									                  Link Light Rail
                              Westlake Station
                              University Street Station
                                Pioneer Square Station
                                  International District/
                                  Chinatown Station
                   Stadium
                    Station
                                   Beacon Hill
                     SODO            Station
                    Station
                                                      Mount Baker
                                                      Station



                                        Columbia
                                      City Station




                                                 Othello
                                                 Station




                                           Rainier Beach
                                                 Station




Adopted 2009 Budget                                       Tukwila
                                                     International Blvd
                                                           Station



                                        SeaTac/Airport
                                           Station


              DecembeR 2008
                                         Table of Contents
BUDGET MESSAGE
TABLE OF CONTENTS
BUDGET OVERVIEW
    Sound Transit – The Central Puget Sound Regional Transit Authority........................... ...............1
    Sound Transit’s Mission and Measures of Success.........................................................................2
    2008 Accomplishments....................................................................................................................4
    The Sound Transit District Boundary..............................................................................................8
    Sound Transit Board of Directors..................................................................................................10
    Management Organization.............................................................................................................11
    Citizen Oversight Panel.................................................................................................... .............13
    Basis of Accounting.......................................................................................................................14
    Financial Policies...........................................................................................................................14
    Financial Plan.................................................................................................................................15
    How to Read the Budget................................................................................................................15
    Revenue & Expense Summary......................................................................................... .............16
    Revenue Summary.........................................................................................................................17
    Adopted 2009 Budget Summary....................................................................................................21
    System Expansion..........................................................................................................................22
    Service Delivery ............................................................................................................................24
    Project Delivery ............................................................................................................................26
    Agency Operations.........................................................................................................................27
    Adopted 2009 Capital Budget........................................................................................................31
SYSTEM EXPANSION
    Program Summary.........................................................................................................................37
    Office of Policy and Planning Budget...........................................................................................38
    System Expansion Project Summary.............................................................................................39
SERVICE DELIVERY
    Program Summary.........................................................................................................................43
    2009 Budget Overview..................................................................................................................46
    Tacoma Link..................................................................................................................................49
    Central Link...................................................................................................................................53
    Sounder Commuter Rail.................................................................................................................57
    ST Express Bus..............................................................................................................................61
    Accessible Services........................................................................................................................65
    Transportation Services Capital Budget........................................................................... .............68
    Service Delivery Project Summary................................................................................................69
PROJECT DELIVERY
    Program Summary.........................................................................................................................87
    Link Light Rail Program Summary.................................................................................. .............89
    Changes in the Adopted 2009 Budget............................................................................................95
    Link Light Rail Project Summary..................................................................................................97
    Capital Projects Program Summary.............................................................................................112
   Sounder Program Summary.........................................................................................................112
   Changes in the Adopted 2009 Budget..........................................................................................115
   Sounder Project Summary................................................................................................ ...........118
   Regional Express Program Summary..........................................................................................141
   Changes in the Adopted 2009 Budget..........................................................................................144
   Regional Express Project Summary.............................................................................................148
AGENCY OPERATIONS
   Program Overview.......................................................................................................................187
   Staff Operations...........................................................................................................................187
   Staff Operating Budget Summary................................................................................................190
   Agency Scorecard........................................................................................................................193
   Executive Department..................................................................................................................194
   Finance & Information Technology.............................................................................................198
   Legal Services..............................................................................................................................203
   Link Light Rail.............................................................................................................................207
   Capital Projects............................................................................................................................210
   Corporate Services.......................................................................................................................213
   Transportation Services...............................................................................................................221
   Policy, Planning, and Public Affairs............................................................................................225
   Central Costs................................................................................................................................230
   Community Development Fund...................................................................................................232
   Transit Oriented Development.....................................................................................................232
   Public Art Program......................................................................................................................234
   Research & Technology...............................................................................................................236
   Debt Service.................................................................................................................................238
   Non-Operating Expenses.............................................................................................................238
   Agency Administration Capital........................................................................................ ...........240
   Capital Replacement....................................................................................................................241
APPENDICES
   Appendix A - Sound Transit Staffing Plan..................................................................................243
   Appendix B - Supplemental Information.....................................................................................257
   Appendix C - Performance Measures..........................................................................................265
   Appendix D - Financial Policies..................................................................................................271
   Appendix E - Budget Process......................................................................................................279
   Appendix F - Sound Transit History............................................................................................283
   Appendix G - Glossary of Terms.................................................................................................301
   Appendix H - Reconciliation of Adopted Capital Plan to Proposed Capital Plan.......................307
                                 BUDGET OVERVIEW
    SOUND TRANSIT—THE CENTRAL PUGET SOUND REGIONAL
    TRANSIT AUTHORITY

    How the Agency was Established
    In the early 1990s, the Washington Legislature authorized King, Pierce and Snohomish counties
    to create a single agency—the Central Puget Sound Regional Transit Authority (Sound Transit)—
    to plan, build and operate a high-capacity transit system within the region’s most heavily used
    travel corridors. In September 1993, the Sound Transit Board of Directors held its first official
    meeting. The Sound Transit District includes the most urban parts of the three-county area and
    close to half of the state’s population.

    History of Sound Move
    In May 1996, the Sound Transit Board adopted Sound Move. The plan includes a mix of
    transportation improvements: high-occupancy vehicle (HOV) lane access improvements, ST
    Express bus routes, Sounder commuter rail and Link light rail. The plan includes new community
    “gateways”— connections in urban and suburban areas for communities to connect to the rest of
    the region. Sound Move is a comprehensive regional transit plan made up of almost 100 separate
    but interrelated capital and service projects. The plan also contains commitments to:
    •   Equitable revenue distribution. Local tax revenues will be used to benefit the five subareas of
        the Sound Transit District (Snohomish County, North King County, South King County, East
        King County and Pierce County) based on the share of revenues each subarea generates.
    •   Coordinated services and integrated fares. Regional and local transit services will be
        coordinated and an integrated fare structure developed.
    •   System expansion or tax rollback. Any second phase capital program that continues using
        local taxes for financing will require voter approval within the Sound Transit District. If
        voters decide not to extend the system, Sound Transit will roll back the tax rate to a level
        sufficient to pay off outstanding debt, and operate and maintain the investments made as part
        of Sound Move.
    •   Public accountability. Sound Transit will hire independent auditors and appoint a citizen
        committee to monitor Sound Transit’s performance in carrying out its public commitments.
        Citizens will be directly involved in the placement, design and implementation of facilities in
        their communities.

    Voter Approval
    On November 5, 1996, voters in the three-county Sound Transit District approved the local taxes
    necessary to fund the regional bus and rail transit systems described in Sound Move by a 56.5
    percent to 43.5 percent margin. The measure received a majority of votes in each of the three
    counties in the Sound Transit District (58.8 percent in King County, 54.4 percent in Snohomish
    County and 50.1 percent in Pierce County).


    On November 4, 2008, voters in the three-county Sound Transit District approved the local taxes
    necessary to fund approximately 36 more miles of light rail, 17 percent more express bus service
    and additional Sounder commuter rail service described in the regional Mass Transit Expansion
    Proposal (ST2) by a 57 percent to 43 percent margin. The measure was approved by 61 percent
    in King County, 54 percent in Snohomish County and 49 percent in Pierce County.



Adopted 2009 Budget                                                                              Page 1 of 312
    Sound Transit’s Mission and Measures of Success
    Sound Transit’s Mission
    Sound Transit’s mission is to build and operate an integrated regional high-capacity
    transportation system serving the three-county Sound Transit district. The services include
    commuter rail, light rail and regional bus services and capital facilities. Sound Transit is
    implementing its Sound Move regional plan in partnership with public agencies, jurisdictions,
    private sector and other interests, and the citizens of the Sound Transit District.
    Sounder commuter rail
    •   An 83-mile commuter rail system with 4 round trip trains between Everett and Seattle and 9
        round trip trains between Seattle through Tacoma to Lakewood and 12 stations.
    Regional Express bus and facilities
    •   19 ST Express regional bus routes to better connect cities and suburbs throughout the region
        and link with other local and regional transit services.
    •   Sound Transit is funding HOV access to 100 miles of freeway, bus, and carpool lanes to
        ensure fast and reliable local connections for regional bus service, to encourage carpool and
        vanpool use, and eliminate the need for buses, carpools, and vanpools to weave through
        general traffic at freeway entrances and exits.
    •   Community Connections includes stations, transit centers, park-and-ride lots, and arterial
        improvements to provide access to the regional transit network.


    Link light rail
    •   A 1.6-mile Link light rail line currently operating in Tacoma that connects the downtown,
        business, theater, and university districts with local and ST Express regional buses and
        Sounder commuter rail services at the new Tacoma Dome Station.
    •   Approximately 19 miles of new Central Link light rail transit that connects the University of
        Washington, Capitol Hill, downtown Seattle, southeast Seattle, Tukwila and SeaTac.
    •   The Initial Segment of the Central Link line is a 14-mile route that connects downtown
        Seattle, Beacon Hill and Rainier Valley with the Tukwila International Boulevard Station at
        South 154th Street in Tukwila near the Seattle-Tacoma International Airport.
    •   The Airport Link Segment of the Central Link line is approximately 1.7 miles in length
        extending from the Tukwila International Boulevard Station (South 154th Street) to a station
        near the main terminal at Seattle-Tacoma International Airport.
    •   The University Link Segment of the Central Link line connects downtown Seattle to Capitol
        Hill and the University District. University Link is the first segment of North Link that will
        be constructed, extending about 3 miles from downtown Seattle to a station on Capitol Hill
        and north to the University of Washington Station near Husky Stadium.




Adopted 2009 Budget                                                                             Page 2 of 312
    The voter approved Mass Transit Expansion (ST2) builds on the Sound Move program by:

        •    Adding 36 more miles of light rail to serve three major travel corridors. Link light rail
             would extend from North Seattle into Snohomish County, across Lake Washington into
             East King County and south of Sea-Tac International Airport to Federal Way.

        •    Providing 17 percent more express bus service, including 100,000 additional bus hours
             starting in 2009.

        •    Adding 65 percent more Sounder service capacity between Tacoma and Seattle, with four
             new round trips and longer trains and add permanent Sounder stations in Edmonds and
             Tukwila.




    Sound Transit’s Measures of Success
    •   High-quality projects completed on time and within budget.
    •   Services are well used and customer satisfaction is high.
    •   Checks and balances ensure accountability to the community.
    •   Staff, consultants, and contractors are accountable to the Sound Transit Board.
    •   Projects are developed with the help of meaningful community involvement and
        participation.
    •   Technical expertise is appropriate to implement the system, and a lean organization reflects
        the Sound Transit District’s values and diversity.
    •   Maximum local participation, including Minority/Women/Disadvantaged Business Enterprise
        firms, has been achieved in Sound Transit contracting.
    •   Projects include innovative design and operating features that benefit Sound Transit’s
        customers and will attract new riders.
    •   Partnerships are created that leverage Sound Transit’s investments and/or reduce project
        costs.
    •   Accessible transportation facilities in compliance with the Americans with Disabilities Act.




Adopted 2009 Budget                                                                              Page 3 of 312
    2008 Accomplishments
    As Sound Transit moves into 2009, the agency can look back on 2008 and point to significant
    accomplishments in projects and services.

    Project Delivery Accomplishments
    Sounder commuter rail
    •   Mukilteo Station, North Platform opened for service in June.
    •   Lakewood Station opened to bus service in September.
    •   Initiated construction at Everett Station Phase II in June.
    •   Initiated construction of South Tacoma Station in January.
    •   Groundbreaking for L Street Layover took place in October.
    •   Initiated final design of D to M Street Track and Signal Improvements between Tacoma and
        Lakewood.


    Link light rail
    •   Link light rail tunnel boring machine broke through the second Beacon Hill tunnel at the East
        Portal.
    •   The Tukwila Link light rail track and guideway work was completed.
    •   The SeaTac/Airport light rail station finishes contract package was awarded.
    •   The Airport Link light rail guideway was completed.
    •   Link light rail trains began testing in the Rainier Valley and Tukwila.
    •   Installation of public art continued for Link light rail Initial Segment.
    •   The entire Link light rail fleet of 35 vehicles was delivered to the O&M Facility in 2008.
    •   The contract amendment for 27 University Link light rail vehicles was awarded in 2008.
    •   Advanced the University Link final design to approximately 85% complete in 2008.
    •   Awarded the first two University Link construction contracts well below the engineers
        estimate.
    •   Published the East Link Draft Environmental Impact Statement in December 2008.


    Regional Express
    •   Redmond Transit Center opened for service in February.
    •   N. Everett Transit Center/College Station opened for service in March.
    •   Mercer Island Park & Ride opened for service in January.
    •   Bothell Branch Campus Access improvements were completed in April.
    •   Issaquah Transit Center opened in August.
    •   I-90 Two Way Transit and HOV Operations Stage 1 opened for service in October.
    •   South Everett Freeway Station opened for service in September.
    •   Totem Lake Transit Center/Evergreen Medical Center opened for service in October.



Adopted 2009 Budget                                                                             Page 4 of 312
    Service Delivery Accomplishments
    Systemwide
    •   Achieved a life-to-date milestone of 85 million riders carried systemwide during 2008.
    •   Assumed operations and maintenance of seven Central Link Light Rail stations in
        anticipation of the July 2009 passenger service date.
    •   Successfully transitioned the Capitol Hill properties into development-ready sites for
        University Link construction.
    •   Improved on cost per boarding performance measure for all modes. Consistently met all
        department scorecard measures.
    •   Under lead of regional Transit Integration Group and in coordination with WSDOT, began
        work to develop transit mitigation plans for major WSDOT highway projects including the
        Nickel and TPA projects.


    Tacoma Link
    •   Achieved a life-to-date milestone of more than 4 million passenger boardings since inception
        of service.
    •   Extended service to 10 pm on weeknights to meet requests for extended weekday hours.
    •   Provided service to four special events during 2008.


    Sounder commuter rail
    •   Achieved a life-to-date milestone of more than 10 million passenger boardings since
        inception of service.
    •   Average weekday boardings of nearly 10,000 per day were 13% higher than the previous
        year.
    •   Added two new peak-directional round trips on the Tacoma-Seattle South Line.
    •   Added a second reverse-peak directional trip on the South Line, operating from Seattle-
        Tacoma in the morning and from Tacoma-Seattle in the afternoon.
    •   Provided Sounder service for 15 Mariners Games, 8 Seahawks Games, the Susan G Komen
        Race for the Cure, and other special events.
    •   Began service to Mukilteo Station in June 2008.
    •   Received Board authorization to procure Automatic Engine Start Stop units to save fuel and
        reduce emissions of the Sounder locomotive fleet.
    •   Implemented new Sounder Commuter Rail Station Agent Program in April 2008 to provide
        customer service agents at Sounder stations during commute times and for special event
        trains.


    ST Express regional bus
    •   Achieved a life-to-date milestone of more than 74 million passenger boardings since
        inception of service.
    •   Weekday ridership surpassed 44,000 boardings per day during the fourth quarter and grew by
        17% in 2008



Adopted 2009 Budget                                                                              Page 5 of 312
    •   Began service to the South Everett freeway station.
    •   Achieved approximately $750,000 in savings from midday storage program with Pierce
        Transit.
    •   In September, began Sounder Connector service between Lakewood and Tacoma, the first
        competitively procured service contracted by Sound Transit.
    •   Accepted delivery on 27 buses as the first phase of the fleet replacement program. In
        addition, Sound Transit accepted delivery on 10 new buses to be operated by Community
        Transit and 2 for King County Metro.


    Central Link light rail
    •   Received delivery of the full complement of 35 light rail vehicles that will make up the
        Central Link fleet and will support operations between Downtown Seattle and the SeaTac
        International Airport.
    •   Vehicle testing of the light rail fleet will have been initiated on the entire initial segment and
        resulted in a total of more than 15,000 miles of test “burn in”.
    •   Successfully tested the joint operations of both buses and light rail vehicles sharing the same
        right of way in the Downtown Seattle Transit Tunnel.
    •   Hired more than 50 King County Metro Link staff as part of the Link Start up process.
    •   Updated operations and maintenance plans for Central and University Link.


    System Expansion Accomplishments
    Fare Integration
        Renegotiated the ticket vending machine maintenance agreement.
        Completed the Link Fare Structure Alternative Analysis to set the stage for Board decisions.
        Continued with final design and start-up preparation for regional ORCA smart card program
        scheduled to begin in 2009.


    Phase 2 Planning (ST2)
    •   Completed a Needs Assessment to guide the ST2 Update program development.
    •   Fully evaluated the performance of multiple ST2 Update Options against the Board’s
        performance criteria.
    •   Developed alternative schedules for the ST2 Update process, one leading to a public vote in
        2008 and another leading to a vote in 2010. Managed to the 2008 schedule based on Board
        direction throughout the year.
    •   Briefed the Board on topics such as the System Access Program, station access flexibility, the
        growth of the ST Express bus system, the expansion of the Sounder commuter rail service,
        and subarea equity.
    •   Worked with the jurisdictions to refine project scopes and cost estimates.
    •   Worked with the Board as they narrowed the investment options to 12-year 0.4% and 0.5%
        sales tax options for purposes of public review; updated the 20-year 0.5% sales tax option
        from 2007; and finally developed a compromise 15-year plan based on public and Board
        input.




Adopted 2009 Budget                                                                                 Page 6 of 312
    •   Met twice with the Expert Review Panel to review ST2 Update technical work.
    •   Completed a Benefit/Cost Analysis of the ST2 Update Plan.
    •   Worked with PSRC with respect to completing a formal finding of conformity with regional
        plans. This is expected to be final in September.
    •   The Board adopted the ST2 Update Plan on July 24, 2008 and scheduled the Plan to go to the
        voters on November 4, 2008.
    •   ST2 was approved by the voters on November 4, 2008.



    Agency Operations Accomplishments
    Start Program
    The following public art projects were installed:
    •   “El Jardin” and “Fishmobile” by Mauricio Robalino; “Parable” by Buster Simpson;
        “Increment” by Eugene Parnell at Rainier Beach Station
    •   “Come Dance With Me” by Augusta Asberry; “Rainier Valley Haiku” by Roger Shimomura
        at Othello Station
    •   “Garden Windows and Gate” by Juan Alonso; “A Relic in the Garden” and “Baskets of
        Light” by Gale McCall at Columbia City Station
    •   “Crow Creates the Earth with Lightening” by Barbara Earl Thomas at Walden Plaza
    •   “Cultural Storyboards” by Peter Reiquam (lead), Dionne Haroutunian, Joe Feddersen, James
        Jaxxa, Chris Silva and Sultan Mohammed along the MLK Corridor
    •   “Reeds” and “Bangles” OCS art by Dan Corson and Norie Sato along the MLK Jr. Way light
        rail alignment in Seattle
    •   “Seattle Sunrise” and “Seattle Sunset” by Guy Kemper; “Sky Within” by Sheila Klein at
        Mount Baker Station
    •   “Blue Lights over Duwamish” along the Tukwila Guideway by Dan Corson and Norie Sato
    •   “A Molecule for the Region” and “A Drop of Sustenance” by Tad Savinar; “Confluence” by
        Clark Weigman at Tukwila/International Blvd Station
    •   Sculptural attachments for the International Blvd crossing OCS poles
    •   “Anserinae” by Julie Berger at Mercer Island Park-and-Ride
    •   “Veiled Nature” by Gordon Huether at the Issaquah Transit Center
    •   “Flame” by Mark Calderon at Lakewood Station
    •   “South Tacoma” and “The End of the Line” by Ilan Averbuch at South Tacoma Station
    •   Two Earth Canoes for the “As Above So Below” Phase I project at Mukilteo Sounder Station


    Additionally, the art program:
    •   Received an award from the Americans for the Arts Public Art Network for “Sound of
        Light.” This artwork consists of a two block collection of reflector murals by Richard C.
        Elliott, and was recognized as one of the best public art projects in the nation for 2007-2008.
    •   Managed design review and approval for the Capitol Hill and UW Stadium stations of
        University Link, including hosting of the Capitol Hill Art Forum in June; design review and
        approval for the Kirkland Transit Center project; design review and approval for the
        Mountlake Terrace In-Line Station.



Adopted 2009 Budget                                                                              Page 7 of 312
    •   Implemented “STart on Broadway,” a series of temporary art installations and banners that
        activated empty storefront, mitigating the impact of early construction on Capitol Hill
    •   Began development and implementation of a system-wide long-term maintenance plan to
        protect Sound Transit’s public art investment.
    •   Completed a community-based project in the Rainier Valley at Aki Kurose Middle School,
        culminating in the launch of the Community Haiku competition.
    •   Completed a new youth-created mural lead by UrbanArtworks for the E-3 busway corridor.


    Research and Technology
    •   Began implementing the recommendations from the Downtown Tacoma Transit Technology
        Study with the City of Tacoma and Pierce Transit, which will implement Transit Signal
        Priority and signal timing modifications to ensure operational improvements for all transit
        modes through Downtown Tacoma.
    •   Expanded the Sounder south line communications and CCTV to Tacoma Link stations and
        maintenance base.
    •   Procured and installed Wifi devices and services for passenger internet use aboard Sounder
        cab and passenger cars.
    •   Negotiated change order with GE Transportation Systems to expand Sounder’s passenger
        readerboards to include ‘next arriving bus’ information to specific transit centers.
    •   Completed final design of the Kent and Auburn Garages Communications and CCTV
        expansion.
    •   Continued to provide GIS services to the agency for map production, data maintenance,
        application support and spatial analysis.


    Transit Oriented Development
    •   Analyzed real estate value of adopted Bel-Red Corridor transit-oriented rezone
    •   Coordinated purchase for Firestone Store relocation to facilitate Mount Baker Station TOD
    •   Completed the 2008-2010 Rainier Valley Surplus Property Utilization Plan


    The Sound Transit District Boundary
    The Sound Transit District, shown on the next page, includes the most congested urban areas of
    King, Pierce and Snohomish counties. The Sound Transit District boundary lines generally follow
    the urban growth boundaries created by each county in accordance with the state Growth
    Management Act.
    Effective January 1, 1999, the Sound Transit Board approved the withdrawal of approximately
    half of the city of Covington from the Sound Transit District. Effective January 1, 2002, the
    Issaquah Highlands area of the city of Issaquah was annexed into the Sound Transit District. On
    June 13, 2002, the Sound Transit Board authorized changes to the existing agency’s narrative
    boundary description. The changes include the annexed Issaquah Highlands area and replace
    references to precinct boundaries and city limit lines with geographical landmarks or references
    based on the public land survey system.




Adopted 2009 Budget                                                                           Page 8 of 312
Adopted 2009 Budget   Page 9 of 312
    Sound Transit District Subareas
    The Sound Transit District is divided into five geographic subareas for planning and financial
    purposes. The system components in Sound Move address unique needs in each of these subareas.
    Local tax revenues and related debt for projects and services are utilized to benefit the subareas
    generally in proportion to the level of revenues each subarea generates.
    Snohomish County: The Snohomish County subarea of the Sound Transit District includes the
    cities of Brier, Edmonds, Everett, Lynnwood, Mill Creek, Mountlake Terrace, Mukilteo and
    Woodway. In 2007, the Snohomish County subarea had an estimated population of 405,000
    residents, accounting for 59 percent of the Snohomish County population.
    North King County: The North King County subarea includes the cities of Seattle, Shoreline
    and Lake Forest Park. In 2007, the North King subarea had an estimated population of 654,000,
    accounting for 35 percent of King County’s entire population.
    South King County: The South King County subarea includes the cities of Algona, Auburn,
    Burien, Des Moines, Federal Way, Kent, Normandy Park, Pacific, SeaTac and Tukwila. Since
    1990, this has been the fastest growing area of King County. In 2007, the South King subarea had
    an estimated population of 488,000 residents, 26 percent of King County’s population.
    East King County: The East King County subarea includes the cities of Beaux Arts, Bellevue,
    Bothell, Clyde Hill, Hunts Point, Issaquah, Kenmore, Kirkland, Medina, Mercer Island,
    Newcastle, Redmond, Renton, Sammamish, Woodinville and Yarrow Point. In 2007, the East
    King County subarea had an estimated population of 500,000 residents, accounting for 27 percent
    of King County’s population.
    Pierce County: The Pierce County subarea of the Sound Transit District includes the cities of
    Bonney Lake, DuPont, Edgewood, Fife, Fircrest, Lakewood, Milton, Orting, Puyallup, Ruston,
    Steilacoom, Sumner, Tacoma and University Place. In 2007, the Pierce County subarea had an
    estimated population of 664,000 residents, accounting for 84 percent of the Pierce County
    population.


    Sound Transit Board of Directors
    Sound Transit is governed by an 18-member board made up of 17 elected officials and the
    Washington State Department of Transportation (WSDOT) secretary. The local elected officials
    include mayors, city councilmembers, county executives and county councilmembers from within
    the Sound Transit District. Each county is represented by one boardmember per 145,000 people
    living within that county. Boardmembers from each county are appointed by their respective
    county executive and confirmed by their county council. The appointment process includes
    consultation with local cities and towns.
    By state law, appointments must include an elected city official representing the largest city in the
    participating county and proportional representation from other cities and unincorporated areas.
    To help assure coordination between local and regional transit plans, half the appointments in
    each county must be officials who serve on the local transit agency board.
    Sound Transit boardmembers elect the board officers, including a chair and two vice chairs, every
    two years. The chair presides over all board meetings and is also a voting member. Additional
    information on the Sound Transit Board—including its structure, meeting schedules and
    locations, standing committees and actions—can be accessed at the Sound Transit Web site at
    www.soundtransit.org.
    All board sessions are open to the public, and comments are invited.




Adopted 2009 Budget                                                                             Page 10 of 312
    Management Organization

    Sound Transit’s management organization is designed to ensure achievement of the Agency’s
    strategic focus on project delivery, service delivery, system expansion, stewardship of resources
    and organizational vibrancy.

    In 2008 future challenges and opportunities, both external and internal, called for a strategic and
    comprehensive organizational review of how Sound Transit is structured and staffed to improve
    its ability to effectively deliver the mission—“Sound Transit plans, builds, and operates regional
    transit systems and services to improve mobility for Central Puget Sound.” Throughout the first
    half of 2008, the staff participated in key listening sessions to gather their input on the
    organization’s structure, strengths and gaps, guiding principles and other key inputs to the CEO
    for consideration. Based on employee input, industry review and a comprehensive review of the
    organization’s evolution and changing demands, the CEO is planning changes necessary to meet
    current and future needs; and to build on the foundation that emphasizes efficiency, effectiveness,
    quality, and customer service while meeting the needs of various constituencies.

    At the time that this document was published the results of the organizational review had not been
    finalized.




Adopted 2009 Budget                                                                            Page 11 of 312
                                                                                                                                          Sound Transit Management Organization
                                    Revised: 01/01/2009                                                                                          Sound Transit
                                                                                                                                                Board of Directors


                                                                                                                     Senior Rail
                                                                                                                     Activation                   Sound Transit
                                                                                                                      Manager                    Chief Executive
                                                                                                                                                     Officer                                   Diversity
                                                                                                                  Michael Williams
                                                                                                                                                    Joni Earl                                  Program
                                                                                                                                                                                              Manager (3)
                                                                                                                  Deputy Director                                                            Leslie Jones
                                                                                                                  Executive Admin




Adopted 2009 Budget
                                                                                                                   Kathy Albert




                         Executive
                      Director, Policy,                          Executive Director,
                                           Executive Director,       Finance &                   Executive Director,
                        Planning, &
                                            General Counsel         Information                    Link Light Rail
                       Public Affairs
                                           Desmond Brown            Technology                     Ahmad Fazel
                       Ric Ilgenfritz
                                                                  Brian McCartan
                         Gov’t &
                       Community             Environmental
                        Relations             Compliance                                                                                                                                                    Chief Corporate
                                                                                       Deputy Executive       Deputy Executive        Capital Projects                                                                               Human            Chief Safety,
                        Manager                Manager                                                                                                                    Transportation                    Communications
                                                                    Treasurer              Director               Director               Director                                                                                  Resources         Security & QA
                       Ann McNeil           Perry Weinberg                                                                                                               Services Director                      Officer
                                                                   Tracy Butler           Technical           Support Services       James Edwards                                                                                Manager (1)          Officer (2)
                                                                                          Services                                                                        Bonnie Todd                        Kathy Albert       Adrian Byrd-Pina     Hamid Qaasim
                                                                                                                Ron Lewis
                                                                                         Joe Gildner                                                                                                           (Acting)
                         Board
                      Administrator         Contracts Officer                                                                                                                       Deputy Director –                                                 Chief Safety
                      Marcia Walker          Kunjan Dayal           Controller                                  Civil/Systems                                   Deputy Director      Operations &              Public Art                              Manager
                                                                                                                 Integration             Business                                                              Program
                                                                  Kelly Priestley        Construction                                                          Program Facilities        Maint                                                         Peregrin
                                                                                                                  Manager            Services Manager                                                        Administrator
                                                                                          Manager                                                                Vicki Youngs          VACANT                                                          Spielhoiz
                                                                                                               George Hodges          Jerry DeMuro                                                          Barbara Luecke
                      Media Relations                                                    Ben Emam
                       & Public Info
                                                                                                                                                                                    Program Manager                                                  Security Officer
                         Manager                                  Risk Manager                                                                                                                                 Marketing
                                                                                                              Program Manager                                                        Mike Bergman                                                      Geoffrey
                       Geoff Patrick                                                   Civil Engineering
                                                                  David Grenier                                  Community             Construction                                                             Manager                                Getchman
                                                                                           Manager                                                               Assist Deputy
                                                                                                                  Outreach              Manager                                                                Tim Healy
                                                                                        John Sleavin                                                                Director
                                                                                                               Brooke Belman          Carol Rhodes              (Transportation)    Customer Service
                          Policy &                                                                                                                                                                                                                   Agency Quality
                      Planning Officer                                                                                                                             VACANT               Manager                                                        Assurance
                                                                                          Systems                                                                                                           Creative Services
                       Greg Walker                                 Finance and                                                                                                       Julie Shibuya                                                      Manager
                                                                                         Engineering           Project Control                                                                                  Manager
                                                                 Budget & Agency                                  Manager           Program Manager                                                          Jim Hammond                              Tim McClure
                                                                  Project Control         Manager                                       Corridor                                                                                                        (Acting)
                                                                                       George Hodges           Aniekan Usoro
                                                                     Manager                                                         Eric Beckman               Assist Deputy        Bus Operations
                                                                  Pete Rogness                                                                                     Director         Program Manager
                                                                                                                                                                Transportation          VACANT
                                                                                       Program Manager                                                         Services (Light
                                                                                                               Real Property         Transit -Oriented
                                                                                            Project                                                            Rail Operations)        Sounder
                                                                 Chief Information                               Manager               Development
                                                                                         Development                                                              VACANT              Operations
                                                                      Officer                                  Roger Hansen          Scott Kirkpatrick
                                                                                            Vacant                                                                                     Manager
                                                                  Jason Weiss
                                                                     (Acting)                                                                                                        Martin Young
                                                                                       Program Manager                                                           Accessibility
                                                                                        Environmental                                                          Project Manager        Tacoma Link
                                                                  Grants Manager          James Irish                                                           Michael Miller          Manager
                                                                  Lisa Wolterink                                                                                                    Cleve Cleveland
                                                                                                                                                                                                                 (1) This position has a dotted line reporting
                                                                                                                                                                                                                  relationship to the Chief Executive Officer.
                                                                                                                                                                                    Property Manager
                                                                                                                                                                                     Nancy Bennett
                                                                                                                                                                                                                 (2) This position has a dotted line reporting
                                                                                                                                                                                                               relationship to the Chief Executive Officer and
                                                                                                                                                                                                                     the Link Light Rail Executive Director




Page 12 of 312
                                                                                                                                                                                      Central Link
                                                                                                                                                                                      Operations
                                                                                                                                                                                    Charles Joseph              (3) This position has a dotted line reporting
                                                                                                                                                                                                                relationship to the Operations, Projects and
                                                                                                                                                                                                                   Corporate Services Executive Director
    Citizen Oversight Panel
    The Sound Transit Board’s commitment to public accountability is a significant theme in the
    policies that frame Sound Move. During the first quarter of 1997, the Sound Transit Board
    appointed members to the first Citizen Oversight Panel (COP). The provision for and
    commitment to a COP is contained in the agency’s adopted financial policies [“Public
    Accountability” (Sound Move financial policies, May 31, 1996, p. B7)]:
    “To insure that the 10-year construction program development and implementation occurs within
    the framework and intent of these policies, Sound Transit will:
        (a) conduct an annual comprehensive performance audit through independent audit services;
        (b) appoint and maintain for the 10-year construction period a COP, charged with an annual
            review of Sound Transit’s performance audit and financial plan, for reporting and
            recommendations to the Sound Transit Board.”
    Citizen Oversight Panel’s mission
    As an independent body, the COP reviews Sound Transit’s performance toward achieving its
    commitments to the public and provides recommendations regarding its performance. The COP’s
    responsibility is to provide the Sound Transit Board and the public with a regular report card.


    Members of COP
        Josh Benaloh
        Richard U. Chapin, Chair
        Aubrey Davis
        Chris Elwell
        Robert M. Goldstein
        Miriam Helgeland
        Robert B. Hitchcock
        Karen Miller
        Michael Murphy
        David A. Russell, Ph.D.
        Stuart Scheuerman
        Bruce Seiber
        Vic Sood
        Joseph D. Wessling
        Paul J. Wiesner, MD


    Areas of Responsibility
    The COP monitors and provides recommendations concerning Sound Transit’s performance in
    meeting its public commitments in the following policy areas:
        •    Public participation in plan implementation.
        •    Evaluation of project alternatives and recommendations.
        •    Management of annual capital/operating budgets and finance plan.
        •    Regional fund management.
        •    Equity, subarea budgets, and financial reporting.
        •    Adherence to project schedules and budgets.




Adopted 2009 Budget                                                                         Page 13 of 312
    Reports on Sound Transit Performance
    The COP has delivered nineteen annual and semi-annual reports. In May 2005, the COP delivered
    a Sound Move Year 8 Review on Sound Transit’s performance in meeting its commitments to the
    public since the 1997 Midyear COP Report. In April 2007, the COP delivered a review of the ST2
    Draft Plan. On January 27, 2009 the COP delivered its 2008 Year End Report. All COP
    performance reports can be accessed on the Sound Transit Web site at
    http://www.soundtransit.org/x2199.xml


    Basis of Accounting
    Sound Transit maintains its accounts and prepares its financial statements using the economic
    resources measurement focus and accrual basis of accounting in accordance with accounting
    principles generally accepted in the United States of America and methods prescribed by the State
    Auditor. The Governmental Accounting Standards Board (GASB) is the accepted standard-
    setting body for establishing governmental accounting and financial reporting principles. All
    applicable GASB pronouncements, as well as all Financial Accounting Standards Board (FASB)
    statements and interpretations are applied, except for those FASB statements and interpretations
    that contradict GASB pronouncements.
    Information presented in the budget is presented in accordance with this basis of accounting. Tax
    revenues are reflected when the underlying transaction upon which the tax is imposed is expected
    to occur, operating revenues in the period for which services are provided and earned, and
    expenses in the period when incurred. Expenditures on capital outlays are capitalized as ‘capital
    assets’ when the costs have been incurred. The costs of these assets are then depreciated over the
    estimated useful life of the asset beginning when the asset has been put into use. Capital assets
    whose ownership is not retained by Sound Transit and transferred to another governmental entity
    pursuant to an interlocal agreement, are expensed as a ‘contribution to other governments’ upon
    completion.

    Financial Policies
    The Sound Transit Board (“the Board”) adopted an initial framework for the financing of Sound
    Move, by setting local tax rates, focusing on minimal debt financing, requiring conservative
    projections for federal and state funding, and establishing a definition by which equity will be
    measured. The Financial Policies reflect the Board's policy intent for implementing the financial
    framework for completing Sound Move and subsequent System Plans and for providing the tools
    to the Board to appropriately manage toward and respond to future conditions.
    These policies, adopted under Resolutions No. 72, 72-1, R2007-05 and R2008-10 provide:
    Equity: Equity will be defined as utilizing revenues for projects and services that provide
    transportation benefits to residents and businesses in each of the subareas generally in proportion
    to the level of revenues each subarea generates. The Financial Plan will provide projections for
    each of the five subareas, comprised of the subarea's projected share of local taxes, use of bonds,
    farebox proceeds, an assumption for federal funding and related expenditures. Sound Transit will
    establish a system that on an annual basis reports subarea revenues and expenditures. Subarea
    capital projects and transit services will be evaluated annually as a part of the Board’s
    consideration of an annual budget.
    System-wide expenditures: The Board shall fund such system-wide expenditures as necessary
    to maintain and plan for an integrated regional transit system consistent with voter-approved
    System Plans. Such system-wide expenditures shall include fare integration, research and
    technology programs, future phase planning and agency administration and other such
    expenditures as determined by the Board to be appropriate. Properties authorized for purchase by



Adopted 2009 Budget                                                                            Page 14 of 312
    the Board to preserve required right-of-way will be funded as a system-wide cost until such time
    as the right-of-way is utilized by a subarea(s), at which time the cost will be allocated to the
    subarea(s) consistent with Board approved allocation.
    Conservative use of debt: Sound Transit is committed to placing limits on its use of long-term
    debt. These policies establish the conservative approach Sound Transit will use to calculate the
    cash flow available to service debt, set a debt service coverage ratio policy, and reserve a portion
    of Sound Transit’s debt financing capacity to provide a future potential funding source for
    unforeseen circumstances.
    Public accountability: Sound Transit has hired independent auditors and has appointed a Citizen
    Oversight Panel to monitor Sound Transit performance in carrying out its public commitments.
    Also, the state auditor and the Performance Audit committee provide additional oversight and
    accountability for the agency.
    System expansion or tax rollback: When the voter-approved capital projects in ST2 and Sound
    Move are completed, the Board will initiate steps to roll back the rate of sales tax collected by
    Sound Transit: to a level necessary to pay off the outstanding bonds, system operations and
    maintenance, fare integration, capital replacement, and ongoing system-wide costs and reserves.


    Financial Plan
    Sound Transit maintains a 25-year financial model that projects the total revenues and costs of
    Sound Move and Sound Transit 2 (ST2) on a consolidated basis. The model is used to verify the
    long-term financial viability of the program and confirm the maintenance of subarea equity.
    The financial model forecasts operating costs, capital outlays, revenues, bonding, debt service,
    and reserves from 1997 through 2040. The agency updates the Financial Plan each year with the
    latest grant and revenue and inflation forecasts, and capital and operating budget data. The plan is
    reviewed, but not adopted, by the board each year and is available to the public on request.

    How to Read the Budget
    Overall, the Adopted 2009 budget is organized into six main sections:
    Overview: This piece provides background on Sound Transit and its financial structure and a
    summary of the Adopted 2009 Budget.
    System Expansion: This section includes a detailed annual budget for projects relating to the
    vision for expanding the transit system and communicating that vision to the public.
    Service Delivery: This section provides detailed annual budgets for the operation of Sounder
    commuter rail, Tacoma Link light rail and Regional Express bus service and associated capital
    outlays.
    Project Delivery: This section includes an overview of the agency’s capital program for Link
    light rail, Sounder commuter rail and Regional Express projects. The section also includes a six-
    year capital plan with a detailed annual cash flow for each capital project. A risk assessment for
    each project identifies factors that could have budget and schedule implications.
    Agency Operations: This section details the 2009 staff operating budgets and 2009 performance
    management scorecards for each Sound Transit department. This section also includes budgets
    for capital expenditures and other operating costs, such as debt service, the costs of the Transit
    Oriented Development program, the STart Program and non-operating expenses.
    Appendix: This section includes further detailed information to provide the reader with
    additional background on the agency and the budget.




Adopted 2009 Budget                                                                             Page 15 of 312
     Sound Transit Revenue and Expense Summary
    I. REVENUES & OTHER FINANCING SOURCES

                                                                                                    2007 Actual               Adopted           2008              Adopted
                                                                                                     Revenues               2008 Budget        Actuals          2009 Budget

              Retail Sales and Use Tax                                                               $280,263,259            $286,195,724      $265,357,722      $278,661,569
              Motor Vehicle Excise Tax & Car Rental Tax                                                74,933,586              77,149,820        71,119,011        74,386,360
              Federal Grants                                                                          112,667,746             103,500,000       162,118,845       127,024,296
              Farebox Revenue                                                                          22,028,754              19,913,867        26,701,464        29,639,591
              Interest Earnings                                                                        20,235,774              21,056,076        15,720,084        11,481,556
                                     1
              Miscellaneous Revenue                                                                    13,430,423               5,611,234        25,846,635         3,893,846
              Bond Proceeds                                                                           450,000,000                     -                 -                  -


            TOTAL REVENUES & OTHER FINANCING SOURCES                                                 $973,559,543            $513,426,721      $566,863,762      $525,087,218



    II. EXPENSES AND OUTLAYS
                                                                                                    2007 Actual               Adopted           2008              Adopted
                                                                                                     Expenses               2008 Budget        Actuals          2009 Budget

            OPERATING BUDGET
             Staff Operating Budget                                                                     50,323,869               60,611,651       54,219,406        65,388,739
             less: Allocation to Capital                                                               (25,035,346)             (31,067,260)     (34,342,460)      (28,957,104)
             less: Allocation to Tr. Ops & Op Projs.                                                    (6,871,538)              (7,283,281)      (6,957,012)      (11,478,001)
             Transit Operations & Allocs.                                                             131,785,483              153,568,377      150,795,341       203,859,212
             Op. Projects, Interest & Allocs.                                                         144,369,259                70,646,032       91,293,961        51,076,948
             Total Operating Budget                                                                   294,571,728              246,475,519      255,009,236       279,889,793

              Adjustment for Non-cash Items                                                            (72,454,571)             (79,885,114)   (104,893,290)       (65,038,470)
              TOTAL NET OPER. BUDGET                                                                  222,117,157              166,590,405      150,115,947       214,851,323

            CAPITAL PLAN
             Capital Outlays                                                                          699,045,220              651,315,248      505,390,804       605,506,896
              Capital Replacement                                                                      22,964,000               22,244,940        22,244,940       24,689,540
              Administrative Capital Outlays                                                            1,321,160                1,317,000          261,964         1,243,000
              Costs Allocated to Capital                                                               25,035,346               31,067,260       34,342,460        28,957,104
              Capitalized Interest                                                                     37,267,261               69,372,598       57,752,162        54,198,834
              TOTAL CAPITAL OUTLAYS                                                                   785,632,986              775,317,046      619,992,330       714,595,374

            TOTAL OPERATING BUDGET
                                                                                                   $1,007,750,143             $941,907,451     $770,108,277      $929,446,698
            AND CAPITAL OUTLAYS

    Notes
        1   Includes contributions from local jurisdictions, REX advertising revenues, and rental income from Sound Transit properties.




Adopted 2009 Budget                                                                                                                                             Page 16 of 312
     REVENUE SUMMARY

    Sound Transit will collect an estimated $278.7 million in Retail Sales and Use Tax revenue and
    $74.4 million in Motor Vehicle Excise Tax (MVET) and Rental Car Tax revenues. In 2009,
    Sound Transit anticipates receiving $127.0 million in federal grant drawdowns, $29.6 million in
    farebox revenues, $11.5 million in interest earnings on cash and investments, and $3.9 million in
    miscellaneous revenues which includes contributions from local jurisdictions, Regional Express
    advertising revenues and rental income from Sound Transit properties.




                           Adopted FY 2009 Revenues
                           & Other Financing Sources
                                               (YOE $000)
                                                                       $525,087
                                                                       Retail Sales & Use Tax
                                                                       $278,662 (53.1%)
                                                                       MVET & Rental Car Tax
                                                                       $74,386 (14.2%)
                                                                       Federal Grants
                                                                       $127,024 (24.2%)
                                                                       Farebox Revenue
                                                                       $29,640 (5.6%)
                                                                       Interest Earnings
                                                                       $11,482 (2.2%)
                                                                       Miscellaneous Revenue
                                                                       $3,894 (0.7%)




Adopted 2009 Budget                                                                             Page 17 of 312
    Revenues and Financing Sources
    Retail sales and use tax
    In 2009, Sound Transit is anticipating to receive $278.7 million in Retail Sales and Use Tax
    revenue. Sound Transit collects 4/10 of one percent Retail Sales and Use Tax on transactions in
    the Sound Transit District. With the approval of ST2 by voters, Sound Transit will collect an
    additional five-tenths of one percent sales and use tax from April 1, 2009. The Retail Sales and
    Use Tax is imposed on the sale of most goods and certain services in the district. The tax is
    collected by businesses, which then remit the tax to the state. This tax is both a sales tax and a use
    tax, with the use tax collections amounting to about eight percent of the total taxes collected. The
    use tax is levied on items purchased out of state but used in state and on other items for which
    sales tax has not been paid. The tax is collected by the state Department of Revenue and remitted
    to Sound Transit through the Office of the State Treasurer.
    Motor Vehicle Excise Tax
    Sound Transit is expecting to receive $71.7 million in Motor Vehicle Excise Tax revenue for
    2009. Sound Transit collects 3/10 of one percent Motor Vehicle Excise Tax. The Motor Vehicle
    Excise Tax is a tax levied on the value of motor vehicles and collected at the time of vehicle
    licensing. The tax is collected by the state Department of Licensing and remitted to Sound Transit
    through the Office of the State Treasurer.
    Rental Car Tax
    Rental Car Tax revenues for 2009 are anticipated to be $2.7 million. Sound Transit collects 8/10
    of one percent Rental Car Tax, levied on the rental value of vehicles. The tax is collected by
    businesses and remitted to the state Department of Revenue. The Department of Revenue
    disburses the proceeds to Sound Transit through the Office of the State Treasurer.
    Federal Grant Funding Program
    Grant Assumptions in 2009 Financial Plan: The Financial Plan assumes a total of $1.98 billion
    in grant awards for Sound Move projects through 2016. The $1.98 billion includes: $500 million
    for the Link Initial Segment, $825 million for University Link, $57 million for Airport Link, $433
    million for Sounder and Regional Express and $172 million of FTA formula funds assumed for
    preventative maintenance for all modes.
    For University Link, the $825 million grant assumption consists of $813 million of section 5309
    New Starts funds under a Full Funding Grant Agreement (FFGA), $9 million of Congestion
    Mitigation/Air Quality (CMAQ) funds and $3 million of Section 5309 Fixed Guideway funds.
    The CMAQ and section 5309 Fixed Guideway funds have already been secured for years 2008-
    2010. The University Link FFGA is assumed to receive annual appropriations between 2008
    through 2016, totaling $813 million.
    Federal funding will be secured through conventional Federal Transit Administration (FTA) and
    Federal Highway Administration (FHWA) programs currently authorized under the Safe,
    Accountable, Flexible, Efficient Transportation Efficiency Act: A Legacy for Users (SAFETEA-
    LU) and future authorizations. Funding will be secured through both congressional
    appropriations and regional/national grant competitions. Grant funding assumptions by source
    are shown in the following table.




Adopted 2009 Budget                                                                              Page 18 of 312
                      Federal Funding Assumptions (Including University Link)
                                                                                Funding in Millions
                                 Funding Category
         Section 5309 New Starts (FTA Discretionary)                                    $1,435
         Section 5307 FTA Formula                                                        $222
         Section 5309 Fixed Guideway FTA Formula                                         $137
         Surface Transportation Program (FHWA Urban Competitive)                           $68
         Congestion Mitigation Air Quality (FHWA Competitive)                              $44
             Section 5309 Bus (FTA Discretionary)                                          $33
         State                                                                             $24
         Miscellaneous Competitive                                                         $11
         Surface Transportation Program (FHWA Railroad Crossing Comp.)                      $5
           Total                                                                        $1,980


    Results
    To date, Sound Transit has been awarded $1 billion, or 51 percent of the total projected federal
    funding. Funding has been secured through congressional appropriations and regional, state and
    national competitions. Funding has been secured across all funding sources and modes:
    •   $277 million for Sounder commuter rail rolling stock, track and signal work, railroad
        crossings, equipment, right-of-way and station construction.
    •   $590 million for Link Initial Segment, Airport Link. and University Link.
    •   $129 million for Regional Express rolling stock, transit centers, park-and-rides, and direct
        access ramps.
    •   $6 million for system wide improvements such as security improvements, signage and
        planning, Smart Card equipment, and the Remote Infrared Audible Signage project


    2009 Grant Award Projections: In 2009, Sound Transit is estimated to receive $162 million in
    grant awards. Of this amount, $129 million (80%) is the 2009 appropriation for University Link
    and the Initial Segment/Airport Link - consistent with the schedule of federal funds in the Full
    Funding Grant Agreements.


    2009 Grant Drawdown Projections: Grant drawdowns represent actual grant funds received
    from grant awards based on eligible expenditures occurring in the program. Generally, there is a
    time lag between the grant awards and the grant drawdowns, so the annual grant award estimate
    will not match the grant drawdown estimate. The time lag between the grant awards and the grant
    drawdowns varies in relation to when the FTA annual apportionments are published in the
    Federal Register, the time for FTA grant processing and when actual spending occurs on Sound
    Transit grant funded projects. In 2009, the budget for grant drawdowns is $127.0 million.




Adopted 2009 Budget                                                                              Page 19 of 312
    Farebox Revenues
    The Adopted 2009 Budget of $29.6 million includes approximately $15.6 million in farebox
    revenues from the ST Express bus service, $3.0 million for Central Link and $11.0 million from
    the Sounder commuter rail service. The Sounder fare structure was changed in June 2007 to be
    distance-based, whereby a distance based charge was added to a nominal base rate. The change
    yielded projected increases in revenues of approximately 10%. In projecting fare revenues over
    the long run, it is generally assumed that present transit fares continue with fare increases
    matching only inflation rates; the Adopted 2009 Budget does not assume any fare increases.
    The fare revenue forecast was built on the assumption of an average fare per boarding of $3.00
    for Sounder commuter rail service and $1.42 for ST Express bus service. An average fare per
    boarding of $1.00 was assumed for Central Link, pending the setting of an actual fare by the
    Sound Transit Board. Factors influencing the average fare per boarding include the base fare, the
    average number of zones traveled or distance traveled, the amount of institutional purchases of
    Puget Passes, and the amount of fare evasion.


    Interest Earnings
    In 2009, Sound Transit will earn an estimated $11.5 million in interest on its investments (on an
    accrual basis). The assumed 2009 effective interest rate on Sound Transit’s investments is 2.5%.
    On October 28, 2004, the Sound Transit Board adopted resolution R2004-14 that adopted an
    Asset Liability Management Framework to synchronize the management of the agency’s
    investments and debt on a consolidated basis. This policy superseded Resolution No. 97 and
    includes four distinct but coordinated policies: Asset Liability Management, Investment, Debt
    Management and Debt Swap.


    Miscellaneous Revenue
    The agency expects to receive a variety of miscellaneous revenue totaling $3.9 million in 2009.
    Primarily, these revenues include advertising on Sounder cars and Sound Transit buses along with
    rental income from Sound Transit properties. The agency will also receive some other
    miscellaneous payments and contributions from other government or private parties to Sound
    Transit. In the budget these revenues are reported on a consolidated basis for the agency.




Adopted 2009 Budget                                                                           Page 20 of 312
    Adopted 2009 Budget Summary
    The Adopted 2009 Budget represents the thirteenth full year of Sound Transit’s Sound Move. It
    contains the agency’s 2009 operating and capital budgets, a Phase 1 capital spending plan, as well
    as a 6-year rolling forecast for Service Delivery. Sound Transit uses the January-to-December
    calendar year for its budget and fiscal year. The total budgeted operating and capital plan for
    fiscal year 2009 is $929.4 million.
    Sound Transit’s Adopted 2009 Budget is organized according to its strategic focus: System
    Expansion, Service Delivery, Project Delivery and Agency Operations. As detailed in the budget
    information above, each of these components has an annual operating expense, an annual capital
    expenditure, and a long-term capital plan. The following information summarizes the Adopted
    2009 Budget by total operating and total capital expenses, regardless of the program area in
    which it is contained.
    The agency maintains a lifetime capital plan, which records historic spending since 1997 and
    forecasts all capital outlays through 2016. Summaries of the agency’s capital budget are presented
    below and each individual project capital plan is presented in subsequent chapters of the Adopted
    2009 Budget. For Service Delivery, to reflect the fact that Sound Transit is now out of the start-up
    mode, the budget forecasts will no longer only report on a 1997-2009 basis but will also show a
    six-year rolling forecast of expenses for each mode. This treatment is more in line with other
    transit properties and provides a more accurate picture of ongoing operations.




          Adopted FY 2009 Operating Budget & Capital Plan
                                               (YOE $000)



                                                                        $929,447
                                                                        Agency Operations
                                                                        $125,386 (13.5%)
                                                                        System Expansion
                                                                        $28,580 (3.1%)
                                                                        Service Delivery
                                                                        $211,978 (22.8%)
                                                                        Project Delivery
                                                                        $563,503 (60.6%)




Adopted 2009 Budget                                                                            Page 21 of 312
                                      Sound Transit Budget Overview
                                           Adopted 2009 Budget Summary

                                             2009               2009            Lifetime            6 year
                                           Operating           Capital          Capital       rolling forecast
                                            Budget             Budget           Budget            (2009-2014)

      System Expansion                 $ 15,008,700        $   13,570,964   $    20,867,298          N/A

      Service Delivery
       Link Light Rail                 $ 27,281,885        $            -   $             -   $   279,934,899
       Sounder commuter rail              37,964,614                    -                 -       244,867,515
       Regional Express bus               91,403,173                    -                 -       614,192,307
       Mobility Initiative Program         1,154,253                    -                 -         8,412,781
       Service Delivery Capital                  -             54,173,970   $   320,715,667       159,140,507
         Subtotal                      $ 157,803,925       $   54,173,970   $   320,715,667   $ 1,306,548,009

      Project Delivery
       Link light rail                                 -     371,680,207      4,379,229,827           -
       Sounder commuter rail                           -     154,253,524      1,429,941,142           -
       Regional Express bus                            -      37,569,112        834,400,809           -
         Subtotal                      $               -   $ 563,502,842    $ 6,643,571,778          N/A

      Agency Operations
       Net Staff Operations                 22,659,561                  -                 -            -
       STart                                   202,083          1,216,225        16,318,123            -
       Research & Technology                   100,000          2,000,000         6,364,852
       Transit Oriented Development            265,000                  -           100,000           -
       Capital Replacement                                     24,689,540       316,088,500           -
       Administrative Capital                     -             1,243,000        24,090,000           -
       Net Non-Operating Expenses        15,959,434                     -                 -           -
       Debt Service                       2,852,570            54,198,834                 -           -
         Subtotal                      $ 42,038,648        $   83,347,599   $   362,961,475          N/A

      Total                            $ 214,851,273       $ 714,595,375    $ 7,348,116,218   $ 1,306,548,009




    System Expansion
    System Expansion consolidates the agency’s activities that are related to the development and
    communication of a long-term plan for regional transit within the Puget Sound region. The
    program manages the Fare Integration project to implement a seamless system of regional fare
    media and policies and continues to work on long-range planning for the agency.
    The Adopted 2009 Budget of $28.6 million for System Expansion programs is $15.0 million in
    operating expenses and $13.6 million in capital expenditures. The Adopted lifetime budget of
    $103.7 million for this program is $82.8 million in operating expenses and $20.9 million in
    capital expenditures.




Adopted 2009 Budget                                                                                        Page 22 of 312
            Adopted FY 2009 System Expansion Budget
                                           (YOE $000)


                                                             $28,580
                                                         Fare Integration - Capital
                                                         $8,571 (30%)
                                                         Fare Integration - Operating
                                                         $1,478 (5.2%)
                                                         East Link - Capital
                                                         $5,000 (17.5%)
                                                         East Link - Operating
                                                         $5,303 (18.6%)
                                                         Phase II Planning - Operating
                                                         $8,228 (28.8%)




                                  System Expansion Budget
                                  Adopted 2009 Budget Summary

                                               Adopted                Adopted
                                                2009                 1997-2016
                                               Budget                 Budget
             Capital Budget
              Fare Integration             $    8,570,964        $       15,867,298
              East Link                    $     5,000,000       $        5,000,000
                Subtotal                   $    13,570,964       $       20,867,298

             Operating Budget
              Fare Integration             $    1,477,857        $       26,672,654
              East Link                    $     5,302,784       $       23,000,000
              Phase II Planning            $    8,228,058        $       33,168,000
               Subtotal                    $    15,008,700       $       82,840,654

             Total Spending
              Fare Integration             $    10,048,821       $      42,539,952
              East Link                    $    10,302,784       $      28,000,000
              Phase II Planning            $     8,228,058       $      33,168,000
                Total                      $    28,579,663       $     103,707,952




Adopted 2009 Budget                                                                      Page 23 of 312
    SERVICE DELIVERY
    The Transportation Services Department combines the planning, scheduling and operations for
    Sounder commuter rail, ST Express regional bus, and Central Link and Tacoma Link light rail.
    The department also includes customer service, facility maintenance, region wide signage and
    way-finding programs, and the Mobility Initiative Program.
    The Adopted 2009 Budget for Service Delivery is $212.0 million, of which $157.8 million is for
    expenses for operations and $54.2 million is for Service Delivery capital. Operational expenses
    are divided between the agency’s four modal services: $4.4 million for Tacoma Link operations,
    $22.9 million for Central Link operations, $38.0 million for Sounder operations, and $91.4
    million for ST Express operations, along with $1.2 million for Accessible Services, which
    supports all four modes of operations. The budget for operational expenses represents a $40.1
    million, or 34.1 % increase from the Adopted 2008 Budget. This increase reflects increased
    services for Sounder, ST Express and a half-year of Central Link operations. More information on
    transit operations budgets is provided in the Service Delivery section of the budget.




               Adopted FY 2009 Service Delivery Budget
                                              (YOE $000)


                                                             $211,978
                                                            Tacoma Link Light Rail
                                                            $4,379 (2.1%)
                                                            Central Link Light Rail
                                                            $22,903 (10.8%)
                                                            Sounder Commuter Rail Operations
                                                            $37,965 (17.9%)
                                                            ST Express Bus Operations
                                                            $91,403 (43.1%)
                                                            Accessible Services
                                                            $1,154 (0.5%)
                                                            Service Delivery Capital
                                                            $54,174 (25.6%)




Adopted 2009 Budget                                                                        Page 24 of 312
                                 Service Delivery Budget Summary
                                       Adopted 2009 Budget Summary
                                              (in YOE $000s)

                                                                                                      6-year
                                                    Adopted                  Adopted                  rolling
                                                     2009                   1997-2009                forecast
       Budget                                       Budget                   Budget                  (2009-2014)
       Operating Budget
       Tacoma Link Light Rail                   $        4,379          $       21,303          $         29,353
       Central Link Light Rail                          22,903                  22,903                  250,582
       Sounder Commuter Rail                            37,965                 218,488                  244,868
       ST Express Bus                                   91,403                 576,101                  614,192
        Subtotal                                $      156,650          $      838,794           $     1,138,995
       Accessible Services                               1,154                   3,736                     8,413
        Subtotal                                $      157,804          $      842,530           $     1,147,408

       Capital Budget                           $        54,174         $       184,273          $       159,141

       Total Budget                             $      211,978           $ 1,026,803             $ 1,306,548


       * These figures include contingency but do not include depreciation costs.
       * The 6-year rolling forecast includes expenditures from 2009-2014.
       * Lifetime capital budget includes expenditures through 2014
       * Link Light Rail includes Tacoma Link and Central Link operations only. Capital costs are included in
         the Project Delivery Section.




Adopted 2009 Budget                                                                                                Page 25 of 312
    PROJECT DELIVERY
    Sound Move included the development of a system of new regional public transit assets. The
    design and construction of these assets are grouped under Project Delivery. These include the
    Sounder commuter rail and Regional Express HOV and Community Connection projects, and
    Link light rail. The Adopted 2009 Budget includes $563.5 million capital expenditures in 2009.
    The Adopted 2009 spending plan represents a $83.2 million decrease from 2008 activity for these
    capital programs.
    The Adopted 2009 Budget also contains Sound Transit’s $6.6 billion lifetime capital spending
    plan (1997-2016) that presents detailed expenses on capital assets for each project in the three
    capital programs.




              Adopted FY 2009 Project Delivery Budget
                                               (YOE $000)



                                                                $563,503
                                                                Link Light Rail Capital
                                                                $371,680 (66%)
                                                                Sounder Commuter Rail Capital
                                                                $154,254 (27.4%)
                                                                Regional Express Capital
                                                                $37,569 (6.7%)




                                          Project Delivery
                             Adopted 2009 Capital Budget Summary

                                                     Adopted                    Adopted
                                                       2009                    1997-2016
                                                     Budget                      Budget
           Link light rail                       $   371,680,207             $ 4,379,229,827
           Sounder commuter rail                     154,253,524               1,429,941,142
           Regional Express bus                       37,569,112                 834,400,809
           Total                                 $   563,502,843             $ 6,643,571,778




Adopted 2009 Budget                                                                             Page 26 of 312
    AGENCY OPERATIONS
    The Adopted 2009 Budget contains $42.0 million in operating expenses and $83.3 million in
    capital outlays related to staff operations, debt service, public art (STart), Research &
    Technology, Transit Oriented Development, Capital Replacement, and other miscellaneous
    expenses.




                      Adopted FY 2009 Agency Operations
                                             (YOE $000)
                                                                  $125,386
                                                                  Net Staff Operating Budget
                                                                  $22,660 (18.1%)
                                                                  STart
                                                                  $1,418 (1.1%)
                                                                  Research & Technology
                                                                  $2,100 (1.7%)
                                                                  Transit Oriented Development
                                                                  $265 (0.2%)
                                                                  Capital Replacement
                                                                  $24,690 (19.7%)
                                                                  Administrative Capital
                                                                  $1,243 (1%)
                                                                  Net Non-Operating Expenses
                                                                  $15,959 (12.7%)
                                                                  Debt Service
                                                                  $57,051 (45.5%)




                                       Agency Operations
                                  Adopted 2009 Budget Summary

                                                                 2009
                                       2009 Operating           Capital
                                          Budget                Budget              Total
       Net Staff Operations            $ 22,659,561         $           -       $  22,659,561
       STart                                 202,083            1,216,225           1,418,308
       Research & Technology                 100,000            2,000,000           2,100,000
       Transit Oriented Development          265,000                    -             265,000
       Capital Replacement                                     24,689,540          24,689,540
       Administrative Capital                        -          1,243,000           1,243,000
       Net Non-Operating Expenses           15,959,434                  -          15,959,434
       Debt Service                          2,852,570         54,198,834          57,051,404
          Total                         $   42,038,648       $ 83,347,599       $ 125,386,247




Adopted 2009 Budget                                                                       Page 27 of 312
    Staff Operations: Sound Transit employs corporate staff—which administers its programs and
    services—and operations staff, which is directly involved in transit operations. The costs for
    corporate employees and associated expenses are captured within the agency’s staff budgets,
    which are detailed by the agency’s eight departments. The costs for operations employees are
    included in the Transportation Services budget and are addressed in the Service Delivery section.
    Sound Transit’s staff operating budget, including depreciation, increased from $60.7 million in
    the Adopted 2008 Budget to $65.4 million in the Adopted 2009 Budget. These costs include
    salaries and benefits for all agency non-operational employees, materials and supplies, utilities,
    insurance, depreciation, leases and rentals and other miscellaneous expenses.



                      ST Staff Operating Budget Change Summary
                                                 Adopted              Adopted              $             %
    Department                                  2008 Budget       2009 Budget            Change        Change
      Executive                             $       4,930,435     $    5,552,411     $     621,976       12.62%
      Finance & Information Technology             13,327,939         14,712,703          1,384,764      10.39%
      Central Costs                                 3,910,308          3,917,260               6,952      0.18%
      CDF Staff                                        88,930                 -             (88,930)   -100.00%
      Legal                                         2,889,623          3,246,401           356,778       12.35%
      Link Light Rail                              12,708,853         13,199,134           490,281        3.86%
      Capital Projects                              3,293,079          3,229,798            (63,281)     -1.92%
      Corporate Services                            8,679,211          9,203,769           524,558        6.04%
      Transportation Services                       5,494,913          6,575,206          1,080,293      19.66%
     Policy, Planning, and Public Affairs           5,388,360          5,752,058           363,698        6.75%
    Total Staff Operating Budget                   60,711,651         65,388,739          4,677,088       7.70%
      Allocation to Capital                        (31,067,260)       (28,957,104)        2,110,156      -6.79%
      Allocation to Transit Services                (7,283,281)       (11,478,001)       (4,194,720)     57.59%
     Depreciation                                   (2,125,308)        (2,294,073)         (168,765)      7.94%
    Net Staff Operating Budget                    $20,235,802         22,659,561          2,423,759      11.98%




Adopted 2009 Budget                                                                                     Page 28 of 312
                      ST Staff Operating Budget Change Summary
                                                 Adopted         Adopted             $             %
    Category                                   2008 Budget     2009 Budget        Change         Change
      Salaries & Benefits                    $     41,482,333 $ 44,306,909 $       2,824,576        6.81%
      Services                                      9,317,998     10,126,645         808,647        8.68%
      Materials & Supplies                          1,244,911      1,221,791         (23,120)      -1.86%
      Miscellaneous Expenses                        2,926,441      3,041,862         115,421        3.94%
      Leases & Rentals                              1,947,850      1,969,700          21,850        1.12%
      Other Expenses                                1,666,810      2,427,760         760,950       45.65%
      Depreciation                                  2,125,308      2,294,073         168,765        7.94%
    Total Staff Operating Budget                   60,711,651     65,388,739       4,677,088        7.70%
     Allocation to Capital                        (31,067,260)   (28,957,104)      2,110,156       -6.79%
     Allocation to Transit Services                (7,283,281)   (11,478,001)     (4,194,720)      57.59%
     Depreciation                                  (2,125,308)    (2,294,073)       (168,765)       7.94%
    Net Staff Operating Budget                     20,235,802     22,659,561       2,423,759       11.98%




                                      ST Staffing Plan Summary
                                                   Adopted        Current         Adopted       Change to
    Department                                   2008 Budget    Staffing Plan   2009 Budget      Current
    Corporate Staff
     Executive                                          31.00          31.00          31.00            -
      Finance & Information Technology                  73.00          75.00          78.00           3.00
      Legal                                             18.00          19.00          19.00            -
      Link                                             102.00         102.00         104.00           2.00
      Capital Projects                                  30.25          28.00          26.00          (2.00)
      Corporate Services                                55.25          56.75          58.25           1.50
      Transportation Services                           30.60          38.60          47.10           8.50
      Policy, Planning, and Public Affairs              31.25          31.50          31.50            -
    Total Corporate Staff                              371.35         381.85         394.85          13.00

    Operations Staff
     Accessible Services                                 2.33           2.00           2.00            -
     ST Express Bus Operations                           2.33           2.00           2.00            -
      Sounder Commuter Rail Operations                   4.33           4.00           4.00            -
      Tacoma Link Light Rail Operations                 17.00          18.00          19.00           1.00
      Central Link Light Rail Operations                  -              -             1.50           1.50
      Ticket Vending Machines                             -              -             7.50           7.50
    Total Operations Staff                              26.00          26.00          36.00          10.00

    Total Sound Transit Staff                          397.35         407.85         430.85          23.00




Adopted 2009 Budget                                                                                Page 29 of 312
    Community Development Fund (CDF): The Sound Transit Board established a $50 million
    fund to supplement the mitigation of impacts associated with construction and operation of light
    rail in southeast Seattle. For the Adopted 2009 Budget this program is closed with $0 dollar funds
    requested for 2009.
    STart: The Sound Transit Board has endorsed a public art program to work with artists,
    community and project staff to develop art projects for the agency’s capital projects to reflect the
    community’s interest and that reflects positively on the agency. The Adopted 2009 STart budget
    includes $202 thousand operating costs and $1.2 million capital costs.
    Research and Technology: Research and Technology is a Sound Move Phase I project to assess
    research and implement new transit technologies. The Adopted 2009 Budget for the Research and
    Technology Project includes $100 thousand operating costs and $2 million capital costs.
    Transit Oriented Development (TOD): The Sound Transit Board has adopted policies to
    promote public and private development that supports transit use by emphasizing pedestrian and
    transit access, clustering development and mixing land uses. These efforts include station area
    planning, surplus property redevelopment, and joint development opportunities. The Adopted
    2009 Budget for TOD expenses is $265 thousand.
    Capital Replacement: The Adopted 2009 Budget contains $24.7 million for contributions to a
    sinking fund for major maintenance and repair of Sound Transit capital assets. The contributions
    to the capital replacement reserve are consistent with the agency’s long term financial plan and
    methodologies outlined by the Federal Transit Administration (FTA).
    Miscellaneous: Agency Operations also includes expenses for administrative capital and non-
    operational expenses. The Adopted 2009 Budget for these expenditures is $1243 thousand and
    $32.6 million respectively.
    Debt Service: In December, 2008, Sound Transit had $1,195 million of long-term bonds
    outstanding, the proceeds of which were used to finance construction of capital projects.
    Payment of interest and amortization of issuance costs on the Sound Transit bonds is budgeted to
    be $57.1 million for 2009.




Adopted 2009 Budget                                                                             Page 30 of 312
                      Sound Transit Lifetime Capital Plan
        Adopted 2009 Budget (in $000) by Subarea/Department
                                          2008         2009         Change     % Change
                                         Current      Adopted
                Description              Budget
Snohomish County
         STart Capital                       1,084          1,084         0           0.00%
         Sounder                           382,698       382,698         -1           0.00%
         Regional Express                  157,681       169,066     11,384           7.22%
         Service Delivery Capital           40,065         51,739    11,674          29.14%
         TOD Capital                           100            100          0          0.00%
         Agency Operations                  79,556         51,139    -28,417        -35.72%
Snohomish County                           661,185       655,826      -5,360         -0.81%

North King County
         STart Capital                       6,757          6,757         0           0.00%
         Light Rail Capital               3,292,925     3,447,539   154,614           4.70%
         Agency Operations                  35,055         35,633       578           1.65%
North King County                         3,334,737     3,489,929    155,192          4.65%

South King County
         STart Capital                       4,319         4,319          0           0.00%
         Sounder                           360,969       462,645    101,676          28.17%
         Light Rail Capital                833,893       854,593     20,700           2.48%
         Regional Express                   78,733         78,296      -437          -0.56%
         Service Delivery Capital           22,084         23,712     1,628           7.37%
         Agency Operations                  70,109         72,198     2,089           2.98%
South King County                         1,370,107     1,495,763    125,656          9.17%

East King County
         STart Capital                       2,633          2,633         0           0.00%
         Regional Express                  528,081       566,294     38,212           7.24%
         System Expansion Capital                          5,000
         Service Delivery Capital           96,325       152,539     56,214          58.36%
         Agency Operations                  63,264         64,307     1,043           1.65%
East King County                           690,302       790,772     100,470         14.55%

Pierce County
         STart Capital                       1,525         1,525          0           0.00%
         Sounder                           476,274       584,598    108,324          22.74%
         Light Rail Capital                 80,416         77,097     -3,319         -4.13%
         Regional Express                   20,745         20,745         0           0.00%
         Service Delivery Capital           83,951         92,725     8,774          10.45%
         Agency Operations                 127,253         92,812    -34,440        -27.06%
Pierce County                              790,165       869,504      79,339         10.04%

Regional Fund
         System Expansion Capital           15,867         15,867         0           0.00%
         Agency Operations                  30,033         30,455       422           1.41%
Regional Fund                               45,900        46,322         422          0.92%

Agency Total                              6,892,396     7,348,116    455,720          6.61%




Adopted 2009 Budget                                                            Page 31 of 312
                           Sound Transit Lifetime Capital Plan
          Adopted 2009 Budget (In $000) by Department/Subarea
                                                2008         2009        Change     % Change
                                               Current      Adopted
                     Description               Budget
STart Capital
      Snohomish County                             1,084         1,084         0           0.00%
      North King County                            6,757         6,757         0           0.00%
      South King County                            4,319         4,319         0           0.00%
      East King County                             2,633         2,633         0           0.00%
      Pierce County                                1,525         1,525         0           0.00%
STart Capital                                     16,318        16,318         0           0.00%
Sounder
      Snohomish County                           382,698       382,698        -1           0.00%
      South King County                          360,969       462,645   101,676          28.17%
      Pierce County                              476,274       584,598   108,324          22.74%
Sounder                                         1,219,941    1,429,941   210,000          17.21%
Light Rail Capital
      North King County                         3,292,925    3,447,539   154,614           4.70%
      South King County                           833,893      854,593    20,700           2.48%
      Pierce County                                80,416       77,097    -3,319          -4.13%
Light Rail Capital                              4,207,234    4,379,230   171,996           4.09%
Regional Express
      Snohomish County                           157,681       169,066    11,384           7.22%
      South King County                           78,733        78,296      -437          -0.56%
      East King County                           528,081       566,294    38,212           7.24%
      Pierce County                               20,745        20,745         0           0.00%
Regional Express                                 785,242       834,401    49,159           6.26%
System Expansion Capital
      East King County                                           5,000
      Regional Fund                               15,867        15,867         0           0.00%
System Expansion Capital                          15,867        20,867     5,000          31.51%
Service Delivery Capital
      Snohomish County                            40,065        51,739    11,674          29.14%
      South King County                           22,084        23,712     1,628           7.37%
      East King County                            96,325       152,539    56,214          58.36%
      Pierce County                               83,951        92,725     8,774          10.45%
Service Delivery Capital                         242,425       320,716    78,290          32.29%
TOD Capital
      Snohomish County                               100          100          0           0.00%
TOD Capital                                          100          100          0           0.00%
Agency Operations
      Snohomish County                            79,556        51,139    -28,417        -35.72%
      North King County                           35,055        35,633        578          1.65%
      South King County                           70,109        72,198      2,089          2.98%
      East King County                            63,264        64,307      1,043          1.65%
      Pierce County                              127,253        92,812    -34,440        -27.06%
      Regional Fund                               30,033        30,455        422          1.41%
Agency Operations                                405,269       346,543    -58,726        -14.49%

Agency Total                                    6,892,396    7,348,116   455,720           6.61%




Adopted 2009 Budget                                                                 Page 32 of 312
                        Sound Transit Adopted 2009 Capital Budget
                                                      In $000
                                                                                   2009 Adopted            2009 Adopted
 Project                Project Name                                                                          Lifetime

             STart Capital
    000      STart Program                                                                    1,216                        16,318

                STart Capital                                                               1,216                       16,318
             Sounder
    100      Everett-Seattle Track & Signal                                                        0                     300,242
    101      Willow Creek Environmental Mitigation                                               96                         1,001
    110      Seattle-Auburn Track & Signal                                                  13,636                       255,469
    120      Auburn-Tacoma Track & Signal                                                    6,579                       198,352
    130      M Street-Lakewood Track & Signal                                               32,863                         78,630
    131      Permitting/Environmental Mitigation                                               426                         8,179
    135      D Street-M Street Track & Signal                                               29,914                       101,025
    140      Layover                                                                          5,666                        26,812
    150      Nisqually-Lakewood ROW                                                                0                       14,868
    201      Everett Station                                                                  1,432                        33,957
    205      Mukilteo Station, North Platform                                                     8                        10,221
    206      Mukilteo Station, South Platform                                                 1,888                        11,131
    207      Edmonds Station (Temporary)                                                          0                           176
    209      Edmonds Station                                                                  4,914                        12,929
    231      King Street Station                                                                   0                        7,928
    233      Boeing Access Rd Station                                                              0                           65
    235      Tukwila Station (Temporary)                                                          0                         2,837
    236      Tukwila Station                                                                    446                        16,434
    237      Kent Station                                                                          0                       32,388
    239      Auburn Station                                                                        0                       25,815
    241      Sumner Station                                                                        0                        8,741
    243      Puyallup Station                                                                      0                       13,336
    245      Tacoma Dome Station                                                                   0                        9,767
    247      Reservation-Freighthouse                                                             0                        16,380
    251      South Tacoma Station                                                               385                        16,476
    253      Lakewood Station                                                                      0                       31,358
    255      Lakewood CBD                                                                        0                         1,816
    510      ST2 Seattle - Auburn Track & Signal                                            30,778                       101,676
    520      ST2 Auburn - Seattle Track & Signal                                            25,222                         83,324
    600      Sounder Program Reserve                                                               0                        8,608

                Sounder                                                                  154,254                    1,429,941
             Light Rail Capital
    100      North Link - Northgate to 45th St                                                2,313                        19,548
    110      North Link - ST2 Early Work                                                      5,000                         5,000
    200      University Link - Pine St Stub Tunnel (PSST) to UW Station                    138,711                     1,756,007
    290      North Link - UW Station to Brooklyn Station (NE 45th St)                         6,103                        26,444
    300      Initial Segment                                                               156,126                     2,070,000
    390      DSTT Capital Costs                                                                  0                        23,719
    399      Initial Segment Project Reserve                                                       0                     128,300
    400      Airport Link - 154th St to 176th St                                            63,427                       269,100
    480      Airport Link South - 176th St to 200th St                                           0                         4,014

Note: Figures shown are rounded to nearest thousand, so totals may vary from the detail. Debt Service costs are not included in Total
Capital budget.




Adopted 2009 Budget                                                                                                           Page 33 of 312
                        Sound Transit Adopted 2009 Capital Budget
                                                      In $000
                                                                                   2009 Adopted            2009 Adopted
 Project                Project Name                                                                          Lifetime

    500      Tacoma Link                                                                           0                       77,097

                Light Rail Capital                                                       371,680                    4,379,230
             Regional Express
    105      Ash Way Transit Access/164th SW                                                    148                        18,993
    111      Lynnwood HOV Access/46th Ave W                                                        0                       25,707
    125      Federal Way HOV Access/S 317th                                                      23                        32,180
    131      Star Lake Freeway Station/S 272nd                                                     0                        3,096
    135      I-405 @ Southcenter                                                                   0                           55
    140      Totem Lake Freeway Station/NE 128th                                                115                        80,339
    141      85th Corridor, Kirkland                                                          3,569                         6,015
    142      Kirkland Transit Center/3rd                                                      2,871                        13,300
    144      Redmond Way, Redmond                                                                  0                        2,075
    145      Bellevue HOV Access                                                                   0                       71,470
    150      Renton HOV Access/N 8th                                                          6,339                        67,075
    151      Rainier Avenue Arterial Improvements                                             3,895                        15,717
    152      Strander Boulevard Extension                                                     1,023                         4,219
    160      Eastgate HOV Access/142nd Ave SE                                                      0                       31,774
    165      I-90 @ Sunset Interchange                                                             0                        9,185
    166      SR900 Park-And-Ride Arterial Improvements                                             0                        7,117
    311      Lynnwood Transit Ctr/46th Ave W                                                       0                       30,314
    312      Mountlake Terrace Freeway Station/236th SW                                     10,292                         40,869
    314      S Everett Transit Center                                                            0                             31
    316      N Everett Transit Center/Everett Comm College                                         0                        1,641
    319      S Everett Freeway Station/112th SE                                                 171                        31,209
    321      Federal Way Transit Center/S 317th                                                 604                        39,455
    322      Bellevue Transit Center/NE 6th                                                        0                       15,453
    323      Bellevue Rider Services Bldg                                                          0                        2,760
    324      Canyon Park Freeway Station                                                        273                        10,528
    326      Issaquah Transit Center/SR900                                                       63                        29,482
    328      Totem Lake Transit Center/Evergreen Medical Center                               3,080                         7,163
    330      Newcastle Transit Center/SE 70th                                                 2,021                         4,428
    332      Overlake Transit Center/NE 40th                                                      0                        10,939
    340      Ash Way Park-And-Ride                                                                 0                        1,114
    342      Swamp Creek Park-And-Ride                                                             0                          303
    345      Lynnwood SR99 Transit Lanes                                                           0                        2,546
    346      E Everett Park-And-Ride                                                               0                           86
    350      Redondo Heights Park-And-Ride/SR99                                                    0                        2,483
    352      Other Park-And-Ride Expansion                                                        0                            10
    354      Mercer Island Park-And-Ride/N Mercer Way                                           509                        16,829
    355      Issaquah Highlands Park-And-Ride/Highland Dr                                          0                        7,366
    356      Tacoma Dome Station                                                                   0                       10,805
    358      South Hill Park-And-Ride/94th Ave E                                                   0                        5,625
    360      Dupont Station/Wilmington Dr                                                          0                        4,314
    370      Pacific Avenue Overpass                                                               0                       16,222
    372      Bothell Branch Campus Access                                                       177                         2,281
    374      Redmond Transit Center/NE 83rd                                                       0                         6,666

Note: Figures shown are rounded to nearest thousand, so totals may vary from the detail. Debt Service costs are not included in Total
Capital budget.




Adopted 2009 Budget                                                                                                           Page 34 of 312
                         Sound Transit Adopted 2009 Capital Budget
                                                      In $000
                                                                                   2009 Adopted            2009 Adopted
 Project                 Project Name                                                                         Lifetime

    376      Woodinville Arterial HOV/SR202/SR522                                                  0                        1,411
    378      Yarrow Point Stop Improvements                                                        0                          109
    380      Sammamish Park-And-Ride/228th SE                                                      0                        7,086
    382      I-90 Two-Way Transit & HOV Operations, Stage 1                                     125                        25,782
    384      SR522 HOV Enhancements/Kenmore                                                      19                         8,791
    385      SR522 HOV Enhancements/Bothell                                                   1,786                         8,601
    386      I-90 Two-Way Transit & HOV Operations, Stage 2                                      19                        19,372
    387      I-90 Two-Way Transit & H0V Operations, Stage 3                                     446                        64,222
    395      Funds For Other Projects                                                             0                            31
    999      Regional Express Program Reserve                                                      0                        9,755

                Regional Express                                                          37,569                       834,401
             System Expansion Capital
    600      East Link                                                                        5,000                         5,000
    405      Fare Integration                                                                 8,571                        15,867

                System Expansion Capital                                                  13,571                        20,867
             Service Delivery Capital
    212      Ticket Vending Machines                                                            834                         7,678
    216      Passenger Information System/CCTV                                                  375                         6,231
    261      Bus Maintenance Facility                                                         3,720                        22,347
    290      ST Express Fleet Program                                                              0                     100,686
    356      Tacoma Dome Station                                                                   0                         311
    701      ST Express Fleet Replacement Program                                                  0                     116,569
    702      Sounder Fleet Program                                                             886                          2,434
    705      ST2 Fleet Expansion                                                            42,000                         42,000
    740      Small Works Program                                                                445                         2,748
    741      Auburn Bus Loop Concrete Replacement                                               470                           521
    743      Homeland Security Enhancements                                                     388                           947
    744      Talking Signs                                                                      503                         2,379
    745      ST Express Mobile Communications Projects                                        2,330                        10,531
    746      Regional Mobility Parking Enhancements                                           2,025                         4,972
    747      Security Office Expansion                                                            0                           165
    750      Sounder Maintenance Base Development                                               197                           197

                Service Delivery Capital                                                  54,174                       320,716
             TOD Capital
    340      Ashway TOD                                                                            0                          100

                TOD Capital                                                                       0                          100
             Agency Operations
    001      Agency Administration                                                            1,243                        24,090
    410      Research & Technology                                                           2,000                         6,365
    500      Capital Replacement                                                            24,690                       316,089

                Agency Operations                                                         27,933                       346,543
                       Total Capital budget                                              660,397                    7,348,116

Note: Figures shown are rounded to nearest thousand, so totals may vary from the detail. Debt Service costs are not included in Total
Capital budget.




Adopted 2009 Budget                                                                                                           Page 35 of 312
                      This page intentionally left blank




Adopted 2009 Budget                                        Page 36 of 312
                                   SYSTEM EXPANSION

    Program Summary
    Formerly known as “Transit Vision” this section of the agency budget has been renamed “System
    Expansion” in order to better articulate the agency’s priority for improving regional transit
    service by expanding and integrating the high capacity transit system. “System Expansion” is
    principally the responsibility of the Office of Policy, Planning and Public Affairs department
    (O3PA), which is made up of Office of Policy and Planning, Government and Community
    Relations, Media Relations and Public Information and Board Administration.

    O3PA is charged with working with the Sound Transit Board, the public, and partner jurisdictions
    to shape the agency’s priorities and policies for expanding and integrating the regional transit
    system. The department has led the agency’s effort to shape the Sound Transit 2 Plan that went
    before voters in November 2008, carrying out the technical work needed for the region’s
    communities and the Board to make decisions that deliver the greatest long-term benefits to
    region’s residents. O3PA maintains responsibility for informing and facilitating the participation
    of key stakeholders throughout the region and general public. O3PA maintains responsibility for
    government relations, community relations and media relations spanning all of the agencies
    activities, working with every department of the agency to provide the public with timely
    information and opportunities for involvement. O3PA facilitates the deliberations and actions of
    the Sound Transit Board and its committees, ensuring proceedings comply with state law and
    fulfill the Board’s commitment to operate in an open and transparent fashion.

    This section of the budget covers the operating expenses and capital expenditures for activity in
    2009 toward Sound Transit 2 and fare integration. Staff budgets for the Office of Policy,
    Planning, and Public Affairs are included in the Agency Operations section of the budget
    document.

    Sound Transit 2 – A Mass Transit Guide
    A healthy transit system is vital for the economy and quality of life in the region, particularly
    when faced with an estimated population increase of more than 40 percent by 2040. The core of
    the regional transit system Sound Move, approved by voters in 1996, is nearing completion.
    Sound Transit now carries more than 12 million riders annually. Sounder commuter trains run
    every weekday on 75 miles of track, and the system has seen some of the fastest ridership growth
    in the nation. ST Express buses connect population and employment centers throughout the
    region. Tacoma Link light rail trains are breaking ridership expectations. Construction is under
    way on the Central Link light rail system in Seattle and on transit centers and park-and-ride lots
    throughout King, Pierce, and Snohomish counties.

    Sound Move represents an important first step in building a regional system, but more work
    remains. Planning efforts culminated in updated ST2 Plan, adopted by the Sound Transit Board
    on July 24, 2008, to expand the regional system and approved by voters in November 2008.




Adopted 2009 Budget                                                                            Page 37 of 312
    Office of Policy and Planning (OPP)
    OPP provides agency and regional leadership in planning the regional High Capacity Transit
    (HCT) system; formulates public policy related to regional transit planning and system
    integration; coordinates regional transit fare policies and implementing regional fare technology
    and media; provides development review assistance to local jurisdictions to facilitate
    implementation of regional smart growth objectives; ensures Sound Transit’s needs are heard at
    the national level with respect to implementation of federal SAFETEA-LU mandates; and
    coordinated internal and external efforts for the update to the Sound Transit 2 plan. OPP was
    responsible for the planning that supported the Board’s update of the Long-Range Plan (July
    2005), and the technical planning and development of the Sound Transit 2 Plan. Both of these
    efforts build upon the achievements of Sound Move.

    In addition to its work on the update to Sound Transit 2, OPP also manages the Fare Integration
    Program, delivering the "seamless" system that was promised in Sound Move. While progress
    has been made in the near term to institute the PugetPass, OPP is working closely with Sound
    Transit’s regional partners to deliver a new system based on smart card technology which will
    allow customers to use the same card for fare payment for multiple transit services, including the
    Washington State Ferries, operated by various agencies. This future method of fare payment,
    scheduled to roll out prior to the opening of the Central Link light rail line, will make the system
    even more seamless for passengers; reduce cash transactions; and provide the basis for more
    accurate analysis of transit market patterns in the region.

    OPP also develops agency-wide policies and coordinates regional transportation planning efforts
    for Sound Transit. In addition to these specific responsibilities, it is responsible for addressing
    issues affecting all lines of business and coordinating transit reporting to the state and federal
    governments. OPP also supports the Sound Transit Board in its role of policy setting and long-
    range planning by developing alternative courses of action for its consideration that are realistic,
    timely, clear, and balanced. It works to develop internal policies that are consistent across all
    departments. It coordinates agency work with the Puget Sound Regional Council.

    Office of Policy and Planning Budget
    The Adopted 2009 Budget contains $15.0 million in operating expenses and $13.6 million in
    capital expenditures for activity in 2009 toward Sound Transit 2 and fare integration. The
    Adopted lifetime budget for the two projects is $82.8 million in operating expenses, and $20.9
    million in capital expenditures. Staff budgets for the Office of Policy, Planning and Public
    Affairs are included in the Agency Operations section of the budget document.




Adopted 2009 Budget                                                                             Page 38 of 312
              Adopted FY 2009 System Expansion Budget
                                             (YOE $000)


                                                                $28,580
                                                                Fare Integration - Capital
                                                                $8,571 (30%)
                                                                Fare Integration - Operating
                                                                $1,478 (5.2%)
                                                                East Link - Capital
                                                                $5,000 (17.5%)
                                                                East Link - Operating
                                                                $5,303 (18.6%)
                                                                Phase II Planning - Operating
                                                                $8,228 (28.8%)




                                     System Expansion Budget
                                     Adopted 2009 Budget Summary

                                                  Adopted                    Adopted
                                                   2009                     1997-2016
                                                  Budget                     Budget
                Capital Budget
                 Fare Integration             $    8,570,964           $       15,867,298
                 East Link                    $     5,000,000          $        5,000,000
                   Subtotal                   $    13,570,964          $        20,867,298

                Operating Budget
                 Fare Integration             $    1,477,857           $       26,672,654
                 East Link                    $     5,302,784          $       23,000,000
                 Phase II Planning            $     8,228,058          $       33,168,000
                  Subtotal                    $    15,008,700          $        82,840,654

                Total Spending
                 Fare Integration             $    10,048,821          $       42,539,952
                 East Link                    $    10,302,784          $       28,000,000
                 Phase II Planning            $     8,228,058          $       33,168,000
                   Total                      $    28,579,663          $      103,707,952




Adopted 2009 Budget                                                                             Page 39 of 312
    Phase 2 Planning
    The High Capacity Transit (HCT) Phase 2 Planning Program has proceeded with building on the
    updated Long-Range Plan to develop a second phase High Capacity Transit implementation plan
    known as “ST2”. Conceptual study, planning and detailed evaluation of potential ST2 projects,
    including ridership forecasting and conceptual cost estimating for a broad range of high capacity
    transit corridors, segments, alignments, projects and supporting projects and programs, continued
    throughout 2008.
    Sound Transit’s East Link light rail project is one element of the Sound Transit Long-Range Plan,
    as updated in 2005. Funding is included in the adopted Mass Transit Expansion Plan for East
    Link to expand light rail from downtown Seattle to the Eastside with nine planned stations
    serving Mercer Island, south Bellevue, downtown Bellevue, Bel-Red and the Overlake
    neighborhood of Redmond. Conceptual engineering for the project is complete and the Draft
    Environmental Impact Statement (DEIS) has been completed. The adopted 2009 operating
    budget will carry the project through the DEIS comment period and Board identification of a
    locally preferred alignment alternative for the project. The 2009 capital budget of $5.0 million
    for East Link will enable preliminary engineering to begin in the spring of 2009. The
    comprehensive budget amendment to be brought to the Board later this year will propose
    additional budget to complete East Link preliminary engineering and the Final Environmental
    Impact Statement.
    Budget Changes for Phase 2 Planning
    The lifetime operating budget of $33.2 million for Phase 2 Planning and $23 million for East
    Link are unchanged from the 2008 adopted budget. A new capital project for East Link has been
    added and has a 2009 budget and a lifetime budget of $5 million. This project will be further
    developed in the 2010 budget. The adopted operating budget for activity in 2009 is $8.2 million
    for Phase 2 Planning and $5.3 million for East Link.
    Fare Integration
    The Fare Integration program is responsible for promoting regional mobility through a system of
    seamless regional fare media and policies. The keystone of the program is the Regional Fare and
    Pass Reconciliation Agreement, which forms the basis for regional account reconciliation and the
    PugetPass (the regional transit pass program). The agreement allows all five of the region’s
    transit agencies to pool pass revenue into one account. It allows passes and cash transfers to be
    valid on all transit systems, regardless of purchase location, while insuring that agencies are
    compensated for the boardings provided. The basis for revenue reconciliation is research data,
    which is updated periodically based on on-board survey research conducted by Sound Transit.
    Fare Integration also oversees institutional passes such as FlexPass and U-Pass and negotiates
    pricing with Sound Transit’s partners and customers. PugetPasses and institutional passes, and a
    significant portion of cash fare payments will soon be replaced with “smart cards,” an electronic
    fare payment system which will allow for more accurate and timely data, faster boardings, and a
    simpler reconciliation process. Full system implementation is targeted for late 2009.
    Budget Changes for Fare Integration
    The total combined lifetime (1997-2011) operating and capital budget of $42.5 million for Fare
    Integration is unchanged from the Adopted 2008 Budget. The capital budget is $15.9 million and
    the operating budget is $26.7 million.
    The Adopted 2009 annual operating budget of $1.5 million and capital budget of $8.6 million is
    for continued work on fare integration. Since the 2007 budget was established, smart card project
    milestone delays have deferred the majority of project expenses by one fiscal year. The 2009
    budget increases the funding allocated for ticket vending machine expansion in 2009 and
    subsequent years once integration with the smart card system occurs. This integration increases
    the flexibility and potential regional uses for self-service smart card vending purposes.


Adopted 2009 Budget                                                                          Page 40 of 312
                                                System Expansion Capital
Project                                405      Fare Integration

Description
The purpose of the Fare Integration Program is to develop a uniform, single-ticket fare system and integrated fare policy for the region's
entire public transit service network. Currently, the Puget Pass program provides a means for transit riders to use a single piece of fare
media to ride all transit services in the three-county region. Puget Pass was embraced by regional transit agencies as a significant
commitment to the one-ticket ride concept and was seen as an interim step toward implementation of Smart Card technology.

Smart card is a cooperative effort of 7 different agencies providing public transportation, including Sound Transit, Community Transit,
Everett Transit, King County Metro, Kitsap Transit, Pierce Transit and Washington State Ferries. This new electronic fare system will
allow riders and employers providing transit benefits to reload passes and stored value on to reusable fare cards, eliminating the need for
monthly paper pass purchases. The smart card system will benefit transit agencies by speeding boardings and automatically tracking and
distributing fare revenue among participants. In 2009, ST's Fare Integration Program and representatives from the other agencies will
complete implementation and roll out of a seamless fare payment system among the 7 agencies.

Changes since 2008 budget: None
                            Summaries

                                                             Baseline (in $ 000)                  0
                                             2008 Current Budget (in $ 000)                   15,867
                                             2009 Adopted budget (in $000)                    15,867




Capital Costs
Sub Area                          1997-2007        2008          2009       2010       2011       2012       2013       Future     Total
Regional Fund                          5,691        1,069         8,571        537            0          0          0         0    15,867
Total                                   5,691       1,069          8,571       537            0          0          0         0     15,867


Capital Cost Elements
Cost Element                      1997-2007       2008          2009        2010       2011       2012       2013       Future      Total
Agency Administration                     0              0             0           0          0          0          0         0              0
Fare Integration/Research              5,691        1,069         8,571        537            0          0          0         0      15,867
Total                                  5,691        1,069         8,571        537            0          0          0         0      15,867




Adopted 2009 Budget                                                                                                      Page 41 of 312
                                                  System Expansion Capital
Project                                 600       East Link

Description
Scope: Construct an East Link project from downtown Seattle to downtown Bellevue, and Overlake Hospital via I-90. East Link would
connect to Central Link at the International District Station in Seattle and provide stations on I-90 at Rainier Avenue and Mercer Island. In
Bellevue, this segment of East Link would have three to four stations which would serve a regional park-and-ride, downtown Bellevue, and
Overlake Hospital. Continue the East Link project from east of downtown Bellevue to the Overlake Transit Center with a connection to a
light rail vehicle maintenance facility. This segment of East Link would have three stations which would serve the Bellevue-Redmond
Road corridor, the Overlake Station neighborhood, and the Overlake Transit Center. Complete environmental reviews and preliminary
engineering for extending light rail from Overlake Transit Center to Redmond Terminal Station.
The alignment and station locations will be determined through project level design and environmental review. Cost estimates for both
aerial and underground alignments in downtown Bellevue are presented here.
Changes since 2008: New capital project for the early implementation of East Link with an Adopted 2009 budget of $5M.
                                 Summaries

                                                                Baseline (in $ 000)                     0
                                              2008 Current Budget (in $ 000)                         5,000
                                              2009 Adopted budget (in $000)                          5,000




Capital Costs
Sub Area                             1997-2007       2008           2009       2010       2011          2012       2013       Future     Total
East King County                              0               0      5,000            0          0             0          0         0     5,000
Total                                         0               0      5,000            0          0             0          0         0      5,000


Capital Cost Elements
Cost Element                         1997-2007      2008           2009        2010       2011          2012       2013       Future      Total
Pre-Engineering/Env Review                   0              0       5,000             0          0             0          0         0       5,000
Total                                         0             0        5,000            0          0             0          0         0       5,000




Risk Assessment :
 Status: Preliminary Engineering

  Estimate Type:        Design                                            Schedule Risk level:        MEDIUM

      Budget Risk Level: MEDIUM                                              2008 Budget Schedule: NA
                                                                             2009 Budget Schedule: 2021




Adopted 2009 Budget                                                                                                            Page 42 of 312
                                  SERVICE DELIVERY
    PROGRAM SUMMARY
    Sound Transit’s Service Delivery program consists of the operations of the ST Express bus,
    Sounder commuter rail and Tacoma Link light rail systems. A major accomplishment for 2009
    will be the addition of Central Link’s 14 mile light rail service to Sound Transit’s transportation
    mix. ST Express operates 19 regional bus routes, Sounder North line offers four daily roundtrips
    between Everett and Seattle; as of September 2008 Sounder South line runs eight daily round
    trips between Tacoma and Seattle with two reverse commutes; and Tacoma Link provides service
    in the downtown Tacoma area.
    In 2009 Sound Transit will provide over 836,000 service hours to the region’s transportation
    choices, up about 29% over 2008. The 2009 ridership target is 20.3 million total boardings and
    average weekday boardings of about 79,000. Sound Transit also provides more than 40 commuter
    and light rail stations, transit centers and park-and-ride lots creating essential regional
    transportation connections and delivering high quality customer amenities and service. With
    Central Link and a dozen new light rail stations coming on line in July 2009, this amounts to a
    21% growth in service hours and a 30% growth in facilities maintained by ST.
    Ridership has grown steadily over the past few years, with a marked up-tick in 2008 due to high
    gas prices. Parking at regional park-and-ride lots is at or over capacity, especially at Sounder
    stations. In 2009 the agency will direct an even greater focus on initiatives to address system
    access and parking management.
    Since the inception of Sound Transit in 1997, the agency has played a key role in regional
    coordination activities including service planning, fare policy, accessibility initiatives and
    customer service delivery. This is accomplished though the regional Transit Integration Group
    (TIG), with participation from six other public transit entities.


    2009 Highlights
    The Transportation Services Department’s mission is to provide safe, reliable, user-friendly, and
    cost-effective bus and rail services to our customers. The following are other activity and
    initiative highlights for 2009:


    Transportation Services Operations and Maintenance
    Tacoma Link Operations
    •   Continue special event service, extending hours to accommodate events at the Tacoma Dome
        and Downtown Tacoma.
    Central Link Operations
    •   The Link Operations and Maintenance facility is occupied by King County Metro as the final
        six months of rail service activation preparation takes place.
    •   During the first half of 2009, King County Metro is staffed up to 145 employees to complete
        vehicle and system testing along the light rail test track and commence sixty days of
        simulated pre-revenue service.
    •   Other key activities include continuing development of operations and maintenance plans and
        standard and emergency operating procedures, finalization of the Operating Rule Book and
        completing emergency drills with emergency responders.




Adopted 2009 Budget                                                                            Page 43 of 312
    Sounder Commuter Rail Operations
    •   In 2009, the ninth and final south-line train will be in operation, with a fifth train set to be
        stored at the expanded L Street Yard in Tacoma.
    •   Sounder will continue to offer event service to Mariner baseball and Seahawk football games.
        Additional capacity will be added to meet the demand for this popular service.
    ST Express Bus Operations
    •   Manage new service contracts for Lakewood-Tacoma and Tukwila-Airport bus routes.
    •   Develop bus procurement plan for fleet replacement. Included in this plan will be an
        evaluation of alternative technologies in support of the agency’s Sustainability Initiative.
    •   Coordinate with partner staff on the development and implementation of plans for
        enhancements to the capacity of the maintenance facilities necessary to maintain the ST
        Express fleet.
    •   Community Transit and King County Metro will each begin their own radio system
        improvement projects. Pierce Transit will complete their radio system improvements in 2009.
        Radio system improvements increase reliability for dispatches through improved GPS
        locators, provide better passenger counting systems and benefit our customers with
        enhancements such as automatic stop announcements.


    Property, Facilities and Equipment
    Facilities, Signage and Fleet
    •   New facilities coming on line for 2009 include two freeway stations, one transit center, the
        addition of two Sounder stations and one platform and the expansion of another station, and
        the addition of twelve Central link stations, bringing the total number of facilities managed
        and operated to more than 40.
    •   Recruit and train new facility staff providing contract management and oversight to new
        facilities.
    •   Implement cost savings measures identified from using industry standards from the Building
        Owners and Managers Association as well as the International Facilities Management
        Association.
    •   Upgrade the facilities management program to help control maintenance costs and frequency
        of planned and preventive service at our sites.
    Parking and Customer Facilities Management
    •   Development of parking and customer facilities management strategies, for example, site
        specific plans, monitoring and enforcement initiatives, and public restroom policies and
        management.
    •   Participation in regional parking management initiatives: WSDOT park-and-ride program and
        regional Transit Integration Group activities.
    •   Transition of the Sounder Commuter Rail Station Agent Program from “start up” mode to full
        implementation.
    •   Development of performance measures.




Adopted 2009 Budget                                                                                Page 44 of 312
    Property Management
    •   Property Management will license the right to use ST railroad right-of-way to approximately
        87 private property encroachments, generating additional revenue of $150-250 thousand per
        year.
    •   Develop and implement a physical Real Property Asset filing system containing all land
        assets owned and operated by Sound Transit.
    •   Finalize and implement a property surplus program to responsibly surplus real property
        deemed surplus to Sound Transit operations.
    Ticket Vending Machines
    •   Sound Transit will hire and train technicians to provide the infrastructure to enable the
        Agency to maintain ticket vending machines with internal staff rather than solely relying on
        third party contracts.
    •   Ticket vending machines will be installed and operational at all new rail stations coming on
        line in 2009, more than doubling the number of TVMs serving the region.


    Transportation Services Support
    Service Planning & Development
    •   Development and approval of annual 2010 Service Implementation Plan (SIP).
    •   Implement 2009 service changes as called for in the 2009 SIP.
    •   Implement service standards to improve system productivity and optimize the use of
        resources.
    •   Complete public outreach and service planning process for bus service changes associated
        with Link Airport Extension.
    •   Work with WSDOT and partners to develop highway construction service mitigation plans.
    Customer Services
    •   Conduct annual Customer Service Satisfaction survey. Results will be compared to prior
        years’ surveys and trends will be evaluated and addressed as necessary.
    •   Coordinate with transit partners on regional customer service including comment response,
        rider information and trip planning.
    •   Support implementation of ORCA system and Central Link start-up.
    Accessible Services
    •   The first phases of the Talking Signs project will be completed and installed throughout the
        region.




Adopted 2009 Budget                                                                           Page 45 of 312
    Adopted 2009 Budget Overview
    The Transportation Services Adopted 2009 Budget is $212.0 million, consisting of $54.2 million
    for capital expenditures and $157.8 million for transit operations. The adopted 2009 rolling six-
    year forecast (2009-2014) for the Transportation Services program is $1,306.5 million, consisting
    of $159.1 million for capital expenditures and $1,147.4 million for operations.




               Adopted FY 2009 Service Delivery Budget
                                              (YOE $000)


                                                              $211,978
                                                             Tacoma Link Light Rail
                                                             $4,379 (2.1%)
                                                             Central Link Light Rail
                                                             $22,903 (10.8%)
                                                             Sounder Commuter Rail Operations
                                                             $37,965 (17.9%)
                                                             ST Express Bus Operations
                                                             $91,403 (43.1%)
                                                             Accessible Services
                                                             $1,154 (0.5%)
                                                             Service Delivery Capital
                                                             $54,174 (25.6%)


    Note: These figures include contingency, but not depreciation.




Adopted 2009 Budget                                                                          Page 46 of 312
                                Service Delivery Budget Summary
                                      Adopted 2009 Budget Summary
                                             (in YOE $000s)

                                                                                                     6-year
                                                   Adopted                  Adopted                  rolling
                                                    2009                   1997-2009                forecast
       Budget                                      Budget                   Budget                  (2009-2014)
       Operating Budget
       Tacoma Link Light Rail                  $        4,379          $       21,303          $         29,353
       Central Link Light Rail                         22,903                  22,903                  250,582
       Sounder Commuter Rail                           37,965                 218,488                  244,868
       ST Express Bus                                  91,403                 576,101                  614,192
        Subtotal                               $      156,650          $      838,794           $     1,138,995
       Accessible Services                              1,154                   3,736                     8,413
        Subtotal                               $      157,804          $      842,530           $     1,147,408

       Capital Budget                          $        54,174         $       184,273          $       159,141

       Total Budget                            $      211,978           $ 1,026,803             $ 1,306,548


      * These figures include contingency but do not include depreciation costs.
      * The 6-year rolling forecast includes expenditures from 2009-2014.
      * Lifetime capital budget includes expenditures through 2014
      * Link Light Rail includes Tacoma Link and Central Link operations only. Capital costs are included in
        the Project Delivery Section.




                                Service Delivery Budget Summary
                                      Adopted 2009 Budget Summary
                                             (in YOE $000s)

                                                                                                   6-year
                                                   Adopted                  Adopted                rolling
                                                    2009                   1997-2009              forecast
       Subarea                                     Budget                   Budget              (2009-2014)
       Operating Budget
       Snohomish County                        $       20,611          $      119,387          $       137,286
       North King County                               15,728                  15,728                  154,080
       South King County                               34,515                 171,938                  262,904
       East King County                                46,894                 281,528                  316,535
       Pierce County                                   40,056                 253,949                  276,602
         Subtotal                              $      157,804          $      842,530           $     1,147,408

       Capital Budget
       Snohomish County                                16,998          $       32,851          $         35,886
       South King County                                5,093                  18,109                    10,696
       East King County                                21,341                  72,174                    70,807
       Pierce County                                   10,741                  61,138                    41,752
         Subtotal                              $       54,174          $      184,273           $       159,141

       Total Budget                            $      211,978           $ 1,026,803             $ 1,306,548
      * These figures include contingency but do not include depreciation costs.
      * The 6-year rolling forecast includes expenditures from 2009-2014.
      * Link Light Rail includes Tacoma Link and Central Link operations only. Capital costs are included in
        the Project Delivery Section.




Adopted 2009 Budget                                                                                               Page 47 of 312
              Agency Transit Operations Budget Summary
                                                                                             2008 Adopted              2008               2009 Adopted
                                                                         2007 Actuals
                                                                                                Budget                Actuals                Budget

             SALARIES AND BENEFITS                                             1,813,786            2,285,500            2,131,364           11,624,941

             SERVICES
                 Management Services - TVMs                                      631,299             607,000               645,545              386,754
                 Maintenance of vehicles and system                            7,015,557           9,104,627             8,035,121           10,554,978
                 Maintenance of stations                                       1,496,017           2,353,383             1,711,667            3,334,162
                 Paratransit                                                           -                   -                     -              622,550
                 Downtown Seattle Transit Tunnel                                       -           4,274,000             4,029,879            3,372,416
                 Transit Planning and Services                                   103,242              17,910                35,680               18,000
                 Security and safety                                           3,218,656           2,776,113             3,383,035            6,029,056
                 Interlocal Agreement                                             35,934              50,000                10,723               50,000
                 Maintenance of Way                                                    -             291,480                57,101              300,000
                 Marketing                                                       331,843             518,808               207,849              468,264
                 Miscellaneous services                                          341,581             915,671             1,680,990            2,069,706
                 Accessible Services Program Operations                          276,229             771,083               494,457              680,500
                 Subtotal, Services                                           13,450,358          21,680,075            20,292,049           27,886,386

             MATERIALS & SUPPLIES                                              2,496,621           4,101,422            4,941,971             7,581,891
             UTILITIES                                                           630,295             667,399              738,795             1,998,115
             INSURANCE                                                         1,320,986           2,311,448            1,878,797             2,724,112
             TAXES                                                             1,027,917           1,154,463            1,135,469             1,263,554
             PURCHASED TRANSPORTATION SERVICES                                69,953,781          74,535,094           77,199,639            85,446,672
             MISCELLANEOUS EXPENSES                                              775,178             557,350              826,667               983,814
             LEASES & RENTALS                                                  2,893,697             335,524              272,472               723,169
                  Subtotal, Gross Transit Operations                          94,362,618         107,628,276          109,417,223           140,232,656

                   Transfer of agency admin.                                   6,390,196            7,283,281            6,957,013           12,343,077

                   Fully Allocated Transit Operations                       100,752,814          114,911,556          116,374,235           152,575,733

                   Contingency                                                                     2,764,910                                  5,228,193
                   Subtotal, Fully Allocated Transit                        100,752,814          117,676,466          116,374,235           157,803,925
                   Operations and Contingency

                   Depreciation and amortization                              32,672,208          35,891,910            35,181,281           46,055,236

             TOTAL TRANSIT OPERATIONS                                       133,425,022          153,568,376          151,555,516           203,859,161

    Notes
            1 Includes salaries and benefits for ST transit operations staff (Tacoma Linj - 17FTE; Sounder 4.3 FTE; ST Express -2.3FTE; Accessible
             Services - 2.3 FTE. One new full-time position is being added in the 2008 budget, as well as a project coordinator positon
            2 Includes excise taxes on Sounder passenger fare revenue, as well as property taxes paid by BNSF which are related to improvements to the
             rail corridor funded by Sound Transit.




Adopted 2009 Budget                                                                                                                           Page 48 of 312
    Transportation Services Operations and Maintenance

    Tacoma Link Operations

    Service Description
    Tacoma Link is a 1.6-mile light rail passenger system that runs through the heart of downtown
    Tacoma. From the Tacoma Dome Station on South 25th Street to the Theater District on
    Commerce Street, there are five unique stations complete with artwork that reflect the history and
    community of Tacoma. Two trains operate Monday through Friday with one train at 5:20 a.m.
    and a second train at 7:00 a.m. A two train operation continues until 8:10 p.m. when one train is
    removed and the remaining train continues to operate until 10:20 p.m. On Saturday two trains
    provide service from 8:00 a.m. to 10:00 p.m. and on Sunday Tacoma Link runs a one train
    operation from 10:00 a.m. to 6:00 p.m. A third train is available as a spare when maintenance is
    required. All vehicles, services and facilities are ADA compliant.
    Since Tacoma Link service began in August 2003, the average ridership has exceeded the
    projection of 2,000 passengers per weekday in 2010. Ridership now averages about 3,000 per
    weekday. In 2009, more than 9,500 service hours will be delivered. The 2009 target for ridership
    is 855,000 total boardings and 2,851 per weekday. Additional service and performance data is
    provided in Appendix C.


    Operations Overview
    Sound Transit operates Tacoma Link Light Rail out of the Operations and Maintenance (O&M)
    facility in Tacoma. Staffing plan currently consists of 18 employees, including one manager, one
    assistant manager, three operations supervisors, one operations lead, seven full-time light rail
    vehicle operators, three system technicians and one support staff. After an internal reorganization
    in early 2008, an assistant director position was added to Tacoma Link.
    The fleet consists of three single-car trains. Staff performs routine maintenance work eleven
    hours per day, seven days per week out of the maintenance workshops located at the Tacoma
    facility. Maintenance work for traction power, track work, signals, landscaping and janitorial
    work is primarily contracted out.




Adopted 2009 Budget                                                                            Page 49 of 312
     Adopted 2009 Budget – Tacoma Link Light Rail
    The adopted 2009 rolling six-year forecast budget for the Tacoma Link Light Rail Program is
    $29.4 million. The operating budget for 2009 is $4.4 million.



                                    Tacoma Link Light Rail Budget
                              Operating & Maintenance Budget by Subarea
                                            (in YOE $000s)

                                                                                                   6-year
                                                  Adopted                  Adopted                 rolling
                                                   2009                   1997-2009               forecast
       Subarea                                    Budget                   Budget               (2009-2014)
       Pierce County                                  4,379                   21,303                   29,353
       Total                                    $     4,379             $     21,303           $       29,353
       * These figures include contingency but do not include depreciation costs.
       * The 6-year rolling forecast includes expenditures from 2009-2014.
       * Link Light Rail includes Tacoma Link operations only. Capital costs are included in
         the Project Delivery Section.


    Changes in the Adopted 2009 Budget
    For 2009, Tacoma Link has added one Operations and Maintenance Supervisor to bring the total
    FTEs to 19. The addition of this supervisor would enable Tacoma Link to perform maintenance
    and repairs on the way, power, and signals that previously had been done by vendors.
    The total transit operations budget increases from $3.8 million in 2008 to $4.4 million in 2009
    (excluding depreciation). The addition of the O&M Supervisor described above resulted in a net
    increase in salaries and wages, but is offset in reduced contract services costs. In addition, wage
    costs are higher after evaluating current negotiations with Link Operators. As the vehicles
    continue to age, maintenance costs are likely to increase, and materials and supplies increases
    reflect the purchase of additional parts to keep the vehicles in operation. Agency allocations are
    higher as more central resources are focused on support of transit operations.




Adopted 2009 Budget                                                                                             Page 50 of 312
Adopted 2009 Budget   Page 51 of 312
              Tacoma Link Light Rail Transit Operations Budget
                                                                                            2008 Adopted            2008             2009 Adopted
                                                                        2007 Actuals
                                                                                               Budget              Actuals              Budget

                                             1
             SALARIES AND BENEFITS                                            1,358,384           1,395,236           1,370,112            1,826,632

             SERVICES
                 Maintenance of Stations and Facilities                         182,072             338,404             194,084              238,676
                 Maintenance of Vehicles                                         51,706              70,000              35,833               75,000
                 Security Services                                              496,352             477,906             501,947              437,072
                 Third Party Agreements                                               -                   -              20770.66                  -
                 Marketing                                                       15,675              43,572              29,641               39,424
                 Miscellaneous Services                                          43,163              42,624             782,276               35,403
                 Subtotal, Services                                             788,969             972,506           1,564,552              825,575

             MATERIALS & SUPPLIES                                               158,207             204,218              27,355              198,550
             UTILITIES                                                          115,180             138,767             116,150              148,338
             INSURANCE                                                          262,915             333,817             540,659              309,055
             TAXES                                                                   37                 500               1,902                  500
             PURCHASED TRANSPORTATION SERVICES                                     879.02             1,000               1,798                3,000
             MISCELLANEOUS EXPENSES                                               3,133              15,550              11,061               16,000
             LEASES AND RENTALS                                                     117               4,000               1,500                5,500
                  Subtotal, Gross Transit Operations                          2,687,822           3,065,593           2,852,813            3,333,150

                   Transfer of agency admin.                                    466,146             569,325             539,740              855,534

                   Fully Allocated Transit Operations                         3,153,968           3,634,918           3,392,553            4,188,684

                   Contingency                                                        -             180,655                    -             190,510
                   Subtotal, Fully Allocated Transit                          3,153,968           3,815,573           3,392,553            4,379,194
                   Operations and Contingency

                   Depreciation and amortization                              2,848,230           2,881,717            2,818,194           2,982,577

             TOTAL TRANSIT OPERATIONS                                         6,002,198           6,697,290           6,210,746            7,361,772

             OPERATIONS FTEs                                                        17.0                17.0                 18.0                19.0
    Notes
            1 Includes 19 FTE including a Light Rail Assistant Director, Tacoma Link Operations Manager, Assistant Manager, 5 Leads, 7 Operators, 3
             Vehicle Technicians and 1 Project Assistant




Adopted 2009 Budget                                                                                                                        Page 52 of 312
    Central Link Operations

    Service Description
    In November, 2003, Sound Transit broke ground on the Initial Segment of Central Link light rail.
    This 13.9 mile segment begins at Westlake Station in the Downtown Seattle Transit Tunnel
    (DSTT) and ends at the Tukwila/International Boulevard Station, next to SR-518 and just north of
    Sea-Tac Airport. In addition to downtown Seattle and Tukwila, the Initial Segment serves
    Seattle’s SODO industrial area, Beacon Hill and the Rainier Valley.
    Light rail trains are scheduled to begin providing service on the Initial Segment in July 2009,
    providing a 30-minute ride between Tukwila and downtown Seattle. Trains will leave
    approximately every six or seven minutes during peak periods, and every 10-15 minutes during
    midday and evening hours. By 2020, the Link Initial Segment is projected to carry more than
    42,500 passengers each day.
    In December 2004, Sound Transit and the Port of Seattle reached an agreement to extend Link
    light rail to Sea-Tac Airport. Service on the 1.7 mile segment to the airport is scheduled to begin
    in December 2009. In the months between the opening of the Initial Segment and the opening of
    the airport extension, a shuttle bus will transport passengers from Tukwila International Blvd.
    Station to SeaTac/Airport Station, just minutes away.
    Additional service and performance data is provided in Appendix C.
    Operations Overview
    The operations will be supported in the Link Operations and Maintenance Facility (OMF) capable
    of supporting a 104 vehicle fleet at full build out. The OMF is located in south Seattle adjacent to
    the mainline, and south of Forest Street South and west of Airport Way.
    The light rail vehicles (LRVs) are manufactured by Kinkisharyo of Japan and are 95 feet in length
    and double articulated with a three-truck configuration. The floor of the LRV will be at platform
    height, 14 inches from the top of the rail at all 4 door entries. Trains can be coupled to run in one
    to four vehicles in length. Initially, the system will start in a two car configuration. LRVs will be
    powered by an overhead contact wire energized at 1500 volts dc, and propelled with ac motors.
    Each vehicle will seat 74 passengers and will have room for 74 standees and are designed to meet
    all current ADA standards.
    Link will share the DSTT with hybrid diesel/electric buses operated by King County Metro. This
    shared use of the tunnel will continue until such time that increases in Link service and frequency
    requires exclusive use of the DSTT by light rail operations only. Operations of the tunnel will be
    controlled by King County staff at the Operations Control Center south of the tunnel entrance.
    Operations and Maintenance of the Central Link system will be performed under contract by
    King County Metro as governed by an Intergovernmental Agreement (IGA) with King County.
    Sound Transit, as owner, will have fiscal and performance oversight for this contract. In addition,
    Sound Transit will directly contract for cost elements such as traction power, parts, insurance, and
    most elements of facilities maintenance.
    The IGA defines performance and maintenance standards and requirements for the operator and
    maintainer. By agreement with King County Metro, there will be 145 full time employees
    supporting Link operations and maintenance, including 56 operators.




Adopted 2009 Budget                                                                             Page 53 of 312
    Adopted 2009 Budget – Central Link Light Rail
    The adopted 2009 rolling six-year forecast budget for the Central Link Light Rail Program is
    $250.6 million. The operating budget for 2009 is $22.9 million
    The budget for Link operations is split between the North King and South King County sub-areas
    on the basis of the number of revenue vehicle miles operated in each sub-area.


                                         Central Link Light Rail Budget
                                   Operating & Maintenance Budget by Subarea
                                                 (in YOE $000s)

                                                                                                        6-year
                                                       Adopted                   Adopted                rolling
                                                        2009                    1997-2009              forecast
           Subarea                                     Budget                    Budget              (2009-2014)
           North King County                         $    15,596              $     15,596          $     153,205
           South King County                               7,307                      7,307                 97,377
           Total                                     $    22,903              $     22,903          $     250,582
           * These figures include contingency but do not include depreciation costs.
           * The 6-year rolling forecast includes expenditures from 2009-2014.
           * Link Light Rail includes Central Link operations only. Capital costs are included in
             the Project Delivery Section.


    Changes in the Adopted 2009 Budget
    This is the first year that a detailed transit operations budget has been presented for the Central
    Link program. With the onset of operations in July 2009, one half year of 3 FTEs (1.5 FTE) for
    ST management will be included in operations. In addition, a portion of the ticket vending
    machine maintenance staff will be charged to operations. This total of 7.5 FTEs will be shared
    with Sounder transit operations in proportion to the work performed.




Adopted 2009 Budget                                                                                             Page 54 of 312
    Central Link Alignment - Initial Segment and Airport Link




Adopted 2009 Budget                                             Page 55 of 312
              Central Link Light Rail Transit Operations Budget
                                                                                                  2008 Adopted              2008              2009 Adopted
                                                                             2007 Actuals
                                                                                                     Budget                Actuals               Budget

                                               1
              SALARIES AND BENEFITS                                                          -                     -                     -          8,402,103

              SERVICES
                  Downtown Seattle Transit tunnel 2                                          -                     -                     -          1,114,022
                  Paratransit                                                                -                     -                     -            622,550
                  Security                                                                   -                     -                     -          2,074,334
                  Facilities Maintenance and Maintenance of Wa                               -                     -                     -          1,124,880
                  Miscellaneous services                                                     -                     -                     -            646,854
                  Subtotal, Services                                                         -                     -                     -          5,582,639

              MATERIALS & SUPPLIES                                                           -                     -                     -            945,491
              UTILITIES                                                                      -                     -                     -          1,253,600
              INSURANCE                                                                      -                     -                     -            748,908
              TAXES                                                                          -                     -                     -            117,600
              PURCHASED TRANSPORTATION SERVICES                                              -                     -                     -          1,765,783
              MISCELLANEOUS EXPENSES                                                         -                     -                     -            204,129
              LEASES & RENTALS                                                               -                     -                     -             96,220
                   Subtotal Gross Transit Operations                                         -                     -                     -         19,116,473

                    Transfer of agency admin.                                                -                     -                     -          2,695,611

                    Fully Allocated Transit Operations                                       -                     -                     -         21,812,084

                    Contingency                                                              -                     -                     -          1,090,607
                    Subtotal Fully Allocated Transit
                    Operations and Contingency                                               -                     -                     -         22,902,691


                    Depreciation and amortization                                            -                     -                     -          8,709,048

              TOTAL TRANSIT OPERATIONS                                                       -                     -                     -         31,611,739

              ST OPERATIONS FTEs                                                             -                     -                     -                   1.5
    Notes
            1 Includes salaries and benefits for sound Transit Link light rail operations staff. There are three positions that will be charged to transit
              operations for half of 2009 = 1.5 FTE. In addition, salaries costs include the link portion of 7.5 FTEs who will be providing ticket vending
              machine maintenance.
            2 Sound Transit share of the DTSS facilities maintenance and debt services are shared between ST Express and Central link, based on the
              relative proportion of service in the tunnel.




Adopted 2009 Budget                                                                                                                                 Page 56 of 312
    Sounder Commuter Rail Operations
    Service Description
    Sounder commuter rail saw phenomenal ridership growth in 2008. By the end of 2008, Sounder
    added a fourth round to trip to the North line from Everett to Seattle – and two more round trips
    and one more reverse trip to the South line, bringing the total trips between Tacoma and Seattle to
    eight with two reverse commutes. In 2009 a ninth round trip will be added to the South Line.
    With the commencement of service in September 2000, Sounder was the first commuter rail
    service to operate in the Puget Sound region in over 60 years. Service began in the south corridor
    with a commuter route from Tacoma to Seattle and expanded to another route from the north –
    Everett to Seattle – three years later. Sounder has welcomed more than 10 million riders since the
    inception of service.
    Service runs Monday through Friday, except major holidays. Travel times between Tacoma and
    Seattle and between Everett and Seattle are both roughly 60 minutes. Event service for Mariners
    and Seahawks games as well as major concerts at the Tacoma Dome is also provided.
    There are thirteen Sounder commuter rail stations in operation. Like Link stations, all are unique
    and feature artwork reflective of the area. All have bus transportation connections located directly
    at the station. Bus service schedules and, on the North Line, ferry schedules, are typically
    synchronized to the train schedule. Access to Sounder commuter rail for people who use
    wheelchairs or other mobility aids is provided to one car per train by the use of a mini-high
    platform and bridge plate. All service, vehicles and facilities are ADA compliant.
    South line ridership now averages about 9,000 boardings per day; North line ridership averages
    more than 1,200 boardings per day. In 2009, more than 35,000 vehicle hours will be delivered, up
    25% over 2008. The 2009 target for ridership is 3.1 million boardings. Additional service and
    performance measure data is provided in Appendix C.
    Operations Overview
    Train operation is contracted to the BNSF Railway (BNSF) and fleet maintenance is contracted to
    Amtrak. Sound Transit oversees and manages these contracts. Sound Transit also manages
    contracts for Sounder’s insurance, safety and security and station maintenance. BNSF provides
    train crews, including conductors and engineers, dispatching and most of the track maintenance.
    The service is managed by the Transportation Services Department and BNSF supervisors, who
    are co-located at Sound Transit offices. Sound Transit staff consists of the program manager, one
    operation and maintenance project manager, a vehicle compliance officer and one support staff.
    Sounder operates on BNSF right-of-way and shares the 75 miles of track between Tacoma and
    Everett with BNSF freight trains and Amtrak passenger trains. The final 1.3 miles in Tacoma is
    operated on right-of way owned by the City of Tacoma, used by the Tacoma Rail Mountain
    Division. Sounder’s fleet consists of 11 locomotives, 18 cab cars and 40 coaches. Amtrak is
    responsible for heavy and light maintenance, inspections, and all cleaning.
    Surplus fleet due to service implementation delays are leased to MetroLink in Los Angeles and
    provide revenue to the agency. As Sound Transit is close to implementing its full service plan,
    this fleet will be recalled from the other properties. All equipment is expected to be back in
    Seattle by the end of 2009.




Adopted 2009 Budget                                                                            Page 57 of 312
    Adopted 2009 Budget—Sounder Commuter Rail
    The adopted 2009 rolling six-year forecast for the Sounder commuter rail program is $244.9
    million. The adopted operating expenditures budget for 2009 is $38.0 million.


                                  Sounder Commuter Rail Budget
                              Operating & Maintenance Budget by Subarea
                                            (in YOE $000s)

                                                                                           6-year
                                                  Adopted                  Adopted         rolling
                                                   2009                   1997-2009       forecast
       Subarea                                    Budget                   Budget       (2009-2014)
       Snohomish County                         $     8,528             $     40,025   $       53,673
       South King County                             16,351                   99,092           97,908
       Pierce County                                 13,087                   79,370           93,286
       Total                                    $    37,965             $    218,488   $     244,868
       * These figures include contingency but do not include depreciation costs.
       * The 6-year rolling forecast includes expenditures from 2009-2014.




    Changes in the Adopted 2009 Sounder Commuter Rail Budget
    The total transit operations budget increases from $32.3 million in 2008 to $38.0 million in 2009.
    The largest driver of this increase in the budget is the 26% increase in trips that will be offered in
    2009. The primary contracts for Sounder, with BNSF for train operations and with Amtrak for
    vehicle maintenance, both allow for economies of scale with respect to expanding operations.
    Thus, increases in service will be met with commensurate increases in operations and
    maintenance costs as the final planned service is in full operation. Additionally, other costs such
    as insurance, station maintenance, marketing and ticket vending machines are not directly
    impacted by the increase in service, further improving the unit costs with the expanded service.
    Beginning in 2009, Sound Transit will begin transitioning to perform maintenance of the ticket
    vending machine system using in-house staff, rather than exclusively through a contract with an
    outside vendor. A staff of seven FTEs plus a division manager will be on hand by the end of 2009
    to perform the maintenance of the machines for both Sounder and Central Link. Costs will be
    apportioned to Sounder and Link in proportion to the expected workload and will show up as
    salaries. There is a corresponding decrease in contracted service. 2009 will be a start-up year, so
    there may be some overlap as the existing contract is completed and work is shifted to the in-
    house staff.




Adopted 2009 Budget                                                                                     Page 58 of 312
Adopted 2009 Budget   Page 59 of 312
           Sounder Commuter Rail Transit Operations Budget
                                                                                                       2008 Adopted                2008                2009 Adopted
                                                                                2007 Actuals
                                                                                                          Budget                  Actuals                 Budget
                                                1
           SALARIES AND BENEFITS                                                         306,409                445,596                 470,242                 981,657
                                                                                                                      -
           SERVICES                                                                                                    -
               Management Services - TVMs                                                631,299                 607,000                 645,545                386,754
               Marketing                                                                 180,711                 204,750                  79,361                186,955
               Maintenance of vehicles                                                 6,991,224               8,834,627               7,974,005             10,271,778
               Maintenance of stations                                                   665,072               1,070,240                 752,624                926,750
               Security and safety                                                     1,922,281               1,708,123               2,051,641              2,646,704
               Maintenance of Way                                                        107,855                 291,480                  57,101                300,000
               Miscellaneous services                                                    262,484                 775,027                 828,890                964,931
                   Subtotal, Services                                                10,760,926             13,491,247              12,389,166              15,683,872

           MATERIALS & SUPPLIES                                                       2,084,460               3,368,535                4,757,147              5,879,155
           UTILITIES                                                                     320,657                328,853                  359,126                361,811
           INSURANCE                                                                  1,208,849               1,955,623                1,316,189              1,643,239
           TAXES 2                                                                      718,008                 824,438                  763,642                777,490
           PURCHASED TRANSPORTATION SERVICES                                          6,867,441               8,345,941                8,621,050              7,270,319
           MISCELLANEOUS EXPENSES                                                        355,306                220,000                  363,768                341,500
           LEASES & RENTALS                                                              112,077                264,571                  150,865                517,580
                   Subtotal, Gross Transit Operations                                22,734,133              29,244,804              29,191,196              33,456,623

                   Transfer of agency admin.                                          2,117,611               2,208,212                2,231,377              3,253,755

                   Fully Allocated Transit Operations                                24,851,744             31,453,016              31,422,574              36,710,379

                   Contingency                                                                -                949,174                        -               1,254,236
                   Subtotal, Fully Allocated Transit                                 24,851,744             32,402,190               31,422,574              37,964,614
                   Operations and Contingency

                   Depreciation and amortization                                     16,653,398             18,199,349               17,400,516             18,945,522

           TOTAL TRANSIT OPERATIONS                                                  41,505,142             50,601,539               48,823,090              56,910,137


           OPERATIONS FTEs                                                                     3.0                    4.3                     4.0                     4.0

           Notes
            1
                   Includes salaries and benefits for Sound Transit Sounder commuter rail operations staff. In addition, salaries includes the staff costs associated with
                   Sounder's share of 7.5 FTEs related to ticket vending machine maintenance.
            2
                   Includes excise taxes on Sounder passenger fare revenue, as well as property taxes paid by BNSF which are related to improvements to the rail
                   corridor funded by Sound Transit.




Adopted 2009 Budget                                                                                                                                           Page 60 of 312
    ST Express Bus Operations

    Service Description
    The ST Express bus system operates fast, frequent, two-way service connecting the major urban
    centers of Snohomish, King and Pierce counties. There are a total of 19 ST Express bus routes
    which provide links to local transit networks, other ST Express buses, commuter rail, light rail,
    ferries, Amtrak, and the Seattle-Tacoma International Airport. With the startup of new Route 577
    between Federal Way and Seattle in February 2006, all of the express bus routes planned in
    Sound Move have been implemented.
    Sound Transit also provides many facilities and customer amenities such as transit centers, park-
    and-ride lots, and multi-modal stations. With completion of capital projects such as HOV lanes,
    new freeway stations and park-and ride facilities, most routes will operate 7 days per week, 18
    hours per day and achieve the service levels outlined in Sound Move. All service, vehicles, and
    facilities are ADA compliant.
    Approximately 656,000 service hours will be delivered in 2009, about an 8% increase over 2008.
    Weekday ridership now averages more than 43,000 passenger boardings. The target for 2009 total
    ridership is 13.3 million boardings and nearly 45,000 per weekday. Additional service and
    performance data is provided in Appendix C.
    Operations Overview
    Operation of ST Express bus service is provided via contracts with Community Transit, King
    County Metro Transit, and Pierce Transit. Community Transit operates four routes through a
    private operator, First Transit. King County Metro operates eight routes and Pierce Transit
    operates seven routes. In 2009, King County Metro will operate approximately 54% of ST
    Express bus service, Pierce Transit will operate 27% and Community Transit, 19%. By the end
    of 2009 the fleet will total 240 buses, 40% of which are emission-friendly compressed natural gas
    or hybrid diesel-electric buses. At the end of 2009, the ST Express fleet will have reached the
    maximum number of buses that are contemplated in the Service Implementation Plan.
    The Sound Transit ST Express bus division oversees and manages the service contracts. There are
    two full-time ST Express Division employees on staff: the division project manager and one
    support staff. The key functions are the oversight of the daily operations of Sound Transit bus
    routes and routine vehicle maintenance to keep the fleet in top operating condition, together with
    planning for fleet replacement and additions. Overall, the scope of services provided by the
    partner agencies includes operations, vehicle maintenance, security on buses, emergency service
    response, customer services, some route planning and scheduling, facilities maintenance for
    operating bases, and labor negotiations.
    Service costs are reviewed, negotiated, and reconciled on an annual basis as defined in the service
    agreements. This process requires the transit partners to submit a three-year baseline cost estimate
    for Sound Transit’s review and approval, usually in late October. By the end of November, the
    cost for the upcoming year is negotiated and agreed to by the parties and cost estimates for
    subsequent years are updated. The current service agreements are for a five-year term ending
    December 31, 2009.
    Adopted 2009 Budget—ST Express Bus Program
    The Adopted 2009 Budget includes purchased transportation costs to operate ST Express bus
    service, marketing, maintenance of the vehicles and facilities, signage and accessibility
    investments, and a continuation of the Spot Improvement program, which partners with other
    jurisdictions to make targeted improvements to transit facilities in the region. The ST Express bus



Adopted 2009 Budget                                                                            Page 61 of 312
    rolling six-year forecast calls for total operating expenditures of $614.2 million. The Adopted
    2009 Budget is $91.4 million (excluding depreciation and amortization).


                                         ST Express Bus Budget
                              Operating & Maintenance Budget by Subarea
                                            (in YOE $000s)

                                                                                           6-year
                                                  Adopted                  Adopted         rolling
                                                   2009                   1997-2009       forecast
       Subarea                                    Budget                   Budget       (2009-2014)
       Snohomish County                         $    11,902             $     78,683   $       82,188
       South King County                             10,605                   64,810   $       66,089
       East King County                              46,629                  280,523         314,373
       Pierce County                                 22,267                  152,084         151,542
       Total                                    $    91,403             $    576,101   $     614,192
       * These figures include contingency but do not include depreciation costs.
       * The 6-year rolling forecast includes expenditures from 2009-2014.




    Changes in the Adopted 2009 Budget—ST Express Bus
    The budget for fully-allocated transit operations, including the allocated administrative costs and
    contingency, increased from $80.3 million in 2008 to $91.4 million in the Adopted 2009 Budget,
    an increase of $11.1 million. Purchased transportation, which is the largest single element of the
    ST Express bus budget, is budgeted to increase by a total of $11.9 million. This is due in part to
    increases in service, but also due to higher wages and benefit rates and rising fuel costs. In
    addition, ST Express will be providing shuttle service between Tacoma and Lakewood Station
    until Sounder service is up and running in that corridor.
    Increases are projected in security, driven mainly by the increasing number of ST facilities, and in
    other facilities maintenance costs. For the first six months of 2009, ST Express will bear the full
    ST share of facilities maintenance and debt service costs associated with the DSTT, which re-
    opened to buses in September 2008. Beginning in July 2009, these ST costs will be shared with
    Central Link light rail, in proportion to the amount of service that will be operated by Sound
    Transit in the tunnel.




Adopted 2009 Budget                                                                                     Page 62 of 312
Adopted 2009 Budget   Page 63 of 312
              ST Express Bus Transit Operations Budget
                                                                                                  2008 Adopted            2008              2009 Adopted
                                                                           2007 Actuals
                                                                                                     Budget              Actuals               Budget

                                              1
             SALARIES AND BENEFITS                                                 174,957              231,260                 93,668              206,464

             SERVICES
                 Marketing services                                                135,457              270,486                98,847               241,885
                 Maintenance of vehicles                                           (27,373)             200,000                25,283               208,200
                 Maintenance of stations                                           648,873              944,739               764,959             1,043,856
                 Transit Planning & Financial Services                             103,242               17,910                35,680                18,000
                 Security and safety                                               800,023              590,084               829,447               870,946
                 Downtown Seattle Transit tunnel 2                                  737,860           4,274,000             4,029,879             2,258,394
                 Interlocal agreements                                               8,299               50,000                10,723                50,000
                 Miscellaneous services                                             35,934               98,020                69,824               422,518
                 Subtotal, Services                                              2,442,315            6,445,239             5,864,644             5,113,800

             MATERIALS & SUPPLIES                                                 241,952               502,070               157,308               507,095
             UTILITIES                                                            193,481               198,580               262,600               233,166
             INSURANCE                                                           (150,779)               22,008                21,949                22,910
             TAXES                                                                309,871               329,525               369,926               367,964
             PURCHASED TRANSPORTATION SERVICES                                 63,086,340            66,188,153            68,576,791            76,407,570
             MISCELLANEOUS EXPENSES                                               404,374               309,400               444,304               409,785
             LEASES & RENTALS                                                      93,798                66,953               120,106               103,869
                  Subtotal Gross Transit Operations                            66,796,310            74,293,188            75,912,620            83,372,624

                    Transfer of agency admin.                                    3,745,612            4,396,917             4,081,104             5,371,328

                    Fully Allocated Transit Operations                          70,541,922           78,690,105            79,993,723            88,743,952

                    Contingency                                                          -            1,578,846                     -             2,659,221
                    Subtotal Fully Allocated Transit                            70,541,922           80,268,951            79,993,723            91,403,173
                    Operations and Contingency

                    Depreciation and amortization                              13,170,579            14,810,843            14,962,571            15,418,088

              TOTAL TRANSIT OPERATIONS                                         83,712,502            95,079,794           94,956,294           106,821,260

              OPERATIONS FTEs                                                          2.00                 2.33                   2.00                 2.00

    Notes
            1 Includes salaries and benefits for Sound transit St Express bus operations staff.
            2 Sound Transit share of the DSTT facilities maintenance and debt service are 100% covered by ST Express in 2008, as the tunnel opens in
             September 2007 for bus service but will not carry light rail service until 2009. At that point, the ST Express share of tunnel costs will be 14%.

            3 The Mobility Initative Program was reported as a part of ST Express operations until the 2006 budget year, when it became a standalone
             program.




Adopted 2009 Budget                                                                                                                               Page 64 of 312
    Accessible Services
    In 1999 it was determined that Sound Transit did not have a complementary paratransit
    responsibility under the Americans with Disabilities Act (ADA) for ST Express bus or Sounder
    commuter rail service. However, a main tenet for Sound Transit is to improve mobility for all
    people in the Central Puget Sound region. To meet this objective the Mobility Initiative Program
    (MIP) was created by the Sound Transit board with the adoption of the 2001 Service
    Implementation Plan. In 2008, the MIP was renamed Accessible Services to better reflect the full
    scope of activities being performed and to use terminology more in line with other transit
    properties. There are currently two Sound Transit staff dedicated to the implementation of this
    program.


    Accessible Services contains programs in five general areas:
    •   Communications and Information: The development, production, and distribution of a
        FindARide.org and public information in Braille and other alternate forms of transit
        information.
    •   Accessibility Training: To provide experiential sensitivity training to Sound Transit staff,
        contractors, and partner agencies and travel training for seniors and people with disabilities.
    •   Facility and Equipment Improvements: To ensure Sound Transit services and facilities are
        compliant with ADA Accessibility Design Guidelines and state and local guidelines. Also to
        fund and manage improvements at existing facilities.
    •   Accessibility Research: To fund research and demonstration projects in ways to make Sound
        Transit services and facilities more accessible.
    •   Special Needs Transportation: To implement the Regional Special Needs Transportation
        Coordination Plan (RSNTCP), which was adopted by the ST Board and the Puget Sound
        Regional Council in 2006, support FindARide.org, and to fund special needs transportation
        coalitions in Pierce, King and Snohomish counties.




Adopted 2009 Budget                                                                             Page 65 of 312
    Adopted 2009 Budget—Accessible Services
    The adopted 2009 rolling six-year forecast for the Accessible Services program is $8.4 million.
    The adopted operating expenditures budget for 2009 is $1.2 million.


                                            Accessible Services
                              Operating & Maintenance Budget by Subarea
                                            (in YOE $000s)

                                                                                                    6-year
                                                                           Adopted                  rolling
                                               Adopted 2009               1997-2009                forecast
       Subarea                                   Budget                    Budget                (2009-2014)
       Snohomish County                        $        182             $         679           $        1,425
       North King County                                132                       132                      875
       South King County                                253                       728                    1,530
       East King County                                 264                     1,005                    2,162
       Pierce County                                    323                     1,192                    2,420
       Total                                   $      1,154             $       3,736           $        8,413
       * These figures include contingency but do not include depreciation costs.
       * The 6-year rolling forecast includes expenditures from 2009-2014.
       Note: Prior to 2006, Accessible Services costs were included in the ST Express budget.




    Changes in the Adopted 2009 Budget—Accessible Services
    The budget for Accessible Services, including the allocated administrative costs and contingency,
    stayed flat at $1.2 million in the Adopted 2009 Budget, a change of less than $0.1 million from
    2008. Implementation of the RSNTCP, which was adopted by the Sound Transit Board late in
    2006, continues and projects identified for 2009 include establishing a Bus Buddy program to
    match volunteers with people who could ride the fixed route bus system with assistance, and
    providing funding for staffed inter-regional paratransit transfer sites within the ST service area.
    Beginning with the opening of Central Link light rail in July 2009, Accessible Services costs will
    also now be apportioned to the North King County subarea in proportion to the amount of service
    supported by the program in that subarea.




Adopted 2009 Budget                                                                                              Page 66 of 312
              Accessible Services Program Operations Budget
                                                                                                   2008 Adopted            2008             2009 Adopted
                                                                            2007 Actuals
                                                                                                      Budget              Actuals              Budget

              SALARIES AND BENEFITS                                                 186,684              213,408               197,342               208,085

              SERVICES
                                                 1
                  Communications/Info Program                                         7,715               39,650                15,627                40,000
                                          2
                  Accessibility Training                                             42,401                5,000                30,414                 5,000
                                                     3
                  Facility/Equipment Improvement                                        522              180,000                29,745               150,000
                                                   4
                  Assessibility Service Research                                                          10,000                     -                10,000
                                        5
                  Consulting Services                                                42,718               25,000                19,473                25,000
                                  6
                  Other Services                                                    191,508              510,933               397,934               450,000
                  Printing/Binding                                                    4,906                  500                 1,265                   500
                  Subtotal, Services                                                289,770              771,083               494,457               680,500

              MATERIALS & SUPPLIES                                                   12,001               26,600                   161                51,600
              UTILITIES                                                                 977                1,200                   918                 1,200
              MISCELLANEOUS EXPENSES                                                 15,381               12,400                 7,534                12,400
                   Subtotal Gross Transit Operations                                504,813            1,024,691               700,414               953,785

                    Transfer of agency admin.                                        60,827              108,827               104,791               166,849

                    Fully Allocated Transit Operations                              565,640            1,133,518               805,205            1,120,634

                    Contingency                                                           -               56,235                     -                33,619
                    Subtotal Fully Allocated Transit                                565,641            1,189,753              805,205             1,154,253
                    Operations and Contingency

                    Depreciation and amortization                                        -                    -                        -                  -

              TOTAL TRANSIT OPERATIONS                                              565,641            1,189,753               805,205            1,154,253

              OPERATIONS FTEs                                                                2.0                  2.3                2.0                      2.0
    Notes
            1 The development, production, and distribution of a Regional Accessibility Transportation Guide and public information in Braille and other
             alternate forms of transportation
            2 Experiential Sensitivity training to Sound Transit staff, contractors and partner agencies and providing travel training for seniors and people
             with disability.
            3 Review Sound Transit services and facilities for compliance with ADA Accessibility Design Guidelines and state and local guidelines and
             funding and managing improvements at existing facilities.
            4 Funding for consultant research efforts which are out-side scope of ADA on-call contracts.
            5 ADA on-call contact
            6 Funding for projects under the Regional Special Needs Transportation Coordination Plan and FindARide.org and providing funding for
             special needs transportation coalitions in Pierce, jing and Snohomish counties.




Adopted 2009 Budget                                                                                                                               Page 67 of 312
    TRANSPORTATION SERVICES CAPITAL BUDGET
    The Transportation Services capital budget includes the capital purchases for fleet vehicles and
    capital projects associated with assets already placed into service.
    There are now several major capital maintenance needs that have been identified in the upcoming
    five-year planning cycle. One project is to begin replacing the aging ST Express bus fleet. Other
    projects include major maintenance programs on Sounder locomotives and coaches, and support
    for maintenance projects at the Tacoma Dome Station garage which have been previously
    committed to. In addition, participation in upgrading all ST Express partner agency mobile
    communications systems is programmed over the next few years. The Adopted 2009 Budget also
    contains a Small Works capital program to provide funding for small capital projects under
    $100,000. This program, which was started in 2006, enables Sound Transit to address those needs
    expected to arise as operations continue to expand and facilities age. Finally, other on-going
    programs include CCTV and passenger information systems projects for Sounder stations, and
    the acquisition and installation of ticket vending machines (TVMs) for Sound Transit rail
    locations.
    The Adopted 2009 Budget for Service Delivery capital is $54.2 million. The adopted 2009 rolling
    six-year forecast (2009-2014) for the capital program is $159.1 million.


                             Service Delivery Capital Budget Summary
                                  Adopted 2009 Budget Summary by Subarea
                                               (in YOE $000s)

                                                                                             6-year
                                                                             Adopted         rolling
                                                  Adopted 2009              1997-2009       forecast
          Subarea                                    Budget                  Budget       (2009-2014)
          Snohomish County                        $     16,998            $     32,851   $       35,886
          South King County                              5,093                  18,109           10,696
          East King County                              21,341                  72,174           70,807
          Pierce County                                 10,741                  61,138           41,752
          Total                                    $    54,174            $    184,273   $     159,141
          * The 6-year rolling forecast includes expenditures from 2009-2014.




    Changes in the Adopted 2009 Budget—Transportation Services Capital
    Program
    One new project has been added to the Service Delivery capital budget for 2009:
    Sounder Maintenance Facility: In preparation for a growing Sounder fleet and to ensure the
    optimal market rate for vehicle maintenance, a new maintenance facility is being developed.
    Funding included in the 2009 budget would provide for project definition and scoping and enable
    a consensus on the best option to meet Sounder vehicle maintenance needs in the future.
    Although this project was originally included in Sound Move, it was reprogrammed into the
    system-wide projects for immediate needs while a partnership with Amtrak made such an initial
    investment unnecessary.
    Additional details about the capital program are available on the following pages.



Adopted 2009 Budget                                                                                  Page 68 of 312
                                          Service Delivery Capital
                                     2009 Adopted Budget By Equity Area

 Subarea                              1997-2007     2008       2009       2010      2011      2012       2013       Future       Total
  Snohomish County                        11,990     3,862     16,998     10,591     8,072       75         75           75       51,739
  South King County                       10,357     2,659      5,093      1,337     3,989       92         92           92       23,712
  East King County                        48,125     2,709     21,341      5,451    25,264    9,653      8,948       31,049      152,539
  Pierce County                           37,145    13,252     10,741      3,880    16,744      302      9,959          702       92,725

Service Delivery Capital                 107,617    22,482     54,174     21,259    54,069   10,122     19,074       31,918      320,716


                                           2009 Adopted Budget By Phase

 Phase                                 1997-2007    2008       2009       2010      2011      2012       2013       Future         Total
10 Agency Administration                  1,369          7         54         73       569        0             0            0      2,072
20 Pre-Engineering/Env Review              448          62        768        250         0        0             0            0      1,529
40 ROW Acquisition and Permits              117         92         28          0         0        0          0             0          238
50 Construction                          11,809      8,447      9,627      6,648    17,178      442        753           442       55,345
70 Vehicles                              93,865     13,874     42,886     14,284    36,322     9,680     18,321       31,476      260,709
90 Contingency                                9          0        810          4         0        0             0            0       823

Service Delivery Capital               107,617      22,482     54,174     21,259    54,069   10,122      19,074       31,918      320,716




                                           2009 Adopted Budget By Project


  Project                              1997-2007    2008       2009       2010      2011      2012       2013 Future               Total
212 Ticket Vending Machines            25   6,154       633         834       27        30       0         0             0          7,678
216 Passenger Information System/CCTV 85    4,258       432         375      436       729       0         0             0          6,231
261 Bus Maintenance Facility             0  2,126       471       3,720      382    15,647       0         0             0         22,347
290 ST Express Fleet Program             3 90,899      5,832          0         0    3,955        0         0            0        100,686
356 Tacoma Dome Station                  0      0          0          0         0        0        0       311            0            311
701 ST Express Fleet Replacement Program
                                       99   3,799      8,042          0    12,884   32,367    9,680    18,321       31,476        116,569
702 Sounder Fleet Program                0    148          0        886     1,400        0        0         0            0          2,434
705 ST2 Fleet Expansion                  0      0          0     42,000         0        0        0         0            0         42,000
740 Small Works Program                  0      0         93        445       442      442      442       442          442          2,748
741 Auburn Bus Loop Concrete Replacement 0      2          7        470        43        0       0         0             0            521
743 Homeland Security Enhancements       1    111        112        388       336        0       0         0             0            947
744 Talking Signs                      60      60      1,815        503         0        0       0         0             0          2,379
745 ST Express Mobile Communications     0      0      4,730      2,330     2,572      898       0         0             0         10,531
    Projects
746 Regional Mobility Parking Enhancements
                                       62      62       160       2,025     2,725        0       0         0             0          4,972
747 Security Office Expansion            0      0       153           0        12        0       0         0             0            165
750 Sounder Maintenance Base Development 0      0         0         197         0        0       0         0             0            197
Service Delivery Capital                 107,617      22,482     54,174    21,259   54,069   10,122    19,074       31,918        320,716




        Adopted 2009 Budget                                                                                     Page 69 of 312
                                                Service Delivery Capital
Project                               212      Ticket Vending Machines

Description
Scope: 40 Ticket Vending Machines (TVMs) have been purchased and 28 have been installed to date at the 12 Sounder stations. The
TVMs are dispersed across the system on the basis of projected ridership. TVMs sell tickets and passes via an interactive touch screen or
through the use of a keypad, and where possible are located near the mini-high platforms for the convenience of persons with disabilities.
The remaining scope of work is a 2008 project to bring the TVMs up to Link and SmartCard standards as well as the remaining
installations that are to be performed at Everett, Mukilteo, Edmonds, Tukwila, South Tacoma, and Lakewood. The cost of the installations
is approximately $10k per machine.

Changes since 2008 Budget: None
                             Summaries

                                                            Baseline (in $000)                   7,678
                                             2008 Current Budget (in $000)                       7,678
                                            2009 Adopted budget (in $000)                        7,678




Capital Costs
Sub Area                         1997-2007        2008         2009       2010        2011          2012       2013       Future     Total
Snohomish County                      1,162          115          168         25             0             0          0         0     1,471
South King County                      2,633         230          348             0       0                0          0         0      3,211
Pierce County                          2,359         288          318             2      30                0          0         0      2,997
Total                                  6,154         633          834            27      30                0          0         0      7,678


Capital Cost Elements
Cost Element                      1997-2007      2008          2009       2010        2011          2012       2013       Future      Total
Agency Administration                   171             0             0          0           0             0          0         0        171
Pre-Engineering/Env Review              150           0             0             0       0                0          0         0         150
Construction                          5,832         633           834            27      30                0          0         0       7,357
Total                                 6,154         633           834            27      30                0          0         0       7,678




Adopted 2009 Budget                                                                                                        Page 70 of 312
                                                Service Delivery Capital
Project                              216       Passenger Information System/CCTV

Description
Scope: Sounder is implementing a CCTV and Passenger Information System at all rail stations. The system includes communications for
a number of CCTV cameras at each station, audible rail announcements, variable message signs, customer emergency stations, and on-
board automated vehicle location. There will be a central control and monitoring system. Completion of the project is dependent upon the
schedule for completion of the Lakewood Corridor track and signal improvements, which are now scheduled to be complete in 2012.

In the 2008 Budget $150,000 was added to the project budget to reflect a funding agreement with the City of Lakewood for certain scope
items added at the behest of the City.

Changes since 2008 Budget: None
                             Summaries

                                                             Baseline (in $000)                 6,231
                                            2008 Current Budget (in $000)                       6,231
                                           2009 Adopted budget (in $000)                        6,231




Capital Costs
Sub Area                         1997-2007        2008          2009       2010        2011        2012       2013       Future     Total
Snohomish County                        459              0         200        249         451             0          0         0     1,358
South King County                      2,017          2             25         25          9              0          0         0      2,078
Pierce County                          1,783        430            150        162        270              0          0         0      2,795
Total                                  4,258        432            375        436        729              0          0         0      6,231


Capital Cost Elements
Cost Element                     1997-2007       2008           2009       2010        2011        2012       2013       Future      Total
Agency Administration                  210               0             0           2       12             0          0         0        223
Pre-Engineering/Env Review             205               0             0          16        0             0          0         0        221
Construction                          3,844         433            375        418        717              0          0         0       5,787
Total                                 4,258         432            375        436        729              0          0         0       6,231




Adopted 2009 Budget                                                                                                       Page 71 of 312
                                                 Service Delivery Capital
Project                               261       Bus Maintenance Facility

Description
The bus maintenance facility budget contains funds for expansion of ST's fleet maintenance capacity.

A project scope has been negotiated with Pierce Transit to accommodate the ST Express fleet needs. The budget for this part of the Bus
Maintenance Facility is $4,700,000. This is a capped contribution amount with a series of payments tied to completed project milestones.
The project cashflow for 2009 relates to payments scheduled in the agreement.

Funding for future maintenance capacity projects has been moved to 2011. As near-term maintenance capacity investments may be
identified, funding may be re-programmed to earlier years.

Changes since 2008 Budget: There were two budget amendments to the 2009 budget, reflected in Resolution R2008-14, Amendment 3.
The first transferred $3,000,000 from project #290, the ST Express Fleet Program to this project budget. The second transferred $250,000
from the ST Express Mobile Communications project to this project budget. Both amendments impacted the Snohomish County subarea
only.
                              Summaries

                                                              Baseline (in $000)                   0
                                             2008 Current Budget (in $000)                     19,097
                                            2009 Adopted budget (in $000)                      22,347




Capital Costs
Sub Area                          1997-2007        2008          2009        2010       2011       2012       2013       Future     Total
Snohomish County                       2,007           30         3,220             0          0          0          0         0     5,257
South King County                          10            51             59     382       2,360            0          0         0      2,861
East King County                          102             6              0       0       7,956            0          0         0      8,064
Pierce County                               7         384           442             0    5,331            0          0         0      6,164
Total                                  2,126          471         3,720        382      15,647            0          0         0     22,347


Capital Cost Elements
Cost Element                      1997-2007       2008           2009        2010       2011       2012       2013       Future      Total
Agency Administration                     3              0              0           0      557            0          0         0        560
Pre-Engineering/Env Review                7              0              0           0        0            0          0         0           7
ROW Acquisition and Permits               59             0              0           0          0          0          0         0           59
Construction                          2,057          471          3,720        382      15,090            0          0         0      21,720
Total                                 2,126           471         3,720        382      15,647            0          0         0      22,347




Adopted 2009 Budget                                                                                                       Page 72 of 312
                                                 Service Delivery Capital
Project                               290       ST Express Fleet Program

Description
The budget for vehicles reflects capital costs for the acquisition and start-up of new ST Express buses. Buses are purchased by Sound
Transit and then operated and maintained by the partner agencies. Sound Transit funds the acquisition costs of the fleet as well as major
maintenance programs through the ST Express Fleet Program.

After the final procurements in 2008, the total ST Express fleet will number 240 buses.

The remaining project budget would fund major maintenance programs and/or expansion of the ST Express fleet to meet ridership
demand.

Changes Since the 2008 Budget: A 2009 Budget Amendment (Resolution R2008-14, Amendment 3) reduced this project budget by
$3,000,000 and transferred the funding to the Bus Maintenance Facility project (#261). This amendment impacted the Snohomish County
subarea only.
                            Summaries

                                                            Baseline (in $000)                 0
                                             2008 Current Budget (in $000)                103,686
                                            2009 Adopted budget (in $000)                 100,686




Capital Costs
Sub Area                          1997-2007        2008        2009       2010       2011      2012       2013       Future     Total
Snohomish County                       8,308        3,359             0          0      587           0          0         0    12,254
South King County                       5,170         281             0          0     775            0          0         0      6,226
East King County                      48,005        2,136             0          0      107           0          0         0     50,248
Pierce County                         29,415           56             0          0    2,486           0          0         0     31,957
Total                                 90,899        5,832             0          0    3,955           0          0         0    100,686


Capital Cost Elements
Cost Element                      1997-2007       2008         2009       2010       2011      2012       2013       Future      Total
Agency Administration                   980            0              0          0        0           0          0         0         980
Vehicles                             89,919        5,832              0          0    3,955           0          0         0      99,706
Total                                90,899         5,832             0          0    3,955           0          0         0     100,686




Adopted 2009 Budget                                                                                                   Page 73 of 312
                                                 Service Delivery Capital
Project                               356       Tacoma Dome Station

Description
The Tacoma Dome Station project was completed in 2002. Per agreement, Sound Transit has maintained a capital budget for major
maintenance which may be necessary during the useful life of the facility. Current projections are for spending to be programmed after
2009.

Changes Since 2008 Budget: None
                            Summaries

                                                             Baseline (in $000)                   0
                                             2008 Current Budget (in $000)                       311
                                            2009 Adopted budget (in $000)                        311




Capital Costs
Sub Area                         1997-2007        2008          2009       2010       2011        2012       2013       Future     Total
Pierce County                             0              0             0          0          0           0      311           0       311
Total                                       0            0             0          0          0           0     311            0           311


Capital Cost Elements
Cost Element                      1997-2007       2008          2009       2010       2011        2012       2013       Future      Total
Agency Administration                     0              0             0          0          0           0          0         0             0
Construction                                0            0             0          0          0           0      311           0           311
Total                                       0            0             0          0          0           0      311           0           311




Adopted 2009 Budget                                                                                                      Page 74 of 312
                                                 Service Delivery Capital
Project                               701       ST Express Fleet Replacement Program

Description
This project details the necessary bus replacement program for the ST Express fleet. This program is separate from the original bus
procurement project (#290), which funds the original acquisition of the ST Express fleet.

Current assumptions include:
Budgets have been added in 2011 to reflect the first replacement of approximately 100 buses that were acquired in 1999. The specific
timing and fleet mix of these acquisitions will be further defined in future Service Implementation Plans.

Acquisition of the replacement fleet would only occur upon approval by the Sound Transit Board. Note that the budget listed in this project
covers just the planning horizon through 2016. Additional replacement purchases will need to be included in future budgets and will be
funded through the Capital Replacement Fund.

Changes since 2008 Budget: Added the years 2013 - 2016 to the replacement plan.
                            Summaries

                                                              Baseline (in $000)                0
                                             2008 Current Budget (in $000)                  80,861
                                            2009 Adopted budget (in $000)                  116,569




Capital Costs
Sub Area                          1997-2007        2008          2009       2010       2011     2012       2013       Future      Total
Snohomish County                           0              0             0    9,120      6,960          0          0         0     16,080
South King County                         444         940               0          0     615           0          0         0       2,000
East King County                            0           0               0    3,694     16,305    9,503      8,798      30,899     69,199
Pierce County                           3,354       7,102               0       69      8,487      177      9,523         577     29,290
Total                                   3,799       8,042               0   12,884     32,367    9,680     18,321      31,476    116,569


Capital Cost Elements
Cost Element                      1997-2007       2008           2009       2010       2011     2012       2013       Future      Total
Vehicles                              3,799        8,042                0   12,884     32,367    9,680     18,321      31,476     116,569
Total                                  3,799       8,042                0   12,884     32,367    9,680     18,321      31,476     116,569




Adopted 2009 Budget                                                                                                    Page 75 of 312
                                                  Service Delivery Capital
Project                               702        Sounder Fleet Program

Description
This project was created in 2005 to cover major capital replacement cycles and spare parts acquisitions for the Sounder locomotives and
coaches. These funds will be set aside to pay for future capital projects for Sounder vehicles, including major component acquisitions,
such as auxiliary power units and turbochargers.

The planning horizon for this project covers the period through 2013. There will be future needs for capital replacement which will occur
outside this planning horizon. These needs are funded through the Capital Replacement Fund.
                            Summaries

                                                               Baseline (in $000)                   0
                                             2008 Current Budget (in $000)                       2,434
                                            2009 Adopted budget (in $000)                        2,434




Capital Costs
Sub Area                          1997-2007         2008          2009       2010     2011          2012       2013       Future     Total
Snohomish County                          43               0         323        406          0             0          0         0       772
South King County                           58             0         265        546          0             0          0         0           869
Pierce County                               47             0         298        448          0             0          0         0           793
Total                                     148              0         886      1,400          0             0          0         0      2,434


Capital Cost Elements
Cost Element                      1997-2007        2008           2009       2010     2011          2012       2013       Future      Total
Vehicles                                148                0         886      1,400          0             0          0         0       2,434
Total                                    148               0         886      1,400          0             0          0         0       2,434




Adopted 2009 Budget                                                                                                        Page 76 of 312
                                                 Service Delivery Capital
Project                               705       ST2 Fleet Expansion

Description
Created by Amendment #22 to the Proposed 2009 Budget, the ST2 ST Express Fleet Expansion Project provides funding for an addition
of 60 buses to the ST Express fleet. These acquistions will be reviewed with the Board during 2009 and will support an additional 100,000
hours that have been described in the ST2 service plan.
                           Summaries

                                                              Baseline (in $000)                  0
                                             2008 Current Budget (in $000)                        0
                                            2009 Adopted budget (in $000)                     42,000




Capital Costs
Sub Area                         1997-2007         2008          2009       2010       2011       2012       2013       Future     Total
Snohomish County                          0               0      12,180            0          0          0          0         0    12,180
South King County                           0             0       2,940            0          0          0          0         0      2,940
East King County                            0             0      20,580            0          0          0          0         0     20,580
Pierce County                               0             0       6,300            0          0          0          0         0      6,300
Total                                       0             0      42,000            0          0          0          0         0     42,000


Capital Cost Elements
Cost Element                      1997-2007       2008           2009       2010       2011       2012       2013       Future      Total
Vehicles                                  0               0      42,000            0          0          0          0         0      42,000
Total                                       0             0      42,000            0          0          0          0         0      42,000




Adopted 2009 Budget                                                                                                      Page 77 of 312
                                                 Service Delivery Capital
Project                               740       Small Works Program

Description
This budget was created in the 2006 budget to fund the projected costs of capital improvements to be performed at sites throughout the
service area.

The budget is based on number of sites maintained, age of facilities and amount of use.

Individual projects with a project cost not exceeding $100,000 are charged to the Small Works project. Once the project cost exceeds
$100,000 it must be specifically identified as a separate project in the capital plan.

Changes since the 2008 Budget: The planning horizon has been extended to 2016. Historical planning costs from 2007 were transferred to
project #746, Regional Mobility Parking Enhancements, once that project was approved by the Board for 2008.
                              Summaries

                                                              Baseline (in $000)                     0
                                             2008 Current Budget (in $000)                        3,130
                                            2009 Adopted budget (in $000)                         2,748




Capital Costs
Sub Area                          1997-2007        2008          2009       2010       2011          2012       2013       Future     Total
Snohomish County                           0           14            75         75         75            75         75          75       464
South King County                          0           33            95         92         92            92         92          92       588
East King County                            0            43         150        150       150              150     150         150            943
Pierce County                               0             3         125        125       125              125     125         125            753
Total                                       0            93         445        442       442              442     442         442       2,748


Capital Cost Elements
Cost Element                      1997-2007       2008           2009       2010       2011          2012       2013       Future      Total
Agency Administration                     0              -4             0          0          0             0          0         0             -4
ROW Acquisition and Permits                 0        -58                0          0          0             0          0         0            -58
Construction                                0        155            445        442       442              442      442         442       2,810
Total                                       0         93            445        442       442              442      442         442       2,748




Adopted 2009 Budget                                                                                                         Page 78 of 312
                                                 Service Delivery Capital
Project                               741       Auburn Bus Loop Concrete Replacement

Description
The concrete bus loop has eroded at Auburn Station. To reduce the long-term maintenance costs associated with this location, staff
proposes to redo the entire concrete bus loop. Upon approval of a contract by the board, this project will be completed in the span of
approximately one month.

Changes since 2008 Budget: None
                             Summaries

                                                              Baseline (in $000)                    0
                                             2008 Current Budget (in $000)                         521
                                            2009 Adopted budget (in $000)                          521




Capital Costs
Sub Area                          1997-2007        2008          2009       2010        2011        2012       2013       Future     Total
South King County                          2              7         470         43             0           0          0         0       521
Total                                       2             7         470            43          0           0          0         0           521


Capital Cost Elements
Cost Element                      1997-2007       2008           2009       2010        2011        2012       2013       Future      Total
Agency Administration                     2               7             0       18             0           0          0         0          26
Pre-Engineering/Env Review                  0             0             0          25          0           0          0         0            25
Construction                                0             0         470            0           0           0          0         0           470
Total                                       2             7         470            43          0           0          0         0           521




Adopted 2009 Budget                                                                                                        Page 79 of 312
                                                Service Delivery Capital
Project                              743       Homeland Security Enhancements

Description
This project was created by Board Resolution R2006-16. It funds the enhancements to existing security systems at Sounder parking
garages, the Tacoma Link O&M facility and Union Station. The project includes closed circuit television enhancements. Phase 1 of this
project is funded by federal grants and is complete.

A second federal Homeland Security grant was received and added $397k to the project budget in the 2008 budget process. The scope
will be coordinated with Pierce Transit, which is a co-recipient of the award.

Changes Since 2008: None
                             Summaries

                                                             Baseline (in $000)                   0
                                            2008 Current Budget (in $000)                        947
                                           2009 Adopted budget (in $000)                         947




Capital Costs
Sub Area                         1997-2007        2008          2009       2010       2011        2012       2013       Future     Total
South King County                         0           41           263         10            0           0          0         0       315
Pierce County                            111            71         125        326            0           0          0         0           633
Total                                    111        112            388        336            0           0          0         0           947


Capital Cost Elements
Cost Element                     1997-2007       2008           2009       2010       2011        2012       2013       Future      Total
Agency Administration                    0              0           20         25            0           0          0         0          45
Pre-Engineering/Env Review                87         56             18            5          0           0          0         0           165
Construction                              24         57            350        306            0           0          0         0           737
Total                                    111        112            388        336            0           0          0         0           947




Adopted 2009 Budget                                                                                                      Page 80 of 312
                                                   Service Delivery Capital
Project                                744        Talking Signs

Description
This project was created in late 2006 to receive federal funds to implement improvements to transit accessibility throughout the region in
the form of "talking signs". The local match is approximately $400,000.

The Talking Signs project utilizes Remote Intrafred Audible Signage (RIAS) technology to provide way-finding and information to people
who have visual, cognitive, or learning disabilities. The plan calls for installation of this technology at nine regional, multimodal transit
facilities. RIAS is a system of infrared transmitters and receivers installed on features such as elevators, stairs and ticket vending
machines. The receivers pick up voice messages from the transmitters and then guide the users through the envrironment.

Improvements will be spread throughout the region and funds are programmed in accordance with the three-year implementation plan.
Work to be completed through the end of 2009 includes installation at Everett Station, Tacoma Dome Station, King Street Station,
Overlake Transit Center, Bellevue Transit Center and Lynnwood Transit Center.

Changes since 2008 Budget: None
                             Summaries

                                                              Baseline (in $000)                      0
                                              2008 Current Budget (in $000)                        2,379
                                             2009 Adopted budget (in $000)                         2,379




Capital Costs
Sub Area                           1997-2007         2008         2009       2010       2011          2012       2013       Future     Total
Snohomish County                           12           344          202            0          0             0          0         0       558
South King County                            12         354          301            0          0             0          0         0           667
East King County                             18         524            0            0          0             0          0         0           542
Pierce County                                19         593              0          0          0             0          0         0           613
Total                                        60       1,815          503            0          0             0          0         0      2,379


Capital Cost Elements
Cost Element                       1997-2007        2008          2009       2010       2011          2012       2013       Future      Total
Agency Administration                      0              0           0             0          0             0          0         0           0
Construction                              60          1,815         503             0          0             0          0         0       2,379
Total                                      60         1,815         503             0          0             0          0         0       2,379




Adopted 2009 Budget                                                                                                          Page 81 of 312
                                                 Service Delivery Capital
Project                               745       ST Express Mobile Communications Projects

Description
As part of the operation of the Sound Move ST Express bus fleet, mobile communications are necessary to ensure driver and passenger
safety, to enhance the customer service information, and to improve the information available to the service planning funciton. The
existing mobile communications systems are aging and in need of upgrades.

A signed project particiapation agreement with Pierce Transit was executed in 2007. This project is ongoing and is expected to be
complete by the end of 2009.

An agreement for ST project participation with King County Metro is expected to go to the Board during the second half of 2008..

After these two agreements are concluded, the total committed amount will be approximately $8 million.

Changes in 2008: Resolution R2008-14, Amendment 3 reduced this project budget by $250,000 and moved the funding to the the Bus
Maintenance Facility project (#261).
                           Summaries

                                                              Baseline (in $000)                   0
                                             2008 Current Budget (in $000)                     10,781
                                            2009 Adopted budget (in $000)                      10,531




Capital Costs
Sub Area                         1997-2007         2008          2009       2010        2011       2012       2013       Future     Total
Snohomish County                          0               0         592        715             0          0          0         0     1,307
South King County                           0         553           241        228        139             0          0         0      1,160
East King County                            0           0           611      1,607        746             0          0         0      2,963
Pierce County                               0       4,177           887            23      14             0          0         0      5,100
Total                                       0       4,730         2,330      2,572        898             0          0         0     10,531


Capital Cost Elements
Cost Element                      1997-2007       2008           2009       2010        2011       2012       2013       Future      Total
Construction                              0        4,730          2,330      2,572         898            0          0         0      10,531
Total                                       0       4,730         2,330      2,572        898             0          0         0      10,531




Adopted 2009 Budget                                                                                                       Page 82 of 312
                                                   Service Delivery Capital
Project                                746        Regional Mobility Parking Enhancements

Description
In 2007 Sound Transit received a Regional Mobility grant in the amount of $3.7 million to expand commuter rail parking in the Tacoma-
Seattle Corridor. The local match for this grant is $500k. The funding will be used to expand capacity at Sumner and/or Puyallup Stations.
The specific parcels are still being selected for acquisition. Upon acquisition, the parcels will be cleared and converted to use for parking.
Up to 285 parking stalls would be added to the inventory available for Sounder customers.

Changes since the 2008 Budget: A 2009 budget amendment (Resolution R2008-14, Amendment 4) added $772,000 to the project budget
to reflect a grant that was received by the City of Puyallup and which will be administered by Sound Transit as part of this project. There
was a corresponding increase to the grant revenues assumed in the finance plan and added to the revenue budget..
                              Summaries

                                                               Baseline (in $000)                     0
                                              2008 Current Budget (in $000)                        4,200
                                             2009 Adopted budget (in $000)                         4,972




Capital Costs
Sub Area                          1997-2007          2008         2009       2010       2011          2012       2013       Future     Total
South King County                         12             12              0          0          0             0          0         0         24
Pierce County                                49         148        2,025      2,725            0             0          0         0      4,948
Total                                        62         160        2,025      2,725            0             0          0         0      4,972


Capital Cost Elements
Cost Element                       1997-2007        2008          2009       2010       2011          2012       2013       Future      Total
Agency Administration                      4               4          25         20            0             0          0         0          53
Pre-Engineering/Env Review                   0             7         600        204            0             0          0         0           811
ROW Acquisition and Permits                58          150            28          0            0             0          0         0         236
Construction                                0            0           600      2,500            0             0          0         0       3,100
Contingency                                  0             0         772            0          0             0          0         0           772
Total                                      62          160         2,025      2,725            0             0          0         0       4,972




Adopted 2009 Budget                                                                                                          Page 83 of 312
                                                 Service Delivery Capital
Project                              747        Security Office Expansion

Description
Scope: Expand the Sound Transit security office at Union Station. Additional space is required to monitor CCTV cameras and to
accommodate growth anticipated due to additional service provided on Link Light Rail and other service modes.

Project completed during 2008.

Changes since 2008 Budget: None
                           Summaries

                                                             Baseline (in $000)                    0
                                            2008 Current Budget (in $000)                         165
                                           2009 Adopted budget (in $000)                          165




Capital Costs
Sub Area                         1997-2007         2008         2009       2010        2011        2012       2013       Future     Total
South King County                         0           153              0       12             0           0          0         0       165
Total                                       0         153              0          12          0           0          0         0           165


Capital Cost Elements
Cost Element                     1997-2007        2008          2009       2010        2011        2012       2013       Future      Total
Agency Administration                    0               0             0          8           0           0          0         0             8
Construction                               -9        153               0          0           0           0          0         0           144
Contingency                                 9          0               0          4           0           0          0         0            13
Total                                      0          153              0          12          0           0          0         0           165




Adopted 2009 Budget                                                                                                       Page 84 of 312
                                                 Service Delivery Capital
Project                               750       Sounder Maintenance Base Development

Description
New Project Adopted in 2009 Budget

This project would fund the initial preliminary engineering and scoping for a potential Sounder Commuter Rail maintenance base
development. Specific work occuring during 2009 would entail needs identification and conceptual design, and would refine options
available for base development, with a goal of having design estimates to better inform the development of a complete budget estimate for
a base project.

Changes since 2008 Budget: This is a new project in the 2009 Budget.
                             Summaries

                                                              Baseline (in $000)                    0
                                             2008 Current Budget (in $000)                           0
                                            2009 Adopted budget (in $000)                          197




Capital Costs
Sub Area                         1997-2007         2008          2009        2010       2011        2012       2013       Future     Total
Snohomish County                          0               0          37             0          0           0          0         0         37
South King County                           0             0             88          0          0           0          0         0            88
Pierce County                               0             0             72          0          0           0          0         0            72
Total                                       0             0         197             0          0           0          0         0           197


Capital Cost Elements
Cost Element                     1997-2007        2008           2009        2010       2011        2012       2013       Future      Total
Agency Administration                    0                0             9           0          0           0          0         0             9
Pre-Engineering/Env Review                  0             0         150             0          0           0          0         0           150
Contingency                                 0             0          38             0          0           0          0         0            38
Total                                       0             0         197             0          0           0          0         0           197




Adopted 2009 Budget                                                                                                        Page 85 of 312
                      This page intentionally left blank




Adopted 2009 Budget                                        Page 86 of 312
                                 PROJECT DELIVERY
    PROGRAM SUMMARY
    The Link light rail, Sounder commuter rail, and Regional Express programs each have a 1997-
    2016 capital spending plan, including a project-by-project listing of capital outlays. These plans
    include the costs for building the initial Phase 1 Sound Move projects, plus any changes to Sound
    Move adopted by the board. A map illustrating these capital projects is included in each
    department’s budget summary. Capital programs managed by corporate departments are listed
    with the managing department under the Agency Operations tab.
    Baseline Budgets
    In accordance with adopted agency budget policies, each capital project is assigned a baseline
    budget as adopted by the board. This budget reflects the cost estimate for a project when:
    1) Preliminary Engineering has reached 30 percent, 2) key third party requirements are finalized,
    3) right-of-way plans are established, 4) Record of Decision (ROD)/Finding of No Significant
    Impact (FONSI) has been issued, and 5) a single well-defined scope is to be advanced into final
    design. The individual capital budget pages reflect baseline budgets for those projects that have
    met the established baseline criteria.
    Risk Assessments
    The Adopted 2009 Budget also contains risk assessments for active capital projects. These
    assessments identify project risk factors that have potential scope, budget, and schedule
    implications. In some cases, a great deal is known about the project scope, location and
    community expectations, and the public process for permitting and local jurisdictional
    participation is advanced. However, other projects are earlier in the planning stages, and
    environmental factors, community input, engineering modifications, or other changes could
    substantially alter the scheduled outlay of funds.
    Budget Risk
    •   Status: Current status of project, including conceptual engineering (CE), preliminary
        engineering/environmental design (PE/ED), final design (FD), construction (CO), and not
        initiated.
    •   Type of budget estimate: Identifies the type of budget estimate that is currently being used for
        the project. These include: allocation (“round number” project budgets agreed upon by
        stakeholders during the development of Sound Move), planning (preliminary conceptual
        estimate developed for specific sites based on limited project information), conceptual
        engineering, scoping (estimate based on itemized right-of-way and construction costs on an
        estimated unit price), PE/ED (estimate based on preliminary engineering/environmental
        design), and construction (estimate based on full design drawings, specifications, and known
        unit prices).
    •   Budget risk level: Overall risk level for project, classified as high, medium, or low.
    •   Right-of-way costs: A check mark indicates those projects with potential for higher than
        budgeted right-of-way costs.
    •   Scope Escalation/Change: A check mark indicates those projects that may not be able to
        absorb additional costs and changes desired by all parties.
    •   Design and Environmental Requirements: A check mark indicates those projects with
        outstanding unresolved issues related to design or environmental requirements.
    •   Unexpected Finding During Engineering: A check mark indicates those projects which had
        an unexpected issue arise related to engineering.




Adopted 2009 Budget                                                                              Page 87 of 312
    •   Limited Budget Basis: A check mark indicates those projects which are currently only
        developed to a conceptual level.
    •   Shared Project Funding: A check mark indicates those projects which rely, not only on
        Sound Transit funding, but also on outside party funding for a portion of the project.
    •   Utilities Relocation: A check mark indicates those projects that had undefined utility
        relocation issues.
    •   Project Location: A check mark indicates those projects which have unresolved location
        issues.
    •   Coordination: A check mark indicates those projects with community issues or conflicts and
        difficult project interfaces with other parties.
    Schedule Risk
    •   Risk level: Overall risk level for project classified as high, medium or low, depending on the
        nature and complexity of the issues related to the project.
    •   2008 Budget schedule: The schedule for start of service in the 2008 Budget.
    •   Adopted 2009 Budget schedule: The schedule for start of service in the Adopted 2009
        Budget.


    Spending the Adopted 2009 Capital Budget
    Sound Transit anticipates spending approximately $563.5 million in capital outlays in 2009 for
    the three project delivery programs. This budget is the result of a detailed estimate of the amount
    the agency will spend on each capital project by phase (design, construction, right-of-way, etc.).



             Adopted FY 2009 Project Delivery Budget
                                             (YOE $000)



                                                               $563,503
                                                               Link Light Rail Capital
                                                               $371,680 (66%)
                                                               Sounder Commuter Rail Capital
                                                               $154,254 (27.4%)
                                                               Regional Express Capital
                                                               $37,569 (6.7%)




    The Adopted 2009 Budget also contains Sound Transit’s capital spending plan (1997-2016) with
    detailed expenses on capital assets for each project in Phase 1 of Sound Move. The major
    elements of this capital spending are discussed below.




Adopted 2009 Budget                                                                              Page 88 of 312
                                   Project Delivery
                       Adopted 2009 Capital Budget Summary

                                             Adopted                Adopted
                                               2009                1997-2016
                                             Budget                  Budget
        Link light rail                  $   371,680,207         $ 4,379,229,827
        Sounder commuter rail                154,253,524           1,429,941,142
        Regional Express bus                  37,569,112             834,400,809
        Total                            $   563,502,842         $ 6,643,571,778


    Included within this chapter is:
    •    Link light rail, consisting of $371.7 million in capital outlays in 2009 and $4.4 billion in the
         total lifetime capital spending plan.
    •    Sounder commuter rail, consisting of $154.3 million in capital outlays in 2009 and a total
         lifetime capital spending plan of $1.4 billion.
    •    Regional Express, consisting of $37.6 million in capital outlays in 2009, and a total lifetime
         capital spending plan of $834.4 million.

    LINK LIGHT RAIL PROGRAM SUMMARY
    Light rail is part of a regional high-capacity transit network that was approved by Puget Sound
    voters in 1996. It includes a 24-mile Central Link system connecting Seattle, Tukwila, and
    SeaTac. Downtown Tacoma is served by a 1.6-mile Tacoma Link light rail line. This
    transportation investment provides a stepping stone for expansion. Central Link light rail will
    create a new transportation corridor where it is needed most—in the major population and
    employment centers where existing roads and bus services are already at capacity during peak
    travel times.
    The Initial Segment will extend from the Tukwila International Boulevard Station in Tukwila and
    move through Tukwila and Rainier Valley on elevated and at-grade tracks. It will pass through
    Beacon Hill in a tunnel and emerge south of downtown Seattle. It will then continue north
    alongside the existing E-3 Busway and into the Downtown Seattle Transit Tunnel to Westlake
    Station. A stub tunnel will extend under Pine Street. Buses and rail will operate jointly in the
    downtown tunnel. The Initial Segment is scheduled to start revenue service in the summer of
    2009.
    The Airport Link project will connect the Tukwila International Boulevard Station in Tukwila on
    elevated and at-grade tracks into the city of SeaTac to a light rail station at the main terminal
    parking garage at Sea-Tac International Airport. Airport Link is scheduled to be constructed and
    operated as part of the Central Link Light Rail Project by the end of 2009.
    The Airport Link South project would extend from the Airport Station at SeaTac along an
    elevated guideway to an elevated station combined with a park and ride lot at S. 200th Street. This
    extension is included as part of ST2.
    North of downtown Seattle, the University Link project route will consist of new tunnels to a
    station on Capitol Hill and under the Montlake Cut to the University of Washington Station near
    Husky Stadium. University Link is expected to start construction in early 2009 and open for
    revenue service in 2016.



Adopted 2009 Budget                                                                              Page 89 of 312
    The Northgate extension will extend from the station at Husky Stadium via both tunnel and
    elevated sections to an elevated station at Northgate with underground stations at 45th Street and
    Brooklyn Avenue and Roosevelt Way. North Link was included in Sound Move, but construction
    was not funded north of 45th Street. With the passage of Sound Transit 2 (ST2) in November
    2008, the Northgate extension is funded, as is the next extension north to Lynnwood.
    Tacoma Link opened on August 22, 2003, and connects downtown Tacoma with a regional transit
    center at the Tacoma Dome Station. Riders can transfer to Sounder commuter rail, ST Express
    regional buses, or local Pierce Transit buses. Five stations along the line serve major city
    destinations such as the theater district, history museum, University of Washington branch
    campus, and the commercial core.
    East Link has completed conceptual engineering and is currently in the environmental process.
    The East Link corridor extends from the Central Link International District Station in Seattle to
    Redmond via I-90, Mercer Island and Bellevue.
    The Route and Stations
    Central Link
    Seattle’s unique topography and environmental constraints are among the reasons light rail was
    chosen as the best option to meet the region's transportation needs. Seattle’s topography requires
    that a transit system be capable of running in tunnels, along hills, and on elevated tracks as well
    as at street level. Of the 14-mile Initial Segment, 2.5 miles consist of existing and new tunnels.
    Five miles are elevated and 6.5 miles are at-grade. When Central Link is completed, light rail
    trains will offer generations of passengers a congestion-free alternative to driving with service to
    a number of destinations, including colleges, hospitals, employment centers and Sea-Tac Airport.
    Central Link’s Final Environmental Impact Statement (EIS) was completed and published in the
    fall of 1999. The Sound Transit Board selected a route between Sea-Tac and the University
    District in November 1999. Subsequent to that action, the Central Link project was divided into
    three separate segments for implementation: the Initial Segment, Airport Link and North Link.
    Sound Transit has worked with neighborhoods, architects, artists and cities to make sure the light
    rail system and stations along the Central Link line are important assets to each community.
    The Initial Segment, Airport Link, and North Link, are discussed below.
    Initial Segment
    In November 2001, after publication of the Tukwila Freeway Route Final Supplemental EIS and
    Initial Segment SEPA Addendum updating the Central Link Final EIS, the Sound Transit Board
    selected an initial segment of the Central Link project to be constructed from downtown Seattle to
    South 154th Street in Tukwila, with a bus shuttle connecting to Sea-Tac Airport. Construction of
    the Initial Segment is approximately 95% complete as of year-end 2008, and it is on track to
    open for revenue service by July 2009.
    Downtown Seattle to South Downtown
    The Initial Segment will start in a new cut-and-cover tunnel under Pine Street and travel through
    the Downtown Seattle Transit Tunnel utilizing existing stations at Westlake, University Street,
    Pioneer Square, and the International District. Light rail and bus service will operate jointly
    within the Downtown Seattle Transit Tunnel. The Convention Place Station will not serve rail
    patrons, but will continue to serve bus passengers.
    From the International District Station, the route will extend south along the east side of the
    Metro E-3 Busway to the Stadium Station south of Royal Brougham Way, continuing to the
    SODO Station north of Lander Street. After crossing Lander Street at-grade, it will transition to
    elevated track before turning east. It will travel on the elevated tracks along the south side of
    South Forest Street and cross over Airport Way. An operations and maintenance facility has been
    constructed south of South Forest Street and west of Airport Way on site of the old Rainier
    bottling plant south of downtown Seattle.


Adopted 2009 Budget                                                                             Page 90 of 312
    Beacon Hill
    The light rail route will enter Beacon Hill in a tunnel that will start under Interstate 5 and continue
    approximately one mile to the east where it will emerge at McClellan Street and 25th Avenue.
    The deep subway Beacon Hill Station with elevator access only, will be located at the intersection
    of Lander Street and Beacon Avenue.
    Rainier Valley
    The light rail route will emerge from the Beacon Hill tunnel to an elevated station at South
    McClellan Street. The route will continue on elevated tracks to South Walden Street, and then run
    at grade level in a center median of Martin Luther King Jr. Way South to a point just north of the
    Boeing Access Road.
    The Mount Baker Station at McClellan and the at-grade Columbia City Station, Othello Station,
    and Rainier Beach Station will benefit Rainier Valley neighborhoods, including Beacon Hill,
    Mount Baker, Rainier Vista, Columbia City, Brighton, New Holly Park, Dunlap, and Rainier
    Beach.
    Tukwila
    In November 1999, the Sound Transit Board proposed a light rail route through Tukwila. In
    November 2001, the board selected a different route, the Tukwila Freeway Route, which was
    recommended by the City of Tukwila. The route will cross I-5 on the south side of Boeing Access
    Road and then travel on elevated tracks along the west side of East Marginal Way, crossing over
    the Duwamish River and State Route 599. The route will continue in a combination of elevated
    tracks and short at-grade sections on the west side of State Route 599, then along the west side of
    Interstate 5. Near South 151st Street, the route will turn west on elevated tracks along the north
    side of State Route 518 to the Tukwila International Boulevard Station and park-and-ride lot at
    South 154th Street. A bus shuttle will provide a direct connection with Sea-Tac Airport until light
    rail service is extended to the airport (see Airport Link section below).
    Airport Link
    In November 1999, the Sound Transit Board selected a light rail alignment that included an
    airport station connecting with the previously proposed North End Airport Terminal. The North
    End Airport Terminal project is not being pursued by the Port of Seattle at this time, and
    alternative expansion plans for airport facilities are under construction.
    In July 2005, the Sound Transit Board selected a new alignment, the Airport Link route and
    stations extending the Initial Segment from South 154th Street to South 200th Street. The board
    also selected the project to the Airport Station to be constructed and in operation by the end of
    2009. This project will continue south from the Tukwila International Boulevard Station on an
    elevated structure, cross over State Route 518, and transition to grade north of the South 160th
    Street bridge. The alignment will continue south in the median of the realigned North Airport
    Expressway, cross over South 170th Street and continue on an elevated structure to the site of the
    light rail station near the main terminal/garage of Sea-Tac International Airport. The Airport Link
    project includes construction of the SeaTac/Airport light rail station, rail installation, pedestrian
    bridge, and a pick-up and drop-off plaza located on the east side of International Boulevard in the
    City of SeaTac. At year-end 2008, the Airport Link project is approximately 77% complete.
    A resolution to amend the Airport Link project budget based on the revised cost to complete for
    redesign on the balance of the airport station and associated facilities (Station Finishes) was
    adopted by the Sound Transit Board in February 2008. The resolution also created a new project
    for the light rail segment extending from South 176th Street to South 200th Street.




Adopted 2009 Budget                                                                               Page 91 of 312
    North Link – University Link
    In September 2001, the Sound Transit Board directed staff to initiate a process for developing a
    North Link Supplemental Environmental Impact Statement and design effort to reconsider routes
    between downtown Seattle and Northgate. The North Link Final Supplemental EIS was
    completed in April 2006. That same month the Sound Transit Board selected the North Link
    project route to Northgate and selected the University Link portion of North Link from downtown
    Seattle to the University of Washington Station as the first phase of North Link for
    implementation. The University Link project secured New Starts funding from FTA. The signing
    of the Full Funding Grant Agreement (FFGA) is scheduled for January 15, 2009. Construction is
    expected to begin in early 2009 with operations beginning in 2016.
    University Link is a three mile light rail extension that will tunnel east from the Downtown
    Seattle Transit Tunnel (DSTT), cross under I-5 and proceed east and then north to a Capitol Hill
    Station serving the First Hill/Capitol Hill urban center. The tunnel route would then cross under
    the ship canal to an interim terminus at the University of Washington Station at Husky Stadium,
    serving the University of Washington campus and the surrounding neighborhoods.
    ST2 calls for extending light rail to the Northgate as a high priority. North from the University of
    Washington Station, the tunnel route would continue to a Brooklyn Station serving the University
    business district, surrounding residential neighborhood and north University of Washington
    campus. The light rail route would then continue north in a tunnel to the Roosevelt Station
    serving the Roosevelt commercial area, continuing along the east side of I-5 to a Northgate
    Station that would provide access to bus transfers at the Northgate Transit Center and to adjacent
    park-and-ride facilities. Funding for environmental analysis and preliminary engineering for the
    segment of the alignment from the University District to Northgate was included in Sound Move.
    Tacoma Link
    Tacoma Link is a 1.6-mile line that connects downtown Tacoma and the Tacoma Dome Station.
    The route is essentially L-shaped, extending south from South Ninth Street along Commerce
    Street. It then transitions over to Pacific Avenue near South 17th Street, and continues south. At
    South 25th Street, the route turns east to the Tacoma Dome Station. The line is a double track
    from South Ninth Street to a point just south of South Union Station/South 19th Station on
    Pacific Avenue. There it becomes a single track to the Tacoma Dome Station.
    Five stations along the line serve major city destinations: 1) Theater District/South Ninth Station,
    2) Convention Place/South 15th Station, 3) Union Station/South 19th Station, 4) South 25th
    Station, and 5) the Tacoma Dome Station. They serve city destinations that include the theater
    district, history museum, University of Washington Tacoma Branch campus, and the commercial
    core. A light rail operations and maintenance facility has been constructed near the Tacoma
    Dome Station, where light rail vehicles are serviced and stored at night.
    Tacoma Link has been in operation since August 2003, and the project completed under budget.
    East Link
    The 19-mile East Link project extends from the Central Link International District Station in
    downtown Seattle to Redmond via I-90, Mercer Island and Bellevue. The project will serve the
    transit destinations of downtown Seattle, Mercer Island, downtown Bellevue, and Overlake in
    Redmond. Additional transit markets to be served include Rainier Avenue, Mercer Island, south
    Bellevue, and the Bel-Red Corridor. Conceptual engineering for the East Link project has been
    completed, and the draft environmental impact statement is currently under development.




Adopted 2009 Budget                                                                             Page 92 of 312
Adopted 2009 Budget   Page 93 of 312
    Link 2009 Activities
    The primary Link activities in 2009 will be to complete construction of the entire 14-mile Initial
    Segment from downtown Seattle to Tukwila, and start revenue operation in July 2009.
    Construction of Airport Link will be completed in December 2009. Construction will begin on
    University Link. East Link is expected to enter the preliminary engineering phase and significant
    progress will be made on the final EIS.
    The Link Executive Director’s Office will continue to provide oversight and direction for the
    Initial Segment, Airport Link, University Link, and East Link projects. A primary focus will be
    on civil/systems integration and the testing and start-up of the Initial Segment and Airport Link
    service in 2009.

    Civil Engineering tasks will include: a) necessary support of construction contracts,
    b) coordinating with partner cities to address utilities, traffic circulation, and other design issues,
    c) complete civil final design for University Link and, d) support for East Link project
    preliminary engineering and environmental review.
    Systems Engineering tasks will include: a) management of contracts for light rail vehicle, signals,
    communications, and traction power, b) providing systems engineering design support for civil
    line section construction, c) complete systems final design for University Link, and d) support for
    East Link preliminary engineering and environmental review.
    Community Outreach staff will inform the public about light rail project plans, designs, and
    construction details, including safety outreach to the communities along the line. They will work
    closely with affected communities to address concerns and potential project impacts.
    Project Control staff will continue to report up-to-date information on cost, schedule, and scope
    of all Link projects to support project decision making and help assess project performance.
    During the ongoing construction and startup of the Initial Segment, continued focus will be
    placed on the configuration management process. This will assure that construction changes are
    effectively managed and coordinated. For the University Link project, the Project Control effort
    will focus on the refinement of cost estimates, schedule, and risk assessment. The Project Control
    effort for the Airport Link project will focus on the continued tracking and monitoring of budget
    and schedule performance, including coordination of schedules with the Port of Seattle, and
    supporting construction. For East Link, Project Control will support preparation of cost estimates for
    the preliminary engineering and design of the EIS alternatives.
    Project Development staff will continue to facilitate design development by coordinating with all
    Link divisions and project partners. The division will support the University Link final design and
    the federal Full Funding Grant Agreement process, and manage the East Link project. Finally,
    Project Development staff will support federal communications and reporting, and negotiate and
    manage third-party agreements.
    Link Environmental staff will continue to track the required mitigation measures, compile the
    quarterly reports for the Federal Transit Administration, and implement wetland and historic
    mitigation measures for the Initial Segment, University Link and Airport Link projects. They will
    direct environmental permitting for University Link. They will manage the environmental process
    for the East Link Final EIS. The Environmental Division will also support Operations to identify
    and implement operational environmental requirements in preparation for opening of the Initial
    Segment and Airport Link in 2009.
    Link Real Estate staff will continue to provide real estate support as needed on the Initial
    Segment close out, Airport Link, University Link, East Link and other projects in ST2. In
    addition to providing real estate services for Link projects, Link Real Estate also acquires
    property rights as needed for Regional Express and Sounder Commuter Rail projects.




Adopted 2009 Budget                                                                                Page 94 of 312
    Link Capital Plan
    The Adopted 2009 lifetime budget of $4.4 billion for the Link Program contains the following
    four capital project budgets: 1) $1.8 billion for North Link, including $1.756 billion for
    University Link, $46.0 million for the two other segments from the University of Washington
    Station to Brooklyn Station at NE 45th Street, and Northgate to 45th Street, and $5.0 million for
    ST2 Early Work; 2) $2.2 billion for the Initial Segment, which includes a program reserve of
    $128 million, and the $23.7 million payment to King County Metro for debt service related to the
    transfer of the Downtown Seattle Transit Tunnel (DSST); 3) $269.1 million for Airport Link; 4)
    $4.0 million for the new Airport Link South project; and 5) $77.1 million for Tacoma Link which
    is complete.
    The Adopted 2009 Budget for Link contains annual expenditures in the amount of $371.7
    million: 1) $152.1 million for North Link, of which $138.7 million is for University Link; 2)
    $156.1 million for the Initial Segment and 3) $63.4 million for Airport Link.
    Changes in the Adopted 2009 Budget
    Project Changes
    The Adopted 2009 lifetime budget reflects a project budget amendment adopted by the Sound
    Transit Board in 2008 for the Airport Link project that increased the budget and created a new
    Airport Link South project for the light rail segment extending from S. 176th Street to S. 200th
    Street.
    As part of ST2, the Adopted 2009 lifetime budget includes a new project North Link – ST2
    Early Work to advance preliminary engineering for the North Link segment from UW Station to
    Northgate. Sound Move includes preliminary engineering for the two projects that currently
    comprise this North Link segment, Northgate to 45th St and UW Station to Brooklyn Station (at
    NE 45th St). The new ST2 Early Work project will be combined with the two existing projects
    from UW Station to Northgate into a single project in a future budget.


    Budget Changes
    The North Link – Northgate to 45th Street project lifetime budget has increased by $10.5 million
    to the revised total amount of $19.5 million by resolution of the Sound Transit Board in
    November 2008 to supplement funding needed to acquire property for the Roosevelt Station.
    The North Link – UW Station to Brooklyn Station project lifetime budget has decreased by $10.5
    million to the revised total amount of $26.4 million by resolution of the Sound Transit Board in
    November 2008 to transfer project contingency funds to the North Link – Northgate to 45th Street
    project.
    The University Link project lifetime budget has increased by $142.0 million to the revised
    Baseline Cost estimate of $1.756 billion adopted by the Sound Transit Board in July 2008 to
    proceed with the FFGA application. The FTA has increased the federal funding share amount in
    the proposed FFGA by $63 million, partially offsetting the financial impact to Sound Transit. The
    local share of the proposed budget increase would be funded from unutilized uncommitted
    financial capacity in North King County.
    Initial Segment project lifetime subarea budget for North King County has increased by $8.6
    million and the South King subarea budget has decreased by a like amount. Budgets for North
    King County and South King County reflect the sum of actual historical lifetime outlays by
    subarea, plus estimated costs to complete distributed by subarea in accordance with the equity
    area rules established in the baseline construction estimate (BCE). With the completion of the
    Tukwila Freeway segment, unallocated construction contingency is projected to be utilized for
    North King County segments.
    The lifetime budget for DSTT Capital Costs, debt service on the Downtown Seattle Transit


Adopted 2009 Budget                                                                            Page 95 of 312
    Tunnel during construction, reflects actual capital outlays for this project of $23.7 million, which
    is $1.2 million under the adopted lifetime project budget of $24.9 million.
    The Airport Link project lifetime budget has increased by $25.5 million to the revised total
    amount of $269.1 million by resolution of the Sound Transit Board in February 2008, based on
    the revised cost to complete for redesign of the airport station and associated facilities (Station
    Finishes). Funding for the budget increase is provided by unutilized uncommitted financial
    capacity in South King County plus a transfer from the Regional Fund, which will be reimbursed
    by the South King County subarea, plus interest, as additional financial capacity is generated. The
    resolution also created the new Airport Link South project for the light rail segment extending
    from South 176th Street to South 200th Street to separately manage and report the costs directly
    attributable to this segment.
    The Adopted 2009 lifetime budget shows Tacoma Link closing out at $77.1 million of actual
    capital outlays, which is $3.3 million under the adopted lifetime project budget of $80.4 million.
    Tacoma Link began revenue service in August of 2003.


    Schedule Changes
    Sound Transit’s current baseline project completion milestone for University Link of late
    September 2016 for start of revenue services remains unchanged.
    The project schedule for the Initial Segment is unmodified and revenue service remains scheduled
    for July 2009.
    The project schedule for Airport Link is unmodified and revenue service remains scheduled for
    December 2009.


    Baseline Budgets and Schedules

    The Adopted 2009 Budget includes baseline budgets and schedules for the following projects,
    which have completed the criteria established for setting project baselines:
    1. University Link: baseline budget of $1.756 billion and scheduled project completion in
       September 2016
    2. Central Link Initial Segment: baseline capital budget of $2.07 billion and scheduled project
       completion in July 2009.
    3. Airport Link: baseline budget of $269.1 million and scheduled project completion in
       December 2009.
    4. Tacoma Link: baseline budget of $80.4 million. Revenue service began in August 2003.




Adopted 2009 Budget                                                                             Page 96 of 312
                                                          Light Rail Capital
                                          2009 Adopted Budget By Equity Area


  Subarea                                     1997-2007 2008            2009        2010      2011       2012        2013 Future             Total
   North King County                         1,427,102     239,162    280,271     412,431   323,583   292,296     205,367       267,326      3,447,539
   South King County                           580,143     135,335     91,409      47,706         0         0           0             0        854,593
   Pierce County                                76,737        361          0           0         0          0              0             0      77,097

Light Rail Capital                           2,083,982     374,858    371,680     460,136   323,583   292,296      205,367      267,326      4,379,230


                                               2009 Adopted Budget By Phase

  Phase                                      1997-2007       2008       2009 2010             2011       2012        2013 Future             Total

10 Agency Administration                      165,415       22,461     27,282      22,357    14,246    15,087       15,697        42,882      325,427
20 Pre-Engineering/Env Review                  80,783           74      5,858         992         0         0            0             0       87,707
30 Final Design and Specification             187,077       30,987     15,328       4,088     3,246      2,945       4,194         3,803      251,668
40 ROW Acquisition and Permits                305,383       54,428     22,204      27,050    10,522      5,980       2,000           80       427,646
50 Construction                             1,041,020      186,312    215,883     222,445   277,689   254,009      172,734      205,480 2,575,572
52 Construction Services                      136,055       18,621     22,269      12,268    13,346    13,088        9,911       13,019   238,576
65 Third Parties                                66,561       4,238      6,223       2,057     1,755      1,187        832          2,063        84,916
70 Vehicles                                   101,690       57,736     55,956      40,577     2,780         0              0             0    258,738
90 Contingency                                      0            0        677     128,302         0         0              0             0    128,979

Light Rail Capital                          2,083,982      374,858    371,680     460,136   323,583   292,296      205,367      267,326 4,379,230



                                             2009 Adopted Budget By Project


   Project                                   1997-2007       2008       2009        2010      2011       2012        2013 Future             Total

100 North Link - Northgate to 45th St     98   6,398         10,592       2,313     244           0         0          0             0          19,548
110 North Link - ST2 Early Work            0       0              0       5,000       0           0         0          0             0           5,000
200 University Link - Pine St Stub Tunnel 62 128,962         93,229     138,711 306,531     323,583   292,296    205,367       267,326       1,756,007
    (PSST) to UW Station
290 North Link - UW Station to Brooklyn Station 18,875
                                           75                    24       6,103     1,442        0         0          0             0          26,444
    (NE 45th St)
300 Initial Segment                          11,698,941     196,603     156,126 18,330           0         0          0             0        2,070,000
390 DSTT Capital Costs                       9 23,719             0           0       0          0         0          0             0           23,719
399 Initial Segment Project Reserve          0        0           0           0 128,300          0         0          0             0          128,300
400 Airport Link - 154th St to 176th St    90 128,290        72,094      63,427   5,289          0         0          0             0          269,100
480 Airport Link South - 176th St to 200th St
                                           59     2,059       1,955           0       0          0         0          0             0            4,014
500 Tacoma Link                            37 76,737            361           0       0          0         0          0             0           77,097
Light Rail Capital                          2,083,982       374,858     371,680 460,136     323,583   292,296    205,367       267,326       4,379,230




         Adopted 2009 Budget                                                                                               Page 97 of 312
                                                              Light Rail Capital
Project                                    100        North Link - Northgate to 45th St

Description
The Sound Move plan calls for building a light rail line from SeaTac to the University District and extending it to the Northgate
area subject to available funding. The route in this segment between the University District and Northgate was adopted by
the Sound Transit Board in April 2006 and includes a tunnel station in the Roosevelt neighborhood and an elevated Northgate
Station near the Northgate Transit Center. The budget for this segment reflects an estimate to complete preliminary
engineering only. Final design, right of way, and construction for this segment have not yet been authorized or funded.

The total budget for the North Link - Northgate to 45th St segment reflects the amended project budget of $19.5 million as
adopted by the Sound Transit Board in November 2008.
                             Summaries

                                                                   Baseline (in $ 000)                      0
                                                  2008 Current Budget (in $ 000)                        19,548
                                                  2009 Adopted budget (in $000)                         19,548




Capital Costs
Sub Area                              1997-2007          2008         2009         2010      2011          2012       2013       Future     Total
North King County                          6,398         10,592        2,313          244           0             0          0         0    19,548
Total                                       6,398        10,592         2,313        244            0             0          0         0     19,548


Capital Cost Elements
Cost Element                          1997-2007          2008         2009        2010       2011          2012       2013       Future      Total
Agency Administration                       496             551        1,225          48            0             0          0         0      2,320
Pre-Engineering/Env Review                 4,711             41          308          82            0             0          0         0      5,142
Final Design and Specification             1,034               0            0            0          0             0          0         0      1,034
ROW Acquisition and Permits                      97      10,000             9         44            0             0          0         0     10,150
Third Parties                                    59            0           95         71            0             0          0         0           225
Contingency                                      0             0         677             0          0             0          0         0           677
Total                                      6,398         10,592         2,313        244            0             0          0         0     19,548
Risk Assesment :
 Status: Preliminary Engineering

  Estimate Type:          Study Estimate                                    Schedule Risk level:         LOW

      Budget Risk Level: LOW                                                    2008 Budget Schedule: TBD
                                                                                2009 Budget Schedule: TBD

                                                                   Comment
                                                                   The study programmed for this project has been completed. Since any
                                                                   future work for this segment of North Link prior to funding the completion of
                                                                   the project will be performed on an as-needed basis, budget and schedule
                                                                   risk are low.




Adopted 2009 Budget                                                                                                               Page 98 of 312
                                                          Light Rail Capital
Project                                  110       North Link - ST2 Early Work

Description
North Link - ST2 Early Work project is a new project created to advance preliminary engineering in 2009 for the North Link
segment from UW Station to Northgate.

Sound Move provides for preliminary engineering for the two projects that currently comprise the North Link segment from
UW Station to Northgate, North Link - Northgate to 45th St and North Link - UW Station to Brooklyn Station (NE 45th St). The
new ST2 Early Work project will be combined with the two existing projects from UW Station to Northgate into a single project
in a future budget.
                           Summaries

                                                                 Baseline (in $ 000)                     0
                                               2008 Current Budget (in $ 000)                            0
                                               2009 Adopted budget (in $000)                          5,000




Capital Costs
Sub Area                            1997-2007         2008          2009        2010       2011         2012       2013       Future     Total
North King County                            0               0       5,000             0          0            0          0         0     5,000
Total                                          0             0       5,000             0          0            0          0         0      5,000


Capital Cost Elements
Cost Element                        1997-2007         2008          2009        2010       2011         2012       2013       Future     Total
Pre-Engineering/Env Review                  0                0       5,000             0          0            0          0         0     5,000
Total                                          0             0       5,000             0          0            0          0         0      5,000




Risk Assesment :
 Status: Preliminary Engineering

  Estimate Type:        Study Estimate                                    Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                 2008 Budget Schedule:
                                                                             2009 Budget Schedule: 2009




Adopted 2009 Budget                                                                                                            Page 99 of 312
                                                            Light Rail Capital
Project                                   200       University Link - Pine St Stub Tunnel (PSST) to UW
                                                    Station
Description
The 3.15-mile University Link alignment between the Pine Street Stub Tunnel in Downtown Seattle and the University of
Washington Station is located entirely underground with tunnels traveling from Pine Street: under the I-5 freeway to an
underground station at Capitol Hill, continuing north beneath SR 520 and the Lake Washington Ship Canal, to an
underground station on the University of Washington campus, near Husky Stadium. With the exception of limited cut-and-
cover tunnel sections in the vicinity of the stations, the alignment is located in two parallel bored tunnels that will be
constructed using Earth Pressure Balanced Tunnel Boring Machines. University Link is expected to generate high ridership by
connecting the three major population and employment centers of Downtown Seattle, Capitol Hill and the University District.
The adopted budget for University Link reflects an amended baseline cost estimate to add construction contingency
requested by the FTA, which was approved by the Sound Transit Board in late July 2008 for the purpose of applying for the
FFGA.
                              Summaries

                                                                 Baseline (in $ 000)           1,756,007
                                                   2008 Current Budget (in $ 000)              1,614,007
                                                   2009 Adopted budget (in $000)               1,756,007




Capital Costs
Sub Area                              1997-2007         2008        2009         2010      2011        2012       2013        Future       Total
North King County                        128,962        93,229     138,711      306,531   323,583     292,296    205,367      267,326    1,756,007
Total                                    128,962        93,229     138,711      306,531   323,583     292,296    205,367      267,326    1,756,007


Capital Cost Elements
Cost Element                          1997-2007        2008         2009        2010       2011       2012        2013        Future       Total
Agency Administration                     6,706           731        8,885      10,995     14,246     15,087      15,697       42,882     115,229
Pre-Engineering/Env Review                24,243             5           37        103           0           0          0            0      24,388
Final Design and Specification            21,084       26,363       12,325        3,984     3,246       2,945      4,194        3,803       77,944
ROW Acquisition and Permits               60,820       44,496       19,430       24,004    10,522       5,980      2,000           80     167,332
Construction                               8,921            68      47,323      213,809   277,689    254,009     172,734      205,480 1,180,033
Construction Services                           0        1,339        6,750      11,073    13,346      13,088      9,911       13,019       68,526
Third Parties                              7,188          940         2,695       1,986     1,755       1,187        832        2,063       18,646
Vehicles                                        0      19,286       41,266       40,577     2,780            0          0            0    103,909
Total                                    128,962       93,229      138,711      306,531   323,583    292,296     205,367      267,326    1,756,007
Risk Assesment :
 Status: Final Design

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       MEDIUM

      Budget Risk Level: MEDIUM                                               2008 Budget Schedule: 2016
                                                                              2009 Budget Schedule: 2016

                                                                 Comment
                                                                 Budget Risk: Primarily associated with the complex nature of underground
                                                                 construction and the uncertainty of the economy of the construction
                                                                 industry over a long project execution period. These risks include: limited
                                                                 site access, soil conditions, water infiltration, settlement concerns and
                                                                 potential for higher cost inflation than budgeted. Risk has been rated
                                                                 medium, instead of high, due to a robust level of contingency allocated
                                                                 within the budget.

                                                                 Schedule Risk: The major schedule risks on this project are potential bid
                                                                 protest delays on large construction contracts, production rate of the
                                                                 underground construction works, and interface of multiple contracts on the
                                                                 same site. The baseline schedule has built-in float that could be utilized to
                                                                 mitigate potential delays.




Adopted 2009 Budget                                                                                                           Page 100 of 312
                                                             Light Rail Capital
Project                                    290       North Link - UW Station to Brooklyn Station (NE 45th St)

Description
This one mile segment of North Link spans between the UW Station and the Brooklyn Station at NE 45th Street, and will be
located underground, including twin-bored tunnels with one station near Brooklyn Ave, NE and NE 45th Street in the
University District.

The budget for the North Link - UW Station to Brooklyn Station segment reflects the amended project budget of $26.4 as
adopted by the Sound Transit Board in November 2008. The total budget has not changed; however, the adopted budget
reflects advance construction of four (4) additional LRV storage tracks to be built at the Operations and Maintenance Facility.
                             Summaries

                                                                   Baseline (in $ 000)                      0
                                                 2008 Current Budget (in $ 000)                         26,444
                                                 2009 Adopted budget (in $000)                          26,444




Capital Costs
Sub Area                              1997-2007         2008          2009         2010      2011          2012       2013       Future     Total
North King County                         18,875            24         6,103        1,442           0             0          0         0    26,444
Total                                      18,875            24         6,103       1,442           0             0          0         0     26,444


Capital Cost Elements
Cost Element                          1997-2007         2008          2009        2010       2011          2012       2013       Future     Total
Agency Administration                     1,206                1         372         103            0             0          0         0     1,681
Pre-Engineering/Env Review                  7,709           23           461         807            0             0          0         0      9,000
Final Design and Specification              5,350              0            0            0          0             0          0         0      5,350
ROW Acquisition and Permits                 2,133              0            0            0          0             0          0         0      2,133
Construction                                1,344              0       5,000         500            0             0          0         0      6,844
Construction Services                            0             0         270          30            0             0          0         0           300
Third Parties                               1,134              0            0            0          0             0          0         0      1,134
Contingency                                      0             0            0            2          0             0          0         0             2
Total                                      18,875           24         6,103        1,442           0             0          0         0     26,444
Risk Assesment :
 Status: Preliminary Engineering

  Estimate Type:          Study Estimate                                    Schedule Risk level:         LOW

      Budget Risk Level: LOW                                                    2008 Budget Schedule: TBD
                                                                                2009 Budget Schedule: TBD

                                                                   Comment
                                                                   Budget Risk: The Preliminary Engineering is complete; budget risk is low.
                                                                   Budget for this segment was set aside when the North Link alignment was
                                                                   selected by the board in the April 2006 amendment.

                                                                   Schedule Risk: There is no schedule risk. Final design work is not yet
                                                                   authorized.




Adopted 2009 Budget                                                                                                              Page 101 of 312
                                                       Light Rail Capital
Project                               300      Initial Segment

Description
The 14-mile Initial Segment of the Central Link light rail line is under construction. The northern terminus is at Convention
Place with passenger service beginning at Westlake Station serving downtown Seattle, the SODO industrial area, Beacon
Hill, Rainier Valley, Tukwila and reaching an interim southern terminus at the Tukwila International Boulevard Station (S.154th
St.). Passenger stations include Westlake, University Street, Pioneer Square, International District, Stadium, SODO, Beacon
Hill, Mount Baker, Columbia City, Othello, Rainier Beach, and Tukwila International Boulevard. The operations and
maintenance base has been constructed south of South Forest Street. Buses and light rail trains will share joint operations in
the Downtown Seattle Transit Tunnel (DSTT) beginning in the summer of 2009. Lifetime subarea budgets reflect the sum of
actual historical lifetime outlays by subarea, plus estimated costs to complete distributed by subarea in accordance with the
equity area rules established in the baseline cost estimate (BCE). With the completion of the Tukwila Freeway segment,
unallocated construction contingency within the Initial Segment project is projected to be utilized for North King County
segments, including Rainier Valley and the Beacon Hill Tunnel. As a result, the budget in North King County has increased by
$8.5 million and the South King subarea budget has decreased by a like amount. The 2009 annual budget has been
increased to reflect actual activity in 2008 and project completion in 2009.
                                Summaries

                                                            Baseline (in $ 000)          2,070,000
                                             2008 Current Budget (in $ 000)              2,070,000
                                            2009 Adopted budget (in $000)                2,070,000




Capital Costs
Sub Area                          1997-2007       2008         2009       2010        2011       2012       2013       Future       Total
North King County                  1,249,147     135,317      128,144     13,518             0          0          0         0    1,526,125
South King County                    449,794      61,286       27,982      4,812             0          0          0         0     543,875
Total                              1,698,941     196,603      156,126     18,330             0          0          0         0    2,070,000


Capital Cost Elements
Cost Element                      1997-2007       2008         2009       2010        2011       2012       2013       Future       Total
Agency Administration               147,549       18,759       13,856      9,049             0          0          0         0     189,213
Pre-Engineering/Env Review            33,257            5          28             0          0          0          0         0      33,289
Final Design and Specification       142,137       2,926         2,091        54             0          0          0         0     147,208
ROW Acquisition and Permits          198,838       3,247         2,160     2,926             0          0          0         0     207,171
Construction                         954,227     121,039      114,589      5,136             0          0          0         0 1,194,991
Construction Services                 79,597      13,550         8,648     1,165             0          0          0         0     102,960
Third Parties                         56,853       3,174         2,834            0          0          0          0         0      62,861
Vehicles                              86,484      33,903       11,920             0          0          0          0         0     132,307
Total                              1,698,941     196,603      156,126     18,330             0          0          0         0    2,070,000
Risk Assesment :




Adopted 2009 Budget                                                                                                    Page 102 of 312
 Pine Street Stub Tunnel and Downtown Seattle Transit                    Status: Construction

 Tunnel
 Estimate Type:   Construction               Schedule Risk level:      LOW

    Budget Risk Level: LOW                     2008 Budget Schedule: 2007
                                               2009 Budget Schedule: 2007

                                    Comment
                                    Budget Risk: Risk is low. This contract is substantially completed.
                                    Schedule Risk: Work is substantially completed.




 E-3 Busway/South Forest Street                                          Status: Construction

 Estimate Type:   Construction               Schedule Risk level:      LOW

    Budget Risk Level: LOW                     2008 Budget Schedule: 2006
                                               2009 Budget Schedule: 2006

                                    Comment
                                    Budget Risk: Budget risk is low. Project is complete, and all cost issues
                                    are settled.
                                    Schedule Risk: Work is complete.




Adopted 2009 Budget                                                                            Page 103 of 312
 Beacon Hill Tunnel and McClellan Facilities                               Status: Construction

 Estimate Type:   Construction                 Schedule Risk level:      HIGH

    Budget Risk Level: HIGH                      2008 Budget Schedule: 2009
                                                 2009 Budget Schedule: 2009

                                      Comment
                                      Budget Risk: Remaining civil work and station finishes, coupled with
                                      coordination and access issues for follow-on systems work, still pose major
                                      budget
                                      risk.
                                      Schedule Risk: The tunnel work involves schedule risk. The construction of
                                      the Beacon Hill Station is on the critical path of the C710 contract and the
                                      overall Initial Segment schedule. Completion of the station finishes and
                                      follow-on systems work pose major schedule risk.




 MLK Jr. Way South                                                         Status: Construction

 Estimate Type:   Construction                 Schedule Risk level:      LOW

    Budget Risk Level: HIGH                      2008 Budget Schedule: 2008
                                                 2009 Budget Schedule: 2008

                                      Comment
                                      Budget Risk: Although civil work is substantially completed, significant
                                      unresolved issues still pose major budget risk.
                                      Schedule Risk: Civl work is substantially completed. The work for this
                                      contract is no longer most critical.




Adopted 2009 Budget                                                                               Page 104 of 312
 Tukwila                                                              Status: Construction

 Estimate Type:   Construction            Schedule Risk level:      LOW

    Budget Risk Level: LOW                  2008 Budget Schedule: 2009
                                            2009 Budget Schedule: 2009

                                 Comment
                                 Budget Risk: Civil work is substantially
                                 completed.

                                 Schedule Risk: Civil work is substantially completed.




 Maintenance Base                                                     Status: Construction

 Estimate Type:   Construction            Schedule Risk level:      LOW

    Budget Risk Level: LOW                  2008 Budget Schedule: 2007
                                            2009 Budget Schedule: 2007

                                 Comment
                                 Budget Risk: All budget/cost issues have been resolved and
                                 settled.

                                 Schedule Risk: Work is complete.




Adopted 2009 Budget                                                                      Page 105 of 312
 Systems                                                              Status: Construction

 Estimate Type:   Construction            Schedule Risk level:      HIGH

    Budget Risk Level: HIGH                 2008 Budget Schedule: 2009
                                            2009 Budget Schedule: 2009

                                 Comment
                                 Budget Risk: Delays to civil contracts have necessitated acceleration of
                                 systems work, which may impact contract budgets.
                                 Schedule Risk: Delays to civil contracts are creating significant schedule
                                 risk for systems follow-on work.




Adopted 2009 Budget                                                                         Page 106 of 312
                                                      Light Rail Capital
Project                               390      DSTT Capital Costs

Description
Payment of the portion of King County Metro debt service on the Dowtown Seattle Transit Tunnel (DSTT) during construction
that will be capitalized. There is also a component that will be charged to Operations. Total costs 2005-2009 are estimated to
be $29,008,169, of which $5,288,774 will be charged to Operations.

The budget for DSTT Capital Costs (Debt Service) has been reduced to reflect actual costs for this project of $23.7million,
which is $1.2 million under the project budget adopted for 2008..
                              Summaries

                                                             Baseline (in $ 000)                      0
                                             2008 Current Budget (in $ 000)                       24,919
                                            2009 Adopted budget (in $000)                         23,719




Capital Costs
Sub Area                          1997-2007       2008          2009       2010        2011          2012       2013       Future     Total
North King County                     23,719             0             0           0          0             0          0         0    23,719
South King County                          0             0             0           0          0             0          0         0          0
Total                                 23,719             0             0           0          0             0          0         0     23,719


Capital Cost Elements
Cost Element                      1997-2007      2008           2009       2010        2011          2012       2013       Future     Total
ROW Acquisition and Permits          23,719              0             0           0          0             0          0         0    23,719
Total                                 23,719             0             0           0          0             0          0         0     23,719




Adopted 2009 Budget                                                                                                        Page 107 of 312
                                                         Light Rail Capital
Project                                399       Initial Segment Project Reserve

Description
Unallocated project reserve for the Central Link Initial Segment that, if required, can be directed to augment contingencies
allocated for individual line items within the Initial Segment budget. This project reserve may not be used for additional
scope. A supermajority vote of the board is required to allocate these funds to the project.
                                Summaries

                                                               Baseline (in $ 000)                 0
                                             2008 Current Budget (in $ 000)                   128,300
                                             2009 Adopted budget (in $000)                    128,300




Capital Costs
Sub Area                          1997-2007         2008          2009        2010     2011       2012       2013       Future     Total
North King County                          0               0             0    90,695          0          0          0         0    90,695
South King County                            0             0             0    37,605          0          0          0          0    37,605
Total                                        0             0             0   128,300          0          0          0          0   128,300


Capital Cost Elements
Cost Element                      1997-2007         2008          2009        2010     2011       2012       2013       Future      Total
Contingency                               0                0             0   128,300          0          0          0         0    128,300
Total                                        0             0             0   128,300          0          0          0          0   128,300




Adopted 2009 Budget                                                                                                     Page 108 of 312
                                                              Light Rail Capital
Project                                     400       Airport Link - 154th St to 176th St

Description
Airport Link is a 1.7-mile light rail extension under construction between the Tukwila International Boulevard station and the
SeaTac International Airport that is planned to be completed by the end of 2009. The Airport Link route is a combination of
elevated and at-grade guideway, and includes a light rail station near the main terminal of the Airport, a pedestrian bridge,
and a pick-up and drop-off facility located on the east side of International Boulevard in the City of SeaTac.

The budget for Airport Link reflects the amended project budget of $269.1 million as adopted by the Sound Transit Board in
February 2008. The 2009 annual budget has been increased to reflect actual activity in 2008 and project completion in 2009.
                              Summaries

                                                                   Baseline (in $ 000)              269,100
                                                  2008 Current Budget (in $ 000)                    269,100
                                                  2009 Adopted budget (in $000)                     269,100




Capital Costs
Sub Area                                 1997-2007       2008         2009         2010      2011        2012       2013       Future      Total
South King County                           128,290      72,094       63,427        5,289           0           0          0         0     269,100
Total                                      128,290       72,094       63,427        5,289           0           0          0         0     269,100


Capital Cost Elements
Cost Element                             1997-2007       2008         2009        2010       2011        2012       2013       Future      Total
Agency Administration                        4,920        2,160        2,944       2,162            0           0          0         0     12,187
Pre-Engineering/Env Review                   4,669        -1,003           25            0          0           0          0         0        3,691
Final Design and Specification              13,479        1,325          912          50            0           0          0         0      15,765
ROW Acquisition and Permits                 15,084        -3,315         605          76            0           0          0         0      12,450
Construction                                76,094       65,205       48,971        3,000           0           0          0         0    193,270
Construction Services                        5,088        3,731        6,601             0          0           0          0         0      15,421
Third Parties                                1,326          -197         600             0          0           0          0         0        1,729
Vehicles                                     7,631        4,187        2,769             0          0           0          0         0      14,587
Contingency                                       0            0            0            0          0           0          0         0            0
Total                                      128,290       72,094       63,427        5,289           0           0          0         0    269,100
Risk Assesment :
 Status: Construction

  Estimate Type:          Construction                                      Schedule Risk level:        HIGH

      Budget Risk Level: MEDIUM                                                 2008 Budget Schedule: 2009
                                                                                2009 Budget Schedule: 2009

                                                                   Comment
                                                                   Budget Risk: Budget risk for the Airport Link project is medium. Primary
                                                                   risk factors are associated with systems work and station finishes.


                                                                   Schedule Risk: Continued close coordination with the Port of Seattle is
                                                                   required to help ensure on-time completion. In addition, closely coordinated
                                                                   civil and systems contractor access must be achieved to avoid delays.




Adopted 2009 Budget                                                                                                            Page 109 of 312
                                                             Light Rail Capital
Project                                    480       Airport Link South - 176th St to 200th St

Description
This segment extends from the southern limits of the Airport Link Project (at S. 176th Street) to S. 200th Street. This project
completed in 2009.

Airport Link South was added as new project with a budget of $3.8 million as adopted by the Sound Transit Board in February
2008. The adopted budget has been increased to reflect actual costs for this project of $4.0 million.
                           Summaries

                                                                  Baseline (in $ 000)                       0
                                                 2008 Current Budget (in $ 000)                          3,767
                                                 2009 Adopted budget (in $000)                           4,014




Capital Costs
Sub Area                                1997-2007       2008         2009          2010       2011         2012       2013       Future     Total
South King County                            2,059       1,955              0             0          0            0          0         0     4,014
Total                                        2,059        1,955             0             0          0            0          0         0      4,014


Capital Cost Elements
Cost Element                            1997-2007       2008         2009         2010        2011         2012       2013       Future     Total
Agency Administration                           0          259              0             0          0            0          0         0       259
Pre-Engineering/Env Review                       0       1,003              0             0          0            0          0         0      1,003
Final Design and Specification                   0         373              0             0          0            0          0         0           373
ROW Acquisition and Permits                 2,059            -1             0             0          0            0          0         0      2,059
Third Parties                                    0         321              0             0          0            0          0         0           321
Total                                       2,059        1,955              0             0          0            0          0         0      4,014


Risk Assesment :
 Status: None

  Estimate Type:          Actual cost                                       Schedule Risk level:         LOW

      Budget Risk Level: LOW                                                    2008 Budget Schedule: none
                                                                                2009 Budget Schedule: none

                                                                  Comment
                                                                  Budget Risk: None.
                                                                  Schedule Risk: None




Adopted 2009 Budget                                                                                                              Page 110 of 312
                                                      Light Rail Capital
Project                               500       Tacoma Link

Description
Tacoma Link runs between downtown Tacoma and the multimodal regional transit center at the Tacoma Dome. The line
operates at-grade and provides connections to downtown offices, the theater district and the University of Washington’s
Tacoma Campus.

The Tacoma Link Project project budget of $77.1 reflects actual costs at project close-out. The project has been in operation
since August 2003, and completed $3.3 million under budget.
                           Summaries

                                                             Baseline (in $ 000)                    80,416
                                            2008 Current Budget (in $ 000)                          80,416
                                            2009 Adopted budget (in $000)                           77,097




Capital Costs
Sub Area                          1997-2007       2008          2009          2010       2011          2012       2013       Future     Total
Pierce County                         76,737         361               0             0          0             0          0         0    77,097
Total                                 76,737         361               0             0          0             0          0         0     77,097


Capital Cost Elements
Cost Element                      1997-2007       2008          2009          2010       2011          2012       2013       Future     Total
Agency Administration                 4,538              0             0             0          0             0          0         0     4,538
Pre-Engineering/Env Review             6,194             0             0             0          0             0          0         0      6,194
Final Design and Specification         3,994             0             0             0          0             0          0         0      3,994
ROW Acquisition and Permits            2,632             0             0             0          0             0          0         0      2,632
Construction                             434             0             0             0          0             0          0         0           434
Construction Services                 51,369             0             0             0          0             0          0         0     51,369
Vehicles                               7,575         361               0             0          0             0          0         0      7,935
Contingency                                 0            0             0             0          0             0          0         0             0
Total                                 76,737         361               0             0          0             0          0         0     77,097
Risk Assesment :
 Status: In Service

  Estimate Type:                                                       Schedule Risk level:          LOW

      Budget Risk Level: LOW                                               2008 Budget Schedule: completed
                                                                           2009 Budget Schedule: completed

                                                             Comment
                                                             Budget Risk: None
                                                             Schedule Risk: None




Adopted 2009 Budget                                                                                                          Page 111 of 312
    CAPITAL PROJECTS PROGRAM SUMMARY
    Regional Express and Sounder programs are part of the regional high-capacity transit network
    approved by Puget Sound voters in 1996. The programs include capital facilities and access
    improvements to support the Sounder commuter rail and ST Express bus service. The Capital
    Projects Department focuses on the delivery of these projects and utilizes its considerable
    expertise and experience to effectively complete the Sound Transit capital program.
    SOUNDER PROGRAM SUMMARY
    The Sounder Commuter Rail program includes planning, right of way acquisition, design and
    construction of the infrastructure needed to support a commuter rail system. When completed,
    the system will have peak-hour passenger train service to 12 stations along an 83-mile corridor
    between Everett in Snohomish County and Lakewood in Pierce County. The Sounder capital
    projects are grouped in three segments: Everett-to-Seattle, Seattle-to-Tacoma, and Tacoma-to-
    Lakewood. Burlington Northern Santa Fe Railroad (BNSF) owns the right-of-way between
    Everett and Tacoma. Sound Transit owns about 7 miles of right-of-way at the south end of the
    corridor in Lakewood and Tacoma, and is acquiring about 1.2 miles of right-of-way to close the
    gap between the northern end of this right-of-way and the Tacoma Dome Station in Tacoma.
    Everett to Seattle Segment
    The Everett to Seattle segment is a 35-mile long BNSF railroad corridor that will include three
    Sounder commuter rail stations - Everett, Mukilteo, and Edmonds. In 2003, Sound Transit and
    BNSF executed agreements that allowed commuter rail service in the corridor to begin with stops
    in Edmonds and Everett. Service at the Mukilteo Station began in May 2008. The agreements
    provide Sound Transit perpetual commuter rail, round-trip service easements for four trips a day
    that are tied to Sound Transit delivering to BNSF environmental permits and approvals for track
    and signal improvements throughout the corridor. The final permit was completed and certified
    by BNSF in August 2006. The BNSF track and signal improvements will replace three single
    track sections in the corridor with double tracking and increase the capacity of the system. The
    first round trip went into service in December 2003 and the second in June 2005. The third round
    trip began in September 2007 and the fourth trip began in September 2008.
    Seattle to Tacoma Segment
    This Sounder segment is a 40-mile long BNSF railroad corridor between Seattle and Tacoma that
    includes seven Sounder commuter rail stations - King Street (Seattle), Tukwila, Kent, Auburn,
    Sumner, Puyallup, and Tacoma. The service at Tukwila is currently being provided at a
    temporary facility.
    Extensive track and signal improvements throughout the 40-mile Seattle to Tacoma corridor were
    completed through a partnership between Sound Transit and BNSF. These improvements
    increased the rail capacity of the corridor to support nine round trip Sounder trains a day without
    compromising freight mobility in the Puget Sound area. The 5th and 6th roundtrip trains
    including a reverse commute train began in September 2007. Together, the partnership
    accomplished approximately $343 million in rail capacity improvements, including a new train
    control signal system; railroad crossing safety improvements and approximately 25 miles of track
    upgrades.




Adopted 2009 Budget                                                                           Page 112 of 312
    Tacoma to Lakewood Segment
    This Sounder segment is eight-miles long, including over one mile of new track to be constructed
    by Sound Transit and seven miles of track purchased from BNSF that will be upgraded for
    commuter rail by Sound Transit. Property acquisition for the new track portion began in 2003 and
    is scheduled to be completed in 2008. This corridor will serve stations in South Tacoma and
    Lakewood. It will connect to the Seattle to Tacoma segment at the Tacoma Dome Station.

    Construction in the corridor is being completed in two phases; the M Street to Lakewood phase is
    scheduled to begin in 2009 and the D Street to M Street phase is tentatively scheduled to begin in
    2010. Note the current budget for D to M Street improvements is insufficient to complete the
    project; additional funding from benefited 3rd parties will be necessary for improvements to be
    constructed.
    Sounder Systemwide
    Layover facilities are a systemwide element of the Sounder capital program. The Layover project
    includes three facilities for overnight train layover at Everett, Seattle, and Lakewood. Currently a
    three train layover facility is in service at Everett with expansion planned for 2009, a layover
    facility is in service near King Street Station in Seattle, and a temporary layover facility is in
    service at Tacoma. The temporary Tacoma layover will be replaced by a layover facility to be
    constructed at Lakewood during the M-Street to Lakewood Track and Signal improvements.




Adopted 2009 Budget                                                                            Page 113 of 312
Adopted 2009 Budget   Page 114 of 312
    Sounder Capital Plan
    The Sounder 2009 adopted lifetime capital budget (1997 – 2013) is $1.4 billion with a adopted
    2009 annual spending plan of $154.3 million. The program lifetime budget has a net increase of
    $210 million from 2008 due to a budget increase for the D Street - M Street Track and Signal
    Improvements Project and the addition of the ST2 project adding trains to the south line. The
    yearly spending plan reflects an increase of $87.7 million compared to the current 2008 spending
    plan. The spending increase is mainly due to the planned initiation of construction of M Street -
    Lakewood Track and Signal improvements and payments due to BNSF for the ST2 project
    adding trains to the south line.
    The final stage of construction on Everett Station began in June 2008. The Mukilteo Station,
    North Platform was completed and opened for service in May 2008. Design work for interim
    improvements continues for the Edmonds Station prior to relocation of the station to the new
    Edmonds Crossing project. The Edmonds Crossing project is a new multimodal terminal under
    development by the Washington State Ferries and will be located southwest of the existing
    station.
    In the Seattle to Tacoma corridor Sound Transit continues to work with the cities of Tukwila and
    Renton to define the scope and sequencing of permanent Tukwila Station improvements in
    accordance with local development plans.
    In the Tacoma to Lakewood corridor, Lakewood Station opened for regional and local bus service
    in the fourth quarter of 2008. Construction of the South Tacoma Station began in May 2008 and
    is scheduled for completion in March 2009. Design for the M to Lakewood Track and Signal
    Improvements and the L Street Layover was completed in June 2008; final design for the D to M
    Street Track and Signal Improvements was initiated in July 2008.
    Changes in the Adopted 2009 Budget
    Budget Changes:
    •   Mukilteo S. Platform (206): The project budget was increased by a $1.8 million transfer from
        the program reserves, due to delays in transfer of property. The budget increase is to fund
        escalation of construction costs.
    •   Layover – Snohomish County (140): The project budget was be increased by $458 thousand
        transferred from the program reserves due to increases in construction costs caused by project
        delays associated with a property owner dispute.
    •   Layover –South King County (140): The project budget was increased by $880 thousand
        transferred from the program reserves to fund increases in construction costs due to
        construction delays resulting from property owner dispute.
    •   Layover – Pierce County (140): The project budget was increased by $1.1 million transferred
        from the program reserves to fund increases in construction costs. The increase is due to
        delays in the construction of the M Street – Lakewood Track and Signal Project.
    •   ST2 Seattle-Tacoma Track & Signal (510/520): This project is part of ST2 and was an
        amendment to the 2009 budget. The project budget is $185 million with $56 million due to
        be spent in 2009. This will ultimately add four new trips to the south line with one each
        scheduled to come on line in 2011, 2013, 2014 and 2015.
    •   M Street to Lakewood Track and Signal Improvements (130): The project budget was
        increased by a $5 million transfer from the program reserves to fund increases in construction
        costs due to project delays.
    •   D to M Street Track and Signal Improvements (135): The project budget was increased by
        $25 million in available subarea financial capacity due to scope modifications that increase
        the overall project costs. Note, with this additional funding the budget is insufficient to
        complete the project. Additional funding from benefited third parties will be necessary for
        improvements to be constructed.


Adopted 2009 Budget                                                                          Page 115 of 312
    Transfers to Capital Program Subarea Reserves:
    Snohomish County:
    •     Permitting and Environmental Mitigation (131): $2.1 million cost savings transferred to the
          program reserve.
    •     Everett – Seattle Track & Signal (100): $127 thousand cost savings transferred to the
          program reserve.
    South King County:
    •     Reservation-Freighthouse SKC (247): $1.8 million cost savings transferred to the program
          reserve.
    Pierce County:
    •     Auburn to Tacoma Track and Signal Improvements (120): $6.9 million cost savings was
          transferred to the program reserve.
    •     Reservation-Freighthouse PRC (247): $1.7 million cost savings was transferred to the program
          reserve.
    •     Lakewood Station (253): $1.6 million in cost savings was transferred to the program reserve.
    •     Nisqually-Lakewood Right-of-Way (150): $1.2 million cost savings was transferred to the
          program reserve.


    Sounder Schedule Changes
    Old Completion Date/New Completion Date

        Project                                   2008        2009         2010          2011
        101 Willow Creek Environmental                                                   1st Q
        Mitigation                                          4Q 2009                      2011
        131 Permitting/Environmental
        Mitigation                                          1Q 2009                    4Q 2011
        201 Everett Station                    3Q 2008      1Q 2009
        209 Edmonds Station
                                                            2Q 2009      2Q 2010
        206 Mukilteo Station South                                       1Q 2010
                                                                         4Q 2010
        140 Layover                                                      4Q 2010       1Q 2011
        130 M St.-Lakewood T & S                                         1Q 2010
                                                                         2Q 2010
        135 D St. – M St. T & S                                          1Q 2010
                                                                           TBD


    The completion dates in the table above reflect when construction is expected to be substantially
    complete and the facility will be open for service. These dates do not include the project closeout
    effort, which can extend between twelve to eighteen months beyond the completion of
    construction as liens are released, final invoices are processed, claims are negotiated and settled
    and remaining budget is returned to program reserves.




Adopted 2009 Budget                                                                              Page 116 of 312
    Scope, Schedule and Budget Risks

    •   D Street - M Street Track and Signal (135): The alternative selected for the D to M
        Street Track and Signal improvements provides separation between the track and Pacific
        Avenue that was not anticipated when Sound Move was adopted. The elimination of at-grade
        crossings results in a cost increase of approximately $60 to $75 million. Funding for the
        project will be derived from available subarea financial capacity ($25 million) and yet to be
        identified grants and direct and in-kind partner funding.
    •   M Street - Lakewood Track and Signal (130): Start of construction for these
        improvements was delayed because of an on-going dispute over utility relocations with fiber
        optic providers and to accommodate the WSDOT-Rail Point Defiance Bypass Project.
        Delays in construction have lead to cost escalation. The project budget has been increased by
        $5 million. Further delays will continue to negatively impact the project budget.
    •   Mukilteo Station, South Platform (206): The north platform of the Mukilteo Station
        was completed in 2008. The build-out of the south platform is dependent upon resolution of a
        complex real property transaction within budget and schedule for use of the property
        adjoining the rail right-of-way.
    •   Tukwila Station (236): A temporary station is in service at Tukwila. Design and
        construction of a permanent station has been impacted by the planned implementation of
        other major improvements in the project area by the Cities of Renton and Tukwila. Design of
        a permanent station will be advanced to the 30% engineering stage to complement the cities’
        planning processes. It is unlikely that sufficient funding will be identified to fully implement
        this project as part of Sound Move. Portions of the total project may be constructible within
        existing budget.
    •   Layover (140): This system wide project has challenges in several areas. In Everett, the
        ongoing work to address an adjacent property owner’s claim of access rights has added
        additional time and cost to the project. Legal action will be necessary to resolve the issue.
        Construction delays in the M Street – Lakewood Track and Signal project have delayed
        Pierce County Layover that is to be constructed concurrently with the track and signal
        improvements.
    •   Edmonds Station (209): Permitting coordination with City led projects and the BSNF
        double track project have delayed the start of construction. Construction bidding will take
        place in late 2008; construction will be initiated in early 2009 and completed in 2010.
        Further delays may place the project budget at risk due to continuing construction cost
        escalation.


    Baseline Budgets
    •   M Street-Lakewood Track and Signal (130) was re-baselined to $78.6 million to
        accommodate the concurrent WSDOT project.
    •   Edmonds Station (209)




Adopted 2009 Budget                                                                            Page 117 of 312
                                                    Sounder
                                    2009 Adopted Budget By Equity Area

 Subarea                            1997-2007    2008      2009      2010     2011     2012     2013     Future       Total
 Snohomish County                     331,779    17,018     9,535    20,566    3,800       0        0                  382,698
 South King County                    310,790     9,168    46,979    46,162   23,715   25,831       0                  462,645
 Pierce County                        317,260    29,457    97,739    64,806   30,551   24,306   20,479                 584,598

Sounder                               959,829    55,643   154,254   131,533   58,066   50,137   20,479            1,429,941


                                        2009 Adopted Budget By Phase

 Phase                               1997-2007   2008      2009      2010     2011     2012     2013     Future         Total
10 Agency Administration              37,918      4,692     3,645     4,744      554      112      462                  52,125
20 Pre-Engineering/Env Review         25,471        886         9     1,257        0        0        0                  27,624
30 Final Design and Specification     28,954      2,828     6,213     6,892      508        0        0                  45,396
40 ROW Acquisition and Permits       344,296      5,909    24,730     9,505      670        0        0                 385,110
50 Construction                      388,685     41,328   119,657    90,489   53,270   50,025        0                 743,455
70 Vehicles                          134,505          0         0         0        0        0        0                 134,505
90 Contingency                            0           0         0    18,646    3,063        0   20,017                  41,726

Sounder                              959,829     55,643   154,254   131,533   58,066   50,137   20,479                1,429,941




       Adopted 2009 Budget                                                                          Page 118 of 312
2009 Adopted Budget By Project

Sounder


Project Number and Name                   1997-2007     2008     2009     2010      2011    2012     2013 Future         Total

Active Projects
101 Willow Creek Environmental                  11       57       96      375       461        0        0                1,001
     Mitigation
110 Seattle-Auburn Track & Signal          218,361     7,863   13,636   15,609        0        0        0              255,469
120 Auburn-Tacoma Track & Signal           175,900     6,586    6,579    9,288        0        0        0              198,352
130 M Street-Lakewood Track & Signal        26,770     1,121   32,863   12,385    5,491        0        0               78,630
131 Permitting/Environmental Mitigation      1,358     1,347      426    1,709    3,339        0        0                8,179
135 D Street-M Street Track & Signal        26,273     4,855   29,914   18,265     5,618    3,137   12,962             101,025
140 Layover                                 14,772     1,304    5,666    4,914      157        0        0               26,812
201 Everett Station                         17,878    11,010    1,432    3,636        0        0        0               33,957
205 Mukilteo Station, North Platform         6,577     2,858       8      777         0        0        0               10,221
206 Mukilteo Station, South Platform           636      806     1,888    7,801        0        0        0               11,131
209 Edmonds Station                          3,521      654     4,914    3,841        0        0        0               12,929
236 Tukwila Station                          9,001      762       446    6,225        0        0        0               16,434
251 South Tacoma Station                     3,891     9,076     385     3,124        0        0        0               16,476
253 Lakewood Station                        21,911     7,248        0    2,199        0         0       0               31,358
510 ST2 Seattle - Auburn Track & Signal          0         0   30,778   21,434   23,633    25,831       0              101,676
520 ST2 Auburn - Seattle Track & Signal          0        0    25,222   17,566   19,367    21,169       0               83,324
600 Sounder Program Reserve                      0        0        0     1,091        0        0     7,517               8,608
Total for Active Projects                  526,859 55,547 154,254 130,240        58,066    50,137   20,479             995,581


Closed Projects
100 Everett-Seattle Track & Signal         298,943        46       0     1,253        0        0        0              300,242
150 Nisqually-Lakewood ROW                  14,866       -30       0        32        0        0        0               14,868
207 Edmonds Station (Temporary)                176        0        0        0         0        0        0                  176
231 King Street Station                      7,928        0        0        0         0        0        0                7,928
233 Boeing Access Rd Station                    65        0        0        0         0        0        0                   65
235 Tukwila Station (Temporary)              2,837        0        0        0         0        0        0                2,837
237 Kent Station                            32,388        0        0        0         0        0        0               32,388
239 Auburn Station                          25,815        0        0        0         0        0        0               25,815
241 Sumner Station                           8,741        0        0        0         0        0        0                8,741
243 Puyallup Station                        13,336        0        0        0         0        0        0               13,336
245 Tacoma Dome Station                      9,767        0        0        0         0        0        0                9,767
247 Reservation-Freighthouse                16,291       81        0        8         0        0        0               16,380
255 Lakewood CBD                             1,816        0        0        0         0        0        0                1,816
Total for Closed Out Projects              432,971      97        0     1,293        0         0        0              434,360


Sounder                                    959,829    55,643 154,254 131,533      58,066   50,137   20,479           1,429,941




 Adopted 2009 Budget                                                                                         Page 119 of 312
                                                                       Sounder
Project                                   100       Everett-Seattle Track & Signal

Description
Scope: Sound Transit executed agreements with Burlington Northern Santa Fe (BNSF) and purchased commuter rail easements for
service between Seattle and Everett. Sound Transit made payments to BNSF on specific dates; $79M - 12/17/2003, $79M - 12/17/2004,
$50M - 12/17/2006, $50M - 12/17/2007. BNSF is responsible for construction of any track and signal improvements, Sound Transit has
environmental compliance responsibilities that run concurrent with the construction activity which are being captured in
Permitting/Environmental Mitigation (project 131) and Willow Creek Environmental Mitigation (project 101). BNSF is expected to complete
their work in 2010.

Changes since 2008: $127K in project savings transferred to the Snohomish County program reserve.
                                 Summaries

                                                                 Baseline (in $ 000)           303,258
                                                2008 Current Budget (in $ 000)                 300,369
                                                2009 Adopted budget (in $000)                  300,242




Capital Costs
Sub Area                              1997-2007        2008          2009        2010      2011         2012       2013       Future       Total
Snohomish County                         298,943           46               0     1,253            0           0          0                300,242
Total                                    298,943             46             0     1,253            0           0          0                300,242


Capital Cost Elements
Cost Element                           1997-2007      2008          2009         2010      2011         2012       2013       Future        Total
Agency Administration                      8,064             7              0     1,253            0           0          0         0         9,324
Pre-Engineering/Env Review                 3,951             0              0         0            0           0          0         0         3,951
Final Design and Specification                11             0              0          0           0           0          0            0        11
ROW Acquisition and Permits             258,206            82               0          0           0           0          0            0   258,288
Construction                                668           -43               0          0           0           0          0            0       624
Vehicles                                  28,043             0              0          0           0           0          0            0    28,043
Contingency                                     0            0              0          0           0           0          0            0         0
Total                                   298,943            46               0     1,253            0           0          0            0   300,242

Risk Assessment :
 Status: Construction

  Estimate Type:          Baseline Cost Estimate                            Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                    2008 Budget Schedule: 2007
                                                                                2009 Budget Schedule: 2007




Adopted 2009 Budget                                                                                                           Page 120 of 312
                                                                        Sounder
Project                                   101        Willow Creek Environmental Mitigation

Description
Scope: This project includes the final design and construction of a new structure that will allow Willow Creek to cross the railroad tracks
once the creek is day lighted as part of the Edmonds Crossing Project. The structure is required as part of a commitment made by the
Sound Transit as compensatory mitigation for environmental impacts.

Changes since 2008: None
                                 Summaries

                                                                  Baseline (in $ 000)                       0
                                                2008 Current Budget (in $ 000)                           1,001
                                                2009 Adopted budget (in $000)                            1,001




Capital Costs
Sub Area                               1997-2007        2008          2009         2010     2011            2012       2013       Future       Total
Snohomish County                               11           57            96          375      461                 0          0                 1,001
Total                                           11            57             96       375      461                 0          0                 1,001


Capital Cost Elements
Cost Element                           1997-2007       2008           2009         2010     2011            2012       2013       Future       Total
Agency Administration                          1              3              5         18       26                 0          0         0           52
Pre-Engineering/Env Review                      0             0              0          0            0             0          0            0          0
Final Design and Specification                11            52            73            0            0             0          0            0        136
ROW Acquisition and Permits                    0             0             0            0            0             0          0            0          0
Construction                                    0             2           19          350      370                 0          0            0        741
Vehicles                                        0             0              0          0        0                 0          0            0          0
Contingency                                     0             0              0          7       66                 0          0            0         72
Total                                         11            57            96          375      461                 0          0            0     1,001

Risk Assessment :
 Status: Final Design

  Estimate Type:          Conceptual                                          Schedule Risk level:        MEDIUM

      Budget Risk Level: LOW                                                      2008 Budget Schedule: 2009
                                                                                  2009 Budget Schedule: 2011

                                                                   Comment
                                                                   Timing for construction is dependant on BNSF's grading work for the
                                                                   2nd main line in Edmonds.




Adopted 2009 Budget                                                                                                               Page 121 of 312
                                                                      Sounder
Project                                   110       Seattle-Auburn Track & Signal

Description
Scope: This project is the Seattle to Auburn portion of the 40-mile segment from Seattle to Tacoma, located in the existing BNSF mainline
railroad corridor, is made up of this project and Auburn to Tacoma Track and Signal, project 120. The costs are allocated to the two
projects based on track miles. The extensive track and signal improvements throughout the corridor are being made through a
partnership between Sound Transit and BNSF. These improvements will increase the rail capacity of the corridor so that additional
passenger trains do not compromise freight mobility in the Puget Sound area. Phase I track improvements have been completed.
Passenger service began in September 2000 with two round-trip trains per weekday. Currently, eight round trips per day are running, as
well as special event service for weekend sports and community events. Sound Transit's agreement with BNSF allows nine round-trip
trains to Lakewood when track and signal improvements are complete. Train 9 is scheduled for mid-2009. We have an agreement with
WSDOT for an $8.6M contribution for track modifications at King Street Station, which is included in the project budget.

Changes since 2008: None
                                 Summaries

                                                                Baseline (in $ 000)          256,147
                                                2008 Current Budget (in $ 000)               255,469
                                                2009 Adopted budget (in $000)                255,469




Capital Costs
Sub Area                              1997-2007        2008         2009       2010       2011        2012       2013       Future       Total
South King County                        218,361        7,863       13,636     15,609            0           0          0                255,469
Total                                    218,361        7,863       13,636     15,609            0           0          0                255,469


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010       2011        2012       2013       Future        Total
Agency Administration                      9,494         959          379             0          0           0          0         0        10,831
Pre-Engineering/Env Review                 5,890            0            0            0          0           0          0            0     5,890
Final Design and Specification             4,865            0            0            0          0           0          0            0     4,865
ROW Acquisition and Permits                   62           11            0            0          0           0          0            0        74
Construction                            148,358         6,893       13,257      5,117            0           0          0            0   173,625
Vehicles                                 49,692             0            0          0            0           0          0            0    49,692
Contingency                                     0           0            0     10,492            0           0          0            0    10,492
Total                                   218,361         7,863       13,636     15,609            0           0          0            0   255,469

Risk Assessment :
 Status: Construction

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                 2008 Budget Schedule: 2008
                                                                             2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                         Page 122 of 312
                                                                     Sounder
Project                                   120       Auburn-Tacoma Track & Signal

Description
Scope: This project is the Auburn to Tacoma portion of the 40-mile segment from Seattle to Tacoma, located in the existing BNSF
mainline railroad corridor, is made up of this project and Seattle to Auburn Track and Signal, project 110. The costs are allocated to the
two projects based on track miles. The extensive track and signal improvements throughout the corridor are being made through a
partnership between Sound Transit and BNSF. These improvements will increase the rail capacity of the corridor so that additional
passenger trains do not compromise freight mobility in the Puget Sound area. Phase I track improvements have been completed.
Passenger service began in September 2000 with two round-trip trains per weekday. Currently, eight round trip trains per day are running,
as well as special event service for weekend sports and community events. Sound Transit's agreement with BNSF allows nine round-trip
trains to Lakewood when track and signal improvements are complete. Train 9 is scheduled for mid-2009. We have an agreement with
WSDOT for an $8.6M contribution for track modifications at King Street Station, which is included in the project budget.

Changes Since 2008: $6.9M ins savings moved to the Pierce County Program Reserve.
                                 Summaries

                                                               Baseline (in $ 000)          206,965
                                                2008 Current Budget (in $ 000)              205,295
                                                2009 Adopted budget (in $000)               198,352




Capital Costs
Sub Area                              1997-2007        2008        2009       2010       2011        2012       2013       Future       Total
Pierce County                            175,900        6,586       6,579      9,288            0           0          0                198,352
Total                                    175,900        6,586       6,579      9,288            0           0          0                198,352


Capital Cost Elements
Cost Element                           1997-2007      2008        2009        2010       2011        2012       2013       Future        Total
Agency Administration                      7,454         937         245             0          0           0          0         0         8,636
Pre-Engineering/Env Review                 4,807           0            0            0          0           0          0            0     4,807
Final Design and Specification             3,904           0            0            0          0           0          0            0     3,904
ROW Acquisition and Permits                   34           0            0            0          0           0          0            0        34
Construction                            120,838        5,649        6,334      9,288            0           0          0            0   142,108
Vehicles                                 38,863            0            0          0            0           0          0            0    38,863
Contingency                                     0          0            0            0          0           0          0            0         0
Total                                   175,900        6,586        6,579      9,288            0           0          0            0   198,352

Risk Assessment :
 Status: Construction

  Estimate Type:          Baseline Cost Estimate                         Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                2008 Budget Schedule: 2008
                                                                            2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                        Page 123 of 312
                                                                      Sounder
Project                                   130       M Street-Lakewood Track & Signal

Description
Scope: To extend Sounder service to South Tacoma and Lakewood Stations, Sound Transit will be reconstructing 7 miles of the Lakeview
Subdivision tracks, installing a new signal system, and upgrading crossings from M St. to Bridgeport Way in Lakewood.

Changes Since 2008: Budget increased by $5M for higher construction costs.
                                 Summaries

                                                                Baseline (in $ 000)              78,630
                                                2008 Current Budget (in $ 000)                   73,601
                                                2009 Adopted budget (in $000)                    78,630




Capital Costs
Sub Area                              1997-2007        2008         2009       2010        2011       2012        2013        Future       Total
Pierce County                             26,770        1,121       32,863     12,385       5,491            0           0                 78,630
Total                                     26,770        1,121       32,863     12,385       5,491            0           0                 78,630


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010        2011       2012        2013        Future       Total
Agency Administration                      1,436          41        1,350         523         325            0           0          0        3,675
Pre-Engineering/Env Review                 1,493           3             0            0          0           0           0             0     1,496
Final Design and Specification             2,789         125           200        514         149            0           0             0     3,776
ROW Acquisition and Permits               11,759         432             0          0           0            0           0             0    12,191
Construction                                 340         521        31,312     11,349       2,042            0           0             0    45,564
Vehicles                                   8,953           0             0            0          0           0           0             0     8,953
Contingency                                     0          0             0            0     2,975            0           0             0     2,975
Total                                     26,770        1,121       32,863     12,385       5,491            0           0             0    78,630

Risk Assessment :
 Status: Final Design

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       MEDIUM

      Budget Risk Level: LOW                                                 2008 Budget Schedule: 2010
                                                                             2009 Budget Schedule: 2010

                                                                Comment
                                                                Completion of utility relocation poses a schedule risk to the start of
                                                                construction.




Adopted 2009 Budget                                                                                                           Page 124 of 312
                                                                      Sounder
Project                                   131       Permitting/Environmental Mitigation

Description
Scope: The Agreement between BNSF and Sound Transit signed in December 2003 commits Sound Transit to acquire all of the permits
necessary for BNSF improvements identified in the Environmental Impact Statement. Sound Transit is also responsible for implementing
the off-site mitigation required for the project. All environmental permits for all easements were in-hand by August 2006. The mitigation
scope includes the purchase of three properties in the Snohomish River Estuary, and a small freshwater wetland enhancement project in
the Town of Woodway. Construction is scheduled to be completed in 2009 but post construction mitigation and monitoring will take place
through 2010.

Changes since 2008: $2.1M in project savings transferred to the Snohomish County program reserve.
                                 Summaries

                                                                Baseline (in $ 000)                     0
                                                2008 Current Budget (in $ 000)                   10,288
                                                2009 Adopted budget (in $000)                        8,179




Capital Costs
Sub Area                               1997-2007       2008         2009       2010       2011          2012       2013       Future       Total
Snohomish County                            1,358       1,347          426      1,709      3,339               0          0                 8,179
Total                                       1,358       1,347          426      1,709      3,339               0          0                 8,179


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010       2011          2012       2013       Future       Total
Agency Administration                         85          71           23         262            0             0          0         0          441
Pre-Engineering/Env Review                   833         106            0         881            0             0          0         0        1,820
Final Design and Specification                20            0            0            0      360               0          0            0        380
ROW Acquisition and Permits                  234        1,063            0          0        670               0          0            0     1,967
Construction                                 186          106          404        566      2,308               0          0            0     3,570
Vehicles                                        0           0            0            0          0             0          0            0          0
Contingency                                     0           0            0            0          0             0          0            0          0
Total                                      1,358        1,347          426      1,709      3,339               0          0            0     8,179

Risk Assessment :
 Status: Conceptual Engineering

  Estimate Type:          Conceptual                                      Schedule Risk level:        MEDIUM

      Budget Risk Level: LOW                                                 2008 Budget Schedule: 2009
                                                                             2009 Budget Schedule: 2011

                                                                Comment
                                                                Difficulty in securing properties and cooperative agreements for the
                                                                mitigation projects has created delays in completing this work.




Adopted 2009 Budget                                                                                                           Page 125 of 312
                                                                      Sounder
Project                                   135       D Street-M Street Track & Signal

Description
Scope: Design and construct a connection between the Tacoma Dome Station and the Sound Transit railroad right-of-way (the Lakeview
Subdivision Line) commencing at the S. Tacoma Avenue overpass. Board action was taken in December 2007 selecting an alternative
that provides grade-separation over Pacific Avenue. Project costs estimated at $125M to $150M exceeds current budget and Sound
Transit financial capacity. Funding partnerships are being developed to offset this shortfall.

Changes Since 2008: $25M increase in project budget from additional Sound Transit financial capacity in the Pierce County sub-area.
The 2009 annual budget was increased by $2.2M from the proposed budget by amendment.
                                   Summaries

                                                                Baseline (in $ 000)                   0
                                                2008 Current Budget (in $ 000)                   76,025
                                                2009 Adopted budget (in $000)                  101,025




Capital Costs
Sub Area                               1997-2007       2008         2009       2010       2011        2012      2013        Future       Total
Pierce County                              26,273       4,855       29,914     18,265      5,618       3,137    12,962                   101,025
Total                                      26,273       4,855       29,914     18,265      5,618       3,137    12,962                   101,025


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010       2011        2012       2013       Future        Total
Agency Administration                      1,412         173        1,065         687        200         112        462           0         4,111
Pre-Engineering/Env Review                 1,570         140            0          35          0           0          0           0         1,745
Final Design and Specification             2,679        1,181        5,097      5,929            0          0          0             0    14,886
ROW Acquisition and Permits               11,555        3,360       23,752      8,589            0          0          0             0    47,257
Construction                                 104            0            0      3,025      5,418       3,025           0             0    11,572
Vehicles                                   8,953            0            0          0          0           0           0             0     8,953
Contingency                                     0           0            0            0          0          0    12,500              0    12,500
Total                                     26,273        4,855       29,914     18,265      5,618       3,137     12,962              0   101,025

Risk Assessment :
 Status: Final Design

  Estimate Type:          Design                                          Schedule Risk level:       HIGH

      Budget Risk Level: HIGH                                                2008 Budget Schedule: TBD

           Right of Way Costs                                                2009 Budget Schedule: TBD
           Scope Escalation/Change
           Design and Environmental regulations                 Comment
                                                                Selection of new alternative has created a budget shortfall and the
           Unexpected Finding During Engineering
                                                                need for funding partnerships. Delay in obtaining full funding by 4th
           Limited Budget Basis                                 quarter 2009 will further affect the timing for project completion.
           Shared Project funding
           Utilities Relocation    Project Location
           Coordination




Adopted 2009 Budget                                                                                                         Page 126 of 312
                                                                         Sounder
Project                                   140        Layover

Description
Scope: Layover is a system wide component of the commuter rail program. It includes storage tracks and facilities for layover of trains at
Seattle, Everett, and Lakewood. The costs and budget are allocated to 3 subareas based on vehicle miles with 26 weekday train trips in
service. The budget includes a $12.7 million pass-through state grant to Amtrak for the improvements to the Seattle (Holgate) yard. A
new sub-project has been initiated to expand the existing temporary L St. Layover Yard in Tacoma because of the delay on the D St. to M
St. Track & Signal project.
Changes since 2008: The Proposed Budget increased to account for an escalation in construction scope and costs. This amount was
amended prior to Board adoption of budget.
                                   Summaries

                                                                   Baseline (in $ 000)                   0
                                                 2008 Current Budget (in $ 000)                     24,424
                                                2009 Adopted budget (in $000)                       26,812




Capital Costs
Sub Area                               1997-2007        2008           2009       2010       2011        2012       2013       Future       Total
Snohomish County                            2,680          241            770      1,141            0           0          0                 4,831
South King County                           5,476         499           2,120      1,829        82              0          0                10,007
Pierce County                               6,616         564           2,776      1,944        75              0          0                11,974
Total                                      14,772        1,304          5,666      4,914       157              0          0                26,812


Capital Cost Elements
Cost Element                           1997-2007       2008           2009        2010       2011        2012       2013       Future       Total
Agency Administration                        607          -56            107         240            2           0          0         0         901
Pre-Engineering/Env Review                     196         40               0        115            0           0          0            0        350
Final Design and Specification                 333        234             192         49            0           0          0            0       808
ROW Acquisition and Permits                    606        361             635        212            0           0          0            0     1,813
Construction                              13,029          724           4,732      4,294       132              0          0            0    22,912
Vehicles                                         0             0            0            0       0              0          0            0          0
Contingency                                      0             0            0            5      22              0          0            0         27
Total                                     14,772        1,304           5,666      4,914       157              0          0            0    26,812

Risk Assessment :
 Status: Final Design

  Estimate Type:          Design                                             Schedule Risk level:       MEDIUM

      Budget Risk Level: HIGH                                                   2008 Budget Schedule: 2010

           Right of Way Costs                                                   2009 Budget Schedule: 2011
           Scope Escalation/Change
           Design and Environmental regulations                    Comment
                                                                   Complex ROW acquisition has impacted the ability to proceed to
           Unexpected Finding During Engineering
                                                                   construction in Everett. Lakewood Layover is delayed due to delays
           Limited Budget Basis                                    in building the track and signal work between D Street - M Street.
           Shared Project funding
           Utilities Relocation    Project Location
           Coordination




Adopted 2009 Budget                                                                                                            Page 127 of 312
                                                                      Sounder
Project                                  150       Nisqually-Lakewood ROW

Description
Project complete.

Changes since 2008: Transferred $1.2M in project savings to the Pierce County program reserves.
                                  Summaries

                                                                Baseline (in $ 000)                    0
                                               2008 Current Budget (in $ 000)                     16,101
                                               2009 Adopted budget (in $000)                      14,868




Capital Costs
Sub Area                              1997-2007      2008           2009        2010       2011        2012       2013       Future       Total
Pierce County                             14,866        -30                0        32            0           0          0                14,868
Total                                     14,866         -30               0          32          0           0          0                14,868


Capital Cost Elements
Cost Element                          1997-2007      2008          2009         2010       2011        2012       2013       Future       Total
Agency Administration                         1             0              0           0          0           0          0         0              1
Pre-Engineering/Env Review                    0             0              0           0          0           0          0         0              0
Final Design and Specification                 0            0              0           0          0           0          0            0           0
ROW Acquisition and Permits              14,865         -30                0          32          0           0          0            0    14,867
Construction                                  0           0                0           0          0           0          0            0         0
Vehicles                                       0            0              0           0          0           0          0            0           0
Contingency                                    0            0              0           0          0           0          0            0           0
Total                                    14,866         -30                0          32          0           0          0            0    14,868

Risk Assessment :
 Status: Closed

  Estimate Type:          Final                                            Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                   2008 Budget Schedule: 2007
                                                                               2009 Budget Schedule: 2007




Adopted 2009 Budget                                                                                                          Page 128 of 312
                                                                      Sounder
Project                                   201       Everett Station

Description
Scope: Everett Station is a multimodal station accommodating Amtrak, Greyhound, Everett Transit, Community Transit, Sound Transit
Express Bus, Sounder Commuter Rail, charters, taxis, and shuttles. The initial phase of the project was developed by the City of Everett.
Sound Transit is responsible for construction of the final phase of the station, including demolition and remediation on the east side of the
tracks (completed in 2006), the east parking lot (440 stalls), a pedestrian bridge over the tracks connecting the east parking lot to the
commuter rail platform, pedestrian access plazas on both sides of the tracks, completion of the north portion of the south parking lot (total
300 parking stalls), and a small operations building on the west side of the tracks to house maintenance supplies, security personnel and
BNSF train crews.

Changes since 2008: None
                                 Summaries

                                                                Baseline (in $ 000)               26,872
                                                2008 Current Budget (in $ 000)                    33,957
                                                2009 Adopted budget (in $000)                     33,957




Capital Costs
Sub Area                              1997-2007        2008         2009       2010        2011        2012       2013       Future       Total
Snohomish County                          17,878       11,010        1,432      3,636             0           0          0                33,957
Total                                     17,878       11,010         1,432     3,636             0           0          0                33,957


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010        2011        2012       2013       Future       Total
Agency Administration                      1,054         582           74         179             0           0          0         0        1,889
Pre-Engineering/Env Review                 1,194            0            0            1           0           0          0            0     1,195
Final Design and Specification             1,458           32           20            25          0           0          0            0     1,534
ROW Acquisition and Permits                7,231           38            0            65          0           0          0            0     7,334
Construction                               6,941       10,358         1,339     3,135             0           0          0            0    21,773
Vehicles                                        0           0            0            0           0           0          0            0          0
Contingency                                     0           0            0        232             0           0          0            0        232
Total                                     17,878       11,010         1,432     3,636             0           0          0            0    33,957

Risk Assessment :
 Status: Construction

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                  2008 Budget Schedule: 2008
                                                                              2009 Budget Schedule: 2009




Adopted 2009 Budget                                                                                                          Page 129 of 312
                                                                     Sounder
Project                                  205       Mukilteo Station, North Platform

Description
Project is in service.

Changes since 2008: None
                                  Summaries

                                                               Baseline (in $ 000)                   9,810
                                               2008 Current Budget (in $ 000)                    10,221
                                               2009 Adopted budget (in $000)                     10,221




Capital Costs
Sub Area                              1997-2007       2008         2009        2010       2011          2012       2013       Future       Total
Snohomish County                           6,577       2,858              8       777            0             0          0                10,221
Total                                      6,577       2,858              8       777            0             0          0                10,221


Capital Cost Elements
Cost Element                          1997-2007      2008         2009         2010       2011          2012       2013       Future       Total
Agency Administration                       448         146               1        88            0             0          0         0         684
Pre-Engineering/Env Review                  620           0               0         2            0             0          0         0         622
Final Design and Specification            1,702         -405              0          28          0             0          0            0     1,326
ROW Acquisition and Permits                 345            9              0       161            0             0          0            0       515
Construction                              3,462        3,108              7       406            0             0          0            0     6,982
Vehicles                                       0           0              0          0           0             0          0            0        0
Contingency                                    0           0              0          92          0             0          0            0        92
Total                                     6,577        2,858              8       777            0             0          0            0    10,221

Risk Assessment :
 Status: In Service

  Estimate Type:          Final                                           Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                  2008 Budget Schedule: 2008
                                                                              2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                           Page 130 of 312
                                                                       Sounder
Project                                   206        Mukilteo Station, South Platform

Description
Scope: The Mukilteo Station South Platform project includes the 2nd platform, stair & elevator towers for both platforms and the
pedestrian bridge connecting them. A contribution towards a surface parking lot to be constructed by Washington State Ferries as part of
a future new Mukilteo multimodal terminal, is also included.

Changes since 2008: Project budget increased by $1.8M, delays in property transfer have resulted in escalated construction cost
estimates.
                                   Summaries

                                                                 Baseline (in $ 000)                     0
                                                 2008 Current Budget (in $ 000)                       9,371
                                                2009 Adopted budget (in $000)                     11,131




Capital Costs
Sub Area                               1997-2007        2008         2009       2010       2011          2012       2013       Future       Total
Snohomish County                              636          806        1,888      7,801            0             0          0                11,131
Total                                          636         806        1,888      7,801            0             0          0                11,131


Capital Cost Elements
Cost Element                           1997-2007       2008         2009        2010       2011          2012       2013       Future       Total
Agency Administration                         37           57          118         445            0             0          0         0         658
Pre-Engineering/Env Review                       0           0            0          0            0             0          0            0         0
Final Design and Specification                 598         749           18        126            0             0          0            0     1,491
ROW Acquisition and Permits                      0           0          312        378            0             0          0            0        689
Construction                                     0           0        1,440      6,852            0             0          0            0     8,293
Vehicles                                         0           0            0            0          0             0          0            0          0
Contingency                                      0           0            0            0          0             0          0            0          0
Total                                          636         806        1,888      7,801            0             0          0            0    11,131

Risk Assessment :
 Status: Final Design

  Estimate Type:          Design                                           Schedule Risk level:        HIGH

      Budget Risk Level: HIGH                                                 2008 Budget Schedule: 2010

           Right of Way Costs                                                 2009 Budget Schedule: 2010
           Scope Escalation/Change
           Design and Environmental regulations                  Comment
                                                                 Project dependent upon the schedule of the Mukilteo Tank Farm
           Unexpected Finding During Engineering
                                                                 surplus by the Department of Defense to the Port of Everett.
           Limited Budget Basis
           Shared Project funding
           Utilities Relocation    Project Location
           Coordination




Adopted 2009 Budget                                                                                                            Page 131 of 312
                                                                        Sounder
Project                                  207        Edmonds Station (Temporary)

Description
Project is in service.

Changes since 2008: None
                                  Summaries

                                                                  Baseline (in $ 000)                     0
                                                2008 Current Budget (in $ 000)                          177
                                               2009 Adopted budget (in $000)                            176




Capital Costs
Sub Area                              1997-2007        2008           2009        2010       2011        2012       2013       Future       Total
Snohomish County                             176              0              0           0          0           0          0                   176
Total                                         176             0              0           0          0           0          0                     176


Capital Cost Elements
Cost Element                          1997-2007       2008           2009         2010       2011        2012       2013       Future       Total
Agency Administration                         9               0              0           0          0           0          0         0              9
Pre-Engineering/Env Review                    3               0              0           0          0           0          0         0              3
Final Design and Specification                  0             0              0           0          0           0          0            0           0
ROW Acquisition and Permits                     0             0              0           0          0           0          0            0          0
Construction                                  163             0              0           0          0           0          0            0        163
Vehicles                                        0             0              0           0          0           0          0            0           0
Contingency                                     0             0              0           0          0           0          0            0           0
Total                                         176             0              0           0          0           0          0            0        176

Risk Assessment :
 Status: In Service

  Estimate Type:          Final                                              Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                     2008 Budget Schedule: 2003
                                                                                 2009 Budget Schedule: 2003




Adopted 2009 Budget                                                                                                            Page 132 of 312
                                                                      Sounder
Project                                   209        Edmonds Station

Description
Scope: Edmonds is currently served by a temporary platform on the east side of the tracks at the Edmonds Amtrak Station. An interim
station will be constructed for Sounder service until such time as the Edmonds Crossing multimodal station led by the Washington State
Ferries is funded and built. When BNSF constructs a second main line through Edmonds, construction will require removal of the
temporary station platform. The interim station will include two platforms (shared with Amtrak), shelters for weather protection, short term
parking for passenger drop off and pick up, and about 150 parking spaces. The station scope has been revised to reflect the shorter
lifespan (10-15 years) expected for the interim station due to the future Edmonds Crossing project. To ensure continuous service is
provided once BNSF starts construction of the second mainline, Sound Transit must build a new platform on the west side of the existing
tracks between Dayton and Main Streets, as an initial phase of development at this site.
Changes since 2008: None
                                   Summaries

                                                                Baseline (in $ 000)               12,929
                                                 2008 Current Budget (in $ 000)                   12,929
                                                2009 Adopted budget (in $000)                     12,929




Capital Costs
Sub Area                               1997-2007        2008        2009       2010        2011        2012       2013       Future       Total
Snohomish County                            3,521          654       4,914      3,841             0           0          0                12,929
Total                                       3,521         654         4,914     3,841             0           0          0                12,929


Capital Cost Elements
Cost Element                           1997-2007       2008         2009       2010        2011        2012       2013       Future       Total
Agency Administration                        234           34          208        198             0           0          0         0         674
Pre-Engineering/Env Review                     685         18             9           1           0           0          0            0        713
Final Design and Specification               455          427          107            37          0           0          0            0     1,026
ROW Acquisition and Permits                2,069          127           24             0          0           0          0            0     2,221
Construction                                    78         47        4,565      3,395             0           0          0            0     8,086
Vehicles                                         0          0             0           0           0           0          0            0          0
Contingency                                      0          0             0       210             0           0          0            0        210
Total                                      3,521          654        4,914      3,841             0           0          0            0    12,929

Risk Assessment :
 Status: Final Design

  Estimate Type:          Design                                          Schedule Risk level:        MEDIUM

      Budget Risk Level: LOW                                                  2008 Budget Schedule: 2009
                                                                              2009 Budget Schedule: 2010

                                                                 Comment
                                                                 BNSF schedule for construction of second mainline track may
                                                                 require staging of construction. Given the uncertainty of Edmonds
                                                                 Crossing project, the City may request that the original 2002
                                                                 permanent station be constructed in lieu of an interm station.




Adopted 2009 Budget                                                                                                          Page 133 of 312
                                                                      Sounder
Project                                   236       Tukwila Station

Description
Scope: Service to Tukwila is currently supported by a temporary station boarding area. Preliminary engineering is underway on the
design of a permanent station. The permanent Tukwila Station may include two platforms with canopies, surface parking, a bus transfer
facility, two ticket vending machines, and bike lockers, depending on the cost estimate for these elements. It will be constructed south of
Longacres Way and west of the BNSF railroad tracks. The current station budget is only sufficient to fund a portion of the permanent
station. The project partners (Tukwila, Renton, AMTRAK, KCM, ST) have developed a Master Plan for the station. The Master Plan also
identifies off-site improvements that will be the responsibility of others.

Changes since 2008: None
                                 Summaries

                                                                Baseline (in $ 000)                   0
                                                2008 Current Budget (in $ 000)                   16,434
                                                2009 Adopted budget (in $000)                    16,434




Capital Costs
Sub Area                               1997-2007       2008         2009       2010       2011        2012       2013       Future       Total
South King County                           9,001         762          446      6,225            0           0          0                16,434
Total                                       9,001         762          446      6,225            0           0          0                16,434


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010       2011        2012       2013       Future       Total
Agency Administration                        203         135           39         525            0           0          0         0          901
Pre-Engineering/Env Review                   373         578            0         223            0           0          0         0        1,175
Final Design and Specification                  0          14          400            0          0           0          0            0        414
ROW Acquisition and Permits                8,425           35            7            0          0           0          0            0     8,466
Construction                                   0            0            0            0          0           0          0            0         0
Vehicles                                        0           0            0            0          0           0          0            0          0
Contingency                                     0           0            0      5,477            0           0          0            0     5,477
Total                                      9,001          762          446      6,225            0           0          0            0    16,434

Risk Assessment :
 Status: Preliminary Engineering

  Estimate Type:          Conceptual                                      Schedule Risk level:       HIGH

      Budget Risk Level: MEDIUM                                              2008 Budget Schedule: TBD

           Right of Way Costs                                                2009 Budget Schedule: TBD
           Scope Escalation/Change
           Design and Environmental regulations                 Comment
                                                                       Project depends on resolution of City of Renton progress on
           Unexpected Finding During Engineering
                                                                       Strander Boulevard and relocation of the Union Pacific Railroad
           Limited Budget Basis                                        tracks.
           Shared Project funding
           Utilities Relocation    Project Location
           Coordination




Adopted 2009 Budget                                                                                                         Page 134 of 312
                                                                       Sounder
Project                                  247        Reservation-Freighthouse

Description
Project is complete.

Changes since 2008: Transferred the unused budget in the project $1.8M to the South King County program reserve and $1.7M to the
Pierce County program reserve. These amounts were reduced by $88K by amendment to the proposed budget.
                                  Summaries

                                                                 Baseline (in $ 000)               19,013
                                                2008 Current Budget (in $ 000)                     19,889
                                               2009 Adopted budget (in $000)                       16,380




Capital Costs
Sub Area                              1997-2007        2008          2009        2010       2011        2012       2013       Future       Total
South King County                          8,918           44               0           4          0           0          0                 8,966
Pierce County                              7,373             36             0           4          0           0          0                 7,413
Total                                     16,291             81             0           8          0           0          0                16,380


Capital Cost Elements
Cost Element                          1997-2007       2008          2009         2010       2011        2012       2013       Future       Total
Agency Administration                       905              0              0           8          0           0          0         0         913
Pre-Engineering/Env Review                    201            0              0           0          0           0          0            0        201
Final Design and Specification            1,202              0              0           0          0           0          0            0     1,202
ROW Acquisition and Permits                   0              0              0           0          0           0          0            0         0
Construction                             13,983           81                0           0          0           0          0            0    14,064
Vehicles                                        0            0              0           0          0           0          0            0          0
Contingency                                     0            0              0           0          0           0          0            0          0
Total                                    16,291            81               0           8          0           0          0            0    16,380

Risk Assessment :
 Status: In Service

  Estimate Type:          Final                                             Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                    2008 Budget Schedule: 2007
                                                                                2009 Budget Schedule: 2007




Adopted 2009 Budget                                                                                                           Page 135 of 312
                                                                      Sounder
Project                                   251       South Tacoma Station

Description
Scope: The project is located between South 56th and South 60th Streets in South Tacoma. This station will provide service to South
Tacoma and University Place residents to destinations along the Sounder Commuter Rail corridor and intercept those customers currently
traveling north to the Tacoma Dome Station. The project includes a single-side platform with passenger amenities, surface parking for
approximately 215 vehicles and a passenger drop-off zone. The station will be served by bus transit upon completion and commuter rail
once all track and signal improvements are completed.

Changes since 2008: None
                                 Summaries

                                                                Baseline (in $ 000)              17,115
                                                2008 Current Budget (in $ 000)                   16,476
                                                2009 Adopted budget (in $000)                    16,476




Capital Costs
Sub Area                              1997-2007        2008         2009       2010       2011        2012       2013       Future       Total
Pierce County                              3,891        9,076          385      3,124            0           0          0                16,476
Total                                       3,891       9,076          385      3,124            0           0          0                16,476


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010       2011        2012       2013       Future       Total
Agency Administration                        276         556           32         165            0           0          0         0        1,029
Pre-Engineering/Env Review                   542           0            0           0            0           0          0         0          542
Final Design and Specification               962         214           106            0          0           0          0            0     1,282
ROW Acquisition and Permits                1,981         371             0            0          0           0          0            0     2,351
Construction                                 130       7,936           248      2,390            0           0          0            0    10,703
Vehicles                                       0           0             0          0            0           0          0            0         0
Contingency                                     0          0             0        569            0           0          0            0        569
Total                                      3,891        9,076          385      3,124            0           0          0            0    16,476

Risk Assessment :
 Status: Construction

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                 2008 Budget Schedule: 2009
                                                                             2009 Budget Schedule: 2009




Adopted 2009 Budget                                                                                                         Page 136 of 312
                                                                     Sounder
Project                                   253       Lakewood Station

Description
Scope: In service.

Changes since 2008: Transferred $1.6M in project savings to the Pierce County program reserve.
                                 Summaries

                                                               Baseline (in $ 000)               32,920
                                                2008 Current Budget (in $ 000)                   32,920
                                                2009 Adopted budget (in $000)                    31,358




Capital Costs
Sub Area                              1997-2007        2008        2009        2010      2011         2012       2013       Future       Total
Pierce County                             21,911        7,248             0     2,199            0           0          0                31,358
Total                                     21,911        7,248             0     2,199            0           0          0                31,358


Capital Cost Elements
Cost Element                           1997-2007      2008        2009         2010      2011         2012       2013       Future       Total
Agency Administration                      1,270       1,046              0       153            0           0          0         0        2,468
Pre-Engineering/Env Review                 1,347           0              0         0            0           0          0         0        1,347
Final Design and Specification             1,829         205              0       185            0           0          0            0     2,220
ROW Acquisition and Permits                4,302          50              0        68            0           0          0            0     4,421
Construction                              13,164       5,947              0     1,322            0           0          0            0    20,433
Vehicles                                        0          0              0          0           0           0          0            0          0
Contingency                                     0          0              0       470            0           0          0            0        470
Total                                     21,911       7,248              0     2,199            0           0          0            0    31,358

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                  2008 Budget Schedule: 2008
                                                                              2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                         Page 137 of 312
                                                                      Sounder
Project                                 510       ST2 Seattle - Auburn Track & Signal

Description
Scope: Sound Transit has executed a term sheet with BNSF to purchase four additional commuter rail easements between Seattle and
Tacoma. A $20 million earnest money payment is due for the four easements in 2009 and the balance of payments will be spread
between 2009 and 2012. BNSF will be responsible for any track and signal improvements and Sound Transit will have environmental
responsibilities.

Changes Since 2008: This is a new project being added as part of ST2, the project budget will be further developed as part of the 2010
budget.
                                 Summaries

                                                                Baseline (in $ 000)                   0
                                              2008 Current Budget (in $ 000)                          0
                                              2009 Adopted budget (in $000)                   101,676




Capital Costs
Sub Area                             1997-2007       2008           2009       2010       2011        2012       2013       Future       Total
South King County                             0             0       30,778     21,434     23,633      25,831            0                101,676
Total                                         0             0       30,778     21,434     23,633      25,831            0                101,676


Capital Cost Elements
Cost Element                         1997-2007      2008           2009        2010       2011        2012       2013       Future        Total
Agency Administration                        0              0             0           0          0           0          0         0               0
Pre-Engineering/Env Review                   0              0             0           0          0           0          0         0               0
Final Design and Specification                0             0             0           0          0           0          0            0            0
ROW Acquisition and Permits                   0             0             0           0          0           0          0            0            0
Construction                                  0             0       30,778     21,434     23,633      25,831            0            0   101,676
Vehicles                                      0             0            0          0          0           0            0            0         0
Contingency                                   0             0             0           0          0           0          0            0            0
Total                                         0             0       30,778     21,434     23,633      25,831            0            0   101,676

Risk Assessment :
 Status:

  Estimate Type:                                                          Schedule Risk level:       MEDIUM

      Budget Risk Level: HIGH                                                 2008 Budget Schedule: NA

           Right of Way Costs                                                 2009 Budget Schedule: 2015
           Scope Escalation/Change
           Design and Environmental regulations
           Unexpected Finding During Engineering
           Limited Budget Basis
           Shared Project funding
           Utilities Relocation    Project Location
           Coordination




Adopted 2009 Budget                                                                                                         Page 138 of 312
                                                                      Sounder
Project                                 520       ST2 Auburn - Seattle Track & Signal

Description
Scope: Sound Transit has executed a term sheet with BNSF to purchase four additional commuter rail easements between Seattle and
Tacoma. A $20 million earnest money payment is due for the four easements in 2009 and the balance of payments will be spread
between 2009 and 2012. BNSF will be responsible for any track and signal improvements and Sound Transit will have environmental
responsibilities.

Changes Since 2008: This is a new project being added as part of ST2, the project budget will be further developed as part of the 2010
budget.
                                 Summaries

                                                                Baseline (in $ 000)                   0
                                              2008 Current Budget (in $ 000)                          0
                                              2009 Adopted budget (in $000)                      83,324




Capital Costs
Sub Area                             1997-2007       2008           2009       2010       2011        2012       2013       Future       Total
Pierce County                                 0             0       25,222     17,566     19,367      21,169            0                83,324
Total                                         0             0       25,222     17,566     19,367      21,169            0                83,324


Capital Cost Elements
Cost Element                         1997-2007      2008           2009        2010       2011        2012       2013       Future       Total
Agency Administration                        0              0             0           0          0           0          0         0              0
Pre-Engineering/Env Review                   0              0             0           0          0           0          0         0              0
Final Design and Specification                0             0             0           0          0           0          0            0           0
ROW Acquisition and Permits                   0             0             0           0          0           0          0            0           0
Construction                                  0             0       25,222     17,566     19,367      21,169            0            0    83,324
Vehicles                                      0             0            0          0          0           0            0            0         0
Contingency                                   0             0             0           0          0           0          0            0           0
Total                                         0             0       25,222     17,566     19,367      21,169            0            0    83,324

Risk Assessment :
 Status:

  Estimate Type:                                                          Schedule Risk level:       MEDIUM

      Budget Risk Level: HIGH                                                 2008 Budget Schedule: NA

           Right of Way Costs                                                 2009 Budget Schedule: 2015
           Scope Escalation/Change
           Design and Environmental regulations
           Unexpected Finding During Engineering
           Limited Budget Basis
           Shared Project funding
           Utilities Relocation    Project Location
           Coordination




Adopted 2009 Budget                                                                                                         Page 139 of 312
                                                                     Sounder
Project                                 601       Sounder Program Reserve

Description
Changes since 2008: Snohomish County program reserves increased by net $20K as a result of savings from Everett-Seattle Track &
Signal - $127K and Permitting/Environmental Mitigation - $2.1M, and draws for Layover - $458K and Mukilteo Station, South Platform -
$1.8M. South King County program reserves increased by a net $941K as a result of savings from Reservation-Freighthouse - $1.8M and
a draw for Layover - $880K. Pierce County program reserves increased by a net $5.3M as a result of savings from Auburn-Tacoma Track
& Signal - $6.9M, Nisqually-Lakewood ROW - $1.2M, Reservation-Freighthouse - $1.7M, Lakewood Station - $1.6M and draws for M St.-
Lakewood Track & Signal - $5M and Layover - $1.1M.
                                 Summaries

                                                               Baseline (in $ 000)                     0
                                              2008 Current Budget (in $ 000)                        2,301
                                              2009 Adopted budget (in $000)                         8,608




Capital Costs
Sub Area                             1997-2007      2008           2009       2010       2011          2012       2013       Future       Total
Snohomish County                              0            0              0       32            0             0          0                     32
South King County                             0            0              0    1,059            0             0          0                 1,059
Pierce County                                 0            0              0          0          0             0    7,517                   7,517
Total                                         0            0              0    1,091            0             0    7,517                   8,608


Capital Cost Elements
Cost Element                         1997-2007      2008          2009        2010       2011          2012       2013       Future       Total
Agency Administration                        0             0              0          0          0             0          0         0              0
Pre-Engineering/Env Review                    0            0              0          0          0             0          0            0           0
Final Design and Specification                0            0              0          0          0             0          0            0           0
ROW Acquisition and Permits                   0            0              0          0          0             0          0            0           0
Construction                                  0            0              0          0          0             0          0            0           0
Vehicles                                      0            0              0          0          0             0          0            0           0
Contingency                                   0            0              0    1,091            0             0    7,517              0     8,608
Total                                         0            0              0    1,091            0             0    7,517              0     8,608




Adopted 2009 Budget                                                                                                          Page 140 of 312
    REGIONAL EXPRESS PROGRAM SUMMARY

    The Regional Express program includes Community Connections and HOV Access projects. To
    maximize public access between regional and local transit systems, Sound Transit is completing a
    variety of Community Connection facilities, including transit centers, park-and-ride lots, and
    transit access improvements. These facilities will improve access to the regional transit system as
    well as connections to local transit services.
    The HOV Access projects are being implemented through a partnership between Sound Transit
    and the Washington State Department of Transportation. Sound Transit is funding direct access
    ramps and freeway transit stations within WSDOT right-of-way to make it easier for transit
    customers, vanpools, and carpools to access the HOV lanes on some of the region’s most
    congested freeways.




Adopted 2009 Budget                                                                          Page 141 of 312
Adopted 2009 Budget   Page 142 of 312
Adopted 2009 Budget   Page 143 of 312
    Regional Express Capital Plan
    The Regional Express 2009 adopted lifetime capital budget (1997–2013) is $834.4 million with a
    2009 annual spending plan of $37.6 million. The program lifetime budget is adopted to increase
    by $49.1 million in 2009. The increase is associated with the construction of the Mountlake
    Terrace Freeway Station scheduled in 2009-2010 and the completion of design for the I-90 Two
    Way Transit and HOV Access Stage 3 project now scheduled for 2013.
    The yearly spending plan reflects a decrease of $22.4 million compared to the current 2008
    spending plan. Expenditures in 2009 in the Regional Express Program will be lower than in 2008
    due to the completion of the Totem Lake Freeway Station, Mercer Island Park-and-Ride, Bothell
    Branch Campus Access, South Everett Freeway Station, Redmond Transit Center, I-90 Two Way
    Transit and HOV Access Stage 1, and Issaquah Transit Center projects in 2008.
    The Snohomish County program has one project remaining to be completed, Mountlake Terrace
    Freeway Station currently in final design.
    The South King County projects are in service with the exception of the Star Lake Freeway
    Station. A feasibility study completed in 2008 concluded that a viable project could not be
    constructed. The project has been deleted from Sound Move.
    In East King County, Regional Express management is focused on completing the design of the
    remaining program and advancing these projects into construction. The projects not yet under
    construction include the Renton HOV Access and I-90 Two-Way Transit and HOV Operations
    (Stages 2 and 3) projects. The 2009 adopted budget includes funding for completion of the
    previously unfunded I-90 Stage 3 design. Construction of this stage as well as Stage 2 however is
    contingent upon funding from WSDOT and ST2. The Kirkland Transit Center project is
    currently in the design phase. The remaining East King County projects not yet under
    construction are being led by others with capped contributions from Sound Transit.
    All Pierce County projects in the Regional Express program have been in service since 2004.

    Changes in the Adopted 2009 Budget
    Budget Changes:
    •   Mountlake Terrace Freeway Station (312): The budget was increased by $15.3 million to
        reflect the 100% design cost estimate; the budget increase will be funded by $4.1 million
        from subarea reserves, $1 million in CMAQ grants and $10.2 million in available Snohomish
        County subarea financial capacity.
    •   Lynnwood HOV Access/46th Ave. W (111): The budget was increased by $13 thousand to
        cover trailing administrative costs; the budget increase was funded using the program reserve.
    •    I-90 Two-Way Transit and HOV Access Stage 3 (387): The budget was increased $62.5
        million to allow for advancing and completing design efforts in preparation for starting
        construction in 2014; $24 million of the budget increase will be funded using the East King
        County program reserve and the additional $38.5 million using available East King County
        subarea financial capacity.


    Transfers to Capital Program Subarea Reserves:

    Snohomish County:
    •   N. Everett Transit Center/Everett Community College (316): The project budget was
        decreased by $58 thousand in project savings; savings were transferred to the program
        reserve.




Adopted 2009 Budget                                                                         Page 144 of 312
    East King County:
    •   Eastgate HOV Access/142nd Ave SE (160): The project budget was decreased by $7 million
        in project savings; savings were transferred to the program reserve.
    •   Bellevue Rider Services Building (323): The project budget was decreased by $741 thousand
        in project savings; savings were transferred to the program reserve.
    •   Totem Lake Transit Center/Evergreen Medical Center (328): The project budget was
        decreased by $580 thousand in project savings; savings were transferred to the program
        reserve.
    •   Bothell Branch Campus (372): The project budget was decreased by $1.6 million in project
        savings; savings were transferred to the program reserve.
    •   Canyon Park Freeway Station (324): The project budget was decreased by $200 thousand in
        project savings; savings were transferred to the program reserve.
    •   Sammamish Park & Ride (380): The project budget was decreased by $93 thousand in
        project savings; savings were transferred to the program reserve.
    •   Issaquah Highlands Park and Ride (355): The project budget was decreased by $750
        thousand in project savings; savings were transferred to the program reserve.
    •   Woodinville Arterial HOV/SR202/SR522 (376): The project budget was decreased by $12
        thousand in project savings; savings were transferred to the program reserve.
    •   Redmond Way, Redmond (144): The project budget was decreased by $55 thousand in
        project savings; savings were transferred to the program reserve.
    •   Redmond Transit Center (374): The project budget was decreased by $265 thousand in
        project savings; savings were transferred to the program reserve.
    •   Newcastle Transit Center (330): The project budget was decreased by $2.8 million removing
        the project contingency budget and transferring it to the program reserve. This project is a
        capped contribution and will not need contingency funds,
    South King County:
    •   Star Lake Freeway Station (131): The budget was decreased by $1 million; a viable project
        can not be constructed within the established budget. Remaining budget was transferred to
        the program reserve.


    Transfer of Program Funds to Transportation Services:
    •   Federal Way HOV Access/S. 317th (125): $437 thousand for plant establishment and post
        construction wetland mitigation and water quality monitoring
    •   Bellevue HOV Access (145): $96 thousand for plant establishment
    •   Eastgate HOV Access/142nd Ave SE (160): $118 thousand for plant establishment




Adopted 2009 Budget                                                                        Page 145 of 312
    Regional Express Schedule Changes
    Led by Sound Transit

    Old Completion Date/New Completion Date

               Project              2008         2009          2010         2011       2012        2013

     319 South Everett            2Q 2008
     Freeway Station              3Q 2008

                                                             3Q 2010
     312 Mountlake Terrace
     Freeway Station                                         4Q 2010

     142 Kirkland Transit                                    1Q 2010
     Center                                                  3Q 2010

     150 Renton HOV                                          4Q 2010
     Access                                                    TBD

    Led by Others - Sound Transit provides a capped contribution

    Old Completion Date/New Completion Date

     Project                          2008       2009        2010        2011        2012        2013
     151 Rainier Avenue
     Arterial Improvements
                                               2Q 2009                 3Q 2011
     328 Totem Lake Transit
     Center /Evergreen Medical      2Q 2008
     Center                         3Q 2008
     330 Newcastle Transit
     Center/SE 70th                            3Q 2009     1Q 2010
     386 I-90 Two-Way Transit
     Enhancements, Stage 2                                 4Q 2010                             4Q 2013
     385 SR 522 HOV
     Enhancements/Bothell                      3Q 2009     4Q 2010


    The completion dates in both tables above reflect when construction is expected to be
    substantially complete and the facility will be open for service. These dates do not include the
    project closeout effort, which can extend between twelve to eighteen months beyond the
    completion of construction as liens are released, final invoices are processed, claims are
    negotiated and settled and remaining budget is returned to program reserves.




Adopted 2009 Budget                                                                           Page 146 of 312
    Scope, Schedule and Budget Risks
    •   Star Lake Freeway Station (131): Feasibility study unable to identify a viable project, the
        project is proposed to be terminated and remaining funds transferred to reserves.
    •   Federal Way Transit Center/S. 317th (321): There is some budget exposure should an existing
        $2.7 million claim related to earthwork be mediated in the contractor’s favor. ST has denied
        the claim, does not believe the claim has merit and does not anticipate a settlement in the
        contractor’s favor. Nonetheless, until the determination is made, there is cost exposure.
    •   Renton HOV Access/N 8th (150): There are currently no WSDOT funds for the needed
        reconstruction of I-405 through this area. WSDOT is considering tolling and HOT lanes as a
        funding source; design efforts may be reinitiated.
    •   I-90 Two-Way, Stage 2 (386): There is a need for existing programmed state appropriations
        ($24 million) for WSDOT’s portion of the shared construction cost to proceed. Final design
        is 90% complete and is being shelved until funding is resolved. Stage 2 is on the critical path
        for East Link and needs to be completed by 2014.
    •   I-90 Two Way, Stage 3 (387): WSDOT is proceeding to complete conceptual design to
        facilitate future decisions. Stage 3 is on the critical path for East Link and needs to be
        completed by 2014.
    Baseline Budgets:

    The following active projects were baselined in 2008:
    •   Kirkland Transit Center (142)
    •   Mountlake Terrace Freeway Station (312)




Adopted 2009 Budget                                                                           Page 147 of 312
                                               Regional Express
                                    2009 Adopted Budget By Equity Area

 Subarea                            1997-2007    2008     2009      2010     2011     2012     2013     Future       Total
 Snohomish County                     121,344     9,119   10,611    26,475    1,407      64       46                 169,066
 South King County                     72,350      116      627      5,203       0        0        0                  78,296
 East King County                     319,838    28,093   26,331   102,601   18,398   23,471   10,005         0      566,294
 Pierce County                         20,745         0        0         0        0        0        0                 20,745

Regional Express                      534,276    37,328   37,569   134,279   19,805   23,535   10,051         0      834,401


                                        2009 Adopted Budget By Phase

 Phase                               1997-2007   2008     2009      2010     2011     2012     2013     Future        Total
10 Agency Administration              28,215      3,138    2,057     8,340    1,065      802      571          0       46,160
20 Pre-Engineering/Env Review         49,188      1,458       65     1,029      150        0        0          0       51,890
30 Final Design and Specification     41,537      2,258    6,616    10,900    9,125    8,052    1,167          0       79,655
40 ROW Acquisition and Permits        47,162      1,016    8,179     4,693      211       50        0          0       61,311
50 Construction                      368,175     29,459   20,047    94,741    9,244    5,892    6,068          0      533,626
90 Contingency                            0           0      605    14,576        8    8,739    2,246          0       61,758

Regional Express                     534,276     37,328   37,569   134,279   19,805   23,535   10,051          0      834,401




       Adopted 2009 Budget                                                                         Page 148 of 312
2009 Adopted Budget By Project

Regional Express


Project Number and Name                  1997-2007    2008      2009     2010      2011    2012     2013 Future         Total

Active Projects
125 Federal Way HOV Access/S 317th         28,679       94       23     3,385        0        0        0               32,180
140 Totem Lake Freeway Station/NE          72,859    1,292      115     5,849      130       72       22               80,339
     128th
141 85th Corridor, Kirkland                 1,354       -2    3,569     1,094        0        0        0                6,015
142 Kirkland Transit Center/3rd             1,073    1,196    2,871     8,161         0       0        0               13,300
150 Renton HOV Access/N 8th                 3,286        0    6,339    54,077     3,373       0        0               67,075
151 Rainier Avenue Arterial                   964    3,802    3,895     2,867     2,688    1,501       0               15,717
    Improvements
152 Strander Boulevard Extension                0        0    1,023     1,460     1,418     318        0                4,219
312 Mountlake Terrace Freeway               4,660    1,932   10,292    22,659     1,301      16        8               40,869
    Station/236th SW
319 S Everett Freeway Station/112th SE     20,903    6,652      171     3,358       40       48       38               31,209
321 Federal Way Transit Center/S 317th     38,028       22      604       800        0        0        0               39,455
324 Canyon Park Freeway Station             9,500     177       273      577         0        0        0               10,528
326 Issaquah Transit Center/SR900          22,081    6,313       63      961        41       18        5               29,482
328 Totem Lake Transit                        844     437     3,080     2,802        0        0        0                7,163
    Center/Evergreen Medical Center
330 Newcastle Transit Center/SE 70th          455     515     2,021     1,437        0        0        0                4,428
354 Mercer Island Park-And-Ride/N          15,350     458       509      512         0        0        0               16,829
    Mercer Way
372 Bothell Branch Campus Access            1,238     866       177        0         0        0        0          0     2,281
382 I-90 Two-Way Transit & HOV             10,706    7,277      125     7,627       26       15        6               25,782
    Operations, Stage 1
384 SR522 HOV                               5,262    3,510       19        0         0        0        0          0     8,791
    Enhancements/Kenmore
385 SR522 HOV Enhancements/Bothell          2,033     879     1,786     3,903        0        0        0                8,601
386 I-90 Two-Way Transit & HOV              2,602     574        19     2,339      752     4,262    6,373              19,372
    Operations, Stage 2
387 I-90 Two-Way Transit & H0V              1,720       0       446     4,835     9,969    8,547    3,600              64,222
    Operations, Stage 3
999 Regional Express Program Reserve            0       0         0     1,016        0     8,739       0          0     9,755
Total for Active Projects                 243,596 35,994     37,421 129,719     19,739    23,535   10,051         0   537,613


Closed Projects
105 Ash Way Transit Access/164th SW        18,524      56       148      199        66        0        0               18,993
111 Lynnwood HOV Access/46th Ave W         25,677       0         0       29         0        0        0               25,707
131 Star Lake Freeway Station/S 272nd       3,094       0         0        2         0        0        0                3,096
135 I-405 @ Southcenter                        55        0        0        0         0        0        0                   55
144 Redmond Way, Redmond                    2,031      -52        0       96         0        0        0                2,075
145 Bellevue HOV Access                    70,896       0         0      575         0        0        0               71,470
160 Eastgate HOV Access/142nd Ave          29,466     108         0     2,201        0        0        0               31,774
    SE
165 I-90 @ Sunset Interchange               9,185       0         0        0         0        0        0                9,185
166 SR900 Park-And-Ride Arterial            7,117       0         0        0         0        0        0                7,117
    Improvements
311 Lynnwood Transit Ctr/46th Ave W        30,085       0         0      229         0        0        0               30,314
314 S Everett Transit Center                   31       0         0        0         0        0        0                      31




 Adopted 2009 Budget                                                                                        Page 149 of 312
2009 Adopted Budget By Project

Regional Express


Project Number and Name                   1997-2007     2008     2009     2010     2011    2012     2013 Future         Total
316 N Everett Transit Center/Everett         1,163      478        0        0        0        0        0                1,641
    Comm College
322 Bellevue Transit Center/NE 6th          15,453        0        0        0        0        0        0               15,453
323 Bellevue Rider Services Bldg             2,759        1        0        0        0        0        0          0     2,760
332 Overlake Transit Center/NE 40th         10,939        0        0        0        0        0        0               10,939
340 Ash Way Park-And-Ride                    1,114        0        0        0        0        0        0                1,114
342 Swamp Creek Park-And-Ride                  303        0        0        0        0        0        0                  303
345 Lynnwood SR99 Transit Lanes              2,546        0        0        0        0        0        0                2,546
346 E Everett Park-And-Ride                     86        0        0        0        0        0        0                      86
350 Redondo Heights Park-And-                2,483        0        0        0        0        0        0                2,483
    Ride/SR99
352 Other Park-And-Ride Expansion               10        0        0        0        0        0        0                      10
355 Issaquah Highlands Park-And-             7,179        2        0      185        0        0        0                7,366
    Ride/Highland Dr
356 Tacoma Dome Station                     10,805        0        0        0        0        0        0               10,805
358 South Hill Park-And-Ride/94th Ave E      5,625        0        0        0        0        0        0                5,625
360 Dupont Station/Wilmington Dr             4,314        0        0        0        0        0        0                4,314
370 Pacific Avenue Overpass                 16,222        0        0        0        0        0        0               16,222
374 Redmond Transit Center/NE 83rd           5,044      727        0      895        0        0        0                6,666
376 Woodinville Arterial                     1,410        0        0        1        0        0        0                1,411
    HOV/SR202/SR522
378 Yarrow Point Stop Improvements             108        0        0        0        0        0        0                  109
380 Sammamish Park-And-Ride/228th            6,925       14        0      147        0        0        0                7,086
    SE
395 Funds For Other Projects                    31        0        0        0        0        0        0                      31
Total for Closed Out Projects              290,680    1,334     148     4,560      66         0        0          0   296,788


Regional Express                           534,276    37,328   37,569 134,279    19,805   23,535   10,051         0   834,401




 Adopted 2009 Budget                                                                                        Page 150 of 312
                                                          Regional Express
Project                                   105       Ash Way Transit Access/164th SW

Description
Scope: Project is in service.

Changes since 2008: None. The proposed budget was going to transfer savings of $149K to the Snohomish County Program Reserve. It
was determined that the budget needed to remain in the project so the proposed budget was amended to reflect that.
                                 Summaries

                                                               Baseline (in $ 000)              18,428
                                                2008 Current Budget (in $ 000)                  18,993
                                                2009 Adopted budget (in $000)                   18,993




Capital Costs
Sub Area                              1997-2007        2008        2009       2010        2011       2012       2013       Future       Total
Snohomish County                          18,524           56         148        199          66            0          0                18,993
Total                                     18,524           56         148        199         66             0          0                18,993


Capital Cost Elements
Cost Element                           1997-2007      2008        2009        2010        2011       2012       2013       Future       Total
Agency Administration                        783          12         101         149          42            0          0         0        1,088
Pre-Engineering/Env Review                 1,144           0            0            0          0           0          0            0     1,144
Final Design and Specification             1,639           0            0            0          0           0          0            0     1,639
ROW Acquisition and Permits                    0           0            0             0       0             0          0            0         0
Construction                              14,958          44           47            50      19             0          0            0    15,119
Contingency                                     0          0            0            0          4           0          0            0        4
Total                                     18,524          56          148        199         66             0          0            0    18,993

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                         Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                2008 Budget Schedule: 2005
                                                                            2009 Budget Schedule: 2005




Adopted 2009 Budget                                                                                                        Page 151 of 312
                                                         Regional Express
Project                                  111       Lynnwood HOV Access/46th Ave W

Description
Project is in service.

Changes since 2008: Budget increased by $13K for administrative costs.
                                  Summaries

                                                                Baseline (in $ 000)               31,157
                                               2008 Current Budget (in $ 000)                     25,694
                                               2009 Adopted budget (in $000)                      25,707




Capital Costs
Sub Area                              1997-2007      2008           2009        2010       2011        2012       2013       Future       Total
Snohomish County                          25,677            0              0        29            0           0          0                25,707
Total                                     25,677            0              0          29          0           0          0                25,707


Capital Cost Elements
Cost Element                          1997-2007      2008          2009         2010       2011        2012       2013       Future       Total
Agency Administration                     1,457             0              0        29            0           0          0         0        1,487
Pre-Engineering/Env Review                3,263             0              0         0            0           0          0         0        3,263
Final Design and Specification            1,686             0              0          0           0           0          0            0     1,686
ROW Acquisition and Permits               2,907             0              0          0           0           0          0            0     2,907
Construction                             16,364             0              0          0           0           0          0            0    16,364
Contingency                                    0            0              0          0           0           0          0            0        0
Total                                    25,677             0              0          29          0           0          0            0    25,707

Risk Assessment :
 Status: In Service

  Estimate Type:          Final                                            Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                   2008 Budget Schedule: 2004
                                                                               2009 Budget Schedule: 2004




Adopted 2009 Budget                                                                                                          Page 152 of 312
                                                          Regional Express
Project                                   125       Federal Way HOV Access/S 317th

Description
Project is in service.

Changes since 2008: Transferred $437K to Transportation Services for plant and water quality monitoring, and wetland mitigation.
                                 Summaries

                                                               Baseline (in $ 000)               32,618
                                                2008 Current Budget (in $ 000)                   32,618
                                                2009 Adopted budget (in $000)                    32,180




Capital Costs
Sub Area                              1997-2007        2008        2009        2010      2011         2012       2013       Future       Total
South King County                         28,679           94          23       3,385            0           0          0                32,180
Total                                     28,679           94            23     3,385            0           0          0                32,180


Capital Cost Elements
Cost Element                           1997-2007      2008        2009         2010      2011         2012       2013       Future       Total
Agency Administration                      1,610          27             2        237            0           0          0         0        1,876
Pre-Engineering/Env Review                 2,396           0             0          0            0           0          0         0        2,396
Final Design and Specification             1,833           0             0           0           0           0          0            0     1,833
ROW Acquisition and Permits                1,424           0           21          21            0           0          0            0     1,467
Construction                              21,415          67            0       1,933            0           0          0            0    23,414
Contingency                                     0          0             0      1,194            0           0          0            0     1,194
Total                                     28,679          94           23       3,385            0           0          0            0    32,180

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                  2008 Budget Schedule: 2006
                                                                              2009 Budget Schedule: 2006




Adopted 2009 Budget                                                                                                         Page 153 of 312
                                                           Regional Express
Project                                   131       Star Lake Freeway Station/S 272nd

Description
Scope: This project consists of an in-line transit station in the I-5 median north of South 272nd Street in Kent, as well as transit/HOV direct
access ramps to and from South 272nd Street to improve bus speed and reliability. The project would provide convenient customer
access to I-5 bus service without requiring buses to exit the freeway and would improve the I-5/South 272nd Street connection for both
transit and HOV's. The I-5/South 272nd Interchange Feasibility Study identified a Single Point Urban Interchange (SPUI) as the best
alternative to improve transit access and traffic flow to/from the Star Lake area. The estimated cost of the full SPUI exceeds $100
million. WSDOT led a feasibility study to identify a viable Phase 1 project that would have independent utility and that could be built with
the available funding and determined that the project can not be built in stages.

Changes since 2008: Budget has been transferred to the South King County program reserve and the project has been closed.
                                 Summaries

                                                                  Baseline (in $ 000)                      0
                                                2008 Current Budget (in $ 000)                          4,113
                                                2009 Adopted budget (in $000)                           3,096




Capital Costs
Sub Area                               1997-2007       2008           2009        2010       2011          2012       2013       Future       Total
South King County                           3,094             0              0           2          0             0          0                 3,096
Total                                       3,094             0              0           2          0             0          0                 3,096


Capital Cost Elements
Cost Element                           1997-2007      2008           2009         2010       2011          2012       2013       Future       Total
Agency Administration                        213              0              0           2          0             0          0         0         215
Pre-Engineering/Env Review                 1,465              0              0           0          0             0          0            0     1,465
Final Design and Specification               259              0              0           0          0             0          0            0        259
ROW Acquisition and Permits                    0              0              0           0          0             0          0            0          0
Construction                               1,157              0              0           0          0             0          0            0     1,157
Contingency                                     0             0              0           0          0             0          0            0         0
Total                                      3,094              0              0           2          0             0          0            0     3,096

Risk Assessment :
 Status: Closed

  Estimate Type:          Conceptual                                         Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                     2008 Budget Schedule: TBD
                                                                                 2009 Budget Schedule: NA

                                                                  Comment
                                                                  A feasibility study has concluded that a viable Phase 1 project could
                                                                  not be built within the available budget. Project has been closed
                                                                  and remaining budget returned to the program reserves.




Adopted 2009 Budget                                                                                                              Page 154 of 312
                                                          Regional Express
Project                                   140       Totem Lake Freeway Station/NE 128th

Description
Project is in service. ST is working with WSDOT on final completion of the project. Plant establishment will continue until 2011.


Changes since 2008: None
                                 Summaries

                                                                Baseline (in $ 000)              85,875
                                                2008 Current Budget (in $ 000)                   80,339
                                                2009 Adopted budget (in $000)                    80,339




Capital Costs
Sub Area                              1997-2007        2008         2009       2010       2011        2012       2013       Future       Total
East King County                          72,859        1,292          115      5,849        130          72         22                  80,339
Total                                     72,859        1,292          115      5,849       130            72       22                   80,339


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010       2011        2012       2013       Future       Total
Agency Administration                      3,928         248              9       342         10             6          2         0        4,545
Pre-Engineering/Env Review                 6,283           0              0           0          0           0          0            0     6,283
Final Design and Specification             4,564           1              0           0          0           0          0            0     4,565
ROW Acquisition and Permits                1,672          23             0        237         0             0         0              0     1,932
Construction                              56,411       1,020           106      1,305       120            66        20              0    59,048
Contingency                                     0          0              0     3,965            0           0          0            0     3,965
Total                                     72,859        1,292          115      5,849       130            72        22              0    80,339

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                  2008 Budget Schedule: 2007
                                                                              2009 Budget Schedule: 2007




Adopted 2009 Budget                                                                                                         Page 155 of 312
                                                           Regional Express
Project                                   141       85th Corridor, Kirkland

Description
Scope: The project includes street widening, traffic signals, sidewalk improvements, and bus shelters at various intersections in Kirkland
to enhance reliability and connections to transit. This project will be led by the City of Kirkland for all phases and funding of transit
elements by Sound Transit is capped at $3,734,460. The Interlocal Agreement for funding the project was approved by the Sound Transit
board in 2007. Construction to be completed by December 2009.

Changes since 2008: None
                                 Summaries

                                                                  Baseline (in $ 000)                  6,015
                                                2008 Current Budget (in $ 000)                         6,015
                                                2009 Adopted budget (in $000)                          6,015




Capital Costs
Sub Area                              1997-2007        2008           2009       2010       2011          2012       2013       Future       Total
East King County                           1,354              -2       3,569      1,094            0             0          0                 6,015
Total                                       1,354             -2        3,569      1,094           0             0          0                 6,015


Capital Cost Elements
Cost Element                           1997-2007      2008            2009       2010       2011          2012       2013       Future       Total
Agency Administration                        115              0          184         59            0             0          0         0         358
Pre-Engineering/Env Review                 1,124              0             0         0            0             0          0            0     1,124
Final Design and Specification                54              0             0       540            0             0          0            0       594
ROW Acquisition and Permits                   43             -2          835            0          0             0          0            0        876
Construction                                  17              0        2,550            8          0             0          0            0     2,575
Contingency                                     0             0             0       487            0             0          0            0        487
Total                                      1,354             -2        3,569      1,094            0             0          0            0     6,015

Risk Assessment :
 Status: Construction

  Estimate Type:          Baseline Cost Estimate                            Schedule Risk level:        MEDIUM

      Budget Risk Level: LOW                                                    2008 Budget Schedule: 2009
                                                                                2009 Budget Schedule: 2009

                                                                   Comment
                                                                   Sound Transit's contribution is capped. The City of Kirkland has
                                                                   indicated it will take an additional 2 years before they start
                                                                   construction.




Adopted 2009 Budget                                                                                                             Page 156 of 312
                                                           Regional Express
Project                                   142       Kirkland Transit Center/3rd

Description
Scope: This project is a regional transit center in Kirkland on Third Street, south of Central Way. The new transit center will
accommodate existing and anticipated bus service by King County Metro and Sound Transit Regional Express routes. The project also
includes intersection improvements in the vicinity of the transit center to enhance bus service speed and reliability.

Change since 2008: None.
                                 Summaries

                                                                Baseline (in $ 000)               13,300
                                                2008 Current Budget (in $ 000)                    13,300
                                                2009 Adopted budget (in $000)                     13,300




Capital Costs
Sub Area                               1997-2007       2008         2009       2010        2011        2012       2013       Future       Total
East King County                            1,073       1,196        2,871      8,161             0           0          0                13,300
Total                                       1,073       1,196        2,871      8,161             0           0          0                13,300


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010        2011        2012       2013       Future       Total
Agency Administration                         56          62          141         432             0           0          0         0         692
Pre-Engineering/Env Review                 1,009          129            0            0           0           0          0            0     1,138
Final Design and Specification                  0         951        1,578             0          0           0          0            0     2,529
ROW Acquisition and Permits                     7          43          532            46          0           0          0            0       628
Construction                                    0          11          620      7,682             0           0          0            0     8,314
Contingency                                     0           0            0            0           0           0          0            0         0
Total                                      1,073        1,196        2,871      8,161             0           0          0            0    13,300

Risk Assessment :
 Status: Final Design

  Estimate Type:          90% Design                                      Schedule Risk level:        MEDIUM

      Budget Risk Level: MEDIUM                                              2008 Budget Schedule: 2010

          Right of Way Costs                                                 2009 Budget Schedule: 2010
          Scope Escalation/Change
          Design and Environmental regulations                  Comment
                                                                       Adjacent King County Wastewater Treatment Division pump station
          Unexpected Finding During Engineering
                                                                       renovation project requires close coordination of under transit center
          Limited Budget Basis                                         piping work with installation of transit center pavework. Delays
          Shared Project funding                                       during environmental work and the City of Kirkland coordination
          Utilities Relocation    Project Location                     have increased projected construction costs.
          Coordination




Adopted 2009 Budget                                                                                                          Page 157 of 312
                                                         Regional Express
Project                                   144       Redmond Way, Redmond

Description
Scope: Project is in service.

Changes since 2008: Transferred $55K in project savings to the East King County program reserve.
                                 Summaries

                                                                 Baseline (in $ 000)                   2,438
                                                2008 Current Budget (in $ 000)                         2,130
                                                2009 Adopted budget (in $000)                          2,075




Capital Costs
Sub Area                              1997-2007       2008           2009        2010       2011          2012       2013       Future       Total
East King County                           2,031         -52                0        96            0             0          0                 2,075
Total                                       2,031        -52                0          96          0             0          0                 2,075


Capital Cost Elements
Cost Element                           1997-2007      2008          2009         2010       2011          2012       2013       Future       Total
Agency Administration                         12             0              0        96            0             0          0         0         108
Pre-Engineering/Env Review                     0             0              0         0            0             0          0         0            0
Final Design and Specification               229             0              0          0           0             0          0            0        229
ROW Acquisition and Permits                   17           0                0          0           0             0          0            0        17
Construction                               1,774         -52                0          0           0             0          0            0     1,722
Contingency                                     0            0              0          0           0             0          0            0          0
Total                                      2,031         -52                0          96          0             0          0            0     2,075

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                            Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                    2008 Budget Schedule: 2007
                                                                                2009 Budget Schedule: 2007




Adopted 2009 Budget                                                                                                             Page 158 of 312
                                                          Regional Express
Project                                   145       Bellevue HOV Access

Description
Project is in service.

Changes since 2008: Transferred $96K to Transportation Services for plant establishment.
                                 Summaries

                                                                 Baseline (in $ 000)               82,903
                                                2008 Current Budget (in $ 000)                     71,566
                                                2009 Adopted budget (in $000)                      71,470




Capital Costs
Sub Area                              1997-2007       2008           2009        2010      2011         2012       2013       Future       Total
East King County                          70,896             0              0       575            0           0          0                71,470
Total                                     70,896             0              0       575            0           0          0                71,470


Capital Cost Elements
Cost Element                           1997-2007      2008          2009         2010      2011         2012       2013       Future       Total
Agency Administration                      3,740             0              0       575            0           0          0         0        4,315
Pre-Engineering/Env Review                 1,408             0              0         0            0           0          0         0        1,408
Final Design and Specification             4,039             0              0          0           0           0          0            0     4,039
ROW Acquisition and Permits                8,202             0              0          0           0           0          0            0     8,202
Construction                              53,507             0              0          0           0           0          0            0    53,507
Contingency                                     0            0              0          0           0           0          0            0        0
Total                                     70,896             0              0       575            0           0          0            0    71,470

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                            Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                    2008 Budget Schedule: 2005
                                                                                2009 Budget Schedule: 2005




Adopted 2009 Budget                                                                                                           Page 159 of 312
                                                          Regional Express
Project                                   150       Renton HOV Access/N 8th

Description
Scope: An HOV interchange on I-405 at North 8th Street to be built in partnership with WSDOT to include HOV direct-access to and from
North 8th Street at I-405, and a "T" interchange to the center lanes of North 8th Street. This project would be designed and constructed as
part of the WSDOT I-405 widening construction project that has a significant funding shortfall. The East King County Program Reserve is
earmarked for Renton HOV Access and other remaining East King County projects.

Changes since 2008: None
                                 Summaries

                                                                  Baseline (in $ 000)                   0
                                                2008 Current Budget (in $ 000)                     67,075
                                                2009 Adopted budget (in $000)                      67,075




Capital Costs
Sub Area                               1997-2007       2008           2009       2010       2011        2012       2013       Future       Total
East King County                            3,286             0        6,339     54,077      3,373             0          0                67,075
Total                                       3,286             0        6,339     54,077      3,373             0          0                67,075


Capital Cost Elements
Cost Element                           1997-2007      2008           2009        2010       2011        2012       2013       Future       Total
Agency Administration                        376              0         330       2,818        176             0          0         0        3,700
Pre-Engineering/Env Review                 2,870              0           27         26            0           0          0            0     2,923
Final Design and Specification                35              0        2,241      2,241            0           0          0            0     4,517
ROW Acquisition and Permits                     4             0        3,741      3,462            0           0          0            0     7,208
Construction                                    0             0            0     45,530      3,193             0          0            0    48,723
Contingency                                     0             0            0            0          4           0          0            0        4
Total                                      3,286              0        6,339     54,077      3,373             0          0            0    67,075

Risk Assessment :
 Status: PE/ED

  Estimate Type:          Conceptual                                        Schedule Risk level:       HIGH

      Budget Risk Level: HIGH                                                  2008 Budget Schedule: 2010

          Right of Way Costs                                                   2009 Budget Schedule: TBD
          Scope Escalation/Change
          Design and Environmental regulations                    Comment
                                                                  The project can not move forward until funding is obtained by
          Unexpected Finding During Engineering
                                                                  WSDOT for the reconstruction of I-405 between Park Ave. and SR
          Limited Budget Basis                                    167. Project estimate is based on WSDOT cost estimate validation
          Shared Project funding                                  process which assumes construction starting in 2012.
          Utilities Relocation    Project Location
          Coordination




Adopted 2009 Budget                                                                                                           Page 160 of 312
                                                           Regional Express
Project                                   151       Rainier Avenue Arterial Improvements

Description
Scope: This project will add Business and Transit Access Lanes (BAT Lanes), sidewalk, and medians on Hardie Ave between Rainier Ave
and Sunset Boulevard. The existing BNSF Railroad trestle will be widened to accommodate the improvements. A Transit only traffic
signal will be installed at the intersection of Hardie and Rainier Avenues. Rainier Avenue will be reconstructed between S. 2nd Street and
S. 4th Place with access control elements; sidewalk bus stop improvements and a transit signal priority system. An eastbound queue
jump on S. 3rd Street at Rainier Avenue will be constructed as part of the Rainier Avenue improvements. The City of Renton is the project
lead. Sound Transit's contribution to the project is capped at $14.9M. Sound Transit's contributions will be made as work is completed in
specific phases. The Interlocal Agreement for the PE/ED phase outlines the requirements for the City of Renton to receive monies for
each additional phase.

Changes since 2008: None
                                 Summaries

                                                                Baseline (in $ 000)              15,675
                                                2008 Current Budget (in $ 000)                   15,717
                                                2009 Adopted budget (in $000)                    15,717




Capital Costs
Sub Area                              1997-2007        2008         2009       2010       2011        2012     2013       Future       Total
East King County                             964        3,802        3,895      2,867      2,688       1,501          0                15,717
Total                                        964        3,802        3,895      2,867      2,688       1,501          0                15,717


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010       2011        2012     2013       Future       Total
Agency Administration                         50         198          198         158        137          76          0         0         817
Pre-Engineering/Env Review                   914        1,105            0        481            0         0          0            0     2,500
Final Design and Specification                  0           0        1,396        304            0         0          0            0     1,700
ROW Acquisition and Permits                     0           0        2,300        500            0         0          0            0     2,800
Construction                                    0       2,500            0      1,424      2,551       1,424          0            0     7,900
Contingency                                     0           0            0            0          0         0          0            0        0
Total                                        964        3,802        3,895      2,867      2,688       1,501          0            0    15,717

Risk Assessment :
 Status: Conceptual Engineering

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                 2008 Budget Schedule: 2009
                                                                             2009 Budget Schedule: 2011




Adopted 2009 Budget                                                                                                       Page 161 of 312
                                                              Regional Express
Project                                   152          Strander Boulevard Extension

Description
Scope: Strander Boulevard will be extended, as a five lane arterial, between the East Valley Highway and West Valley Highway. The City
of Renton is the project lead. Sound Transit's contribution to the project is capped at $4M for the design, ROW and construction costs for
the project's transit related elements (transit queue jumps at Lind Avenue, Oaksdale and the Boeing Access Road) and a pro-rated share
of the frontage improvements. Sound Transit's contributions will be made as work is completed in specific phases. The Interlocal
Agreement for the PE/ED phase outlines the requirements to be met for the City of Renton to receive monies for each additional phase.

Changes since 2008: None
                                 Summaries

                                                                     Baseline (in $ 000)                  4,208
                                                2008 Current Budget (in $ 000)                            4,219
                                                2009 Adopted budget (in $000)                             4,219




Capital Costs
Sub Area                              1997-2007           2008           2009       2010       2011          2012       2013       Future       Total
East King County                               0                 0        1,023      1,460      1,418           318            0                 4,219
Total                                              0             0        1,023      1,460      1,418             318          0                 4,219


Capital Cost Elements
Cost Element                           1997-2007         2008           2009        2010       2011          2012       2013       Future       Total
Agency Administration                          0                 0          51          82         70            16            0         0         219
Pre-Engineering/Env Review                     0                 0           0          30          0             0            0         0           30
Final Design and Specification                  0                0          395            0          0             0          0            0        395
ROW Acquisition and Permits                     0                0          275            0          0             0          0            0        275
Construction                                    0                0          302      1,348      1,348             302          0            0     3,300
Contingency                                     0                0            0          0          0               0          0            0         0
Total                                           0                0        1,023      1,460      1,418             318          0            0     4,219

Risk Assessment :
 Status: Final Design

  Estimate Type:          Baseline Cost Estimate                               Schedule Risk level:        HIGH

      Budget Risk Level: LOW                                                      2008 Budget Schedule: 2013
                                                                                  2009 Budget Schedule: 2013

                                                                     Comment
                                                                     The City has not advanced the design of Strander Blvd. but has
                                                                     been focusing on the Union Pacific Railroad relocation needed for
                                                                     full build out of the project. ST's contribution is capped.




Adopted 2009 Budget                                                                                                                Page 162 of 312
                                                          Regional Express
Project                                   160       Eastgate HOV Access/142nd Ave SE

Description
Project is in service.

Changes since 2008: Transferred $118K to Transportation Services for plant monitoring and the remaining budget of $7M in project
savings to the East King County program reserve.
                                 Summaries

                                                               Baseline (in $ 000)               38,908
                                                2008 Current Budget (in $ 000)                   38,908
                                                2009 Adopted budget (in $000)                    31,774




Capital Costs
Sub Area                              1997-2007       2008         2009        2010      2011         2012       2013       Future       Total
East King County                          29,466         108              0     2,201            0           0          0                31,774
Total                                     29,466         108              0     2,201            0           0          0                31,774


Capital Cost Elements
Cost Element                           1997-2007      2008        2009         2010      2011         2012       2013       Future       Total
Agency Administration                      1,617          27              0       195            0           0          0         0        1,838
Pre-Engineering/Env Review                 2,096           0              0          0           0           0          0            0     2,096
Final Design and Specification             2,272           0              0          0           0           0          0            0     2,272
ROW Acquisition and Permits                   49           0              0         0            0           0          0            0        49
Construction                              23,431          81              0     2,006            0           0          0            0    25,518
Contingency                                     0          0              0          0           0           0          0            0        0
Total                                     29,466         108              0     2,201            0           0          0            0    31,774

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                  2008 Budget Schedule: 2006
                                                                              2009 Budget Schedule: 2006




Adopted 2009 Budget                                                                                                         Page 163 of 312
                                                          Regional Express
Project                                  311       Lynnwood Transit Ctr/46th Ave W

Description
Project is in service.

Changes since 2008: None
                                  Summaries

                                                                 Baseline (in $ 000)               33,683
                                               2008 Current Budget (in $ 000)                      30,314
                                               2009 Adopted budget (in $000)                       30,314




Capital Costs
Sub Area                              1997-2007       2008           2009        2010      2011         2012       2013       Future       Total
Snohomish County                          30,085             0              0       229            0           0          0                30,314
Total                                     30,085             0              0       229            0           0          0                30,314


Capital Cost Elements
Cost Element                          1997-2007      2008           2009         2010      2011         2012       2013       Future       Total
Agency Administration                     1,466              0              0       229            0           0          0         0        1,695
Pre-Engineering/Env Review                1,713              0              0         0            0           0          0         0        1,713
Final Design and Specification            2,457              0              0          0           0           0          0            0     2,457
ROW Acquisition and Permits              11,539              0              0          0           0           0          0            0    11,539
Construction                             12,910              0              0          0           0           0          0            0    12,910
Contingency                                    0             0              0          0           0           0          0            0        0
Total                                    30,085              0              0       229            0           0          0            0    30,314

Risk Assessment :
 Status: In Service

  Estimate Type:          Final                                             Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                    2008 Budget Schedule: 2004
                                                                                2009 Budget Schedule: 2004




Adopted 2009 Budget                                                                                                           Page 164 of 312
                                                           Regional Express
Project                                   312       Mountlake Terrace Freeway Station/236th SW

Description
Scope: The Mountlake Terrace Freeway Station project is an in-line station in the I-5 median near 236th Street SW with a pedestrian
connection to the Mountlake Terrace Park-and-Ride. Due to a half-diamond interchange, Sound Transit Express does not stop at the
Mountlake Terrace Park-and-Ride Lot. The in-line station will enable Sound Transit Express, operating in the I-5 corridor, to serve
Mountlake Terrace and the park-and-ride lot.

Changes since 2008: Project budget is being increased by $15.3M to reflect the 100% construction cost estimate. The funding includes a
$1M CMAQ grant, $3.9M transfer from the Snohomish County program reserve and $10.4M in available financial capacity in Snohomish
County.
                                 Summaries

                                                                Baseline (in $ 000)              40,869
                                                2008 Current Budget (in $ 000)                   25,545
                                                2009 Adopted budget (in $000)                    40,869




Capital Costs
Sub Area                              1997-2007        2008         2009       2010     2011          2012       2013       Future       Total
Snohomish County                           4,660        1,932       10,292     22,659    1,301            16            8                40,869
Total                                       4,660       1,932       10,292     22,659     1,301            16           8                40,869


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010     2011          2012       2013       Future       Total
Agency Administration                        281         131          550       1,196       59               1          0         0        2,218
Pre-Engineering/Env Review                 2,402           6            0         177        0               0          0         0        2,585
Final Design and Specification             1,975       1,100           604        124            0           0          0            0     3,802
ROW Acquisition and Permits                     3         29            49         19        29             0           0            0       129
Construction                                    0        667         9,089     17,446     1,213            15           8            0    28,438
Contingency                                     0          0             0      3,698            0           0          0            0     3,698
Total                                      4,660        1,932       10,292     22,659     1,301            16           8            0    40,869

Risk Assessment :
 Status: Final Design

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                 2008 Budget Schedule: 2010
                                                                             2009 Budget Schedule: 2010




Adopted 2009 Budget                                                                                                         Page 165 of 312
                                                           Regional Express
Project                                   316       N Everett Transit Center/Everett Comm College

Description
Project is in service.

Changes since 2008: Transferred $57K in project savings to the Snohomish County program reserve, this was reduced from $58K in the
proposed budget by amendment.
                                 Summaries

                                                                Baseline (in $ 000)                   1,698
                                                2008 Current Budget (in $ 000)                        1,698
                                                2009 Adopted budget (in $000)                         1,641




Capital Costs
Sub Area                              1997-2007        2008         2009        2010       2011          2012       2013       Future       Total
Snohomish County                           1,163          478              0           0          0             0          0                 1,641
Total                                       1,163         478              0           0          0             0          0                 1,641


Capital Cost Elements
Cost Element                           1997-2007      2008         2009         2010       2011          2012       2013       Future       Total
Agency Administration                         70          25               0           0          0             0          0         0           95
Pre-Engineering/Env Review                    67            0              0           0          0             0          0            0         67
Final Design and Specification                  1        452               0           0          0             0          0            0        454
ROW Acquisition and Permits                1,025            0              0           0          0             0          0            0     1,025
Construction                                   0            1              0           0          0             0          0            0         1
Contingency                                     0           0              0           0          0             0          0            0          0
Total                                      1,163          478              0           0          0             0          0            0     1,641

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                           Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                   2008 Budget Schedule: 2007
                                                                               2009 Budget Schedule: 2007




Adopted 2009 Budget                                                                                                            Page 166 of 312
                                                           Regional Express
Project                                   319       S Everett Freeway Station/112th SE

Description
Scope: In service.

Changes since 2008: None
                                 Summaries

                                                                Baseline (in $ 000)              31,209
                                                2008 Current Budget (in $ 000)                   31,209
                                                2009 Adopted budget (in $000)                    31,209




Capital Costs
Sub Area                              1997-2007        2008         2009       2010       2011        2012       2013       Future       Total
Snohomish County                          20,903        6,652          171      3,358         40          48         38                  31,209
Total                                     20,903        6,652          171      3,358        40            48       38                   31,209


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010       2011        2012       2013       Future       Total
Agency Administration                      1,194         642           12             4          2           2          2         0        1,858
Pre-Engineering/Env Review                 2,863           0            0             0          0           0          0         0        2,863
Final Design and Specification             2,328            1            0            0          0           0          0            0     2,328
ROW Acquisition and Permits                   28            0            0          0         0             0         0              0        28
Construction                              14,490        6,010          160      1,502        38            45        36              0    22,281
Contingency                                     0           0            0      1,851            0           0          0            0     1,851
Total                                     20,903        6,652          171      3,358        40            48        38              0    31,209

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                 2008 Budget Schedule: 2008
                                                                             2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                         Page 167 of 312
                                                           Regional Express
Project                                   321       Federal Way Transit Center/S 317th

Description
Project is in service.

Changes since 2008: None
                                 Summaries

                                                                 Baseline (in $ 000)               39,455
                                                2008 Current Budget (in $ 000)                     39,455
                                                2009 Adopted budget (in $000)                      39,455




Capital Costs
Sub Area                              1997-2007        2008          2009       2010        2011        2012       2013       Future       Total
South King County                         38,028           22           604        800             0           0          0                39,455
Total                                     38,028             22         604        800             0           0          0                39,455


Capital Cost Elements
Cost Element                           1997-2007      2008          2009        2010        2011        2012       2013       Future       Total
Agency Administration                      2,370             2          42          57             0           0          0         0        2,470
Pre-Engineering/Env Review                 1,553             0           0           0             0           0          0         0        1,553
Final Design and Specification             1,701             0            0            99          0           0          0            0        1,800
ROW Acquisition and Permits                6,543            0            59         66             0           0          0            0        6,668
Construction                              25,861           20           503        578             0           0          0            0       26,963
Contingency                                     0            0            0            0           0           0          0            0           0
Total                                     38,028           22           604        800             0           0          0            0       39,455

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                           Schedule Risk level:        LOW

      Budget Risk Level: MEDIUM                                               2008 Budget Schedule: 2006

          Right of Way Costs                                                  2009 Budget Schedule: 2006
          Scope Escalation/Change
          Design and Environmental regulations                    Comment
                                                                        The budget risk is due to final construction costs resulting from an
          Unexpected Finding During Engineering
                                                                        unresolved contractor claim.
          Limited Budget Basis
          Shared Project funding
          Utilities Relocation    Project Location
          Coordination




Adopted 2009 Budget                                                                                                           Page 168 of 312
                                                           Regional Express
Project                                  323        Bellevue Rider Services Bldg

Description
Project is in service.

Changes since 2008: Transferred $741K in project savings to the East King County program reserve, this was reduced from $743K in the
proposed budget by amendment.
                                  Summaries

                                                                  Baseline (in $ 000)                   3,501
                                                2008 Current Budget (in $ 000)                          3,501
                                               2009 Adopted budget (in $000)                            2,760




Capital Costs
Sub Area                              1997-2007        2008           2009        2010       2011          2012       2013       Future     Total
East King County                           2,759              1              0           0          0             0          0         0     2,760
Total                                      2,759              1              0           0          0             0          0         0      2,760


Capital Cost Elements
Cost Element                          1997-2007       2008           2009         2010       2011          2012       2013       Future      Total
Agency Administration                       168               0              0           0          0             0          0         0        168
Pre-Engineering/Env Review                      0             0              0           0          0             0          0         0             0
Final Design and Specification                583             0              0           0          0             0          0         0           583
ROW Acquisition and Permits                  94               1              0           0          0             0          0         0          94
Construction                              1,915               0              0           0          0             0          0         0       1,915
Contingency                                     0             0              0           0          0             0          0         0             0
Total                                     2,759               1              0           0          0             0          0         0       2,760

Risk Assessment :
 Status: In Service

  Estimate Type:          Final                                              Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                     2008 Budget Schedule: 2006
                                                                                 2009 Budget Schedule: 2006




Adopted 2009 Budget                                                                                                              Page 169 of 312
                                                          Regional Express
Project                                   324       Canyon Park Freeway Station

Description
Project is in service.

Changes since 2008: Transferred $200K in project savings to the East King County program reserve.
                                 Summaries

                                                               Baseline (in $ 000)                  9,132
                                                2008 Current Budget (in $ 000)                  10,728
                                                2009 Adopted budget (in $000)                   10,528




Capital Costs
Sub Area                              1997-2007        2008        2009       2010       2011          2012       2013       Future       Total
East King County                           9,500          177         273        577            0             0          0                10,528
Total                                       9,500         177         273        577            0             0          0                10,528


Capital Cost Elements
Cost Element                           1997-2007      2008        2009        2010       2011          2012       2013       Future       Total
Agency Administration                        791          29          16          34            0             0          0         0         870
Pre-Engineering/Env Review                   950           0           0           0            0             0          0         0         950
Final Design and Specification             1,127           0            0            0          0             0          0            0     1,127
ROW Acquisition and Permits                   11           0            0          0            0             0          0            0        11
Construction                               6,621         148          257        544            0             0          0            0     7,570
Contingency                                     0          0            0            0          0             0          0            0        0
Total                                      9,500         177          273        577            0             0          0            0    10,528

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                         Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                2008 Budget Schedule: 2007
                                                                            2009 Budget Schedule: 2007




Adopted 2009 Budget                                                                                                          Page 170 of 312
                                                           Regional Express
Project                                   326       Issaquah Transit Center/SR900

Description
Scope: In service.

Changes since 2008: None
                                 Summaries

                                                                Baseline (in $ 000)               29,482
                                                2008 Current Budget (in $ 000)                    29,482
                                                2009 Adopted budget (in $000)                     29,482




Capital Costs
Sub Area                              1997-2007        2008         2009        2010       2011        2012       2013       Future       Total
East King County                          22,081        6,313           63         961         41          18            5                29,482
Total                                     22,081        6,313             63       961        41            18           5                29,482


Capital Cost Elements
Cost Element                           1997-2007      2008         2009         2010       2011        2012       2013       Future       Total
Agency Administration                      1,395         389              5         30            4           2          0         0        1,826
Pre-Engineering/Env Review                   848           0              0          0            0           0          0         0          848
Final Design and Specification             1,881         111              0           51          0           0          0            0     2,043
ROW Acquisition and Permits                  929         117             0          68         0             0           0            0     1,113
Construction                              17,028       5,696            57         584        38            17           5            0    23,424
Contingency                                     0          0              0        228            0           0          0            0        228
Total                                     22,081        6,313           63         961        41            18           5            0    29,482

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                           Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                   2008 Budget Schedule: 2008
                                                                               2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                          Page 171 of 312
                                                           Regional Express
Project                                   328       Totem Lake Transit Center/Evergreen Medical Center

Description
Project is in service. Final payment will be made to Evergreen Medical Center in 2009.

Changes since 2008: Transferred $580K in project savings to the East King County program reserve.
                                 Summaries

                                                                Baseline (in $ 000)               13,243
                                                2008 Current Budget (in $ 000)                        7,743
                                                2009 Adopted budget (in $000)                         7,163




Capital Costs
Sub Area                              1997-2007        2008         2009       2010        2011          2012       2013       Future       Total
East King County                             844          437        3,080      2,802             0             0          0                 7,163
Total                                        844          437        3,080      2,802             0             0          0                 7,163


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010        2011          2012       2013       Future       Total
Agency Administration                         71          23          149         158             0             0          0         0         401
Pre-Engineering/Env Review                   495           0            0           0             0             0          0         0         495
Final Design and Specification               133            0            0            33          0             0          0            0        166
ROW Acquisition and Permits                   76           2           367         83             0             0          0            0       528
Construction                                  69         413         2,463      1,598             0             0          0            0     4,542
Contingency                                     0           0          101        930             0             0          0            0     1,031
Total                                        844         437         3,080      2,802             0             0          0            0     7,163

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:         LOW

      Budget Risk Level: LOW                                                 2008 Budget Schedule: 2008
                                                                             2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                            Page 172 of 312
                                                           Regional Express
Project                                   330       Newcastle Transit Center/SE 70th

Description
Scope: This project includes transit improvements along the Newcastle Way Corridor at the intersection with Coal Creek Parkway to
provide improved intersection channelization to enhance transit speed and reliability, coupled with pedestrian access/safety, shelters, and
new signalization. The project will improve customer access to King County Metro (KCM) transit services. The project definition changed
from a four bay on-street transit center on S.E. 70th Street/132nd Place S.E. to providing transit improvements along the Newcastle Way
Corridor at Coal Creek Parkway reducing the project cost. The City of Newcastle is the lead agency for design and construction of this
$4M capped contribution project funded by Sound Transit.

Changes since 2008: Transferred project savings of $2.8M to the East King County Program Reserves.
                                 Summaries

                                                                Baseline (in $ 000)                     0
                                                2008 Current Budget (in $ 000)                       7,223
                                                2009 Adopted budget (in $000)                        4,428




Capital Costs
Sub Area                              1997-2007        2008         2009       2010       2011          2012       2013       Future       Total
East King County                             455          515        2,021      1,437            0             0          0                 4,428
Total                                        455          515        2,021      1,437            0             0          0                 4,428


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010       2011          2012       2013       Future       Total
Agency Administration                         38          27          102          78            0             0          0         0         245
Pre-Engineering/Env Review                   412          84            0           0            0             0          0         0         496
Final Design and Specification                  5        404             0            0          0             0          0            0        410
ROW Acquisition and Permits                     0           0            0          0            0             0          0            0         0
Construction                                    0           0        1,919      1,358            0             0          0            0     3,277
Contingency                                     0           0            0            0          0             0          0            0          0
Total                                        455          515        2,021      1,437            0             0          0            0     4,428

Risk Assessment :
 Status: Final Design

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                 2008 Budget Schedule: 2009
                                                                             2009 Budget Schedule: 2010




Adopted 2009 Budget                                                                                                           Page 173 of 312
                                                           Regional Express
Project                                   354       Mercer Island Park-And-Ride/N Mercer Way

Description
Project is in service.

Changes since 2008: None
                                 Summaries

                                                               Baseline (in $ 000)              14,302
                                                2008 Current Budget (in $ 000)                  16,829
                                                2009 Adopted budget (in $000)                   16,829




Capital Costs
Sub Area                              1997-2007        2008        2009       2010       2011        2012       2013       Future       Total
East King County                          15,350          458         509        512            0           0          0                16,829
Total                                     15,350          458         509        512            0           0          0                16,829


Capital Cost Elements
Cost Element                           1997-2007      2008        2009        2010       2011        2012       2013       Future       Total
Agency Administration                        876          64          17             0          0           0          0         0          957
Pre-Engineering/Env Review                 1,423           0           0             0          0           0          0         0        1,423
Final Design and Specification               661           0            0            2          0           0          0            0        663
ROW Acquisition and Permits                  212           1            0         49            0           0          0            0       261
Construction                              12,179         393            0        462            0           0          0            0    13,034
Contingency                                     0          0          492            0          0           0          0            0        492
Total                                     15,350         458          509        512            0           0          0            0    16,829

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                         Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                2008 Budget Schedule: 2008
                                                                            2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                        Page 174 of 312
                                                          Regional Express
Project                                  355       Issaquah Highlands Park-And-Ride/Highland Dr

Description
Project is in service.

Changes since 2008: Transferred $750K in project savings to the East King County program reserve, this was reduced from $751K in the
proposed budget by amendment..
                                  Summaries

                                                                 Baseline (in $ 000)                   5,312
                                               2008 Current Budget (in $ 000)                          8,116
                                               2009 Adopted budget (in $000)                           7,366




Capital Costs
Sub Area                              1997-2007       2008           2009        2010      2011           2012       2013       Future       Total
East King County                           7,179             2              0       185            0             0          0                 7,366
Total                                      7,179             2              0       185            0             0          0                 7,366


Capital Cost Elements
Cost Element                          1997-2007      2008           2009         2010      2011           2012       2013       Future       Total
Agency Administration                       216              1              0       185            0             0          0         0         402
Pre-Engineering/Env Review                     0             0              0          0           0             0          0            0        0
Final Design and Specification                 0             0              0          0           0             0          0            0        0
ROW Acquisition and Permits                   0              0              0          0           0             0          0            0         0
Construction                              6,963              1              0          0           0             0          0            0     6,963
Contingency                                    0             0              0          0           0             0          0            0        0
Total                                     7,179              2              0       185            0             0          0            0     7,366

Risk Assessment :
 Status: In Service

  Estimate Type:          Final                                             Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                    2008 Budget Schedule: 2006
                                                                                2009 Budget Schedule: 2006




Adopted 2009 Budget                                                                                                             Page 175 of 312
                                                          Regional Express
Project                                   372       Bothell Branch Campus Access

Description
Project is in service.

Changes since 2008: Transferred $1.6M in project savings to the East King County program reserve.
                                 Summaries

                                                               Baseline (in $ 000)                  3,860
                                                2008 Current Budget (in $ 000)                      3,860
                                                2009 Adopted budget (in $000)                       2,281




Capital Costs
Sub Area                              1997-2007        2008        2009       2010       2011          2012       2013       Future     Total
East King County                           1,238          866         177            0          0             0          0         0     2,281
Total                                       1,238         866         177            0          0             0          0         0      2,281


Capital Cost Elements
Cost Element                           1997-2007      2008        2009        2010       2011          2012       2013       Future      Total
Agency Administration                         78         527             9           0          0             0          0         0        614
Pre-Engineering/Env Review                   211          40             0           0          0             0          0         0        250
Final Design and Specification               285          32             0           0          0             0          0         0           317
ROW Acquisition and Permits                    3           0            0            0          0             0          0         0           3
Construction                                 660         267          168            0          0             0          0         0       1,095
Contingency                                     0          0             0           0          0             0          0         0             0
Total                                      1,238         866          177            0          0             0          0         0       2,281

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                         Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                 2008 Budget Schedule: 2008
                                                                             2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                          Page 176 of 312
                                                          Regional Express
Project                                   374       Redmond Transit Center/NE 83rd

Description
The transit center is completed and in service in 2008. Pending board action to approve a change in the project scope project savings of
$800K from the transit center will be used to supplement the Redmond Transit Garage project that King County Metro is building.

Changes since 2008: Transferred $265K in project savings to the East King County program reserve.
                                 Summaries

                                                               Baseline (in $ 000)                   6,931
                                                2008 Current Budget (in $ 000)                       6,931
                                                2009 Adopted budget (in $000)                        6,666




Capital Costs
Sub Area                              1997-2007        2008        2009        2010      2011           2012       2013       Future       Total
East King County                           5,044          727             0       895            0             0          0                 6,666
Total                                       5,044         727             0       895            0             0          0                 6,666


Capital Cost Elements
Cost Element                           1997-2007      2008        2009         2010      2011           2012       2013       Future       Total
Agency Administration                        237          27              0        95            0             0          0         0         359
Pre-Engineering/Env Review                   299           0              0          0           0             0          0            0        299
Final Design and Specification             1,004           0              0          0           0             0          0            0     1,004
ROW Acquisition and Permits                    0           0              0         0            0             0          0            0         0
Construction                               3,504         701              0       800            0             0          0            0     5,004
Contingency                                     0          0              0          0           0             0          0            0          0
Total                                      5,044         727              0       895            0             0          0            0     6,666

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                  2008 Budget Schedule: 2008
                                                                              2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                           Page 177 of 312
                                                          Regional Express
Project                                  376        Woodinville Arterial HOV/SR202/SR522

Description
Project is in service.

Changes since 2008: Transferred $12K in project savings to the East King County program reserve.
                                  Summaries

                                                                  Baseline (in $ 000)                      0
                                                2008 Current Budget (in $ 000)                          1,424
                                               2009 Adopted budget (in $000)                            1,411




Capital Costs
Sub Area                              1997-2007        2008           2009        2010       2011          2012       2013       Future       Total
East King County                           1,410              0              0           1          0             0          0                 1,411
Total                                      1,410              0              0           1          0             0          0                 1,411


Capital Cost Elements
Cost Element                          1997-2007       2008           2009         2010       2011          2012       2013       Future       Total
Agency Administration                        89               0              0           1          0             0          0         0           90
Pre-Engineering/Env Review                  590               0              0           0          0             0          0         0         590
Final Design and Specification                 33             0              0           0          0             0          0            0        33
ROW Acquisition and Permits                    72             0              0           0          0             0          0            0         72
Construction                                  627             0              0           0          0             0          0            0        627
Contingency                                     0             0              0           0          0             0          0            0         0
Total                                     1,410               0              0           1          0             0          0            0     1,411

Risk Assessment :
 Status: In Service

  Estimate Type:          Final                                              Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                     2008 Budget Schedule: 2006
                                                                                 2009 Budget Schedule: 2006




Adopted 2009 Budget                                                                                                              Page 178 of 312
                                                          Regional Express
Project                                  380        Sammamish Park-And-Ride/228th SE

Description
This project is in service. Ownership transfers of the SE Pine Lake Road extension and the P&R to the City of Sammamish and KCM
were completed in 2008 so the project can be closed out.

Changes since 2008: Transferred $93K in project savings to the East King County program reserve, this was reduced from $145K prior to
Board adoption.
                                  Summaries

                                                                 Baseline (in $ 000)                   7,764
                                                2008 Current Budget (in $ 000)                         7,179
                                               2009 Adopted budget (in $000)                           7,086




Capital Costs
Sub Area                              1997-2007       2008           2009        2010       2011          2012       2013       Future       Total
East King County                           6,925          14                0       147            0             0          0                 7,086
Total                                      6,925             14             0       147            0             0          0                 7,086


Capital Cost Elements
Cost Element                          1997-2007       2008          2009         2010       2011          2012       2013       Future       Total
Agency Administration                       318              0              0        94            0             0          0         0         412
Pre-Engineering/Env Review                    216            0              0          0           0             0          0            0        216
Final Design and Specification              527              0              0          0           0             0          0            0       527
ROW Acquisition and Permits               2,890              1              0          1           0             0          0            0     2,893
Construction                              2,975           13                0          2           0             0          0            0     2,989
Contingency                                     0            0              0          50          0             0          0            0         50
Total                                     6,925           14                0       147            0             0          0            0     7,086

Risk Assessment :
 Status: In Service

  Estimate Type:          Final                                             Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                    2008 Budget Schedule: 2006
                                                                                2009 Budget Schedule: 2006




Adopted 2009 Budget                                                                                                             Page 179 of 312
                                                           Regional Express
Project                                   382       I-90 Two-Way Transit & HOV Operations, Stage 1

Description
Scope: In service. Budget includes 3 years of plant establishment per agreement with WSDOT.

Changes Since 2008: None
                                 Summaries

                                                                Baseline (in $ 000)              25,782
                                                2008 Current Budget (in $ 000)                   25,782
                                                2009 Adopted budget (in $000)                    25,782




Capital Costs
Sub Area                              1997-2007        2008         2009       2010     2011          2012       2013       Future       Total
East King County                          10,706        7,277          125      7,627       26            15            6                25,782
Total                                     10,706        7,277          125      7,627       26             15           6                25,782


Capital Cost Elements
Cost Element                           1997-2007      2008         2009        2010     2011          2012       2013       Future       Total
Agency Administration                        640         410              7       424            2           1          0         0        1,485
Pre-Engineering/Env Review                 1,595           -3             0         3            0           0          0         0        1,595
Final Design and Specification             3,823       -1,226             0     1,124            0           0          0            0     3,721
ROW Acquisition and Permits                   57           0             0          8        0              0           0            0        66
Construction                               4,589       8,096           118      4,955       24             14           5            0    17,802
Contingency                                     0           0             0     1,113            0           0          0            0     1,113
Total                                     10,706        7,277          125      7,627       26             15           6            0    25,782

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:       LOW

      Budget Risk Level: LOW                                                  2008 Budget Schedule: 2008
                                                                              2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                         Page 180 of 312
                                                          Regional Express
Project                                   384       SR522 HOV Enhancements/Kenmore

Description
Scope: HOV improvements on SR-522 between Kenmore and Bothell to improve bus speed and reliability. The HOV improvements for
the Kenmore segment will be located within the Kenmore city limits along SR-522 between 73rd Avenue and 83rd Avenue. Projects
include widening SR-522 for the addition of north and south BAT lanes, replacement of the Swamp Creek Bridge, improvements to 80th
Avenue, sidewalks, retaining wall from 80th to the end of the project, new signals at 80th, 83rd and Kenmore Lanes, utility
undergrounding, urban amenities and illumination. The City of Kenmore is the lead for preliminary engineering and environmental
documentation (PE/ED), final design, ROW acquisition and construction. Project improvements will be jointly funded by the City of
Kenmore, King County Metro (KCM), and Sound Transit. Sound Transit funding for final design, ROW acquisition, construction and
construction management of transit elements is capped at $7,918,000.

Changes since 2008: None.
                                 Summaries

                                                               Baseline (in $ 000)                   8,791
                                                2008 Current Budget (in $ 000)                       8,791
                                                2009 Adopted budget (in $000)                        8,791




Capital Costs
Sub Area                              1997-2007       2008         2009        2010       2011          2012       2013       Future     Total
East King County                           5,262       3,510           19             0          0             0          0         0     8,791
Total                                       5,262      3,510             19           0          0             0          0         0      8,791


Capital Cost Elements
Cost Element                           1997-2007      2008        2009         2010       2011          2012       2013       Future      Total
Agency Administration                        291         182             0            0          0             0          0         0        474
Pre-Engineering/Env Review                   416         -36             0            0          0             0          0         0           380
Final Design and Specification               829          0              0            0          0             0          0         0           829
ROW Acquisition and Permits                  730          0              0            0          0             0          0         0           730
Construction                               2,996       3,363           19             0          0             0          0         0       6,378
Contingency                                     0         0              0            0          0             0          0         0             0
Total                                      5,262       3,510           19             0          0             0          0         0       8,791

Risk Assessment :
 Status: In Service

  Estimate Type:          Baseline Cost Estimate                          Schedule Risk level:        LOW

      Budget Risk Level: LOW                                                  2008 Budget Schedule: 2008
                                                                              2009 Budget Schedule: 2008




Adopted 2009 Budget                                                                                                           Page 181 of 312
                                                          Regional Express
Project                                   385       SR522 HOV Enhancements/Bothell

Description
Scope: HOV improvements on SR-522 between Kenmore and Bothell to improve bus speed and reliability. The HOV improvements for
the Bothell segment will be located within the City of Bothell along SR 522 near 96th Avenue (Wayne Curve). The scope of the project will
include construction of a north transit queue bypass lane, south transit lane/right turn lane, signal improvements (including Transit Signal
Priority), additional left turn lane, sidewalks, 96th Avenue improvements, north retaining wall, south retaining wall, urban amenities and
illumination. The City of Bothell will be the lead agency for preliminary engineering and environmental documentation (PE/ED), final design
and construction. Project improvements will be jointly funded by the City of Bothell, King County Metro (KCM), and Sound Transit. Sound
Transit's funding for final design, ROW acquisition, construction and construction management of the transit elements is capped at
$7,736,000.

Changes since 2008: None
                                 Summaries

                                                               Baseline (in $ 000)                   8,572
                                                2008 Current Budget (in $ 000)                       8,601
                                                2009 Adopted budget (in $000)                        8,601




Capital Costs
Sub Area                              1997-2007       2008         2009       2010        2011          2012       2013       Future       Total
East King County                           2,033         879        1,786      3,903             0             0          0                 8,601
Total                                       2,033        879        1,786      3,903             0             0          0                 8,601


Capital Cost Elements
Cost Element                           1997-2007      2008        2009        2010        2011          2012       2013       Future       Total
Agency Administration                         81          41         105         234             0             0          0         0         462
Pre-Engineering/Env Review                   308          36            0            0           0             0          0            0        344
Final Design and Specification               673           0            0            0           0             0          0            0       673
ROW Acquisition and Permits                  971         802            0            0           0             0          0            0     1,772
Construction                                    0          0        1,669      3,625             0             0          0            0     5,293
Contingency                                     0          0           12            44          0             0          0            0         56
Total                                      2,033         879        1,786      3,903             0             0          0            0     8,601

Risk Assessment :
 Status: Final Design

  Estimate Type:          Baseline Cost Estimate                         Schedule Risk level:         HIGH

      Budget Risk Level: LOW                                                2008 Budget Schedule: 2009
                                                                            2009 Budget Schedule: 2010

                                                               Comment
                                                               This project has been delayed while the City of Bothell finishes the
                                                               Right of Way acquisition.




Adopted 2009 Budget                                                                                                           Page 182 of 312
                                                           Regional Express
Project                                   386       I-90 Two-Way Transit & HOV Operations, Stage 2

Description
Scope: Stage 2 of the I-90 Two-way Transit and HOV Operations project will provide reliable two-way transit and HOV operations
eastbound on I-90 between 80th Avenue Southeast on Mercer Island and Bellevue Way. A new HOV lane will be added on eastbound
outer roadway and the existing ramps at 80th Avenue Southeast on Mercer Island and Bellevue Way and I-405 will be modified. In
addition, the existing eastbound I-90 to I-405 auxiliary lane will be extended west to East Mercer Way. The current reversible operations in
the center roadway, with both lanes operating in the same direction, will remain. Stage 2 is being cost shared between Sound Transit and
the Washington State Department of Transportation. Resolution of scope issues and funding shares, and construction cost escalation
due to schedule uncertainty may require funding from the East King County Program Reserve for ST's share of the project.

Changes Since 2008: None
                                 Summaries

                                                                Baseline (in $ 000)                    0
                                                2008 Current Budget (in $ 000)                    19,372
                                                2009 Adopted budget (in $000)                     19,372




Capital Costs
Sub Area                               1997-2007       2008         2009        2010      2011         2012      2013     Future       Total
East King County                            2,602         574           19       2,339       752        4,262     6,373                19,372
Total                                       2,602         574             19     2,339      752         4,262     6,373                19,372


Capital Cost Elements
Cost Element                           1997-2007      2008         2009         2010      2011         2012      2013     Future       Total
Agency Administration                        177          44              1         95        45          253       379       146        1,139
Pre-Engineering/Env Review                 1,750          97              0           0           0          0        0            0     1,847
Final Design and Specification               676         432            18       2,112            0          0        0            0     3,237
ROW Acquisition and Permits                    0           0             0         132            8          0        0            0       140
Construction                                    0           0             0           0     700         4,008     5,994            0    10,702
Contingency                                     0           0             0           0           0          0        0      2,305       2,305
Total                                      2,602         574            19       2,339      752         4,262     6,373      2,451      19,372

Risk Assessment :
 Status: Final Design

  Estimate Type:          Conceptual                                       Schedule Risk level:       HIGH

      Budget Risk Level: HIGH                                                  2008 Budget Schedule: 2010

          Right of Way Costs                                                   2009 Budget Schedule: 2013
          Scope Escalation/Change
          Design and Environmental regulations                  Comment
                                                                High budget and schedule risk due to the need for state
          Unexpected Finding During Engineering
                                                                appropriation for WSDOT's portion of the shared construction costs,
          Limited Budget Basis                                  currently shown as 2017 to be moved forward. Sound Transit has
          Shared Project funding                                requested legislative action in 2009 session to move funds forward.
          Utilities Relocation    Project Location
          Coordination




Adopted 2009 Budget                                                                                                       Page 183 of 312
                                                           Regional Express
Project                                   387       I-90 Two-Way Transit & H0V Operations, Stage 3

Description
Scope: Stage 3 of the I-90 Two-way Transit and HOV Operations project will provide reliable two-way transit and HOV operations
eastbound and westbound I-90 between 80th Avenue Southeast on Mercer Island and Rainier Avenue / I-5 in Seattle. This stage will also
include the installation of screening on the shared-use pathway on the I-90 floating bridge. The current reversible operations in the center
roadway, with both lanes operating in the same direction, will remain.

Changes Since 2008: Project budget has been increased by $62.5M, $24M will be transferred from the East King County program reserve
and $38.5M in available financial capacity in East King County.
                                 Summaries

                                                                  Baseline (in $ 000)                     0
                                                2008 Current Budget (in $ 000)                         1,722
                                                2009 Adopted budget (in $000)                      64,222




Capital Costs
Sub Area                               1997-2007       2008           2009       2010       2011          2012      2013      Future       Total
East King County                            1,720             0          446      4,835      9,969         8,547     3,600                 64,222
Total                                       1,720             0          446      4,835      9,969         8,547     3,600                 64,222


Capital Cost Elements
Cost Element                           1997-2007      2008            2009       2010       2011          2012      2013      Future       Total
Agency Administration                        125              0           23        252        519           445       187      1,827        3,378
Pre-Engineering/Env Review                 1,595              0           38        312        150             0         0          0        2,095
Final Design and Specification                  0             0          385      4,271      9,125         8,052     1,167             0    23,000
ROW Acquisition and Permits                     0             0            0            0      175             50        0             0       225
Construction                                    0             0            0            0          0           0         0          0            0
Contingency                                     0             0            0            0          0           0     2,246     33,279       35,525
Total                                      1,720              0          446      4,835      9,969         8,547     3,600     35,106       64,222

Risk Assessment :
 Status: PE/ED

  Estimate Type:          Conceptual                                        Schedule Risk level:        HIGH

      Budget Risk Level: HIGH                                                  2008 Budget Schedule: TBD

          Right of Way Costs                                                   2009 Budget Schedule: TBD
          Scope Escalation/Change
          Design and Environmental regulations                    Comment
                                                                  This stage is currently funded through completion of final design with
          Unexpected Finding During Engineering
                                                                  some construction funding. Full funding will require funding from
          Limited Budget Basis                                    WSDOTcurrently showing in 2017 be advanced and additional
          Shared Project funding                                  Sound Transit funds included in ST2.
          Utilities Relocation    Project Location
                                                                  .
          Coordination




Adopted 2009 Budget                                                                                                          Page 184 of 312
                                                        Regional Express
Project                                 999       Regional Express Program Reserve

Description
Changes since 2008: Snohomish Country program reserves had draws for Lynnwood HOV of $13K and Mountlake Terrace Freeway
Station of $3.9M and savings of $57K from North Everett Transit Center deposited. South King County program reserve increased to
reflect moving budget from Star Lake Freeway Station - $1M. East King County's current program reserve of $18.7M increased by $14.1M
to reflect savings from multiple projects and there is a draw for I-90 Two-Way Transit & HOV, Stage 3 of $24M. Renton HOV Access/N
8th is at budget risk and that may require future draws on East King County reserves. Based on current needs future draws are
estimated to require the remaining funds in the program reserve.
                                 Summaries

                                                                Baseline (in $ 000)                     0
                                              2008 Current Budget (in $ 000)                     22,621
                                              2009 Adopted budget (in $000)                          9,755




Capital Costs
Sub Area                             1997-2007       2008           2009       2010       2011          2012       2013       Future       Total
South King County                             0             0              0    1,016            0             0          0                 1,016
East King County                              0             0              0          0          0       8,739            0         0       8,739
Pierce County                                 0             0              0          0          0             0          0                        0
Total                                         0             0              0    1,016            0       8,739            0         0       9,755


Capital Cost Elements
Cost Element                         1997-2007      2008           2009        2010       2011          2012       2013       Future       Total
Agency Administration                        0              0              0          0          0             0          0         0              0
Pre-Engineering/Env Review                    0             0              0          0          0             0          0            0           0
Final Design and Specification                0             0              0          0          0             0          0            0           0
ROW Acquisition and Permits                   0             0              0          0          0             0          0            0           0
Construction                                  0             0              0          0          0             0          0            0           0
Contingency                                   0             0              0    1,016            0       8,739            0            0     9,755
Total                                         0             0              0    1,016            0       8,739            0            0     9,755




Adopted 2009 Budget                                                                                                           Page 185 of 312
                      This page intentionally left blank




Adopted 2009 Budget                                        Page 186 of 312
                              AGENCY OPERATIONS



                      Adopted FY 2009 Agency Operations
                                              (YOE $000)
                                                                    $125,386
                                                                     Net Staff Operating Budget
                                                                     $22,660 (18.1%)
                                                                     STart
                                                                     $1,418 (1.1%)
                                                                     Research & Technology
                                                                     $2,100 (1.7%)
                                                                     Transit Oriented Development
                                                                     $265 (0.2%)
                                                                     Capital Replacement
                                                                     $24,690 (19.7%)
                                                                     Administrative Capital
                                                                     $1,243 (1%)
                                                                     Net Non-Operating Expenses
                                                                     $15,959 (12.7%)
                                                                     Debt Service
                                                                     $57,051 (45.5%)



    PROGRAM OVERVIEW
    Agency Operations consolidates the activities of the agency that support the project and service
    delivery activities, manage board-approved initiatives and programs and cover agency-wide costs
    not associated with an individual project or modal service. The major program areas include net
    staff operations, capital replacement, Research & Technology and debt service.
    The Adopted 2009 Budget for Agency Operations is $125.4 million, $42.0 million for operational
    expenses and $83.3 million for capital.


    Staff Operations
    As we look forward to 2009 and beyond, Sound Transit continues to mature as an organization.
    Areas that will require additional staff focus in 2009 include the start-up of Central Link
    operations, the roll-out of the ORCA smartcard system to customers of seven transit agencies in
    the region as well as the ramping up of construction for University Link.
    In addition, two areas where cost and management efficiencies have been identified are related to
    ticket vending machine (TVM) maintenance, and facilities maintenance. As Central Link begins
    operation, these two programs will be reaching a level of activity that supports bringing these
    functions in-house. This will result in increased operational efficiencies and more predictable
    cost control over the current business model of contracting these functions with outside vendors.
    The board’s budget policy vests authority to add, move or delete positions to the CEO while
    maintaining authority over agency staff expenditures through its authorization of budget amount.
    Since the 2008 budget was adopted, 10 FTE’s have been added to the staffing plan that was
    included in the 2008 budget. These positions are funded for 2008 within board-authorized
    budgetary levels.


Adopted 2009 Budget                                                                         Page 187 of 312
                                         Agency Operations
                                     Adopted 2009 Budget Summary

                                                                      2009
                                         2009 Operating              Capital
                                            Budget                   Budget               Total
       Net Staff Operations              $ 22,659,561            $          -         $  22,659,561
       STart                                   202,083              1,216,225             1,418,308
       Research & Technology                   100,000              2,000,000             2,100,000
       Transit Oriented Development            265,000                      -               265,000
       Capital Replacement                                         24,689,540            24,689,540
       Administrative Capital                          -            1,243,000             1,243,000
       Net Non-Operating Expenses             15,959,434                    -            15,959,434
       Debt Service                            2,852,570           54,198,834            57,051,404
          Total                           $   42,038,648         $ 83,347,599         $ 125,386,247



    Sound Transit employs both corporate staff which administers its programs and services, and
    operations staff that are directly involved in transit operations. The organizational chart (page 12)
    identifies the functions that are performed within each department. For example, the Executive
    Department includes executive management, diversity, rail activation as well as safety, security
    and quality assurance functions. The agency maintains a long-term staffing plan (currently
    through 2016) that allows agency management to confirm that staffing levels fall within the
    agency’s financial resources.
    The costs for employees and associated expenses dedicated to the operation of Link light rail, ST
    Express bus, Accessible Services, Sounder commuter rail, and TVM maintenance, are listed
    under Transit Operations Budget Summary in the Service Delivery section of this document. The
    staffing plan to support these functions includes 36 FTE’s; an increase of 10 FTE’s over the 2008
    Budget.
    The costs for corporate employees and associated expenses are captured within the agency’s staff
    budgets, which are detailed in the agency’s eight departments later in this section of the Adopted
    2009 Budget. These costs include salaries and benefits for all agency non-operational employees,
    services, materials and supplies, utilities, insurance, depreciation, leases and rentals and other
    miscellaneous expenses. In addition, this section presents performance scorecards for each
    department for 2009.
    The total Adopted Staff Operating Budget for 2009 of $65.4 million represents a $4.7 million
    (7.7 percent) increase to the Adopted 2008 Budget.
    The staffing plan for corporate positions includes an increase of 13 FTE’s over current levels.
    The corporate staffing plan will add positions to support the Smartcard system, an enhanced
    facilities maintenance function, the conversion of two temporary helpdesk positions in IT to
    permanent staff, additional support for University Link construction, agency-wide training
    support and administrative/customer support in Transportation Services.
    In addition, the corporate staff budget includes funding to support agency wide initiatives related
    to environmental sustainability, management of the agency’s assets, document management and
    staff training.




Adopted 2009 Budget                                                                            Page 188 of 312
                      ST Staff Operating Budget Change Summary
                                                 Adopted         Adopted             $             %
    Category                                   2008 Budget     2009 Budget        Change         Change
      Salaries & Benefits                    $     41,482,333 $ 44,306,909 $       2,824,576        6.81%
      Services                                      9,317,998     10,126,645         808,647        8.68%
      Materials & Supplies                          1,244,911      1,221,791         (23,120)      -1.86%
      Miscellaneous Expenses                        2,926,441      3,041,862         115,421        3.94%
      Leases & Rentals                              1,947,850      1,969,700          21,850        1.12%
      Other Expenses                                1,666,810      2,427,760         760,950       45.65%
      Depreciation                                  2,125,308      2,294,073         168,765        7.94%
    Total Staff Operating Budget                   60,711,651     65,388,739       4,677,088        7.70%
     Allocation to Capital                        (31,067,260)   (28,957,104)      2,110,156       -6.79%
     Allocation to Transit Services                (7,283,281)   (11,478,001)     (4,194,720)      57.59%
     Depreciation                                  (2,125,308)    (2,294,073)       (168,765)       7.94%
    Net Staff Operating Budget                     20,235,802     22,659,561       2,423,759       11.98%




                                      ST Staffing Plan Summary
                                                   Adopted        Current         Adopted       Change to
    Department                                   2008 Budget    Staffing Plan   2009 Budget      Current
    Corporate Staff
     Executive                                          31.00          31.00          31.00            -
      Finance & Information Technology                  73.00          75.00          78.00           3.00
      Legal                                             18.00          19.00          19.00            -
      Link                                             102.00         102.00         104.00           2.00
      Capital Projects                                  30.25          28.00          26.00          (2.00)
      Corporate Services                                55.25          56.75          58.25           1.50
      Transportation Services                           30.60          38.60          47.10           8.50
      Policy, Planning, and Public Affairs              31.25          31.50          31.50            -
    Total Corporate Staff                              371.35         381.85         394.85          13.00

    Operations Staff
     Accessible Services                                 2.33           2.00           2.00            -
     ST Express Bus Operations                           2.33           2.00           2.00            -
      Sounder Commuter Rail Operations                   4.33           4.00           4.00            -
      Tacoma Link Light Rail Operations                 17.00          18.00          19.00           1.00
      Central Link Light Rail Operations                  -              -             1.50           1.50
      Ticket Vending Machines                             -              -             7.50           7.50
    Total Operations Staff                              26.00          26.00          36.00          10.00

    Total Sound Transit Staff                          397.35         407.85         430.85          23.00




Adopted 2009 Budget                                                                               Page 189 of 312
             Sound Transit Staff Operating Budget Summary
                                            2007         2008         2008         2009
  Description                              Actuals
                                                        Budget       Actuals      Adopted

Salaries & Benefits
       Salaries                            22,013,080   26,775,434   23,350,187    27,888,195
       Benefits                            11,677,728   14,706,899   12,801,689    16,418,715
            Subtotal                       33,690,808   41,482,333   36,151,876    44,306,909
Services
       Consultant/Management                2,635,012    3,575,150    2,849,011     4,154,338
       Legal                                  120,222      275,000      189,939       237,500
       Accounting/Auditing                    462,116      450,500      385,058       455,500
       Maintenance                            468,138      522,300      329,773       442,000
       Printing/Binding                       439,218      637,750      465,482       630,061
       Advertising/Marketing                  358,681      395,750      371,672       480,500
       Interlocal Agreements                  681,205      722,000      721,598       743,500
       Other Services                       1,589,060    1,341,365    1,631,596     1,675,488
       Software And Hardware Maintenance    1,078,496    1,395,183    1,084,805     1,307,758
             Subtotal                       7,832,147    9,314,998    8,028,933    10,126,645
Materials And Supplies
       Office Supplies                        305,596      314,435      292,437       325,295
       Postage                                 43,706      137,726       28,643       102,411
       Small Equipment/Furniture              666,376      504,150      419,204       406,435
       Other Materials & Supplies             239,810      291,600      274,229       387,650
            Subtotal                        1,255,488    1,247,911    1,014,513     1,221,791
Miscellaneous Expenses
       Dues & Memberships                     291,456      331,883      265,165       343,666
       Travel & Meetings                      329,302      449,595      311,378       413,670
       Books & Subscriptions                  139,474      141,200       99,389       128,700
       Training                               142,667      359,518      187,235       224,105
       Other Misc. Expenses                 2,144,627    1,444,245    2,113,788     1,453,188
       Contingency                                  0      200,000       12,502       478,533
            Subtotal                        3,047,525    2,926,441    2,989,458     3,041,862
Leases and Rentals
       Admin Facilities Rental              1,627,017    1,659,000    1,623,123     1,682,187
       Leased Vehicles/Parking                168,353      180,400      291,726       185,000
       Meeting Space                               88       30,550        3,111        21,013
       Leased Furniture & Equip                80,590       77,900      117,958        81,500
           Subtotal                         1,876,047    1,947,850    2,035,917     1,969,700
Other Expenses
       Utilities                              436,950      635,560      494,266       649,010
       Insurance                              950,616    1,000,000    1,240,636     1,750,000
       Taxes                                    1,418        5,750        3,073         3,250
       Interest Expense                        25,012       25,500       15,742        25,500
       Depreciation                         2,128,916    2,125,308    1,870,325     2,294,073
              Subtotal                      3,542,913    3,792,118    3,624,043     4,721,833

    TOTAL STAFF OPERATIONS                 51,244,930   60,711,651   53,844,740    65,388,739




Adopted 2009 Budget                                                               Page 190 of 312
      Sound Transit Staff Operating Change Summary
                                           2008          2009            $            %
  Description                             Adopted       Adopted       Change        Change

  Salaries & Benefits
      Salaries                             26,775,434    27,888,195    1,112,761         4.16%
      Benefits                             14,706,899    16,418,715    1,711,816        11.64%
           Subtotal                        41,482,333    44,306,909    2,824,577         6.81%

  Services
      Consultant/Management                 3,575,150     4,154,338     579,188         16.20%
      Legal                                   275,000       237,500     -37,500        -13.64%
      Accounting/Auditing                    450,500       455,500        5,000          1.11%
      Maintenance                            522,300       442,000       -80,300       -15.37%
      Printing/Binding                       637,750       630,061       -7,689         -1.21%
      Advertising/Marketing                  395,750       480,500       84,750         21.42%
      Interlocal Agreements                  722,000       743,500       21,500          2.98%
      Other Services                        1,341,365     1,675,488     334,123         24.91%
      Software And Hardware Maintenance     1,395,183     1,307,758     -87,425         -6.27%
           Subtotal                         9,314,998    10,126,645     811,647          8.71%

  Materials And Supplies
      Office Supplies                        314,435       325,295        10,860         3.45%
      Postage                                137,726       102,411       -35,315       -25.64%
      Small Equipment/Furniture              504,150       406,435       -97,715       -19.38%
      Other Materials & Supplies              291,600       387,650       96,050        32.94%
           Subtotal                         1,247,911     1,221,791      -26,120        -2.09%

  Miscellaneous Expenses
      Dues & Memberships                     331,883       343,666        11,783          3.55%
      Travel & Meetings                      449,595       413,670       -35,925         -7.99%
      Books & Subscriptions                  141,200       128,700       -12,500         -8.85%
      Training                               359,518       224,105      -135,413       -37.67%
      Other Misc. Expenses                  1,444,245     1,453,188       8,943          0.62%
      Contingency                             200,000       478,533     278,533        139.27%
           Subtotal                         2,926,441     3,041,862     115,420          3.94%

  Leases and Rentals
      Admin Facilities Rental               1,659,000     1,682,187      23,187          1.40%
      Leased Vehicles/Parking                180,400       185,000        4,600          2.55%
      Meeting Space                            30,550       21,013        -9,538       -31.22%
      Leased Furniture & Equip                 77,900        81,500       3,600          4.62%
           Subtotal                         1,947,850     1,969,700      21,850          1.12%

  Other Expenses
      Utilities                               635,560       649,010      13,450          2.12%
      Insurance                             1,000,000     1,750,000     750,000         75.00%
      Taxes                                     5,750         3,250       -2,500       -43.48%
      Interest Expense                         25,500        25,500           0          0.00%
      Depreciation                          2,125,308     2,294,073     168,765          7.94%
           Subtotal                         3,792,118     4,721,833     929,715         24.52%

  TOTAL STAFF OPERATIONS                   60,711,651    65,388,739    4,677,088         7.70%




Adopted 2009 Budget                                                                Page 191 of 312
    S0UND TRANSIT AGENCY REVIEW (STAR)

    In 2005, Sound Transit initiated work on updating its performance reporting through development
    of a performance management system based on the ‘balanced scorecard’ approach developed by
    Robert Kaplan of the Harvard Business School. Development of this reporting system included
    updating the agency vision and mission statements, establishment of five key results areas,
    identification of a goal statement for each key result area, implementing department initiatives to
    achieve desired outcomes, and selection of performance measures for department initiatives.
    A Transit Performance Management Roundtable was held in October 2005 where Sound Transit
    exchanged performance management ideas with executives from BART (Bay Area Rapid
    Transit), DART (Dallas Area Rapid Transit), Orange County Transit Authority (OCTA), Utah
    Transit Authority (UTA), and Valley Transit Authority (VTA). After studying the performance
    measurement and reporting systems of 11 transit agencies, a new performance reporting system
    was developed for Sound Transit based on knowledge gained from those peer comparisons. The
    performance system called Sound Transit Agency Review (STAR) includes goals and objectives
    statements for five key results areas or Themes which consists of Project Delivery, Service
    Delivery, System Expansion, Stewardship, and Organizational Vibrancy. A goal statement for
    each Theme is published and each department is responsible for translating those goals into
    specific initiatives with defined performance measures. This integrated system provides a basis
    for evaluating the accomplishments of our departments towards the overall agency goals.
    The Agency’s vision statement is:


                      “Easy connections…
                            to more places...
                                     for more people.”


    Sound Transit’s mission statement is:


              “Sound Transit plans, builds, and operates regional transit systems and
             services to improve mobility for the Central Puget Sound”.
    These goals, initiatives, and measures are summarized below on individual scorecards for each
    department to provide a concise basis for evaluation of our performance. As the STAR
    performance management system is implemented, this set of scorecards will evolve as Sound
    Transit gains experience through quarterly internal reporting on these measures. The scorecards
    are presented below, first as an overall agency scorecard and then as departmental scorecards that
    support the overall agency vision and mission. This project continues to be refined as staff is
    focused on improving the performance metrics and the data to measure and report.




Adopted 2009 Budget                                                                          Page 192 of 312
                                                                       2009 AGENCY SCORECARD
                      Mission Statement:                                                        Vision:
                            Sound Transit plans, builds and operates regional                            Easy connections ….
                            transit systems and services to improve mobility for the                           to more places ….
                            Central Puget Sound.                                                                       for more people.




Adopted 2009 Budget
                                 THEME                  GOAL STATEMENT                                       PERFORMANCE MEASURES

                                                Build quality projects on time and       Ensure all Title VI/DBE meet Federal grant applications and are updated
                               PROJECT          within budget                            and within compliance according to 49 CFR part 26.
                               DELIVERY                                                  Lost time, accidents, and injuries are below national average.
                                                                                         95% of projects completed within the baseline budget.
                                                                                         95% of projects completed within the baseline schedule.


                                                Provide quality service to our           Safety and security incidents decline by 10%.
                                                customers and co-workers                 Maintain annual customer satisfaction rating equal to 3.5 (on a 4 –point
                               SERVICE
                                                                                         scale) or higher.
                               DELIVERY
                                                                                         Annual system wide ridership growth of 4.3%.
                                                                                         100% of internal customer service measures met.


                               SYSTEM           Implement the long range transit         Performance measures will be developed after November 2008.
                              EXPANSION         system vision and plan

                                                Manage public resources in a             Limit on-going expense growth to equal inflation over a 10 year average.
                                                manner that demonstrates                 100% of agency physical assets maintained to insure useful service life.
                           STEWARDSHIP OF
                                                accountability, environmental            95% transit operating efficiency and effectiveness measures met.
                             RESOURCES
                                                responsibility, fiscal responsibility,   100% of Environmental Sustainability Management System targets met.
                                                and delivers on commitments


                                                Foster an atmosphere of                  100% of employees have a professional development plan that includes
                                                inclusiveness where talented and         opportunities for career development.
                           ORGANIZATIONAL
                                                dedicated people want to work            80% of employees receiving at least 16 hours of training/professional
                              VIBRANCY
                                                toward our common mission                development per year.
                                                                                         100% of performance reviews are completed within 30 days of anniversary.




Page 193 of 312
                      EXECUTIVE DEPARTMENT




Adopted 2009 Budget                          Page 194 of 312
 Executive Staff Operating Budget

                                                            2007                  2008                2008                  2009
  Description                                              Actuals               Budget              Actuals               Adopted

   Salaries & Benefits
        Salaries                                             1,435,548             2,413,253             1,952,762            2,485,908
        Benefits                                               687,123             1,283,436             1,025,473            1,340,236
             Subtotal                                        2,122,671             3,696,689            2,978,235             3,826,144

   Services
        Consultant/Management                                  144,854               499,300               256,810              550,161
        Accounting/Auditing                                      2,028
        Printing/Binding                                         2,286                26,300                 9,697               34,800
        Advertising/Marketing                                         0                1,000                      0                3,500
        Other Services                                         109,716               199,485               166,929              308,398
        Software And Hardware Maintenance                             0                     0                  294
             Subtotal                                          258,884               726,085              433,730               896,858

   Materials And Supplies
        Office Supplies                                          4,871                 9,510                 9,685               11,470
        Postage                                                  1,564                12,450                      6                7,900
        Small Equipment/Furniture                                3,869                20,200                26,862               28,500
        Other Materials & Supplies                              60,289                55,150                54,683               66,000
             Subtotal                                           70,592                97,310                91,237              113,870

   Miscellaneous Expenses
        Dues & Memberships                                      42,311                30,020                 3,008               46,150
        Travel & Meetings                                       63,475                76,406                66,784               70,406
        Books & Subscriptions                                    7,086                17,950                 4,832               13,250
        Training                                                 9,038                25,125                15,207               31,100
        Other Misc. Expenses                                    13,271                27,300                30,617               51,000
        Contingency                                                   0              200,000                12,502              477,533
             Subtotal                                          135,181               376,801              132,950               689,439

   Leases and Rentals
        Meeting Space                                                 0               16,000                 2,456                 8,000
        Leased Furniture & Equip                                 4,226                 7,900                 2,309                 1,500
             Subtotal                                             4,226               23,900                 4,765                 9,500

   Other Expenses
        Utilities                                                9,805                 9,650                32,674               16,600
        Taxes                                                                               0                    23
             Subtotal                                             9,805                9,650                32,697               16,600

  TOTAL STAFF OPERATIONS                                    2,601,358              4,930,435            3,673,614             5,552,411

  *** Due to reorganization, historical expenditures and forecasts will vary from previously published budget documents. Agency wide
  summaries include all figures




Adopted 2009 Budget                                                                                                        Page 195 of 312
                                                2009 EXECUTIVE DEPARTMENT SCORECARD




Adopted 2009 Budget
                       THEME        GOAL STATEMENT                           DEPARTMENT INITIATIVES                          PERFORMANCE MEASURES

                                                               1.   Ensure all Title VI/DBE meet Federal grant          DBE/Title VI program submittals are
                                                                    applications and are updated and within             provided in a timely manner and are
                                                                    compliance according to CFR 49 Part 26.             approved by FTA.
                      PROJECT                                  2.   Develop a strong safety and security culture.       Comprehensive safety and security plans
                      DELIVERY    Build projects on time and                                                            for ST facilities, operations, construction,
                                         within budget                                                                  and real estate.
                                                               3.   Provide an atmosphere where staff, consultants,     Consistent trends of lost time accidents and
                                                                    and contractors deliver on taxpayer expectations.   injuries below national averages.


                                                               1.   Provide oversight and guidance on safety and        Consistent operations safety recordables
                                                                    security initiatives.                               below national averages.
                                                               2.   Perform audits to assess performance.               85% of QA audit findings replied to within
                                                                                                                        60 days.
                                                                                                                        Low rate of security incidents.
                      SERVICE
                                  Provide quality service to   3.   Emergency preparedness plans consistent with        Emergency management plan accepted by
                      DELIVERY
                                       our customers                transit industry.                                   Department of Homeland Security and the
                                                                                                                        FTA
                                                               4.   Execute all key Rail Activation activities within   100% of all key Rail Activation activities are
                                                                    project scope, schedule, and budget.                complete within scope, budget by the
                                                                                                                        Passenger Service Date.


                       SYSTEM      Create integrated plans
                                                               1.   Provide leadership on development of a transit      Performance measures will be developed
                      EXPANSION     for future expansion
                                                                    vision for the region.                              after November 2008.




Page 196 of 312
                                                       2009 EXECUTIVE DEPARTMENT SCORECARD




Adopted 2009 Budget
                          THEME           GOAL STATEMENT                            DEPARTMENT INITIATIVES                            PERFORMANCE MEASURES

                                                                       1.   Develop a small business program to maximize          Small business program implemented and
                                                                            small business participation.                         operational.
                                                                       2.   Effectively manage Safety Certification Plans to      100% of safety certification items resolved
                                                                            assure that safety critical tasks are completed so    before opening.
                                         Manage resources in a
                                                                            projects can open on-time.
                                       manner that demonstrates
                      STEWARDSHIP OF                                   3.   Provide Citizen Oversight Panel (COP) support in      Staff support provided to COP in meetings.
                                       public accountability, fiscal
                        RESOURCES                                           its role to monitor and provide feedback on Sound
                                       responsibility, and delivers
                                                                            Transit’s performance to the Board.
                                            on commitments
                                                                       4.   Provide internal support to the Diversity Oversight   Staff support provided to Diversity
                                                                            Committee in its role to monitor and provide          Oversight Committee in a timely and
                                                                            feedback on Sound Transit’s performance to the        proactive manner.
                                                                            CEO and Board.


                                                                       1.   Ensure professional development through               100% of employees have a professional
                                        Foster an atmosphere of             training, growth opportunities, and challenging       development plan that includes
                      ORGANIZATIONAL       inclusiveness where              work.                                                 opportunities for career development.
                         VIBRANCY        talented and dedicated        2.   Manage, recognize, measure, and compensate            80% of employees receiving at least 16
                                           people want to work              performance that focuses on the mission, goals,       hours of training/professional development
                                           toward our common                and initiatives.                                      per year.
                                                  mission              3.   Build and develop valued teams with ownership         100% of performance reviews are
                                                                            for overall agency goals.                             completed within 30 days of anniversary.




Page 197 of 312
               FINANCE AND INFORMATION TECHNOLOGY




Adopted 2009 Budget                           Page 198 of 312
 Finance and Information Technology Staff Operating Budget

                                                            2007                  2008                2008                  2009
  Description                                              Actuals               Budget              Actuals               Adopted

   Salaries & Benefits
        Salaries                                             3,705,564             4,877,196             4,329,105            5,044,979
        Benefits                                             2,000,839             2,759,593             2,417,918            3,091,100
             Subtotal                                        5,706,403             7,636,789            6,747,022             8,136,079

   Services
        Consultant/Management                                  883,308             1,028,500             1,324,013            1,369,500
        Legal                                                    2,327                15,000                68,949
        Accounting/Auditing                                    460,088               450,000               385,058              455,000
        Printing/Binding                                        21,155                37,900                24,232               40,900
        Advertising/Marketing                                                               0                  507                     800
        Interlocal Agreements                                  476,144               500,000               526,443              525,000
        Other Services                                         806,154               284,675               420,378              372,500
        Software And Hardware Maintenance                    1,078,496             1,395,183             1,084,510            1,292,158
             Subtotal                                        3,727,672             3,711,258            3,834,090             4,055,858

   Materials And Supplies
        Office Supplies                                         10,125                22,000                 9,656               17,750
        Postage                                                      19                4,350                   182                 4,300
        Small Equipment/Furniture                              545,144               366,100               251,777              224,200
        Other Materials & Supplies                              33,112                31,000                14,921               32,000
             Subtotal                                          588,400               423,450              276,537               278,250

   Miscellaneous Expenses
        Dues & Memberships                                      39,304                18,610                 5,387               20,200
        Travel & Meetings                                       51,328                76,182                57,877               49,926
        Books & Subscriptions                                   79,129                36,850                31,063               50,100
        Training                                                62,145               124,100                88,422               62,480
        Other Misc. Expenses                                     7,677                14,150                 8,431               25,500
        Contingency                                                                                                               1,000
             Subtotal                                          239,582               269,892              191,180               209,206

   Leases and Rentals
        Meeting Space                                                 0                  200                      0                    250
             Subtotal                                                 0                   200                     0                    250

   Other Expenses
        Utilities                                              146,874               285,850               194,438              282,560
        Insurance                                              954,846             1,000,000             1,245,719            1,750,000
        Interest Expense                                           325                   500                   285                     500
        Depreciation                                                                        0                2,409
             Subtotal                                        1,102,045             1,286,350            1,442,850             2,033,060

  TOTAL STAFF OPERATIONS                                   11,364,102            13,327,939            12,491,680            14,712,703

  *** Due to reorganization, historical expenditures and forecasts will vary from previously published budget documents. Agency wide
  summaries include all figures




Adopted 2009 Budget                                                                                                        Page 199 of 312
                                                                  FINANCE & INFORMATION TECHNOLOGY
                                                                           2009 SCORECARD

                           THEME         GOAL STATEMENT                  DEPARTMENT INITIATIVES                               PERFORMANCE MEASURES




Adopted 2009 Budget
                                                                  1.   Provide relevant and accurate           Reconciliation of BOE reports to Capital Outlay reports data within
                                                                       management systems and financial        10 working days of month-end.
                                                                       data.                                   Payment of all vendors within established time frames.
                                                                  2.   Maximize project funding,               100% of adopted lifetime capital budgets in the system by January
                                                                       communicate funding strategy and        31.
                                                                       results.                                Deliver approved agency projects and initiatives on budget and on
                                                                                                               schedule.
                      PROJECT DELIVERY   Build projects on time                                                Meet 95% of agency revenue forecasts.
                                          and within budget       3.   Develop and maintain risk               100% of capital projects have a communicated risk transfer, risk
                                                                       management programs for all ST          financing, insurance and risk management strategy.
                                                                       capital projects.
                                                                  4.   Maintain agency-level project control   On-time production of the Agency Progress Report (within 30 days
                                                                       systems and procedures.                 from the end of the quarter).
                                                                                                               Maintain up-to-date monthly schedule/status report for Phase Gate
                                                                                                               meetings.
                                                                                                               Successfully implement agency lessons learned program.


                                                                  1.   Provide relevant and accurate           Meet agency and special Service Level Agreement’s
                                                                       management systems and financial        measurements for core sites and corporate departments.
                                                                       and service data.                       Meet requirements of Board approved ST Technology Plan for
                                                                                                               Research & Technology.
                                            Provide quality
                      SERVICE DELIVERY                                                                         Completion of NTD reporting by April 30.
                                            service to our
                                                                                                               Timely review of proposed service changes for impacts on agency
                                              customers
                                                                                                               financial plan.
                                                                  2.   Maintain property and liability risk    100% of annual insurance renewals 30 to 60 days prior to policy
                                                                       programs.                               expiration date.
                                                                                                               Report 100% of claims to insurer within 72 hours.




Page 200 of 312
                                                                FINANCE & INFORMATION TECHNOLOGY
                                                                         2009 SCORECARD




Adopted 2009 Budget
                          THEME        GOAL STATEMENT                  DEPARTMENT INITIATIVES                                  PERFORMANCE MEASURES

                                                                1.   Review financial management                Build scalable systems to meet future requirements of ST and ST2
                                                                     structure to improve use of agency         planning.
                                        Create integrated            resources.
                         SYSTEM
                                         plans for future       2.   Define an IT architecture that             Meet agency, federal and board financial planning requirements.
                        EXPANSION
                                            expansion                matches agency planning.
                                                                3.   Develop and facilitate financial related   Establish administrative budgets for ST2.
                                                                     planning processes.                        Establish insurance budgets for ST2.


                                                                1.   Provide reporting of financial             Receipt of 100% unqualified audit opinions with no reportable
                                                                     information that meets state, federal,     conditions.
                                                                     and legal requirements.                    Drawdown eligible grant funds within 30 days of month-end report.
                                                                2.   Maintain records and insure all            100% of agency assets insured or have risk strategy (in
                                                                     agency assets.                             collaboration with LOB department managers).
                                       Manage resources in
                                                                                                                  o Agency Operations Infrastructure
                                          a manner that
                                                                                                                  o Railroad Operations – Rolling Stock
                                       demonstrates public
                      STEWARDSHIP OF                                                                              o Capital Assets (replacement cost)
                                       accountability, fiscal
                        RESOURCES                                                                                 o Real Estate Properties
                                        responsibility, and
                                                                3.   Protect and secure all FIT intellectual    Zero IT security breaches.
                                           delivers on
                                                                     assets.                                    Meet back-up and retention requirements for technology-based
                                          commitments
                                                                                                                intellectual assets.
                                                                4.   Ensure agency long-term financial          Finance plan updated by September 30 annually.
                                                                     liquidity.                                 Long Term Administrative Cost model updated by September 30
                                                                                                                annually.
                                                                                                                100% of month-end close within established time frames.




Page 201 of 312
                                                              FINANCE & INFORMATION TECHNOLOGY
                                                                       2009 SCORECARD




Adopted 2009 Budget
                          THEME        GOAL STATEMENT                DEPARTMENT INITIATIVES                                 PERFORMANCE MEASURES

                                                              1.   Ensure professional development           100% of employees have a professional development plan that
                                       Foster an atmosphere        through training, growth opportunities,   includes opportunities for career development.
                                          of inclusiveness         and challenging work.
                      ORGANIZATIONAL    where talented and    2.   Manage, recognize, measure and            80% of employees receiving at least 16 hours of
                         VIBRANCY        dedicated people          compensate performance that               training/professional development per year.
                                        want to work toward        focuses on the mission, goals, and
                                       our common mission          initiatives.
                                                              3.   Build and develop valued teams with       100% of performance reviews are completed within 30 days of
                                                                   ownership for overall agency goals.       anniversary.




Page 202 of 312
                      LEGAL SERVICES




Adopted 2009 Budget                    Page 203 of 312
 Legal Staff Operating Budget

                                                            2007                  2008                2008                  2009
  Description                                              Actuals               Budget              Actuals               Adopted

   Salaries & Benefits
        Salaries                                             1,471,253             1,626,242             1,426,422            1,674,429
        Benefits                                               746,573               835,550               736,841              939,814
             Subtotal                                        2,217,826             2,461,792            2,163,263             2,614,243

   Services
        Consultant/Management                                  106,813                88,550                85,524              257,732
        Legal                                                  117,896               260,000               114,490              237,500
        Printing/Binding                                           344                   450                   346                     583
        Advertising/Marketing                                         0                  300                      0                      0
        Other Services                                           5,523                10,800                75,458               70,790
             Subtotal                                          230,576               360,100              275,818               566,605

   Materials And Supplies
        Office Supplies                                          3,389                 3,400                 2,724                 3,350
        Postage                                                       9                    46                    25                    48
        Small Equipment/Furniture                                5,852                 4,150                 5,406                 5,385
        Other Materials & Supplies                               1,440                 1,800                 3,171                4,750
             Subtotal                                           10,690                 9,396                11,325               13,533

   Miscellaneous Expenses
        Dues & Memberships                                       6,506                 6,735                 5,936                 7,154
        Travel & Meetings                                        8,553                11,200                10,040                 9,751
        Books & Subscriptions                                   23,035                21,600                22,870               22,579
        Training                                                 7,023                12,615                12,470                 9,650
        Other Misc. Expenses                                       835                     45                  577                  475
             Subtotal                                           45,952                52,195                51,893               49,609

   Leases and Rentals
        Meeting Space                                                 0                  500                      0                    713
             Subtotal                                                 0                   500                     0                    713

   Other Expenses
        Utilities                                                5,531                 5,640                 4,934                 1,700
             Subtotal                                             5,531                5,640                 4,934                 1,700

  TOTAL STAFF OPERATIONS                                    2,510,575              2,889,623            2,507,233             3,246,401

  *** Due to reorganization, historical expenditures and forecasts will vary from previously published budget documents. Agency wide
  summaries include all figures




Adopted 2009 Budget                                                                                                        Page 204 of 312
                                                                          LEGAL 2009 SCORECARD

                          THEME        GOAL STATEMENT                  DEPARTMENT INITIATIVES                                 PERFORMANCE MEASURES




Adopted 2009 Budget
                                                                 1.   Provide timely legal advice to avoid       90% of requests for legal services completed by date agreed
                         PROJECT
                                       Build projects on time         project delays.                            by attorney and client.
                         DELIVERY
                                       and within budget         2.   Ensure that environmental documents        100% of appeals successfully defended when legal advice
                                                                      comply with environmental                  followed.
                                                                      requirements.

                                                                 1.   Provide prompt, thorough review of         No errors in legal analysis.
                                                                      legal issues identified.
                                                                 2.   Keep clients informed about major or       100% of law/regulatory changes that affect clients’ activities
                                                                      recurring legal issues.                    communicated to clients at least 30 days before effective
                                                                                                                 date through education and training sessions or documents
                         SERVICE                                                                                 on recurring legal issues provided.
                                       Provide quality service
                         DELIVERY                                3. Survey clients to assess attorney’s
                                       to our customers
                                                                    performance on defined client service
                                                                    measures such as the effectiveness           80% or higher positive rating on client survey-delivery of
                                                                    of attorney/client communications,           legal services.
                                                                    effort to understand and achieve
                                                                    client’s objectiveness, timeliness of
                                                                    work, etc.


                                       Create integrated         1.   Timely identification and resolution of    100% of legal issues identified that impact ability to
                         SYSTEM                                       legal issues that could affect plans for   implement approval of phase 2 system expansion.
                                       plans for future
                        EXPANSION                                     future expansion
                                       expansion


                                       Manage resources in       1.   Provide mechanism to capture               Maintain monthly report tracking legal memoranda, briefs,
                                       a manner that                  significant work product and research.     and legal instruments archived in library database.
                                       demonstrates public       2.   Ensure compliance with public              100% of public disclosure requests responded to on time.
                      STEWARDSHIP OF
                                       accountability, fiscal         disclosure laws.
                        RESOURCES
                                       responsibility, and       3.   Minimize energy use in the office.         All energy consuming devices such as computers, office
                                       delivers on                                                               lights, desk lamps are turned off at end of day unless
                                       commitments                                                               otherwise directed by IT.




Page 205 of 312
                                                                        LEGAL 2009 SCORECARD

                          THEME        GOAL STATEMENT                 DEPARTMENT INITIATIVES                            PERFORMANCE MEASURES




Adopted 2009 Budget
                                                               1. Ensure professional development           100% of employees have a professional development plan
                                                                  through training, growth opportunities,   that includes opportunities for career development.
                                       Foster an atmosphere       and challenging work.
                      ORGANIZATIONAL   of inclusiveness        2. Manage, recognize, measure and            80% of employees receiving at least 16 hours of
                         VIBRANCY      where talented and         compensate performance that focuses       training/professional development per year.
                                       dedicated people want      on the mission, goals and initiatives.
                                       to work toward our      3. Build and develop valued teams with       100% of performance reviews are completed within 30 days
                                       common mission             ownership for overall agency goals.       of anniversary.




Page 206 of 312
                      LINK LIGHT RAIL




Adopted 2009 Budget                     Page 207 of 312
 Link Light Rail Staff Operating Budget

                                                            2007                  2008                2008                  2009
  Description                                              Actuals               Budget              Actuals               Adopted

   Salaries & Benefits
        Salaries                                             6,730,497             7,832,662             7,078,800            7,955,618
        Benefits                                             3,482,223             4,189,107             3,791,939            4,597,872
             Subtotal                                       10,212,720           12,021,769            10,870,740            12,553,490

   Services
        Consultant/Management                                   13,120                46,500                      0              40,000
        Accounting/Auditing                                           0                  500                      0                    500
        Maintenance                                                   0               25,600                      0              25,000
        Printing/Binding                                         3,377                11,700                 3,498               10,650
        Advertising/Marketing                                         0                  100                      0
        Other Services                                          45,943                94,230                18,066               81,600
        Software And Hardware Maintenance                                                                                        15,600
             Subtotal                                           62,440               178,630                21,565              173,350

   Materials And Supplies
        Office Supplies                                         36,051                50,500                30,460               48,000
        Postage                                                    112                 1,830                     52                1,600
        Small Equipment/Furniture                               48,573                54,900                 9,619               67,150
        Other Materials & Supplies                              11,342                29,600                11,985               56,500
             Subtotal                                           96,078               136,830                52,117              173,250

   Miscellaneous Expenses
        Dues & Memberships                                       7,990                29,791                25,824               17,369
        Travel & Meetings                                       69,029               149,470                65,955              131,875
        Books & Subscriptions                                   11,295                17,300                13,002               17,500
        Training                                                23,319                75,313                21,643               35,550
        Other Misc. Expenses                                    24,296                26,300                 2,233               18,800
             Subtotal                                          135,929               298,174              128,657               221,094

   Leases and Rentals
        Admin Facilities Rental                                                        4,000                      0                4,000
        Meeting Space                                                88                9,750                   655                7,950
             Subtotal                                                88               13,750                   655               11,950

   Other Expenses
        Utilities                                               44,406                59,700                52,248               66,000
             Subtotal                                           44,406                59,700                52,248               66,000

  TOTAL STAFF OPERATIONS                                   10,551,662            12,708,853            11,125,981            13,199,134

  *** Due to reorganization, historical expenditures and forecasts will vary from previously published budget documents. Agency wide
  summaries include all figures




Adopted 2009 Budget                                                                                                        Page 208 of 312
                                                                     LINK LIGHT RAIL 2009 SCORECARD

                          THEME                 GOAL                           DEPARTMENT INITIATIVES                                 PERFORMANCE MEASURES

                                                                    1. Construct projects per approved plans and           All open Non-Conformance Reports (NCR’s) associated




Adopted 2009 Budget
                                                                       specifications.                                     with a project should be closed within 90 days of being
                                                                                                                           initiated. Report quarterly and annually.
                                                                    2. Achieve forecasted expenditure levels.              Project expenditures incurred to-date should be at least
                                                                                                                           90% of the cumulative annual project budget.
                         PROJECT                                    3. Maintain project float throughout the life of the   All projects must maintain positive schedule float
                         DELIVERY                                      project.                                            throughout the life of the project. Report quarterly and
                                       Build quality projects on                                                           annually.
                                       time and within budget       4. Construct projects in a safe and efficient          The Recordable Injury Rate (RIR) should be less than
                                                                       manner.                                             the national average for each project. Report quarterly
                                                                                                                           and annually.
                                                                    5. Manage project contingency over the life of the     Contingency Index: A measure of work progress relative
                                                                       project.                                            to contingency drawdown, computed as a ratio of %
                                                                                                                           construction complete to % contingency expended
                                                                                                                           should be 1.0 or more. Report quarterly on the
                                                                                                                           cumulative project to date.

                                       Provide quality service to
                         SERVICE                                    Design and build a reliable, customer friendly light   After the opening of the Link system, survey users to
                                        our customers and co-
                         DELIVERY                                   rail system.                                           determine satisfaction.
                                               workers
                         SYSTEM        Create integrated plans      Participate with other ST departments and transit      Performance measures will be developed after
                        EXPANSION       for future expansion        organizations in the development of the ST2 plan.      November 2008.
                                       Manage public resources
                                            in a manner that        1. Provide timely information about Link projects      Produce each monthly report by end of following month.
                                              demonstrates             to all interested stakeholders.
                                             accountability,        2. Provide project staff at the levels required to     Actual Link staff/consultant hours expended within 95%
                      STEWARDSHIP OF
                                             environmental             complete the projects on time and within            of planned hours. Report quarterly and annually.
                        RESOURCES
                                          responsibility, fiscal       budget.
                                           responsibility, and
                                       delivers on commitments

                                                                    1. Ensure professional development through             100% of employees have a professional development
                                       Foster an atmosphere of         training, growth opportunities, and challenging     plan that includes opportunities for career development.
                                          inclusiveness where          work.
                      ORGANIZATIONAL
                                        talented and dedicated      2. Manage, recognize, measure and compensate           80% of employees receiving at least 16 hours of




Page 209 of 312
                         VIBRANCY
                                          people want to work          performance that focuses on the mission, goals      training/professional development per year.
                                          toward our common            and initiatives.
                                                 mission            3. Build and develop valued teams with ownership       100% of performance reviews are completed within 30
                                                                       for overall agency goals.                           days of anniversary.
                      CAPITAL PROJECTS




Adopted 2009 Budget                      Page 210 of 312
 Capital Projects Staff Operating Budget

                                                            2007                  2008                2008                  2009
  Description                                              Actuals               Budget              Actuals               Adopted

   Salaries & Benefits
        Salaries                                             1,871,379             1,965,602             1,591,728            1,846,449
        Benefits                                             1,022,280             1,093,541               886,954            1,091,565
             Subtotal                                        2,893,660             3,059,143            2,478,683             2,938,014

   Services
        Consultant/Management                                   65,762                95,000                33,659              168,743
        Printing/Binding                                           405                 3,000                 1,385                 2,059
        Advertising/Marketing                                         0                4,500                      0                4,000
        Other Services                                          59,441                59,250                30,950               53,150
             Subtotal                                          125,608               161,750                65,994              227,952

   Materials And Supplies
        Office Supplies                                          2,758                10,000                 1,437               10,000
        Postage                                                    175                   650                   180                     200
        Small Equipment/Furniture                                4,390                 1,500                 4,718
        Other Materials & Supplies                                    0                2,000                 5,809                3,500
             Subtotal                                             7,323               14,150                12,144               13,700

   Miscellaneous Expenses
        Dues & Memberships                                       2,801                 3,150                 2,519                 3,150
        Travel & Meetings                                       13,187                26,236                 7,601               23,382
        Books & Subscriptions                                      230                 2,000                   449                 2,000
        Training                                                14,280                15,650                 8,878               12,600
        Other Misc. Expenses                                                                0                1,040
             Subtotal                                           30,497                47,036                20,487               41,132

   Leases and Rentals
        Meeting Space                                                 0                2,000                      0                2,000
             Subtotal                                                 0                2,000                      0                2,000

   Other Expenses
        Utilities                                                6,255                 9,000                 3,867                 7,000
             Subtotal                                             6,255                9,000                 3,867                 7,000

  TOTAL STAFF OPERATIONS                                    3,063,343              3,293,079            2,581,175             3,229,798

  *** Due to reorganization, historical expenditures and forecasts will vary from previously published budget documents. Agency wide
  summaries include all figures




Adopted 2009 Budget                                                                                                        Page 211 of 312
                                                       CAPITAL PROJECTS 2009 SCORECARD
                           THEME             GOAL STATEMENT                      DEPARTMENT INITIATIVES                    PERFORMANCE MEASURES

                                                                          Manage design and construction process to      85% annual expenditures of program




Adopted 2009 Budget
                                                                          deliver projects within baseline budget and    forecast.
                      PROJECT DELIVERY   Build quality projects on time
                                                                          schedule.                                      95% of projects completed during the
                                               and within budget
                                                                                                                         annual performance period within
                                                                                                                         baseline schedule and budget.


                                                                          In coordination with Transportation Services   Employ Transition to Operations
                      SERVICE DELIVERY   Provide quality service to our   Division, develop and implement formal         checklist and exception memoranda for
                                                  customers               Transition to Operations procedures            all projects moving from construction to
                                                                                                                         service.


                                                                          Identify and manage resources to provide       Maintain staffing levels to meet project
                                          Create integrated plans for     technical expertise for long range planning    lifecycle staffing requirements and
                      SYSTEM EXPANSION
                                              future expansion            and ST2 plan development.                      Adopted Budget.



                                                                          1. Effectively manage department               Ensure Staff operating budget is not
                                                                             financial resources.                        over-spent.
                                            Manage resources in a                                                        Performance on Project Delivery
                                          manner that demonstrates                                                       Measures.
                      STEWARDSHIP OF
                                          public accountability, fiscal   2. Evaluate design standards and               Updated design standards and
                        RESOURCES
                                          responsibility, and delivers       construction specifications for             construction specifications to
                                               on commitments                environmental sustainability                incorporate as appropriate
                                                                                                                         environmental sustainable construction
                                                                                                                         materials/methods


                                                                          1.   Ensure professional development           100% of employees have a professional
                                                                               through training, growth opportunities,   development plan that includes
                                            Foster an atmosphere of            and challenging work.                     opportunities for career development.
                                         inclusiveness where talented
                      ORGANIZATIONAL                                      2.   Manage, recognize, measure, and           80% of employees receiving at least 16
                                           and dedicated people want
                         VIBRANCY                                              compensate performance that focuses       hours of training/professional
                                          to work toward our common
                                                                               on the mission, goals, and initiatives.   development per year.
                                                    mission




Page 212 of 312
                                                                          3.   Build and develop valued teams with       100% of performance reviews are
                                                                               ownership for overall agency goals.       completed within 30 days of
                                                                                                                         anniversary.
                      CORPORATE SERVICES




Adopted 2009 Budget                        Page 213 of 312
 Corporate Services Staff Operating Budget

                                                            2007                  2008                2008                  2009
  Description                                              Actuals               Budget              Actuals               Adopted

   Salaries & Benefits
        Salaries                                             2,990,276             3,336,169             2,927,296            3,496,931
        Benefits                                             1,698,684             1,983,993             1,705,264            2,181,543
             Subtotal                                        4,688,960             5,320,162            4,632,560             5,678,473

   Services
        Consultant/Management                                  242,390               411,500               161,377              492,800
        Maintenance                                              1,114                 6,000                      0                5,500
        Printing/Binding                                       327,495               412,200               390,522              408,070
        Advertising/Marketing                                  161,965               196,100               124,557              272,500
        Interlocal Agreements                                    6,135                12,000                 7,666                 8,500
        Other Services                                         246,305               390,875               311,034              433,400
             Subtotal                                          985,404             1,428,675              995,157             1,620,770

   Materials And Supplies
        Office Supplies                                        220,204               201,775               209,419              216,430
        Postage                                                 41,797                77,500                28,102               67,463
        Small Equipment/Furniture                               16,528                17,200                12,409               22,200
        Other Materials & Supplies                              29,360                57,600                 9,461               46,200
             Subtotal                                          307,890               354,075              259,392               352,293

   Miscellaneous Expenses
        Dues & Memberships                                      12,457                12,753                10,364               11,368
        Travel & Meetings                                       26,949                38,286                26,079               38,230
        Books & Subscriptions                                    5,460                35,450                17,851                 8,922
        Training                                                 7,432                29,200                26,190               21,800
        Other Misc. Expenses                                 1,073,322             1,353,650             1,312,181            1,354,913
             Subtotal                                        1,125,621             1,469,339            1,392,666             1,435,232

   Leases and Rentals
        Meeting Space                                                 0                1,500                      0                1,500
        Leased Furniture & Equip                                76,364                70,000               111,667               79,000
             Subtotal                                           76,364                71,500              111,667                80,500

   Other Expenses
        Utilities                                                9,151                10,460                12,092               11,500
        Interest Expense                                        24,687                25,000                15,457               25,000
        Depreciation                                                                        0                  652
             Subtotal                                           33,838                35,460                28,201               36,500

  TOTAL STAFF OPERATIONS                                    7,218,076              8,679,211            7,419,643             9,203,769

  *** Due to reorganization, historical expenditures and forecasts will vary from previously published budget documents. Agency wide
  summaries include all figures




Adopted 2009 Budget                                                                                                        Page 214 of 312
                                              CORPORATE COMMUNICATIONS 2009 SCORECARD




Adopted 2009 Budget
                           THEME         GOAL STATEMENT                  DEPARTMENT INITIATIVES                            PERFORMANCE MEASURES

                                                                  1.   Increase public awareness of ST          Maintain awareness of ST projects within two percentage
                                                                       projects.                                points of baseline survey results from previous years (55%
                                                                                                                Park-and-Ride lots, 55% Transit Centers and Freeway
                                                                                                                Stations and 45% HOV ramps)
                                                                                                                Hold special events for eight 2009 project delivery
                                         Build projects on time                                                 milestones.
                      PROJECT DELIVERY
                                          and within budget       2.   Integrate public art into ST projects.   Install 25 Public Art projects: 20 Link, 2 ST Express, 3
                                                                                                                Sounder.
                                                                                                                Assist in meeting STs FY 2009 6.5% DBE/small business
                                                                                                                participation goal.
                                                                                                                Respond to 800 requests for publications, videos,
                                                                                                                graphics, signage, and other printed materials.


                                                                  1.   Increase public awareness of ST          Maintain awareness of ST services and brand within 2%
                                                                       services.                                points of previous year baseline survey results.
                                                                                                                Increase ridership on lower productivity routes identified by
                                            Provide quality
                                                                                                                Transportation Services by 2-4 percent range.
                      SERVICE DELIVERY      service to our
                                                                                                                Hold special events/promotions for 13 service
                                              customers
                                                                                                                enhancement milestones.
                                                                                                                Respond to 800 requests for publications, videos,
                                                                                                                graphics, signage, and other printed materials.

                                           Create integrated
                                                                  1.   Increase public awareness of ST          Reach 85% of target audience (adults 25 – 54 within
                      SYSTEM EXPANSION      plans for future
                                                                       service expansion.                       three-county service area) with ST advertising.
                                              expansion
                                                                  1.   Prepare and disseminate information      Maintain favorability rating within 2% points of previous
                                                                       about the agency’s stewardship of        year’s survey.
                                         Manage resources in           public resources including annual        Distribute annual report to 95% identified stakeholders.
                                            a manner that              report and frequently updated web
                                         demonstrates public           site.
                      STEWARDSHIP OF
                                         accountability, fiscal   2.   Manage department budget within          Maintain department spending within Board approved
                        RESOURCES
                                          responsibility, and          95% Board approved amounts.              budgets and policies.




Page 215 of 312
                                             delivers on          3.   Meet ESMS goals through increased        Switch paper supply for copiers, printers and fax machines
                                            commitments                use of recycled paper with higher        to 100% post-consumer recycled content paper.
                                                                       levels of post-consumer content.
                                            CORPORATE COMMUNICATIONS 2009 SCORECARD




Adopted 2009 Budget
                             THEME     GOAL STATEMENT               DEPARTMENT INITIATIVES                           PERFORMANCE MEASURES

                                                              1.   Ensure professional development        100% of employees have a professional development plan
                                                                   through training, growth               that includes opportunities for career development.
                                       Foster an atmosphere        opportunities, and challenging work.
                                        where talented and    2.   Manage, recognize, measure, and        80% of employees receiving at least 16 hours of
                      ORGANIZATIONAL
                                         dedicated people          compensate performance that            training/professional development per year.
                         VIBRANCY
                                        want to work toward        focuses on the mission, goals, and
                                       our common mission          initiatives.
                                                              3.   Build and develop valued teams with    100% of performance reviews are completed within 30
                                                                   ownership for overall agency goals.    days of anniversary.




Page 216 of 312
                                                             CONTRACTS 2009 SCORECARD

                       THEME      GOAL STATEMENT                   DEPARTMENT INITIATIVES                              PERFORMANCE MEASURES




Adopted 2009 Budget
                                                            1.   Provide cost effective, timely, and      Meet each procurement milestones within established
                                                                 proper contract action to facilitate     baseline schedules.
                                                                 project goals.

                                                            2.   Implement a sound and transparent        Ensure full and open competition.
                                                                 procurement process to demonstrate       Encourage SBE participation and ensure proper contractual
                      PROJECT     Build projects on time         proper accountability of public tax      flow-down of provisions.
                      DELIVERY     and within budget             dollars.                                 Ensure regulatory compliance.
                                                                                                          Ensure best value procurement action.
                                                                                                          Complete contract closeout per State statutes.
                                                                                                          Keep stakeholders informed of current and upcoming
                                                                                                          contract actions.
                                                                                                          Enhance image within ST and with external stakeholders
                                                                                                          and public.


                                                            1.   Ensure procurement processes are         Simplify procurement policies and procedures.
                                                                 aligned with internal and external       Ensure proper quality of procured goods, services, and
                                                                 customer goals.                          construction project.
                                                                                                          Ensure timely payment to vendors and lower tier vendors.
                      SERVICE
                                  Provide quality service
                      DELIVERY                              2.   Proactively practice accountability of   Achieve measurable cost savings.
                                    to our customers
                                                                 procurement actions.                     Monitor vendor performance
                                                                                                          Use of leverage through combining requirements.
                                                                                                          Improve internal and external customer satisfaction.
                                                                                                          Demonstrate best procurement practices to assure full
                                                                                                          accountability to internal and external stakeholders.

                                                            1.   Transform department from process        Conduct periodic reviews and updates of the Procurement
                                                                 orientation to customer and business     Manual for cutting edge practices.
                                                                 orientation.                             Implement forward planning for all major and critical
                                    Create integrated
                       SYSTEM                                                                             projects.
                                     plans for future
                      EXPANSION
                                        expansion
                                                            2.   Take a leadership role in local          Participate in local contracting events to increase visibility
                                                                 business/contracting community.          and leadership.




Page 217 of 312
                                                                 CONTRACTS 2009 SCORECARD

                          THEME        GOAL STATEMENT                  DEPARTMENT INITIATIVES                               PERFORMANCE MEASURES




Adopted 2009 Budget
                                                                1.   Review and ensure that Contracts          All files established within a three-year window are accurate,
                                                                     Division hard copy records are            complete, and data is a one-for-one match in Live Link.
                                                                     maintained within State and Federal       100% of applicable contracts have a documented prevailing
                                       Manage resources in
                                                                     statute and records management            wage audit, where required.
                                          a manner that
                                                                     guidelines.
                                       demonstrates public
                      STEWARDSHIP OF                            2.   Executed contracts are held in            Zero audit findings on Agency audits.
                                       accountability, fiscal
                        RESOURCES                                    compliance with State and Federal
                                        responsibility, and
                                                                     regulations.
                                           delivers on
                                                                3.   Division practices are in compliance      100% of solicitation documents contain direction for
                                          commitments
                                                                     with and in support of ST ESMS goals      providing responses that use environmentally friendly
                                                                     and measures for procurement and          practices and materials and encourage “green” purchasing
                                                                     contracting.                              practices.


                                                                1.   Ensure professional development           100% of employees have a professional development plan
                                       Foster an atmosphere          through training, growth opportunities,   that includes opportunities for career development.
                                       of inclusiveness where        and challenging work.
                      ORGANIZATIONAL         talented and       2.   Manage, recognize, measure and            80% of employees receiving at least 16 hours of
                         VIBRANCY      dedicated people want         compensate performance that focuses       training/professional development per year.
                                         to work toward our          on the mission, goals, and initiatives.
                                           common mission       3.   Build and develop valued teams with       100% of performance reviews are completed within 30 days
                                                                     ownership for overall agency goals.       of anniversary.




Page 218 of 312
                                                            HUMAN RESOURCES 2009 SCORECARD

                       THEME      GOAL STATEMENT                   DEPARTMENT INITIATIVES                               PERFORMANCE MEASURES




Adopted 2009 Budget
                                                            1.   Provide timely, quality project            Identify a vendor for Project Management Training.
                                                                 management skill enhancement to
                                                                 facilitate project delivery goals.
                                                            2.   Implement a tracking process to            Implement a tracking process, partnering with IT, to enhance
                      PROJECT                                    ensure 70% of the employee                 the quality of tracking training agency-wide.
                                  Build projects on time
                      DELIVERY                                   population attends training.               Provide training on a monthly basis for ST employees.
                                  and within budget
                                                            3.   Provide training that supports Strategic   Identify a vendor for Strategic Thinking-Strategic
                                                                 Thinking as a core competency to           Implementation.
                                                                 support business goal achievement          Develop a process to keep stakeholders informed of current
                                                                 that is timely, relevant, and proactive.   and upcoming training.
                                                                                                            Assist in meeting Sound Transit's DBE/small business
                                                                                                            participation goal; within the vendor selection process.

                                                            1.   Ensure HR has processes and service        Review, update, and simplify policies and procedures.
                                                                 delivery practices that support            Partner with Contracts to monitor vendor performance.
                      SERVICE                                    business goal achievement.                 Improve internal and external customer satisfaction.
                                  Provide quality service
                      DELIVERY                                                                              Learn about and implement, where appropriate, HR industry
                                  to our customers
                                                            2.   Proactively practice accountability.       best practices to enhance customer satisfaction and assist
                                                                                                            the agency in meeting business goals.
                                                                                                            Develop and implement HR Training sessions on standard
                                                                                                            management practices and ST HR policy implementation.
                                                            1.   Transform department from process          Implement a process that supports workforce and skill
                                                                 orientation to customer and business       planning for all major initiatives and projects.
                                                                 orientation.
                                                            2.   Take a leadership role in the HR           Participate in local Career Fairs, HR professional
                                                                 community, locally and within APTA         organization events, university and community outreach
                                                                 and other transportation related           events to increase visibility and awareness of ST and an
                                  Create integrated              professional organizations.                employer of choice.
                       SYSTEM
                                  plans for future          3.   Increase public awareness of ST as a       Continue to implement a Diversity Recruiting Outreach effort
                      EXPANSION
                                  expansion                      “Best Place to Work.”                      via advertising and participation in events.
                                                            4.   Ensure recruiting and staffing efforts     Partner with the business to attain skill requirements and
                                                                 are in step with business needs.           develop staffing plans.
                                                                                                            Ensure time-to-fill for key positions is within or below
                                                                                                            industry standards.




Page 219 of 312
                                                                HUMAN RESOURCES 2009 SCORECARD

                          THEME        GOAL STATEMENT                  DEPARTMENT INITIATIVES                              PERFORMANCE MEASURES




Adopted 2009 Budget
                                       Manage resources in      1.   Ensure State and Federal employment       Work to attain zero audit findings on Agency audits.
                                       a manner that                 compliance.
                                       demonstrates public      2.   Ensure HR practices are in                Implement a program to review and automate HR
                      STEWARDSHIP OF
                                       accountability, fiscal        compliance with State and Federal         processes.
                        RESOURCES
                                       responsibility, and           regulations.
                                       delivers on              3.   Manage department budget.                 Maintain department spending within Board approved
                                       commitments                                                             budgets and policies.


                                                                1.   Ensure professional development           100% of employees have a professional development plan
                                       Foster an atmosphere          through training, growth opportunities,   that includes opportunities for career development.
                                       of inclusiveness where        and challenging work.
                      ORGANIZATIONAL   talented and             2.   Manage, recognize, measure, and           80% of employees receiving at least 16 hours of
                         VIBRANCY      dedicated people want         compensate performance that focuses       training/professional development per year.
                                       to work toward our            on the mission, goals, and initiatives.
                                       common mission           3.   Build and develop valued teams with       100% of performance reviews are completed within 30 days
                                                                     ownership for overall agency goals.       of anniversary.




Page 220 of 312
                      TRANSPORTATION SERVICES




Adopted 2009 Budget                             Page 221 of 312
 Transportation Services Staff Operating Budget

                                                            2007                  2008                2008                  2009
  Description                                              Actuals               Budget              Actuals               Adopted

   Salaries & Benefits
        Salaries                                             1,595,165             2,214,722             1,753,717            2,993,403
        Benefits                                               857,900             1,244,622             1,055,826            1,804,755
             Subtotal                                        2,453,064             3,459,344            2,809,543             4,798,159

   Services
        Consultant/Management                                  100,678               330,000                87,976               77,902
        Legal                                                                               0                6,500
        Maintenance                                            454,993               467,500               307,121              387,500
        Printing/Binding                                        79,125                89,200                26,755               90,200
        Advertising/Marketing                                   79,936               122,250               106,937              128,200
        Interlocal Agreements                                   17,265                25,000                      0              25,000
        Other Services                                         276,304               231,150               551,747              258,050
             Subtotal                                        1,008,301             1,265,100            1,087,035               966,852

   Materials And Supplies
        Office Supplies                                         22,467                 7,750                22,671                 8,795
        Postage                                                    -443               20,400                     14                5,200
        Small Equipment/Furniture                               30,849                36,500                99,429               51,500
        Other Materials & Supplies                             102,049               109,650               167,936              174,400
             Subtotal                                          154,923               174,300              290,050               239,895

   Miscellaneous Expenses
        Dues & Memberships                                       5,353                 4,754                 1,665                 2,325
        Travel & Meetings                                       25,459                30,100                19,799               28,400
        Books & Subscriptions                                   11,411                 7,750                 7,618               12,050
        Training                                                17,547                58,115                12,548               39,425
        Other Misc. Expenses                                    13,599                20,000               131,717                2,000
             Subtotal                                           73,368               120,719              173,347                84,200

   Leases and Rentals
        Admin Facilities Rental                                 53,782                55,000                61,355               55,000
        Leased Vehicles/Parking                                168,353               180,400               291,639              185,000
        Meeting Space                                                 0                  600                      0                    600
        Leased Furniture & Equip                                      0                     0                3,982                1,000
             Subtotal                                          222,135               236,000              356,976               241,600

   Other Expenses
        Utilities                                              197,525               233,700               175,527              241,250
        Insurance                                                -4,230                     0                -5,083
        Taxes                                                    1,086                 5,750                 2,984                3,250
             Subtotal                                          194,381               239,450              173,428               244,500

  TOTAL STAFF OPERATIONS                                    4,106,173              5,494,913            4,890,379             6,575,206

  *** Due to reorganization, historical expenditures and forecasts will vary from previously published budget documents. Agency wide
  summaries include all figures




Adopted 2009 Budget                                                                                                        Page 222 of 312
                                                TRANSPORTATION SERVICES 2009 SCORECARD

                           THEME               GOAL                       DEPARTMENT INITIATIVES                             PERFORMANCE MEASURES
                                                             1. Review all capital project design plans to ensure    95% of design plans are reviewed, comments




Adopted 2009 Budget
                                                                operations and maintenance related issues are        provided and issues identified within prescribed
                                         Build projects on      addressed.                                           timeframe.
                      PROJECT DELIVERY
                                         time and within     2. To prevent project delays, ensure operations and     100% of capital projects receive operations and
                                         budget                 maintenance plans are developed for all capital      maintenance plans prior to base lining.
                                                                projects.
                                                             1. Ridership: Retain and increase ridership on all      Meet agency goals to increase ridership* as follows:
                                                                modes.                                                o ST Express bus: 6%
                                                                                                                      o Sounder commuter rail: 7%
                                                                                                                      o Tacoma Link: 4%
                                                                                                                     On-time performance:
                                                                                                                      o ST Express bus: ≥90%
                                                                                                                      o Sounder: ≥95%
                                                                                                                      o Tacoma Link: ≥98.5%
                                                                                                                     Preventable accidents per revenue mile:
                                                                                                                      o ST Express bus: ≤0.8 per 100,000 mi.
                                                                                                                      o Tacoma Link: ≤1 per 30,000 miles
                                                                                                                      o Sounder: ≤1 per 1,000,000 miles
                                                                                                                     Customer complaints as percent of total boardings:
                                                                                                                     ≤ 0.05% for all modes
                                         Provide quality                                                             Percent of scheduled trips operated:
                      SERVICE DELIVERY   service to our                                                               o ST Express bus: 99.8%
                                         customers                                                                    o Sounder commuter rail: 99.5%
                                                                                                                      o Tacoma Link: 98.5%
                                                                                                                     Vehicle availability:
                                                                                                                      o ST Express bus: ≥90%
                                                                                                                      o Sounder commuter rail: 100%
                                                                                                                      o Tacoma Link: >90%
                                                             2. Service quality: Provide high quality service that   Maintain annual customer satisfaction rating equal
                                                                is responsive to customer needs, including the       to 3.5 (on 4-point scale) or higher.
                                                                region’s special needs population. Ensure service    In conjunction with other ST departments, develop
                                                                is safe, accessible, reliable, cost effective, and   maintenance and operating plans for projects that
                                                                efficient.                                           meet revenue start-up requirements.
                                                                                                                     Complete inventory of 100% of existing facilities to
                                                                                                                     update Facilities Operations and Maintenance Plan.
                                                                                                                     Development of measures for new Parking &




Page 223 of 312
                                                                                                                     Customer Facilities division.
                                                TRANSPORTATION SERVICES 2009 SCORECARD

                           THEME               GOAL                        DEPARTMENT INITIATIVES                                PERFORMANCE MEASURES




Adopted 2009 Budget
                                         Create integrated     Review proposed ST long-range plans and provide           95% of plans reviewed, comments provided and
                      SYSTEM EXPANSION    plans for future     input relative to service delivery issues.                issues resolved within prescribed timeframe.
                                            expansion

                                                               1. Preventive maintenance: perform preventive             90% of regularly scheduled maintenance is
                                                                  maintenance to maximize the life cycle of facilities   performed within 10% of required interval for all ST
                                                                  and equipment and minimize maintenance costs.          facilities.
                                                               2. Efficiently and effectively use resources to control   Evaluate 100% of bus and Tacoma Link service
                                                                  costs and manage service levels.                       annually according to the Service Standards and
                                                                                                                         Performance Measures guidelines.
                                         Manage resources                                                                80% of system wide bus and Tacoma Link hours
                                          in a manner that                                                               receive a Good or Satisfactory performance rating.
                                            demonstrates       3. Ensure integrity of Sounder barrier-free collection    For each mode, meet agency 2009 budget target for
                      STEWARDSHIP OF            public            system to maximize cost recovery.                      cost per boarding as follows:
                        RESOURCES           accountability,                                                               o ST Express: $6.96
                                                fiscal                                                                    o Sounder: $13.68
                                           responsibility, &                                                              o Tacoma Link: $3.81
                                             delivers on                                                                 Achieve agency 2009 fare box recovery targets:
                                            commitments                                                                   o ST Express: 18.4%
                                                                                                                          o Sounder: 22.0%
                                                               4. Develop a real property inventory in support of the    100% of Sound Transit’s real property assets will be
                                                                  agency initiative for an asset management plan.        catalogued in system.
                                                                                                                         Develop measures for new Parking & Customer
                                                                                                                         Facilities division.


                                             Foster an         1.   Ensure professional development through              100% of all non-represented employees will have a
                                          atmosphere of             training, growth opportunities, and challenging      professional development plan that includes
                                           inclusiveness            work.                                                opportunities for career development.
                      ORGANIZATIONAL      where talented       2.   Manage, recognize, measure, and compensate           80% of non-operating staff receiving at least 16
                         VIBRANCY         and dedicated             performance that focuses on the mission, goals       hours of training/professional development per year.
                                          people want to            and initiatives.
                                         work toward our       3.   Build and develop valued teams with ownership        100% of appraisals completed within 30 days of
                                         common mission             for overall agency goals.                            anniversary date.




Page 224 of 312
       OFFICE of POLICY, PLANNING and PUBLIC AFFAIRS




Adopted 2009 Budget                             Page 225 of 312
 Office of Policy Planning and Public Affairs Staff Operating Budget

                                                            2007                  2008                2008                  2009
  Description                                              Actuals               Budget              Actuals               Adopted

   Salaries & Benefits
        Salaries                                             2,161,964             2,455,303             2,239,090            2,390,477
        Benefits                                             1,148,019             1,282,412             1,145,006            1,371,830
             Subtotal                                        3,309,984             3,737,715            3,384,096             3,762,308

   Services
        Consultant/Management                                1,078,086             1,075,800               899,653            1,197,500
        Maintenance                                             12,030                23,200                22,652               24,000
        Printing/Binding                                         5,032                57,000                 9,047               42,800
        Advertising/Marketing                                  112,827                71,500               135,275               71,500
        Interlocal Agreements                                                               0              187,489              185,000
        Other Services                                          33,391                70,900                54,464               97,600
             Subtotal                                        1,241,365             1,298,400            1,308,580             1,618,400

   Materials And Supplies
        Office Supplies                                          5,731                 9,500                 6,384                 9,500
        Postage                                                    474                20,500                     82              15,700
        Small Equipment/Furniture                                9,968                 3,600                 8,982                 7,500
        Other Materials & Supplies                               2,216                 4,800                 6,263                4,300
             Subtotal                                           18,389                38,400                21,711               37,000

   Miscellaneous Expenses
        Dues & Memberships                                      13,761               226,070               210,463              235,950
        Travel & Meetings                                       69,932                41,715                57,244               61,700
        Books & Subscriptions                                    1,827                 2,300                 1,705                 2,300
        Training                                                 1,883                19,400                 1,875               11,500
        Other Misc. Expenses                                       353                 2,800                   883                  500
             Subtotal                                           87,757               292,285              272,170               311,950

   Leases and Rentals
        Leased Vehicles/Parking                                                             0                    87
             Subtotal                                                                       0                   87

   Other Expenses
        Utilities                                               17,360                21,560                18,409               22,400
             Subtotal                                           17,360                21,560                18,409               22,400

  TOTAL STAFF OPERATIONS                                    4,674,855              5,388,360            5,005,053             5,752,058

  *** Due to reorganization, historical expenditures and forecasts will vary from previously published budget documents. Agency wide
  summaries include all figures




Adopted 2009 Budget                                                                                                        Page 226 of 312
                                            OFFICE OF POLICY PLANNING & PUBLIC AFFAIRS
                                                         2009 SCORECARD




Adopted 2009 Budget
                       THEME       GOAL STATEMENT                 DEPARTMENT INITIATIVES                         PERFORMANCE MEASURES

                                                             1.   Secure federal appropriations.       Deliver 100% of federal appropriations assumed in
                      PROJECT      Build projects on time                                              financial plan.
                      DELIVERY      and within budget        2.   Monitor and act on state             Proactive review of proposed legislation during session
                                                                  legislation.                         and define required action.

                      SERVICE     Provide quality services
                      DELIVERY       to our customers.


                                                             1.   Develop and initiate integrated      Initiate study to develop planning guidelines for ST2
                                                                  implementation plans for ST2.        projects.
                                                                                                       Develop ST Express bus service delivery plan in
                                                                                                       conjunction with TSD,
                                                                                                       Initiate bus maintenance base siting, NEPA and
                                                                                                       conceptual design study.
                                                             2.   Ensure full implementation of        Facilitate the full implementation of ORCA at ST
                                                                  ORCA in conjunction with Link        facilities prior to the opening of Link light rail.
                       SYSTEM                                     opening and partner agency           Participate in regional group to achieve full operational
                                  Create integrated plans
                      EXPANSION                                   needs.                               status of ORCA at all regional partner agencies.
                                   for future expansion.
                                                             3.   Assist the agency with transition    Transition to in-house operations and maintenance of
                                                                  to absorbing in- house TVM           TVMs by end of 2009.
                                                                  operations and maintenance           Assist in implementation of Link fare policy.
                                                                  capabilities.
                                                             4.   Support the Board of Directors in    Conduct ST parking analysis for Board review.
                                                                  policy review, strategic planning,   Review potential fare increases for ST services in 2009.
                                                                  and program implementation           Keep Board informed of federal surface transportation
                                                                  decision-making.                     reauthorization activities and potential impact to ST and
                                                                                                       the region.




Page 227 of 312
                                                OFFICE OF POLICY PLANNING & PUBLIC AFFAIRS
                                                             2009 SCORECARD




Adopted 2009 Budget
                          THEME         GOAL STATEMENT                DEPARTMENT INITIATIVES                        PERFORMANCE MEASURES

                                                                 1.   Engage with federal, state, and     Demonstration of regular engagement with stakeholders
                                                                      local partners to ensure            (federal, state, regional, local) to build strong
                                                                      development and improvement of      relationships and ensure supportive policy direction.
                                                                      the regional transit system and
                                                                      facilitate opportunities for
                                                                      partnership and integration.
                                                                 2.   Maintain high standards of          Regular communication with stakeholders to ensure
                                                                      accuracy, timeliness, and           consistent visibility of the agency in all arenas (federal,
                                                                      transparency in communicating       state, regional, local).
                                                                      with the news media and public      Consistent support of organizations and associations
                                       Manage resources in a          about the agency’s projects,        involved in developing and improving the regional transit
                                            manner that               services, system expansion          system.
                                        demonstrates public           initiatives, accomplishments and    Maintain or increase the number of stories proactively
                      STEWARDSHIP OF
                                        accountability, fiscal        challenges.                         pitched each quarter.
                        RESOURCES
                                         responsibility, and                                              Measure the overall volume of media coverage received
                                            delivers on                                                   each quarter.
                                           commitments.          3.   Direct Board support functions to   Maintain a positive trend in public opinion about Sound
                                                                      ensure compliance with Board        Transit as reflected in surveys.
                                                                      policies and state law.             100% compliance.
                                                                 4.   Provide guidance to staff in the    Actions proposed for board consideration undergo
                                                                      development of materials for        thorough internal review process and complete
                                                                      Board decision making to ensure     materials to the Board and website a week in advance.
                                                                      conformity with policies,
                                                                      processes, and procedures.
                                                                 5.   Direct the agency’s Records         Department Records Officers are adequately trained in
                                                                      Management function ensuring        the agency’s records retention policies and procedures.
                                                                      compliance with state laws and
                                                                      regulations.




Page 228 of 312
                                                 OFFICE OF POLICY PLANNING & PUBLIC AFFAIRS
                                                              2009 SCORECARD




Adopted 2009 Budget
                          THEME         GOAL STATEMENT                 DEPARTMENT INITIATIVES                      PERFORMANCE MEASURES

                                                                  1.   Ensure professional              100% of employees have a professional development
                                                                       development through training,    plan that includes opportunities for career development.
                                                                       growth opportunities, and
                                        Foster an atmosphere           challenging work.
                                         where talented and       2.   Manage, recognize, measure       80% of employees receiving at least 16 hours of
                      ORGANIZATIONAL
                                       dedicated people want to        and compensate performance       training/professional development per year.
                         VIBRANCY
                                           work toward our             that focuses on the mission,
                                          common mission.              goals, and initiatives.
                                                                  3.   Build and develop valued teams   100% of performance reviews are completed within 30
                                                                       with ownership for overall       days of anniversary.
                                                                       agency goals.




Page 229 of 312
                      Central Costs




Adopted 2009 Budget                   Page 230 of 312
 Central Costs Staff Operating Budget

                                                            2007                  2008                2008                  2009
  Description                                              Actuals               Budget              Actuals               Adopted

   Services
        Advertising/Marketing                                    3,953                      0                4,395
        Interlocal Agreements                                  181,661               185,000                      0                    0
             Subtotal                                          185,614               185,000                 4,395                     0

   Materials And Supplies
        Small Equipment/Furniture                                1,204
             Subtotal                                             1,204

   Miscellaneous Expenses
        Dues & Memberships                                     160,974
        Travel & Meetings                                        1,390
        Other Misc. Expenses                                                                0                2,438
             Subtotal                                          162,364                      0                2,438

   Leases and Rentals
        Admin Facilities Rental                              1,573,234             1,600,000             1,561,768            1,623,187
             Subtotal                                        1,573,234             1,600,000            1,561,768             1,623,187

   Other Expenses
        Utilities                                                    43                     0                    78
        Taxes                                                      333                      0                    66
        Depreciation                                         2,128,916             2,125,308             1,867,264            2,294,073
             Subtotal                                        2,129,292             2,125,308            1,867,408             2,294,073

  TOTAL STAFF OPERATIONS                                    4,051,708              3,910,308            3,436,009             3,917,260

  *** Due to reorganization, historical expenditures and forecasts will vary from previously published budget documents. Agency wide
  summaries include all figures




Adopted 2009 Budget                                                                                                        Page 231 of 312
    COMMUNITY DEVELOPMENT FUND
    The Sound Transit Board established a $50 million fund to supplement the mitigation of impacts
    associated with construction and operation of light rail in southeast Seattle. For the Adopted 2009
    Budget this program is closed with $0 dollar funds requested for 2009.



    TRANSIT ORIENTED DEVELOPMENT (TOD)
    The Board established the Transit Oriented Development (TOD) Program in 1997. Subsequent
    motions and resolutions provide program guidance, including M99-60 prescribing TOD evaluation
    criteria and the Real Property Disposition Policy and Procedures (R99-35) which focuses on surplus
    property and joint development. The board actions direct the TOD Program to create transit
    supportive development and communities at Sound Transit facilities, stations, and station areas by
    working with local jurisdictions, property owners, and public and private developers. The TOD
    Program focuses on five areas of activity:


    Technical assistance: provides staff and consulting expertise to Sound Transit project staff, cities,
    counties, and not-for-profit agencies within the district. During 2008, technical assistance included
    station area and station development analyses for TOD and joint development opportunities,
    including at the Capitol Hill Station, continued participation in Snohomish County’s Urban Centers
    Program, and a real estate value analysis of the transit-oriented rezone proposal for the Bel-Red
    Corridor.


    Facility enhancement: creates improvements to existing facilities that support transit and
    pedestrian connections and increased ridership. In 2008, the Program staff began conceptual
    discussions with Capital Projects and City of Tukwila staff for future redevelopment at Tukwila
    Station, and monitored design and permitting for the Federal Way Transit Center East TOD Parcel
    mixed-use development.


    Strategic acquisition: identifies potential sites to preserve or create TOD opportunities by working
    with local jurisdictions, property owners, and developers. During 2008, no strategic acquisition
    opportunities were identified.


    Broker/catalyst/partner: creates increased ridership through appropriate development within
    station areas in collaboration with community representatives. In 2008, Program staff evaluated
    potential joint development options for private investment at the Mount Baker Station and issued a
    Request for Proposals for potential mixed-use redevelopment.


    Surplus Property Utilization Plan: evaluating the agency’s real property inventory to make
    disposition recommendations as directed by TOD/Joint Development policies and guidelines. In
    2008, the TOD Program led agency staff and consultants in completing the 2008-2010 Rainier
    Valley Excess Real Property Utilization Plan. In addition, Program staff initiated the property
    evaluation and prospective sale of a surplus parcel for the relocation of Firestone’s retail store at
    Mount Baker Station, for an eventual TOD redevelopment there.




Adopted 2009 Budget                                                                             Page 232 of 312
    2009 Activities:
    In 2009 the TOD Program will monitor the construction of the Korean Women’s Association senior
    housing project at the Federal Way Transit Center East TOD Parcel. Staff will manage a multi-year
    process with the City of Seattle, Capitol Hill Chamber, and the community to guide the future TOD
    opportunities at the Capitol Hill Station. A request for proposals (RFP) will be issued for
    redevelopment of the former Firestone site at the Mount Baker Station, involving the community,
    the City of Seattle, and Sound Transit. Progress in selecting a developer for a joint development at
    the Mount Baker “Triangle” site is also anticipated. Similar RFP efforts will occur for the two
    Othello Station surplus TOD properties.
    Future ST2 joint development opportunities will be evaluated based on alignment and facility
    decisions, with staff contributing to real property evaluations for right-of-way and stations options.
    Staff will continue to provide on-demand real estate and land use information to the public and
    private sectors for station areas and facilities throughout the district.
    The Adopted 2009 operating budget for TOD is $265,000 in District wide TOD operating
    expenditures.




                                    Transit Oriented Development
                                       Adopted 2009 Budget Summary

                                                          Adopted           Adoptedd
                                                           2009             1997- 2016
                                                          Budget             Budget
                      Operating Budget
                       Technical Assistance                 265,000             1,640,457
                                                      $     265,000         $   1,640,457

                      Capital Budget
                       Ashway TOD                     $             -      $     100,000
                                                      $             -      $     100,000

                      Total                           $     265,000         $ 1,740,457




Adopted 2009 Budget                                                                            Page 233 of 312
    Public Art Program
    The Sound Transit Board has endorsed a public art program to work with artists, community and
    project staff to develop art projects for the agency’s capital projects that reflects the community’s
    interest and reflects positively on the agency.
    The Sound Transit art policy adopted by the board in January 1998:
        recognizes a wide range of opportunities for art, from discrete artworks to artistic
        enhancements, to functional elements of facilities.
        commits to having artists work with the preliminary and final design teams on the development
        of the project design and on the integration of art into the system as a whole.
        establishes an art budget calculated as 1% of capital construction costs, excluding the cost of
        tunneling. The funds for art are pooled within subareas.
    To carry out the policy, the Sound Transit Art Program (STart) was established. STart is staffed by
    one full-time administrator and one full-time project coordinator responsible for coordinating the
    work of the art program.
    Art and design are developed collaboratively through a process involving communities, engineers,
    architects, landscape architects, artists and staff working together and sharing ideas. Because art is
    intended to be an integral part of Sound Transit facilities, it is reviewed during the design review
    process organized for each project.
    In 2009 the public art program will:
                 •    Manage completion of Final Design of artwork for the Capitol Hill and UW
                      Stadium Stations of University Link; Manage design development for Tukwila
                      Sounder Station.
                 •    Oversee installation of art projects for the following capitol projects:
                      SeaTac/Airport Station; the E-3 Transit Corridor in Seattle; South Tacoma Sounder
                      Station, Mukilteo Phase II; Everett Phase II; and Kirkland Transit Center.
                 •    Identify opportunities and commission artists for South Everett Transit Center and
                      Ash Way Park-and-Ride.
                 •    Analyze system-wide art to identify remaining commission opportunities within the
                      Sound Move package.


                                               Public Art (STart )
                                        Adopted 2009 Budget Summary

                                                             Adopted              Adopted
                                                               2009              1997-2016
                                                             Budget                Budget
                      Operating Expenditures               $    202,083         $ 1,777,768
                      Capital                                 1,216,225           16,318,123
                      Total                                $ 1,418,308          $ 18,095,891



    The Adopted 2009 Budget for STart is $1.4 million which is composed of $202.0 thousand in
    operating expenditures and $1.2 million of capital investment. Operating expenses consist of the
    cost of maintaining, repairing, replacing and cleaning installed art work and was established at
    roughly 10% of total life time budget. The lifetime budget was increased in 2008 by $26.5 thousand
    through a transfer from Sounder Mukilteo station in Snohomish County.

Adopted 2009 Budget                                                                             Page 234 of 312
                                                      Agency Operations
Project                                 x68      STart Program

Description
The Sound Transit Art Program - STart - is responsible for incorporating public art into Sound Transit systems and facilities. The artwork
will reflect the communities served and contribute to a positive experience for customers.

In 2009 the public art program will:
• Manage completion of Final Design of artwork for the Capitol Hill and UW Stadium Stations of University Link; Manage design
development for Tukwila Sounder Station.
• Oversee installation of art projects for the following capitol projects: SeaTac/Airport Station; the E-3 Transit Corridor in Seattle; South
Tacoma Sounder Station, Mukilteo Phase II; Everett Phase II; and Kirkland Transit Center.
• Identify opportunities and commission artists for South Everett Transit Center and Ash Way Park-and-Ride.
• Analyze system-wide art to identify remaining commission opportunities within the Sound Move package.


Changes since 2008 budget: No changes.
                             Summaries

                                                             Baseline (in $000)                    0
                                               2008 Current Budget (in $000)                 16,318
                                              2009 Adopted budget (in $000)                  16,318




Capital Costs
Sub Area                           1997-2007        2008        2009       2010       2011        2012        2013        Future       Total
Snohomish County                          293          255         174        263         99             0           0          0       1,084
North King County                        4,287       1,277         438        250         250           50        50          155        6,757
South King County                        1,923         315         428        773         815           65         0            0        4,319
East King County                         1,496         242         116        250         250          278           0          0        2,633
Pierce County                            1,114         116           60       149          86            0           0          0        1,525
Total                                    9,114       2,205       1,216      1,686       1,500          393        50          155       16,318


Capital Cost Elements
Cost Element                        1997-2007      2008         2009       2010       2011        2012        2013        Future        Total
STart Program                           9,114       2,205        1,216      1,686      1,500         393          50          155        16,318
Total                                   9,114       2,205        1,216      1,686       1,500          393           50       155        16,318




Adopted 2009 Budget                                                                                                       Page 235 of 312
    RESEARCH & TECHNOLOGY
    In 2002, the Sound Transit Board approved the “Sound Transit Transit Technology Plan (Motion
    2002-101),” which established the goals, objectives and funding limits for a set of technology based
    initiatives. The purpose of these initiatives is to provide research, funding, and the implementation
    of new systems to support bus rapid transit type technology applications, next train arrival
    information for Sounder Commuter Rail, and security technologies among ST facilities and
    services. Applications have included the expansion of transit signal priority in specific corridors,
    funding for automated next stop displays next stop annunciation for passengers on ST buses,
    vehicle location systems and research, automated passenger counting systems, and real-time
    passenger information at select transit centers and Sounder Stations.

    Research and Technology staff will continue the implementation of the transit technology
    initiatives in 2009, as well as the completion of earlier projects identified and approved by the
    board. The activities that are continuing into next year include the expansion of next arriving
    vehicle to transit facilities and web application; passenger counting technologies for Sounder
    Commuter Rail; the continued implementation of Transit Signal Priority for Sound Transit bus
    routes in Redmond and Snohomish County; the expansion of CCTV to the Kent and Auburn
    Garages; and completion of a technical study for providing high bandwidth WiMax technology to
    Sounder passenger cars for customer internet use and train data communications.




                                  Research and Technology Budget
                                     Adopted 2009 Budget Summary

                                                     Adopted                  Adopted
                                                      2009                   1997-2016
                                                     Budget                   Budget

                 Operating Budget                $        100,000        $        3,801,830

                 Capital Budget                         2,000,000                 6,364,852
                      Total                      $      2,100,000        $       10,166,682




    The adopted 2009 budget for capital expenditures of $2.0 million is $1.123,million more than last
    year’s Adopted 2008 Budget of $877 thousand..The Adopted 2009 operating budget of $100
    thousand is $50,874 less than last year’s budget of $150,874.




Adopted 2009 Budget                                                                           Page 236 of 312
                                                     Agency Operations
Project                                410      Research & Technology

Description
The Research and Technology Program was created to assess, evaluate research, and implement new transit technologies that will
improve the effectiveness and efficiency of public transit. This program has focused on evaluating and implementing transit technology
that enhances security and safety at facilities and services, providing real-time passenger information, expanding communications, and
deploying applications to better manage operations.

Activity in 2009 will include the continued implementation of the transit technology initiatives that were part of the board-approved “Sound
Transit Technology Plan,” as well as the completion of earlier projects identified and approved by the board. Other activities continuing into
next year include the expansion of next arriving vehicle to transit facilities and web applications; passenger counting technologies for
Sounder commuter rail; the expansion of security and safety technologies to existing and to be constructed facilities; and, based on the
outcome of a feasibility study, providing high bandwidth WiMax technology to Sounder passenger cars for customer internet use and train
location and data communications.
                             Summaries

                                                             Baseline (in $ 000)                     0
                                             2008 Current Budget (in $ 000)                       9,003
                                             2009 Adopted budget (in $000)                        6,365




Capital Costs
Sub Area                          1997-2007        2008          2009       2010       2011          2012       2013       Future     Total
Regional Fund                          3,139          877         2,000        348            0             0          0         0     6,365
Total                                   3,139         877         2,000        348            0             0          0         0      6,365


Capital Cost Elements
Cost Element                       1997-2007      2008          2009        2010       2011          2012       2013       Future      Total
Agency Administration                      6             0             0           0          0             0          0         0             6
Pre-Engineering/Env Review                14           0              0          0            0             0          0         0          14
Fare Integration/Research              3,119         877          2,000        348            0             0          0         0       6,345
Total                                  3,139         877          2,000        348            0             0          0         0       6,365




Adopted 2009 Budget                                                                                                        Page 237 of 312
    DEBT SERVICE
    As of December 31, 2008, Sound Transit has $1,195 million of long-term bonds outstanding, the
    proceeds of which are being used to finance construction of capital projects. In December 1998,
    Sound Transit issued its first series of bonds in the amount of $350 million, with maturity dates
    from 2006 to 2028. In March 2005, after the board of directors approved Resolution 2005-7
    providing for the issuance of new bonds, $423 million in bonds were issued, with maturity dates on
    the 2005 issue of bonds ranging from 2011 to 2030. In December 2007 after the board of directors
    approved Resolution 2007-22 providing for the issuance of new bonds, $450 million in bonds were
    issued with maturity dates on the 2007 issue of bonds ranging from 2008 to 2036. The aggregate
    debt service for the existing bonds is $57.1 million in the Adopted 2009 Budget.

    NON-OPERATING EXPENSES
    In accordance with generally accepted accounting principles, certain costs (insurance claim costs
    and premiums related to operations, taxes, operating leases and rentals, costs of maintaining
    facilities which are completed, but not yet in service, depreciation, and amortization) should not be
    capitalized to projects, but rather expensed.
    These accounting principles also require that the agency regularly evaluate the costs that are
    capitalized. If some of the agency’s capital projects have not progressed as rapidly as initially
    anticipated, excess general and administration costs or costs related to project elements that are not
    included in the final project build-out may be expensed. In addition, as projects are completed that
    will not be owned by Sound Transit, such projects are donated to the municipality that will own and
    maintain the project and an expense equivalent to the cost of the project is recorded for the
    donation.
    For 2009, these costs are captured in three non-operating expense categories. This approach will
    allow the agency to reflect more clearly the true costs of its capital assets once completed.
    Non-operating Property Expenses
    The 2009 budget for non-operating property expenses is $1.4 million.
    Expenses in this category relate to non-operational properties, including property purchased for use
    in agency projects but not yet in construction and property remaining after construction is complete
    – such as remainders and construction staging areas. These expenses for transit centers, stations,
    park and ride lots and other operational facilities, budget for these costs are included in the
    appropriate operational mode’s transit operations budget and not in this category. In addition, costs
    of preparing excess property for resale, such as surveys, title and other costs are included in this
    category.
    Costs related to operations and maintenance of property include such costs as utilities, property
    taxes, security, landscaping, cleaning and other management services related to keeping the
    agency’s properties in good condition.
    Non-operating Project Expenses
    The 2009 budget for non-operating project expenses is $14.6 million.
    Included in this category are $7.4 million in costs related to the Central Link start-up. Budget and
    expenditures for these costs have been included in the Initial Segment and Airport Link projects.
    But due to their nature, as described above, they are being expensed to the appropriate subarea.




Adopted 2009 Budget                                                                           Page 238 of 312
    Donations and other non-cash expenses
    The 2009 budget for donations and other non-cash expenses is $16.7 million.
    Certain projects being built in the Sound Transit capital program are intended to belong to other
    governmental agencies when completed. Examples of these projects include HOV ramps being
    built in WSDOT right of way and other projects in which Sound Transit is a partial funding partner
    and a city or county agency is acting as project lead. Authorization to expend ST funds to design
    and build these projects occurs in the capital program. However, as these projects are completed
    and put into service, accounting principles require Sound Transit to record the donation of these
    projects to the agency as an expense in the year that the transfer occurs.
    Also included in this category are project costs that are being written off and depreciation related to
    non-operating agency assets.




                                    Non-Operating Expenses
                                   Adopted 2009 Budget Summary

                                                                  2008                2009
                                                                 Adopted             Adopted
                                                                 Budget              Budget
      Non-operating Property Expense                         $      1,359,282    $       1,398,242
      Non-operating Project Expense                                 5,155,396           14,561,193
      Subtotal                                               $      6,514,678    $      15,959,435

      Donations and other non-cash Expenses                       41,873,596            16,689,161

      Total Non-Capitalizable costs                          $    48,388,274     $      32,648,596




Adopted 2009 Budget                                                                             Page 239 of 312
                                                      Agency Operations
Project                                001       Agency Administration

Description
This budget item is the cost of Sound Transit staff administration capital. Only those items that meet the current accounting capitalization
threshold of $5,000 per item are included here. All of these items are funded out of the Regional Fund.

Budget has been added for period 2009 through 2016, consistent with the finance plan, to fund this program through the end of Sound
Move capital construction. There was an amendment transfering $90,000 from Sounder Operations to Agency Administration for the
purchase of agency fleet vehicles.

Changes since the 2008 Budget: In July 2008 the Board adopted an amendment to the Administrative Capital budget that increased the
lifetime budget by $715,000.
                            Summaries

                                                              Baseline (in $ 000)                  0
                                             2008 Current Budget (in $ 000)                    24,383
                                             2009 Adopted budget (in $000)                     24,090




Capital Costs
Sub Area                          1997-2007         2008          2009       2010       2011       2012       2013       Future     Total
Regional Fund                         15,459         1,592         1,243        870        870        870        870       2,317    24,090
Total                                  15,459        1,592         1,243        870       870           870     870        2,317     24,090


Capital Cost Elements
Cost Element                      1997-2007        2008          2009        2010       2011       2012       2013       Future      Total
Office Furniture                      2,271               0             0           0          0          0          0         0       2,271
Fleet - Automobiles                    1,030           90               0           0          0          0          0         0       1,120
Computer Equipment                     4,495          262            298            0          0          0          0         0       5,055
ERP System                             4,432            0              0            0          0          0          0         0       4,432
Computer Software                      2,547        1,198            485            0          0          0          0         0       4,230
Other Office Equipment                   683           43             20            0          0          0          0         0           745
Unallocated Budget                           0            0          440        870       870           870      870       2,317       6,236
Total                                 15,459         1,592         1,243        870       870           870      870       2,317      24,090




Adopted 2009 Budget                                                                                                      Page 240 of 312
                                                     Agency Operations
Project                               500       Capital Replacement

Description
This project provides funds for a sinking fund contribution to a capital replacement reserve to replace agency capital assets as they wear
out and need replacement. These amounts are derived from the Agency’s long-term financial plan which generates a capital replacement
schedule for all agency assets based on their costs and useful lives.
In 2009, Staff will complete a set of policies that layout guidelines and the process for funding future capital replacement from this fund.
                            Summaries

                                                           Baseline (in $ 000)                 0
                                            2008 Current Budget (in $ 000)              375,236
                                            2009 Adopted budget (in $000)               316,089




Capital Costs
Sub Area                          1997-2007        2008        2009       2010     2011       2012       2013        Future       Total
Snohomish County                       5,508        5,508       5,683      5,683    5,683      4,741      4,667       13,668      51,139
North King County                           0           0           0          0        0          0           0      35,633      35,633
South King County                           0           0         304        304      304     14,336      14,287      42,663      72,198
East King County                        7,650       7,650       7,882      7,882    7,882       5,457      5,216      14,687      64,307
Pierce County                           9,087       9,087      10,821     10,821   10,821       8,736      8,563      24,876      92,812
Total                                 22,245       22,245      24,690     24,690   24,690     33,271      32,734    131,526      316,089


Capital Cost Elements
Cost Element                      1997-2007       2008        2009        2010     2011       2012        2013       Future       Total
Contingency                          22,245       22,245      24,690      24,690   24,690     33,271      32,734     131,526      316,089
Total                                 22,245      22,245       24,690     24,690   24,690      33,271     32,734     131,526      316,089




Adopted 2009 Budget                                                                                                  Page 241 of 312
                      This page intentionally left blank




Adopted 2009 Budget                                        Page 242 of 312
                             APPENDIX A



                      SOUND TRANSIT STAFFING PLAN




Adopted 2009 Budget                                 Page 243 of 312
                      This page intentionally left blank




Adopted 2009 Budget                                        Page 244 of 312
                        Sound Transit 2009 Staffing Plan
                                               Filled At
                                                End of                Current
                                              December       2008     Staffing     2009      Change to
                                                   08      Adopted     Plan      Adopted      Current
Corporate
 Executive
    CEO's Office                                   3.00        3.00       3.00       3.00            -
    Diversity Program                              8.00        8.00       8.00       8.00            -
    Quality Assurance                              7.00        8.00       8.00       8.00            -
    Rail Activation                                1.00        2.00       2.00       2.00            -
    Safety                                         5.00        6.00       6.00       6.00            -
    Safety Security and QA Manager's Office        2.00        2.00       2.00       2.00            -
    Security                                       2.00        2.00       2.00       2.00            -
 Executive Total                                  28.00       31.00      31.00      31.00            -
 Finance and Information Technology
    Community Development Fund                     0.25        0.25       0.25        -            (0.25)
    Agency Project Control                         2.00        2.00       2.00       2.00            -
    Finance and Budget                             7.00        8.00       8.00       8.00            -
    CFO's Office                                   3.00        4.00       4.00       4.00            -
    Financial Accounting                          18.75       20.75      20.75      20.00          (0.75)
    Grants                                         2.00        2.00       2.00       2.00            -
    Information Technology                        26.00       28.00      30.00      32.00           2.00
    Risk Management                                3.00        4.00       4.00       4.00            -
    Treasury & Revenue                             4.00        4.00       4.00       6.00           2.00
 Finance and Information Technology Total         66.00       73.00      75.00      78.00           3.00
 Legal
    Environmental Compliance                       6.00        6.00       6.00       6.00            -
    General Counsel                               10.00       12.00      13.00      13.00            -
 Legal Total                                      16.00       18.00      19.00      19.00            -
 Light Rail
    Civil Engineering                             15.00       15.00      16.00      16.00            -
    Community Outreach                            10.00       11.00      11.00      11.00            -
    Construction Management                       11.00       12.00      13.00      13.00            -
    Executive Director's Office                   10.00       12.00      11.00      12.00           1.00
    Environmental                                  2.00        2.00       2.00       2.00            -
    Project Controls                              19.00       18.00      19.00      20.00           1.00
    Project Development                           11.00       11.00      11.00      11.00            -
    Systems Engineering                            8.00       12.00      12.00      12.00            -
    Real Estate                                    7.00        9.00       7.00       7.00            -
 Light Rail Total                                 93.00      102.00     102.00     104.00           2.00
 Capital Projects                                                                                    -
    Business Services                              8.00        9.00       9.00       8.00          (1.00)
    Community Connections                           -          8.00        -          -              -
    Construction Management                        7.00        4.00       9.00       8.00          (1.00)
    Rail Program                                   5.00        5.25       6.00       6.00            -
    Director's Office                              2.00        3.00       3.00       3.00            -
    Transit-Oriented Development                   1.00        1.00       1.00       1.00            -
 Capital Projects Total                           23.00       30.25      28.00      26.00          (2.00)




Adopted 2009 Budget                                                                         Page 245 of 312
                         Sound Transit 2009 Staffing Plan
                                              Filled At
                                               End of                Current
                                             December       2008     Staffing     2009      Change to
                                                  08      Adopted     Plan      Adopted      Current
 Corporate Services
    Corporate Communications                      1.00        2.00       2.00       2.00            -
    Creative Services                             7.00        7.00       7.00       7.00            -
    Gsc/Warehouse                                 2.00        2.00       2.00       2.00            -
    Marketing                                     9.75       10.25      10.75      11.25           0.50
    Public Art Program                            2.00        2.00       2.00       2.00            -
    Contracts Management                         21.00       26.00      26.00      26.00            -
    Human Resources                               5.00        5.00       6.00       7.00           1.00
    OPCS Exec Dir Office                           -          1.00       1.00       1.00            -
 Corporate Services Total                        47.75       55.25      56.75      58.25           1.50
 Transportation Services
    Customer Service and Information              8.60        8.60       8.60      10.60           2.00
    Facilities and Fleet                         10.00        8.00      12.00      19.00           7.00
    Central Link Operations                       3.00        3.00       3.00       1.50          (1.50)
    Property Management                           3.00        3.00       3.00       3.00            -
    Director's Office                             7.00        5.00       9.00      10.00           1.00
    Scheduling And Planning                       3.00        3.00       3.00       3.00            -
 Transportation Services Total                   34.60       30.60      38.60      47.10           8.50
 Policy, Planning and Public Affairs
    Board Administration                          4.00        5.00       5.00       5.00           -
    Government Relations                          5.00        5.00       5.00       5.00           -
    Media Relations and Public Information        4.50        5.50       5.50       5.50           -
    PPPA Executive Director's Office              2.00        2.00       2.00       2.00           -
    Office of Policy and Planning                14.00       13.75      14.00      14.00           -
 Policy, Planning and Public Affairs Total       29.50       31.25      31.50      31.50           -
Corporate Total                                 337.85      371.35     381.85     394.85         13.00

Operations
    Accessible Services                           2.00        2.33       2.00       2.00           -
    Sounder                                       4.00        4.33       4.00       4.00           -
    ST Express                                     -          2.33       2.00       2.00           -
    Tacoma Link Light Rail                       15.00       17.00      18.00      19.00          1.00
    Central Link Light Rail                        -           -          -         1.50          1.50
    Ticket Vending Machines                        -           -          -         7.50          7.50
Operations Total                                 21.00       26.00      26.00      36.00         10.00
Sound Transit Total                             358.85      397.35     407.85     430.85         23.00




Adopted 2009 Budget                                                                        Page 246 of 312
                      Sound Transit Staffing By Department
                                                                Current
                                                       2008     Staffing       2009
                                                     Adopted     Plan        Adopted
 Corporate
    Executive
     CEO's Office
         Chief Executive Officer                         1.00        1.00           1.00
         Deputy Director Executive Administration        1.00        1.00           1.00
         Executive Assistant                             1.00        1.00           1.00
     CEO's Office Total                                  3.00        3.00           3.00
     Diversity Program
         Diversity Program Manager                       1.00        1.00           1.00
         Diversity Program Specialist                    4.00        2.00           2.00
         Diversity Technical Advisor                     1.00        1.00           1.00
         Lead Diversity Program Specialist                -          1.00           1.00
         Project Assistant                               1.00        1.00           1.00
         Project Labor Agreement Specialist              1.00        2.00           2.00
     Diversity Program Total                             8.00        8.00           8.00
     Quality Assurance
         Lead Assessor                                   1.00        1.00           1.00
         Project Assistant                               1.00        1.00           1.00
         Quality Assurance Manager                       2.00        2.00           1.00
         Quality Assurance Specialist                    2.00        3.00           4.00
         System Safety and QA Specialist                 2.00        1.00           1.00
     Quality Assurance Total                             8.00        8.00           8.00
       Rail Activation
         Project Assistant                               1.00        1.00           1.00
         Senior Rail Activation Manager                  1.00        1.00           1.00
       Rail Activation Total                             2.00        2.00           2.00
     Safety
         Chief Safety Manager                            1.00        1.00           1.00
         Construction Safety Manager                     1.00        1.00           1.00
         Construction Safety Specialist                  2.00        2.00           2.00
         Rail Activation Safety Manager                  1.00        1.00           1.00
         Safety Technician                               1.00        1.00           1.00
     Safety Total                                        6.00        6.00           6.00
     Safety Security and QA Manager's Office
         Administrative Specialist                       1.00        1.00           1.00
         Safety, Security and QA Manager                 1.00        1.00           1.00
     Safety Security and QA Manager's Office Total       2.00        2.00           2.00
     Security
         Project Assistant                               1.00       1.00           1.00
         Security Officer                                1.00       1.00           1.00
     Security Total                                      2.00       2.00           2.00
    Executive Total                                     31.00      31.00          31.00




Adopted 2009 Budget                                                         Page 247 of 312
                      Sound Transit Staffing By Department
                                                               Current
                                                      2008     Staffing       2009
                                                    Adopted     Plan        Adopted
     Finance and Information Technology
       Community Development Fund
          Administrative Analyst                        0.25        0.25            -
       Community Development Fund Total                 0.25        0.25            -
       Agency Project Control
          Project Control Engineer                      1.00        1.00           1.00
          Project Coordinator                           1.00        1.00           1.00
       Agency Project Control Total                     2.00        2.00           2.00
       Finance and Budget
          Finance and Budget Manager                    1.00        1.00           1.00
          Senior Economist                              1.00        1.00           1.00
          Senior Finance Analyst                        5.00        5.00           5.00
          Transportation Finance Planner                1.00        1.00           1.00
       Finance and Budget Total                         8.00        8.00           8.00
       CFO's Office
          Administrative Assistant                      1.00        1.00           1.00
          Administrative Specialist                     1.00        1.00           1.00
          Executive Director                            1.00        1.00           1.00
          Project Assistant                             1.00        1.00           1.00
       CFO's Office Total                               4.00        4.00           4.00
       Financial Accounting
          Accountant                                    4.00       4.00           4.00
          Accounting Assistant                          3.00       3.00           3.00
          Accounts Payable Lead                         1.00       1.00           1.00
          Administrative Analyst                        0.75       0.75           1.00
          Assistant Controller                          1.00       1.00           1.00
          Business Reporting Analyst                    1.00       1.00           1.00
          Controller                                    1.00       1.00           1.00
          External Reporting & Compliance Manager       1.00       1.00           1.00
          Financial Compliance Analyst                  1.00       1.00           1.00
          Lead Accountant                                -         1.00           1.00
          Payroll Coordinator                           1.00       1.00           1.00
          Project Manager                               1.00       1.00            -
          Senior Accountant                             3.00       2.00           2.00
          Senior Finance Analyst                        1.00       1.00           1.00
          Senior Financial Compliance Analyst           1.00       1.00           1.00
       Financial Accounting Total                      20.75      20.75          20.00
       Grants
          Grants Administrator                          1.00        1.00           1.00
          Grants Manager                                1.00        1.00           1.00
       Grants Total                                     2.00        2.00           2.00




Adopted 2009 Budget                                                        Page 248 of 312
                      Sound Transit Staffing By Department
                                                              Current
                                                     2008     Staffing       2009
                                                   Adopted     Plan        Adopted
       Information Technology
           Business Systems Administrator              2.00       2.00           2.00
           Business Systems Analyst                    3.00       3.00           3.00
           Business Systems Analyst - TVM              1.00        -              -
           Business Systems Analyst, Senior             -         1.00           1.00
           Chief Information Officer                   1.00       1.00           1.00
           Desktop Specialist                          1.00        -             1.00
           Desktop Specialist, Senior                  2.00       3.00           3.00
           Enterprise Applications Administrator       1.00       1.00           1.00
           Enterprise Systems Administrator            1.00       1.00           1.00
           GIS Analyst                                 1.00       1.00           1.00
           Help Desk Analyst                            -          -             1.00
           Integration Engineer                        1.00       1.00           1.00
           IT Administrative Analyst                   1.00        -              -
           IT Business Systems Manager                 1.00       1.00           1.00
           IT Project Analyst                          1.00       1.00           1.00
           IT Project Manager                          1.00       1.00           1.00
           IT Project Manager, Senior                  1.00       1.00           1.00
           IT Services Manager                         1.00       1.00           1.00
           Network Engineer                            1.00       1.00           1.00
           Network Engineer, Senior                     -         1.00           1.00
           Project Coordinator                         1.00       2.00           2.00
           Report & Systems Developer                  1.00       2.00           2.00
           Server Administrator                         -         1.00           1.00
           Server Engineer                             3.00       2.00           2.00
           Systems Integration Analyst, Senior         1.00       1.00           1.00
           Telecommunications Specialist               1.00       1.00           1.00
       Information Technology Total                   28.00      30.00          32.00
       Risk Management
           Claims Coordinator                          1.00        1.00           1.00
           Risk & Claims Analyst                       1.00        1.00           1.00
           Risk & Insurance Specialist                 1.00        1.00           1.00
           Risk Manager                                1.00        1.00           1.00
       Risk Management Total                           4.00        4.00           4.00
       Treasury & Revenue
           Accountant                                  1.00       1.00           1.00
           Assistant Treasurer                         1.00       1.00           1.00
           Project Manager                              -          -             1.00
           Senior Accountant                           1.00       1.00           1.00
           Treasurer                                   1.00       1.00           1.00
           Treasury Cash Accountant                     -          -             1.00
       Treasury & Revenue Total                        4.00       4.00           6.00
     Finance & Information Technology Total           73.00      75.00          78.00




Adopted 2009 Budget                                                       Page 249 of 312
                      Sound Transit Staffing By Department
                                                                      Current
                                                             2008     Staffing       2009
                                                           Adopted     Plan        Adopted
     Legal
      Environmental Compliance
          Biologist                                            1.00        1.00           1.00
          Environmental Compliance Manager/Legal Counsel       1.00        1.00           1.00
          Project Coordinator                                  1.00        1.00           1.00
          Senior Environmental Analyst                         1.00        1.00           1.00
          Senior Environmental Planner                         2.00        2.00           2.00
      Environmental Compliance Total                           6.00        6.00           6.00
      General Counsel
          Administrative Specialist                            1.00       1.00           1.00
          Deputy General Counsel                               1.00       1.00           1.00
          Executive Director                                   1.00       1.00           1.00
          Legal Counsel                                        6.00       6.00           6.00
          Paralegal                                            1.00       1.00           1.00
          Project Assistant                                    2.00       2.00           2.00
          Project Coordinator                                   -         1.00           1.00
      General Counsel Total                                   12.00      13.00          13.00
     Legal Total                                              18.00      19.00          19.00

     Light Rail
       Civil Engineering
          Architect                                            2.00       2.00           2.00
          Assistant Permits Administrator                       -         1.00           1.00
          CAD Specialist                                       2.00       2.00           2.00
          Civil Engineer                                       2.00       2.00           2.00
          Civil Engineering Manager                            1.00       1.00           1.00
          Permits Administrator                                2.00       1.00           1.00
          Program Manager                                      1.00       1.00           1.00
          Senior Civil Engineer                                5.00       5.00           5.00
          Senior Structural Engineer                            -         1.00           1.00
       Civil Engineering Total                                15.00      16.00          16.00
       Community Outreach
          Administrative Assistant                             1.00       1.00           1.00
          Community Outreach Coordinator                       3.00       3.00           3.00
          Community Outreach Specialist                        5.00       4.00           4.00
          Program Manager                                      1.00       1.00           1.00
          Project Assistant                                    1.00       1.00           1.00
          Project Manager                                       -         1.00           1.00
       Community Outreach Total                               11.00      11.00          11.00
       Construction Management
          Construction Management Specialist                    -         1.00           1.00
          Construction Manager                                 5.00       2.00           2.00
          Deputy Construction Manager                          1.00       5.00           5.00
          Project Assistant                                     -         1.00           1.00
          Project Coordinator                                  2.00       2.00           2.00
          Project Manager                                      1.00       1.00           1.00
          QC Specialist                                        1.00        -              -
          Senior Civil Engineer                                2.00       1.00           1.00
       Construction Management Total                          12.00      13.00          13.00




Adopted 2009 Budget                                                               Page 250 of 312
                      Sound Transit Staffing By Department
                                                              Current
                                                     2008     Staffing       2009
                                                   Adopted     Plan        Adopted
       Executive Director's Office
          Administrative Assistant                     2.00       2.00           2.00
          Administrative Specialist                    1.00       1.00           1.00
          Civil/Systems Integration Manager            1.00       1.00           1.00
          Deputy Executive Director - Light Rail       3.00       3.00           3.00
          Executive Director                           1.00       1.00           1.00
          Link Chief of Staff                          1.00       1.00           1.00
          Mechanical Engineer                          1.00       1.00           1.00
          Project Assistant                            1.00       1.00           1.00
          Senior Civil Engineer                        1.00        -             1.00
       Executive Director's Office Total              12.00      11.00          12.00
       Environmental
          Environmental Planner                        1.00        1.00           1.00
          Program Manager                              1.00        1.00           1.00
       Environmental Total                             2.00        2.00           2.00
       Project Controls
          Administrative Analyst                        -         1.00           1.00
          Administrative Assistant                     1.00       1.00           1.00
          Document Control Coordinator                 4.00       4.00           4.00
          Project Assistant                            1.00       2.00           2.00
          Project Control Coordinator                  1.00       1.00           1.00
          Project Control Specialist                   8.00       7.00           7.00
          Project Manager                              1.00       1.00           1.00
          Senior Project Control Engineer              1.00       1.00           2.00
          Senior Project Control Manager               1.00       1.00           1.00
       Project Controls Total                         18.00      19.00          20.00
       Project Development
          Administrative Assistant                     1.00       1.00           1.00
          Program Manager                              2.00       2.00           2.00
          Project Development Coordinator              2.00       2.00           3.00
          Project Manager                              6.00       6.00           5.00
       Project Development Total                      11.00      11.00          11.00
       Systems Engineering
          Administrative Assistant                     1.00       1.00           1.00
          Engineering Systems Inspector                1.00       1.00           1.00
          Senior Systems Engineer                      6.00       6.00           6.00
          Systems Engineer                             3.00       3.00           3.00
          Systems Engineering Manager                  1.00       1.00           1.00
       Systems Engineering Total                      12.00      12.00          12.00
       Real Estate
          Administrative Analyst                       1.00        -              -
          Project Assistant                            2.00       1.00           1.00
          Project Coordinator                          2.00       2.00           2.00
          Real Property Manager                        1.00       1.00           1.00
          Senior Real Property Agent                   3.00       3.00           3.00
       Real Estate Total                               9.00       7.00           7.00
     Light Rail Total                                102.00     102.00         104.00




Adopted 2009 Budget                                                       Page 251 of 312
                      Sound Transit Staffing By Department
                                                             Current
                                                    2008     Staffing       2009
                                                  Adopted     Plan        Adopted
     Capital Projects
        Business Services
          Business Services Program Manager           1.00        1.00           1.00
          Community Outreach Specialist               1.00        1.00           1.00
          Document Control Coordinator                1.00        1.00           1.00
          Management Analyst                          1.00        1.00           1.00
          Project Control Coordinator                 2.00        2.00           1.00
          Project Control Specialist                  2.00        2.00           2.00
          Project Manager                             1.00        1.00           1.00
        Business Services Total                       9.00        9.00           8.00
        Community Connections
          Community Connections Manager               1.00         -              -
          Project Coordinator                         2.00         -              -
          Project Development Coordinator             3.00         -              -
          Project Manager                             2.00         -              -
        Community Connections Total                   8.00         -              -
        Construction Management
          Construction Manager                        1.00        1.00           1.00
          Project Coordinator                         1.00        2.00           1.00
          Project Development Coordinator              -          2.00           2.00
          Project Manager                             2.00        4.00           4.00
        Construction Management Total                 4.00        9.00           8.00
        Rail Program
          Program Manager                             1.00        1.00           1.00
          Project Development Coordinator             1.00        1.00           1.00
          Project Development Coordinator             1.00        1.00           1.00
          Project Manager                             2.25        3.00           3.00
        Rail Program Total                            5.25        6.00           6.00
        Director's Office
          Administrative Assistant                    1.00        1.00           1.00
          Administrative Specialist                   1.00        1.00           1.00
          Capital Projects Director                   1.00        1.00           1.00
        Director's Office Total                       3.00        3.00           3.00
        Transit-Oriented Development
          TOD Program Manager                         1.00       1.00           1.00
        Transit-Oriented Development Total            1.00       1.00           1.00
      Capital Projects Total                         30.25      28.00          26.00

      Corporate Services
       Corporate Communications
         Administrative Specialist                    1.00        1.00           1.00
         Chief Corporate Communications Officer       1.00        1.00           1.00
       Corporate Communications Total                 2.00        2.00           2.00
       Creative Services
         Creative Services Manager                    1.00        1.00           1.00
         Graphic Design Specialist                    3.00        3.00           3.00
         Graphic Design Specialist                    1.00        1.00           1.00
         Project Assistant                            1.00        1.00           1.00
         Video Production Specialist                  1.00        1.00           1.00
       Creative Services Total                        7.00        7.00           7.00




Adopted 2009 Budget                                                      Page 252 of 312
                      Sound Transit Staffing By Department
                                                             Current
                                                    2008     Staffing       2009
                                                  Adopted     Plan        Adopted
       Gsc/Warehouse
         General Services Center Assistant            1.00        1.00           1.00
         General Services Center Coordinator          1.00        1.00           1.00
       Gsc/Warehouse Total                            2.00        2.00           2.00
       Marketing
         Communications Specialist                    3.50       3.00           3.50
         Marketing & Events Specialist                1.00       1.00           1.00
         Marketing Coordinator                         -         1.00           1.00
         Marketing Manager                            1.00       1.00           1.00
         Marketing Specialist                         2.00       1.00           1.00
         Project Coordinator                          1.00       2.00           2.00
         Web Developer                                1.00       1.00           1.00
         Web Producer                                 0.75       0.75           0.75
       Marketing Total                               10.25      10.75          11.25
       Public Art Program
         Project Coordinator                          1.00        1.00           1.00
         Public Art Program Administrator             1.00        1.00           1.00
       Public Art Program Total                       2.00        2.00           2.00
       Contracts Management
         Administrative Assistant                     2.00       2.00           2.00
         Contracts Administrator                      6.00       6.00           6.00
         Contracts Assistant                          7.00       7.00           7.00
         Contracts Manager                            1.00       1.00           1.00
         Cost/Price Analyst                           1.00       1.00           1.00
         Lead Contracts Administrator                 4.00       4.00           4.00
         Project Coordinator                          1.00       1.00           1.00
         Senior Contracts Administrator               4.00       4.00           4.00
       Contracts Management Total                    26.00      26.00          26.00
       Human Resources
         Administrative Assistant                     1.00        1.00           1.00
         Human Resources Coordinator                  1.00        2.00           2.00
         Human Resources Officer                      1.00        1.00           1.00
         Senior Human Resources Generalist            2.00        2.00           2.00
         Senior Training Specialist                    -           -             1.00
       Human Resources Total                          5.00        6.00           7.00
       OPCS Exec Dir Office
         Executive Director                           1.00       1.00           1.00
       OPCS Exec Dir Office Total                     1.00       1.00           1.00
      Corporate Services Total                       55.25      56.75          58.25

      Transportation Services
        Customer Service and Information
         Administrative Assistant                     2.00        2.00          2.00
         Customer Service & Information Manager       1.00        1.00          1.00
         Customer Service Coordinator                  -           -            1.00
         Customer Service Specialist                  1.00        1.00          1.00
         Information Center Specialist                0.60        0.60          0.60
         Project Assistant                            3.00        3.00          3.00
         Project Coordinator                          1.00        1.00          2.00
        Customer Service and Information Total        8.60        8.60         10.60




Adopted 2009 Budget                                                      Page 253 of 312
                      Sound Transit Staffing By Department
                                                                           Current
                                                                  2008     Staffing       2009
                                                                Adopted     Plan        Adopted
        Facilities and Fleet
         Facilities Manager                                         1.00       1.00           1.00
         Facilities Specialist                                      2.00       1.00           6.00
         Maintenance Management Information System Technician        -          -             1.00
         Program Manager                                             -         2.00           2.00
         Project Assistant                                          1.00       1.00           1.00
         Project Coordinator                                        2.00       2.00           2.00
         Project Development Coordinator                            1.00       2.00           2.00
         Project Manager                                            1.00       2.00           2.00
         Senior Facilities Specialist                                -         1.00           2.00
        Facilities and Fleet Total                                  8.00      12.00          19.00
        Central Link Operations
         Program Manager                                            1.00        1.00           0.50
         Project Manager                                            2.00        2.00           1.00
        Central Link Operations Total                               3.00        3.00           1.50
        Property Management
         Assistant Property Manager                                 1.00        1.00           1.00
         Project Coordinator                                        1.00        1.00           1.00
         Property Manager                                           1.00        1.00           1.00
        Property Management Total                                   3.00        3.00           3.00
        Director's Office
         Administrative Assistant                                   1.00        1.00          1.00
         Administrative Specialist                                  1.00        1.00          1.00
         Assistant Director                                          -          1.00          1.00
         Deputy Director                                            1.00        2.00          2.00
         Document Control Coordinator                                -          1.00          1.00
         Project Control & Contracts Administrator Specialist        -           -            1.00
         Project Coordinator                                        1.00        2.00          2.00
         Transportation Services Director                           1.00        1.00          1.00
        Director's Office Total                                     5.00        9.00         10.00
        Scheduling And Planning
         Program Manager                                            1.00       1.00           1.00
         Project Manager                                            2.00       2.00           2.00
        Scheduling And Planning Total                               3.00       3.00           3.00
      Transportation Services Total                                30.60      38.60          47.10

     Policy, Planning and Public Affairs
        Board Administration
          Board Administrator                                       1.00        1.00           1.00
          Board Coordinator                                         2.00        2.00           2.00
          Project Assistant                                         1.00        1.00           1.00
          Records Management Coordinator                            1.00        1.00           1.00
      Board Administration Total                                    5.00        5.00           5.00
      Government Relations
          Government and Community Relations Manager                1.00        1.00           1.00
          Government and Community Relations Specialist             2.00        2.00           2.00
          Government Relations Specialist                           2.00        2.00           2.00
      Government Relations Total                                    5.00        5.00           5.00




Adopted 2009 Budget                                                                    Page 254 of 312
                      Sound Transit Staffing By Department
                                                               Current
                                                      2008     Staffing       2009
                                                    Adopted     Plan        Adopted
     Media Relations and Public Information
         Communications Specialist                      1.50        1.50           1.50
         Media Relations & Public Info. Manager         1.00        1.00           1.00
         Project Coordinator                            1.00        1.00           1.00
         Project Manager                                1.00        1.00           1.00
         Public Information Specialist                  1.00        1.00           1.00
     Media Relations and Public Information Total       5.50        5.50           5.50
     Office of Policy and Planning
         Administrative Specialist                      1.00       1.00           1.00
         ORCA Implementation Manager                    1.00       1.00           1.00
         Policy & Planning Officer                      1.00       1.00           1.00
         Program Manager                                2.00       3.00           3.00
         Project Assistant                              1.00       1.00           1.00
         Project Coordinator                            1.00       1.00           1.00
         Project Manager                                3.75       3.00           3.00
         Senior Planner                                 3.00       3.00           3.00
     Office of Policy and Planning Total               13.75      14.00          14.00
     PPPA Executive Director's Office                               -
         Administrative Specialist                      1.00       1.00           1.00
         Executive Director                             1.00       1.00           1.00
     PPPA Executive Director's Office Total             2.00       2.00           2.00
    Policy, Planning and Public Affairs Total          31.25      31.50          31.50
 Corporate Total                                      371.35     381.85         394.85

 Operations
    Accessible Services
           Project Assistant                            1.00        1.00           1.00
           Project Coordinator                          0.33         -              -
           Project Manager                              1.00        1.00           1.00
    Accessible Services Total                           2.33        2.00           2.00
    Sounder
           Mechanical Compliance Officer                1.00        1.00           1.00
           Program Manager                              1.00        1.00           1.00
           Project Assistant                            1.00        1.00           1.00
           Project Coordinator                          0.33         -              -
           Project Manager                              1.00        1.00           1.00
    Sounder Total                                       4.33        4.00           4.00
    ST Express
           Bus Operations Program Manager               1.00        1.00           1.00
           Project Coordinator                          1.33        1.00           1.00
    ST Express Total                                    2.33        2.00           2.00




Adopted 2009 Budget                                                        Page 255 of 312
                      Sound Transit Staffing By Department
                                                                   Current
                                                          2008     Staffing      2009
                                                        Adopted     Plan       Adopted
    Tacoma Link Light Rail
           Assistant Director                                -         1.00          1.00
           Assistant Operations & Maintenance Manager       1.00       1.00          1.00
           LRV Operator                                     8.00       7.00          7.00
           Maintenance Supervisor                            -          -            1.00
           Operations & Maintenance Manager                 1.00       1.00          1.00
           Operations & Maintenance Supervisor              3.00       4.00          4.00
           Project Assistant                                1.00       1.00          1.00
           Systems Maintenance Technician                   3.00       3.00          3.00
    Tacoma Link Light Rail Total                           17.00      18.00         19.00
        Central Link Light Rail
           Program Manager                                   -           -            0.50
           Project Manager                                   -           -            1.00
        Central Link Light Rail Total                        -           -            1.50
    Ticket Vending Machines
           TVM Electronic Technician                         -          -            5.00
           Senior Systems Engineer                           -          -            0.50
           TVM Maintenance Supervisor                        -          -            2.00
    Ticket Vending Machines Total                            -          -            7.50
 Operations Total                                          26.00      26.00         36.00
 Sound Transit Total                                      397.35     407.85        430.85




Adopted 2009 Budget                                                           Page 256 of 312
                            APPENDIX B



                      SUPPLEMENTAL INFORMATION




Adopted 2009 Budget                              Page 257 of 312
                      This page intentionally left blank




Adopted 2009 Budget                                        Page 258 of 312
    SUPPLEMENTAL INFORMATION

    Allocation and capitalization methodology
    Approximately 62 percent ($40.4 million) of the staff operating budget of $65.4 million is
    allocated either to capital projects, transit operations, or is a general and administration expense.
    The remaining 38 percent ($25.0 million) represents the net staff operating budget for the agency.
    These costs are summarized in the table below.


                       Allocation of Adopted 2009 Operating Staff Budgets

                                                   Total Staff                                  Net Staff
                                                   Operating              Allocated            Operating
                                                    Budgets                 Costs               Budgets
         Corporate Departments                    $ 40,090,528          $ 20,256,064          $ 19,834,464
         Project Delivery & Service Delivery        23,004,138             20,179,041            2,825,097
         Depreciation                                2,294,073                    -              2,294,073
                                                  $ 65,388,739          $ 40,435,105          $ 24,953,634



    The Adopted 2009 Budget allocates about 51 percent of corporate department costs to the capital
    projects and transit operations. These costs are distributed by an activity-based allocation model
    that utilizes activity drivers to distribute costs to departments based on their use of the service or
    resource. For example, a portion of accounting’s costs is distributed to modal departments based
    on the relative share of total agency invoices that were processed for that department.
    Transportation Services, with 25 percent of the agency’s invoices for a given period, would be
    assigned 25 percent of the costs of the accounting unit. Each division is reviewed for appropriate
    drivers to allocate their costs and examples of other activity drivers include: direct wages,
    computer users, and square footage of space occupied. For budgeting purposes, these activity
    drivers are estimated for the coming year. The actual expenses are ultimately allocated based on
    actual activity drivers which are updated at the end of the year.
    Budget for costs allocated from corporate departments to capital projects and transit services are
    included in the departments' capital and operating budgets. These budgets are calculated based on
    projections of the costs for each within the agency’s long-term administrative cost forecast model.
    The costs assigned to capital projects are “capitalized”—captured as part of the capital projects’
    total costs and depreciated over the life of the capitalized project. Miscellaneous capital outlays
    (such as computers and small equipment) are recorded as Regional Fund fixed assets, even if the
    costs are incurred by a modal department.
    Capitalization
    It is the policy of Sound Transit to capitalize costs for items that cost more than $5,000 and have
    useful lives that are greater than one year. Such costs are capitalized into fixed asset accounts
    within the balance sheet and depreciated over their useful lives. Sound Transit’s balance sheet
    contains separate accounts for fixed assets as described by the Washington State Budget and
    Accounting Reporting System. Fixed assets are tracked through the agency’s enterprise resource
    planning system, and are reconciled by asset account. Expenditures for capital projects under
    construction are reported on the balance sheet in a construction in progress account. When
    construction is completed and the asset placed in service, the asset will then be recorded as a
    fixed asset and associated depreciation will be recorded.



Adopted 2009 Budget                                                                              Page 259 of 312
    The Adopted 2009 Budget records all debt service payments as non-departmental operating
    expenses so that total debt service payments are identifiable. It then allocates a portion of those
    debt service payments as capitalized interest to capital projects in proportion to the agency’s
    annual capital spending s a percentage of outstanding debt, consistent with generally accepted
    accounting principles.
    The Adopted 2009 Budget contains $32.6 million in non-operating expenses. These costs are
    associated with capital programs, but under generally accepted accounting principles cannot be
    treated as capital outlays and must be expensed. These costs include leases, rent, taxes, some
    insurance items, specific project management consulting services, and project write-offs and
    contributions to other governments.
    Subarea financial structure, allocations, borrowing, and debt allocation
    The subarea equity principle is an integral part of the regional transit system approved by the
    voters in 1996 and is included in Sound Move’s Appendix B: Financial Policies as adopted in
    1996 and amended on April 13, 2006. The subarea principle is defined as “utilizing local tax
    revenues and related debt for projects and services which benefit generally in proportion to the
    level of revenues each subarea generates.” The financial policies also define Phase 1 as the period
    in which subarea equity will be evaluated. A determination of whether subarea equity is achieved
    will occur at the end of Phase 1.
    To this end, the agency has developed an accounting system that tracks all transactions, i.e.,
    revenues, expenses, and capital outlays at the subarea level. On an annual basis, management
    represents the accuracy of the subarea data through an annual agreed upon procedures report
    issued by the agency’s independent auditor in conjunction with the financial and federal audit
    processes. Additionally, the Washington State Auditor’s Office audits the subarea data annually.
    The majority of capital, transit operations, and non-capital line of business expenses and revenues
    are solely attributable to a single subarea. For those transactions that span two or more subareas,
    the agency has developed a methodology based on Sound Move’s Appendix A: Detailed
    Description of Facilities and Costs and Appendix B: Financial Policies as amended. Transactions
    that require an allocation are based on drivers that are specific to each line of business. These
    drivers are derived from Sound Move assumptions in Appendix A and B and reviewed on an
    annual basis by independent auditors. Detailed below are the drivers used by each line of business
    that are interwoven throughout the budget document and incorporated into the agency’s financial
    system for allocating costs between projects and subareas:
    Sounder drivers
    •   Track Miles: Examples of transactions allocated by track miles include construction of track
        and facilities, electrical work on track and lighting and signs pertaining to trackwork.
    •   Layover Facilities: Examples of transactions allocated by the layover facilities rule driver
        include surveying and mapping, control and signal systems, and construction of track that is
        associated with layover facilities.
    Link drivers (Initial Segment)
    •   Total Construction Costs: Examples of transactions allocated by total construction costs
        include systemwide support and agency administration costs.
    •   Fleet Requirement: Examples of transactions allocated by fleet requirement include vehicle
        costs, vehicle maintenance and the operations and maintenance facility costs.
    •   Route Miles: Examples of transactions allocated by route miles include electrification
        systems and communication systems.




Adopted 2009 Budget                                                                             Page 260 of 312
    •   Number of Stations: Examples of transactions allocated by the number of stations include
        ticket vending machines and signage.


    Regional Express drivers
    •   Project size: Examples of transactions allocated by project size include agency administrative
        costs, allocated administrative consultants and signage.


    Transportation Services drivers
    •   Vehicles: Examples of transaction allocated by vehicles include the cost of vehicles and
        vehicle parts.
    •   Train Miles: Examples of transactions allocated by train miles include the costs of running
        the trains and any other costs associated with BNSF.
    •   Vehicle Miles: The number of vehicle miles is used as a driver for Sounder and is calculated
        as the number of rail cars times the number of train miles. This measure is used to allocate
        costs related to vehicle maintenance and fuel costs.
    •   Ticket Vending Machines (TVMs): Examples of transactions allocated by ticket vending
        machines include the cost and installation of TVMs and the costs for maintaining those
        machines.
    •   Platform hours: Examples of transactions allocated by platform hours include bus and
        operating revenues and expenses.


    Inter-subarea Borrowing
    In 1999, the Sound Transit Board recognized that inter-subarea borrowing would occur to
    facilitate efficient cash and debt management. During the 2001 budget process, the board further
    clarified their inter-subarea borrowing policy to establish borrowing through 2009 for financial
    planning purposes. Inter-subarea borrowing is deemed needed when a subarea has a negative
    unrestricted net asset position in any given month and does not have restricted assets to cover the
    shortfall. Borrowing from other subareas will be proportional based on the lending subareas
    positive unrestricted nets assets. The borrowing subarea will pay the lending subareas interest at
    the current Seattle CPI-U rate. Subarea borrowing requirements are evaluated at each month end.
    Debt Allocation
    Phase 1 of Sound Move is forecasted to have approximately $1.6 billion of debt being issued to
    finance related capital projects. As debt is being issued throughout Phase 1, the debt will be
    allocated provisionally to each subarea consistent with the forecasted total bond allocation
    included in the annual updated finance plan. Any changes in provisional allocation will only be
    done prospectively. At the completion of Phase 1, final debt allocations will be completed based
    on the cash requirements each year of the Phase 1 program not met by subarea resources. This
    final debt allocation will establish the permanent subarea bond obligation and debt service
    requirements for the life of the outstanding debt.




Adopted 2009 Budget                                                                           Page 261 of 312
    Regional Fund
    The Regional Fund is funded proportionately by contributions from the five subareas. Sound
    Move financial policies allow for annual board review of the amount of local taxes to be
    contributed to the Regional Fund. The policies permit up to 10 percent of local revenues to be
    distributed to the Regional Fund. Interest earnings (excluding bond proceeds and board-approved
    repurchase agreements) on all Sound Transit funds are also assigned to the Regional Fund for
    uses specified within the financial policies.
    Sound Move identified agency administration, fare integration, research and technology, and
    Sound Transit 2 planning as funded elements within the Regional Fund. The Adopted 2009
    Budget has a $30.9 million total lifetime budget for these cost elements.
    Strategic Acquisition Fund
    Resolution 72-1 amended the Sound Transit Financial Polices to include acquisition of certain
    properties as an authorized use of the Regional Fund Contingency when it is in the best interest of
    Sound Transit to preserve right-of-way required to implement the regional transportation system.
    The Strategic Acquisitions fund provides interim funding to purchase properties and the
    appropriate subarea will reimburse the Regional Fund Contingency for a property acquisition
    when the property is incorporated into a Board approved project or sold. A property in the area of
    the Roosevelt Station in the North Link Alignment was purchased for $1.4 Million prior to July
    31, 2008. Payments to a second property owner in the amount of $532,000 were made to forbear
    construction pending final acquisition which took place in December, 2008. $11,763,298
    including the payments to forbear construction will be funded from the Strategic Acquisitions
    fund. As of the end of 2008, acquisition discussions are continuing with the owner of a third
    property located between the Airport Station and South 200th in SeaTac.


    Reserves
    Within the original $3.9 billion (1995$) program cost, Sound Move identified $110 million
    (1995$) for reserves (including bond reserves, operating reserves, and capital replacement
    reserves) over the 10-year program, allocated by subarea. Contributions to reserves are not an
    expense or outlay in proprietary fund accounting and, therefore, are not included in the Adopted
    2009 Budget. To the extent, however, reserves reflect a current obligation is identified in Sound
    Transit’s year-end financial statements in conformance with generally accepted accounting
    principles. As part of its commitment to maintain subarea equity, Sound Transit tracks
    contributions to reserves by subarea.
    Sound Move also identified $11 million (YOE$) as a systemwide contingency fund. In the 2002
    budget, the board transferred funds to create a new emergency fund that would serve to provide
    coverage in the event of an uninsured loss. While the agency maintains a comprehensive
    insurance program, the policies do contain retentions (deductibles) which the agency would have
    to cover in the event of an insurable loss. In such instances, the board, on a case-by-case basis,
    would authorize use of the Emergency Fund.
    During 2003, as part of the board action on Smart Card, $19.9 million (YOE$) was moved from
    Regional Fund programs into a Regional Fund contingency account. In 2006 the Board adopted a
    strategic property acquisition program in the financial policy 72-1 to be funded out of the
    Regional Fund contingency. To date, three actions have been authorized by the board: Two at
    North Link-Roosevelt Station and staging area and one at Airport Link – South 200th. Once these
    properties have closed actual amounts will be identified out of the Regional Fund contingency.




Adopted 2009 Budget                                                                          Page 262 of 312
              Emergency Account & Contingency Funds
                                       (in YOE $000s)

                                                  2008                     2009
                                                Lifetime                 Lifetime
                                                Budget                   Budget
       Systemwide Contingency                 $       3,072            $       3,072
       Emergency Fund                                 7,928                    7,928
       Regional Fund Contingency                    18,500                   17,968
        Strategic Acquisition Fund                    1,400                    1,932
       Total                                  $     30,900             $     30,900


       * these are Balance Sheet accounts, so not included in budget numbers



    Status of Debt
    The Sound Move Financial Plan projected expenditures of $5.1 billion in year-of-expenditure
    dollars for the 10-year period from 1997 through 2007. Of this amount, the plan called for
    funding $1.39 billion from bond proceeds. In December 1998, Sound Transit issued its first series
    of bonds in the amount of $350 million, with maturity dates from 2006 to 2028. The Series 1999
    bonds are special limited obligations of Sound Transit that are secured by the Motor Vehicle
    Excise Taxes, Retail Sales and Use Taxes and Rental Car Taxes. In March 2005, Sound Transit
    issued its second series of bonds in the amount of $423 million, with maturity dates from 2011 to
    2030. The Series 2005A bonds are special limited obligations of Sound Transit that are secured
    by Retail Sales and Use Taxes and Rental Car Taxes. In December 2007, Sound Transit issued
    its third series of bonds in the amount of $450 million with maturity dates from 2008 to 2036.
    The Series 2007A bonds are special limited obligations of Sound Transit that are secured by
    Retail Sales and Use Taxes and Rental Car Taxes. The interest component of the annual debt
    service payments on the bonds is allocated to capital projects as capitalized interest, consistent
    with generally accepted accounting principles. For, 2009, total projected debt service is budgeted
    at $57.1 million, of which $54.2 million is capitalized.

    Although Sound Transit has no authority to levy property taxes, its debt capacity is determined
    with reference to the value of taxable property within its service area. Under state law, issuance of
    bonds payable from any type of taxes is subject to statutory debt limitations. Sound Transit
    currently is authorized to incur debt in an amount equal to 1-1/2 percent of the value of taxable
    property within the service area without securing voter approval for bonds. With the approval of
    60 percent of the region’s voters, Sound Transit may incur aggregate indebtedness of up to 5
    percent of the value of taxable property within the service area. Each county assessor in the
    service area is required to report to Sound Transit annually on the value of the property within its
    taxing district. From those reports, the agency’s current debt capacity, taking account of the 1999,
    2005, and 2007 bond issues, has been calculated as shown below.




Adopted 2009 Budget                                                                            Page 263 of 312
                            2008 Debt Capacity Status for Sound Transit
                                                 ($ in 000s)
    2007 Assessed Valuation for collection of 2008 taxes                      $        373,129,881

    Maximum nonvoted debt (1.5% of assessed valuation)                        $          5,596,948
    Less: Series 1999, 2005A, 2007A Bonds and Other Long-term debt            $          1,195,123
    Nonvoted debt capacity remaining                                          $          4,401,825

    Maximum voted debt (5% of assessed valuation)                             $         18,656,494
    Less: Series 1999, 2005A & 2007A Bonds and Other Long-term debt           $          1,195,123
    Voted debt capacity remaining                                             $         17,461,371




                         Debt Service Requirements to Maturity on 1999,
                      500
                                2005A and 2007A Series Bonds
                      400
         $ millions




                      300
                      200
                      100
                       0
                            2009-   2014-   2019-          2024-   2029-    2034-
                            2013    2018    2023           2028    2033     2036
                                        Five year increments               Principal   Interest




Adopted 2009 Budget                                                                       Page 264 of 312
                           APPENDIX C



                      PERFORMANCE MEASURES




Adopted 2009 Budget                          Page 265 of 312
                      This page intentionally left blank




Adopted 2009 Budget                                        Page 266 of 312
    Performance Statistics Discussion
    Systemwide Performance Management Program
    Sound Transit is designing an outcome-based performance management system to monitor
    progress towards accomplishing our goals. The Service Delivery Quarterly Performance Report
    to the CEO was established as a means of helping to establish the baseline framework for
    evaluating existing agency and departmental goals, objectives, and performance measures relative
    to the agency’s service delivery vision. Now finishing its fourth year, the quarterly report has
    been an integral way for the department to communicate its performance to the rest of the Agency
    as well as the public.
    The report content and form were informed by a preliminary review conducted by TSD staff of
    industry practices for performance reporting, such as the guidelines and criteria developed by the
    Association of Government Accountants. Numerous transit and other public agency management
    and performance reports were also reviewed.

    Performance Measures and Standards
    The performance measures that are presented here and that are reported on in the quarterly report
    are coordinated with the Transportation Services scorecard as well as the Agency scorecard as
    described in the Sound Transit Agency Review (STAR) section of the budget. They were selected
    by the department’s management based on industry practices for transit performance, are
    consistent with National Transit Database requirements, and take into account recommendations
    from the 2004 performance audit of ST Express bus operations.
    Efficiency and effectiveness measures that are reported on quarterly include:
    •   Ridership
    •   Percent of scheduled trips operated
    •   Boardings per revenue vehicle hour
    •   Boardings per trip or train
    •   Cost per boarding

    Service quality measures that will be reported on quarterly include:
    •   On-time performance
    •   Customer complaints
    •   Preventable accidents


          Performance Statistics - Systemwide


                                                    2006         2007         2008                     %
                                                   Actuals      Actuals      Actuals     2009 Budget Change
    Service Consumed
     Total Boardings                              12,256,022   13,764,711   16,128,142    19,692,640       22.1%
     Average Weekday Boardings                        42,736       47,799       55,953        79,159       41.5%




Adopted 2009 Budget                                                                                    Page 267 of 312
        Sounder Commuter Rail Transit Operations - Performance Statistics

                                                                              2006               2007                2008              2009            %
                                                                             Actuals            Actuals             Actuals           Budget         Change
        SUMMARY DATA
                         (1)
        Service Provided
         Revenue Vehicle Hours Operated                                            16,095             19,293            27,006            35,311       30.8%
         Revenue Vehicle Miles Operated                                           618,808            738,148         1,039,433         1,378,281       32.6%
         Trips Operated                                                             3,116              3,575             5,114             6,576       28.6%
        Service Consumed
         Total Boardings                                                      1,692,971             2,156,652        2,668,623         3,117,762       16.8%
         Average Weekday Boardings                                                6,310                 8,026            9,914            11,759       18.6%
        PERFORMANCE MEASURES
         Total Boardings/Revenue Vehicle Hour                                       105                112                  99                88      -10.6%
         Total Boardings/Trip                                                       543                603                 522               474       -9.1%
         Percentage of Scheduled Trips Operated                                   99.5%              99.4%               99.9%             99.5%       -0.4%
         Cost/Revenue Vehicle Hour                                       $     1,406.80     $     1,288.12      $     1,163.54    $     1,039.63      -10.6%
         Cost/Revenue Vehicle Mile                                       $        36.59     $        33.67      $        30.23    $        26.63      -11.9%
         Cost/Boarding                                                   $        13.37     $        11.52      $        11.77    $        11.77        0.0%
                              (2)
         On-time Performance                                                      95.0%              98.3%                 98%             >95%
                                           (3)
         Complaints (Percent of boardings)                                        0.03%              0.02%               0.02%            <0.05%
                                                         (4)
         Preventable Accidents per 1,000,000 total miles                               0                  0                   0                <1
        Operating costs (less depreciation and contingency)              $   22,642,413     $   24,851,744      $   31,422,574    $   36,710,379       16.8%

    Notes
    (1) Service at the end of 2008 is eight round trips on the South line and four round trips on the North line. Service will be at 13
        round trips at 100% of buildout. One additional trip in the South is budgeted to be added in 2009.
    (2) Standard is 95%, defined as having the average of all trains in a month arriving at terminus within seven minutes of schedule
        at least 19 out of 20 trips.
    (3) The standard is less than.05% of total boardings, based on the Performance Standards from the ST Express bus service
        agreements.
    (4) A preventable accident is defined as an accident in which the operating employee(s) failed to do everything reasonable to
        prevent it. For Sounder, the standard is less than or equal to 1.0 per 1,000,000 total miles.




         Tacoma Link Light Rail Transit Operations - Performance Statistics

                                                                                   2006               2007             2008                      %
                                                                                  Actuals            Actuals          Actuals      2009 Budget Change
         SUMMARY DATA
         Service Provided
          Service Hours Operated(1)                                                   9,979             10,034             9,708            9,523      -1.9%
          Service Miles Operated                                                     96,118             97,115            94,189           92,195      -2.1%
          Trips Operated                                                             60,394             60,473            58,812           57,379      -2.4%
         Service Consumed
          Total Boardings                                                           885,397            919,013          930,632           854,687      -8.2%
          Average Weekday Boardings                                                   2,967              3,044            3,032             2,851      -6.0%
         PERFORMANCE MEASURES
          Total Boardings/Service Hour                                                   89                 92               96                90      -6.4%
          Total Boardings/Trip                                                           15                 15               16                15      -5.9%
          Percentage of Scheduled Trips Operated                                      98.5%              99.8%            99.8%             98.5%      -1.3%
          Cost/Service Hour                                                   $      291.32     $       314.33      $    349.46       $    439.85      25.9%
          Cost/Service Mile                                                   $       30.24     $        32.48      $     36.02       $     45.43      26.1%
          Cost/Boarding                                                       $        3.28     $         3.43      $      3.65       $      4.90      34.4%
          On-time Performance(2)                                                      98.5%              99.6%            99.8%             98.5%
          Complaints (Percent of boardings)                                          0.001%             0.000%            0.00%             0.05%
          Preventable Accidents per 30,000 service miles(3)                                0               0.31                0                <1
         Operating costs (less depreciation and contingency)                  $   2,907,052     $    3,153,968      $ 3,392,552       $ 4,188,684      23.5%

    Notes
    (1) Service is reported as service hours or miles operated. Revenue hours or miles are not reported as Tacoma Link collects
         no fares for regular service at this time.
    (2) Standard is greater than or equal to 98.5%. A train is late if it a) departs a terminal station more than one minute late or,
         b) arrives at a terminal station three or more minutes late and is unable to make it's departure time.
    (3) A preventable accident is defined as an accident in which the operating employee(s) failed to do everything reasonable
         to prevent it. For Tacoma Link, the standard is less than or equal to 1.0 per 30,000 service miles. This standard was
         lowered from one preventable accident per 100,000 service miles to better reflect standard industry practices for light
         rail.




Adopted 2009 Budget                                                                                                                             Page 268 of 312
        ST Express Transit Operations - Performance Statistics


                                                                              2006                  2007                   2008                               %
                                                                             Actuals               Actuals                Actuals         2009 Budget       Change
        SUMMARY DATA
        Service Provided
         Revenue Vehicle Hours Operated(1)                                         459,939            489,813                504,709             517,500      2.5%
         Revenue Vehicle Miles Operated                                          9,834,938         10,042,843             10,290,367          10,575,000      2.8%
         Trips Operated                                                            364,056            374,605                391,199             401,991      2.8%
         Platform Hours(2)                                                         582,319            608,610                630,621             650,200      3.1%
        Service Consumed
         Total Boardings                                                         9,677,654         10,689,046             12,528,887          13,320,191      6.3%
         Average Weekday Boardings                                                  33,459             36,729                 43,007              44,749      4.1%
        PERFORMANCE MEASURES
         Total Boardings/Revenue Vehicle Hour                                        21.0                21.8                  24.8                 25.7       3.7%
         Total Boardings/Trip                                                        26.6                28.5                  32.0                 33.1       3.5%
         Percentage of Scheduled Trips Operated                                    99.80%              99.97%               100.11%               99.80%      -0.3%
         Cost/Revenue Hour                                               $         138.49 $            144.02 $              158.49 $             171.49       8.2%
         Cost/Platform Hour                                              $         109.38 $            115.91 $              126.85 $             136.49       7.6%
         Cost/Boarding                                                   $           6.58 $              6.60 $                6.38 $               6.66       4.3%
         On-time Performance(3)                                                     94.2%               94.3%                   94%                >90%
         Complaints (Percent of boardings)(4)                                       0.02%               0.02%                 0.02%               <0.05%
         Preventable Accidents per 100,000 revenue miles(5)                           0.80                 1.0                   0.9               < 0.80
        Operating costs (less depreciation and contingency)(6)           $ 63,696,807            $ 70,541,922        $ 79,993,723         $ 88,743,952       10.9%

    Notes
    (1) Revenue hours: The aggregation of time during which service is available to carry passengers.
    (2) Platform hours: The aggregation of time during which a transit vehicle leaves the operating base, is available for service and
        returns to the operating base, including layover and deadhead time.
    (3) Per the performance standards set in the service agreements with the transit partners, the standard is 90% or higher, defined
        as no later than 10 minutes of scheduled departure time.
    (4) Per the performance standards set in the service agreements with the transit partners, the standard is less than .05% of total
        boardings.
    (5) A preventable accident is defined as an accident in which the operating employee(s) failed to do everything reasonable to
        prevent it. Per the service agreements, the standard is less than or equal to 0.8 or 1.0 per 100,000 revenue miles during
        tunnel closure.
    (6) Estimated operating costs for ST Express Bus are subject to change, based on the annual cost reconciliation process as
        specified in the service agreements with Sound Transit's operating partners.



         Central Link Light Rail Transit Operations - Performance Statistics

                                                                                  2006                 2007                2008                               %
                                                                                 Actuals              Actuals             Actuals         2009 Budget       Change
         SUMMARY DATA
         Service Provided
          Revenue Vehicle Hours Operated(1)                                                  0                   0                    0           63,524     N/A
          Revenue Vehicle Miles Operated(1)                                                  0                   0                    0        2,562,938     N/A
          Trips Operated                                                                     0                   0                    0           60,462     N/A
         Service Consumed
          Total Boardings                                                                    0                   0                    0        2,400,000     N/A
          Average Weekday Boardings                                                          0                   0                    0           19,800     N/A
         PERFORMANCE MEASURES
          Total Boardings/Service Hour                                                       0                   0                    0               38     N/A
          Total Boardings/Trip                                                               0                   0                    0               40     N/A
          Percentage of Scheduled Trips Operated                                   N/A                 N/A                  N/A                    98.5%     N/A
          Cost/Service Hour                                                  $           -        $          -        $           -       $       343.37     N/A
          Cost/Service Mile                                                  $           -        $          -        $           -       $         8.51     N/A
          Cost/Boarding                                                      $           -        $          -        $           -       $         9.09     N/A
          On-time Performance(2)                                                   N/A                 N/A                  N/A                    98.5%     N/A
          Complaints (Percent of boardings)                                        N/A                 N/A                  N/A                    0.05%     N/A
          Preventable Accidents per 30,000 service miles(3)                        N/A                 N/A                  N/A                        <1    N/A
         Operating costs (less depreciation and contingency)                 $               -    $              -    $               -   $   21,812,084     N/A

    Notes
    (1) Hours of operation and actual service levels not decided by Board. These hours and miles assume operations from %:00
         AM to 1:00 AM with six-minute headways during peak rush hour times up to 15 minute headways during the early
         morning/late evening hours.
    (2) Standard is greater than or equal to 98.5%. A train is late if it a) departs a terminal station more than one minute late or, b)
         arrives at a terminal station three or more minutes late and is unable to make it's departure time.
    (3) A preventable accident is defined as an accident in which the operating employee(s) failed to do everything reasonable to
         prevent it. For Central Link, the standard is less than or equal to 1.0 per 30,000 service miles.




Adopted 2009 Budget                                                                                                                                   Page 269 of 312
                      This page intentionally left blank




Adopted 2009 Budget                                        Page 270 of 312
                         APPENDIX D



                      FINANCIAL POLICIES




Adopted 2009 Budget                        Page 271 of 312
                      This page intentionally left blank




Adopted 2009 Budget                                        Page 272 of 312
    FINANCIAL POLICIES


                                                                 As Adopted May 31, 1996 (Resolution No. 72)
                                                            As Amended April 13, 2006 (Resolution No. 72-1)
                                                      As Amended May 24, 2007 (Resolution No. R2007-05)
                                                     As Amended July 24, 2008 (Resolution No. R2008-10)∗


    The Sound Transit Board may amend these Financial Policies from time to time;
    the most current version of the Financial Policies is available at
    www.soundtransit.org


    PURPOSE
    The Sound Transit Board (the Board) adopted an initial framework for the financing of Sound
    Move, by setting local tax rates, focusing on minimal debt financing, requiring conservative
    projections for federal and state funding, and establishing a definition by which equity will be
    measured. The Financial Policies reflect the Board's policy intent for implementing the financial
    framework for completing Sound Move and subsequent system plans and for providing the tools
    to the Board to appropriately manage toward and respond to future conditions.


    LEGAL RESPONSIBILITIES
    In adopting these Financial Policies, the Board recognizes certain legal responsibilities. Existing
    state law grants all legislative and policy authority to the Board, and does not allow the Board to
    abrogate, transfer or delegate such authority to other agencies or to the five subareas within the
    Sound Transit District. Consequently, all funds collected by or provided to Sound Transit,
    including local tax revenues, federal and other government grants, bond proceeds, fare box
    revenues, interest earnings, and private development revenues, may be disbursed only with
    approval of the Board. Priorities for disbursements will be determined within Sound Transit's
    annual budgetary process, which by law requires two-thirds affirmative vote of the Board.


    Similarly, the Board recognizes that bonds issued by Sound Transit will be secured by a pledge of
    repayment through local taxes. When the bonds are issued, Sound Transit will enter a binding
    contract with its bondholders that requires a first claim against local tax revenues for repayment.
    Stated differently, bondholders will have a legal priority to Sound Transit's local tax revenues,
    above and beyond any commitment Sound Transit may wish to make with its subareas that no
    subarea will pay another subarea’s debt. Therefore, these Financial Policies reflect Sound
    Transit's commitment to subarea equity while maintaining the flexibility necessary to manage the
    financing of the System Plan on a consolidated basis and within legal constraints.


    ∗
     Resolution No. R2008-10 provides that these amended Financial Policies take effect upon the earlier of either the
    approval of local funding for the ST2 Plan by the voters at an election, or upon Board adoption of the amended
    Financial Policies by separate Resolution.




Adopted 2009 Budget                                                                                            Page 273 of 312
    EQUITY
    Definition of equity
    Equity will be defined as utilizing local tax revenues for projects and services that provide
    transportation benefits to the residents and businesses in each of the subareas generally in
    proportion to the level of revenues each subarea generates. Subareas may fund projects or
    services located outside of the geographic subarea when the project substantially benefits the
    residents and businesses of the funding subarea. The Financing Plan for Sound Transit activities
    addresses this equity principle by providing a financial plan for each of the five Sound Transit
    subareas, comprised of the subarea's share of local taxes, bonding capacity, farebox proceeds and
    an assumption for federal funding. The five subareas are defined as Snohomish County, North
    King County/Seattle, East King County, South King County, and Pierce County. While the
    Financing Plan will be managed by the Board on a consolidated basis, the Board will report
    annually on individual subarea performance.
    The Board agrees, therefore, that the facilities, projects and services identified in all voter-
    approved system plans represent a reasonable definition of equity for purposes of satisfying both
    public policy concerns and statutory requirements. The Financial Plan for voter-approved system
    plans will serve as the starting point for evaluating the equity principle.


    IMPLEMENTATION POLICY


    Subarea Reporting
      1. The Financial Plan will provide projections for each of the five subareas, comprised of the
         subarea's projected share of local taxes, use of bonds, farebox proceeds, an assumption for
         federal funding and related expenditures.

      2. Local taxes will be allocated for subarea reporting based on actual tax receipts collected by
         subarea and within the Sound Transit District. The annual Financial Plan will incorporate
         updated forecasts based on these actual receipts. A portion of local taxes from each
         subarea will be allocated to fund system-wide costs as identified by the Board.

      3. For subarea reporting purposes, government funding that is received for a specific project
         or service will be allocated to subarea(s) on a basis consistent with the allocation of costs
         for the project or service, unless the Board takes action to allocate the funds to other
         subareas as it deems in the best interest of Sound Transit after consideration of the funding
         needs to complete, enhance or extend the system plan.

           For subarea reporting purposes, government funding that is received that is agency-wide or
           general in scope will be allocated by the Board as it deems in the best interest of Sound
           Transit after consideration of the funding needs to complete, enhance or extend the system
           plan.

      4. Miscellaneous revenues, such as those generated through private-public partnerships,
         advertising and terminal concessions will be allocated for subarea reporting based on
         subarea investment in the facility and/or service from which the revenue is generated.



Adopted 2009 Budget                                                                          Page 274 of 312
      5. Debt will be allocated for subarea reporting based on a subarea's share of total long-term
         bonding requirements or as otherwise directed by the Board as deemed in the best interest
         of Sound Transit.


      6. Subarea expenditures will be allocated for subarea reporting based on facilities and services
         to be provided, their projected costs and project contingencies, associated operating costs,
         debt service, reserves for debt service, operations and maintenance and capital replacement.
         The allocation of expenditures for reporting purposes for facilities and services that cross
         subarea boundaries will be made by the Board to ensure safe and efficient operation of the
         system-wide facilities and services after due consideration to subarea benefits and
         priorities.

    Monitoring function
      1. Sound Transit will establish a system that on an annual basis reports subarea revenues and
         expenditures. This monitoring and reporting function will be incorporated into Sound
         Transit’s financial cycle. The Board may at its discretion conduct an independent
         assessment of the consistency of subarea reporting with Board policy guidance.

      2. Sound Transit will appoint an advisory citizen oversight committee to monitor Sound
         Transit performance under these policies (see Public Accountability below).

    Adjustments to subarea projects and services
      1. Subarea capital projects and transit services will be evaluated and adjusted annually as a
         part of the Board’s consideration and adoption of an annual budget which requires a two-
         thirds affirmative vote of the Board. Adjustments to subarea capital projects and services
         can include additional priority projects and/or services within that subarea should funding
         be available. This adjustment process recognizes that some fluctuation in revenues and
         expenditures against forecasts will occur.

      2. For those cases where a subarea's actual and projected expenditures exceed its actual and
         projected revenues and funding sources by five percent or greater, and/or where unforeseen
         circumstances occur which would result in an inability to substantially complete projects
         within such subarea's plan, the Board shall take one or more of the following actions:

               •      Correct the shortfall through use of such subarea's uncommitted funds and/or bond
                      capacity which is available to the subarea; and/or
               •      Scale back the subarea plan or projects within the plan to match a revised budget;
                      and/or
               •      Extend the time period of completion of the subarea plan; and/or
               •      Seek legislative authorization and voter approval for additional resources.

      3. For those cases where a subarea’s actual and projected revenue to be collected until the
         system plan is completed will exceed its actual and projected expenditures by five percent
         or greater, and/or where unforeseen circumstances occur which would result in the
         subarea’s ability to fund additional projects and services not identified in the System Plan,



Adopted 2009 Budget                                                                            Page 275 of 312
           then Sound Transit may use such surplus funds to complete, extend or enhance the System
           Plan to provide transportation benefits for the subarea’s residents or businesses as
           determined by the Board.

      4. Contributions from other parties, including the State, local governments and private sector
         can be programmed by the Board to complete, extend or enhance the System Plan,
         consistent with agreements with the other party.

    SYSTEM-WIDE EXPENDITURES
    The Board shall fund such system-wide expenditures as necessary to maintain and plan for an
    integrated regional transit system consistent with voter-approved system plans. Such system-
    wide expenditures shall include fare integration, research and technology programs, future phase
    planning and agency administration and other such expenditures as determined by the Board to be
    appropriate. Properties authorized for purchase by the Board to preserve required right-of-way
    will be funded as a system-wide cost until such time as the right-of-way is utilized by a
    subarea(s), at which time the cost will be allocated to the subarea(s) consistent with Board
    approved allocation. System-wide expenditures, not funded by dedicated system-wide agency
    interest earnings, revenues or other specific funding sources, shall be allocated to subareas
    proportional to the subarea’s share of total local tax revenues, population, benefits received, or on
    another basis as deemed appropriate by the Board.


    DEBT MANAGEMENT

    Legal Definition of Sound Transit Debt Financing Capacity
    Sound Transit's enabling legislation defines Sound Transit's capacity for issuing general
    obligation debt at one and one-half percent of the value of the taxable property within the
    boundaries of the Sound Transit District (and with approval of three-fifths of voters voting within
    the Sound Transit District, up to five percent of the value of the taxable property within the
    district's boundaries). There is no dollar limit for revenue indebtedness.


    Debt Service Coverage Requirements
    The Board recognizes that its future bondholders will hold first claim against taxes pledged as
    repayment for outstanding bonds. However, Sound Transit's debt financing capacity will be
    calculated on a more conservative basis, by evaluating all revenues and deducting total operating
    expenses for net revenues available for debt service.


    For long-term planning purposes, Sound Transit agency debt service coverage ratio policy will be
    set at an average coverage ratio of 2.0x for net revenues over annual debt service costs, not to fall
    below 1.5x in any single year. However, as voter-approved plans are implemented, prudent
    changes to coverage ratios may be made by the Board as appropriate. Prior to bond issuance,
    Sound Transit will establish the appropriate debt service coverage ratio to incorporate into its
    bond covenants.




Adopted 2009 Budget                                                                            Page 276 of 312
    Uses of Debt Financing
      1. Debt financing for capital projects covers two distinct types of borrowing, the first related
         to long-term debt financing, and the second related to short-term debt financing.

      2. Short-term debt financing (with terms of ten years or less) is expected to be used primarily
         to bridge the gap between the necessary timing of expenditures and the anticipated receipt
         of revenues.

      3. The use of long-term financing (with terms of more than ten years) is expected to be
         limited to capital and related costs for portions of the program that have a useful life in
         excess of the term of the debt. Long-term financing should be preserved for those aspects
         of the program for which other sources of funds are not likely to be available.

    Allocation of Sound Transit Debt
      1. For reporting purposes, the amount of long-term debt financing used to benefit each of the
         subareas will be based on each subarea's ability to repay debt after covering operating costs.
         The Board may determine appropriate debt service limits by subarea.

      2. While the above policy prescribes the use of debt financing for subarea reporting, the Board
         will manage the agency's debt capacity on a consolidated basis so as to maximize resources
         between subareas.

    SETTING PRIORITIES FOR EXPENDITURES
    The Board will adopt expense budgets for transit operations and agency administration and
    maintain a multi-year capital improvement plan. A two-thirds affirmative vote of the Board is
    required for budget adoption. Sound Transit will establish guidelines for its budgeting process
    and criteria by which to establish priorities for expenditures.


    FINANCIAL MANAGEMENT
    Sound Transit shall maintain polices for debt and investment management, risk management,
    capital replacement, fares and operating expenses and grants management so as to effectively
    manage voter-approved revenues and efficiently operate the regional public transit system.


    PUBLIC ACCOUNTABILITY
    To ensure that the construction program development and implementation occurs within the
    framework and intent of these policies, Sound Transit will:


      1. Conduct an annual independent audit of its financial statements in compliance with state
         and federal requirements;

      2. Implement a performance audit program; and




Adopted 2009 Budget                                                                           Page 277 of 312
      3. Appoint and maintain an advisory citizen oversight committee, charged with an annual
         review of Sound Transit’s performance and financial plan, for reporting and
         recommendations to the Board.



    FUTURE PHASES

    Voter Approval Requirement
    The Board recognizes that the voter-approved taxes are intended to be used to implement the
    System Plan and to provide permanent funding for future operations, maintenance, capital
    replacement and debt service (“permanent operations”) for voter-approved programs and
    services. The Board has the authority to fund these future costs through a continuation of the
    local taxes authorized by the voters. However, as a part of its commitment to public
    accountability, the Board pledges that the local taxes will be rolled back to the level required for
    permanent operations and debt service after the voter-approved Sound Transit 2 and Sound Move
    plans are completed and implemented. The rollback procedure is prescribed in the Tax Rate
    Rollback section. The Board further pledges that, after the voter-approved Sound Transit