  HVSIA 2nd meeting
  24 -26 August 2005
   Gauteng Department of Public Transport, Roads and Works

HVSIAmeeting.24-26August2005                Gautrans HVS Programme. Elzbieta Sadzik
      HVS Programme 2003- 2005

      Concrete pavements
      Cold in situ recycling with ET & FT
      Pavement - vehicle interaction




HVSIAmeeting.24-26August2005         Gautrans HVS Programme. Elzbieta Sadzik
           Concrete Roads in South
                    Africa




HVSIAmeeting.24-26August2005   Gautrans HVS Programme. Elzbieta Sadzik
                 Concrete Pavements
Objectives (Hilton off N3)
   Investigate the influence of the environment
   and load on joint deterioration (improve cncPave)
     •   Plain aggregate interlock joints
     •   Doweled joints
     •   On 2 aggregate types




HVSIAmeeting.24-26August2005                Gautrans HVS Programme. Elzbieta Sadzik
                   Concrete Pavements
 Conclusions (Hilton off N3):
      Harder aggregate results in better long term
      performance
      Crack width depends on shrinkage but temp
      and humidity are crucial
      Load transfer through dowels shows a small
      change with loading
      Good bond between sub base and slab
      improves performance
      Void underneath the slab is a function of
      deflection, load transfer at the joint and
      erodibility of sub base
HVSIAmeeting.24-26August2005        Gautrans HVS Programme. Elzbieta Sadzik
                 Concrete Pavements
Objectives (N3)
    Determine the remaining life of the CRC inlay
      •   Crack progression
      •   Development of punch-outs

Deliverable
    Improved cncPave – Mechanistic and risk
    based design method for concrete pavements




HVSIAmeeting.24-26August2005          Gautrans HVS Programme. Elzbieta Sadzik
                   Concrete Pavements
Objectives
    To evaluate the structural performance of
    Contec – Ferroplan® (Heidelberg Traffic control
    station)
      •   On top of a weak support (deflection on Asphalt = 1.2mm)
      •   On top of a medium support (deflection on Asphalt = 0.6mm)
      •   On top of strong support (deflection on Asphalt = 0.3mm)




HVSIAmeeting.24-26August2005                     Gautrans HVS Programme. Elzbieta Sadzik
                  Construction of Ferroplan
                               (SANRAL project)
                                                     Structure:
                                                      35mm Ferroplan
                                                      25mm Asphalt




HVSIAmeeting.24-26August2005                  Gautrans HVS Programme. Elzbieta Sadzik
                      Cold in situ recycling
 Objective:
      Guidelines for Stabilisation with Bituminous
      Emulsion and Foam
        •   Mix design
        •   Structural design
        •   Construction issues




HVSIAmeeting.24-26August2005           Gautrans HVS Programme. Elzbieta Sadzik
                      Cold in situ recycling
 Investigations on ET and FT:
      Compaction potential of foam and emulsion
      treated materials
      Property of emulsion treated crushed stone
      and aeolian sand
      Accelerated curing methods for foam and
      emulsion treated materials
      Establishment and monitoring of LTPP
      sections

HVSIAmeeting.24-26August2005           Gautrans HVS Programme. Elzbieta Sadzik
                  Cold in situ recycling
 Objectives (N12 ET crushed stone base)
     Determine the failure mechanism
     Determine the load equivalence for the test section.
     Determine the reasons for the good performance of the
     section.




HVSIAmeeting.24-26August2005            Gautrans HVS Programme. Elzbieta Sadzik
               Cold in Situ Recycling
Findings (N12 ET crushed stone base)
   Very good pavement structure - Up to 34 million E80s
   Only limited failure during prolonged wet phase
   Original road showed good performance over 30 years
   – 11.5 million E80s
                                        13.2 bitumen rubber seal
   Bottom line:                         50 continuously graded asphalt
     •   Deep pavement
                                                135 emulsion treated crushed stone base
     •   Strong supporting layers
     •   Well protected by the surfacing        150/137 cement stabilized gravel subbase


                                                300/332 selected subgrade


                                                659 pavement depth

HVSIAmeeting.24-26August2005                     Gautrans HVS Programme. Elzbieta Sadzik
             Pavement-vehicle interaction
 Stress in motion (SIM) measurements
   Improved understanding of vehicle contact
   stresses and strains
   Application in HVS testing and pavement
   design




HVSIAmeeting.24-26August2005      Gautrans HVS Programme. Elzbieta Sadzik
        Pavement-vehicle interaction

Conclusions (SIM) measurements
   Vertical contact stress ≠ tyre inflation pressure
   AMVCS is 1.2 to 2.58 times greater than tyre
   inflation pressure




HVSIAmeeting.24-26August2005        Gautrans HVS Programme. Elzbieta Sadzik
             HVS Programme management

   Gautrans APT Strategic Plan 2004 –2007
   Quantification of HVS benefits
     •   Methodology
     •   Pilot assessment (G1 base)
   Summary of HVS tests since 1995
   QMS for HVS operation (ISO 9001)
     •   Procedures / protocols / records
     •   Task / responsibility matrix




HVSIAmeeting.24-26August2005                Gautrans HVS Programme. Elzbieta Sadzik
              Strategic Plan 2004 –2007
 Focus areas
      Cold In-Place Recycling (ET & FT)
      Asphalt Performance
      Provision of Low Volume Roads (including
      upgrading of unpaved roads)
      Vehicle Pavement Interaction (including
      dynamic loads and contact stresses)
      Concrete pavements



HVSIAmeeting.24-26August2005       Gautrans HVS Programme. Elzbieta Sadzik
              Strategic Plan 2004 –2007

 HVS action plan
        Performance of Hot Mix Asphalt
        •   Development of a product certification system
            for the evaluation of “fitness-for purpose” of
            proprietary ultra-thin asphalt wearing
            courses; and




HVSIAmeeting.24-26August2005              Gautrans HVS Programme. Elzbieta Sadzik
              Strategic Plan 2004 –2007
 HVS action plan
      Performance of Hot Mix Asphalt
 The validation of the South African HMA
  design and development of specifications.




HVSIAmeeting.24-26August2005       Gautrans HVS Programme. Elzbieta Sadzik
                              Gautrans HVS reports
TITLE                                                             REPORT NO.       AUTHOR            APPROVED         SUBMITTED
Strategic document                                                ?                L Sampson         August 2004      August 2004
                                                                                   F Long
Laboratory testing for the HVS Test Sections on the N7 (TR11/1)   CR-2003/56                         November 2004    November 2004
                                                                                   D Ventura
2nd Level Analysis of the HVS Data for the Southbound                              F Long
                                                                  CR-2004/12                         November 2004    November 2004
      Carriageway of the N7 (TR11/1) HVS                                           A C Brink
Mechanistic-Empirical Structural Design Models for Emulsified                      F Long
                                                                  CR-2003/44                         November 2004    November 2004
    Bitumen Treated Materials                                                      H Theyse
                                                                                   W Steyn,
HVS Summary of tests                                              CR-2004/40       H Theyse,         November 2004    November 2004
                                                                                   A Brink
Curing: Phase 1                                                   CR-2004/55       S Kekwick         November 2004    November 2004
S12: Phase 1                                                      CR-2004/54       D Jones           November 2004    November 2004

                                                                  TR-2002/22       B Morton/
HVS data management protocol                                                                         June 2003        June 2003
                                                                      (conf)       D Jones

1st Level Analysis Report: N7 Western Cape fast lane (CS)         CR-2003/60       H Theyse          February 2005    February 2005
A comparison of the properties of new and recycled crushed
                                                                  CR-2004/04       H Theyse          February 2005    February 2005
     hornfels from the Western Cape
MMLS Testing in Comparison to HVS Testing on Trunk Road 11        ITT Report
                                                                                   L Ebels           May 2005         June 2005
   Section 1 - Malmesburry to National Route 1                         2/2003

HVSIA Matrix                                                      CD and website   R Castelyn        May 2005         May 2005

HVS testing of N12 East Section 2 – March 2005: pre-Level 1
                                                                  CR-2005/13       W Steyn           May 2005         May 2005
    report (NOT ON WEBSITE -ONLY INTERIM REPORT)


  HVSIAmeeting.24-26August2005                                                               Gautrans HVS Programme. Elzbieta Sadzik
                                Gautrans HVS reports
TITLE                                                                 REPORT NO.   AUTHOR          APPROVED      SUBMITTED

Establishment of two LTPP experiments in association with HVS
                                                                      CR-2005/03   D Jones         May 2005      May 2005
     tests on Road D2388 in Gauteng
Establishment of an LTPP experiment in association with HVS
                                                                      CR-2005/04   D Jones         May 2005      May 2005
     tests on Road P243/1 in Gauteng
Initial monitoring of the LTPP experiment in association with HVS
                                                                      CR-2005/06   D Jones         May 2005      May 2005
       tests on Road P243/1 in Gauteng
Initial monitoring of the LTPP experiments in association with
                                                                      CR-2005/05   D Jones         May 2005      May 2005
       HVS tests on Road D2388 in Gauteng
First Level Analysis report: HVS Testing of the concrete test                      AC Brink
                                                                      CR-2004/43                   May 2005      July 2005
      sections on the N3 near Hilton: Tests 421A5 to 423A5                         L du Plessis
First Level Analysis report: HVS Testing of the concrete inlay test
                                                                      CR-2004/59   L du Plessis    May 2005      July 2005
      sections on the N3 near Hilton: Test 424A5.
Concrete pavement research. Construction report: CR-2004/33.
    HVS testing of the concrete test sections on the N3 near          CR-2004/33   AC Brink        May 2005      July 2005
    Hilton. Version: Final

Second level analysis of Hilton concrete sections                     NA           P Strauss       May 2005      July 2005

                                                                                   F Jooste &
Assessment of Gautrans HVS programme benefits                         NA                           July 2005     July 2005
                                                                                   L Sampson
The economic benefits of HVS development work on G1 base                           F Jooste &
                                                                      NA                           July 2005     July 2005
     pavements                                                                     L Sampson

SIM-HVS report                                                        CR-2005/07   M de Beer       June 2005     July 2005

LVR test in WC                                                        CR-2004/36   H Theyse        July 2005     July 2005


  HVSIAmeeting.24-26August2005                                                        Gautrans HVS Programme. Elzbieta Sadzik
     Gautrans HVS reports available on