Csi Schedule of Values

Document Sample
Csi Schedule of Values Powered By Docstoc
					                                    SECTION 01025

                                 SCHEDULE OF VALUES

          ****** ***** **** *** ** * ** *** **** ***** ******
NOTE TO SPECIFIER: The "Miami-Dade County Public Schools Architects and Engineers Special
Conditions A/E SC-1" manual contains the "Contractor's Requisition for Partial Payment" form
(1261SR:ArchManual: 8-30-94). Include this form at the end of this section.
          ****** ***** **** *** ** * ** *** **** ***** ******

PART 1      GENERAL

  1.01      SUMMARY

          ****** ***** **** *** ** * ** *** **** ***** ******
NOTE TO SPECIFIER: Insert and coordinate the correct related CPM Section number (01310,
01311, or 01312) to suit project requirements.
          ****** ***** **** *** ** * ** *** **** ***** ******

      A.    Related Section:

            1.    01310 - Construction Schedule Critical Path Method
                          (CPM).

  1.02      SUBMITTALS

      A.    Immediately    after   contract   award   and   before
            preconstruction meeting, submit a proposed Schedule of
            Values to the A/E.

            1.    Determine with A/E additional data, if any, required
                  to be submitted.

                  a.    Provide copies of the subcontracts or other data
                        acceptable to the A/E, substantiating the sums
                        described.

            2.    Schedule of Values shall be compatible with and
                  related to Section 01310 - Construction Schedule
                  Critical Path Method (CPM).

                  a.    Tasks shall be cost loaded, organized, and coded
                        to allow schedule to be summarized according to
                        the Construction Specifications Institute (CSI)
                        16 division format.
                  b.    Provide a detailed breakdown of the Contract
                        Amount showing values assigned to each of the
                        various parts of the Work coded and organized by
                        area of work according to Section 01310.


Project Name                      M-DCPS MASTER                                   Jan 04
Project No.                  SPECIFICATION GUIDELINES                          01025 - 1
        3.     Provide separate labor and material values of, but
               not limited to, the following:

               a.   Each major and minor construction stage and trade
                    operation of work sequence identified by project
                    specification section number, name of operation,
                    and trade.
               b.   Subcontractors and suppliers individually broken
                    down.
               c.   Monthly applications for payments in relation to
                    the CPM.

        4.     Secure the A/E's approval of the Schedule of Values
               before submitting first requisition for payment.


PART 2 NOT USED

PART 3 NOT USED



                            END OF SECTION




Project Name                M-DCPS MASTER                     Jan 04
Project No.            SPECIFICATION GUIDELINES            01025 - 2

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:169
posted:2/14/2011
language:English
pages:2
Description: Csi Schedule of Values document sample