Pcab Financial Form

W
Description

Pcab Financial Form document sample

Shared by: tjr58585
Categories
Tags
-
Stats
views:
121
posted:
3/16/2011
language:
English
pages:
34
Document Sample
scope of work template
							         Government of Papua New Guinea

   United Nations Development Programme




    Provincial Capacity Building Project
               ‘PCaB Project’
                            PROJECT DOCUMENT
                             Project ID: 00040350


                                     October 2004



Project Brief:

The purpose of the Provincial Capacity Building Project [PCaB Project] is to assist the
Government of Papua New Guinea to further develop an integrated approach to strengthen
financial management at the national and provincial level based on the lessons learned of
previous interventions and new pilot approaches to be tested within the intermediate
assistance phase. The project further aims to consolidate the achievements of the Support to
Provincial Financial Management Training (SPFMT) Project with regard to hands-on
financial management training at provincial level while building national capacities through a
pilot internship and provincial training officer network at the same time. The results of this
intermediate short-term and time-bound phase and previous interventions will feed into a
scoping and design mission for a full-scale decentralization intervention to be fielded in the
last quarter of the project.
 Provincial Capacity Building Project - PCaB                                                     Project Document



                                           SIGNATURE PAGE

                                                                                Country: Papua New Guinea

UNDAF Outcomes/Indicators:             •    Enhanced Leadership and Participation
                                       •    Improved access quality and delivery of basic services
                                       •    Improved internal, regional and global Integration
Expected Outcomes/Indicators:          •    Governance capacity built to ensure more accountable and efficient
                                            policies and strategies are implemented for the allocation and use of
                                            resources in priority areas of national poverty strategy
                                       •    Increased decentralization, devolution and participatory decision
                                            making processes for improved access to basic services
                                       •    Mechanisms developed/introduced including the use of ICTs, for
                                            linking national initiatives with activities pursued through regional and
                                            global initiatives of UN system
Expected Outputs/Indicators:           •    Proposal developed for a full-scale decentralization intervention based
                                            on findings and best practices of recent and current projects
                                       •    Strengthened compliance reported by constitutional compliance bodies
                                       •    Gender mainstreaming in planning: envisaged gender balance (project
                                            staff, internees, trainees)
                                       •    New approaches tested of such as internship programme for senior
                                            university graduates and Trainer-of-Trainers programme for provincial
                                            training officers
                                       •    Strengthened financial management at provincial level
                                       •    Capacities for efficient use of ICTs built at provincial level
Implementing Partner:                  •    Financial Management Improvement Programme – FMIP, Department
                                            of Finance/Government of Papua New Guinea – National Execution
Other Partners:                        •    Papua New Guinea Institute of Public Administration
                                       •    School of Business Administration, University of Papua New Guinea


Programme Period:        2003 – 2007                        Budget:                       USD            200,000.00
Programme Component:     Governance                         GMS Fee:                      USD                  N/A
                                                            Total budget:                 USD            200,000.00
Project Title:           Provincial Capacity
                         Building Project - PCaB            Allocated resources:

Project ID:               00040350                          •  Government
                                                            •  Regular                    USD            200,000.00
Project Duration:        01.10.2004 – 30.9.2005             •  Other:
Management               National Execution (NEX)              In kind contributions
Arrangement:             Department of Finance                      GoPNG                 USD              30,000.00
                         (FMIP Programme)                   Unfunded budget:                                   None




                                                                                                             Page 3
 Provincial Capacity Building Project - PCaB                                                                     Project Document



Table of Contents:

Section I        Background and Project Strategy ......................................................5
  Part I      Situational Analysis ................................................................................................... 5
  Part II     Project Strategy ......................................................................................................... 5
  Part III    Management Arrangements ....................................................................................... 9
  Part IV     Monitoring and Evaluation....................................................................................... 10
  Part V      Legal Context .......................................................................................................... 10
Section II Results and Resources Framework ..................................................11
Section III Annual Workplan and Budget .........................................................12
  Part I      Annual Workplan and Budget for 2004 and 2005..................................................... 12
  Part II     Project Positions ...................................................................................................... 13
  Part III    Project Structure Overview ...................................................................................... 14
Section IV Annexes..............................................................................................15
  Annex 1a:          Standard Letter of Agreement for Provision of Support Services ...................... 15
  Annex 1b:          Universal Price List for UNDP Country Office Support Services ..................... 17
  Annex 2:           Terms of Reference for the Project Steering & Advisory Committee................ 18
  Annex 3:           Terms of Reference National Project Coordinator ............................................ 21
  Annex 4:           Terms of Reference Assistant to FMIP Training Wing Manager....................... 23
  Annex 5a:          Terms of Reference Internship Programme Coordinator................................... 25
  Annex 5b:          Terms of Reference Interns: Provincial Internship Programme ......................... 27
  Annex 6:           Terms of Reference IT Support Technician ...................................................... 29
  Annex 7:           Terms of Reference Web Designer ................................................................... 31
  Annex 8:           Terms of Reference of the IFMS study tour...................................................... 33




                                                                                                                               Page 4
 Provincial Capacity Building Project - PCaB                                      Project Document



Section I           Background and Project Strategy

Part I      Situational Analysis

        In 1995 the ‘Organic Law on Provincial and Local Level Governments’ (OLPLLG) was
passed by the Parliament of Papua New Guinea and was subsequently implemented in 1997. It is
essentially an attempt to decentralise government functions and responsibilities by devolving
substantial financial management functions and responsibilities such as planning, budget and
finance to the sub-national level (Provincial, District and Local Level Administrations and
Treasuries). Since the introduction and implementation of the OLPLLG Papua New Guinea (PNG)
has gone through an extensive process of national and provincial capacity building in order to
apply and comply with the requirements of the law. However, this process is far from completion
and serious problems especially with regard to the management of financial resources at the
provincial and lower level prevail. As a result the delivery of basic services in the provinces is
severely sub-standard even though it varies among different provinces. The lack of resources,
capacity, staff, and understanding of the OLPLLG has been identified as main cause of the uneven
and insufficient development progress made so far in the 19 provinces of Papua New Guinea.
       The Financial Management Improvement Programme (FMIP) has been developed in
response to identified financial management problems at the national and sub-national levels of
government. This Government Programme is based in the Department of Finance and aimed at
building the capacity of provincial treasury, district and local level government (LLG) offices to
absorb the functions of financial management, planning and budgeting as required in the
OLPLLG.
        Early 2000 UNDP launched its ‘Support to Provincial Financial Management Training’
Project (SPFMT) focusing on supporting the delivery of financial management training by the
AusAID-funded ‘Provincial Financial Management Training Programme’ (PFMTP), which is in
turn a component of FMIP. Under the SPFMT Project a total of 11 United Nations Volunteers
(UNVs) and national professionals were deployed to several provinces where they successfully
assisted the provincial treasury offices in providing support and services to the LLGs. The UNVs
also followed up the PFMTP training activities by offering one-on-one hands-on training and
mentoring for treasury staff. The terminal evaluation of SFPMT project (July 2003) concluded that
the project has achieved its main objectives and that it was a ‘best practice’ model. Phase I of the
project was closed by the end of 2003 and since then UNDP and the Government of Papua New
Guinea (GoPNG) have worked together in a series of consultative meetings to discuss and progress
possible modes of additional support, which may lead into the design of a Phase II of an
intervention supporting the process of decentralization.
        The Provincial Capacity Building (PCaB) Project strategy described below is based on the
outcome of these discussions and the indications of preference of possible areas of support
received from the Government. It is an intermediate short-term and time bound (12 months)
intervention building upon the previous SPFMT project as well as new approaches to be piloted
within the project. Its main outcomes are strengthened provincial financial management capacity,
effective use of ICTs in provincial treasury offices and the design of a full-fledged
governance/decentralization intervention.

Part II     Project Strategy

        UNDP continues to support the process of strengthening financial management capacities
at the provincial level through an intermediate short-term (12 months) intervention as requested by


                                                                                            Page 5
 Provincial Capacity Building Project - PCaB                                        Project Document



the Government of Papua New Guinea and in-line with the UNDP Country Programme (2003-
2007).
        The Project assists the Government in consolidating achievements made with regard to
provincial compliance to OLPLLG requirements and sub-national service delivery. It provides a
support framework to the FMIP Provincial Supports Advisors (PSAs), which work under similar
Terms of Reference than UNVs and national professionals previously employed under SPFMT
project. In some cases theses former project staff members have been directly taken over by FMIP
and thus guaranty for continuity, which UNDP seeks to further maintain through the PCaB Project
intervention. Though the placement of UNVs or PSAs is considered to a best practice model it is
not envisaged to directly engage new PSAs under the project since this model has been already
absorbed and replicated by FMIP programme and since the recruitment of UNVs would not be
compatible to the limited resources available for this intermediate intervention. Rather, the projects
will provide support to the PSAs currently employed by FMIP through an internship programme in
direct support of their provincial assignments and through other capacity building activities such as
support to the efficient use of ICTs at provincial level and through the establishment of a network
of provincial training officers. The placement of information and training material on the FMIP
web site to be designed and launched under the project will further play an important role in
provincial capacity building and training process.
        Through embedding of the project implementation into FMIP Programme under NEX
execution modality (national execution though Department of Finance) national ownership and
participation will be given central priority. Additionally, the project seeks to be linked to and in
support of other FMIP and Government activities funded by bi- and multi-lateral donors, which
will be represented in the Project Steering and Advisory Committee (PSAC). Through the PCaB
Project PSAC and FMIP Implementation Committee close coordination and partnership with other
donors and stakeholders will be maintained. Therefore, the project has a complementary character
to on-going activities and provides support to certain areas currently not covered by its partner
interventions.
       The Project’s ultimate deliverable is the design of a full-scale decentralization intervention
drawing on the pilot approaches tested during the intermediate PCaB intervention, lessons learned
from previous UNDP and partner interventions as well as on new developments and endeavours
embarked on by the Government such as the planned roll-out of an Integrated Financial
Management System (IFMS) in 2005.

The Provincial Capacity Building Project consists of three main elements:

   1. Capacity Building for Provincial Training and Pilot Internship Phase
   2. ICT support for Provincial Financial Management and study mission IFMS
   3. Scoping and Design Mission of a full-scale decentralization intervention

       Elements 1 and 2 focus on continued and enhanced capacity building measures and follow-
up support to activities of SPFMT project phase I in order to ensure sustainably of these activities
in the provinces. Additionally, new approaches will be piloted and tested for suitability for a
possible Phase II intervention in the area of decentralization. The 3rd element consists of a scoping
and design mission to be fielded in the second half of the 12-months intermediate phase that will
draw on the projects achievements and include lessons learned in the design of a full-scale Phase II
decentralization intervention.
       The PCaB Project will be implemented by the Department of Finance/FMIP in close
cooperation and partnership with the PNG Institute of Public Administration (PNGIPA). A


                                                                                              Page 6
 Provincial Capacity Building Project - PCaB                                         Project Document



possible new partnership will be also developed with the School of Business Administration of the
University of Papua New Guinea (UPNG) through a provincial pilot internship programme for
students.
        All components/sub-programmes will observe the principle of gender balance. While
selecting project staff as well as course participants, internees, and other project beneficiaries an
equal gender balance should be envisaged. Higher female quotas are appreciated and supported.
While selecting staff for project positions, women should be preferred if having equal
qualifications, than male candidates applying for the same position. Training and internship
programmes also have to take into account the special needs of women in development and in the
provinces.
        Further, all training activities, courses, and internship activities will be used as a forum to
advocate the Millennium Development Goals (MDGs) and for awareness raising with regard to the
HIV/AIDS epidemic in Papua New Guinea. The respective sub-programme managers with
supervision and overall responsibility of the National Project Coordinator (NPC) will coordinate
these advocacy and awareness rising activities. The FMIP training wing is expected to integrate
short introductions on HIV/AIDS and MDGs into its courses. Interns selected though the
provincial internship programme will receive introductory and awareness sessions and are
expected to pass on their knowledge while posted to the provinces. The coordinator of the
internship programme component will be responsible to oversee this process.

1. Capacity Building for Provincial Training and Pilot Internship Phase
Support to FMIP training wing manager in PNGIPA:
         The FMIP training wing situated within PNG Institute of Public Administration (PNGIPA)
has been recently refurbished and offers ‘Certificate in Accounting’ and ‘Diploma in Accounting’
courses for provincial treasury staff. A FMIP training wing-manager has been appointed but needs
to be supported by an assistant. The PACB Project will fund this position for a 12-months period.
The main tasks of the assistant are to ensure quality control and overall daily management of the
students, course and the facility as further specified in the TOR (Annex 4). This placement is
envisaged to directly support the building of financial management capacity at the provincial,
district and local level and the assistant will closely liaise with the internship coordinator to create
a coherent approach to provincial capacity building.
       FMIP is currently exploring long-term capacity building strategies and plans to establish a
network of Provincial Training Officers/Coordinators and Workplace Trainers. PCaB Project will
support this endeavor by exploring possibilities to have Provincial Training Officers trained as
Trainers-of-Trainers (TOT) through courses offered by PNGIPA. This assessment and exploration
of possibilities will be also the task of the training wing manager assistant who will liaise closely
with FMIP and PFMTP management to guarantee for a coherent, complementary and
comprehensive approach to the establishment of a provincial workplace trainer network.


Internship Programme:
        In order to provide senior post and undergraduates with an opportunity for first-hand
experience in the public service at provincial level, a pilot internship programme will be
established within PNGIPA FMIP training wing. A Programme Coordinator will coordinate the
programme and her/his main tasks will be to collaborate with the School of Business
Administration, UPNG, from where internees will be selected. The PCaB project will fund the
coordinator position for duration of 12 months (see TOR Annex 5a) as well as travel and living
allowance of the internees while placed in the provinces. A twinning programme will be


                                                                                               Page 7
 Provincial Capacity Building Project - PCaB                                       Project Document



established for the interns with the PSAs (Provincial Support Advisors) who will be responsible
for training and capacity building. Prior to the placement in the Provinces, interns will receive
preparatory induction training in provincial financial management in the FMIP training wing. The
successful internees may serve as pool of future PSAs, phase II project staff or qualified civil
servants upon completion of their assignment and studies.


2. ICT support for Provincial Financial Management and study mission IFMS
IT Support Technician - System Administration Trainer:
        Under SPFMT Project computers and Local Area Networks (LAN) were purchased and
installed in 19 Provincial Treasury Offices. All provinces need refresher courses and training in
LAN and System Administration in order to ensure a high level of local capacity and skills. An
experienced IT Support Technician will be funded under the Project to travel to each province to
conduct LAN maintenance and (refresher) LAN management and system administration courses.
Therefore the incumbent needs to possess a combination of strong computer (LAN) and training
skills and the ability and willingness to undertake extensive travel within PNG as outlined in the
positions’ ToR (Annex 6).

Web designer:
         The Department of Finance (DoF) and FMIP are currently developing a website with some
seed funding available from own resources. However, with limited capacities for web design
within the department and programme, the services of an expert web designer are needed in order
to design a FMIP and a DoF website and to train at least one DoF and one FIMP staff member in
basic web design and web site maintenance/updating. The PCaB Project will fund this position and
related activities. Further, training materials for the use in the provinces will be placed for
download on the FMIP website to facilitate the transfer of knowledge and capacity to the
provincial level. The National Project Coordinator will be responsible to oversee the establishment
of this linkage between web design component and capacity building component.

IFMS study mission:
        Early next year the Department of Finance will embark on the major exercise of
introducing a computer/software based Integrated Financial Management System (IFMS), first at
the national and later also on the provincial and district level. In order to sensitize and educate a
number of key stakeholders on the benefits and use of such a system as well as to increase their
commitment to it, the Project will fund a study tour of approximately 10 government officials to
other developing countries where integrated financial management systems have been introduced.
The study tour is planned for the end of 2004 as it will support the process of vendor selection with
is currently (10/2004) underway. It is assumed that a possible phase II decentralization
intervention will support the introduction and roll out of the IFMS.


3. Scoping and design mission
         During the second half of the project (1st or 2nd quarter 2005) a scoping and design mission
will be fielded to design a full-scale decentralization intervention which will draw on experiences
and lessons learned of SPFMT Phase I, the intermediate PCaB Project as well as on government
priorities. The mission will place special emphasis to explore an involvement of UNVs in the full-
scale intervention as this modality in combination with the hands-on mentoring approach has
already been identified as ‘best practice’ during the implementation of SPFMT project.



                                                                                             Page 8
 Provincial Capacity Building Project - PCaB                                        Project Document



         The TOR will be developed in cooperation of FMIP, UNDP and other stakeholders within
the first half of the project duration (3rd and 4th quarter 2004). This process will be overseen and
coordinated by the project coordinator.



Part III    Management Arrangements

1.       Management and Execution Modalities
        The project will be nationally executed (NEX) by the Department of Finance (Financial
Management Improvement Programme – FMIP) as Executing Agency (Implementing Partner).
The NEX execution modality is subject to the rules and regulations as laid out in the UNDP
Programming Manual (Chapter 6.2.2, page 5, National Execution) and the UNDP ‘Procedures for
National Execution’, UNDP 1998). Thus, overall responsibility for project implementation and
reporting lies with the Department of Finance (DoF). This includes advertisement, short-listing,
and contraction of project staff as well as making project disbursements/payments from quarterly
advances received from UNDP. Through the quarterly advancement of funds the Government will
have full ownership of the project including its administration. The FMIP programme has the
capacity (qualitative and quantitative) to execute the project as it successfully administers a multi-
million dollar grant within its ADB and AusAID programme components (FMP and PFMTP).
However, the UNDP PNG Country Office may provide support services for the project as
described in the attached ‘Standard Letter of Agreement for Provision of Support Services’ (Annex
1a).
        A Project Steering and Advisory Committee (PSAC) will be established to oversee the
overall project implementation. Membership and scope of the PSAC are specified in the respective
Terms of Reference (Annex 2).
       An experienced National Project Coordinator (NPC) will be responsible for the day-to-day
coordination and oversight of the project. S/he will be placed within the Department of
Finance/FMIP where the Government of Papua New Guinea will provide office space as in-kind
contribution to the project. A similar arrangement will apply for the web designer and ICT Support
technician to be hired under the project.
         Several other project staff (FMIP training wing manager assistant, Web Designer,
Internship sub-programme coordinator) will be placed within FMIP and its training wing in the
affiliated PNG Institute of Public Administration (PNGIPA) as outlined in the Project Structure
Overview (Section II, Part IV), TORs of the project positions (Annex 3-8) and project strategy
(Section I, Part II). Advertisement and short-listing of suitable candidates will be done by FMIP.
The selection will be carried out consultation with UNDP, but project personnel will be directly
contracted by FMIP.
       The Project will have duration limited to 12 months, with a potential subsequent full-scale
programme to be developed and implemented based on the outcomes of the preparatory studies
and activities. A scoping and design mission will be fielded in the second half of the project to
design and formulate a respective project proposal.

2.       Government counterparts and coordination arrangements
The FMIP Programme as implementing partner will be responsible for project coordination
including:
     §   Advertisement, short-listing and contraction of project staff


                                                                                              Page 9
 Provincial Capacity Building Project - PCaB                                         Project Document



   §     Disbursement of project funds (received through quarterly advances by UNDP)
   §     Substantive and financial reporting/acquittal

        This management arrangement has been chosen since FMIP has the overall capacity to
administer the project funds and to comply with financial reporting requirements of UNDP. Direct
payments might also be done by the UNDP PNG CO in parallel for certain activities such IFMS
study tour (DSA and air fares) and as requested by the implementing partner. UNDP will charge
fees for the provision of support services as per UNDP’s universal price list (Annex 1b)


Part IV         Monitoring and Evaluation
       Monitoring of the day-to-day implementation of the project will be the responsibility of the
National Project Coordinator, under the supervision of FMIP and UNDP Management. The NPC
will submit monthly and to FMIP and UNDP as well as quarterly progress reports to the Project
Steering and Advisory Committee.
       The project will be subject to a mid-term review to be carried out by UNDP/FMIP and a
terminal evaluation through the preparation of a terminal project report. The aim of the review is to
monitor progress in project implementation and take decisions on recommendations to secure and
improve the delivery of project targets and to mitigate any risks or adverse developments as they
emerge. Joint on-site monitoring visits by the National Project Coordinator (NPC), FMIP and
UNDP will also play an important role in the monitoring of on-going activities and will be
scheduled as the need arises and deemed appropriate by the executing agency and/or UNDP.


Part V          Legal Context
        This project document shall be the instrument referred to as such in Article 1 of the
Standard Basic Assistance Agreement (SBAA) between the Government of Papua New Guinea
and the United Nations Development Programme, signed by the parties on 7 April 1981. The host
country implementing agency shall, for the purpose of the Standard Basic Assistance Agreement,
refer to the government co-operating agency described in that Agreement.
        The following types of revisions may be made to this project document with the signature
of the UNDP Resident Representative only, provided he or she is assured that the other signatories
of the project document have no objections to the proposed changes:
          (a)      Revisions in, or addition of, any of the annexes of the project document (with the
                   exception of the Standard Legal Text for non-SBAA countries which may not be
                   altered and the agreement to which is a precondition for UNDP assistance);

          (b)      Revisions which do not involve significant changes in the immediate objectives,
                   outputs or activities of a project, but are caused by rearrangement of inputs agreed
                   to or by cost increases due to inflation; and

          (c)      Mandatory annual revisions, which rephase the delivery of agreed project inputs or
                   increased expert or other costs due to inflation or take into account agency
                   expenditure flexibility.




                                                                                              Page 10
        Provincial Capacity Building Project - PCaB

        Section II                Results and Resources Framework
Intended Outcomes as stated in the Country Results Framework:
§    Governance capacity built to ensure more accountable and efficient policies and strategies are implemented for the allocation and use of resources in priority areas of national poverty strategy
§    Increased decentralization, devolution and participatory decision making process for improved access to basic services
§    Mechanisms developed/introduced including the use of ICTs, for linking national initiatives with activities pursued through regional and global initiatives of UN system
Outcome indicator as stated in the Country Programme Results and Resources Framework, including baseline and target:
§    Proposal developed for a full-scale decentralization intervention based on findings and best         §    New approaches tested of such as internship programme for senior university graduates and
     practices of recent and current projects                                                                  Trainer-of-Trainers programme for provincial training officers
§    Strengthened compliance reported by constitutional compliance bodies                                 §    Strengthened financial management at provincial level
§    Gender mainstreaming in planning: envisaged gender balance (project staff, internees, trainees)      §    Capacities for efficient use of ICTs built at provincial level
Applicable MYFF Goals including respective Service Lines: GOAL 1: Achieving the MDGs and reducing human poverty; GOAL 2: Fostering democratic governance
Partnership Strategy: National Execution (NEX) with the Department of Finance (DoF)/Financial Management Improvement Programme (FMIP) as Implementing Partner (Executing Agency);
Cooperation with PNG Institute of Public Administration (through FMIP training wing) and UPNG/School of Business Administration through TOT and provincial internship programme
Project title and ID: Provincial Capacity Building Project - PCaB Project

           Intended Outcomes                                                                                              Activities

1.   Strengthened Capacity in Provincial and           1.1. Overall coordination of the Preparatory Assistance Project supported by one National Project Coordinator to be placed within FMIP office in
     Lower Level Management and Planning                    the Department of Finance.
                                                       1.2. Support to the FMIP Training Wing at PNGIPA through provision of an assistant to the training wing manager who will assist in areas such as
                                                            course and student management, quality assurance, and capacity building
                                                       1.3. Establishment of a pilot provincial internship programme in collaboration with UPNG/School of Business Administration through placement
                                                            of a sub-programme coordinator within the FMIP training wing who will be responsible for programme establishment and roll out of the pilot
                                                            phase.
                                                       1.4. Establishment of a network of Provincial Training Officers/Coordinators through collaboration with PNGIPA and FMIP Training Wing.


2.   Provincial Financial Management supported         2.1. Maintenance of Provincial Treasury Offices’ LAN system installed under SPFMT project and training of provincial treasury staff to carry out
     through efficient use and maintenance of               maintenance independently through the engagement of a LAN manager/ trainer and in order to sustainably transfer skills for LAN and system
     ICTs                                                   administration
                                                       2.2. Design and launch of the Department of Finance and FMIP web site through the engagement of a web designer who will produce the sites but
                                                            also embed the necessary skills for maintenance into the Department (training of at least 3 staff members in the IT section). Placement of
                                                            training materials on the FMIP website to facilitate provincial capacity building process through the use of ICTs
                                                       2.3. Support to a IFMS study tour to another developing country to broaden the understanding of key stakeholders about the endeavor and to learn
                                                            from the experience of other developing countries in implementing similar systems


3.   Proposal for a full-scale Project in support of   3.1. Fielding of a scoping and design mission to develop a full-scale project proposal based on findings and lessons learned from PCaB and other
     the decentralization process and improvement           recent interventions such as SPFMT Project. Special emphasis will be placed on an assessment of a future involvement of the ‘best practice’
     of financial management                                model of UNV placements at the provincial level in a mentoring and coaching framework.


                                                                                                                                  Page 11
Provincial Capacity Building Project - PCaB
Section III         Annual Workplan and Budget

Part I      Annual Workplan and Budget for 2004 and 2005


Annual Budget Distribution 2004
Project ID Expected Output    Key Activities            Timeframe   Resp.     Planned Budget
                                                        Q1 Q2 Q3 Q4 Partner   Fund Donor Budget Description                                 Amount
00040350 Capacity Building       Project Coordination               DoF       04000 00012 71400 Contractual Services                           3,500.00
         for Provincial          and Management                     DoF       04000 00012 71600 Travel                                         1,500.00
         Management                                               X DoF       04000 00012 72400 Communications and Audio Visual Equipment        500.00
                                                                    DoF       04000 00012 72500 Supplies                                         500.00
                                                                    DoF       04000 00012 74500 Miscellaneous Expenses                           800.00
                                 Capacity Building                  DoF       04000 00012 71400 Contractual Services                           4,900.00
                                                                    DoF       04000 00012 71600 Travel                                         5,000.00
                                                                  X
                                                                    DoF       04000 00012 72500 Supplies                                       2,000.00
                                                                    DoF       04000 00012 74500 Miscellaneous Expenses                         2,000.00
                                 ICT support                        DoF       04000 00012 71400 Contractual Services                           2,500.00
                                                                  X DoF       04000 00012 71600 Travel                                        50,000.00
                                                                    DoF       04000 00012 74500 Miscellaneous Expenses                         5,000.00
                                 Design of full-scale               DoF       04000 00012 71200 International Consultants                          0.00
                                 Decentralization                   DoF       04000 00012 71600 Travel                                             0.00
                                 Intervention                       DoF       04000 00012 74500 Miscellaneous Expenses                             0.00
                                 NEX Advances                     X DoF       04000 00012 74500 Miscellaneous Expenses                             1.00
                                                                                                                                  Total 2004 78,201.00




                                                                                      Page 12
Provincial Capacity Building Project - PCaB
Annual Budget Distribution 2005
Project ID Expected Output    Key Activities               Timeframe   Resp.         Planned Budget
                                                           Q1 Q2 Q3 Q4 Partner       Fund Donor Budget Description                                     Amount
00040350 Capacity Building       Project Coordination                  DoF           04000 00012 71400 Contractual Services                              10,500.00
         for Provincial          and Management                        DoF           04000 00012 71600 Travel                                             7,000.00
         Management                                                    DoF           04000 00012 72400 Communications and Audio Visual Equipment          1,000.00
                                                            X X X
                                                                       DoF           04000 00012 72500 Supplies                                           1,000.00
                                                                       DoF           04000 00012 74200 Audio Visual and Printing Production Cost          3,000.00
                                                                       DoF           04000 00012 74500 Miscellaneous Expenses                             1,000.00
                                 Capacity Building                     DoF           04000 00012 71400 Contractual Services                              14,500.00
                                                                       DoF           04000 00012 71600 Travel                                            20,000.00
                                                            X X X
                                                                       DoF           04000 00012 72500 Supplies                                           5,000.00
                                                                       DoF           04000 00012 74500 Miscellaneous Expenses                             1,000.00
                                 ICT support                           DoF           04000 00012 71400 Contractual Services                              10,798.00
                                                            X X X      DoF           04000 00012 71600 Travel                                            15,000.00
                                                                       DoF           04000 00012 74500 Miscellaneous Expenses                             2,000.00
                                 Design of full-scale                  DoF           04000 00012 71200 International Consultants                          8,000.00
                                 Decentralization               X X    DoF           04000 00012 71600 Travel                                            20,000.00
                                 Intervention                          DoF           04000 00012 74500 Miscellaneous Expenses                             2,000.00
                                 NEX Advances               X X X      DoF           04000 00012 74500 Miscellaneous Expenses                                 1.00
                                                                                                                                           Total 2005 121,799.00
                                                                                                                                                 Total 200,000.00

Part II      Project Positions
#   Position                 Duration     Main Duties                                                                                 Posting
1   National Project         12 months    Overall coordination of the Project                                                         FMIP, DoF
    Coordinator
1   Assistant to FMIP        12 months    Assist Wing Manager in course and student management, quality assurance and capacity        PNGIPA, FMIP training wing
    Training Wing Manager                 building; assist in setting up of TOT course programme of provincial treasury staff

1   Coordinator Internship   6 – 12       Coordination of internship pilot programme in close consultation with UNDP, FMIP and UPNG   PNGIPA, FMIP training wing
    pilot component of PA    months       School of Business Administration
    project
1   IT Support Technician    12 months    Visit of all provinces which have received LAN under SPFMT phase I to maintain provincial   FMIP, DoF, Provinces of PNG
                                          LAN systems (PT Offices) and to deliver refresher courses in LAN usage and maintenance to
                                          PT staff
1   Web designer             3 months     Design of FMIP web site, DoF website including integration of FMIP training materials       FMIP, DoF
5   Positions in total



                                                                                               Page 13
Provincial Capacity Building Project - PCaB
Part III       Project Structure Overview



           Project Steering and Advisory                         FMIP Programme
                     Committee                                 Department of Finance

                §     GoPNG (DoF, DNPRD)                       Provincial Capacity
                §     FMIP                                      Building Project
                §     PNGIPA                                         (PCaB)
                §     AusAID
                §     ADB
                §     UNDP




                      PNG Institute of Public
                     Administration (PNGIPA)
           §    Support to FMIP Training Wing in              ICT Support Component                   Proposal Development for full-
                the PNGIPA                                                                                  scale intervention
           §    Establishment of a Provincial           §   Support to efficient use of ICTs in
                Training Officers Network                   Provincial Treasury Offices           §    Design of a full-scale
                                                        §   Design and Launch of FMIP and              decentralization intervention
           §    Provincial Pilot Internship                 DoF web site, transfer of                  (design mission, resource
                Programme                                   maintenance skills                         mobilisation, development of
                                                        §   Website used to disseminate                project proposal)
                University of Papua New Guinea              training materials to Provinces
                    School of Business Administration   §   IFMS study tour




                                                                                Page 14
Provincial Capacity Building Project - PCaB


Section IV          Annexes
Annex 1a:       Standard Letter of Agreement for Provision of Support Services

LETTER OF AGREEMENT BETWEEN UNDP AND THE GOVERNMENT OF PAPUA NEW
GUINEA FOR THE PROVISION OF SUPPORT SERVICES TO ‘RAPID ADVISORY
SERVICES’ - PROJECT

Dear Mr. Kwayaila,

1.       Reference is made to consultations between officials of the Government of Papua
New Guinea (hereinafter referred to as “the Government”) and officials of UNDP with
respect to the provision of support services by the UNDP country office for the ‘Rapid
Advisory Services’ project. UNDP and the Government hereby agree that the UNDP country
office may provide such support services at the request of the Government through its
institution designated in the relevant project document, as described.

2.      The UNDP country office may provide support services for assistance with reporting
requirements and direct payment. In providing such support services, the UNDP country
office shall ensure that the capacity of the Government-designated institution is strengthened
to enable it to carry out such activities directly.

3.       In addition, the UNDP country office may provide, at the request of the designated
institution/Executing Agent, the following support services for implementation activities:

    (a)     Identification and assistance with and/or recruitment of project personnel;
    (b)     Procurement of goods and services;
    (c)     Access to UNDP-managed global information systems, including rosters of
            consultants and providers of development services

4.      The procurement of goods and services and the recruitment of project and programme
personnel by the UNDP country office shall be in accordance with the UNDP regulations, rules,
policies and procedures. Support services described in paragraph 3 above shall be detailed in
Annex 1b to the project document, in the form provided in the Attachment hereto. If the
requirements for support services by the country office change during the life of a programme
or project, the annex to the project document is revised with the mutual agreement of the UNDP
resident representative and the designated institution.

5.      The relevant provisions of Article 1 of the SBAA between the Government of Papua
New Guinea and UNDP signed on the 7th April 1981 (the “SBAA”), including the provisions
on liability and privileges and immunities, shall apply to the provision of such support
services. The Government shall retain overall responsibility for the nationally executed
project or programme through its designated institution/Executing Agent. The responsibility
of the UNDP country office for the provision of the support services described herein shall be
limited to the provision of such support services detailed in the annex 1b to the project
document.

6.      Any claim or dispute arising under or in connection with the provision of support
services by the UNDP country office in accordance with this letter shall be handled pursuant
to the relevant provisions of the SBAA.


                                                                                    Page 15
Provincial Capacity Building Project - PCaB


7.     The manner and method of cost-recovery by the UNDP country office in providing the
support services described in paragraph 3 above shall be specified in the annex 1b to the
programme support document or project document.

8.     The UNDP country office shall submit progress reports on the support services
provided and shall report on the costs reimbursed in providing such services, as may be
required.

9.    Any modification of the present arrangements shall be effected by mutual written
agreement of the parties hereto.

10.     If you are in agreement with the provisions set forth above, please sign and return to
this office two signed copies of this letter. Upon your signature, this letter shall constitute an
agreement between your Government and UNDP on the terms and conditions for the
provision of support services by the UNDP country office for this project.


                                              Yours sincerely,



                                    ______________________
                                    Signed on behalf of UNDP
                                       Mr. Vitalie Muntean
                                    Resident Representative, a.i.




___________________________________
For the Government of Papua New Guinea
Mr. Paul Enny
Acting First Assistant Secretary
Aid Coordination and Management Division
Department of National Planning & Rural Development




__________________________________
For the Department of Finance
(Implementing Partner)
Mr. Gabriel Yer, Deputy Secretary




                                                                                        Page 16
   Provincial Capacity Building Project - PCaB


   Annex 1b:       Universal Price List for UNDP Country Office Support Services



                   Service                       High Cost Mid-High Cost Mid-Low Cost Low Cost
Payment: disbursements, journal voucher,
credit voucher per individual transaction;
create request (70%), approve & process
(20%), post and file voucher (10%)                $18.00      $16.00            $15.00    $8.00
Staff Recruitment Package:
- Selection: advertising (20%), short-listing
(40%), interviewing (40%) per request             $212.30     $212.30           $172.50   $91.00

- Contract: contract issuance, UNJPF/MIP
enrollment, payroll setup per request             $87.00      $55.50            $55.50    $46.00
Consultant Recruitment Package:
advertising (20%), short-listing & selection
(40%), contract issuance (40%) per request        $168.00     $32.00            $32.00    $16.00
Recurring Personnel Management:
file maintenance (10%), extension,
promotion, entitlement management (80%),
leave monitoring (10%), per year & person         $110.00     $65.00            $65.00    $40.00
Issuing IDs (UN PL, UN ID, etc.)                                       $12.30
Local Drivers' License: full process from
submission of request to receipt                  $35.00      $35.00            $25.75    $11.50
Accreditation w. Government: full process,
including submission of forms                     $28.25      $28.25            $15.35    $11.00
Vehicle Registration: full process from
submission of request to receipt                  $62.00      $55.00            $55.00    $11.65
Visa Requests (excluding Government
fees): including submission of request and
security clearance                                $30.00      $30.00            $19.00    $12.50
Ticket Request: booking, purchase                 $22.75      $22.75            $17.50    $10.50
Travel Authorization                                                   $10.15
Hotel Reservation                                                       $5.30
F10 Settlement                                                         $12.65
Procurement Process:
identification/selection (50%), contracting
(25%), follow-up (25%)                            $279.00     $127.00           $127.00   $79.00
Procurement Simple (low value, local):
identification/selection (50%), issuing
Purchase Order (25%), follow-up (25%)                                  $45.80
Disposal of Equipment: full process,
including disposal action and crediting                                $45.50
Custom Clearance: from submission of
forms to receipt of goods                         $58.00      $58.00            $46.50    $43.00
Shipment Arrangements                             $212.00     $48.65            $48.65    $48.65
Fellowship Package: identification of
fellow, contacting, entitlements                  $101.60     $101.60           $53.75    $29.40




                                                                                          Page 17
Provincial Capacity Building Project - PCaB


Annex 2:              Terms of Reference for the Project Steering & Advisory Committee

                                      Terms of Reference

                       The Project Steering and Advisory Committee

                 Provincial Capacity Building Project – Project ID:

1.      Institutional Background
        The Project Steering and Advisory Committee (PSAC) is being established to oversee
and direct project implementation and in conformity with the project execution modality: The
project is Nationally Executed (NEX) with the Department of National Planning and Rural
Development (DNPRD) as executing partner.


2.      Project Steering and Advisory Committee
     The management of the project shall be administered by the Project Steering & Advisory
Committee, which shall consist of:

                (i)       The Deputy Secretary of the Department of Finance, or his/her alternate
                          (Chairperson);
                (ii)      The First Assistant Secretary (FAS) of the Department of National
                          Planning and Rural Development, Aid Coordination & Management
                          Division, or his/her alternate;
                (iii)     The Programme Manager of the Financial Management Improvement
                          Programme (FMIP)/ Department of Finance, or his/her alternate;
                (iv)      The UNDP Deputy Resident Representative, or his/her designated officer
                          (Deputy Chairperson)
                (v)       The Director of PNG Institute of Public Administration, or his/her
                          alternate;
                (vi)      A representative from the Asian Development Bank (ADB)
                (vii)     A representative from AusAID
                (viii)    An ex-officio/secretary from UNDP (project desk officer), or his/her
                          alternate;


3.      Meetings and quorum of the Project Steering & Advisory Committee
        The PSAC shall meet on quarterly basis or as required by the Chairman as the need
arises. Every PSAC meeting may be called to take place at such date, venue and time as may be
determined by:

                (i)       The Chairperson; or
                (ii)      The Deputy Chairperson; or
                (iii)     Any three (3) members of the PSAC.



                                                                                        Page 18
Provincial Capacity Building Project - PCaB


     a) Written notice of a meeting of the Committee shall be given by project coordinator to
        each member of the Committee at least seven (7) days (or such other period as may be
        unanimously agreed upon by the members of the Executive Committee) before the time
        appointed for the holding of the meeting.

     b) Notice of a meeting given under paragraph (a) shall specify the general nature of the
        business to be transacted at the meeting and any other business the members present at
        the meeting unanimously agree to treat as urgent business.

     c) Three (3) members of the PSAC shall constitute a quorum for the transaction of the
        business of a meeting of the Committee if at least one (1) Government and one (1)
        UNDP representative is present.

     d) In the event of a lack of quorum the meeting stands adjourned for such period as the
        members present may agree to and shall set another time convenient.

     e) At a meeting of the PSAC:

                (i)     The Chairperson or, in the Chairpersons absence, the Deputy-
                        Chairperson shall preside; or
                (ii)    If the Chairperson and the Deputy Chairperson are absent one of the
                        remaining members of the Committee may be chosen by the members
                        present at the meeting shall preside.
                (iii)   The project coordinator should be present as observer and to report on the
                        progress of the project. The national project coordinator (NPC) will
                        submit a written progress report to PSAC members at least 3 days before
                        the meeting takes place.

4.      Voting on Decisions by the Project Steering & Advisory Committee

       (a)    Questions arising at a meeting of the PSAC shall be determined by a simple
              majority of the votes of members present at the meeting;

       (b)    Each member present at a meeting of the Committee is entitled to one vote but, in
              the event of an equality of votes on any question, the person presiding may
              exercise a second or casting vote;

       (c)    All decisions shall be recorded in the minutes of the respective PSAC meeting;

       (d)    All minutes shall be approved at the beginning of subsequent PSCA meeting.


5.      Scope of Responsibility
        The Project Steering and Advisory Committee shall oversee the implementation of the
project including:

       (a)    Setting policy directions and guidelines in the implementation of the project,
              including the process for recruitment, acquisition of assets, strategies and plans in
              the implementation of the project.


                                                                                         Page 19
Provincial Capacity Building Project - PCaB



       (b)    Shall in the light of progress of project implementation, deliberate and make
              decision conducive to the advancement of the project;

       (c)    Shall comment on and endorse work plans submitted by the project coordinator
              and coordinators of sub-programmes;

       (d)    Provide instructions and guidance to the project coordinator on the coordination of
              the project implementation;

       (e)    Shall take any other decisions with regard to the project to ensure its proper
              execution and delivery;

       (f)    Shall ensure that the project is executed, completed and available funds are spent
              within a period of 12 months, as the project is a time-bound short-term
              intervention.




                                                                                       Page 20
Provincial Capacity Building Project - PCaB


Annex 3:           Terms of Reference National Project Coordinator


Post Title:                              National Project Coordinator (NPC)

Project Name and Number:                 Provincial Capacity Building Project

Duty Station:                            Port Moresby

Duration of Appointment:                 12 months fixed term

Starting Date:                           October 2004


Project Background:
       Following the SPFMT project intervention through which provincial treasuries have
been supported by UNVs, UNDP has now moved into an intermediate short-term (12 months)
Provincial Capacity Building Project (PCaB Project) to consolidate achievements from
SPFMT project, to test new elements of financial provincial capacity building and to pave
way for the design of a full-scale decentralization intervention.


Supervision:
      Direct Supervisor: The incumbent will work under the direct supervision of the FMIP
Programme Manager and Project Steering & Advisory Committee.
        Content and methodology of supervision: The incumbent’s activities and outputs
during the assignment will be identified, monitored, and evaluated based on an overall and
quarterly results-oriented workplans to be established at the beginning of the assignment. The
workplans include specific deliverables against which the performance of the incumbent will
be appraised and evaluated.

Duties and Responsibilities:
       The Programme Coordinator will be responsible for the overall management and
coordination of the Provincial Capacity Building Project including its sub-programmes and
components.
        The specific duties and responsibilities during the assignment would include, but not
be limited to, the following:
    • Organize and supervise overall project activities
    • Provide strategic advise to FMIP management on maters relating to provincial
        financial capacity building within the project framework
    • Coordination and supervision of MDG advocacy and HIV/AIDS awareness raising
        activities/session within training programmes and project components
    • Take responsibility for logistics and financial management of project activities
    • Closely liaise with all project stakeholders such as FMIP, PNGIPA, UPNG, UNDP
        and other stakeholders/donors
    • Provide support and on-the-job training the coordinators of project sub-programmes




                                                                                     Page 21
Provincial Capacity Building Project - PCaB


    •   Close monitoring of project activities and deliverables according to workplan and
        report on project progress on a regular basis to FMIP management, Project Steering &
        Advisory Committee as well as UNDP
    •   Assist the project executing partner (FMIP, DoF) in meeting the Government and
        donor accountability
    •   Organize logistics of IFMS study tour
    •   Develop TOR for the evaluation and design mission to be fielded during the second
        half of the project
    •   Organize logistics of the design mission


Qualifications and Experience:
    •   Advanced University Degree in Business Administration, Public Sector
        Management/Administration, Project Management, Accounting, or related field
    •   4 years successful professional work experience at management level including
        experience in the area of management and coordination of institutional strengthening
        – capacity building projects or programme
    •   Ability to supervise staff
    •   Very good understanding of Financial Management at Provincial Level as well as of
        issues related to decentralization in Papua New Guinea
    •   Knowledge of GoPNG accounting systems would be an advantage
    •   Ability to plan, organize, and execute specific tasks with good time management
        skills;
    •   Excellent inter-personal and communication skills (tact and discretion; a high level of
        public presentation skills, gender and cultural sensitivity);
    •   Complete fluency in written and spoken English; strong analytical skills and ability to
        write clearly and concisely;
    •   Proficiency in standard Computer applications (MS Office, Internet, Email)
    •   Monitoring, evaluation and report writing skills
    •   Demonstrated ability to adapt to workplaces characterized by diversity, differing
        levels of prior training, and scarce material resources
    •   Developing record of leadership in contexts of change management




                                                                                      Page 22
Provincial Capacity Building Project - PCaB


Annex 4:           Terms of Reference Assistant to FMIP Training Wing Manager


Post Title:                              Assistant to FMIP Training Wing Manager

Project Name and Number:                 Provincial Capacity Building Project

Duty Station:                            Port Moresby

Duration of Appointment:                 12 months fixed term

Starting Date:                           October 2004


Project Background:
        Major progress has been made at the PNGIPA since 2002. FMP has completed the
refurbishment of the FMIP Training Wing consisting of three classrooms, seminar rooms,
administration offices and ablutions. 89 students have now passed the Certificate in
Accounting and 60 have passed the Diploma in Accounting with the highest pass rates ever
recorded from any tertiary institution in the CPAPNG Accounting Technician Exams. Whilst
the results have been impressive and FMIP has appointed a Manager for the Training Wing,
the support provided by the Assistant FMIP Training Wing Manager would enable the new
appointee to effectively manage the facilities, courses and students, and provide some quality
assurance.

Supervision:
        Direct Supervisor: FMIP Training Wing Manager with overall supervision by PACB
Project National Coordinator.

        Content and methodology of supervision: The incumbent’s activities and outputs
during the assignment will be identified, monitored, and evaluated based on an overall and
quarterly results-oriented workplans to be established at the beginning of the assignment. The
workplans include specific deliverables against which the performance of the incumbent will
be appraised and evaluated.


Duties and Responsibilities:
The Assistant FMIP Training Wing Manager will be responsible for assisting the new
appointee to effectively manage the facilities, courses and students; and provide quality
assurance to the FMIP Programme Manager and the Director, PNGIPA.

        The specific duties and responsibilities during the assignment would include, but not
limited to, the following:

    •   Assist with the supervision of day-to-day administration and maintenance of the FMIP
        Training Wing.
    •   Effectively manage the allocation and use of classrooms and facilities to maximize
        usage.
    •   Participate in the development of the professional programme stream to full
        membership of the PNGIPA.


                                                                                     Page 23
Provincial Capacity Building Project - PCaB


    •   Coordinate the implementation of the International Computer Driving License
        (ICDL).
    •   Conduct examinations for the International Computer Driving License (ICDL),
        provide results and guidance to students undertaking the programme.
    •   Initiate and report any defaults, organize3 stationery requirements and maintenance of
        office equipment and the buildings.
    •   Provide quality assurance to the FMIP Programme Manager and the Director,
        PNGIPA.
    •   Assess possibilities to have Provincial Training Officers trained as Trainers of
        Trainers through the TOT course offered by PNGIPA


Qualifications and Experience:
  • Professional training and experience in management of educational facilities
  • Professional training and experience in providing quality assurance of educational
       programmes
  • Highly developed interpersonal skills
  • Experience in providing on-the-job training and mentoring
  • Report writing skills
  • Highly developed time management and resource management skills




                                                                                     Page 24
Provincial Capacity Building Project - PCaB


Annex 5a:       Terms of Reference Internship Programme Coordinator


Post Title:                              Provincial Internship Programme Coordinator

Project Name and Number:                 Provincial Capacity Building Project – Capacity
                                         Building Component
                                         Provincial Financial Internship Programme

Duty Station:                            Port Moresby

Duration of Appointment:                 12 months fixed term

Starting Date:                           October 2004


Project Background:
        As part of the UNDP Provincial Capacity Building Project (PCaB Project) a
Provincial Internship Pilot Programme is to be set up in collaboration with the School of
Business Administration, University of Papua New Guinea. The aim of the programme is to
give postgraduates in Business Administration and senior undergraduates in the Bachelor of
Public Administration program a chance to gather job experience through a short-term (2-3
months) exposure to work life in the civil service at the provincial treasury level. After having
received an induction training on provincial financial management the internees will be sent
to the provinces where they assist experienced Provincial Support Advisors (PSAs) employed
under FMIP Programme in their daily work. Internees as well as provincial staff will benefit
from an exchange of ideas and expertise.
Since this project component is a pilot approach only a small number of internees can be sent
to the provinces (max. 10) under informal or semi-formal agreements to be established with
UPNG. Besides the practical aspects of administration of the programme, the programme
coordinator will explore possibilities to formalize agreement with UPNG and other
stakeholders as this component might be included in a large-scale intervention at a later stage
if performed satisfactory.



Supervision:
       Direct Supervisor: The incumbent will work under the direct supervision of the
National Project Coordinator supported by the overall supervision of the project by the FMIP
Programme Manager and Project Steering & Advisory Committee.
        Content and methodology of supervision: The incumbent’s activities and outputs
during the assignment will be identified, monitored, and evaluated based on an overall and
quarterly results-oriented workplans to be established at the beginning of the assignment. The
workplans include specific deliverables against which the performance of the incumbent will
be appraised and evaluated.

Duties and Responsibilities:
       The Programme Coordinator will be responsible for the development of a Provincial
Financial Internship Programme for postgraduates in Business Administration and senior


                                                                                       Page 25
Provincial Capacity Building Project - PCaB


undergraduates in the Bachelor of Public Administration program in the School of Business
Administration, UPNG.

        The specific duties and responsibilities during the assignment would include, but not
be limited to, the following:
    •   Develop overall contents, duration and logistical framework of the programme
        Develop Programme information material for internee candidates, PSAs and
        Provinces
    •   In close consultation with FMIP management, UPNG, PSAs, and Provincial
        Treasuries, establish an introductory training programme for the internees to be held at
        FMIP training wing (2-3 weeks)
    •   Present the pilot programme to interested students of the School of Business
        Administration
    •   Coordinate immediate-term intern recruitment activities such as developing selection
        criteria for the internees (max 10 persons), receipt of applications and oversee short
        listing and selection of suitable candidates in close consultation with the UNDP, FMIP
        management and Provincial Treasuries
    •   Organize and coordinate promotional work towards future intern intakes
    •   Explore possibilities with the School of Business Administration to enter into a formal
        agreement with UPNG with regard to the integration of the programme into the
        courses offered by the school (credits)
    •   Negotiate with the School to give degree credits for internship
    •   Arrange logistics and take the lead for placement of internees in the provinces (travel,
        accommodation, living allowance, insurance coverage)
    •   Supervise the internees during their placement in the provinces in consultation with
        their PSA twins and supervise the reporting obligations of the internees towards the
        School and Programme
    •   Evaluate the pilot internship programme (among others) through individual evaluation
        reports submitted by internees and produce an overall evaluation report

Qualifications and Experience:
    •   University Degree in Business Administration, Public Administration, Accounting,
        Education or related field of Social Science
    •   3 years successful professional work experience related to project management and or
        public administration
    •   Good understanding of Financial Management systems and processes at Provincial
        Level as well as of issues related to decentralization in Papua New Guinea
    •   Ability to plan, organize, and execute specific tasks with good time management
        skills;
    •   Excellent inter-personal and communication skills (tact and discretion; a high level of
        public presentation skills, gender and cultural sensitivity);
    •   Demonstrated leadership abilities related to youth teams
    •   Complete fluency in written and spoken English; strong analytical skills; and ability to
        write clearly and concisely;
    •   Proficiency in standard Computer applications (MS Office, Internet, Email)
    •   Experience in training facilitation as well as in coordination/management of projects
        or programmes
    •   Monitoring, evaluation and report writing skills



                                                                                      Page 26
Provincial Capacity Building Project - PCaB


Annex 5b:       Terms of Reference Interns: Provincial Internship Programme


Post Title:                              Interns: Provincial Internship Programme

Project Name and Number:                 Provincial Capacity Building Project – Capacity
                                         Building Component
                                         Provincial Financial Internship Programme

Duty Station:                            Port Moresby

Duration of Appointment:                 2-3 months

Starting Date:                           October 2004


Project Background:
        As part of the UNDP Provincial Capacity Building Project (PCaB Project) a
Provincial Internship Pilot Programme in collaboration with the School of Business
Administration, University of Papua New Guinea. The aim of the programme is to give
postgraduates in Business Administration and senior undergraduates in the Bachelor of Public
Administration program a chance to gather job experience through a short-term (2-3 months)
exposure to work life in the civil service at the provincial treasury level. After having
received an induction training on provincial financial management the internees will be sent
to the provinces where they assist experienced Provincial Support Advisors (PSAs) employed
under FMIP Programme in their daily work. Internees as well as provincial staff will benefit
from an exchange of ideas and expertise.
The Internship project component is a pilot approach, which enables a small number of
internees to be sent to the provinces (max. 10) under informal or semi-formal agreements to
be established with UPNG.

Supervision:
       Direct Supervisor: The interns will work under the direct supervision of the
Provincial Internship Programme Coordinator supported by the National Project Coordinator
and the overall supervision of the project by the FMIP Programme Manager and Project
Steering & Advisory Committee.
        Content and methodology of supervision: The interns’ activities and outputs during
the assignment will be identified, monitored, and evaluated based on an overall and quarterly
results-oriented workplans to be established at the beginning of the assignment. The
workplans include specific deliverables and learning results against which the performance of
the interns will be appraised and evaluated.

Duties and Responsibilities:

    The specific duties and responsibilities during the assignment would include, but not be
limited to, the following:

    •   Participate actively in an induction training programme for interns to be held at FMPI
        training wing in the PNG Institute of Public Administration

                                                                                       Page 27
Provincial Capacity Building Project - PCaB


    •   Re-locate to the respective provincial treasury office, and under the supervision of the
        Programme Coordinator and the Provincial Support Advisor (PSA) undertake duties
        commensurate with assisting the PSA in their daily work.
    •   Specific duties encompass:
    •   Assist in the formulation and implementation of Provincial Financial Management
        Improvement Programmes
    •   Assist in monitoring and evaluation activities
    •   Assist in delivery of on-the-job training to provincial treasury staff
    •   Assist in liaison activities with Provincial Administration
    •   Assist the provinces to meet their financial reporting requirements as laid out by the
        Organic Law
    •   Assist the PSAs in their mentoring and coaching role


Qualifications and Experience:
    •   Near completion of university degree in Business Administration, Public
        Administration, Accounting, or related field
    •   Grade Point Average of at least xxx
    •   Familiar with Financial Management systems and processes in contexts of Provincial
        Level governance as well as issues related to decentralization in Papua New Guinea
    •   Ability to plan, organize, and execute specific tasks with good time management
        skills;
    •   Well-developed inter-personal and communication skills (tact and discretion; public
        presentation skills, gender and cultural sensitivity);
    •   Ability to adapt readily to living, working, and learning in a provincial environment
    •   Fluency in written and spoken English; strong analytical skills; and ability to write
        clearly and concisely;
    •   Proficiency in standard Computer applications (MS Office, Internet, Email)




                                                                                       Page 28
Provincial Capacity Building Project - PCaB


Annex 6:           Terms of Reference IT Support Technician


Post Title:                              IT Support Technician/System Administration Trainer

Project Name and Number:                 Provincial Capacity Building Project

Duty Station:                            All PNG Provinces

Duration of Appointment:                 12 months fixed term

Starting Date:                           October 2004


Project Background:
        Under Phase 1 of SPFMT, computers and a Local Area Network (with associated
training) were installed in the Provincial Treasury Offices. Refresher training in Local Area
Network (LAN) and Systems Administration will assist to embed the skills transfer and make
this sustainable.

Supervision:
      Direct Supervisor: PCaB Project National Coordinator

        Content and methodology of supervision: The incumbent’s activities and outputs
during the assignment will be identified, monitored, and evaluated based on an overall and
quarterly results-oriented workplans to be established at the beginning of the assignment. The
workplans include specific deliverables against which the performance of the incumbent will
be appraised and evaluated.


Duties and Responsibilities:
        The IT Support Technician/System Administration Trainer will be responsible for
retraining Provincial Treasury Office counterparts in the management and maintenance of the
LAN to enable maximum usage and benefits to be realized.

        The specific duties and responsibilities during the assignment would include, but not
be limited to, the following:

    •   Conduct a site survey in each of the 19 Provincial Treasury Offices to determine the
        status of the equipment and training requirements and collate this into a master
        document for administration purposes
    •   Conduct necessary PC hardware repairs (if any).
    •   Check wireless connectivity security in the sites with wireless equipment and re-
        establish this as necessary.
    •   Establish file-sharing capabilities.
    •   Establish and maintain an effective virus protection strategy for all PCs
    •   Service the associated printing equipment and train staff in essential maintenance
        procedures.
    •   Install new software that has become available since the initial installation (for
        example, ICDL and PFMTP Training Materials).
    •   Establish a software library system using the LAN.

                                                                                     Page 29
Provincial Capacity Building Project - PCaB


    •   Perform administrative task like and setting security configurations for PCs and other
        related devices and advanced user boot up passwords.
    •   Support the LAN systems administrator.
    •   Provide basic training to counterparts in email and Internet use.
    •   Provide training to key users (including the Provincial Treasurer) in each of the above
        so that sustainability is maximized.

Qualifications and Experience:
  • Professional training and experience in LAN/WAN and TCP/IP Networking and
       knowledge in Microsoft Windows and Network Systems Administration
  • Highly developed interpersonal skills
  • Experience in providing on-the-job training and mentoring
  • Report writing skills
  • Highly developed time management and resource management skills




                                                                                      Page 30
Provincial Capacity Building Project - PCaB


Annex 7:           Terms of Reference Web Designer

Post Title:                              Website Development and Training

Project Name and Number:                 Provincial Capacity Building Project - PCaB

Duty Station:                            Port Moresby

Duration of Appointment:                 3 months fixed term

Starting Date:                           January 2005


Project Background:
FMIP intends to establish a website for the Department of Finance (with web pages for FMIP
as a sub-set of this) that can be accessed by stakeholders and interested persons. Preliminary
work to develop the website has been commenced with some seed funding from FMIP. The
site must be developed in close consultation with key stakeholders. It will need to include a
security system to restrict access to some parts of the site.

Supervision:
      Direct Supervisor:                 PCaB Project National Coordinator

        Content and methodology of supervision: The incumbent’s activities and outputs
during the assignment will be identified, monitored, and evaluated based on an overall and
quarterly results-oriented workplans to be established at the beginning of the assignment. The
workplans include specific deliverables against which the performance of the incumbent will
be appraised and evaluated.

Duties and Responsibilities:
The Web Site Designer will be responsible for the development of the DoF/FMIP website and
to train departmental staff in website maintenance and updating.

The specific duties and responsibilities during the assignment would include, but not limited
to, the following:

    •   Conduct a survey of the work undertaken to develop the DoF/FMIP website to
        determine the status of the website and training requirements.
    •   Refining the design the concept of what the site will contain, how it might look and
        the means of navigating around it.
    •   Preparing a scoping document that sets out the proposed layout and content, the
        resources required, a work plan for implementation of the site and proposals for
        ensuring its sustainability. It is envisaged that this phase be completed within one
        month of commencement.
    •   Following the above, the second part will involve the creation of the site, providing
        user and technical documentation. The FMIP Programme Management and a small
        group of key users will undertake Testing and acceptance of the site.
    •   Train staff in essential maintenance procedures.
    •   Establish administration rights and advanced user access passwords.
    •   Provide basic training to counterparts in website updating the website.
    •   Provide training to key users in each of the above so that sustainability is maximized.

                                                                                       Page 31
Provincial Capacity Building Project - PCaB



Qualifications and Experience:
  • Professional training and experience in website design and development
  • Highly developed interpersonal skills
  • Experience in providing on-the-job training and mentoring
  • Report writing skills
  • Highly developed time management and resource management skills




                                                                             Page 32
Provincial Capacity Building Project - PCaB


Annex 8:           Terms of Reference of the IFMS study tour


1. Public Sector Financial Management Reforms are occurring around the globe and are
   characterized by:
   a.     Legal and regulatory reforms
   b.     Decentralization
   c.     Capacity building and training
   d.     Establishment of medium term expenditure plans or frameworks
   e.     Introduction of output focused budgets
   f.     Utilization of technology to improve fiscal planning and execution through
          integrating financial management systems into one, comprehensive framework
          commonly called an Integrated Financial Management System (IFMS).

2. The Government of Papua New Guinea (GoPNG) has been advancing many of these
   reforms over the past several years through a number of programmes, most notably the
   Financial Management Improvement Programme (FMIP). This programme has advanced
   to the point that it is now engaged in the evaluation and selection of an IFMS software
   package

3. Procurement, implementation and ultimately managing an effective and efficient
   Integrated Financial Management System (IFMS):
   • is a complex and expensive undertaking
   • spans several years
   • will effect almost every area of financial management across all levels of government
   • has the potential to make significant advances to the country’s abilities to manage the
       public’s financial resources
   • has the potential to win praise for the political and bureaucratic leadership of a
       country

4. Selection of the appropriate IFMS package, including the contractors who will install the
   package is critical to realizing the potential benefits of an IFMS and ensuring value for
   money.

5. It is recommended that a study tour be undertaken by selected members of the IFMS
   Evaluation Committee from the Government of PNG to support the evaluation and
   selection process. The Evaluation Committee is comprised of key users from the main
   divisions of the Departments of Finance Planning and Treasury affected by the IFMS.
   They have had limited exposure to modern financial management systems and lack
   experience in implementing systems of the proposed magnitude of the IFMS.

6. In order to be cost effective, the Study Tour should be confined to the key stakeholders
   who form the IFMS Project Management Team and/or the IFMS Evaluation Committee.

7. The study tour should visit various jurisdictions that are implementing or have
   implemented IFMS packages that have been proposed and are currently being evaluated.
   The Client Reference List provided by the Bidders should be used to select those
   installations that the key stakeholders who form the IFMS Project Management Team
   and/or the IFMS Evaluation Committee wish to visit.




                                                                                   Page 33
Provincial Capacity Building Project - PCaB


8. Benefits of the study tour would be:
   a.     Support the bid evaluation and selection process by ensuring that the proposed
          products can deliver the required functionality in a similar environment to that of
          the Government of Papua New Guinea.
   b.     Provide insights into potential benefits (and hazards) of the proposed applications.
   c.     Learn about different approaches to sustainability issues, such as:
               i. IT support
              ii. Communications (MAN/WAN/LAN) support
             iii. Recurrent costs and funding issues
   d.     Discuss techniques and lessons learnt regarding rollouts to sub-national levels of
          government.
   e.     Strengthen the Government’s negotiating position for the IFMS contract
          negotiations.

9. It is intended that the study tour should take place in October/November 2004 – in time to
   inform the selection process and the design of the revised technical requirements for Stage
   2 of the procurement process. The tour should not exceed three weeks duration.

10. A budget for the Study Tour would have to be developed and funding sought, however,
    the Study Tour should not exceed USD $40,000.




                                                                                    Page 34

						
Related docs
Other docs by tjr58585
Peak Oil Global Economy
Views: 5  |  Downloads: 0
Payroll Management System - DOC
Views: 75  |  Downloads: 0
Pcba Contract Manufacturing
Views: 17  |  Downloads: 0
Pdsa Worksheet - PDF
Views: 90  |  Downloads: 0
Pc Richards Job Application - PDF - PDF
Views: 34  |  Downloads: 0
Payroll Business Proposal
Views: 13  |  Downloads: 0
Paystub Spreadsheet
Views: 93  |  Downloads: 1
Pdf Research Report Retired Peoples
Views: 10  |  Downloads: 0
Pe Management
Views: 3  |  Downloads: 0