scope of work template
							3.0 Lean Analysis
Lean analysis (LA) evolves the broader project portfolio (PP) and project to embrace specific content built in the PP. LA is different in that most of the
applications are intentionally in need of further development and interpretation by the team. The team should select multiple worksheets (4-5
minimum) from LA to apply in the project and develop in ways appropriate to the ongoingwork. Team is also expected to include procedures for use,
prototypically, based on templates from CA 1 and 2, using a consistent numbering system throughout.
3.0.1.0 Team Assignments, Flow Of Work
All on team review content in LSSQTT and individually do related applications, and post their responses in the team work area (created by team
leader). Team leader assigns all to complete part of the work, usually a specific worksheet or a part of the broader application workbook, or both. Chats
are configured and led by team leader, assuring that the chat room is ready to go, archiving is running, an agenda was posted, etc. Several items in the
applications should be "standing" items on chat agendas, and a chat should be done early in posting cycle, and a second one will be needed for best
practices, toward the end of the cycle. It may also be appropriate to invite the instructor to participate in chats periodically.
3.0.2.0 Team Postings, Individual And Grand Compilations
Team leader creates posting threads and all on the team post individual tool work, according to schedule, as a suppliers to all others as customers. All
are assigned to complete specific parts of compilation work, taking everyone else's individual work and preparing a "grand" compilation for team
leader to use in a continuously updated PP. All post work at threads, for all to see, in team work area, and those not posting on schedule should have
points reduced in their assessment. After all separate information is posted and "grand" compiled by individuals, this then is final compiled by the
team leader as a total portfolio of worksheets, to be assessed via POAM in syllabus by faculty, as one excel document. Flow of work must be well
planned, articulated and managed by team leader, with all as suppliers and customers, and POAM assessment is done ASAP by faculty, after team
total updated PP is posted by team leader, enabling rapid response for continuous improvement by team.
3.0.3.0 Tool Application, Continuous FACR Relationships
The project portfolio (PP) should result in process documentation systems continuously applied, as a prototypically developed model, based on FACR's
derived from, and consistent with LSSQTT content and applications, built first around the tool FACR provided as the last worksheet in each tool
content workbook, but congruent with POAM elements in the syllabus. Second, and significantly, the FACR provided in each application workbook
should be used to track and feed all main, evolving findings, analysis and other related conclusions, recommendations, and so on, ongoing, with each
tool FACR being added to and improved upon, as is the case in this application. This requires a plan of who will do what, compiling other's work
based on early posts/threads, for full participation. Timelines must be adhered to, and all must "grow" leaders and knowledge in team, culture, and
total portfolio. A vision for continuous improvement must be evidenced, particularly at phases I and II.
3.0.4.0 Generic Application Issues, Phases I and II
Based on all tools/applications, the following can assist at phases I and II, throughout the course:
1. Multiple tool application sets will be provided at the course information area to help assess systems in a change and improvement context.
2. Teams continuously, iteratively, do applications over the course, all integrated into your evolving team model, reflected in the project portfolio.
3. Multiple worksheet applications should be trialed, applied, in the project model, changed as deemed appropriate, based on FACR analysis.
4. Additional time, in various tools done later in the course, will be provided to enable further development of these worksheets, once started
General Layout, Flow
Part Name:                                Date:                  Phase:         Tool:
Other Information:                        Originally By:                      Compiled:


Project layout and flow analysis provides the opportunity for the team to identify, analyze
and present ideas and key issues to help grow the team knowledge base and add value
to the overall portfolio of work evolving as related to general physical circumstances
surrounding the work. This is placed in formats below as individuals, but driven primarily
by the assigned compiler who collects all, placed in one excel worksheet. At phase
reviews, all information is placed in one "macro" worksheet of information to illustrate the


Layout Analysis, Documentation

Project layout analysis should be a not to scale layout of the main devices and systems in
the work area being pursued for improvement.


                     Foundry Area                                                 Casting Area
  Machining
  Area


                                                                           Injection Area
                         Storage
                         and Ship




5.2.0 Process Flow Charter

Project process flow analysis should be a work flow of main steps and activities being
done in the work area being pursued for improvement.

            Activity
Oper                                              Operation                          Evaluation and
 #   Oper Insp Store Move                        Description                        Analysis Method
 1                           Move material from receiving area                    visual; packing slip
 2                           Store material in designated area                    visual
 3                           Move material to point of use location               visual
 4                           Load, die-cut, unload and clean WIP                  SOP
 5                           Inspect for first-off, hourly, and last-off checks   inspection; work order
 6                           Place parts in container                             SOP; counting
 7                           Place bar coded labels adjacent to the container SOP; visual
 8                           Move finished good material from production area visual
 9                           Store finished good material in designated area      visual
 10                          Perform dock audit                                   dock audit SOP
 11                          Move finished good product into truck                visual; shipping log
 12                          Ship product to customer                             visual
 13                          Add operation by clicking cells in last line, cut and paste as next cells down
                             5S WORKPLACE AUDIT
PROJECT AREA:                                                                       BEFORE      /        AFTER


                                                                                  # OF YES:              4/25 =       16%
                             AUDIT ELEMENTS                                                     YES               NO

SORT: (ORGANIZATION) Distinguish between what is needed and not needed
       Unnecessary documents, records, books, tools, equipment are removed from……..                               x
       work area.
       Excess or obsolete supplies have been removed and resolved                                                 x
       Red tag area is used to hold items requiring decisions (no item more than 7 days old)                      x
       Work surfaces and storage areas do not have items in or on them that don't belong there                    x
       Unsafe conditions are promptly resolved (safety, ergonomics)                                               x


SET IN ORDER: (ORDERLINESS) A place for everything and everything in its place
        Documents, equipment, books work-in-process is well organized and clearly labeled                         x
        Work areas and storage areas are clean, clearly labeled and not cluttered                                 x
        Work areas are open and simple, purpose and work flow are easily understood visually                      x
        Standard visual information and communication boards have been established           x
        Items are put away immediately after use                                                                  x


SHINE: (CLEANLINESS) Cleaning and looking for ways to keep it clean and organized
        Floors, work areas, equipment and storage area clean                                                      x
        Garbage and recyclable are labeled, collected and disposed of correctly                                   x
        Work environment is good-air quality, temperature, humidity, lighting, dust, fumes, floors                x
        Cleaning materials are easily accessible                                                                  x
        Problems are promptly solved and ideas implemented to prevent area from getting dirty                     x


STANDARDIZE: (ADHERENCE) Maintain and monitor the first three categories
      Standard Work is posted where appropriate (Capacity, Std. Work, Combination, Key                            x
      Points sheets.
      Standard procedures are posted for cleaning, emergency procedures, and MSDS                                 x
      sheets and upkeep of the area's 5 S Audit
      Document control procedures are established                                                    x
      Between shift communication and tool box feedback meetings are held                            x
      Scheduled PM for equipment is being followed and documented                                                 x


SUSTAIN: (SELF-DISCIPLINE) Stick to the rules
      Where posted, Standard Work is being followed                                                               x
      Standard cleaning and upkeep procedures are being followed                                                  x
      Documents are current and in compliance with control procedures                                             x
      Standard information boards are being used and have current information                        x
      Work area is clean, neat and no serious unsafe conditions observed                                          x
                                                             Productivity Analysis

        Measurable                                          Calculation                                                    Notes
Pre-Tax Margins (profits)         Sales - total costs                                             Total costs = Cost of Goods Sold - SG&A (Service,
                                                                                                  General, and Administrative) to warehouse/finished
                                                                                                  goods
Marginal income                   Sales - direct COP                                              COP (Cost of Production) = material + direct and indirect
                                                                                                  labor + variable overhead

Marketing marginal income         Sales - (direct cost of production + direct sales and
(consumer products)               distribution cost)

Sales $ per employee              (Month Sales / # of work days in month * 240) / (Employee’s
                                  on Payroll, excluding OT Equivalents)

Cost reductions (time             Process cycle time * demand * hourly wage * (1+ benefit         Benefit factor = 33% - 50% of hourly wage pending on
eliminated due to process         factor)                                                         fringe benefit package excluding total variable
change)
                                  Also can be materials savings, utilities savings, etc…

Inventory turns (annualized)      (Prior 3 months average COGS x 12) / (3 months average          COGS (Cost of Goods Sold) Outgoing warehouse
                                  total inventory balance)                                        reciepts or sales

Defective rates                   Internal scrap production / total production

Internal or external rejections   (# of internal and external rejects / total pieces shipped) *
(PPM - parts per million)         1,000,000

Housekeeping                      see 5S Audit Worksheet

Delivery performance              # of orders shipped on time (customer driven) / total orders

Machine Efficiency (OEE -         Availability * Performance * Quality Rate
Overall Equipment
Effectiveness)                    Availability = (Loading time - Downtime) / Loading Time         Loading time = Total available time - Planned downtime
                                                                                                  Downtime = Unexpected losses

                                  Performance Rate = [(Output * Actual Cycle Time) / (Loading
                                  time - Downtime)] * [Ideal cycle time / Actual Cycle time]

                                  Quality Rate = # of good products / input
                                                                                                                                                           Page 4 of 19
                                                        Key Measurables (cont.)


Employee turnover             (# of separations * 100) / average # of employees           Separations excludes attrition

Attendance                    Scheduled attendance / actual attendance

Grievances                    Total # of grievances

# of annual suggestions per   Total suggestions / # of employees
employee

Lead time                     Time from customer order to customer's receipt of product

Direct Labor                  Direct labor standard / actual direct labor

Indirect labor                Indirect variance / direct labor standard




                                                                                                                           Page 5 of 19
                                       KAIZEN ANALYSIS
       DESCRIPTION             OPERATION                                    T                   #
                                                       CYCLE TIME (secs/pc) AKT TIME (secs/pc) OF OPERATORS NEEDED
          Part 1              Transfer Station                12.5                 147.9               0.1
                    Deburr Ends, Buff End For Molding         15.0                 147.9               0.1
                                 Mold End                     46.2                 147.9               0.3
                      Trim / Inspect / Pack B Corner          30.0                 147.9               0.2
                                                                Total # of Operators Per Cell =        0.7
         Part 2               Transfer Station                12.5                 147.9               0.1
                    Deburr Ends, Buff End For Molding         15.0                 147.9               0.1
                                 Mold End                     46.2                 147.9               0.3
                      Trim / Inspect / Pack B Corner          30.0                 147.9               0.2
                                                                Total # of Operators Per Cell =        0.7
         Part 3               Transfer Station                15.0                 47.6                0.3
                             Remove Grippers                  30.0                 47.6                0.6
                        Assemble End Cap / Pack               30.0                 47.6                0.6
                                                                Total # of Operators Per Cell =        1.6
         Part 4               Transfer Station                15.0                 47.6                0.3
                             Remove Grippers                  30.0                 47.6                0.6
                        Assemble End Cap / Pack               30.0                 47.6                0.6
                                                                Total # of Operators Per Cell =        1.6
      Part 5 (RH)             Saw To Length                   14.3                 47.6                0.3
                     Trim B-Pillar for Mold & C-Pillar        33.3                 47.6                0.7
                     Deburr & Buff Ends for Molding           15.0                 47.6                0.3
                             Remove Grippers                  30.0                 47.6                0.6
                                    Mold                      46.2                 47.6                1.0
                              Install End Cap                 30.0                 47.6                0.6
                      Trim / Inspect / Pack B Corner          50.0                 47.6                1.1
                                                                Total # of Operators Per Cell =        4.6
      Part 5 (LH)             Saw To Length                   14.3                 47.6                0.3
                     Trim B-Pillar for Mold & C-Pillar        33.3                 47.6                0.7
                     Deburr & Buff Ends for Molding           15.0                 47.6                0.3
                             Remove Grippers                  30.0                 47.6                0.6
                                    Mold                      46.2                 47.6                1.0
                              Install End Cap                 30.0                 47.6                0.6
                      Trim / Inspect / Pack B Corner          50.0                 47.6                1.1
                                                                Total # of Operators Per Cell =        4.6
TOTAL # OF OPERATORS NEEDED FOR WORK CELLS =                                                          13.7

**Takt Time based on 3 shifts
6.4.0 Benchmarking
6.4.1 Purpose

This document will provide information of suggestions/recommendations of items that could
improve the effectiveness of the poster line at Tiffin Metal Products.


6.4.2 Scope

This document and information applies to Team QS 426/527/616 for the summer 2006
semester at Bowling Green State University.



6.4.3 Definition

A continuous process of measurement of products, services and work processes, against
those recognized as leaders. -thequalityportal.com/glossary/b.htm


 6.4.4 Material Handling System
 A material handling system similar to this could be used at Tiffin Metal to reduce manpower,
 time, and improve ergonimics thus improving several functions of a quality system. The
 systems can be made to flip parts over also.




 6.4.5 Approvals for Document

 Paul Landers
 Ted Lippert                      approved June 26, 2006
 Diane Patino
 Nicole Radziwill
 Gerald Schnapp
 Andrew Vollmar                   approved July 6, 2006




C:\Docstoc\Working\pdf\b8a72c18-aebe-4639-b553-e82fc193784f.xls                     Last Printed:
                                                                               3/7/201111:46 AM
Line #1/2                 Incense     2000                                      6/6/2000



Job         Length        Pieces      Footage                 Rated     Run Hours
            Feet                                              Speed/Min

Red                 4.5     226,000       1,017,000.0                50             339.0
Blue               12.2     452,000       5,514,400.0                50          1,838.1
Green              12.2     452,000       5,514,400.0                50          1,838.1
Yellow              6.9     452,000       3,127,840.0                50          1,042.6
White               4.9     226,000       1,105,140.0                50             368.4
Purple             13.5     226,000       3,053,260.0                50          1,017.8
                                      ---------------------               ------------------
            Total Footage                19,332,040.0

                                      Production Hours                          6,444.0
                                      Scrap                       8.00%           515.5

                                                                          ------------------
                                                                                 6,959.5

Production Hours: 2 lines                                       9,331.2
(16 hours/shift x 3 shifts x 240 days x .81 utilization)
                                                              Capacity           74.58%
                      Name:
                      Line #:
                 Job Number:
                       Date:

Table 1: Parts per minute based on line speed

Line Speed (ft/min) =                                      52
Length of Part (ft/part) =                              2.421

Parts per minutes coming off of line =                   21.5

Table 2: Rate Calculation
                            TOTAL TOTAL MINUTE MISC. LEVELIN MIN /
 ELEMENTS / OPERATIONS MINUTE PIECES S/PC (6.0%)        G     PIECE
1. Up 5 parts at a time -     S1.81  48 0.03771 0.04 FACTOR 0.046
                                                         1.15
Inspect - trim wires on one
end of part at a time.




2. Flip all parts over - Inspect -    2.06       49 0.04204     0.045   1.15 0.0512
time wires on other end of
each part.




3. Up one part - Inspect -            1.69       50   0.0338    0.036     1 0.0358
place on board & ensure cut
length is acceptable.




4. Grab 6 parts & pack into             1.4      50     0.028    0.03     1 0.0297
cardboard box.




5. Build 1 box base                   1.13      140 0.00807     0.009    0.9 0.0077




6. Build 1 lid for box                0.56      140     0.004   0.004   0.95    0.004




7. Move full box out & put            1.68      140     0.012   0.013     1 0.0127
empty box on skid (put lid on
box) - fill out S.S., T.T., &
100% sticker and place on
box.

8. Measure 1 part every 15            0.43      322 0.00134     0.001     1 0.0014
minutes and record on trend
chart.




                                      Total Incentive Work (min/pc) =   0.189
                                     Parts Per Minute Per Incentive =   5.303

Table 3: Crew Size based on 80 Unit Hour

Parts per minute coming off of line =                   21.48
Parts per minute per incentive =                         5.30

Crew Size Based on 80 Unit Hour =                         4.1
                           Equipment Loss / Effectiveness Analysis
Machine (s)                                                       Date:

Product:                                                          Shift:
Availability
A. Gross Available Time:                                                      Hrs:


B. Planned Downtime:                                                          Hrs:


C. Total Available Time:                                                      Hrs:
(Gross Available Time ---Planned Downtime) A-------B


D. Downtime Losses:
(Taken from Downtime Log
# Breakdowns             ________________                         Hrs:
# Setups and Adjustments ________________                         Hrs:        Hrs:
# Minor Stoppages        ________________                         Hrs:

E. Operating Time:
(Total Available Time----- Downtime Losses) C-----D                           Hrs:

F. Percent Equipment Availability:
(Operating Time/Total Available Time x 100) [E/C] x 100                       _______ %
PERFORMANCE RATE
G.Processed Amount/Total Parts Run:                                           Feet:____
  This includes both good and bad parts                                       ________


H. Ideal Cycle Time:                                                          __________

I. Performance Rate:
  (Ideal Cycle Time x Processed Amount/ Operating Time x 100)
  [(H xG) / E] x 100
Quality Rate
J. Defect Amount/Total Reject:

K. Quality Rate:
   (Processed Amount - Defective Amount / Process Amount x 100)
   [(G-J) / G] x 100                                                          ________%


L. Overall Equipment (Machine) Effectiveness:
   (Percent Equipment Availability x Performance Rate x Quality Rate x 100)   ________%
   [F x I x K x 100]                                                          Goal ____%
                                                             TIME STUDY SHEET FOR LEAN S



OPERATION

DEPT.                         START

PART DESCRIPTION              STOP

WIP SIZES                     DIFF. (ELAPSED TIME)

JOB NO.                       PRODUCTION PIECES

LEAD-TIME                     PART TRAVEL DISTANCE




                   ELEMENTS           1      2       3   4       5    6     7
UDY SHEET FOR LEAN SIX SIGMA




                              DATE                                           OPERATOR

                              SHIFT

                              STUDY                                          ENGINEER

                              SHEET

                              EMPLOYEE TRAVEL DISTANCE




              8     9    10           11   12       13   14   15   16   17        18    19   20
OTHER
6.3 TMP VSM (Current State)
                                                                                                                                                                                                                                                                                                             One week time                                                                                                                                      Fax From Customer w/
                                                                                                                                                                                                                                                                                                                    fence                                                                                                                                               P.O.
                                                                                                                                                                                                                                                                                                                             MRP Weekly generated from
                                                                                                                                                                                                                                                                                                                                                                                                ERP System                                    Schedulers                                              CUSTOMER
                                                                                                                                                                                                                                                                                                                                      MPS
                            RAW SUPPLIERS                                                                                                                                                                                                                      Scheduler      schedule X shifts with scrap                                                                                                                                                                                           Clear Channel
                                                                                                                                                                                                                                                           bumps numbers                factor
                      Mostly visual
                                                                                                                                                                                                                                                                                                                             Assembly schedule includes                                                                                                                                                 Viacom
                      Pull, Drumbeat                                                                                                                                                                                                                                                                                                                                                                MPS
                                                                                                                                                                                                                                                                                                                                   scrap factor
                      or MRP ordered


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         CBS




                             1                                              2                                           3                                           4                                             5                                              6
                                                              FIFO                                        FIFO                                        FIFO                                     Inventory                                      Inventory                       Inventory                                      Inventory
                                                                                                                                                                Spot Weld Multi Head
                         Punch Press (Chicago                          Roll Form (Side Former)                    Punch Press (End Former)                                                                              Pack                                          Shipping
                                                                                                                                                                  (Section Welder)


                                                                                                                                                                                                                                                                                                                              WARM                            COLD



                                Cycle                                         Cycle                                       Cycle                                       Cycle                                         Cycle                                          Cycle                                                       Sum of
                           Time/Batch     1,800                I         Time/Batch      1,800             I         Time/Batch      3456.0            I         Time/Batch       7,920           I            Time/Batch      3600.0            I            Time/Batch         0.000                                          Cycle        18,576
                                                                                                                                                                                                                                                                                                                                                           Sum of Cycle
                                                                                                                                                                                                                                                                                                                                                           Time/ Batch
                          (seconds) =                                   (seconds) =                                 (seconds) =                                 (seconds) =                                   (seconds) =                                    (seconds) =                                                        Time/
                            Batch Size                                    Batch Size                                  Batch Size                                  Batch Size                                    Batch Size                                     Batch Size                                                       Batch
                                           60                  60                         60               60                          60              60                          60             60                            60               60                               15                                          Total Inv        300           Total Inv          ?
                              (Units) =                                     (Units) =                                   (Units) =                                   (Units) =                                     (Units) =                                      (Units) =
                         Time to First                                 Time to First                               Time to First                               Time to First                                 Time to First                                  Time to First                                                    Total Time                    Total Time to
                                           30                                             30                                          57.6                                         132                                          60                                                                                                             310
                           (seconds)=                                    (seconds)=                                  (seconds)=                                  (seconds)=                                    (seconds)=                                     (seconds)=                                                       to First                         First
                       Cycle Time/Unit                               Cycle Time/Unit                             Cycle Time/Unit                             Cycle Time/Unit                               Cycle Time/Unit                                Cycle Time/Unit                                                    Max Cycle                    Max Cycle Time
                                          30.00                                           30                                          57.6                                         132                                         60.000                                                                                                        309.60
                          (seconds) =                                   (seconds) =                                 (seconds) =                                 (seconds) =                                   (seconds) =                                    (seconds) =                                                     Time / Unit                       / Unit
                                                                                                                                                                                                                                                                                                                              Average                        Average
                      Available Time /                               Available Time /                            Available Time /                            Available Time /                              Available Time /                               Available Time /
                                           80                                             80                                           80                                          80                                           80                                                80                                          Available        80         Available Time /      ?
                      Week (Hours) =                                 Week (Hours) =                              Week (Hours) =                              Week (Hours) =                                Week (Hours) =                                 Week (Hours) =
                                                                                                                                                                                                                                                                                                                               Time /                          Week
                                                                                                                                                                                                                                                                                                                                Week
                                                                                                                                                                                                                                                                                                                             C/O Time
                             C/O Time                                       C/O Time                                    C/O Time                                    C/O Time                                      C/O Time                                       C/O Time                                                                                 C/O Time per
                                           45                                             30                                           30                                          30                                            0                                                0                                           per shift       8,100                             ?
                            (minutes)=                                     (minutes)=                                  (minutes)=                                  (minutes)=                                    (minutes)=                                     (minutes)=                                                                                shift (seconds)
                                                                                                                                                                                                                                                                                                                             (seconds)
                      C/O Freq (Times                                C/O Freq (Times                             C/O Freq (Times                             C/O Freq (Times                               C/O Freq (Times                                C/O Freq (Times                                                     C/O per
                                            1                                              1                                           1                                            1                                            0                                                0                                                             4          C/O per shift        ?
                           per shift) =                                   per shift) =                                per shift) =                                per shift) =                                  per shift) =                                   per shift) =                                                      shift
                                                                                                                                                                                    not                                                                                          not                                          Overall                                           not
                             OEE % = not recorded                           OEE % = not recorded                        OEE % = not recorded                        OEE % =                                       OEE % = not recorded                           OEE % =                                                                   not recorded    Overall OEE
                                                                                                                                                                                 recorded                                                                                     recorded                                         OEE                                           recorded
                                                                                                                                                                                    not                                                                                          not                                         Average                                            not
                           Uptime % = not recorded                        Uptime % = not recorded                     Uptime % = not recorded                     Uptime % =                                    Uptime % = not recorded                        Uptime % =                                                                  not recorded   Average Uptime
                                                                                                                                                                                 recorded                                                                                     recorded                                        Uptime                                         recorded
                                                                                                                                                                                    not                                                                                          not                                         Average                                            not
                             Yield % = not recorded                         Yield % = not recorded                      Yield % = not recorded                      Yield % =                                     Yield % = not recorded                         Yield % =                                                                 not recorded    Average Yield
                                                                                                                                                                                 recorded                                                                                     recorded                                         Yield                                         recorded
                                                                                                                                                                                    not                                                                                          not                                         Average
                                 PPM= not recorded                              PPM= not recorded                           PPM= not recorded                           PPM=                                          PPM= not recorded                               PPM=                                                                 not recorded    Average PPM
                                                                                                                                                                                 recorded                                                                                     recorded                                         PPM
                                                                                                                                                                                                                                                                                                                               Total                                                                                                                                    Time Reference Table
                          Operators =       2                            Operators =       2                         Operators =       2                         Operators =        2                          Operators =       2                            Operators =         1                                                            11         Total Operators      11
                                                                                                                                                                                                                                                                                                                             Operators
                           Machines =       1                             Machines =       1                          Machines =       1                          Machines =        1                           Machines =       1                                        1                                                  Machines           5            Machines           5                                                                          1            hour            3,600      seconds
                                                                                                                                                                                                                                                                                                                                Total
                         Travel of Part                                 Travel of Part                              Travel of Part                              Travel of Part                                Travel of Part                                 Travel of Part                                                                                Total Travel of
                                           444                                            130                                          33                                          20                                           88                                               108.5                                        Travel of        824                             824                                                                         4           hours            14,400     seconds
                               (feet) =                                       (feet) =                                    (feet) =                                    (feet) =                                      (feet) =                                       (feet) =                                                                                     Part
                                                                                                                                                                                                                                                                                                                                Part
                                                                                                                                                                                                                                                                                                                                Total
                         Travel of                                          Travel of                                   Travel of                                   Travel of                                     Travel of                                      Travel of                                                                                 Total Travel of
                                                                                                                                                                                                                                                                                                                              Travel of                                                                                                                    8           hours            28,800     seconds
                      Operator (feet) =                              Operator (feet) =                           Operator (feet) =                           Operator (feet) =                             Operator (feet) =                              Operator (feet) =                                                                                  Operator
                                                                                                                                                                                                                                                                                                                              Operator
                                                                                                                                                                                                                                                                                                                                                                                                                                                           12          hours             43,200    seconds
                                                                                                                                                                                                                                                                                                                                                                                                                                                           16          hours             57,600    seconds
                                                                                                                                                                                                                                                                                                                                                                                                                                                           1            day              86,400    seconds
                                                                                                                                                                                                                                                                                                                                                                                                                                                           5           days             432,000    seconds
    VA      Seconds        1,800                                           1800                                        3456                                       7,920                                          3600                                             0                                                                                                                     Total VA Time       18,576        309.6     minutes                7           days             604,800    seconds
   NVA                                                                                                                                                                                                                                                                                                                                                                                                                                                     14          days            1,209,600   seconds
                                                                                                                                                                                                                                                                                                                                                                                                        Total NVA Time
   Warm                                                                                                                                                                                                                                                                                                                                                                                                                  40 hours                          30          days            2,592,000   seconds
           Seconds                                                                                                                                                                                                                                                                                                                                                                                           Warm
                                                                                                                                                                                                                                                                                                                                                                                                        Total NVA Time
   Cold    Seconds                                                                                                                                                                                                                                                                                                                                                                                            Cold

                                                      1 day                                          2 hours                                     2 hours                                    4 hours                                        8 hours


                                                                                                                                                                                                                                                                                                                 8
                                                                                                                  ONGOING PROCESS CONTROL PLAN




Customer:                                                                                                                                                                                                                                                           Page 1 of 1
             Prototype                    Pre-launch                   Production        Key Contact/Phone:                                                                                  Date(Original):                            Date(Revision):
Control Plan Number:
Part Number/Latest Change Level:                                                         Core Team:                                                                                          Customer Engineering Approval/Date:


Part Name/Description:                                                                   Supplier/Plant Approval/Date:                                                                       Customer Quality Approval/Date:


Supplier/Plant:                           Supplier Code:                                 Other Approval/Date:                                                                                Other Approval/Date:


    Part             Process Name/                  Machine, Device,                                  Characteristics                  Special                                     Methods
  Process         Operation description                  Jig, Tools.                                                                   Char.           Product/Process           Evaluation Measurement               Sample                       Control                 Reaction Plan
  Number                                                   For Mfg.                 No       Product                Process            Class        Specification/Tolerances           Technique               Size         Frequency             Method
     1                   Receiving                     Receiving Dock               1                              Receipt &              *           Quantity, delivery                 Visual                 All         Per Lot #        Certified vendors,       Notify supplier. Isolate
                                                                                                                  Verification                           & damage.                                                                           Purchase orders /       material until disposition
                                                                                                                                                                                                                                              Packing slips.          is reached. Corrective
                                                                                                                                                                                                                                                                              action.
     2             Move Raw Material                    Warehouse                   1                            Relocation to                                FIFO                       Visual                 All          Per Lot           Procedures /           Notify Material Handling
                                                                                                                  Warehouse                                                                                                                  Work Instructions          Supervisor. Initiate
                                                                                                                                                                                                                                              Trained Material          a corrective action.
                                                                                                                                                                                                                                                 Handlers
     3             Store Raw Material                   Warehouse                   1                               Storage                      FIFO / Storage & Preservation           Visual                 All          Per Lot         Fork lift operator      Notify supervisor. Initiate
                                                                                                                                                           Procedure                                                                       verifies goods against        corrective action.
                                                                                                                                                                                                                                             storage floor plan.
     4             Move Raw Material                    Bruno Press                 1                            Relocation to                                FIFO                       Visual                 All          Per Lot          Procedures /            Notify Material Handling
                                                                                                                   Machine                                                                                                                   Work Instructions          Supervisor. Initiate
                                                                                                                                                                                                                                             Trained Material           a corrective action.
                                                                                                                                                                                                                                                Handlers
   5&6                 Die Cutting &                    Bruno Press                 1                                   Length                     759.4 mm          +/- 5.0mm       Tape measure          1 piece   1st, last &              Job control plan        Stop production. Inform
                        Inspection                                                                                                                                                                        per cavity   hourly                Work order record         Supervisor. Sort back
                                                                                                                                                                                                                                                                     through till pts. conform.
                                                                                    2                                   Width                      539.9 mm          +/- 5.0mm               "                   "              "                    "                            "


   7&8                 Packaging &                      Bruno Press                 1                        Amount per container                     Must have correct            Visual / Counting            All            Per            Job Contol Plan               Re-Count &
                          Labeling                                                                                                                     amount of parts                                                       Order           Work Instruction             Re-Pack Parts.
                                                                                                                                                                                                                                             Work order record
                                                                                    2                           Label information                Bar coded label must reflect                "                   "              "                    "                    Change label to
                                                                                                                                                  the proper part #, serial #                                                                                            reflect the proper
                                                                                                                                                        and quantity                                                                                                        information.
     9            Move Finished Goods                   Warehouse                   1                            Relocation to                                FIFO                       Visual                 All          Per Lot       Procedures / W. Inst.      Notify Material Handling
                                                                                                                  Warehouse                                                                                                                  Trained Material           Supervisor. Iniciate
                                                                                                                                                                                                                                                Handlers                a corrective action.
     10           Store Finished Goods        Warehouse / Shipping Area             1                               Storage                        Storage & Preservation                Visual                 All          Per Lot            Storage &            Notify supervisor. Initiate
                                                                                                                                                         Procedure                                                                             Preservation              corrective action.
                                                                                                                                                                                                                                                procedure.
     11                  Dock Audit                    Shipping Dock                1                         Overall condition of                 As per Work Instruction        Check Sheets, JCPs,          As per Dock Audit                 Dock Audit                Isolate order.
                                                                                                             parts, labels, cartons,                                                  Blue Prints.                procedure.                    check sheet.               Hold for 100%
                                                                                                                 amounts etc.                                                                                                                                               inspection.
                                                                                    2                          Part Verification                  Parts in carton must match       Visual, Work order                   "                            "                            "
                                                                                                                                                      Work order / Label                  Label
     12            Ship to Customer                    Shipping Dock                1                           Part delivered to                     On-time and free of           Mapics tracking            100%            All             Shipping Log              Corrective action.
                                                                                                                 the customer                              damage                      system.                               Orders           On time delivery           Notify customer.
                                                                                                                                                                                                                                                  policy.
                                                                                                                          Potential
                                                                                                               Falure Mode and Effects Analysis
                                                                                                                      (PROCESS FMEA)



Item:                                                                                                                     Die Cutting Application                                          FMEA Number:

Model Year(s) Vehicles:                                                              Process Responsibility:                                                                               Prepared by:

Core Team:                                                                           Key Date:                                                                                             FMEA Date (Orig):           (Rev.) 01
    PROCESS           POTENTIAL FAILURE           EFFECTS OF FAILURE         S   C      POTENTIAL CAUSES OF           O      CURRENT CONTROLS          CURRENT CONTROLS            D   R    RECOMMENDED        RESP.    ACTION TAKEN   S   O   D   R
   DESCRIPTION             MODE                                              E   L           FAILURE                  C          Prevention                Detection               E   P       ACTION          COMP.                   E   C   E   P
                                                                             V   A                                    C                                                            T   N                       DATE                    V   C   T   N
                                                                                 S
                                                                                 S
   1 RECEIVING        - Receive wrong       - Will not meet customers        5     - Vendor labeling problem.         1                             - Vendor certification.        9   45 None
     VersaMat         material.             specifications.                        Miscomunication between                                          Receipt & verification to
                                            Internal reject.                       order desk and vendor.                                           packing slip
                      - Wrong thickness of - Will not meet the               7     - Vendor labeling problem.         1                             - Vendor certification.        9   63 None
                      material is received. customers specifications.              Misscomunication between                                         Receipt & verification
                                                                                   order desk and vendor.
                      - VersaMat has not    - May not meet flammability      9   * - Vendor failure                   1                             - A2LA certification.          9   81 None
                      been certified.       requirements                           Material is not certifiable.                                     Receipt & verification
                      - Material arrives    - May lose the proper yield.     4     - Not loaded in truck              2                             - Vendor certification.        9   72 None
                      damaged.              May cause a slow down                  correctly. Truck leaked etc.                                     Receipt & verification
                                            while processing.
     2 STORE          - Damage during       - Mis-handling of material       6       - Lack of training               1 Forklift training           Training records /             9   54 None
    Raw Material      movement                                                                                                                      certification
                      - Stored in the wrong - Will not meet the customer's   7       - Lack of knowledge of           1 Forklift training           Training records /             9   63 None
                      location              delivery                                 storage location                                               certification
      3 MOVE          - Damage during       - Mis-handling of material       6       - Lack of training               1 Forklift training           Training records /             8   48 None
    Raw Material      movement                                                                                                                      certification
  4 DIE CUTTING       - Miscut              - Will not meet customers        7       Improper set-up / material       1                             - Work instructions, job       8   56 None
  5 INSPECTION                              specifications. Customer                 mis-fed                                                        control plans, quality records
                                            rejection.

                      - Jagged Cuts         - Will not meet customers        7       Dull/bent/damaged die rule       1                             - Work instructions, job       8   56 None
                                            specifications. Customer                                                                                control plans, quality records
                                            rejection.

                      - Dirty Parts         - Will not meet customers        7       Poor housekeeping                1 Housekeeping Audits         - Work instructions, job       8   56 None
                                            specifications. Customer                                                                                control plans, quality records
                                            rejection.

                      - Incomplete Cuts     - Will not meet customers        7       Dull/bent/damaged die rule/      1                             - Work instructions, job       8   56 None
                                            specifications. Customer                 improper head height setting                                   control plans, quality records
                                            rejection.

                      - Used Wrong Die      Parts are usable to customer     7       No label on die                  1 Tooling Die Procedure       Tooling Approval Log           8   56 None

                      - Gage out of         Possible bad products            4       Calibration date expired         1 Gage Calibration System Gage Calibration Log               8   32 None
                      calibration

                      - Wrong part is       - Customer rejection.            7       - Not following Work Inst.       1                             - Production planner reviews   8   56 None
                      produced / wrong      Customer may not have                    Work order discrepency.                                        work orders. Work Instr.
                      amount of parts.      enough to fill orders.                                                                                  Shippers pick list


  6 PACKAGING         - Too many parts in   - Container may not be able      4       - Packer not following JCP       2                             - Production planner reviews   9   72 None
   7 LABELING         container.            to hold up, could break                  work instruction.                                              work orders. Work Instr.
                                            during shipping.                                                                                        Shippers pick list
                      - Not enough parts in - Increased shipping costs.      4       - Packer not following JCP       2                             - Production planner reviews   9   72 None
                      container.            Cust. may not have enough pts            work instruction.                                              work orders. Work Instr.
                                            to keep their process going.                                                                            Shippers pick list




                                                                                                                          Page 16 of 19
                                                                                                                            Potential
                                                                                                                 Falure Mode and Effects Analysis
                                                                                                                        (PROCESS FMEA)



Item:                                                                                                                       Die Cutting Application                                          FMEA Number:

Model Year(s) Vehicles:                                                                Process Responsibility:                                                                               Prepared by:

Core Team:                                                                             Key Date:                                                                                             FMEA Date (Orig):           (Rev.) 01
    PROCESS           POTENTIAL FAILURE             EFFECTS OF FAILURE         S   C      POTENTIAL CAUSES OF           O      CURRENT CONTROLS          CURRENT CONTROLS            D   R    RECOMMENDED        RESP.    ACTION TAKEN   S   O   D   R
   DESCRIPTION             MODE                                                E   L           FAILURE                  C          Prevention                Detection               E   P       ACTION          COMP.                   E   C   E   P
                                                                               V   A                                    C                                                            T   N                       DATE                    V   C   T   N
                                                                                   S
                                                                                   S

                                              Pts damaged / slid in carton.
                      - Wrong parts arrive    - Customer shutdown.             4       - Mislabeled parts. /            1                             - Production planner reviews   9   36 None
                      at customers.                                                    Mislabeled carton.                                             work orders. Work Instr.
                                                                                                                                                      Shippers pick list

                      - Parts are all         - Customer rejection.            4       - Parts were not properly        1                             - Production planner reviews   9   36 None
                      stuck together.         Parts are not fit for use.               orientated in carton                                           work orders. Work Instr.
                                                                                                                                                      Shippers pick list
      8 MOVE          - Damage during         - Mis-handling of material       6       - Lack of training               1 - Forklift training         Training records /             8   48 None
  Finished Goods      movement                                                                                                                        certification
     9 STORE          - Damage during         - Mis-handling of material       6       - Lack of training               1 - Forklift training         Training records /             9   54 None
  Finished Goods      movement                                                                                                                        certification
                      - Stored in the wrong   - Will not meet the customer's   7       - Lack of knowledge of           1 - Forklift training         Training records /             9   63 None
                      location                delivery                                 storage location                                               certification
 10 DOCK AUDIT        - Procedure not         - Customer rejection             4       - Lack of interesting the        1                             Dock Audit Sheet               9   36 None
                      followed correctly                                               dock audit review
     11 MOVE          - Damage during         - Mis-handling of material       6       - Lack of training               1 - Forklift training         Training records /             8   48 None
  Finished Goods      movement                                                                                                                        certification
   12 SHIPPING        - Parts arrive at       - Could cause some down          6       - Parts not cut/assembled on     1                             - On time delivery policy.     9   54 None
                      customers late.         time for customer.                       time. Trucking problem.                                        Delivery tracking system.
                                                                                       Work order discrepency.
                      - Parts arrive at       - Could cause a storage          2       - Work order discrepency.        1                             - On time delivery policy.     9   18 None
                      customer too early.     problem for customer.                    Shipping problem.                                              Delivery tracking system.
                      - Parts arrive at       - Customer rejection             5       - Parts were not loaded on       1                             - Loading instructions,        9   45 None
                      customer damaged.                                                truck properly. Cartons were                                   packaging instructions
                                                                                       not sealed / packed correctly




                                                                                                                            Page 17 of 19
3.13.0 Findings, Analysis, Conclusions and Recommendations (FACR's)
FACR's are used for each individual tool, and each assigned application in the toolset. Generally these are associated with a specific
objective, although they may address more than one objective in the project. The goal is to determine how effectively the tool application
worked, and in what ways? Also, what was found when it was used, what could be concluded, and what was the recommendation based
on use? Note that rows can be added to (and inserted) and that a general summary statement should be added at the bottom of the
worksheetFACR's should be completed for all tools and all applications by all on the team, per the syllabus assignment rollout, although
Note that on this same page.
final compilation is assigned based on the team leader for a given tool or phase under construction. Iterations for different information
and/or data sets for the same application are intentionally to be configured as multiple sets of data for the same application, as a way to
"test" and/or further develop the application. It is also true that applications can be modified and improved as part of the work of the
team, if recommended by them.
All team members first use the application with the project and the tool, as a separate data set generated. After all on the team have used
the application, and posted in the appropriate thread area, one person on the team is assigned by the team leader to compile all of the
same applications. After all separate applications for a given tool are compiled, the team leader compiles all of these into the tool FACR
system as part of the grand portfolio compilation. As each tool is added and the toolset completed across the semester and course, these
are added, cumulatively.
Tool/App/
Team Mem            Project Objective            Analysis Method                        Findings                      Conclusion,                   Recommendation
                                                                                 Findings relate to how the
               Each project objective is       Analysis methods are              application and tool were     Conclusions are directly related   Recommendations are based
               shown in a similar manner,      typically directly/specifically   found to behave--did they     to, and based on, the findings     on analysis, findings and
               as appropriate, and             related to the nature of the      work--and how well?           and analysis method behaviors.     conclusions logically derived
               relationships to the tool and   application and tool under        Findings only reflect what    Conclusions only reflect what      based on the application to the
Explanation    applications are addressed      study, objectively analyzed       was directly addressed,       was directly addressed,            objective, within the context of
and directions and explained objectively.      discreetly, clearly, detailed.    objectively.                  objectively.                       the tool. Objectivity………


                                               The anlysis method was to         Based on various iterations   Conclusion drawn was that the
                                               use the VSPC application as a     it was found that the         VSPC application appears to be     Recommendation was to
Example Tool      To reduce variation in the   systematic approach,              application was appropriate   an appropriate data gathering      continue to collect data and
__, VSPC, by J.   ABC production system,       gathering data iteratively        to monitor the drill          and monitoring system for          pursue the systematic analysis
Doe and B.        specifically at the ______   with each team member             operation for continuous      continuous improvement and         for variation reduction and
Anybody.          operation.                   filling a practice sheet.         improvement.                  variation reduction.               continuous improvement.
                                                                         Name (s) shown at a row,
                                                                         for Tool/App/Team Mem          One indication that a team is
              Rows are added by placing                                  may be one person or           working well together, all are      Typically, the FACR will be
              the cursar in the row desired Rows can be expanded for     multiple's since, when         "pulling their weight", will be     several pages in length, all one
              to be added to, and using the more verbage by going to the compiled, the information      that all names are represented in   worksheet, for a given tool,
General       insert prompt above,          row line at the left, under  may be merged, greater as      the total final tool compilation,   addressing all applications for
information   dragged down to rows.         numbers of rows.             sum, vs. individual.           and all objectives are addressed.   that tool.

              FACR summary is a general statement which summarizes and overviews the more detailed overall listing of information from the FACR information
              provided by all on the team. Main findings, analyses, conclusions and recommendations provided, and how this has impacted the project would be
FACR          appropriate for the summary on each overall tool and/or application, depending on levels of significance afforded by team. The summary is usually best
Summary       done by the team leader for that tool, based on compiled input and feedback from all on team.

						
Related docs
Other docs by kgs75263
Janitorial Business Expense Xls
Views: 63  |  Downloads: 0
It Service Continuity Template
Views: 53  |  Downloads: 0
Job Applicant Work History Addendum Forms - PDF
Views: 45  |  Downloads: 1
Job Applicant Screening Form Excel
Views: 63  |  Downloads: 0
Itil Ncident Reporting Template
Views: 45  |  Downloads: 0
Jd for Finance Manager
Views: 17  |  Downloads: 0
It Ksa Worksheet - DOC
Views: 30  |  Downloads: 0
It Job Work Order
Views: 10  |  Downloads: 0
Itil Knowledge Management
Views: 171  |  Downloads: 3