Residue Management No Till and Strip Till a Statement of Work

Click to download
United States Department of Agriculture Natural Resources Conservation Service – Alabama October 1, 2004 STATEMENT OF WORK Residue Management – No-till and Strip Till (329a) These deliverables apply to this individual practice. For other planned practice deliverables refer to those specific Statements of Work. DESIGN Deliverables: 1. Design documents that demonstrate criteria in NRCS practice standard have been met and are compatible with planned and applied practices a. Practice purpose(s) as identified in the conservation plan. b. List of required permits to be obtained by the client c. Practice standard criteria-related computations and analyses to develop plans, specifications and operation and maintenance plan including but not limited to: i. Results of NRCS erosion prediction tools or equivalent, and other applicable technical tools to address targeted criteria ii. Planned residue amount iii. Orientation of residue iv. Distribution of residue v. Timing of soil disturbance 2. Certification that the design meets practice standard criteria and comply with applicable laws and regulations 3. Design modifications during application as required 4. Written plans and specifications including sketches and drawings shall be provided to the client that adequately describes the requirements to install the practice and obtain necessary permits. INSTALLATION Deliverables Pre-application conference with client Verification that client has obtained required permits Application guidance as needed Facilitate and implement required design modifications with client and original designer Advise client/NRCS on compliance issues with all federal, state, tribal, and local laws, regulations and NRCS policies during installation 6. Certification that the application process meets design and permit requirements 1. 2. 3. 4. 5. CHECK OUT Deliverables 1. Records of application a. Extent of practice units applied b. Actual amount of residue present during critical period to meet targeted standard criteria 2. Certification that the application meets NRCS standards and specifications and is in compliance with permits 3. Progress reporting 4. Post-application conference with client and District Conservationist. Page 1 of 1 United States Department of Agriculture Natural Resources Conservation Service – Alabama October 1, 2004 STATEMENT OF WORK Residue Management – No-till and Strip Till (329a) REFERENCES • • • • NRCS Field Office Technical Guide (eFOTG), Section IV, Conservation Practice Standard - Residue Management, No-till and Strip Till – 329a NRCS National Agronomy Manual (NAM) parts 501, 502 and 506 NRCS National Environmental Compliance Handbook NRCS Cultural Resources Handbook CONTACT INFORMATION Ben Moore Conservation Agronomist 334-335-3613 bennie.moore@al.usda.gov Page 2 of 2

Related docs
Residue Management No Till Strip Till Ac
Views: 8  |  Downloads: 0
No-till
Views: 1  |  Downloads: 0
No-Till Vegetable Production Non
Views: 6  |  Downloads: 1
Cutting No till Costs
Views: 9  |  Downloads: 0
AE-1370 Strip Till for Field Crop Production
Views: 3  |  Downloads: 0
Better Soils with the No Till System
Views: 12  |  Downloads: 0
Other docs by NASSdocs
Real VNC Viewer V4
Views: 11580  |  Downloads: 93
MKTG 101 Week 13 Review 1
Views: 179  |  Downloads: 5
Air Conditioning Service
Views: 189  |  Downloads: 3
EARLY TERMINATION OF CONTRACT
Views: 975  |  Downloads: 35
Connie Property Outline Semester 2
Views: 331  |  Downloads: 16
Tax_Popovich_APIL_
Views: 428  |  Downloads: 47
Zach's Class Notes
Views: 193  |  Downloads: 4
What to Do If Someone Faints
Views: 1172  |  Downloads: 11
7 Psychological Marketing and Sales Secrets
Views: 1932  |  Downloads: 405
To rearrange a canceled meeting[1]
Views: 134  |  Downloads: 4
An Introduction to Fuzzy and Neurofuzzy Systems
Views: 309  |  Downloads: 22
Acceptance of quotation
Views: 567  |  Downloads: 26
Criminal Procedure Outline _Caldwell_ Arameh
Views: 474  |  Downloads: 40