; TITLE OF PROJECT
Documents
Resources
Learning Center
Upload
Plans & pricing Sign in
Sign Out
Your Federal Quarterly Tax Payments are due April 15th Get Help Now >>

TITLE OF PROJECT

VIEWS: 3 PAGES: 13

  • pg 1
									                 TITLE OF PROJECT



                            Submitted by:

                      < Name > -IT- < Roll No. >


Project report submitted in partial fulfillment of the requirements for
the degree of Bachelor of engineering in Information Technology,
M.D. University, Rohtak (Haryana).




DEPARTMENT OF INFORMATION TECHNOLOGY
CAREER INSTITUTE OF TECHNOLOGY AND MANAGEMENT
ARAVALLI HILLS,FARIDABAD(HARYANA-INDIA)


                       JUNE-JULY, 2009
           < The       Companies Letter Head >
(Note: Don’t file this in Project File. You keep the original & a
                       photocopy is to be submitted.)


                                CERTIFICATE



This is to certify that the project report entitled “ Project Title “ by Name in partial
fulfillment of the requirements for the award of degree of Bachelor of Engineering in
Information Technology of M.D. University, Rohtak (Haryana) is a record of bonafide
work carried out by him in this department of information technology         under my
supervision & guidance and has not been submitted any where else for any other
purpose.




HOD „s name and sign
                                                                supervisors name and sign
                                                                  Mr. Name of Supervisor
                                                                       (project guide)




Date and seal :
                        ACKNOWLEDGEMENT



I express my deep sense of gratitude to Mr. Name of Supervisor
In the part of my study curriculum and in-class guidance I am indebt to all of my faculties
who has shared their knowledge and strengthen my conceptual framework in all the
subjects I have gone through in INFORMATION TECHNOLOGY. Without their
guidance it would not be any possible to design any strategic plan or taking any strategic
decisions. The Project has given me a full exposure of the theoretical part, which has
been effectively followed in the practical part in an organization.
                               DECLARATION



The Final Project on “Project Title” under the guidance of Mr Name of Supervisor is
the original work done by me. This is the property of the Institute and use of this report
without prior permission of the Institute will be considered illegal and actionable.




DATE:
PLACE:




                                                             < your Name>
                                                              <Roll no.>
                                                              B.E (I.T) 6TH SEM
                                                              C.I.T.M, FARIDABAD
                                     ABSTRACT

This project “A.I.R. Feedback System and Who‟s Who Management System” mainly
aimes at creating a user interactive system through which the information input by any
user could be put automatically into the created database through the use of PHP and
MYSQL.
The methodology used to create such a system is to use PHP which requires Apache web
server and thus the dynamic web pages created using PHP are made user interactive. The
values can be accessed from these web pages and stored automatically in the linked
database created by usind MySQL.
The outcome of this project is that the values filled in by the user in the form are accessed
using PHP super globals. Thus the system can take user‟s feedback and store their
information in the database in the form of records. Also the Who‟s Who Management
System enables the creation, deletion and updation of the record through easy services
provided at the user end.
                             TABLE OF CONTENTS


CONTENTS                                             PAGE
Certificate                                        i
Acknowledgement                                   ii
Abstract                                         iii
About <Project>                                  iv
1. Introduction                                  1

 1.1 Objectives                                  3
 1.2 Advantages                                  3
2. System Analysis                               4

 2.1 Software and Hardware requirements          4
 2.2 Feasibility Study                       4
3. System Design                                 6

 3.1 Modules (description)                       6

4. System Implementation                     10

 4.1 Working of the system                   10
 4.2 Source code                             21
5. Database commands                         59
6. Output                                    75
7.Conclusion and future scope                99
References
                              1. INTRODUCTION



                                      Introduction

About Project



TESTS AND ASSIGNMENTS MANAGAMENT SYSTEM is a website for managing
the Tests and assignments of an institute in a centralized manner such that it is accessible
for updating and accessing any time any where. The website for this system has been
designed using PHP as the programming language and MySQL for the database end.




About XAMPP


XAMPP is a free and open source web server package. It mainly consists of the Apache
HTTP Server, MySQL database and interpreters for scripts written in PHP.
XAMPP can be downloaded and installed for creating a localhost server on ones
computer which interprets scripts written in PHP. It also has a very useful application
called PHP MyAdmin which allows management of MySQL databases.




About PHP
PHP is a powerful tool for making dynamic and interactive Web pages.


It can be embedded into HTML and generally runs on a web server, which needs to be
configured to process PHP code and create web page content from it. It can be deployed
on most web servers and on almost every operating system and platform free of charge.


PHP scripts will be compiled at runtime by the PHP engine, which increases their
execution speed. PHP scripts are able to be compiled before runtime using PHP
compilers as with other programming languages such as C (the language PHP and its
extensions are written in).




About MySQL


The MySQL® database has become the world's most popular open source database because of
its consistent fast performance, high reliability and ease of use. It's used by individual Web
developers as well as many of the world's largest and fastest-growing organizations to save
time and money powering their high-volume Web sites, business-critical systems and
packaged software -- including industry leaders such as Yahoo!, Alcatel-Lucent, Google, Nokia,
YouTube, and Zappos.com.

Not only is MySQL the world's most popular open source database, it's also become the
database of choice for a new generation of applications built on the LAMP stack (Linux,
Apache, MySQL, PHP / Perl / Python.) MySQL runs on more than 20 platforms including Linux,
Windows, OS/X, HP-UX, AIX, Netware, giving you the kind of flexibility that puts you in
control.

Whether you're new to database technology or an experienced developer or DBA, MySQL
offers a comprehensive range of certified software, support, training and consulting to make
you successful.
1.1 OBJECTIVES



1. Managing the Tests and Assignments of an institute.


2. Allowing the students and teacher to carry out speedy and efficient search for a
   particular assignment or a set of assignments.


3. Allowing control to administrator over which Tests and Assignments are to be shown
   to students and which are to be kept hidden.


4. High functionality and flexibility in terms of allowing administrator to add, delete and
   update any table of the database.


5. Allowing addition of multiple attachments to the assignments and test.


6. Having a robust login system.


7. Efficient error handling during insertion of data to database.


8. Allowing an assignment or test to be categorized under multiple topics of a subject.


9. A centralized storage for all tests and assignments.


10. Creating a secure, easy to access and lasting storage system for the tests and
   assignments.
1.2 ADVANTAGES

  1. Centralized storage of Tests and Assignments.

  2. Secure and lasting means of storage.

  3. Easy to access by using a well equiped search.

  4. The website is easy to use and can be implemented across any web browsers.

  5. Provides any time any where access.

  6. Provides high functionality to the Administrator through an exhaustive Control
     Panel.
                      2. SYSTEM ANALYSIS


This section mainly comprises of the hardware and software requirements for the
successful completion of the project. The following are the required hardware and
software:

2.1 HARDWARE & SOFTWARE REQUIREMENTS

1. HARDWARE REQUIREMENTS:

      A Pentium4 PC with minimum 512MB of RAM(preferred 1 GB)

      Hard disk space of about 50MBfor project and 5 GB for the software storage.

      1.6GHZ OR higher Pentium processor




2. SOFTWARE REQUIREMENTS:

      XAMPP installation for Apache and MySQL.

      A PHP IDE- such as zend studio or eclipse.

      Browser installed.

      An Internet Connection.
2.2 FEASIBILITY STUDY:

 This phase is carried out to assess whether software project is technically and
economically viable. It involves following steps :-

           Problem is defined

           Determination of technical and economical viability

           Study of alternative solutions to attempt the problem, a cost/benefit analysis
            is done

           A layout or plan is prepared to get the project executed, scope of all phases is
            determined

    Feasibility is the likelihood that the system will be useful to the organization.
    Following feasible factors are studied during feasibility study :-

           Technical Feasibility – Its purpose is to gain an understanding of the
            organizational ability to construct the proposed system. It is a measure of
            specific technical solution and availability of technical resources and
            expertise.

           Operational Feasibility – It is the measure of how well the solution will work
            in the organization. It is also a measure of how people feel about the system
            or project. It is the willingness and ability of the management, employees,
            customers, suppliers and others to operate, use and support a proposed
            system.

           Organisational Feasibility - It is likelihood that the project attained the
            desired objectives.

           Scheduled Feasibility – It is the measure of how responsible the project
            timetable is.
                            3. SYSTEM DESIGN


This section of the project involves the division of project in some modules or parts
thus making the presentation of the project clear and easily understandable. We have
discussed below various modules and part of project they contain.



3.1 MODULES (description)

								
To top