Knowledge Management Project Schedule
W
Description
Knowledge Management Project Schedule document sample
Document Sample


JUNE 2006 CLASS SCHEDULE
VENUE KM CENTRE KM CENTRE R2005 (LAB 1) R2004 (LAB 2)
(KM Teaching Room 1) (KM Teaching Room 2) (level 1) (level 1)
MONDAY
6.30pm-9.30pm MDR7423 Research Methodology
(Prof. Peter Woods)
TUESDAY
6.30pm - 9.30pm MSD7333 Database Sys. & Sys. Anl.
(Mr. Sethu)
WEDNESDAY
6.30pm - 9.30pm MEM7432 Evaluat. Method. For e-L MLK7233 e-KM
(Prof. Supyan) (Mr. Moganadass)
THURSDAY
6.30pm - 9.30pm MWP7313 Web Programming MIM7313 Interac. MM. Dev.
(Ms. Hanafizan) (Mr. Tk neo
FRIDAY
6.30pm - 9.30pm MID7133 Inst. Sys. Design MKA7123 KM Application MCN7333 Comp. Networks & Data.
(Ms. Tengku Norishah) (Ms. Niza Adila) (Mr. Ting)
SATURDAY MPM7323/MEP7433
(session 1) Project Management MIT7213 Multimedia & IT MME7113 Prin. Of MM. in Edu. Tech
9.00am - 12.00pm (Prof. peter Woods) (Mr. Neo) (Dr. Neo Mai)
SATURDAY
(session 2) MHC7113 History & Concepts of KM MLS7123 Learn. Theo. & Strategies MMP7413 Multimedia Programming MIM7413 Interc. Inst. MM. Dev.
2.00pm - 5.00pm (Ms. Anne Ho) (Ms. Tengku Norishah) Mr. David Asirvatham (Dr. Neo Mai)
SATURDAY
(session 3)
6.00pm - 9.00pm
MKM Master of Knowledge Management with Multimedia
Me-L Master of Multimedia (e-Learning Technologies)
MKM Me-L Combine classes
Get documents about "