Equipment

Document Sample
Equipment
Equipment.doc









EQUIPMENT



Capital Equipment



The definition and value threshold for capital equipment varies yearly.

Always check with Finance to determine the current status.



As of January 2003, Capital equipment is defined as:



-Equipment that has a dollar value greater than $5000.00, or

-Capital Sensitive (pilfer-able) such as computers, printers and cameras.



All Capital/Capital Sensitive equipment should have an NSF tag number

and is tracked by the property administrator (Finance).



All purchases of capital or capital sensitive items should be reviewed by

the Finance property administrator and assigned a Capital Equipment

Document Number (CAPDOC#) and bought using the appropriate capital

equipment TCB (Transaction Cost Breakdown) code.



The Equipment Module



The MAPCON Equipment module provides a means to manage and track

individual items of equipment. It functions in conjunction with the Work

Order and Inventory modules by sharing or cross-liking some data.



Each of the major departments at McMurdo has the option of using or

not using the module and if they use the module to what extent.

Logistics has little direct control or participation in the equipment

module. Even those departments, which do not use the module, may be

required to have their equipment tracked in it because another

department requires this tracking to provide maintenance (e.g. IT&C

requires all computers to be tracked).



The following departments (as of January 2003) use the equipment

module:



-Operations (VMF, Power & Water, AGE, etc) (work order & equipment).

-IT&C (Information Technology & Communications) (equipment only).

-FEMC (Facilities, Engineering, Maintenance, Construction) (work order

& equipment). FEMC also tracks non-capital items in the equipment

module.

-MEC (Mechanical Equipment Center) (work order & equipment).









09/27/04 Page 1 of 6

Equipment.doc









The following departments do not participate directly in the equipment

module:



-Science and Science Support (except MEC).

-Operations departments (Housing, Recreation, Store)



The Equipment module provides a way to ensure accountability and

control of USAP equipment. However, Logistics/Supply does not

maintain it. There is a misconception that all capital equipment is

entered into the MAPCON Equipment Module. As each division within

Raytheon Polar Services determines whether or not they will utilize the

Equipment Module to track equipment, they also determine which

equipment they will enter.



Note: It is not necessarily the division that owns the equipment that

enters and maintains the equipment record; rather it is the division that

maintains the equipment.



Note: Because many items of equipment do not have equipment

numbers. Do not hold up receiving or inventory transactions waiting for

an equipment number to be assigned.



Note: There is no hard and fast rule about what is entered into the

equipment module. It is a decision that is made by each division.



Cross-linking Equipment and Inventory



Parts that go to a piece of equipment are entered into the second page of

the equipment record by the maintaining division:









09/27/04 Page 2 of 6

Equipment.doc









These stock number cross over to the inventory record and adds the

equipment number to the EQUIP# field on the second page:









Likewise, if you enter an equipment number on the second page of an

inventory record the stock number will appear in the equipment record.



Note: Only the inventory record for the actual major piece of equipment

is marked IN EQP? “YES” and it can only be marked “YES” if the there is

an existing equipment record (most new items will arrive marked “NO”).

The parts linked to a piece of equipment are marked IN EQP? “NO”.



Note: There is no inventory link between the ISSUES & RETURNS and

the Equipment Module. An issue to “Equipment” does nothing to the

equipment record.



Not all departments want to have all parts that are issued to a piece of

equipment associated to the equipment and listed on the second page of

the equipment record. For example, a filter may be issued for use with a

furnace, but it is not listed as being a part of the furnace.



The MET and Equipment:



The MET does not maintain or create Equipment records. They do create

the inventory stock record used to purchase the equipment. However,

because the MET maintains the Manufacturer Table we do impact the

equipment records.



Note: Do not remove a manufacturer from the manufacturer list, unless

you have verified that it is not being utilized in an equipment record.







09/27/04 Page 3 of 6

Equipment.doc









The MET also enters equipment number into the second page of the

inventory record when it is identified that a stock item is a repair part to

a piece of equipment. This will cross over to the equipment record.



If the inventory record is the piece of equipment (such as record 0066701

which is for a Pick-up Truck), do not enter the equipment number in the

EQUIP# field. Enter “YES” in the field IN EQP? as in the example below.









Any other information that may be important for the equipment record

should be passed on to the appropriate department POC.



Receiving Equipment:



When equipment is received on station, the TCN usually will have the

NSF tag number either in the description or in the upper right hand

corner, if the item is considered Capital Equipment. Equipment is

received the same as other stock material.



Keep in mind – Not all equipment is assigned an equipment number in

MAPCON. It all depends on whether or not the item will be maintained

by using station personnel.



The materials personnel are responsible for making two extra copies of

the receiving document (TCN):

-Original copy to the MET, as usual.

-Give one copy to the Finance Property Administrator.

-Give one copy to the equipment POC for the department.



Note: In the winter, the Supply Supervisor may be the collector for some

or all of these copies.





09/27/04 Page 4 of 6

Equipment.doc









With the constant seasonal influx of new personnel, this often gets

overlooked. The MET needs to be aware of equipment being received and

remind the materials person that the copies of the TCN need to be

forwarded to the appropriate people.



Issuing Equipment:



The MET must be constantly aware of the different methods of issuing

Equipment verses normal materials:



Note: It is important that when a piece of equipment is being issued that

it is issued correctly. We do not issue equipment to individuals in

MAPCON.



Note: Do not issue equipment to Work Orders.



Many express concern that issuing to equipment will not show who takes

the equipment. Most equipment is issued as a “DTO” (direct turnover). It

is perfectly acceptable to have the customer sign for the DTO on the

receiving document (TCN).



Items with NSF property tags (and items improperly missing their tags)

are issued (and returned) differently from normal materials. Various

departments have different policies concerning the management of

capital equipment (NSF Tagged items). Some departments enter capital

equipment into the MAPCON Equipment Module and others do not.

Only departments consistently utilizing the Equipment Module will

assign an Equipment# (Operations, IT&C, FEMC, MEC). An equipment

number (if assigned) can be found by browsing in the Equipment Module

under the “Browse by Tag#” selection and then inspecting the applicable

equipment record, if found.



Issue policies also differ by owning department concerning accounting for

inventory on the stock record. Some departments issue capital

equipment upon receipt and never return it to the warehouse (except for

ERR). Other departments keep items in the warehouse or return capital

equipment items to the warehouse and wish the quantity to be reflected

in the inventory stock record when not actually “in-use”.



Equipment numbers are found by browsing the Equipment Module using

the NSF Tag#. DO NOT delay reporting or processing an issue

transaction to wait assignment of an Equipment#. Report and process

the issue when it occurs.









09/27/04 Page 5 of 6

Equipment.doc









If you have an NSF Tagged item that is to be issued but it has not been

assigned an equipment number, enter the NSF tag number in place of

the equipment number. If/when an item has been entered into

equipment and given a number it is possible to edit the issue ticket at

TCL and replace the NSF tag number with the equipment number. Due

to the large number equipment items never receiving an equipment

number perform this edit at your convenience not as a must do

requirement. You must have SYS9 do Edit at TCL, if you do not have this

access, request the MET to edit the issue ticket.



There are three basic formats:



-Issued when the Equipment# is known.

-Issued when only the NSF# is known.

-Issued to “Unknown” or “Serial#” ONLY when neither the

Equipment# nor NSF# is known.



ISSUED TO is “EQUIPMENT/EQP#”

Redacted









ISSUED TO is “EQUIPMENT/NSF#”

Redacted









ISSUED TO is “EQUIPMENT/UNKNOWN” or “EQUIPMENT/Serial

number”

Redacted









09/27/04 Page 6 of 6


Share This Document


Related docs
Other docs by RickyBibey
Science Support Center Building Site Plan
Views: 3  |  Downloads: 0
GSMT-JWST Synergy Handout
Views: 17  |  Downloads: 0
Duct Leak Test Form
Views: 104  |  Downloads: 0
Letter to DETF Chair Edward Kolb (AAAC)
Views: 18  |  Downloads: 0
NASA Program Update -- Anne Kinney
Views: 3  |  Downloads: 0
Refrigerant Usage Log
Views: 1532  |  Downloads: 12
Utilities Outage Reporting
Views: 28  |  Downloads: 0
by registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!