							IT Services 2010-11 Annual Plan



                        IT Services 2010-11 Annual Plan
Executive Summary

IT Services has four principal objectives:
   1. The development and support of an IT, Audio Visual and communications
       infrastructure to enhance the student experience ad facilitate the modern Teaching,
       Learning, Research and Administrative environments expected and required by our
       students, staff and associated Businesses.
   2. The development and support of the information systems needed to enable staff and
       students to make evidence based decisions at the strategic, tactical and day to day
       level.
   3. To ensure that all our services take place in a secure, scaleable, resilient and
       sustainable environment in accordance with relevant policy and legislation.
   4. To facilitate other Schools and Services with responsibility for supplying IT related
       services to ensure efficient and effective integration of processes, appropriate
       resilience and best value.

Our major achievements and contributions over the last year have included:
  • Opening of the Sir John Cass School building
  • Opening of the Stratford Computing and Conference Centre
  • Replaced the Wireless LAN with excellent UEL wide Coverage
  • Implementation of the new Library System on Virtual Servers
  • Extension of student service desk support to 24 x 7 by contracting with NorMan.
  • Updated the Service Helpdesk to adopt best practice and ITIL compliance standards
  • Completing the migration to the new Stratford Server Room
  • Completion of UEL‟s entry into the Eduroam service
  • Delivered the baseline Agresso Business World infrastructure
  • Improved UEL‟s external email reputation and gained places on a number of
     beneficial email “whitelists”
  • Implementation of Kaspersky Anti-Virus UEL wide and supported students with the
     provision of effective anti-virus protection and guidance

Our main challenges are
  1. The rapid increase in student and staff dependency on the IT Infrastructure in all
     aspects of their working life is being impeded by the current network design and
     infrastructure.
  2. Satisfying student and staff expectations in an environment that is increasingly
     complex and inter-related, with a high level of service expected to be available 24*7,
     365 days a year.
  3. Resource limitations lead to single points of failure and individuals being over
     stretched.
  4. Effective organisation and management of our corporate information for decision
     makers.
  5. The infrastructure needs to be re-engineered to modern industry standards to
     support our „transforming for excellence‟ vision and collaborative working.
  6. Sustainability of the aging IT infrastructure in the current financial climate.
  7. Provisioning of services based on user identity.
  8. Physical & logical security of people, data and systems in an increasingly hostile
     environment.
  9. A number of projects continue to materialise during the year which have not been
Confidential                        Page 1                          07/03/2011
 IT Services 2010-11 Annual Plan
       identified in the planning round. These do have a significant impact on our effective
       use of resources and consequently delivering our services. Our IT governance
       structure needs to prioritise these ad-hoc demands.



Key strategic service priorities for action in 2010/11

Strategic Service         Key Actions                          Link to Institutional priority
Priority
Priority 1

Development and           Re-develop our infrastructure to     All
support of the IT,        improve capacity, performance
Audio Visual and          and resilience.
Communication
infrastructure needed     Develop our Desktop to improve Student satisfaction
to facilitate a modern    delivery, flexibility and reduce
Teaching, Learning,       environmental footprint where
Research and              appropriate.
Administrative            Convert six trading floor clusters to Student satisfaction
environment for our       quiet computer teaching rooms at
students, staff and       Docklands. Replace open access
associated                round tables and chairs and
Businesses.               improve power resilience for
                          laptops.
                          Address complaints from teaching Student satisfaction
                          staff at Stratford about lack of quiet
                          computer teaching facilities.
                          Integrate communication facilities
                                                              Student Satisfaction
                          with students (Text, e-mail, phone,
                          Web, UELDirect) and provide
                          additional data storage. Make
                          further      improvements        to
                          organisational directories.
                          Enhancement and update to audio All
                          visual services in teaching spaces
                          including the ability to record
                          lectures.
                          Update the assistive technology Student Satisfaction
                          available for students

Priority 2

Development and           Implement automated attendance Student Satisfaction and
support of the            recording across all learning Portfolio Development.
information systems       spaces and interface with new
needed to enable          timetabling    system.    Ensure
staff and students to     compatibility with existing and
make evidence             future catering and security
based decision at         requirements for SMART Cards.
both the strategic
 Confidential                           Page 2                          07/03/2011
 IT Services 2010-11 Annual Plan
and day to day level.     Review UEL Direct usage and Student Satisfaction
                          Web interface and refresh in line
                          with external web developments.
                          Review how well our core business All
                          processes are supported by our
                          student records system and make
                          recommendations                for
                          improvements or replacement.

                          Enhance our business intelligence All
                          capabilities by implementing MIS
                          personalised dashboards for key
                          staff roles.

                          Implement Microsoft Sharepoint to All
                          replace our current intranet. This
                          will allow us to introduce a
                          document      management        and
                          collaborative working capability as
                          well as enhance our management
                          information capabilities.

Priority 3

Ensure all electronic     Implement identity management All
interaction take place    function for staff and students
in a secure and           including password authentication
resilient environment     to ensure improved security.
in accordance with
the relevant              Provide a standard encryption All
legislation.              mechanism to improve data
                          security on mobile devices and
                          removable media.

                          Implement a system to assist in All
                          the management of IT Assets and
                          software updates and to improve
                          the proactive management of our
                          IT infrastructure.

                          Provide additional network and All
                          security analysis tools to improve
                          the pro-active management of the
                          infrastructure     24/7     including
                          activity logging.


Priority 4

Facilitate other          Delivering the IT infrastructure to All
Schools and               meet     our    Estate     Strategy
Services with             developments – Sports centre,
 Confidential                          Page 3                       07/03/2011
 IT Services 2010-11 Annual Plan
responsibility for        Stratford   Library    and   Stratford
delivering IT related     Island.
Services to ensure
maximum integration       Provide increased storage capacity All
of processes,             for multi-media objects.
resilience and value.

                          Implement Phase 2 of the new All
                          Finance System.


Priority 1: Development, delivery and support of the IT, Audio Visual and Communications
infrastructure needed to facilitate a modern and significantly “online” Teaching, Learning,
Research and Administrative environment for our students, staff and associated Businesses
Issues
Major causes of student/staff dissatisfaction with IT facilities are:

      Student printing at assessment submission dates remain a challenge despite a number
       of initiatives undertaken to improve this system.
      Performance issues with UELPlus continue, trials of loaned, high specification servers
       have not been conclusive and need further investigation by the supplier.
      Complaints from teaching staff and students about the noise and difficulty organising a
       class on the Trading Floor are also now evident from the new Stratford Computer
       centre.
      Across both campuses, a number of computers are not working at any point in time.
      Issues with Mac support & integration into mainstream service provision continue to be
       a challenge, especially for AVA students. Staff providing University Mac support,
       provided by HSS, have been redeployed, which has exacerbated the already poor
       situation.

Demand for increased networked access and services in teaching rooms and the Trading
Floor/Computer Centre is causing student and staff dissatisfaction. This is largely the result of
a network infrastructure that was acceptable upon design/implementation but is no longer “fit
for purpose”, resulting in a number of performance bottlenecks and impacting upon user
satisfaction.

Operation & support of an aging core systems infrastructure which is impacting upon the
delivery of email, business & teaching applications and data.

As a result of the expanding numbers of computers for student use, our servicing and repair
costs have escalated.

Meeting the servicing costs of AV equipped classrooms is exceeding the budget.

Both our increased student numbers and the exchange rate against the dollar and euro are
affecting the costs of software licences and equipment. Consequently, operational and project
costs are increasing which is challenging the budget.

Demands to meet in-force and planned environmental and carbon reduction targets.
Computer equipment disposal under the WEEE regulations and ensuing compliance with data
protection requires improved auditing facilities.



 Confidential                           Page 4                          07/03/2011
 IT Services 2010-11 Annual Plan

Improve Management of Changes and Communications within the delivery of IT
Services.
Users are often not aware of changes to IT, these need to be communicated and controlled.

Analysis of new action proposed for 2010/11 onwards

Student Satisfaction –

Printing - Issues with the reliability of printers and printing software coupled with the effects of
the economic downturn on preferred suppliers caused distress to students attempting to meet
their assessment submission deadlines. In response, we undertook an external review to
improve the student printing system and the following recommendations emerged:
    The reinstallation or replacement of the print system software, PCounter.
    The replacement of RICOH printers which were proving to be unreliable despite being
       less than two years old and their consequent replacement as our supplier of choice.
    The supply of additional printers from the contract supplier during assessment hand-in
       periods.

The PCounter system was re-installed and a new printer contract agreed with OCE. While
initial deliveries and reliability were positive, OCE was unable to meet our demand for future
printers during the critical assessment period. We are working with the supplier to ensure
delivery of replacement printers and will keep the situation under close review through
Semester B. During this period we are reviewing Staff printing together with facilities and the
Print Centre as part of a £50K JISC Environmental IT project. Our recommendation is to
upgrade the Print System for both staff and students.
This project should be funded from student subscriptions and savings from uneconomic staff
printing, although some additional investment in the first year will be required. To gain
additional value including wireless printing which will be implemented. £25K

UELPlus – The current systems supplier, Blackboard, has recommended improved hardware
to resolve our performance and failures issues. We hired new servers to trial the solution but
continue to experience problems although less extreme than in the previous year. We will
continue to work with Blackboard on this issue in the short term, however we should consider
moving to a hosted solution by Blackboard next year where performance issues would
become their problem to resolve for the remaining life of the application. In parallel with this
investigations and development should be carried out into the next generation of UEL‟s VLE.
The total cost for these two activities is £90K

Student Computing – We have installed campus wide wireless facilities this year after
replacing the previous system. The WLan provides excellent coverage over all our sites and
caters for the increasing numbers of students and staff using mobile devices. We have not
seen a corresponding reduction in the use of fixed computing resources and increased
student numbers continue to negatively affect our student to computer ratio. The opening of
the Computer centre at Stratford was targeted to achieve the 8:1 average for benchmark
institutions although even with the retention of Duncan House our ratio is around 9.5:1. We
should plan to look for further opportunities to provide additional student computing resources
either in dedicated Post Graduate centres and Stratford Island. It is essential to continue or
improve our current equipment replacement policy if student and staff satisfaction is to be
maintained. Within this context, its also proposed to move Student email to an externally
hosted solution, this will offer and has been proven to offer, students a far more receptive
 Confidential                          Page 5                             07/03/2011
 IT Services 2010-11 Annual Plan
experience, better aligned with their personal email, removing a number of complexities and
duplication, as well as reducing the overhead/burden on UEL for operating an infrastructure
for student email. This is a full integrated solution, so staff & students can still communicate
efficiently & effectively by email and there are significant infrastructure benefits for UEL. As
part of this move, students would also benefit from a hosted data storage facility
Replacement Costs for servers, storage and client devices £850K

The Stratford Student Computing Centre has been operational since August 2009 and we
expect student satisfaction levels to be greatly improved when this year‟s student satisfaction
report is published. The additional resources to support the Service desk at Stratford have
been deployed and anecdotal feedback is positive. Many of the new computers in both this
area and CASS have suffered a failure of their power switch, although the supplier has now
replaced all switches from this batch. This incident together with similar problems with power
supplies and hard disks on other batches of computers from different manufacturers leads us
to consider changing our strategy to purchase from a single tier one manufacturer and initiate
the move to thin client computing and client/application virtualisation over a 3 to 5 year period.
While the initial purchase may be up 20% higher, a longer life expectancy for the
infrastructure, coupled with reduced support costs and improved service will lead to improved
student satisfaction is considered to be worth the initial investment.

The behavioural problems on the Trading Floor are generally much better following the
increase in security; student and staff are reporting their experience has greatly improved
during the day, although evenings can still be challenging and must be improved. We have
introduced rolling timetable displays on each computer cluster to inform students which
computers are available and which are required for teaching. We continue to receive
complaints from teaching staff and students that the open plan environment and location of
the IT Service Desk is inappropriate and not conducive to support & learning due to noise
from adjacent clusters and the flow of students through the centre. Building work and
infrastructure costs £65K to reconfigure the IT Service Desk and improve
communications for students & staff

Similar complaints are occurring from staff using the new Stratford Computing Centre. We
recommend that four clusters at Strafford are also enclosed. Building work and
infrastructure costs £200K

The Docklands Trading Floor is 5 years old this year and while we have updated computers,
the small open access cluster furniture, helpdesk and a number of the chairs are dirty or
broken. Other furniture and AV equipment is lasting well and does not yet need replacing. We
must ensure our facilities remain in good repair to continue to aid the student experience,
while attracting new students and ensure current students are satisfied with their
environment. £50K

IT Network see Priority 3 below for details; however this development is a pre-requisite for
many of our developments and customer satisfaction and is therefore a Priority 1 issue.

We have over 160 classrooms equipped with our standard Audio Visual facilities, many of
which have been in place for over 3 years. A number of electronic white boards need to be
replaced due to wear and tear or misuse and many bulbs in projectors are failing. We need to
recognise the costs of maintaining these facilities to a satisfactory standard within the budget.
The 250 seat lecture theatre at Dockland is now 10 years old and the AV infrastructure need
to be updated to be compatible with current standards. £525K for replacement and repair of
AV equipment in 12 rooms on Docklands Campus and 27 at Stratford Campus plus the
Docklands 250 seat lecture theatre upgrade.

 Confidential                         Page 6                            07/03/2011
 IT Services 2010-11 Annual Plan
We have developed an Office 2007 version of the Windows XP Desktop and are currently in
the later stages of user testing. This will be installed on staff computers over the next few
months and rolled out to all student computers over the summer. We are in the early stages
of testing Windows 7 which we will incorporate into the rollout for students if time permits. We
are redeveloping our application delivery methods that will enable us to make updates more
frequently, reduce the development time for new desktop applications and also enable us to
have systems pre-imaged by a supplier prior to delivery. This will improve the delivery times
of new and upgraded computers to the desk. £50K for consultancy and services.

While we have trained some of our technical staff to provide additional support for Mac
computers located in the Multi Media Centre and School of Architecture and Visual Arts,
overall Mac support this year has declined as a result of the redeployment of the Multi Media
Mac technician by the School. This position was originally established to provide University
wide Mac support as part of the re-organisation of IT Technical Support in 2001. We would
recommend bringing Mac support back into the IT Service remit and integrated into the
existing technical support organisation. 2 * Technicians £80K – could be redeployed from
schools - see the staffing plan for Technician costs

In previous budget round we have contained the costs of WEEE regulations and repairs
within the existing equipment budget by efficiency savings in procurements. This year repairs
costs will have to be met from the equipment replacement budget reducing the number of
replacement computer available to students and staff. Clearly if this situation is allowed to
continue, our replacement cycle will be extended placing further pressure on the repair
budget. Repairs and Disposal costs £50K increase in revenue budget

Change Control
A change control process needs to be adopted and rigorously enforced. All staff should be
required to adhere to change control processes and actions should be taken when this is not
done. Implement ITIL change control module and recruit Change Manager. £60K - see the
staffing plan for Change Manager costs.


Priority 2: Development, support and integrated access to information systems needed to
enable staff and students to make evidence based decision at both the strategic and day to
day level.
Issues

UEL has a complex IT environment with many applications and databases requiring user
identity data. Some automation of common tasks, especially for student accounts, has
already taken place mainly through scheduled scripted tasks. However, due to the nature of
the existing environment and homogenous growth, it is becoming increasingly complex for
students and other users (members of staff and sponsored accounts) to gain the access they
require in an expedient and consolidated manner.

The use of UEL Direct has continued to increase during term-time, and particularly during
enrolment with over 20,000 students using UEL Direct each month, logging-in on average 15
times. This year, further improvements have been made to the student timetables and
students in the two schools participating in the attendance recording pilots can view their
attendance record. Updating of the web interface has been delayed while we recruited an
experience web developer, but will now proceed in the spring.

Students find our communications channels confusing as there is no integration of systems,
e-mail, text, UEL Direct.

 Confidential                        Page 7                            07/03/2011
 IT Services 2010-11 Annual Plan
The increasing use of e-mail as a marketing and communications tool has been impeded by
the increase in the frequency of Internet provides blocking our e-mail domain.

As identified last year, Managers find the number of often complex reports available in MIS
increasing and coupled with the number of new management users, is leading to a significant
increase in queries being requested to validate information.

CMT have agreed to replace the current timetabling system to improve the allocation of
teaching rooms and ad hoc booking of rooms by individuals. In the meantime, Corporate
Systems have delivered an interim room booking system to Timetable champions within
Schools.

The Pre-Qualification Tender for the Attendance recording system to support retention and
the UK Border Agency Points Based System was inconclusive. Ultimately, this project has
been linked with the new timetable project to ensure compatibility across both systems.

Our auditors identified there was a need to establish a Data Quality management structure to
ensure the statutory data returned to external bodies and used internally for our strategic
decision making is sound.

During the selection of our new Finance system (Aggreso), we took the opportunity to gain an
overview of the associated Student Record systems available from competing suppliers. At
this time, we are not convinced there is a suitable replacement for SITs from a single supplier
with equivalent or greater functionality.

The Trent HR systems self-service facilities are still not in general use by staff although a pilot
in IT Services and CITE is about to commence. Further issues were identified during the
previous testing phase that had to be addressed by the supplier prior to a general rollout.

Analysis of new action proposed for 2010/11 onwards

Intranet Development – SharePoint
Further development of the pilot intranet development
     Production/live implementation, migrate pilot SharePoint environment to production
      platform to live. Note: this excludes any hardware requirements
     Integration with UKBA PBS SITs module for document integration/storage
     Integration with Agresso for document management
     Integration/replacement of the current SITs eVision student/staff portal “UEL Direct”
      with SharePoint portal, this would involve re-branding/re-launching the portal. This
      would require migration of non SITs dependant staff reporting, links/urls etc. to new
      portal

The estimated funding required to deliver these initiatives is £50K including implementation
and consultancy costs.

UELDirect
We have appointed an experienced Web developer to take forward the refresh of UELDirect
and to develop a consistent approach to our Web interface design in collaboration with the
Web team in Corporate Marketing. Consultants are developing a prototype SharePoint portal
to provide Intranet functionality for improved delivery of our management information and
workflow applications such as submission and management of course work, initiatives in this
respect include;
    Migration of 3 business critical MS Access database applications for Employability and
 Confidential                          Page 8                            07/03/2011
 IT Services 2010-11 Annual Plan
       Student Services to MS SQL Server backend and web application front end – estimate
       £45K
      Mobile applications for students, initial first year product implementation and license –
       including mobile computing device (iPhone) application for staff during Clearing and
       Enrolment and Future mobile commerce developments using either web applications
       or App style development £90K
      Enhance SITs eVision portal look & feel to align with new portal look & feel £12K
      Paperless Admissions, business requirement identified by Marketing. £50K
      Contingency funding for new modules/upgrades to core business applications i.e.
       SITs/Agresso/Occam modules relating from unscheduled projects/legislation. £50K

The total estimated funding required to deliver these initiatives is £247K including
implementation and consultancy costs

Identity Management, Organisation Directories and our email reputation.
UEL have a complex identity management solution which includes manual tasks, scheduled
scripted tasks and views and applications which have been developed in-house. Following a
review of the current environment and in response to a longstanding audit action relating to
this item, we believe that there would be substantial benefits for UEL by replacing the existing
piecemeal solution, with one based on system driven automation, initiated by the HR &
Student systems This would include improved supportability, reduced administrative costs,
quicker and more reliable account creation and modification improving security and end user
experience for both students and staff £150K covering development & implementation
services & infrastructure (hardware & software)

The increasing use of e-mail as a marketing and communications tool has been impeded by
the increase in the frequency of internet providers blocking our e-mail domain. Internet
providers take this action when they receive a number of complaints about SPAM from a
particular internet domain. We have put in place a service administrator to manage our e-mail
reputation which has dramatically improved the situation and UEL‟s external email reputation.
This is currently unfunded and need to be addressed this year. £30K for the contracted
service - see the staffing plan for administrator costs.

Timetabling, Attendance Recording and Points Based System implementation.
The Pre-Qualification Tender for the Attendance recording system was inconclusive as no
single supplier was able to demonstrate that they could fully meet our requirements. Although
the RFID data collection pilot looked promising, feedback from students and school registrars
concerning the reliability of identification and the lack of compatibility with our security
systems has resulted in a change in our specification, to a contactless proximity card
compatible with all our existing systems as well as providing the ability to add an electronic
purse at a later date. Funding will be required to fit out all learning spaces with proximity
readers this year. £240K will be required for installation in 200 Teaching & Learning
Spaces.

The cost for the timetabling system will appear in the Facilities plan however and integration
work with our SITs system and timetable displays will be required from within our own
resources. £40K

Management Information
   The re-development of the Management Information System to provide managers with
     individual, customisable dashboards of their data is progressing It is anticipated this
     will be based on Sharepoint technology as such there is a cost estimate of £150K for
     product/software and consultancy, hardware & infrastructure costs will be

 Confidential                         Page 9                           07/03/2011
 IT Services 2010-11 Annual Plan
       funded from the server replacement programme detailed in Priority One .

As examples of further reports requested from Delta and MIS this year;
    Interfaces for pilot UEL+ Moodle project
    Method for tracking application/decision making process (to enable us to track how
      long forms have been with Schools awaiting decisions (needs to be loaded from SITS
      to MIS)
    Automated list of Schools were application forms are outstanding and awaiting
      decision
    Enquiry data from Hobsons EMT to be loaded into SITS to provide conversion
      information and tracking of enquiry to application
    Ability to schedule interviews for applicants using SITS - and related reporting
    Demographic info for applicants including postcode/gender/age etc
    For UCAS applicants - their school/college information
    Ability to load into MIS, bought- in data from UCAS/HESA to enable comparable
      market data
    Summary of qualifications on entry for enrolled students and applicants
    Phone stats in MIS for clearing reports

Data Quality
The Data Quality Board was established this year and has identified a prioritised work
programme to improve our corporate data. An Information Improvement manager has been
appointed on a 0.5 basis working on improving the quality of our data as well contributing to
the redevelopment of our management information capability. A process review of the
student data validation exercise is almost complete and recommendations are emerging.
Given the current difficult external funding climate, the cap on student numbers and the
issues in data quality and governance experienced at London Metropolitan University, it is
imperative that the University adopts strategies and processes aimed at improving the
integrity of our corporate data.

This post has now been established as full time.


Priority 3: Ensure all electronic interaction take place in a secure and resilient environment in
accordance with the relevant legislation.
Issues
The current network, while fit for purpose at the point of its original design, is now no longer
so. It has not tracked the changing nature of UEL (i.e. making more services available online
or via the WWW) and is in need of both redesign and equipment upgrades to meet the
growing needs of the University. Some of the areas identified as problematic and in need of
remediation include;

Design and Availability
The lack of modular components in the current design makes it difficult to adapt the network
to changing business requirements or adopt new services and technology. The network has
homogeneously grown and has not followed best practices in a number of areas, leading to a
number of points of failure. Resiliency is not built into the current design and consequently,
equipment failures can affect service availability for large user communities.

Performance
The current network has limitations with both physical devices and design, and this is causing
sub-optimal performance. It also effects general data transfer and introduces delay when
performing tasks such as logging into workstations and transferring data to network locations.
In addition, the reliability of delay intolerant applications such as voice and video based
 Confidential                        Page 10                            07/03/2011
 IT Services 2010-11 Annual Plan
services and streaming video (CCTV, e-learning etc) will be reduced. Network performance
related delays will have a negative impact on the productivity of all network users. Instances
of degradation of the IT Network has continued to affect user satisfaction.

Logical Security
At present, some of the recommended and expected security features which are designed to
protect the UEL network and the integrity of its data are not in place. The current logical
design exasperates this problem and compounds daily operations management. Malicious
attacks on network based services continue both from internal and external sources. There
remains the need for greater awareness of the implications and possibilities of data loss due
to theft or carelessness of users.

Physical Security
Also under the security umbrella is the overall campus security requirement via CCTV, for
which the network backbone is the sole transport/mechanism. The planned expansions for
CCTV, including again the demands new buildings, 2012 Olympics along with business as
usual operations, requirements for increased vigilance and constant monitoring ability places
a heavy demand on our network infrastructure

Management
As a result of the homogenous growth, devices on the network have been allowed to move
away from required operating level and do not conform to an internal policy or template with
the consequence that risks from configuration errors are increasing and the efficiency of fault
resolution activities is reduced/hampered due to disparate configurations.

Visualisation and Reporting
A combination of inadequacies in the current network monitoring software and the inability to
identify and deliver granular statistics due to design issues prevents the required statistical
output from being generated by the network monitoring system. This makes strategic capacity
planning difficult. In addition, the lack of monitoring information forces the support department
to undertake a reactive fault resolution practice.

We remain without a resilient power supply to our Server Rooms at Dockland and Stratford
with the consequence that loss of power for more than a few minutes will result in the system
shutting down until power is re-established resulting in an probable loss of recently entered
user data.

While we will have relocated the Stratford Server room to ensure greater resilience and
improve capacity, our telecommunications at Stratford is still housed separately in University
House. This leads to additional patch and network requirements and is not as well integrated
with our data networks as our other sites. The site of the current room will impinge heavily on
any refurbishment of University House.




 Confidential                        Page 11                            07/03/2011
 IT Services 2010-11 Annual Plan
Analysis of new action proposed for 20010/11 onwards

IT Network
It is proposed to initiate the implementation of an IT network infrastructure and management
solution aimed at supporting the growth of UEL and the next generation of learning
technologies. In addition, it will provide a reliable platform for the requirements for new estate
developments, the 2012 Olympics and operational changes (e.g. IT Infrastructure
virtualisation), with benefits and deliverables as follows.

Virtualisation
Our ability to rationalise and consolidate the IT Infrastructure to rapidly deliver and support
“on demand/virtual” IT services and to deliver more engaging content to both on-campus and
remote students.

Unified Communications
Delivery of a secure communications platform, which allows the deployment of advanced web
collaboration, instant messaging and video conferencing. The platform uses the existing
network infrastructure and consequently, reduces cost, maintenance and the impact on the
environment.

Mobility
A unified wireless network delivers mobile network access for students and staff members as
well as enabling asset tracking and enhancing campus network security.

Digital Media System
Digital Signage replaces static message boards with digital signs to allow easy
communication of information such as classroom changes, events, general announcements
and emergency messages.

Desktop video enables anytime, anywhere learning by delivering live and pre-recorded
lectures directly to student‟s desktops.

Enterprise TV delivers campus-produced and commercial video on demand to large displays
in dorm lounges and classrooms. Students select and control content with a remote control

The system can deliver media in the right format for any device, ranging from mobile phones
to large displays.

Network Requirements
All of the above solutions, in addition to our business as usual, security and changing network
demands require a modern network capable of delivering differential services to applications
based on their requirements in an “anytime, anywhere” context. The services, requirements
and applications used in the “Next Generation” Teaching and Learning technologies are
generally less forgiving than traditional network applications and, in most cases will not work
on networks that have grown organically rather than being specifically designed to
accommodate them. When these requirements are aligned with the increased growth of data
and associated access requirements, the network must be able to guarantee the applications
end-to-end bandwidth to meet their needs.

In addition to funds made available in 2009/2010, our pre-tender cost estimate for
2010/2011 is £250K, to fully fund the project which will be delivered in a phased
approach but must be delivered by the end of 2011

Stratford Telephony Relocation
 Confidential                         Page 12                           07/03/2011
 IT Services 2010-11 Annual Plan
In support of Estates plans for University House, if funded, relocating the telecoms equipment
at Stratford will cost an additional £200K. The enabling work has been carried out as part of
the new Server room implementation at Stratford.

Power Management & Environmental Efficiencies
We remain without an effective resilient power supply to our Server Room at Docklands with
the consequence that loss of power for more than a few minutes will result in the system
shutting down until power is re-established resulting in loss of student and staff IT services,
including email & file storage and potential corruption to recently entered user data.

This item has been a recurring theme in recent KPMG audits of IT Services, as such in
partnership with Facilities, changes are proposed to the power management of the Docklands
computer suite via the implementation of an all encompassing uninterruptible power supply
(UPS), making provision for the connection of an independent generator driven power supply.
The costs for the acquisition & installation of an environmentally efficient and appropriately
configured UPS and associated electrical works is estimated at £80k

Disaster Recover/Business Continuity - Data Security/Management (backup, restore &
archive)
Building from the purchase of the Commvault Data Management solution, it‟s proposed to
complete the enterprise deployment of data management processes, which will lead to
significant reductions in manpower and physical resources needed to secure UEL data
infrastructure. Benefits will include the de-duplication of saved date. archiving & encryption
where we need it, primary copy and/or secondary copy encryption which are essential for the
data held in UEL‟s core business systems. As a consequence, we will be able to store more
backup sets with less data loss between each backup set whilst reducing the storage required
to retain this data resulting in longer retention cycles on disk. Most importantly, recovery will
be greatly improved. Infrastructure investment required £55K

Network Access Control, Security Analyser and Scanner - The ability to manage network
access and quickly discover which PCs and devices may be non-compliant, infected with
malware, analyse network utilization and provide meaningful reporting on the performance of
the network and applications. The system should provide the end user with an ability to
become clean/compliant but also be able to ensure network policies are being adhered to and
provide reporting on breaches.

Asset Management - A solution is required for both hardware and software enabling IT
services to manage both the hardware estate and software estate accurately. Management of
this estate could provide lower cost savings in hardware and the unnecessary duplication of
software licences. It will also provide a better overview of our security exposure.

Server Anti-Virus - A more effective solution is required in terms of the control of virus
management for the server infrastructure.

Patch Management - A more effective solution is required in terms of the control of software
updates for all operating system and applications regardless of vendor.

The total for all of the above Network Access Management and Security initiatives is £118K

Priority 4: Facilitate other Schools and Services with responsibility for delivering IT related
Services to ensure maximum integration of processes, resilience and value.
Issues
The completion of phase 1 of the new Finance system provides the core Finance Accounting
system and reports, plus the initial rollout of procurement. Further work will be required to
 Confidential                        Page 13                            07/03/2011
 IT Services 2010-11 Annual Plan
implement the full procurement system, asset management and improved reporting function.

Our email infrastructure is now 2 generations behind and issues are beginning to occur in its
operation and continued operation in the virtualised infrastructure we are planning. In
addition, there are increasing demands for increased mail storage, more user friendly web
access and reduction in operational overheads

The new Library System is implemented and is our first major system to be implemented on
Virtual Servers, thereby substantially reducing the number of servers required to support it.
However, there is a requirement to provide a resilient service and this necessitates
developing a second virtual server configuration at Stratford.

Provide technical assistance and advice for a range of assistive technologies to help students
and staff working in collaboration with Student Services and Library and Learning Services.

During the planning period, there will be a requirement to design and possibly begin, the
implementation of the IT infrastructure to support our approved Estates projects.

The outcome of the Research Review is likely to identify additional infrastructure and/or
software requirements to support Research staff and students. A provision should be
considered for this activity.

Support for the Olympics may require improved infrastructure within the student residences.

Analysis of new action proposed for 20010/11 onwards

New Finance System Implementation
On completion of the first phase of the project, Corporate Systems will need to support an
increasing range of on-line finance systems and interfaces e.g. Student Accounting Module
(SAM), Library and Residential Systems. Consideration will be given to migrating the student
finance data from SITs to Agresso, with the objective of improving our reporting facilities for
financial information and the implementation of an on-line payment system.

Email Migration
In line with the above comments about moving to Office 2007 and the proposed move of
student email to a hosted solution, its also proposed to migrate staff email to the latest version
of Microsoft Exchange (Exchange 2010). The version offers UEL a number of operational and
infrastructure benefits. A pilot activity is underway and the infrastructure needed is in place
and a proposal will be made to CMT by Summer 2010 to confirm the complete migration in
readiness for the new academic year in September.

Library System Resilience
Installation of resilient hardware at Stratford to ensure the Library Service/System remains
available if a failure occurs at Docklands. Application and Data Server £50K

Intranet replacement with Enterprise portal.
While a full implementation is likely to exceed £300K over time, savings will be made by not
replacing existing storage space. An initial investment of £60K has been made to provide
servers and software to pilot an application in CITE and ESDS. If successful, further
developments will require prioritisation with an additional £100K required this year to progress
the project.

Estate Infrastructure and Olympic Support
Following the design of our new estate developments, we will need to order fibre network
 Confidential                         Page 14                           07/03/2011
 IT Services 2010-11 Annual Plan
installations for the Sports centre development and Strafford East due to the lead in time
required by BT. The replacement of the Core Switch with higher capacity devices is likely to
be required at Docklands. This can only be implemented with network downtime and
therefore requires careful planning. The network connections will be funded as part of building
projects, although a Core Switch replacement will cost approximately £120K There is very
likely to be a need to improve the residences infrastructure to support our commitments
around the Olympics. This will need implementing during this planning year.

Research infrastructure
Specialist software and relationships with corporate partners to support Research can often
be shared across subject areas. A sponsored budget to provide these services would reduce
overall institutional costs.



 Efficiency Savings Scenario Option:

 What measures would be taken to reduce costs in 2010-11, 2011-12 and 2012-13?
     Rationalisation of Software Licences                               £50K
     Renegotiation of telecommunication maintenance and cost £70K
     Reduction in computer replacement costs and reduced power consumption from
      Green IT initiatives                                              £70K
     Infrastructure consolidation and Virtualisation £150k reduction from licensing and
      maintenance changes.
     Entry into partnerships with technology organisations facilitating shared risk &
      reward for UEL operations, research, teaching and enhancing student employability
     Transition to “thin client/network” computing will significantly reduce our required
      spend on new/replacement “thin client” PC‟s. Savings estimates are in excess of
      £350K over a 3-4 year deployment programme but will require an initial
      investment (as referenced in the above 2010/2011 plan)


 What measures would be taken to seek alternative revenue sources over the same
 period;
      Charge for Student Internet Connection                       £100K
      Facilitation of shared services/space £50K (discussions initiated with Birkbeck
       College over providing computer room space pre Stratford Island) but other shared
       service opportunities may exist and need investigation
      Charge for “persistent” password resets by students
      Charge for support of non-UEL equipments (i.e. student laptops)
      Sale of IT hardware & software direct by UEL (as opposed to John Smiths)


 Which aspects of your planned activity in 2010-11 would be affected, and how?
      Possible data quality and loss of productivity.


 What additional risk exposure might result from these reduced costs or increased
 activities?
        Projects delayed or cancelled
        Student and Staff dissatisfaction
        Infrastructure failure and increased maintenance costs, impacting service delivery

 Confidential                        Page 15                          07/03/2011
 IT Services 2010-11 Annual Plan

 Risk Guidance

Impact (Rated 1-5)                                 Likelihood (Rated 1-5)
5: Catastrophic:                                   5. Almost certain
• University forced to cease business or loss of   >80%
a substantial part of the University [net > 20%
turnover]
• Multiple major injuries or deaths

4: Major                                           4. Very Likely
• Financial net impact of >6% of turnover          51%-80%
Substantial regulatory consequences
• Major negative sanction by Hefce
• Major international adverse publicity
• Death of an individual or several major
injuries

3: Serious                                         3. Likely
• Financial net impact of 3-5% of turnover         21%-50%
• Addressable regulatory consequences
• Adverse publicity in national papers
• Major injury

2: Moderate                                        2. Possible
• Financial net impact of 1-2% of turnover         6%-20%
• No regulatory consequences Adverse
publicity locally or in THES
• Minor injury

1: Minor                                           1. Rare
• Financial net impact of less than 1% of          <5%
turnover
• No other significant impacts


Control Score      Description
      1            Above average – controls are considered to be adequate and highly
                   effective in mitigating the identified risk
        2          Average – controls are considered to be adequate to mitigate the
                   identified risk, but could be further enhanced
        3          Below average – controls are considered to be inadequate to
                   mitigating the identified risk and could be further strengthened.




 Confidential                        Page 16                         07/03/2011
 IT Services 2010-11 Annual Plan




 Risk Register
                                                   Inherent Risk                                                            Residual Risk




                                                                  Likelihood (1-5)




                                                                                                                                           Likelihood (1-5)




                                                                                                                                                                              Tolerable (Y/N)
                                                                                     ‘Inherent’ Risk




                                                                                                                                                              Residual Risk
                                                   Impact (1-5)




                                                                                                                            Impact (1-5)
                                                                                                       Controls
                                                                                                       already in                                                                               Risk          Planned
Category                     Risk                                                                      place                                                                                    Owner         Action          Dependencies
Compliance/Reputation/       Staff or students     3              4                  12                Standardised         2              4                  8               N                 CMT,          Automatic,      Budget availability
Financial                    install unlicensed                                                        builds, manual                                                                           Director of   system
                             software,                                                                 audit and system                                                                         IT            controls and    Staff / Student's
                             Undertaking illegal                                                       controls and                                                                             Services,     vulnerability   acceptance of
                             activity.                                                                 software.                                                                                Network       reporting.      controls and
                                                                                                       Campus licence                                                                           Manager                       enforcement of
                                                                                                       Agreements and                                                                                                         policies
                                                                                                       Computer Use
                                                                                                       Policy
Operational/Reputation       Increasing hostile    4              3                  12                Manual review        3              2                  6               N                 Director of   Increased       Budget availability
                             internet                                                                  antivirus and                                                                            IT            automation,
                             environment will                                                          security logs.                                                                           Services,     and user self
                             result in, an                                                             Firewalls, Access                                                                        Network       service.
                             increasing attempt                                                        controls. User                                                                           Manager,      Improved
                             of user access                                                            communication                                                                            Corporate     security and
                             denied and data                                                           and training.                                                                            Systems       vulnerability
                             and identity theft.                                                                                                                                                Manager       reporting.
Financial                    Investment in IT      3              4                  12                Cross training of    3              3                  9               Y                 Director of   Improvements    Budget availability
                             infrastructure and                                                        staff. Project                                                                           Finance,      to project
                             human resources                                                           prioritisation,                                                                          Director of   management      CMT agreement
                             not sufficient to                                                         planning, and                                                                            IT,CMT        procedures.
                             successfully                                                              management of                                                                                          Information
                             complete all                                                              expectations. ITIL                                                                                     Systems
                             projects and meet                                                         processes and                                                                                          committee to
                             expectations of                                                           procedures                                                                                             priorities
                             support and                                                                                                                                                                      projects.
                             operations.




 Confidential                           Page 17                                                                  07/03/2011
 IT Services 2010-11 Annual Plan




                                                    Inherent Risk                                                          Residual Risk




                                                                   Likelihood (1-5)




                                                                                                                                          Likelihood (1-5)




                                                                                                                                                                             Tolerable (Y/N)
                                                                                      ‘Inherent’ Risk




                                                                                                                                                             Residual Risk
                                                    Impact (1-5)




                                                                                                                           Impact (1-5)
                                                                                                        Controls
                                                                                                        already in                                                                             Risk          Planned
Category                     Risk                                                                       place                                                                                  Owner         Action            Dependencies
Financial                    World Financial        3              4                  12                Necessity of       2              2                  4               Y                 CMT,          Review            Budget availability
                             volatility increases                                                       resource                                                                               Director of   contracts
                             the costs of                                                               reviewed                                                                               IT            annually for
                             maintenance                                                                annually,                                                                              Services,     best value.
                             contracts which                                                            contract                                                                               Network
                             often go up by                                                             negotiations.                                                                          Manager       Continual
                             more than our                                                              Peer and                                                                                             technical
                             budget increase.                                                           technical review                                                                                     review of
                                                                                                        of products and                                                                                      products and
                                                                                                        investment.                                                                                          investment.
Operational                  Unable to deliver      3              3                  9                 Project planning   2              2                  4               Y                 Director of   Continuation of
                             projects due to                                                            and monitoring.                                                                        IT Services   ITIL process
                             software or                                                                Review of                                                                                            and staff
                             hardware not                                                               projects at SMT;                                                                                     awareness
                             performing as                                                              Planning                                                                                             training
                             expected.                                                                  meetings.
                                                                                                        Purchases based
                                                                                                        on technical
                                                                                                        decisions.
                                                                                                        ITIL & Prince II
                                                                                                        processes and
                                                                                                        procedures
                                                                                                        followed.




 Confidential                           Page 18                                                                  07/03/2011
 IT Services 2010-11 Annual Plan




                                                     Inherent Risk                                                           Residual Risk




                                                                    Likelihood (1-5)




                                                                                                                                            Likelihood (1-5)




                                                                                                                                                                               Tolerable (Y/N)
                                                                                       ‘Inherent’ Risk




                                                                                                                                                               Residual Risk
                                                     Impact (1-5)




                                                                                                                             Impact (1-5)
                                                                                                         Controls
                                                                                                         already in                                                                              Risk             Planned
Category                     Risk                                                                        place                                                                                   Owner            Action           Dependencies
Operational/Compliance       Loss of data through    4              3                  16                Disaster            2              2                  4               Y                 Director of      Standby          Budget availability
                             breakdown, virus,                                                           recovery                                                                                Finance,         generator for
                             theft, user error,                                                          planning, IT                                                                            Director of      power supply.    CMT agreement
                             disaster or loss of                                                         security                                                                                IT,CMT           Automatic,
                             power.                                                                      measures,                                                                                                system
                                                                                                         physical security                                                                                        controls and
                                                                                                         measures.                                                                                                event
                                                                                                                                                                                                                  reporting. New
                                                                                                                                                                                                                  DR Provisions.

Strategic                    Managers do not use     3              3                  9                 Review interface    2              2                  4               Y                 Director of      CMT Training     Corporate System
                             MIS and Delta                                                               and complexity                                                                          IT Services      day              Resource
                             information in                                                              and improve                                                                                              Rollout of
                             making decisions.                                                           staff                                                                                                    upgraded MIS
                                                                                                         development.                                                                                             Additional
                                                                                                                                                                                                                  resource to
                                                                                                                                                                                                                  assist
                                                                                                                                                                                                                  managers
Operational                  Failure of systems at   3              3                  9                 Inter-school /      2              3                  6               Y                 Director of      Inter-school /
                             critical junctures                                                          services co-                                                                            IT Services,     services co-
                             cause institutional                                                         ordination and                                                                          Director of      ordination and
                             problems.                                                                   planning. DR                                                                            Facilities, IT   planning.
                                                                                                         plan, resilience                                                                        Managers/
                                                                                                         in systems and                                                                          Supervisors      Improved
                                                                                                         resources,                                                                                               recovery
                                                                                                         equipment                                                                                                across site.
                                                                                                         replacement




 Confidential                           Page 19                                                                    07/03/2011
 IT Services 2010-11 Annual Plan




                                                                                                         cycle.
                                                     Inherent Risk                                                          Residual Risk




                                                                    Likelihood (1-5)




                                                                                                                                           Likelihood (1-5)




                                                                                                                                                                              Tolerable (Y/N)
                                                                                       ‘Inherent’ Risk




                                                                                                                                                              Residual Risk
                                                     Impact (1-5)




                                                                                                                            Impact (1-5)
                                                                                                         Controls
                                                                                                         already in                                                                             Risk          Planned
Category                     Risk                                                                        place                                                                                  Owner         Action             Dependencies
Reputational/ Compliance     Staff working alone     3              2                  6                 Working alone      2              2                  4               Y                 Director of
/ Financial                  may be injured or                                                           procedures,                                                                            IT
                             may result in loss of                                                       security, remote                                                                       Services,
                             resource.                                                                   working / design                                                                       Network
                                                                                                         of workplace.                                                                          Manager,
                                                                                                                                                                                                Corporate
                                                                                                                                                                                                Systems
                                                                                                                                                                                                Manager
Operational                  Specialist staff        2              3                  6                 Market value       2              2                  4               Y                 Director of   Review market
                             turnover not                                                                supplement                                                                             Personnel,    value regularly.
                             controlled.                                                                 scheme, staff                                                                          Director of   Cross training.
                                                                                                         reviews, Hera.                                                                         IT Services




 Confidential                            Page 20                                                                   07/03/2011
 IT Services 2010-11 Annual Plan




 In support of the overall plan, the following table contains the key action plan based on the approval of the requested funding.

Priority One –
Activity                            Target                 Target Date   Lead                Dependencies                   External   Link to Institutional
                                                                         Responsibility                                     Funding    Priority
Redesign the UEL Plus               Maintain improved      October       Infrastructure      Financial approval in time     No         Student Satisfaction
application server infrastructure   performance of         2010          Services Manager    to enable procurement and
                                    UELPlus for                                              installation before students
                                    additional courses                                       return. Only required if do
                                    and students                                             not outsource.
Convert six trading clusters to     To improve the         September     IT Technical        Financial approval in time     No         Student Satisfaction
quiet computer teaching rooms       learning               2010          Support Manager     to enable procurement and
                                    environment and                                          installation before students
                                    improve student                                          return
                                    and staff
                                    satisfaction
Provide a refreshed Desktop         Ensue Office 2007      September     IT Transformation   Server and PC refresh          No         All
environment.                        desktop meets          2010          Programme           approved.
                                    student                              Delivery
                                    expectations and is
                                    resilient to viruses
Enhancement of audio visual         Maintain learning      July 2011     IT Technical        Availability of classrooms     No         Student Satisfaction
services in teaching spaces.        environment to a                     Support Manager     for upgrade. Estates
                                    satisfactory                                             resources to install
                                    standard                                                 electrical infrastructure.
Implement proposal to increase      Improve                Oct 2010      IT                  IT Resource                    No         Student Satisfaction
satisfaction by providing better    communications                       Communications
information to students about the   with students by
availability of services.           development of
                                    UELDirect
                                    application for
                                    iPhone/Blackberry
                                    and integration of
                                    text messaging




 Confidential                           Page 21                                 07/03/2011
 IT Services 2010-11 Annual Plan




                                      service.
Update of assistive software          Maintain support for    Sept 2010     IT Technical         IT Resources                 No         Student Satisfaction
available and ensure all front line   students who                          Support Manager
staff are able to assist students     require assistive
and staff in making best use of       technology to aid
the available technology.             their studies
Improve quality of data relating to   Improved                July 2010     Director of IT       HR availability and IT       No         All
the organisation directories.         communications                                             Resource




Priority Two –
Activity                              Target                  Target Date   Lead                 Dependencies                 External   Link to Institutional
                                                                            Responsibility                                    Funding    Priority
Implement automatic attendance        Improve student         September     Corporate            Tender for new timetabling   No         Student Satisfaction and
recording across all learning         retention and           2011          Systems Manger       system will need to ensure              Portfolio Development.
spaces.                               classroom                                                  compatibility with
                                      availability. Provide                                      attendance monitoring
                                      data to facilitate                                         requirements.
                                      Points Based
                                      System
                                      requirement
Review UEL Direct usage and           Refresh UELDirect       Jan 2011      Director of IT       Availability of Technology   No         Student Satisfaction
Web interface and refresh in line     to maintain student                                        and resource
with external web best practice       satisfaction and
                                      bring up to external
                                      Web standards.
Implement MIS personalised            Improve ease of         Feb 2011      Corporate            Availability of Technology   No         All
Dashboards for key staff roles        use by Managers                       Systems Manger       and resource
following pilot and enhance our       for strategic
reporting capabilities                decision making.




 Confidential                              Page 22                                  07/03/2011
 IT Services 2010-11 Annual Plan




                                    Provide addition
                                    support for school
                                    and service
                                    Managers
Keep under review the feasibility   Understand             September     Director of IT                                       No         All
of replacing the student record     improvements to        2010
system                              business processes
                                    and satisfaction
                                    that could be
                                    attained with a new
                                    system

Priority Three –
Activity                            Target                 Target Date   Lead                 Dependencies                    External   Link to Institutional
                                                                         Responsibility                                       Funding    Priority
Review identity management          Replace existing IT    October       Corporate            Availability of technology at   No         All
capabilities to include password    password facility      2010          Systems Manger       affordable price
authentication                      with appropriate
                                    technology to
                                    ensure improved
                                    security.
Review back-up and archive          Reduction in time to   Sept 2010     Corporate            Availability of technology at   No         All
processes                           restore services                     Systems Manger       affordable price
                                    while maintaining
                                    resilience
Relocate Stratford telecoms         Rationalise            Contingent    Network Manager      Finance and available           No         All
equipment                           infrastructure into    on the                             space in server room
                                    new server room to     redevelopm
                                    improve resilience     ent of UH,
                                    and enable Estates     Stratford
                                    refurbishment of
                                    UH




 Confidential                           Page 23                                  07/03/2011
 IT Services 2010-11 Annual Plan




Priority Four –
Activity                              Target               Target Date   Lead                Dependencies                    External   Link to Institutional
                                                                         Responsibility                                      Funding    Priority
Replace and implement new             Improve financial    Phase 1       Director of         Availability of technology at   No         All
Finance System and integrate          processing and       August        Finance             affordable price. IT
with UEL Direct.                      reporting for        2010                              Resources
                                      Schools and
                                      Services             Phase 2
                                                           August
                                                           2011
Intranet replacement including        Enhance team         Phase to      Corporate           Availability of technology at   No         All
document management system            working and reduce   Sept 2011     Systems Manger      affordable price and
and enhanced data reporting           errors due to                                          allocation of.IT Resources
function                              multiple copies of
                                      documents in use.
Delivering the IT infrastructure to   Ensure new estate    Contingent    IT Transformation   Estates project                 No         All
meet our Estate Strategy              meets expectations   on the        Programme           management
developments                          of modern learning   further       Delivery
     Sports Centre                   environment.         developme
     Stratford Island                                     nt our
     Stratford Library                                    estate
                                                           strategy
Providing increased storage           Reduce multiple      Sept 2010     Infrastructure      Budget and server room          No         All
capacity for multi-media objects      copies of same                     Services Manager    space
                                      object in use.




 Confidential                             Page 24                               07/03/2011
IT Services 2010-11 Annual Plan




Outcomes from February 2010 Independent Review of UEL IT Services

In addition to the above Action Plan, the following table outlines the recommended actions from the IT Review commissioned by The Vice
Chancellor. The elements of these recommendations that require either funding or resource have been incorporated into the 2010/2011 IT
Services Plan & associated HR/Staffing Plan but the entire recommendation set is included here for clarity..

  Action            Finding             Recommendation           Priorit      Overall       2010-2011 Cost Impacts/Estimates                 Justification/Com
 Reference                                                          y Remediation Cost                                                              ments
                                                                         Estimate/Comme
                                                                                nt
                                                                                            Capital     Expense    Additional   Additional
                                                                                                                   Resource     Resource
                                                                                                                     Cost         Count
Technology - The strategy of PC      UEL needs a single PC         1   £2.5 million to      £625,000      £0          £0                     Ongoing
     1       client and software     supply with a single high         replace entire                                                        investment
             installation is         performance PC client             UEL PC estate and                                                     required in
             inadequate. There are   and up to date software.          initiate/continue/                                                    subsequent years
             too many hardware       The IT team needs to be           enforce 4 year                                                        - PC's will be
             types deployed,         supported in declining            replacement                                                           acquired under
             evidenced by the        to host old software, the         cycle, plus                                                           framework
             requirement to have     use of which is in any            associated costs                                                      agreement and
             too many versions of    case likely to undermine          for PC                                                                deployed to desk
             the client image in     employability of                  cradles/furniture                                                     by partner (as will
             place. There is too     students. An explicit                                                                                   become the UEL
             much legacy software    policy to remove legacy                                                                                 norm) and 4 year
             being supported,        teaching software needs                                                                                 replacement
             evidenced by the        developing and                                                                                          cycle will
             inability of all the    deploying immediately.                                                                                  commence, so




Confidential                             Page 25                                  07/03/2011
IT Services 2010-11 Annual Plan




             clients to support all                                                                             investment is
             the software and                                                                                   annually ongoing
             insufficient antivirus
             and security
             procedures evidenced
             by the number of
             antivirus incidents
             that have occurred.
Technology - The PC desktop is not Secure the desktop in       1   As per 2010/2011   £100,000   £10,000   £0   Design new
     2       adequately secured or line with best practices,       Estimate                                     desktop and
             tied down. The         (focus first on student                                                     implement
             network is therefore desktop)                                                                      management/dep
             insecure, this is                                                                                  loyment products
             evidenced by the                                                                                   in line with best
             local disruption                                                                                   practice/industry
             caused by malware                                                                                  standard -
             and virus issues                                                                                   resource costs
                                                                                                                are 3rd party to
                                                                                                                support design
                                                                                                                and delivery of
                                                                                                                the solution
Technology-3 Profiles that are to   Deploy limitations to      1   As per 2010/2011       £0       £0      £0   Resolved by
             large are allowed and profile size.                   Estimate                                     activity under
             are having a negative                                                                              action item
             impact at log in. This                                                                             Technology 5
             is evidenced by slow
             log in and network
             congestion at busy
             times.




Confidential                             Page 26                             07/03/2011
IT Services 2010-11 Annual Plan




  Process-1    No effective              A Panel of senior           1                           £0           £0        £0
               corporate governance      business stakeholders,
               procedures exist that     chaired by a customer
               establish IT priorities   from the VCG should be
               for UEL and monitor       established.
               their delivery.
               Evidenced by the
               absence of a
               documented process
  Process-2    There is no               A governance                1   Initial investment of £20,000 to   £20,000   £60,000   1   Recruitment of a
               Infrastructure            programme should be             engage 3rd party architect to                              interim Senior
               Architecture group        deployed for all key IT         initiate processes, supported by                           Solutions
               inside the IT team and    architectural decisions         permanent recruit at the                                   Architect to
               so infrastructure                                         earliest opportunity                                       initiate &
               design lack                                                                                                          permanent
               appropriate                                                                                                          recruitment to
               governance and                                                                                                       lead Architecture
               scrutiny Evidenced by                                                                                                Steering Group
               the absence of a                                                                                                     and aid
               documented process                                                                                                   infrastructure
                                                                                                                                    design and
                                                                                                                                    compliance/adhe
                                                                                                                                    rence to best
                                                                                                                                    practice/industry
                                                                                                                                    standards
  Process-3    The strategy for PC       UEL needs to select a       1                           £0           £0        £0          See action item
               purchase is deficient.    single strategic supplier                                                                  Technology 1
               Purchasing the PC         of PC services and to
               with the cheapest         stay with that supplier
               ticket price is a false   for an extended contact




Confidential                                 Page 27                                07/03/2011
IT Services 2010-11 Annual Plan




               economy and is             period (4 years). This
               creating many other        will allow more effective
               costs inside the           client image delivery.
               business. These costs
               have both financial
               and service
               consequences. The
               student desktop
               service is significantly
               damaged by the
               current strategy.
               Evidenced by the
               incompatibility of
               current practice with
               best practice as
               recommended by
               Microsoft and HP
  Process-4    The management of          Processes should be         1                £0   £0   £0   Responsibility
               PC stock is very poor      established for regular                                     incorporated into
               indeed, leading to         pro active, eyes on,                                        Campus
               extended fault             recorded stock checking                                     Manager/Campus
               discovery and repair       with immediate PC swap                                      Supervisor Roles,
               times, up to 5 days        out for repair. The                                         coupled with
               from discovery. This is    current KPI of 5 days to                                    enhanced stock
               damaging the student       repair should be                                            management
               experience.                reduced (4 hours from                                       under PC
               Evidenced by PC fix        fault report to repair is                                   framework
               times that in some         more the norm).                                             agreement
               cases are often up to
               five days and on one




Confidential                                  Page 28                     07/03/2011
IT Services 2010-11 Annual Plan




               occasion reported to
               be nine months


  Process-5    The approach to          Whilst this has been          1   As per 2010/2011    £5,000   £25,000        Dedicated
               server management is     recognised by the IT              Estimate                                    infrastructure and
               insecure, evidenced      team and it is                                                                external support
               by the absence of a      understood that                                                               to implement
               full server patching     remedial action is                                                            industry
               policy                   planned, it is mentioned                                                      standard/best
                                        in the review as it is                                                        practice patch
                                        critical that full patching                                                   management
                                        processes are deployed.                                                       solution. Ongoing
                                                                                                                      management will
                                                                                                                      be assigned to
                                                                                                                      infrastructure
                                                                                                                      team.
  People-1     Not all people in the    The decision making           1   See action ID's         £0     £0      £0   See action ID's
               team abide by            process should be clear           Process 6, 11 &                             Process 6, 11 &
               decisions made in the    and once the process              13                                          13
               business. Evidenced      has been followed all
               by management            staff should be required
               feedback and lack of     to follow decisions
               change control           made
               adherence observed
               when looking at
               documentation
  People-2     Areas of technician      Contact processes             1
               support are not          should be put in place
               operating effectively,   that allow academic




Confidential                                 Page 29                                 07/03/2011
IT Services 2010-11 Annual Plan




             with technicians in       staff to get hold of
             particular areas being    technicians, especially at
             “curiously difficult to   the Stratford site. Action
             locate”. Evidenced by     to address this issue is
             direct management         part of the current IT
             comment and the           reorganisation which is
             inability of staff to     in progress.
             locate technicians
Technology-4 There is only one         Different antivirus          2   Recurring cost for       £0      £7,500      £0          Procurment
             antivirus engine in       engines should be                licence renewal                                          under Chest
             widespread use, best      deployed on the servers                                                                   agreement of
             practice would be to      and the clients to                                                                        alternate AV
             have two different        maximise protection                                                                       product for server
             engines, 1 server and                                                                                               infrastructure
             1 client.
Technology-5 The IT network is         The network needs            2   Estimated at          £450,000   £50,000   £60,000   1   Investment cost is
             barely able to support    reengineering to                 £560,000 based                                           estimate based
             current requirements      modern standards to              on HE discounts                                          on preliminary
             at UEL. The current       enhance resilience,              and tender                                               scope of
             network design is         improve performance              process for                                              investigative
             such that single          and improve monitoring           physical/logical                                         works and will be
             equipment failure or      capability. This should          infrastructure,                                          confirmed by
             piece of malware          not be done in the               plus additional                                          network tender.
             would have extensive      current big bang time            headcount for IT                                         Additional
             ramifications. Security   frame of the current             Services. Ongoing                                        resource costs
             is compromised by         proposal but should be           investment                                               relate to the
             the open (flat) nature    phased over a longer             needed for new                                           recruiment of an
             of the design. It will    period to minimise risk.         buildings/initiativ                                      internal network
             not support future                                         es, incremental                                          resource as per
             requirements. This is                                      costs will be                                            2010/2011 plan




Confidential                               Page 30                                  07/03/2011
IT Services 2010-11 Annual Plan




               evidenced by                                          included in                                   submission
               comparing the design                                  initiative plans
               to industry standard                                  accordingly - also
               recommendations                                       see action
                                                                     reference
                                                                     Technology 8
Technology-6 Printing services for    Printing must be           2   As per 2010/2011     £20,000   £5,000    £0   Implementation
             students are unable      redesigned, perhaps            Estimate                                      of resiliency in
             to meet demand. This     based on examples of                                                         student pront
             is evidenced by the      working services at                                                          system and
             queues at printing       other Universities.                                                          external
             and the complaints by                                                                                 investigation of
             students                                                                                              best proactice
  Process-6 Insufficient notice of   A process should be         2                                  £15,000        Development of
             engineering works are   agreed with customers                                                         Intranet/Visual
             common evidenced        that provides adequate                                                        Display
             by disruption for       notice for all non urgent                                                     Communications
             customers without       maintenance works. An                                                         platform &
             sufficient notice       emergency                                                                     allocation &
                                     communication process                                                         training of IT
                                     should also be agreed                                                         Communications
                                     that ensure all                                                               Manager from
                                     customers are made                                                            existing staff base
                                     aware of emergency
                                     engineering works.
  Process-7    The current UEL       The UEL planning            2
               planning process does process requires
               not provide the IT    extensive change if IT
               service with          services is to develop
               intelligence on which programmes that




Confidential                              Page 31                               07/03/2011
IT Services 2010-11 Annual Plan




               to base its plans, nor support key corporate
               does it provide the     objectives. This is not
               rest of the business anticipated to be
               with the opportunity marginal change but a
               to input to IT planning fundamental change to
               or understand           the entire planning
               approved plans.         approach.
               Evidenced by the fact
               that only critical
               friends inside the
               process review and
               understand the IT
               plans and the fact
               that IT see few of the
               other business areas
               emerging plans as
               they emerge
  People-3     Weekend and evening The current on call              2                £2k per person
               coverage for IT         process is under                              for on-call pa
               infrastructure repair resourced; in many
               is operated on call,    cases only one specialist
               the duty IT manager is employed and is
               deciding when to call therefore usually only
               on limited resources. called in an emergency.
                                       During critical operation
                                       periods, Clearing,
                                       Enrolment, Assessment,
                                       International student
                                       arrivals, IT Service staff
                                       work additional hours to




Confidential                                Page 32                     07/03/2011
IT Services 2010-11 Annual Plan




                                      ensure on site cover.



  People-4     The staffing resources A fundamental review is     2
               within the IT service required that identifies
               are not sufficient to what staffing model is
               deliver a high quality required to support the
               service. The lack of    ambitions of the
               resources is            business, this staffing
               responsible for some model should then be
               deficiencies in service considered for
               delivery. Evidenced by resourcing, within the
               the recent Tribal       other priorities of the
               benchmarking            business.
  People-5     There are a number As the new staffing             2
               of staff who appear to profile is established,
               be making a key         ensure key staff are UEL
               contribution but are staff
               external contractors –
               Evidenced by staffing
               records
  People-6     Individuals are         Undertake less activity    2                £160,000   4   Incremental staff
               overstretched into      but undertake it to a                                      for Telpehone
               too many directions higher quality. Split                                          Helpdesk and
               at present whilst fire Maintenance and                                             Student Support
               fighting and            development resources
               developing new          so that performance can
               product - Evidenced be measured. Assess
               by the very high        entire work plan and




Confidential                              Page 33                     07/03/2011
IT Services 2010-11 Annual Plan




             percentage of time        park activities that are
             spent fire fighting and   less important or are
             the inability to create   not going to deliver to a
             key products due to       satisfactory quality
             resource constraints,
             for example a tied
             down corporate client
Technology-7 Too much activity is      Review log in process       3   Estimated at           £0      £0        £0          Resolved by
             undertaken by the         for the next client build       ongoing £50,000                                      activity under
             desktop at log in, this   and shift CPU and               investment per                                       action item
             is poor design and is     network heavy demands           annum                                                Technology 2
             contributing to slow      to the point at which
             log ins. This is          they are needed by the
             evidenced by              desktop.
             reviewing the desktop
             log in process and
             observing log in times
             that reach 8 minutes
             at busy periods.
Technology-8 Network equipment is      Networking equipment        3   Estimated at           £0      £0        £0          Resolved by
             ageing and lacks          should be replaced              ongoing £100,000                                     activity under
             resilience, this is       during the redesign             investment per                                       action item
             evidenced by                                              annum                                                Technology 5
             comparing the design
             to best practice
             recommendations
Technology-9 There is one flat         The AD design should be     3   £50,000 to cover   £30,000   £20,000   £60,000   1   Redesign of
             Activity Directory        reviewed and revised in         new hardware                                         Active Directory
             infrastructure (the       line with best practice.        and external                                         based on industry
             team are aware of                                         expertise for                                        standard/best




Confidential                               Page 34                               07/03/2011
IT Services 2010-11 Annual Plan




               this issue) that does                                 design &                              proctice and
               not comply with                                       implementation,                       procurement of
               standard designs                                      plus recruitment                      necessary
                                                                     of incremental AD                     management
                                                                     expertise                             tools. Extra
                                                                                                           resource cost is
                                                                                                           recruitment of AD
                                                                                                           expertise as part
                                                                                                           of the redesign
                                                                                                           process.
Technology- There are not enough     The current short term      3                          £0   £0   £0   Will be addressed
    10      PCs available for        loan of laptops to                                                    when due for
            students, evidenced      students (in the library)                                             replacement in
            by student feedback      should be extended as                                                 2011/2012
            and physical             resources permit. A
            observations on PC       suitable security process
            availability             should be designed to
                                     enable wired access in
                                     addition to the WiFi
                                     already available. The
                                     practice of UEL business
                                     led functions that
                                     denying PC access to
                                     students in open access
                                     areas during induction
                                     and teaching times,
                                     most notably Enrolment
                                     and Telethon should be
                                     reviewed.
  Process-8    There is no corporate Corporate level KPI         3




Confidential                              Page 35                              07/03/2011
IT Services 2010-11 Annual Plan




            record of IT              should be established to
            achievement or            measure service
            performance. –            performance, this
            Evidenced by the          should be augmented by
            absence of                qualitative data.
            documentation
 Process-9 There is no UEL            A technical roadmap        3   See action item Process 2                               See action item,
            technical roadmap for     should be developed by                                                                 Process 2
            products and IT           the new IT Architectural
            services Evidenced by     Governance Group
            the lack of
            documentation
 Process-10 Over 40% of calls to      If possible, servicing     3   £150000 for          £25,000   £125,000                 Completion of
            the support desk are      these by support staff         infrastructure and                                      Identity
            password resets. This     should be declined and         external                                                Management
            is absorbing capacity     all of these requests          consultancy to                                          Project to support
            and preventing other      should be routed to            implement                                               associated
            calls being resolved.     effective self service         technology                                              process changes
            Evidenced by the help     procedures for                 solutions
            desk support records      password reset.
 Process-11 Change control            A change control           3                                  £15,000    £45,000   1   External
            processes inside the      process needs to be                                                                    consultancy to
            network and server        adopted and rigorously                                                                 activate change
            teams are not             enforced. All staff                                                                    manmagement
            sufficient, and what is   should be required to                                                                  module in ITSM
            in place is not           adhere to change                                                                       product
            adhered to by some        control processes and                                                                  supported by the
            staff. Many               action should be taken                                                                 recruitment of
            disruptive faults         when this is not done.                                                                 Change Manager
            appear after changes




Confidential                              Page 36                               07/03/2011
IT Services 2010-11 Annual Plan




            have taken place. –
            Evidenced on
            studying the change
            control process and
            the change control
            forms completed by
            different staff doing
            the same type of
            work
 Process-12 Business                 A process map should       3
            requirements for the     be developed that
            IT team to deliver       ensure customers create
            arise in an unplanned    requirements in good
            way. Project start ups   time. This should be
            are damaged as a         enforced and supported
            result. Evidenced by     by senior management.
            the absence of an
            agreed medium term
            delivery plan of
            business deliverables
  People-7 The work tracking         Improved processes for     3
            process for              technician work
            Technicians is not       allocation, task
            sufficient. Evidenced    management and
            by the absence of a      tracking, and technician
            documented process       contact need to be
            and performance          deployed. Technician
            measures                 work tracking uses the
                                     documented Incident
                                     management process.




Confidential                             Page 37                    07/03/2011
IT Services 2010-11 Annual Plan




                                    Workflow is monitored.
                                    Escalation management
                                    not currently effective.
 People-8 Due to resource           As new resources come      3
            limitations there are in, a programme of cross
            many single points of training should be
            failure (people)        undertaken to increase
            elevating risk to an    depth of cover in key
            unacceptable level      areas.
            (the team are aware
            of this and are doing
            what they can with
            current resources)
            Evidenced by the fact
            a member of staff was
            recently flown back
            from holiday abroad
            to resolve a problem
Technology- The approach to         A long term plan for       4   £50,000 for           £50,000   £30,000   £0   Funding may be
    11      power management power management                      procurement of                                 available from
            of servers is           should be developed            UPS and                                        Carbon Trust
            unreliable, without     and a review of cooling        completion of                                  based on
            effective UPS or        undertaken at                  associated                                     environmental
            generator services.     Docklands. The new             electrical works at                            savings - work
            Air cooling is suspect. Stratford Server room,         Docklands                                      should be aligned
            Evidenced by the use which was not visited, is         Campus. £30,000                                with refurb of
            of a single UPS for     served by industry             for computer                                   Docklands Server
            every server, the lack standard UPS and                room fit out                                   Room and
            of generator facilities cooling. There is a                                                           provision of
            and the lack of         longstanding request                                                          compliant air




Confidential                            Page 38                               07/03/2011
IT Services 2010-11 Annual Plan




            computer room class from the IT service for                                         management &
            cooling.                 generator backup for                                       racking
                                     both server rooms, this
                                     should be implemented
                                     as resources permit.
Technology- There is no Web          A review of web services   4                £0   £0   £0   Cost estimates to
    12      Content Management is advised to optimise                                           be confirmed be
            system in place or an the web footprint. It is                                      confirmed but
            explicit web strategy. understood that a Web                                        any chnages
            Below the front page content management                                             should
            (which is good) the      system has been                                            incorporate the
            web is not optimised procured and installed.                                        integration of
            This is evidenced by The web team is                                                collaboration
            the technology that is working to implement.                                        tools (e.g. MS
            in place for web                                                                    Shrepoint)
            services
Technology- The management of Identify a single named           4                £0   £0   £0
    12      the server rooms         person responsible for
            does not have clear all computer room
            responsibility lines.    environs and hold them
            They are untidy, with accountable for their
            much cardboard           condition
            creating unnecessary
            fire risk. The utilities
            provision is poor and
            appears unmanaged.
            Evidenced by lack of
            documentation and
            by comparing
            provision to industry




Confidential                             Page 39                    07/03/2011
IT Services 2010-11 Annual Plan




               standard
               recommendations

Technology- There are no network      Appropriate network         4                           £0       £0        £0           Resolved by
     13     management tools          management tools                                                                        activity under
            appropriate for this      should be deployed                                                                      action item
            size of network.          during the redesign, this                                                               Technology 5
            Evidenced by the use      has been identified in
            of NAGIOS, which is       the IT service plan.
            minimal functionality
            monitoring product
Technology- There are “issues”        Develop a competent         4   Estimated at         £30,000   £25,000                  Additional costs
     14     around backup, entire     backup strategy and test        £55,000 to                                              for hardware
            backup sets are not       the strategy regularly. A       complete                                                replacement as
            tested. There is a risk   replacement industry            implementation                                          per 2010/2011
            of failure to recover     standard backup and             of enterprise data                                      plan submission,
            from incidents.           archiving system has            management                                              expense costs are
            Evidenced by the          been procured recently                                                                  for external
            absence of restore        compliance with the                                                                     consultancy and
            testing and the fact      backup strategy is                                                                      staff
            that back up logs         essential to assure                                                                     training/accredita
            identify skipped files    recovery from incidents.                                                                tion
            without resolution
 Process-13 Project Management        Project Management          4                                            £225,000   4   Initiation of
            practices exists to a     practices should be                                                                     formal prject
            limited degree            extended to all major                                                                   governance
            (limited by resources)    project activities. This                                                                processes,
            inside the service.       will have explicit                                                                      supported by
            Where they exist they     resource implications                                                                   recruitment of
            are professional and      but these are less                                                                      Programme/Proje
            effective, improving      significant than the                                                                    ct Delivery




Confidential                               Page 40                               07/03/2011
IT Services 2010-11 Annual Plan




            service delivery.        hidden resource costs of                                                            structure/PMO
            Evidenced by the         ineffective delivery.                                                               (including
            limited project                                                                                              conversion of
            management                                                                                                   existing post)
            resource and
            documentation
 Process-14 The customer support     An effective corporate     4
            process is not           process should be
            operating effectively,   developed and adhered
            leading to poor          to. Its effectiveness
            services for the         should be measured
            majority. Customers      through regular
            who have friends in IT   customer feedback. It is
            use “back door”          recognised that IT
            support routes, by       service has embarked on
            passing the correct      implementing industry
            channels. Evidenced      standard ITIL support
            by the extended wait     processes. These will
            times on help desks      only improve the
            queues                   customer experience if
                                     resourced effectively
                                     and receive top level
                                     support during the
                                     change process.
 Process-15 Mail users are           Define staff and student   4   As per 2010/2011   £25,000   £10,000   £45,000   1   Complere
            spammed internally       communication rules,           Estimate                                             seperation of
            by other users –         communicate them and                                                                staff/student
            Evidenced by             enforce them                                                                        mails systems and
            observing mail itself                                                                                        recruit full time
            and the absence of                                                                                           email email




Confidential                             Page 41                              07/03/2011
IT Services 2010-11 Annual Plan




               control process and                                                          administration
               procedure                                                                    (incorporate bulk
                                                                                            email
                                                                                            administration)
 Process-16 There is no current IT   An IT strategy should be    4                £35,000   Consultation with
            strategy (there has      developed and                                          business analysts
            been no UEL              resources provided to
            corporate strategy for   deliver it once the
            sometime) Evidenced      corporate strategy has
            by absence of            been agreed.
            documentation
  People-9 The web team and          There should be a           4
            the staff printing       review of process and or
            team are in different    structure that results in
            services than IT. The    the web and printing
            teams do not have        teams working much
            shared planning or       more closely with the IT
            share resources.         team.
            Evidenced by the
            absence of a
            documented process
            for shared service
            approach
 People-10 Operational and           A communications            4
            strategic                process should be
            communications with      agreed with customers
            customers are poor.      that allow two way
            Evidenced by the         communications to take
            absence of a             place at an operational
            documented process       and strategic level.




Confidential                             Page 42                     07/03/2011
IT Services 2010-11 Annual Plan




 People-11     The hours technicians   Technician working          4
               are available are not   patterns need to be
               appropriate for         synchronised with
               teaching coverage       teaching requirements.
               Evidenced by the fact   AV technician start
               that Technicians start  times at 08:00 and
               work at the same        08:30. To ensure
               time as classes begin   support for teaching. No
               rather than before      technician cover after
                                       17:00 except where
                                       overtime is requested
                                       by the school.
 People-12     Due to the problems Review all technology           4
               with central services, support teams
               local teams have        placement to ensure
               developed to support best value for money for
               IT. Evidenced by the UEL as a whole
               existence of many
               local teams and local
               products
 People-13     Turnover of IT staff is Existing staff need to be   4                £20,000   Attendance at
               very low and whilst     exposed to more                                        sector and
               this maintains local    external influences                                    industry events
               knowledge it means through networking in
               that the status quo is the industry.
               maintained long
               beyond its natural life
               Evidenced by low
               staff turnover and
               lack of current




Confidential                               Page 43                     07/03/2011
IT Services 2010-11 Annual Plan




               industry standard
               approaches
Technology- Due to problems with      Review local provision     5                Will require
    15      central delivery local    with a view to improving                    implementation
            “closed” IT labs have     corporate and shared PC                     of management
            been developed            availability.                               software as
            resulting in                                                          described in
            fragmented                                                            action item
            investment.                                                           Technology 2 if
            Evidenced by the                                                      resources are to
            existence of local labs                                               be made more
                                                                                  widely available




Confidential                              Page 44                    07/03/2011
 IT Services 2010-11 Annual Plan




 Capital Bids

A          B                                  C             D                            E              F                   G                   H

Priority   Description of item                      Cost        Justification for item   Life (years)       Category            Consequent      Depreciation
                                                     £                                                                            recurrent       =C/E
                                                                                                                                annual cost /
                                                                                                        R   U   N      CS          income
                                                                                                                                      £
                                                            Upgrade to student
    1      Student Printing Services              25,000    printing environment, to                                        +5,000
                                                            include wireless printing
                                                            Enhancements to current
                                                            system and investigation /
    1      UEL Plus                               90,000                                                R
                                                            development of next
                                                            generation VLE.
                                                            3 year replacement cycle
                                                            to maintain resilience and
    1      File Server Replacement                225,000   improve network                   3         R                                           75,000
                                                            performance plus
                                                            UELPlus servers

                                                            4 year replacement cycle
    1       Desktop computer replacement          625,000                                     4         R   U                                       156,250
                                                            including PC's and Macs

                                                            Improving
           Enhance Student & Staff
    1                                             15,000    communications to                                               5,000
           Communications
                                                            students and staff.
                                                            Improvements to IT
           Business School Trading Floor
                                                            Service Desk and open
           modifications to improve student       50,000
    1                                                       access environment to                           U
           support and teaching
                                                            enhance student
                                                            experience and reduce




 Confidential                             Page 45                               07/03/2011
IT Services 2010-11 Annual Plan




                                                             queuing.

                                                             Complaints from teaching
                                                             staff and students that the
                                                             open plan environment is
          Reconfiguration of Teaching &
                                                             not conducive to learning
  1       Learning spaces at Stratford             200,000                                   6   R   33,333
                                                             due to noise from
          Computer & Conference Centre
                                                             adjacent clusters and the
                                                             flow of students through
                                                             the centre
                                                             Replacement of furniture
          Replacement furniture within                       that is 5/6 years old in
  1                                                 50,000                                   6       8,333
          Docklands Trading Floor                            small open access
                                                             learning areas
                                                             6 year replacement cycle
          Replacement/Upgrade to Audio
                                                             to maintain AV in learning
  1       Visual facilities in teaching and        525,000                                   6   R   87,500
                                                             spaces and upgrade to
          learning spaces
                                                             250 seat lecture theatre
                                                             Pre-requisite for upgrade
          Development work for the
                                                             of PC desktop to
          automated delivery of teaching,
  1                                                 50,000   Windows 7 as part of
          learning & administrative
                                                             enhancing the student
          applications to PC desktops
                                                             experience
  2       Redevelopment of UEL intranet             50,000   Migration of pilot
          and adoption of MS Sharepoint                      Sharepoint infrastructure
                                                             to production status and
                                                             Rejuvenation of UEL
                                                             intranet based on MS
                                                             Sharepoint
  2       UEL Direct Developments                  247,000   Staffing and consultancy
                                                             to maintain & Enhance
                                                             UEL Direct (see detail in
                                                             body of this plan for
                                                             specific projects)




Confidential                                  Page 46                           07/03/2011
IT Services 2010-11 Annual Plan




                                                         Implementation of
                                                         automated identity
          Identity management and                        management and re-
  2                                            150,000                                   5               30,000
          organisation directories                       organisation of staff ,
                                                         email and telephone
                                                         directories
                                                         Implementation of
                                                         attendance recording in
  2       Attendance Recording                 280,000   200 classrooms and              5           N   56,000
                                                         integration with SITS and
                                                         timetabling
                                                         The re-development of
                                                         the Management
                                                         Information System to
                                                         provide managers with
          Redevelopment of UEL MIS and
  2                                            150,000   individual, customisable        5               30,000
          adoption of MS Sharepoint
                                                         dashboards of their data
                                                         and its migration &
                                                         conversion to MS
                                                         Sharepoint
  3       Network Update                       250,000   Enhance capacity and            5   R           50,000
          Network Routers and Firewalls                  performance of core
                                                         network hardware to
                                                         enhance the student
                                                         experience and support
                                                         increased capacity
                                                         requirements and
                                                         network expansion for
                                                         new buildings.




          Relocate Stratford                             Rationalise infrastructure
  3                                            200,000                                           U
          telecommunication equipment                    into new server room to




Confidential                              Page 47                           07/03/2011
IT Services 2010-11 Annual Plan




          to new server room                               improve resilience and
                                                           enable Estates
                                                           refurbishment of UH
                                                           Provision of resilient &
                                                           environmentally efficient
          Resilient power supply for
  3                                               80,000   power supply (UPS) to          6       N                     13,333
          Docklands server room
                                                           protect Docklands server
                                                           room
                                                           Completion of the
                                                           deployment of the
          Disaster Recover/Business                        enterprise data
  3                                               55,000                                  5   R                         11,000
          Continuity                                       management solution for
                                                           data backup, recover 7
                                                           archiving
                                                           To ensure that all our
                                                           services take place in a
                                                           secure, scaleable,
          Enhancements to network                          resilient and sustainable
  3       security and overall security          118,000   environment in                 5       N                     23,600
          management                                       accordance with relevant
                                                           policy and legislation.

  4       Library     System     Stratford        50,000   Consultancy and                3       N                     17,000
          Servers for Resilience                           additional servers to
                                                           provide resilience
                                                           System Interface and
                                                                                                      Estimate 10-20%
          Pilot Intranet replacement with                  Web interface
  4                                               100000                                  5       N   annual license
          Enterprise portal                                management to continue
                                                                                                      charge
                                                           ongoing development
  4       Proposed     new             estate    120,000   Replacement of core            6       N
          developments                                     network switch




Confidential                                Page 48                          07/03/2011
IT Services 2010-11 Annual Plan




Confidential                      Page 49   07/03/2011

						
Related docs
Other docs by lqy82073
Job Application Approval
Views: 7  |  Downloads: 0
It Llc Operating Agrement
Views: 10  |  Downloads: 0
Jelly Order Form
Views: 2  |  Downloads: 0
Job Application Administration - PDF
Views: 21  |  Downloads: 0
Janitor Subcontractor Agreement
Views: 5  |  Downloads: 0
Jefferson County Tax Forms
Views: 12  |  Downloads: 0
Jct Minor Works Contract - PowerPoint
Views: 352  |  Downloads: 1
Jeans Sale New Business Proposal
Views: 16  |  Downloads: 0