professional documents
home
Upload
docsters
Upload
about me
contact me
user photo
Bobby Khullar
Finance
West Coast Regional Pr...
Worley Parsons
submit clear
Excel Spreadsheet

Contingency Risk Analysis center doc

financial > Other

Allows you to determine the risk for a project

Contingency Analysis (Scoring) for Project Cost Estimates Project Title: ABC Project Project Design Stage: Area of cost: Process and Non-Process Infrastructure Team Member: Date: Project Manager Date: Cost Engineer: Date: Total estimated cost BEFORE ANY contingency = $ Gate 3 Scored by: Reviewed by: Compiled by: 10,000,000 Elements of Risk: NOT Included: totally unforesee-able events such as catastrophic weather conditions, unexpected changes in HES laws, unexpected labor strikes, unexpected changes in global market conditions Current Relative PROBABILITY of WEIGHT of total achieving 50/50 Weighted Score (Based on Project Team (10 = highest POTENTIAL for accuracy Assessment) variation, not magnitude of estimated cost) (1 = Nailed 10 = very uncertain and >0.5% of TIC) Refer to ASTM E1369, E1946, and E2168 for additional information 0 to 10 1 to 10 Process Design 10 2 20 Clarity of Project Objectives (Product Mix, Cap, Reliability, Logistics, Pre-investmt) Maturity of Technology (Technology: New, Modeled, Tested, Previously Built) 6 2 12 Process Complexity (Familiarity, Alternatives, Life Cycle Operability, Reliability) 4 5 20 Process Design Completeness (Equip List, PFDs, H&M Bal, P&IDs, Arrangemt, PSR) 4 5 20 5 6 30 Infrastructure Design Completeness (Plot Plan, Util Sources, Downstream) Specification completeness (Conventional, Non-Standardized, MOC/Corrosion) 3 4 12 Engineering, Design, & Inspection 4 6 24 Health, Environm'l, Safety (Regulations, Life Safety Services, FP, Security, Incentives) 2 2 4 Site Selection/Conditions (Geography, Geology, Government, Altitude) 4 6 24 Design Completeness (Philosophies, Conceptual, Preliminary, Definitive, Detailed) 4 3 12 Specification Complexity (Industry Standards, Plant Adapted, Mostly by Vendor) MTO Quantities (MTO Methods, Assumptions, Horizontal and Vertical Allowances) 2 5 10 2 3 6 Utilities (Knowledge of Availability & Locations) Project Management Project Execution (Proj Size, Complexity, Clarity of Cost & Schedule Drivers, Constructability) 5 4 20 Risk Management Plan (Identification, Measuremt, Crisis, Change Control, Penalties) 5 4 20 2 3 6 Project Staffing (Availability, Experience, Familiarity, Owner Involvement) Contracting Plan (Sole Source, CM, LSFP, Cost Plus, Incentives, No. of contracts, Clauses) 4 4 16 2 5 10 Estimating Method (Factored, Forced Qty, Budget Quotes, Error/Omissions, Input/feedback) Construction 4 3 12 Construction Type (new greenfield, retrofit, construct in an operating unit) Schedule (Long-Lead Items, Fast-track, Outages, Multiphased, Schedule Compression) 7 4 28 4 5 20 Site and work area (Access/Egress, Laydown area, Emergency & Construction Traffic) 8 4 32 Density & Congestion (Working area per person, Proximity of equipmt arrangement) 3 5 15 Above Grade and Subsurface (Obstructions, Soils Conditions / Stability, Drainage) Construction Labor (Availability, Skill Level, Familiarity, Local Labor Practices, Incentives) 4 3 12 3 4 12 Support Infrastructure (Storage, Housing, Transportation, Remoteness, Temporary) Site Conditions (Contamination, Seasons, Weather, Work Permits, Plant-ordered Delays) 4 4 16 Market Dynamics (Local/Domestic/Global Conditions, Escalation, Exchange Rates) 4 5 20 Dismantling & Demolition (Definition, Quantification) Commissioning & Start-up 2 4 8 Execution Plan (Train, Operate, Maintain, Philosophy, Reliability, As-Builts, Debottlenecking) Totals 111 110 441 Total Possible score = 2500 Score ratio = 0.176 "Normal" contingency chart (applied against lowest reasonable bid/cost after reviewed by project team) Mature Technology New Technology Retrofit Project Contingency Accuracy Range Contingency Accuracy Range Contingency Accuracy Range Gate 1 25% +/- 50% 30% +/- 50% to 75% 25% +/- 50% Gate 2 20% +/- 25% to 30% 25% +/- 40% to 50% 20% +/- 35% to 40% Gate 3 15% +/- 15% 20% +/- 30% 15% +/- 20% Gate 4 10% +/- 10% 15% +/- 10% 10% +/- 10% Accuracy range is based on a 50/50 chance of cost over-run/under-run "Normal" Contingency for this application (from above chart) = Scored Contingency (Score Ratio from above) = Additional Project Specific Risk/Concerns/Opportunities: Opportunity: a favorable outcome will occur Risk: an unfavorable outcome will occur (Describe Add/deduct%) 1. See separate "Opportunities List" 2. See separate Risk Fund / Restricted Reserve Log Total Contingency Percentage to be applied to this element of cost = Total Contingency in USD$ for this portion of project cost = $ 15% 17.6% -1.8% 4.0% 19.8% 1,980,000 Business Confidential 6/10/2008 (Rev 2/05) Page 1 of 1 pages
rate this doc
email this doc
embed this doc
add to folder
digg reddit stumble delicious
flag this doc
463
91
not rated
0
6/10/2008
English
Preview

Contingency Plan Template

ocak 1/6/2008 | 481 | 53 | 0 | business
Preview

Contingency Plan Template[1]

ocak 1/10/2008 | 980 | 70 | 0 | business
Preview

contingency plan template instructions

ocak 1/28/2008 | 233 | 35 | 0 | business
Preview

contingency plan template[2]

ocak 1/28/2008 | 222 | 44 | 0 | business
Preview

Contingency Plan Template[3]

anonymous 2/2/2008 | 178 | 27 | 0 | business
Preview

Risk Calculation Worksheet Template

ocak 1/28/2008 | 299 | 53 | 0 | business
Preview

Risk Mitigation Worksheet Template

ocak 1/28/2008 | 440 | 52 | 0 | business
Preview

Risk analysis Template

jpberes 12/24/2007 | 480 | 86 | 1 | business
Preview

Recruiter Contingency Fee Agreements

Mary_jMenintigar 10/6/2008 | 13 | 1 | 0 | legal
Preview

Waste Management Project Contingency Analysis

EIA 5/30/2008 | 36 | 0 | 0 | legal
Preview

Water Shortage Contingency Plan Template

Reclamation 5/30/2008 | 43 | 2 | 0 | legal
Preview

hhs contingency plan template

HHS 6/19/2008 | 35 | 1 | 0 | legal
Preview

Contingency Planning Template DOJ

NIST 7/2/2008 | 31 | 0 | 0 | legal
Preview

Contingency Planning Template Instructions DOJ

NIST 7/2/2008 | 19 | 0 | 0 | legal
Preview

Blank_Evaluation

bobbykhullar 7/16/2008 | 227 | 32 | 0 | business
 
review this doc