Docstoc

Arturo E

Document Sample
Arturo E Powered By Docstoc
					                   Arturo E. Veve, AIA
                   Apartment 3F, No. 6 Building
                   No. 660 Wan Hang Du Road
                   Jing’An District
                   Shanghai, China 200042
                   Mobile 011 86 (138) 1749 5337
                   Telephone: (021) 3388 2537
                   USA Telephone and Voicemail
                   001 (415) 735 7329
                   Email arturoveve@gmail.com
                         volae@earthlink.net

Education          University of Texas at San Antonio, Master of Business
                   Administration, 1990
                   University of Pennsylvania, Master of Architecture, 1982
                   Notre Dame University, Bachelor of Arts, 1977

Registrations      Registered Architect since 1996. Texas 1996-2000;
                   Florida, #AR-0016901, 1999-present; NCARB Certified
                   since 1996. Pursuing LEED Green Associate certification

Responsibilities   Provide design and architectural technical drawings.
                   Experience with conceptual design, schematic design,
                   design development, construction documents and
                   construction administration phases. Coordinate with design
                   team, owner groups, engineers, specialty consultants and
                   interior designers in a team environment. Review design
                   drawings for constructability. Provide sustainable design
                   recommendations on projects.

Computer Skills    Software: AutoCad, MS Word, Excel, Powerpoint, Adobe
                   PhotoShop, Adobe InDesign, Adobe Dreamweaver, Rhino,
                   Sketchup. Training in Revit Architecture BIM.

Architecture       Joseph Wong Design Associates (JWDA), China
                   Representative Office, Shanghai, China; Project Director,
                   Associate, 2009-2010

                   Project List:
                   Shaoxing Tower, Zhejiang Province, mixed-use
                   development of 105,113 m2 containing a 200 room five
                   star hotel in a 9 story podium, ballrooms, retail, and a 42
                   story, 154.6m tall high-end residential tower. Planned for
                   Zhejian Jiagheng Estates and Investment Development
                   Company, LTD. Produced design development exterior
                   section details.
                   Lotus Office Complex, 65,032m2 corporate and
                   technology Campus for Zhangjiang District Development
                   Corporation, Shanghai, China. Reviewed office complex
                   and glass clad round exposition building drawings for
               Arturo E. Veve, AIA
               Page 2

               constructability. Provided details of curtain wall in response
               to government energy requirements.
               Dongjiadu Residential Towers, two 23 story high rise
               luxury residential towers in the clothing manufacturing area
               of the Bund, Shanghai, China. Prepared construction
               document details for building exterior, including public
               entrances, balconies, windows and rooftop. Reviewed
               curtain wall consultant drawings.
               Tian Zhi Jiao Zi Residential Project, Zhangjiang Hi
               Technology Area, Shanghai, China. Provided public bridge
               cladding details in a complex of three high rise residential
               towers.
               Zhoujiaqiao Towers, Changning District, Shanghai, CN.
               Two 18 story residential towers with three story
               townhouses at base, located next to Tianshan Park.
               Drew design development details for louvers, entrance
               canopies, skylights, balconies, railings and typical wall
               cladding.
               Office Complex C-4-8 B, Zhangjiang Hi Technology Area,
               Shanghai, China. Total construction area of 51614m2, total
               building height 50m. Provided design development wall
               section details of low rise and high rise buildings.
               Reviewed local design institute drawings.
Architecture   Kingdee Software Park design competition, Beijing,
               China. Office campus in 206,902 m2. Associate architects,
               Studios Architecture. Provided sustainable design
               concepts.
               Luxehills Headquarters, Chengdu, China. Offices, private
               club and villas schematic design master plan of 64,343m2
               for Chengdu Luxehills Property Management Co, LTD.
               Associate architects, Studios Architecture. Provided design
               development section details for the office buildings.

               Hornberger + Worstell Architects & Planners, San
               Francisco, California, Project Architect / Designer, 2005 –
               2008

               Project List:
               The Chuang Ye Park Office Building Complex Master
               Plan, Qindao, China, 2008. 1,000,000 m2 project includes
               6 Class A office buildings from 6,000 m2 to 30,000 m2,
               and a 4,000 m2. below grade space with fitness center,
               kindergarden, retail and restaurants. MEP and Structural
               Engineering by Arup. Contributed during the Schematic
               Design Phase
               Project Kiju, Hanazono Resort, Hokaido, Japan. Resort
               Hotel in the ski country area of Niseko in Hokaido, 2008.
               Researched contemporary Japanese mountain
               architecture imagery for design references.
               Park Hyatt Resort and Spa, Beaver Creek, Colorado.
               2005-2006. Conversion of hotel rooms to timeshare
               Arturo E. Veve, AIA
               Page 3

               apartments, expansion of Allegria Spa to 2,900m2. Spa
               contains retail area, feature custom designed stair. A water
               temple pool has wall backdrop of bluestone, with three
               granite water fountains.There are additional pools,
               experience showers, tepidariums, and 25 treatment rooms.
               Worked as project architect and designer from design
               development, construction documents and construction
               administration.
               Westin St Francis Hotel Rehabilitation, San Francisco,
               California, 2006 – present. Renovation and planning of
               new functions in a building of great local historical
               significance. The hotel comprises a 14 story historical main
               building, and a 32 story high rise tower, totaling
               111,500m2. The scope includes renovation of entry
               lobbies, restaurants, re-planning of a retail promenade,
               renovation of kitchens, addition of restrooms, design of a
               new bar, adding a new ballroom, replacement of floors 13
               and 14 with a new meeting rooms overlooking Union
               Square and the city. Collaborated for the interiors with
               Rockwell Group of NY. Involved in design, project
               architecture, client and consultant coordination. The Clock
               Bar is the first portion of the project completed in 2008.
               Terrano Napa Valley Resort, Calistoga, California, 2007-
               2008. Design of 5-star resort in a 9.3 hectare site that
               includes a winery and vineyard. The resort is planned as a
Architecture   “farm village” utilizing stone and wood, sloping roofs,
               chimney forms and deep porches. The winery houses a
               wine cave and culinary center in 2,125m2. Adjacent is a
               560m2 Spa, a 2-story 2,525 m2 Clubhouse and
               Restaurant. 18 individual low rise lodges contain guest
               rooms, totaling 5,810 m2. The project is pursuing LEED
               accreditation, using geothermal transfer of hot springs
               located under the site to heat all the water in the property.
               Worked on the schematic design phase of the winery
               building, modeling the building in 3D and creating
               renderings for the government’s design review board.
               Alpensia Resort Masterplan, 2007. A $1.34 billion USD
               project located in PyeongChang, 187 kilometers east of
               Seoul, South Korea. The site is an applicant for the 2018
               Winter Olympics. The resort is a multi-zoned village
               surrounding the skiing venues. The team modified an
               existing masterplan to include a large program. A spa
               residence zone includes 80 condominiums covering
               13,860m2. The Euro Spa-ville is a 400 unit resort inspired
               by the Rogner Bad Blumau resort in Germany, with arched
               buildings with sod roofs, encompassing 46,860m2. The
               Oriental Spa-ville includes a Wellness Center and 260
               condominiums over 48,660m2. The Festival Place contains
               a Family Entertainment Center, Shops, Pet Hotel, Farmer's
               Market, Arts & Crafts Center, Community Center and
               Waterfront Performing Stage, in 14,200m2. There are
               Arturo E. Veve, AIA
               Page 4

               residential areas, including for employees, for whom a
               10,000m2 Training Facility is planned. Assisted with
               research of design references and creation of image
               boards.
               San Juan Oaks, 2006 - 2008 Master planning of a site
               with an existing golf course, at the foothills of San Juan
               Bautista Mountains, near San Jose in California’s Silicon
               Valley. The project includes a Resort Hotel with a Spa of
               2,800m2, with 60 rooms, 40 suites and 100 2-bedroom
               Bungalows, totaling 21,200m2; Hotel public areas total
               830m2. Another site houses a Community Center with a
               Fitness Facility, and Golf Clubhouse, comprising 4,650m2.
               Amenities include golf course, pools, and tennis courts.
               Along the golf course, 230 villas ranging in size from
               200m2 to 260m2 are grouped in clusters of 9; area totaling
               53,500m2. On another section of the property, .3 to .4
               hectares lots are planned for estate homes surrounding
               central green areas. Planning is done so as to take
               advantage of sightlines to the surrounding mountains and
               agricultural lands. Footpaths and roads connect the
               housing to the Community Center and Hotel areas.
               Worked on master planning and conceptual design.
               Starr Pass Vacation Villas, Tucson, Arizona, 2007.
               Conceptual Design for a desert hillside development on 11
               hectares next to the Marriott Starr Pass Resort and Spa,
Architecture   which the firm designed. The plan addresses the following
               program: 30 to 50 Starr Pass Resort one bedroom suites
               with terraces, each 83m2, totaling 4,150m2; 80 to 100 J.W.
               Marriott "Gold Club" timeshares with terraces, 115 m2
               each, totaling 11,500 m2; Common Facility with
               Restaurant, Fitness Center, Pool, Parking and Storage;
               100 units of 2 and 3-bedroom whole-ownership terraced
               condominiums, ranging from 150m2 to 185m2, totaling
               18,500m2. Worked on the design charrette with the client
               group and on the conceptual design package.
               Starr Pass Golf and Spa Resort River Pool Feature,
               Tucson, Arizona, 2007. The hotel owner requested design
               documents for a new outdoor water entertainment feature
               that includes a water slide, fountain, snack bar, lounging
               area and re-circulating river pool for guests to float on, with
               desert landscaping. Assisted with design development
               drawings.
               Project Pinetree Master Plan Proposal, 2007 for a resort
               development on a pristine site in Thai Muang, Thailand,
               occupying 160 hectares along 3km of beach. On the north
               side there is a 60 room 6 star Lagoon Hotel and Spa, with
               60 2 and 3-bedroom Hotel Villas surrounded by a Golf and
               Resident’s Club, and a Health and Well Being Center. 237
               Villas are sited around an 18 hole golf course, and around
               lagoons. On the south area there is a Marina with yacht
               berths ranging from 40 to 150 feet, a 75 room Marina
                   Arturo E. Veve, AIA
                   Page 5

                   Hotel, four Condominium Towers, each 45 meters tall, that
                   include 2 to 4-bedroom apartments and larger penthouse
                   units. The Marina offers retail venues, and a Sailing
                   Center, Diving School, boat docks and a Sea Plane
                   landing strip. Assisted with the design reference boards
                   and Photoshop coloring of portions of the site plan.
                   Sacramento State University Recreation and Wellness
                   Facility, Sacramento, California, 2008, 150,845 sf.
                   construction documents assist during building permit
                   phase.

                  Hellmuth, Obata + Kassabaum, Inc., (HOK) 2001-2005.
                   San Francisco, California, Intermediate Architect, 2004-
                   2005, Orlando, Florida, Architect, 2001-2004.

                   Project list:
                   New Doha International Airport, Doha, Qatar. 2004-
                   2005. Consultants to Bechtel Engineering for a new airport
                   for the Qatar Civil Aviation Authority to be built over
                   reclaimed land, with a three story terminal, two concourses
                   of 24 gate capacity, 140,000m² of floor space, of which
                   25,000m² is dedicated as retail space, a hotel, structured
                   parking, landscaped deck over parking with public mosque
                   on top, and a central utility plant. Primary area of
                   responsibility was taking the mosque package from design
                   development to construction documents. The mosque is a
Architecture       round building with a rich palette of materials in the interior,
                   topped with a glass dome. Assisted with structural and
                   MEP coordination. Produced complex geometric detail
                   drawings dimensioned in metric. Also worked on
                   foundations package drawings, baggage sortation areas of
                   the terminal building, security checkpoint studies,
                   pedestrian bridges, mosque plaza parking planning,
                   central utility plant, and vertical circulation node. The
                   vertical circulation node is a curving skylit two level glass
                   building linking bridges to parking structures.
                   621 Capitol Mall, Sacramento, California, 2004. Client:
                   David Taylor. 28-story, 400,000sf class-A office building.
                   Assisted during construction documents phase. Produced
                   final construction plans for entries to garage and service
                   areas, building elevations and parking signage.
                   Tampa International Airport Outbound Baggage
                   Handling System. Design-build project for Hillsborough
                   County Aviation Authority. Consultants to Skanska USA
                   Building, Inc, 2003. The projects included creation of
                   automated baggage screening systems in a 44,636sf area
                   of the landside building, design and construction of a new
                   45,140sq ft (4,200 sq. m) outbound baggage facility at
                   Airside A, design and construction of new 36,430sq ft
                   (3,400 sq. m) outbound baggage facility at Airside F, and
                   new sortation systems at Airside E concourse. Worked on
                   Arturo E. Veve, AIA
                   Page 6

                   schematic design, design development, construction
                   documents and construction administration phases.
                   Prepared CAD drawings, assisted with civil, structural and
                   MEP coordination, assisted with shop drawing review
                   during construction.
                   Ft. Lauderdale-Hollywood Airport North Terminal
                   Expansion, Ft. Lauderdale, Florida, 2003. Client: Broward
                   County Aviation Department. Twenty three gate terminal,
                   600,000sf. Assisted with preparation of record as-built
                   drawings.
                   Boston Logan International Airport, Delta Airlines
                   Terminal A Redevelopment. Client: Massachusetts Port
                   Authority, with Beacon/Beers Skanska, 2002. A new 26
                   gate terminal of 317,000sf, with a satellite concourse of
                   308,00sf.and a connecting pedestrian tunnel of 36,000sf.
                   Worked on construction documents incorporating security
                   revisions. This is the first LEED certified airport terminal in
                   the United States. Primary responsibilities were in interior
                   architecture portion of project.
                   Orlando International Airport, South Terminal Complex,
                   Orlando, Florida, 2001-2002. Client: Greater Orlando
                   Aviation Authority. Phase 1 of an airport expansion
                   connected to the north terminal by a roadway and
Architecture       intermodal transit. Airside terminal of 292,300sf, landside
                   concourse of 494,790sf with 12 gates. Worked on
                   schematic design and design development phases.
                   Prepared CAD drawings, verified program, coordinated
                   with consultants, assisted with study of parking and roads.

                  Architectural Design Consortium joint venture with
                   Mateu Carreño Rizo & Partners and Borrelli & Associates,
                   Miami, Florida, Project Architect, 2001

                   Project:
                   Miami International Airport South Terminal Expansion,
                   Coordinated passenger amenities including ATM locations,
                   baggage carts, clocks, phones, information counters,
                   electronic display media and interior landscaping.


                  Beame Architectural Partnership, Architects & Planners,
                   Coral Gables, Florida, Project Architect, 1997–2001

                   Project list:
                   Paseo Caribe, San Juan, Puerto Rico, 1999-2001, mixed-
                   use center with185,000sf of retail/entertainment, casino,
                   cinema, condominium tower and structured parking next to
                   the landmark Caribe Hilton in Old San Juan. Work done in
                   joint venture with Puerto Rico architectural firms of
                   Jimenez & Rodriguez Barcelo and Sierra Cardona Ferrer.
                   Worked on conceptual design, design development and
                   Arturo E. Veve, AIA
                   Page 7

                   construction documents, assisting with engineering
                   coordination and client presentations.
                   The Dolphin Mall, Miami, Florida, 1996-2001, a 1.65
                   million sf themed value/retail and entertainment megamall,
                   destination retail, dining, cinemaplex, bowling alley and
                   parking for 8,000 cars. Worked on construction documents
                   with particular attention to public entries with seating and
                   canopy elements.
                   Plaza Terranova, Managua, Nicaragua, 1998-99,
                   shopping center with 250,000sf of retail, department store,
                   cinema and restaurants, creating a town center. Worked
                   on contract negotiation, conceptual design, design
                   development and construction documents in metric.
                   El Tejar Shopping Center, Bucaramanga, Colombia,
                   1998, shopping center with 323,000sf of retail with two
                   anchors, indoor amusement and an office tower. Worked
                   on conceptual design drawings in metric.
                   Miami Lakes Shopping Center, Miami, Florida,
                   2000. Worked on site planning.
                   Borders Bookstores, Oviedo and Orlando, Florida,
                   1988. Construction administration for two new
                   bookstores.
                   Addition to La Carreta Restaurant and Bar, Miami
Architecture       International Airport, 7,000sf, 1998-99, worked on
                   construction documents and construction administration.
                   Host Marriott Food and Beverage Facilities, Miami
                   International Airport, Florida,1977-98, worked on
                   conceptual design and due diligence.

                  3D/International, Architects & Planners, San Antonio,
                   Texas, Architect, 1994-1997

                   Project List
                   La Quinta Inns, room renovations at 200 locations in the
                   U.S., 1995-97. Traveled throughout the US. Worked in
                   Monterrey, Mexico with Maiz Proyectos on production of
                   outsourced construction documents.
                   Riverwalk Hotel, San Antonio, Texas, 1992. Worked on
                   construction documents.
                   Officer’s Club, Lackland Air Force Base, Texas, 1995.
                   Worked on construction documents
                   Sunshine of Montrose, CO. Designed prototype single
                   residences adapting American Bungalow style to
                   contemporary living for a planned community in Colorado,
                   1996-97.


                  Ford Powell & Carson, Architects & Planners, San
                   Antonio, Texas, Intern, 1992-1994.
                  Arturo E. Veve, AIA
                  Page 8

                  Project List:
                  Pier 21 Hotel & Restaurant, Galveston, Texas, 1992.
                  Lone Coyote Grill & Saloon, Phoenix Airport, Arizona,
                  1992.
                  U.S. Long Distance Headquarters, San Antonio, Texas,
                  15,000 sf, 1992.
                  Law Offices of Frank Herrera, McAllen, Texas, 30,000 sf,
                  1993.
                  Law Offices of Frank Herrera, San Antonio, Texas,
                  expanded lobby, 1993
                  NationsBank, San Antonio, Texas, 150,000 sf space
                  utilization analysis, 1992.
                  Wolf Municipal Baseball Stadium, San Antonio, Texas,
                  1993
                  Texas State Capitol Renovation, Austin, Texas, 1992-94.
                  Business School Building, University of Texas at San
                  Antonio, 200,000 sf, 1992-93.

Engineering      K.M. Ng & Associates, Consulting Engineers, San
                  Antonio, Texas, CAD drafter (part time), 1994-1997, CAD
                  Manager (full time), 1990-1991

                  Project List:
                  Expansion of San Antonio Convention Center, San
                  Antonio, Texas, 1996-97. Design by Kell Munoz Architects.
                  University of Texas Pan American Engineering
                  Building, Edingburg, Texas, 200,000sf, 1994. Designed
                  by Kell Munoz Architects.
                  Downtown Campus, University of Texas at San
                  Antonio, 300,000sf, 1995. Design by Humberto Saldana &
                  Associates Architects and Kell Munoz Architects.

                 Southwest Research Institute, San Antonio, Texas,
                  Research Analyst, 1985-1990

                  Project List:
                  Automation and Data Systems Division, Southwest
                  Research Institute, San Antonio, Texas, 1997, survey and
                  drafting of 133,000sf of offices and laboratories.
                  Robotics and Automation Department, Southwest
                  Research Institute, San Antonio, Texas, space planning of
                  30,000sf of offices and laboratories, 1985-90.
                  Aircraft Canopy Polisher and Paint Stripping Cell,
                  Southwest Research Institute, San Antonio, Texas 1985-
                  1990.
                  C5A Aircraft Hangar, Kelly Air Force Base, Texas, 1988-
                  89, robotic paint stripper cell study.

Languages         English- fluent, Spanish -native, French- fluent, Mandarin-
                  studying

				
DOCUMENT INFO