMANCE BOND

KNOW ALL PERSONS BY THESE PRESENTS: That

                                             CONTRACTOR
                                               Address

a Corporation, hereinafter called Principal, and

____________________________________________________________________________
                                    (Name of Surety)

____________________________________________________________________________
                                   (Address of Surety)

hereinafter called Surety, are held and firmly bound unto

                                    THE CITY OF JOPLIN, MISSOURI
                                602 S. MAIN STREET, JOPLIN, MO 64801

hereinafter     called      OWNER,          in      the     total   aggregate       penal      sum       of
_________________________________ AND ____/100 DOLLARS ($_______________)
lawful money of the United States, for the payment of which sum well and truly to be made, we bind
ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by
these presents.

THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain contract
with the OWNER, dated the ______ day of _________________, 20____, a copy of which is hereto
attached and made a part hereof for the construction of:

                                                   PROJECT

NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings,
covenants, terms, conditions, and agreements of said contract during the original term thereof, or any
extensions thereof, which may be granted by the OWNER, with or with-out notice to the SURETY and
during the one year guaranty period and if the PRINCIPAL shall satisfy all claims and demands incurred
under such contract, and shall fully indemnify and save harmless the OWNER from all costs and damages
which it may suffer by reason of failure to do so, and shall reimburse and repay the OWNER all outlay and
expense which the OWNER may incur in making good any default, then this obligation shall be void,
otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said SURETY, for value received hereby stipulates and agrees that no
change, extension of time, alteration or addition to the terms of the contract or to WORK to be performed
thereunder or the SPECIFICATIONS accompanying same shall in any way affect its obligation on this
BOND, and it does hereby waive notice of any such change, extension of time, alteration or addition to the
terms of the contract or to the WORK or to the SPECIFICATIONS.

PROVIDED, FURTHER, that it is expressly agreed that the BOND shall be deemed amended automatically
and immediately, without formal and separate amendments hereto, upon amendment of the Contract not
increasing the contract price more than 20 percent, so as to bind the PRINCIPAL and the SURETY to the
full and faithful performance of the CONTRACT as so amended. The term “Amendment”, wherever used in
this BOND, and whether referring to this BOND, the Contract or the Loan Documents shall include any
alteration, addition, extension, or modification of any character whatsoever.

IN WITNESS, whereof, this the ________ day of ____________________, 20____.

ATTEST:           (SEAL)


_________________________________                        __________________________________
              Secretary                                                 Principal

Approved as to form this _________ day

of ________________________, 20____.                     By _______________________________


_________________________________                        By _______________________________
           City Attorney

ATTEST:       (SEAL)


_________________________________                        __________________________________
              Secretary                                                  Surety

Approved this _______________ day of

_________________________, 20_____.                      By _______________________________


_________________________________                        By _______________________________
         Director of Finance                                       (Title)
NOTE: Date of BOND must not be prior to date of Contract.

         If CONTRACTOR is partnership, all partners should execute BOND.
IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department’s most
current list (Circular 570 as amended) and be authorized to transact business in the state where the Project
is located.
                       CONTRACTOR’S BOND NO. ________ (contract #)
                                FOR CITY CONTRACTS

                                             PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS: That

                                               CONTRACTOR
                                                 Address
a Corporation, hereinafter called Principal, and

____________________________________________________________________________
                                    (Name of Surety)

hereinafter called Surety, are held and firmly bound unto

                                     THE CITY OF JOPLIN, MISSOURI
                                 602 S. MAIN STREET, JOPLIN, MO 64801

hereinafter called OWNER, and unto all persons, firms, and corporations who or which may furnish labor,
or who furnish materials to perform as described under the contract and to their successors and assigns in
the total aggregate penal sum of ______________________________ AND ____/100
DOLLARS ($_______________) in lawful money of the United States, for the payment of which sum
well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and
assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION is such that whereas, the principal entered into a certain contract
with the OWNER, dated the __________ day of ________________, 20___, a copy of which is hereto
attached and made a part hereof for the construction of:

                                                   PROJECT

NOW, THEREFORE, if the PRINCIPAL shall promptly make payment to all persons, firms, subcontractors,
and corporations furnishing materials for or performing labor in the prosecution of the WORK provided for in
such contract, and any authorized extensions or modification thereof, including all amounts due for
materials, lubricants, oil, gasoline, coal or coke, repairs on machinery, equipment and tools, consumed or
used in connection with the construction of such WORK, all insurance premiums on said work, and for all
labor cost incurred in such WORK including the stipulation in said contract requiring the payment of not
less than the prevailing hourly rate of wages as found by the Department of Labor and Industrial Relations
of the State of Missouri or by final judicial determination of the Courts of the State of Missouri, including that
by a SUBCONTRACTOR, and to any mechanic or material man lien holder whether it acquires its lien by
operation of State or Federal law; then this obligation shall be void, otherwise to remain in full force and
effect.
PROVIDED, that beneficiaries or claimants hereunder shall be limited to the SUBCON- TRACTORS, any
persons, firms, and corporations having a direct contract with the PRINCIPAL or its SUBCONTRACTORS.

PROVIDED, FURTHER, that the said SURETY for value received hereby stipulates and agrees that no
change, extension of time, alteration or addition to the terms of the contract or to the WORK to be
performed thereunder or the SPECIFICATIONS accompanying the same shall in any way affect its
obligation on this BOND, and it does hereby waive notice of any such change, extension of time, alteration
or addition to the terms of this contract or to the WORK or to the SPECIFICATIONS.

PROVIDED, FURTHER, that no suit or action shall be commended hereunder by any claimant:
(a) Unless claimant, other than one having a direct contract with the PRINCIPAL, shall have
given written notice to any two of the following: The PRINCIPAL, the OWNER, or the
SURETY above named within ninety (90) days after such claimant did or performed the last of
the work or labor, or furnished the last of the materials for which said claim is made, stating with
substantial accuracy the amount claimed and the name of the party to whom the materials were
furnished, or for whom the work or labor was done or performed. Such notice shall be served by
mailing the same by registered mail or certified mail, postage prepaid, in an envelope addressed
to the PRINCIPAL, OWNER, or SURETY, at any place where an office is regularly maintained
for the transaction of business, or served in any manner in which legal process may be served in
the state in which the aforesaid project is located, save that such service need to be made by a
public officer. (b) After the expiration of one (1) year following the date of which PRINCIPAL
ceased work on said CONTRACT, it being understood, however, that if any limitation embodied
in the BOND is prohibited by any law controlling the construction thereof, such limitation shall
be deemed to be amended so as to be equal to the minimum period of limitation permitted by
such law.

PROVIDED, FURTHER, that it is expressly agreed that this BOND shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, upon amendment to the
Contract not increasing the contract price more than 20 percent, so as to bind the PRINCIPAL and the
SURETY to the full and faithful performance of the Contract as so amended. The term "Amendment",
wherever used in this BOND and whether referring to this BOND, the contract or the loan documents shall
include any alteration, addition, extension or modification of any character whatsoever.
PROVIDED, FURTHER, that no final settlement between the OWNER and the CONTRACTOR shall
abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
IN WITNESS, whereof, this the ______ day of ________________, 20____.

ATTEST:           (SEAL)


______________________________________                    _________________________________
           Secretary                                      Principal

Approved as to form this __________ day
of _________________________, 20____.                 By _________________________________

___________________________________                   By _________________________________
           City Attorney


ATTEST:           (SEAL)


___________________________________                   ____________________________________
              Secretary                                             Surety

Approved this _________________ day of

____________________________, 20____.                 By _________________________________


___________________________________                  By _________________________________
         Director of Finance                                      (Title)

NOTE: Date of BOND must not be prior to date of Contract.

         If CONTRACTOR is partnership, all partners should execute BOND.
IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most
current list (Circular 570 as amended) and be authorized to transact business in the state where the Project
is located.
(Insert newest annual wage order, about 17 pages, for either
Jasper or Newton Counties, or both if that applies to the project.)

Contact Barbara Mitchell, Sr. Clerk in the engineering department
at 624-0820 extension 536 for the wage determinations. Or you
may go on line at:
      www.dolir.mo.gov/ls/prevailingwage/annual_wage.asp

If there is over 5% unemployement (web site will tell you) you
must also insert the following before the wage order and add to
specifications of project:

        PREVAILING WAGE NOTICE OF EXCESSIVE UNEMPLOYMENT

                       *** IN EFFECT AS OF _______________

Only Missouri laborers and laborers from nonrestrictive states are allowed by law to be
employed on Missouri’s public works projects when the unemployment rate exceeds 5% for
two consecutive months. (See Sections 290.550 through 290.580 RSMo.) The
unemployment rate has exceeded 5% for the past two months. Therefore, this statute is in
effect and will remain in effect as long as this notice is posted. For questions call (573) 751-
3403 extension 0 or to view the statute go to
http://www.moga.state.mo.us/statutes/C290.HTM.

Nonrestrictive states are as follows: Arkansas, Colorado, Georgia, Hawaii, Indiana, Kansas,
Kentucky, Louisiana, Nebraska, New Hampshire, Maryland, Michigan, Minnesota, New
Mexico, New Jersey, New York, North Carolina, Ohio, Oregon, Rhode Island, South Carolina,
Tennessee, Texas, Utah, Vermont, Virginia, Washington, West Virginia and Wisconsin.

				