SAP GUIDE

Click to download
Reviews
Shared by: LeeGreenwood
Stats
views:
423
rating:
not rated
reviews:
0
posted:
6/16/2009
language:
English
pages:
0
SPECIAL APPROPRIATIONS GRANTEE GUIDE AND CHECKLIST DO NOT SUBMIT TO NMED - FOR GRANTEE USE ONLY Project Name Owner Project Manager SAP Project Number Project Number CPB Project Manager Phone Number Item (as noted in NMED Grant Agreement) Completed by Date Comments Equipment Purchase / Professional Services (For Grant Agreements prior to 08 refer to Article 4 - 08 and beyond refer to Article 8) If equipment purchase, follow NM Procurement Code. [§13-1-28 et seq. NMSA 1978] Contact CPB Project Manager for listing and prices of equipment on current state contract. If engineering fees > $50,000 contact Professional Technical Advisory Board [PTAB] or NMED to assist with preparation of RFP. [§13-1-20 et seq. NMSA 1978] Submit draft *Request for Proposal (RFP) and proposed ranking to NMED for review and approval prior to advertising. Engineering Agreement (Article 4 or Article 6) Following selection of engineer, submit draft engineering agreement, *"Publicly Funded Project" standard engineering agreement form, to NMED for review and approval. Plan/Design (Article 4 or Article 6) Submit Preliminary Engineering Report (PER) if applicable. Schedule meeting with professional engineer & NMED regarding construction inspection requirements (part-time or full-time) and rights-of-way. Submit construction inspector's resume to NMED for review and approval. Submit Construction Plans and Specifications prepared and signed by PE to NMED for review and approval before advertising project for construction bids including local wage determinations as provided in §13-4-11 NMSA 1978. Ad/Bid (Article 4 or Article 6) Submit documents showing competitive bidding process in accordance with applicable state laws for awarding construction contracts along with certification of advertisement in newspaper, pre-bid conference agenda, and addenda to NMED. Submit recommendation of award, certified bid tabulation, copy of bid bond for selected contractor and evidence of full project financing to NMED for review and approval prior to awarding the contract. * Forms available on NMED website www.nmenv.state.nm.us/cpb/cpbtop.html Rev. 7/08 D:\Docstoc\Working\pdf\de4e4503-299d-49f2-bca4-d357fa3e96c9.xls Item (as noted in NMED Grant Agreement) Bid Award (Article 4 or Article 6) Upon NMED concurrence of award recommendation, provide a Notice of Award to contractor, submit minutes of meeting awarding contract and copy of award to NMED. Submit copy of payment and performance bonds from contractor and copy of executed construction contract and proposed date and time of pre-construction conference to NMED. (Bonds and contract may be delivered to NMED at time of Pre-Construction Conference) Pre-Construction Conference (Article 4 or Article 6) Issue Notice to Proceed to contractor. Contractor provides construction schedule to professional engineer/owner and copy to NMED. Contractor provides most recent, as approved by DFA, *W-9 to NMED. Construction and Closeout (Article 4 and Article 8 or Article 6 and Article 8) All changes to project scope (contract price or time) by *Contract Change Order submitted to NMED for review and approval prior to implementation of change order. Retain proof of deposit and/or payments to contractors and consultants. Comply with NM Utility Operator's Certification Act. [§ 61-33-1 et seq. NMSA 1978] for water or wastewater treatment facilities/distribution. Closeout: CONSTRUCTION - Submit final disbursement request along with: *Certificate of Project Acceptance and Performance, *Labor Standards Certification, *Record Drawings and O & M Manuals Acceptance letter, *Affidavit of Payment and Release of Lien, *Consent of Surety to Final Payment, and a *Certificate of Substantial Completion including punch list items to NMED for review and approval. Final reimbursement paid after NMED inspects/approves constructed facility and receives all required documentation. EQUIPMENT PURCHASE - If used equipment, submit final disbursement request along with appraisal reports and equipment title. Disbursement Requests (Article 8 or Article 9 - Compensation and Method of Payment) Submit transmittal letter, NMED *Disbursement Request form, *Engineer's Construction Status Report (if applicable) and *Authorization to Make Payment to Payee Memorandum (if applicable) with proper documentation and signatory authority for payment to NMED not more than once every 30 days. IF A STUDY, PRELIMINARY ENGINEERING REPORT (PER]) or PLANS & SPECS. ARE REQUIRED - Study, PER, or plans & specs must be approved by NMED prior to submittal and approval of final Disbursement Request. * Forms available on NMED website www.nmenv.state.nm.us/cpb/cpbtop.html Completed by Date Comments For more information on SAP project implementation go to www.nmenv.state.nm.us/cpb/cbptop.html. If you do not have web access please call 505.827.2806 to obtain a copy of the SAP Guide. Rev. 7/08 D:\Docstoc\Working\pdf\de4e4503-299d-49f2-bca4-d357fa3e96c9.xls

Related docs
SAP_Siemens
Views: 863  |  Downloads: 189
sap assessment guide purdue university
Views: 3  |  Downloads: 1
The SAP Newsletter
Views: 88  |  Downloads: 16
SAP NetWeaver
Views: 469  |  Downloads: 99
HU03 - For Identification
Views: 291  |  Downloads: 32
solutions from sap sap business one 2007 b
Views: 6  |  Downloads: 0
effective document management with sap dms
Views: 14  |  Downloads: 0
SAP R/3 User Guide
Views: 434  |  Downloads: 45
SAP B1 Certification
Views: 313  |  Downloads: 18
sap-trainer-resume 410
Views: 109  |  Downloads: 6
SAP Configuration Guide
Views: 5102  |  Downloads: 917
SAP CRM Certification
Views: 1221  |  Downloads: 37
Electronic SAP Quick Reference Guide
Views: 155  |  Downloads: 23
SAP TSCM60 Certification Questions - 1
Views: 496  |  Downloads: 163
Other docs by LeeGreenwood
Employee Rejection Letter
Views: 1907  |  Downloads: 7
Motion To Dismiss
Views: 454  |  Downloads: 11
Directors Dissent Declaration of Dividend
Views: 199  |  Downloads: 1
Absence policies
Views: 449  |  Downloads: 22
Adverse Representation
Views: 170  |  Downloads: 1
Common Stock Purchase Certificate
Views: 519  |  Downloads: 13
The Doctrine and Practice of Yoga
Views: 287  |  Downloads: 13
CHECK REGISTER
Views: 368  |  Downloads: 21
DAY PLANNER
Views: 852  |  Downloads: 89
Stock Certificate for Preferred Stock
Views: 490  |  Downloads: 20
General Dynamics Corp Ammendments and Bylaws
Views: 179  |  Downloads: 0