									CA Name Project Name                                              BP Catg
                                                   Proj Catg Primary Category

OKGE     Line - Chitwood - Garber 138 kV           OOC      OU




OKGE     Line: Cottonwood Creek - Skyline 138 kV   OOC      OU    8

         Line- Interconnect with SPA @ Colbert     OOC      BPU




OKGE     Line - NE Enid - Glenwood 138 kV          PL       BPU 1

OKGE     Line - Razorback - Short Mountain 69 kV   PL       BPU 6d

OKGE     Line - Richards - Piedmont 138 kV         PL       BPU 2b




OKGE     Line - Tecumseh                                    OU



OKGE     Breaker Failure Protection Scheme         PL       BPU




OKGE     Breaker Failure Protection Scheme         PL       BPU




OKGE     Breaker Failure Protection Scheme         PL       BPU
Latest In-Service EXP Required Date Cost Estimate

01-Jun-06       31-Dec-07           $     1,811,674




                30-Apr-06           $       400,000

31-Dec-06       31-Dec-06           $       657,606




31-Dec-06       31-Dec-06           $     3,732,000

31-Dec-05       31-Aug-07           $     4,791,277

30-Jun-06       31-Dec-07           $     3,500,000




31-Dec-06       31-Dec-06           $       480,000



31-Dec-07                           $       150,000




01-Jun-07                           $       200,000




31-Dec-07                           $       125,000
                                    $    15,847,557
Project Description
New Tie-OMPA-Garber to OG&E Chitwood, complete loop 138kV, Arcadia-Memo
Tp

OMPA is installing a new substation in the Cottonwood Creek to Skyline 138kV
transmission line. OMPA to construct substation and provide switches and
terminals to OG&E. OG&E will design and construct line structures to enter and
exit the new sub.
Remove switch #134, add breaker and change relays to provide an
interconnection with WFEC.




Part of a long term project per K Study 5140.3 to enhance the transmission
system in Enid, OK. This is the last phase of the project.

New 69(161)kV transmission line from Razorback to Short Mountain

New 138kV line from Piedmont to Richards.



Reroute transmission through sub. Install motorized switches and SCADA. Town
of Tecumseh adding additional transformer.


Motorize the L&M switches of breakers 184 & 185 to work with the breaker failure
relaying scheme.



Install breaker failure relaying on all transmission breakers and motorize the tie
switches on each tie breaker in order to prevent the loss of the entire bus for a tie
breaker failure.



Motorize the L&M switches of breakers 184 to work with the breaker failure
relaying scheme.
                                                                              MW-mi
Project Justification                                                         Impact?
Project agreed to be completed under the OG&E OMPA Transmission Service
Agreement.
Town is adding second bay to town owned sub, served off of one span of radial
transmission line. Adding 2nd transformer and looping into and out of the
substation will cause the this portion of line and bus to become part of the
Transmission system, under the new SPP definition. If defined as
transmission, it should be treated as part of the network.

Load on radial line, OP S3-5
Project to meet OG&E Operating Practice S3-5, which is part of OG&E
Planning Criteria, which qualifies this project for Regional Cost Allocation and
inclusion in the Plant. [Due to OGE K5140.3 study in 2001 that identified
violations of OGE S3-5 operating practice and low voltage (possibly voltage
collapse) for the loss of the So. 4th-Cleveland Tap (n-1) contingency or if
Chestnut Tap switch 31 is opened during peak(n-1).]
Project was intiated to close the radial transmission lines at Short Mountain
and Razorback Substation per OGE's Operating Guides S3-5.

Violations of OGE Operating Practice S3-5 due to radial load at Piedmont.      Y
Town is adding second bay to town owned sub, served off of one span of radial
transmission line. Adding 2nd transformer and looping into and out of the
substation will cause the this portion of line and bus to become part of the
Transmission system, under the new SPP definition. If defined as
transmission, it should be treated as part of the network.
2007 Summer Peak model has shown for a NERC TPL-003-0 contingency of
VBI breaker 184 & 185, overloads the Tarby Bus tie transformer, 3rd St Bus tie
transformer. OGE K-10085 study details the working configuration of this
breaker failure scheme.

2007 Summer Peak model has shown for a NERC TPL-003-0 contingency of
Maud Breaker Failure, overloads the 55073 Erlsbor - 55074 Ftsthil, 55177
Parkln - 55180 Byng, and 55179 Byngspa - 55180 Byng. There is also
extreme low voltage at numerous buses below .90Vpu. OGE K-10085 study
details the working configuration of this breaker failure scheme.
2007 Summer Peak model has shown for a NERC TPL-003-0 contingency of
Ft. Smith breaker 184, overloads the 55301 Ft. Smith - 55306 Arkoma line,
and the 55306 Arkoma - 55308 3rd St line. There is also low voltage at
numerous buses. OGE K-10085 study details the working configuration of this
breaker failure scheme.
Form 2 of 3 for Reporting Substation Devices




                                                                                                  Plan, PR/EXP=Others,
                                                                                                   (X=Exp Plan, PL=TO

                                                                                                    OOC=OutOfCycle)
                                                                  Comment
  Remove From the




                                                                            Planned




                                                                                                     Type of Project
                    Categoriers            New In      New In     s for New              Old
     Base Plan


                     Base Plan
                                                                                In
                                          Service     Service     In-                 Expansio
                                                                            Service
                                  STATE   Date as     Date as     Service             n Plan In
                                                                            Date as
                                          of 8/1/05   of 5/1/05   Date                 Service
                                                                            of 4/1/05
                                           (m/d/y)     (m/d/y)    (Source,              Date
                                                                             (m/d/y)
                                                                  Reason)

                                          06SP                              X                     X



                                    OK                                      06/01/07                      X




                                    OK                                      12/31/07                      X




                                    OK                                      06/01/07                      X
OK   12/31/07   X
                                                                             Summer Peak Rating




                                                                                                                       Native Network Load
                                                                                                  Winter Peak Rating
                                        Bus
                                      Number




                                                           Voltage(s) (kV)




                                                                             (Various Units)




                                                                                                  (Various Units)
                                      Used in
SPP Area     Type Description:                  Location
                                        SPP
                                      MDWG
                                       Model


X



    524    Breaker Failure Relaying   54743     Osage      138




    524    Breaker Failure Scheme     55339     VBI        161




    524    Breaker Failure Relaying   55055     Maud       138
524   Breaker Failure Scheme   55301   Ft. Smith   161
                                 Gen Interconnection




                                 Transmission Service


                                 Improvement
                                 (Losses, Maint,
                                 Availability, or Other)
                                 Original
                                 StatusMDWG




PL
           PL
                      PL
                                 I=In Service(new)
                                 PL=Planned

                                 Reporting Sourceor
                                 TO
                                     Project
                                    d cost of
                                    Estimate




$200,000
           $125,000
                      $350,000
                                                model
                                               in SPP


                                               n and
                                               beyond
                                              Included


                                              YYSeaso   IDEV
                                                       Name of
PL   $125,000
    Project Description/
                                        Project Justification
        Comments




                             Past, Present, and Future studies
Install breaker failure relaying
on all transmission breakers has shown for a NERC TPL-003-
and motorize the tie switches0 contingency that multiple
on each tie breaker in order overloads and low voltage areas
to prevent the loss of the   will occur. Some possible to a
entire bus for a tie breaker voltage collapse condition. OGE
failure.                     K-10085 study identified the
                             various areas.
Motorize the L&M switches of 2007 Summer Peak model has
breakers 184 & 185 to work shown for a NERC TPL-003-0
with the breaker failure     contingency of VBI breaker 184 &
relaying scheme.             185, overloads the Tarby Bus tie
                             transformer, 3rd St Bus tie
                             transformer. OGE K-10085 study
                             details the working configuration
                             of this breaker failure scheme.

Install breaker failure relaying   2007 Summer Peak model has
on all transmission breakers       shown for a NERC TPL-003-0
and motorize the tie switches      contingency of Maud Breaker
on each tie breaker in order       Failure, overloads the 55073
to prevent the loss of the         Erlsbor - 55074 Ftsthil, 55177
entire bus for a tie breaker       Parkln - 55180 Byng, and 55179
failure.                           Byngspa - 55180 Byng. There is
                                   also extreme low voltage at
                                   numerous buses below .90Vpu.
                                   OGE K-10085 study details the
                                   working configuration of this
                                   breaker failure scheme.
Motorize the L&M switches of    2007 Summer Peak model has
breakers 184 to work with the   shown for a NERC TPL-003-0
breaker failure relaying        contingency of Ft. Smith breaker
scheme.                         184, overloads the 55301 Ft.
                                Smith - 55306 Arkoma line, and
                                the 55306 Arkoma - 55308 3rd St
                                line. There is also low voltage at
                                numerous buses. OGE K-10085
                                study details the working
                                configuration of this breaker
                                failure scheme.

								
To top