Docstoc
EXCLUSIVE OFFER FOR DOCSTOC USERS
Try the all-new QuickBooks Online for FREE.  No credit card required.

Construction Change Order Forms

Document Sample
Construction Change Order Forms Powered By Docstoc
					According to the Paperwork Reduction Act of 1995, an agency may not conduct or sponsor, and a person is not required to respond to a collection of information
unless it displays a valid OMB control number. The valid OMB control number for this information collection is 0572-0059.. The time required to complete this
information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information.




                                                                                                DATE

                                DEPARTMENT OF AGRICULTURE
                            RURAL UTILITIES SERVICE
                        CONSTRUCTION CHANGE ORDER
 PROJECT                                      LINE                                              SHEET NO.



 ORDER NO.                                    POLES NO.                                         REFER TO ITEM NO.



 CHANGE




 REASON FOR CHANGE




 CHANGE AUTHORIZED BY:




                            SYSTEM MANAGER                                                             BORROWER'S ENGINEER

                                                       ITEMIZED COST OF ABOVE ORDER




                                                                                                            CONTRACTOR

   RUS Form 216 (Rev. 7-67)

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:427
posted:6/10/2009
language:English
pages:1