Procedure For Submission Of Building Plan And Occupation Permit

Reviews
Shared by: IanKnott
Stats
views:
86
rating:
not rated
reviews:
0
posted:
6/18/2009
language:
English
pages:
0
SUBMISSION OF BUILDING PLAN Building Plan must be submitted by qualified person. “Qualified Person” as defined under the Sarawak Building Ordinance 1994 are Registered Architect, Engineer and Registered Building Draughtsman. Note: If the application is submitted by the Architect, Engineer or Registered Draughtsman, please ensure that:(a) Form for the application of OP must be submitted by the Architect, Engineer or Registered Draughtsman to ensure that the building has been completed in accordance with the approved plan. To obtain all certificate of completion from the agencies involved. Registration fee had been paid. To complete application form (forms can be obtained from Plan Counter, Building and Landscaping Division, 1st Floor, Dewan Bandaraya Kuching Selatan). Attention Under By-Law 24 of the Sarawak Building Ordinance 1994 which states:No person shall occupy or permit to be occupied any building or any part thereof unless an occupation permit, a partial occupation permit or a temporary occupation permit has been issued under these By-Laws for such building and any failure to comply with this By-Law shall render such person guilty of an offence: Penalty, a fine of RM10,000.00 and in the case of a continuing offence to a further fine of RM300.00 per day during which the offence is continued after notice to cease occupying the building has been issued on such person. For enquiries, please contact:Building and Landscaping Division, Council of the City of Kuching South, 1st Floor, Jalan Padungan, 93675 KUCHING. Tel: 082-242311 Ext. 188 FLOW CHART FOR THE PROCEDURE OF BUILDING PLANS SUBMISSION START Types Of Plans That Can Be Submitted Registered Architect – Any building plan except where there is engineering works such as reinforced concrete detail or other structural works. Registered Engineer - Any Engineering Plan. Registered Building Draughtsman – Only for Building Plan that is endorsed on his certificate (limitation of floor area) issued by the Board of Architect Malaysia. (b) (c) (d) Procedure For Submission Of Building Plan And Occupation Permit Prosedur Mengemukakan Pelan Bangunan Dan Permit Menduduki [OP] Method Of Application Building owner must appoint a Qualified Person as consultant to submit the necessary documents together with the Building Plan as mentioned below:(a) (b) (c) (d) (e) (f) Letter of authorization on appointment as consultant. Sign copy of the building application form. Photocopy of the land title. Name and address of the owner and consultant to be stated on the drawings and to be endorsed by them. A copy of approved land subdivision plan. To pay processing fee. AGENCIES INVOLVED IN THE APPROVAL OF BUILDING PLAN Note: Registration fees can be paid at 1st Floor, Building and Landscaping Division. Approving Agencies Within M.B.K.S. Building and Landscaping Division Engineering Division Public Health Division Licensing Division Resubmission Other Approving Agencies Fire and Rescue Service Department Land and Survey Department 1 Building plan submitted to Council Land And Survey Department Under the Ordinance, building plan submitted to the Council has to be referred to Land & Survey Department for comment and recommendation. METHOD TO APPLY Upon completion, application forms (Forms E & F) must be submitted to the City Architect, Building & Landscaping Division, 1st Floor, Dewan Bandaraya Kuching Selatan. An inspection will be arranged to check whether that the building has been completed in accordance with the approved plan. As for Commercial, Industrial, Flats and Condominium, the Fire and Rescue Service Department is also required to inspect the building. Occupation Permit will only be issued when Building Section, Engineering Division, Public Health Division, Licensing Division and Fire and Rescue Service Department have no objections. Decision accepted by applicant? 2 4 Application appeal to Ministry in writing Fire And Rescue Service Department Commercial, Industrial, Flat and Condominium, the plan has to be referred to Fire and Rescue Service Department for comment and approval. 6 Plans referred to:1. L & S Dept. 2. Fire Dept. (where relevant) 3. Building & Landscaping Div. 4. Health Div. / Licensing Div. 5. Engineering Div. Minister’s decision is final 7 3 Occupation Permit (OP) Application of occupation permit must be made by the person who submit the building plan to the Council (either an Architect, Engineer or Registered Draughtsman) END Plans returned to Registration Counter of Building & Landscaping Div. after checking by various departments COUNCIL OF THE CITY OF KUCHING SOUTH To request applicant for amendment 4.1 No 4 Yes Plan in order or not Important 5 Application for Occupation Permit is to be made after all the conditions of approval as stated in the approved building plan have been complied with. To City Architect for approval END MENGEMUKAKAN PELAN BANGUNAN Pelan bangunan hanya boleh dikemukakan oleh “Orang Yang Berkelayakan” “Orang Yang Berkelayakan” – Arkitek, Jurutera dan Pelukis Pelan Yang Berdaftar seperti yang didefinasikan dibawah Undang-Undang Kecil Bangunan Sarawak 1994. Jabatan Bomba Dan Penyelamat Semua pelan bangunan Komersial, Industri dan Pangsapuri perlu dirujuk kepada Jabatan Bomba dan Penyelamat untuk disemak dan diluluskan. Jabatan Teknikal Luaran Jabatan Bomba dan Penyelamat Jabatan Tanah & Survei Segala bayaran pendaftaran boleh dijelaskan di Tingkat 1, Bahagian Bangunan dan Lanskap. Sebarang masalah sila hubungi:Bahagian Bangunan & Lanskap, Majlis Bandaraya Kuching Selatan, Tingkat 1, Dewan Bandaraya Kuching Selatan, Jalan Padungan, 93675 KUCHING. Tel. No.: 082-242311 Samb. 188 Permit Menduduki (OP) Permohonan hendaklah dibuat oleh orang yang mengemukakan pelan bangunan kepada Majlis (sama ada oleh seorang Arkitek, Jurutera ataupun Pelukis Pelan Berdaftar). Perhatian Sekiranya permohonan dikemukakan oleh seorang Arkitek, Jurutera atau Pelukis Pelan Berdaftar, sila pastikan bahawa:(a) Bangunan siap dibina mengikut kelulusan pelan bangunan dan surat pengesahan daripada Arkitek, Jurutera, Pelukis Pelan Berdaftar dan Juru Ukur Tanah berlesen diperolehi. Semua surat sokongan daripada jabatan-jabatan teknikal berkenaan diperolehi. Segala bayaran pendaftaran dijelaskan. Borang permohonan (contoh borang boleh diperolehi dari Kaunter Plan, Bahagian Bangunan dan Lanskap, Tingkat 1, Dewan Bandaraya Kuching Selatan) diisi dengan lengkap. CARA-CARA PERMOHONAN Borang permohonan (Borang E & F) yang telah lengkap diisi hendaklah dikemukakan kepada Arkitek Bandaraya, Bahagian Bangunan dan Lanskap, Tingkat 1, Dewan Bandaraya Kuching Selatan. Pemeriksaan bangunan akan dibuat oleh Inspektor Bangunan dan Kesihatan Awam untuk memastikan samada bangunan yang dibina menepati semua syarat kelulusan seperti yang tercatat di dalam pelan bangunan. Untuk bangunan jenis Komersial, Industri dan Pangsapuri, Jabatan Teknikal Luaran iaitu Jabatan Bomba Dan Penyelamat dikehendaki memeriksa bangunan tersebut juga. Permit Menduduki (OP) hanya akan dikeluarkan apabila Bahagian bangunan, Bahagian Kejuruteraan, Bahagian Kesihatan, Bahagian Perlesenan serta Jabatan Bomba dan Penyelamat tidak ada sebarang bantahan terhadap perkara ini. CARTA ALIRAN UNTUK PROSIDUR PENYERAHAN PELAN BANGUNAN Jenis Pelan Yang Boleh Dikemukakan Arkitek Berdaftar – Sebarang pelan bangunan boleh dikemukakan kecuali kerja kejuruteraan seperti kerja yang melibatkan struktur bangunan dan konkrit tertulang. Jurutera Berdaftar – Sebarang pelan kejuruteraan boleh dikemukakan. Pelukis Pelan Berdaftar – Hanya pelan bangunan seperti yang tercatat dalam sijil pendaftaran yang dikeluarkan oleh Lembaga Arkitek boleh dikemukakan. Proses Permohonan Dan Meluluskan Pelan Bangunan Pemilik bangunan perlu mendapat khidmat orang yang berkelayakan sebagai perunding/konsultan dan mengemukakan beberapa dokumen untuk disertakan bersama pelan bangunan seperti tercatat di bawah:(a) (b) (c) (d) (e) (f) Surat Kuasa sebagai perunding konsultan. Borang permohonan ditandatangani. Salinan Surat Tanah. Mencatat nama, alamat serta tandatangan pemilik dan konsultan pada pelan. Salinan Surat Pecah Tanah yang telah diluluskan. Membayar yuran memproses pelan. pelan bangunan yang MULA Penyerahan semula 1 Pelan bangunan diserahkan kepada Majlis (b) (c) (d) Penting Tentukan kesemua syarat kelulusan seperti yang tercatat di dalam pelan bangunan yang telah diluluskan itu dipatuhi sepenuhnya sebelum sebarang permohonan dibuat. Pemohon membuat rayuan secara bertulis kepada Menteri 4 6 Keputusan diterima oleh pemohon? 2 Setiap satu set pelan dirujuk kepada:1. Jab. Tanah & Survei 2. Jab. Bomba (mana-mana yang berkaitan) 3. Bhg. Bangunan & Lanskap 4. Bhg. Kesihatan / Pelesenan Keputusan Menteri adalah muktamad 7 3 Perhatian Segala bayaran pendaftaran boleh dijelaskan di Tingkat 1, Bahagian Bangunan dan Lanskap. Peringatan Penting Dibawah Akta 24, Undang-Undang Kecil Bangunan Sarawak 1994 menyatakan:Tiada seorang pun yang boleh menduduki atau dibenarkan menduduki mana-mana bangunan atau mana-mana bahagiannya melainkan jika sesuatu perakuan kelayakan untuk menetapnya telah dikeluarkan di bawah UndangUndang Kecil Bangunan Seragam. Seseorang boleh didakwa di bawah akta ini jikalau gagal mematuhi undangundang ini. Jika disabit kesalahan, anda boleh didenda tidak melebihi RM10,000.00 dan dalam kesalahan berterusan boleh didenda tidak melebihi RM300.00 sehari. TAMAT Tidak Pemohon diminta membuat perubahan Pelan dikembalikan ke Kaunter Pendaftaran, Bhg. Bangunan dan Lanskap selepas diperiksa oleh pelbagai jab. 4.1 4 Ya Pelan dalam susunan atau tidak Jabatan-Jabatan Teknikal Majlis Bahagian Bangunan dan Lanskap Bahagian Kejuruteraan Bahagian Kesihatan Bahagian Perlesenan 5 Diserahkan kepada Arkitek Bandaraya untuk persetujuan TAMAT AGENSI-AGENSI YANG TERLIBAT MELULUSKAN PELAN BANGUNAN Jabatan Tanah & Survei Dibawah Ordinan pelan bangunan perlu dirujuk ke Jabatan Tanah & Survei untuk diproses dan diluluskan.

Related docs
Other docs by IanKnott
Contract Outline -- Alford
Views: 2309  |  Downloads: 33
Shout Hallelujah
Views: 503  |  Downloads: 9
Weight Management Exercise for Health
Views: 360  |  Downloads: 6
Hess v Pawloski2
Views: 221  |  Downloads: 5
Healer of My Soul
Views: 267  |  Downloads: 0
dv145k
Views: 111  |  Downloads: 0
Awesome God
Views: 479  |  Downloads: 7
Cohen Pop s Goodman
Views: 198  |  Downloads: 0
Physics Study Tips
Views: 666  |  Downloads: 35
fss4
Views: 180  |  Downloads: 0
Hawkins v Mcgee
Views: 710  |  Downloads: 2
Behavioral Economics: Past, Present, Future
Views: 594  |  Downloads: 24
ChineseHerbs
Views: 263  |  Downloads: 8
Just a Little Talk with Jesus
Views: 254  |  Downloads: 4