Article 1 Summary of Articles and Total Guaranteed Savings

Reviews
Shared by: dave Mo
Stats
views:
3
rating:
not rated
reviews:
0
posted:
6/7/2009
language:
pages:
0
Exhibit C – Performance Assurance Town of Orangetown Article 1: Summary of Articles and Total Guaranteed Savings The following Articles and Table are attached and made part of this Exhibit C: Article 1 Article 2 Article 3 Article 4 Article 5 Article 6 Article 7 Summary of Articles and Total Guaranteed Savings Guarantee Savings Types Guarantee Term Responsibilities of the CLIENT Measurement and Verification Plan Baseline Utility Consumption Data Utility Rate Structures and Escalation Rates Baseline Operating Data Table 1.1 Total Guaranteed Energy Savings (Units) FIM # 1 2 3 1 2 3 5 3 1 3 1 3 7 8 Electric Energy Saved (kWh) Electric Power Saved (kW) Fossil Fuel Saved (mmBtu) 220 10,497 59,811 15.0 335 25,241 19,344 384,414 40,945 6.6 71.9 6.5 267 17,920 6.0 19 3,461 158,800 0.8 48.3 709 846 Location Highway-Department (HD) Highway-Department (HD) Highway-Department (HD) Wastewater Treatment Plant (WT) Wastewater Treatment Plant (WT) Wastewater Treatment Plant (WT) Wastewater Treatment Plant (WT) Town Hall & Police Department (TH) Greenbush Building (GB) Greenbush Building (GB) Parks & Recreation (PR) Parks & Recreation (PR) Town of Orangetown (TO) Town of Orangetown (TO) FIM Name Temperature Control Infra Red Heating Lighting Upgrade Temperature Control Infra Red Heating Lighting Upgrade Motor system upgrade-Pumps Lighting Upgrade Temperature Control Lighting Upgrade Temperature Control Lighting Upgrade Traffic Lights Upgrade Traffic Controls Upgrade TOTAL 720,433 155.2 2,395 Page 1 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Table 1.2 Total Guaranteed Energy and Operational Savings (Dollars) Energy/Utility Savings Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12 Year 13 Year 14 Year 15 Operational Savings Total $130,554 $134,471 $138,505 $142,660 $146,940 $151,348 $155,888 $160,565 $165,382 $170,343 $175,454 $180,717 $186,139 $191,723 $197,475 $61,921 $63,779 $65,692 $63,400 $65,302 $67,261 $69,279 $71,357 $73,498 $75,703 $77,974 $80,313 $82,723 $85,204 $87,760 $192,475 $198,249 $204,197 $206,060 $212,242 $218,609 $225,167 $231,922 $238,880 $246,046 $253,428 $261,031 $268,861 $276,927 $285,235 1.1 Table 1.1 shows the CLIENT’S guaranteed utility unit Savings for Year 1 of the Agreement. Table 1.2 shows the CLIENT’S guaranteed cost Savings that can be extrapolated from the guaranteed utility Savings shown in Table 1.1 by multiplying the utility Savings by the stipulated utility rates and the stipulated escalation factors as agreed to and shown in Article 6. SIEMENS cannot and does not predict fluctuations in utility rates or the cost of energy. Therefore, the CLIENT and SIEMENS agree that the energy/utility cost Savings for each Annual Period will be calculated by multiplying the verified units of energy/utility Savings by the Annual Period’s stipulated utility rate and stipulated escalation factors and not the Annual Period’s actual utility rate. 1.2 This Exhibit is attached to and made a part of the Agreement between SIEMENS and the CLIENT. CLIENT: Signature: Printed Name: Title: SIEMENS: Signature: Printed Name: Title: Page 2 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Article 2: Guaranteed Savings Types 2.1 Guarantee Types. Siemens will utilize four basic approach options to measure and verify savings: Option A - Measured Capacity, Option B - Measured Consumption, Option C Main Meter Comparison, and Option D - Stipulated. a. Option A - Measured Capacity. This approach is intended for Facility Improvement Measures where a one-time measurement for specific equipment or systems instantaneous baseline energy use, and a one-time measurement for specific equipment or systems instantaneous post-implementation (Post) energy use can be measured. Baseline and Post energy consumption is calculated by multiplying the measured end use instantaneous capacity (i.e. – kW, Gal/hr, BTU/hr) by stipulated hours of operation for each mode of operation (i.e. – hours, week, month). The calculations for energy consumption will be defined in the Measurement and Verification Article 4 of this Exhibit C. The work sequence required for data collection, evaluation, and reporting will be defined in the Measurement and Verification article of this Exhibit C. b. Option B - Measured Consumption. This approach is intended for Facility Improvement Measures where continuous periodic measurements for specific equipment or systems baseline energy use, and continuous periodic measurements for that equipment or systems post-implementation (Post) energy use can be measured. The calculations for energy consumption will be defined in the Measurement and Verification Article 4 of this Exhibit C. Periodic inspections and consumption measurements of the equipment or systems will be necessary to verify the on-going efficient operation of the equipment and saving attainment. The predetermined schedule for data collection, evaluation, and reporting will be defined in the Measurement and Verification article of this Exhibit C. c. Option C - Main Meter Comparison. This approach is intended for measurements of the whole-facility or specific meter baseline energy use, and measurements of whole-facility or specific meter post-implementation (Post) energy use can be measured. The methodology to establish baseline and Post parameter identification, modeling approach and baseline or model adjustments will be defined in the Measurement and Verification Article 4 of this Exhibit C. Periodic inspections of baseline energy usage, operating practices, and facility and equipment, and meter measurements of the will be necessary to verify the on-going efficient operation of the equipment, systems, practices and facility, and saving attainment. The predetermined schedule for data collection, evaluation, and reporting will be defined in the Measurement and Verification article of this Exhibit C. d. d. Option D - Stipulated. This approach is intended for Facility Improvement Measures where the end use capacity or operational efficiency; demand, energy consumption or power level; or manufacturer’s measurements, industry standard efficiencies or operating hours are known in advance, and used in a calculation or analysis method that will stipulate the outcome. Both CLIENT and SIEMENS agree to the stipulated inputs and outcome(s) of the analysis methodology. Based on the established analytical methodology the savings stipulated will be achieved upon completion of the Facility Improvement Measures Work and that no further measurements or calculations will need to be performed. The methodology and calculations to establish savings value will be defined in the Measurement and Verification article of this Exhibit C. Page 3 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Table 2.1 below summarizes the first year dollar savings associated with each FIM which aggregates to the Total Guaranteed Energy and Operational Savings (Article 1, Table 1.2) and indicates the anticipated option that shall be utilized to measure and verify savings. Table 2.1 – Energy and Operational Savings Details by Guarantee Type Energy or Utility Saving $ FIM# / Location 1 / HD 2 / HD 3 / HD 1 / WT 2 / WT 3 / WT 5 / WT 3 / TH 1 / GB 3 / GB 1 / PR 3 / PR 7 / TO Guarantee Type Options A B Measured Capacity Measured Consumption Operational Savings $ D D Total Maintenance [1] FIM Temperature Control Infra Red Heating Lighting Upgrade Temperature Control Infra Red Heating Lighting Upgrade Motor system upgrade-Pumps Lighting Upgrade Temperature Control Lighting Upgrade Temperature Control Lighting Upgrade Traffic Lights Upgrade TOTAL C Bill Comparison Stipulated/ Calculated Total Savings $3,220 $14,035 $3,220 $14,035 $9,303 $4,700 $12,887 $2,244 $44,587 $5,707 $3,905 $3,242 $331 $582 $25,811 $46,889 $12,156 $71,509 $3,220 $14,035 $9,303 $4,700 $12,887 $2,244 $44,587 $5,707 $3,905 $3,242 $331 $582 $25,811 $130,554 $55 $8,100 $61,921 $423 $1,503 $49,920 $417 $1,503 $10,806 $4,700 $12,887 $3,747 $94,507 $6,124 $3,905 $3,665 $331 $637 $33,911 $192,475 [1] Maintenance savings are detailed in Exhibit C, Article 4.5 HD : Highway-Department WT : Wastewater Treatment Plant TH : Town Hall & Police Department Building GB : Greenbush Building PR : Parks and Recreation Building TO : Township of Orangetown Page 4 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Article 3: Guarantee Term Responsibilities of the CLIENT. In addition to and in supplement of the CLIENT’S responsibilities set forth in Article 6 of the Agreement, this Article details the individual agreed to responsibilities of the CLIENT, in connection with the management and administration of the Performance Guarantee. 3.1 The CLIENT shall designate a representative at (each) facility to coordinate the Work and provide required data as described below. The CLIENT shall provide SIEMENS with accurate facility operating information as defined below and in the Contracted Baseline article of this Exhibit C during each Annual Period, as soon as such information becomes available to the CLIENT. (a) Any material or operating changes to energy consuming or regulating equipment, operating schedules, business/services conducted, occupancy, or hours of operation. (b) Any malfunctions, failures and related changes in energy consuming or regulating equipment. (c) Any damage to, destruction of, or condemnation of the Work. (d) Energy usage and cost. (e) Preventive maintenance and repair records. CLIENT shall provide SIEMENS access to CLIENT’s utility accounts so that SIEMENS can retrieve information via the internet . If such information cannot be obtained through the internet, then CLIENT shall provide SIEMENS with copies of utility bills within 15 days of receipt by CLIENT or provide access to utility and commodity vendor information. The CLIENT is responsible to maintain all boilers in good service, including cleaning and repairs. 3.2 3.3 3.4 Page 5 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Article 4: Measurement and Verification Plan The following information outlines are applicable for this contract: Article 4.1 Measurement and Verification (M&V) methods provided under this Article. Article 4.2 Option A - Measured Capacity Article 4.3 Option B - Measured Consumption Article 4.4 Option C - Main Meter Comparison Article 4.5 Option D - Stipulated 4.1 GENERAL OVERVIEW The purpose of the Measurement and Verification (M&V) articles is to identify the methods, measurements, procedures and tools that will be used to verify the savings for each FIM. Savings were determined by comparing prior usage, consumption or efficiencies defined as the Baseline to the selected FIMs being implemented against the post FIM implementation usage, consumption or efficiencies. The Baseline usage, consumption or efficiencies is described in this Exhibit C, Article 5. The usage, consumption or efficiencies associated with the FIM implementation is defined as the Contracted Baseline, and are described in this Exhibit C, Article 7. Page 6 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown 4.2 4.2.1 OPTION A - MEASURED CAPACITY FIM 3: Lighting System Upgrades Facilities: Wastewater Treatment Plant buildings, Greenbush building, Highway department, Parks & Recreation Department,.Town Hall(New Wing Only). Description: Lighting upgrades include conversion to energy efficient technologies including lamps, ballasts, and/or the installation of occupancy sensors, while maintaining or elevating to standard illumination levels. How M&V will be performed: A detailed description of specific equipment to be installed is contained in the lighting audit inventory spreadsheets. All existing fixtures were individually identified and counted during the audit except for a few rooms that were not accessible, which have very-low occupancy. The baseline wattage for each type of fixture is based on the “Utility Luminaire Wattage Table” used for lighting retrofit savings calculations. Each fixture is either retrofitted or replaced with a new, more efficient system, or left unchanged if already efficient. Energy savings were calculated based upon the number and types of fixtures affected, and on the lighting hours of operation. Table 7.3.1 (Article 7) shows the operating hours for each usage group. A one-time watt measurement will be conducted after the retrofit for a representative sample of lighting fixtures from the different usage groups to verify the circuit draw. For each line item on the lighting inventory list the following savings calculations will be performed: kWhexisting = (Qtyexisting * Wattsexisting) / 1000 * Hrs kWhretrofit = (Qtyretrofit * Wattsretrofit) / 1000 * Hrs Annual Cost Savings = (kWhexisting - kWhretrofit) * ERkWh Where Qtyexisting = Existing number of fixtures Wattsexisting = Existing wattage per fixture Hrs = Annual Operating Hours Qtyretrofit = Retrofit number of fixtures Wattsretrofit = Retrofit wattage per fixture ERkWh = Energy rate $/kWh Savings analysis for this measure is presented in Appendix A, and the guaranteed annual energy savings is 141,480 kWh. The following table present the guarantee savings based in current electric rate: Page 7 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Table 4.2.1: Summary of lighting guarantee savings at current rate Savings Cost savings Location kWh Energy O&M 59,811 $9,303 $1,503 Highway Department 19,344 $2,244 $1,503 Wastewater Treatment Plant 3,461 $582 $55 Parks & Recreational Building 17,920 $3,242 $423 Greenbush Building 40,945 $5,707 $417 Town Hall & Police Department 141,480 $21,078 $3,901 Total 4.2.3 FIM 7: Traffic Lighting Upgrades Facilities: Across the Township of Orangetown Description: Traffic lighting upgrades include conversion from incandescent lighting to Light Emitting Diode (LED) energy efficient technologies. How M&V will be performed: A detailed description of specific equipment to be installed is contained in the lighting audit inventory spreadsheets. All existing fixtures were individually identified and counted during the audit. The baseline wattage for each fixture is based from standard consumption based in size and is used in the calculations. Each fixture/traffic head is either retrofitted or replaced with a new, more efficient system. Energy savings were calculated based upon the number and types of fixtures affected, and on the lighting hours of operation. Table 7.3.2 (Article 7) shows the operating hours for each usage group. A one-time watt measurement will be conducted after the retrofit for a representative number of traffic lighting to verify the electric draw. For each line item on the lighting inventory list the following savings calculations will be performed: kWhexisting = (Qtyexisting * Wattsexisting) / 1000 * Hrs kWhretrofit = (Qtyretrofit * Wattsretrofit) / 1000 * Hrs Annual Cost Savings = (kWhexisting - kWhretrofit) * ERkWh Where Qtyexisting = Existing number of fixtures Wattsexisting = Existing wattage per fixture Hrs = Annual Operating Hours Qtyretrofit = Retrofit number of fixtures Wattsretrofit = Retrofit wattage per fixture ERkWh = Energy rate $/kWh Savings analysis for this measure is presented in Exhibit C-Appendix C-1, and guaranteed annual energy savings is 158,800 kWh. At present rate is equivalent to $25,811. Page 8 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown 4.3 OPTION B - MEASURED CONSUMPTION 4.3.1 FIM 1: Temperature Control Facilities: Greenbush, Parks & Recs, Wastewater Treatment Plant’s existing digester building , and Highway department buildings. Description: Install Temperature Controllers and indoor sensors at mentioned locations with the capability to program time/temperature settings and unoccupied schedule. Savings will come from reductions in heating fuel use. Parks and Recreation, and Highway Departments have heating through hydronic system. The heating system runs 24/7 throughout the winter, maintaining 72ºF by means of a wall thermostat. The outdated temperature controller will be upgraded to “Digital 7-Day programmable” temperature control. The unit will operate based on a control schedule presented in Table 4.3.1.1. Outside occupied hours, the unit will switch to unoccupied mode and cycle to maintain 65ºF winter space temperatures. How M&V will be performed: Spreadsheet calculations using generally accepted engineering practices were used to calculate energy savings for each of the control strategies described above. These calculations will be the basis for verifying energy savings. In order to ensure the FIM is operating as designed, SIEMENS will be responsible for the following:    Pre-Heating Season verification that the control strategies and functions are accurately programmed. Pre-Heating Season verification that the output points are properly controlling equipment Pre-Heating Season verification that the input points are reading properly Table 4.3.1.1 below identifies the occupancy schedules that are the basis for energy savings associated with this FIM. The CLIENT agrees that the areas are unoccupied per the schedules below, and that the systems can be reset to unoccupied conditions during these periods. SIEMENS will calculate and report to the CLIENT the effect any schedule changes have on the energy savings. The CLIENT will report to SIEMENS any changes made to the schedules contained in Table 4.3.1.1 within (5) working days of the said change. During its periodic verifications, if SIEMENS identifies a problem with the system that would cause a control strategy not to function properly, SIEMENS will notify the CLIENT of such problem, and propose corrective actions. Page 9 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Table 4.3.1.1 Temperature Setbacks – Winter Occupancy Schedules Location Existing Schedule Proposed Schedule Highway Department – Offices Wastewater Treatment Plant – Offices Parks & Recreation – Offices Greenbush - DPW 24/7 24/7 24/7 24/7 6 a.m. – 4 p.m. (M-F) 6 a.m. – 12 p.m. (Sa-Su) 6 a.m. – 4 p.m. (M-F) 6 a.m. – 12 p.m. (Sa-Su) 6 a.m. – 4 p.m. (M-F) 6 a.m. – 12 p.m. (Sa-Su) 6 a.m. – 4 p.m. (M-F) 6 a.m. – 12 p.m. (Sa-Su) Table 4.3.1.2: Summary of Temperature Setback guarantee savings at current rate Location Cost Savings Highway Department $3,220 Wastewater Treatment Plant $4,700 Parks & Recreational Building $331 Greenbush $3,905 Total $12,156 The following spreadsheet (Table 4.3.1.3) is a sample of the spreadsheets that were used to determine the savings associated with this upgrades. The spreadsheet will also be used to verify savings on an annual basis based on the verification methodology described above. Only one sample spreadsheet per control strategy type is included below (Other spreadsheets are available upon request). Page 10 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Table 4.3.1.3 Sample Temperature Setback Calculation Title Project: Site: Description Given Unoccupied Space Temperature Setpoint Adjustment Parks And Recreation Building Orangetown, NY Reset unoccupied space temperature setpoint up in summer and down in winter. Heating Energy Cost Electric Energy Cost Wall Area Window Area Roof Area Total Envelope Area Building Heating Costs Window U factor Wall U factor Roof U factor Cooling Conversion Heating Btu Conversion Boiler Efficiency Chiller Efficiency Air Infiltration & Leakage Occupied Indoor Heating Temperature Setpoint Unoccupied Indoor Heating Temperature Setpoint Occupied Indoor Cooling Temperature Setpoint Unoccupied Indoor Cooling Temperature Setpoint $2.42 $0.168 1,650 330 700 2,680 2,123 0.60 0.06 0.05 12 139 83% 0.80 0.10 72 65 74 74 $/gal (Fuel Oil #2) 6 $/kWh square feet square feet square feet square feet (From Bills) (From Bills) (From survey) (From survey) (From survey) (From Bills) (From window survey) (From wall survey) (From roof survey) $ Btu/(h*sqft*degf) Btu/(h*sqft*degf) Btu/(h*sqft*degf) Mbh/Ton Mbh/gallon Assumptions kW/Ton cfm/ft2 Degrees F Degrees F Degrees F Degrees F (Assumption) (Assumption) (Assumption) (Assumption) (Assumption) (Assumption) (Assumption) Formula Overall U Factor = ((Window U factor x Window Area ) + (Wall U factor x Wall Area ) + (Roof U factor x Roof Area ))/ (Total Envelope Area) Cooling Conduction (MBH) = Overall U Factor x Area x ((OA Temperature - Occupied Temperature)*Occupied Hours)+(OA Temperature - Unoccupied Temperature)*Unoccupied Hours))/1,000 btu/MBH Heating Conduction (MBH) = Overall U Factor x Area x ((Occupied Temperature - OA Temperature)*Occupied Hours)+(Unoccupied Temperature - OA Temperature)*Unoccupied Hours))/1,000 btu/MBH Cooling Infiltration (MBH) = Air Infiltration & Leakage x Area x ((OA Temperature - Occupied Temperature)*Occupied Hours)+(OA Temperature - Unoccupied Temperature)*Unoccupied Hours))/1,000 btu/MBH Heating Infiltration (MBH) = Air Infiltration & Leakage x Area x ((Occupied Temperature - OA Temperature)*Occupied Hours)+(Unoccupied Temperature - OA Temperature)*Unoccupied Hours))/1,000 btu/MBH Heat loss = (Heating Conduction) + (Heating Infiltration) Heating Energy = (Heat Loss) / ((Boiler Efficiency) x (Conversion Factor )) Cooling loss = (Cooling Conduction) + (Cooling Infiltration) Cooling Energy = (Cooling Loss) * (Chiller Efficiency) / (Conversion Factor ) Overall U Factor=(( Window U factor xWindow Area ) + ( Overall U Factor=(( 0.60 x 330 ) + ( Wall U factor x 0.06 x Wall Area ) + ( 1650 ) + ( Roof U factor x 0.05 x Roof Area ) )/ ( 700 ))/( Total Envelope Area) 2680 ) = Calculations 0.124 Btu/(h*sqft*degf) Total Envelope energy loss per year with temperature setback Cooling Unoccupied Conduction Hours (MBH) OA Temp Total Hours 92.5 22 39 240 87.5 31 73 327 82.5 161 366 1,033 77.5 376 718 834 72.5 534 882 0 67.5 437 679 0 62.5 497 830 0 57.5 463 754 0 52.5 484 789 0 47.5 368 632 0 42.5 317 559 0 37.5 565 909 0 32.5 473 788 0 27.5 215 372 0 22.5 103 173 0 17.5 77 122 0 12.5 32 50 0 7.5 9 20 0 2.5 0 5 0 0 0 0 0 Subtotal = 5164 Hours 8760 Hours 2,194 MBH Existing Heat loss=( Existing Heat loss=( Proposed Heat loss=( Proposed Heat loss=( Existing Cooling loss=( Existing Cooling loss=( Proposed Cooling loss=( Proposed Cooling loss=( Existing Heating Energy =( Existing Heating Energy =( Proposed Heating Energy =( Proposed Heating Energy =( Existing Cooling Energy =( Existing Cooling Energy =( Proposed Cooling Energy =( Proposed Cooling Energy =( Results Heating Conduction (MBH) 0 0 0 0 0 0 1,463 2,554 3,983 4,285 4,738 9,099 9,235 4,996 2,604 2,029 913 407 115 0 46,421 MBH Cooling Infiltration (MBH) 209 285 900 727 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,913 MBH Heating Infiltration (MBH) 0 0 0 0 0 0 1,275 2,226 3,473 3,736 4,131 7,932 8,051 4,356 2,270 1,768 796 355 101 0 40,470 MBH Existing Heating Conduction) + ( Existing Heating Infiltration ) 55,809 )+( 48,655 ) = Proposed Heating Conduction)+( Proposed Heating Infiltration) 46,421 )+( 40,470 ) = Existing Cooling Conduction)+( Existing Cooling Infiltration) 2,194 )+( 1,913 ) = Proposed Cooling Conduction)+( Proposed Cooling Infiltration) 2,194 )+( 1,913 ) = Existing Heat Loss)/(( Boiler Efficiency)*( Conversion Factor 104,463 )/(( 83% )*( 139 Proposed Heat Loss)/(( Boiler Efficiency)*( Conversion Factor 86,891 )/(( 83% )*( 139 Existing Cooling Loss) x ( Chiller Efficiency)/( Conversion Factor 4,107 )*( 0.80 )/( 12 Proposed Cooling Loss) x ( hiller Efficiency)/( C Conversion Factor 4,107 )*( 0.80 )/( 12 905 gallons 274 kWh =================================>> 104,463 MBH 86,891 MBH 4,107 MBH 4,107 MBH )= )= )= )= )= )= )= )= => => $ $ $ $ $ $ $ $ $ $ $ $ 905 gallons 753 gallons 274 kWh 274 kWh 2,187 46 2,233 1,819 46 1,865 368 368 331 331 16.82% of existing 0.00% of existing 16.47% Reduction 15.14% of existing 0.00% of existing 14.83% Reduction 0.0% Reduction 16.8% Reduction 0.0% Reduction 16.8% Reduction Annual Existing Heating Annual Existing Cooling TOTAL EXIST COST PER YEAR Annual Proposed Heating 753 gallons Annual Proposed Cooling 274 kWh TOTAL POPOSED COST PER YEAR =================================>> SAVINGS AT 100% GUARANTEE Annual Heating Savings 152 gallons Annual Cooling Savings kWh TOTAL EXIST COST SAVINGS PER YEAR =================================>> SAVINGS AT 90% GUARANTEE Annual Heating Savings 137 gallons Annual Cooling Savings kWh TOTAL EXIST COST SAVINGS PER YEAR =================================>> => => => => => => 4.4 Option C – Not Applicable Page 11 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown 4.5 Option D - STIPULATED 4.5.1 FIM 1: Maintenance Savings from Lighting System Upgrade Facilities: All Building Description: Maintenance cost savings will be obtained from the existing lighting fixtures that are proposed to be replaced with new efficient lighting fixtures which have longer life time. How M&V will be performed: Maintenance cost savings are calculated based on the lamp life period and warranty by contractor of three year over the new lamps. Savings analysis for this measure is presented in Exhibit C-Appendix C-1. 4.5.2 FIM 5: Pump Motor system upgrade Facilities: Wastewater Treatment Plant Description: Replace pump motor with high efficiency motors. Connect motors to existing Variable Frequency Drive. There are four set of pumps that will be replaced with equivalent capacity and premium efficiency motors as designed by the engineer. How M&V will be performed: There are four set of two pumps throughout the wastewater treatment plant that will be upgraded with high efficiency motors. For the case of Trickling Filter (TF) pump, the motor will be connected to existing VFD and controlled by effluent flow. The pump will work only when effluent flow decrease below 2,950 gpm per trickling filter in operation (. Verification of the savings will be based on efficiency upgrades, and stipulated operating hours as shown in the following table: Table 4.1: Pump schedule and operating hours Existing normal operation Pump Location TF Circulation Pump BFP Feed Pump Primary Sludge Pump Secondary Sludge Pump Capacity Actual Name Plate (Hp) Power (kW) Efficiency 75 83 20 88.1 20 91.7 15 83 Operation (h) 8,760 3,328 730 8,760 Proposed Capacity Actual Name Plate Operation (Hp) Power (kW) Efficiency (h) 60 93 2,492 20 94.1 1,664 20 93.6 730 15 93 8,760 2 x 75 Hp 2 x 10 Hp 2 x 20 Hp 2 x 7.5 Hp 2 x 60 Hp 2 x 10 Hp 2 x 20 Hp 4 x 7.5 Hp * There will be four secondary sludge pumps provided as part of this measure. Current operation to remain the same. Savings are calculated based in the following formulas: Motor (kW) = (Motor Horsepower x 0.746 (kW/HP) x Load Factor) Speed Ratio Correction Factor = ((RPMNEW)/(RPMEXISTING)) ^ 3 Existing Energy Use (kWh) = (KWExisting / EFFICIENCYEXISTING) x Hours of Operation Page 12 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Existing Demand Use (kW) New Energy Use (kWh) New Demand Use (kW) Ratio Correction Factor = (KWExisting / EFFICIENCYEXISTING) x Peak Load Months x Utilization factor = (KWNEW / EFFICIENCYNEW) x Hours of Use x Speed Ratio Correction Factor = (KWNEW / EFFICIENCYNEW) x Peak Load Months x Utilization factor x Speed Total Savings (kWh) = (kWh existing - kWh new) x $/kWh + (kW existing - kW new) x $/kW Table 4.2: Summary of Pump energy savings based on current rate Set of Pumps Savings kWh Cost Savings Energy Efficient motor upgrade-TFP 352,928 $40,935 Energy Efficient motor upgrade-BFP 19,791 $2,295 Energy Efficient motor upgrade-PSP 2,170 $252 Energy Efficient motor upgrade-SSP 9,524 $1,105 Total 384,414 $44,587 See attachment B for calculation details. Trickling Filter Circulating Pump Schedule Description Hours of operations of trickling filter pump based on influent and number of TF in operation. GPM Actual flow of the influent reported during 2003 - 2004 WWTP Influent Pump Characteristics 6,800 Days Oct-03 Nov-03 Dec-03 Jan-04 Feb-04 Mar-04 Apr-04 May-04 Jun-04 Jul-04 Aug-04 Sep-04 Total 31 30 31 31 28 31 30 31 30 31 31 30 365 Flow (MG) MGD 272.7 8.80 255.8 8.53 362.4 11.69 276.6 8.92 282.5 10.09 275 8.87 291.3 9.71 262.8 8.48 304.9 10.16 364.1 11.75 322.1 10.39 384.2 12.81 3654.4 10.01 Min 8.48 MGD 5,887 gpm GPM 6,109 5,921 8,118 6,196 7,006 6,160 6,743 5,887 7,058 8,156 7,216 8,894 Pump cap Hrs of req GPM Operation 2,741 300 2,929 320 732 80 2,654 290 1,844 202 2,690 294 2,107 231 2,963 324 1,792 196 694 76 1,634 179 0 0 2,492 Trickling Filter Requirements According to manufacturer data, TF minimum flow to maintain rotation is Min Flow 2,950 gpm Therefore; Units in service 1 2 3 Flow to each TF (gpm) 2,950 5,900 8,850 Page 13 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Based on flow data for 2003 – 2004, the minimum hours of operation for trickling filter pump was 2,492 hrs, based on three trickling filters in service. Maintenance Savings from BFP Feed Pump Operation Description: The WWTP has two belt press filter processes located in the sludge facility. The 2.0-meter press was installed in 1994 and is used to dewater sludge for two 8-hour shifts per day, four days per week. Currently, the BFP Feed Pump can not deliver the proper flow (175 gpm) to maximize dewatering operations. After Belt Filter Press Feed Pump upgrade, it is intended that the system will be capable to treat the same amount of sludge during one normal shift. Calculations The calculations for the cost savings will consider the following assumptions:  Hours per shift = 8  Days per week = 4  Total operations hours per shift per year (T) = 1664 hrs  Normal Wage (NW) = $20 per hour  Shift Wage (SW) = $30 per hour The annual stipulated savings are defined in this contract as corresponding to the elimination of one extra shift per day due to second belt filter press in operation. Operation Cost Savings = OC 1 - OC 2 With: OC 1 = Existing Operation Cost = NW x T + SW x T OC 2 = Proposed Operation Cost = NW x T + SW x T Operation Cost Savings = $49,920 4.5.3 FIM 2: Infra Red Heating Facilities: Highway Department, Wastewater Treatment Plant Description: The highway departments consist in one building divided in two main areas: garages and offices. Offices have individual HVAC systems. Garages are heated by two different systems. The original garage has several gas fired unit heaters hanging from the ceiling. The new addition is heated by hot water unit heaters attached to the ceiling as well. Both systems: gas fired and hot water unit heaters (UH) transfer the heat to the air, using a fan. The hot air then is distributed to the space. Wastewater Treatment Plant garages have multiple hydronic unit heaters. A gas-fired infra-red heating system emulates the efficiency of the sun by generating radiant energy that is converted into heat when absorbed by objects it targets. Once the infra-red energy is absorbed by the floors, machinery, stock and people, it is then reradiated to warm the surrounding air. This method of heating, as opposed to filling a room with warm air (such as a forced air unit) allows the source of heat to begin at the floor level and not the ceiling. This makes it the most efficient and effective method to heat the garage spaces. Page 14 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Highway Department Calculations: The determination of the existing heating load for the highway department is obtained by standard billing regression analysis of energy usage versus heating degree-days in base 65 (i.e. degree-days calculated from a balance point of 65 ºF). The total heating load is then corrected to a normal year (30 year normal as defined by N.O.A.A.) The resulting chart is presented in Figure 4.5.3.1 below, and establishes the baseline heating energy use. The normalized annual heating energy use is 33,487 CCF. For this facility the energy for heating is supplied to two different areas: garages and offices. The garages use two independent systems: gas fired unit heaters (forced air); and hydronic unit heaters (forced air). The offices have an independent HVAC system. Natural gas consumption of the forced air heaters is calculated using an estimated system efficiency of 76%. Figure 4.5.3.1 Heating Normalization – Highway Department Heating Normalization - Highway Department 800 700 600 Fuel Use [mmBtu] 500 400 300 200 100 0 0 200 400 600 HDD 800 1000 1200 y = 0.6729x + 9.5 R2 = 0.9736 The following formulas are used to calculate the existing and proposed heating fuel consumption for garage areas: Existing Bldg Energy Use = (Existing unit capacity) x (Part Load Percentage) x (Operating hrs) / (efficiency) / (energy heating value) New Bldg Energy Use = (Ex.unit capacity) x (Part Load %) x (radiant adjustment) x (operating hrs) / (energy heating value) Existing Cost = (Existing bldg energy use ) x ( gas rate) New Cost = (new bldg energy use) x (gas rate) Radiant Cost Savings = (existing cost - new cost) Given Mounted height of infrared system Existing Unit Capacity Energy Heating Value Fuel Cost Operating hours per year Assumption Radiant adjustment to heat loss Part Load Percentage Existing Heating Efficiency = = = = = = = = 20 2,000 103 $1.51 2,343 80% 35% 76% feet MBtu/hr Mbh/CCF /CCF hours Page 15 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Therefore, proposed savings as follow, Annual Existing Heating Use Annual Proposed Heating Use Annual Proposed Heating Savings at 100% 20,952 12,739 8,213 CCF CCF CCF => => => $31,638 $19,236 $12,402 In addition to thermal energy savings, electric savings are obtained by eliminating hot water pumps, and reducing motor capacity (HP) from Unit Heater to Infra Red burner. The following formula is used to calculate existing and post-retrofit electric consumption related to garage heating system, kWh = Capacity (HP) x Qty x 0.746 x hours / (motor efficiency x1000) Electric Savings Existing system Hot Water Pump UH - Fan - Hydronic (new add.) UH - Fan - Gas Fire (org.) Proposed system IR - new addition IR - Original Bldg Capacity (HP) 1/8 1/6 1/3 Capacity 1/30 1/30 Quantity 2 8 12 Quantity 8 10 2400 2400 85% 85% 562 702 Hours 2400 2400 2400 Motor efficiency 85% 85% 85% kWh 527 2,808 8,425 Electric Rate $0.16 Operation Cost => => => => => $81.91 $436.84 $1,310.53 $87.37 $109.21 Annual Proposed Electric Savings 10,497 kWh $1,633 Wastewater Treatment Plant The determination of the existing heating load for the wastewater treatment plant buildings is obtained by standard billing regression analysis of energy usage versus heating degree-days in base 65 (i.e. degree-days calculated from a balance point of 65 ºF). The total heating load is then corrected to a normal year (30 year normal as defined by N.O.A.A.) The resulting chart is presented in Figure 4.5.3.2 below, and establishes the baseline heating energy use. The normalized annual heating energy use is 31,846 CCF. For this facility the energy for heating is supplied to two different areas: garages and offices. The garages use hydronic unit heaters (forced air) to temperate the spaces. The offices have an independent HVAC system. Natural gas consumption of the forced air heaters is calculated using an estimated efficiency of 65%, due to distribution, cycling, and stand-by heating losses. Page 16 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Figure 4.5.3.2 Heating Normalization – Wastewater Treatment Plant Heating Normalization - Wastewater Treatment Plant 900 800 700 Fuel Use [mmBtu] 600 500 400 300 200 y = 0.6775x + 8 100 0 0 200 400 600 HDD 800 1000 1200 R = 0.9534 2 The following formulas are used to calculate the existing and anticipated heating fuel consumption for garage areas: Existing Bldg Energy Use = (Existing unit capacity) x (Part Load Percentage) x (Operating hrs) / (efficiency) / (energy heating value) New Bldg Energy Use = (Ex.unit capacity) x (Part Load %) x (radiant adjustment) x (operating hrs) / (energy heating value) Existing Cost = (Existing bldg energy use ) x ( gas rate) New Cost = (new bldg energy use) x (gas rate) Radiant Cost Savings = (existing cost - new cost) Given Mounted height of infrared system Existing Unit Capacity Energy Heating Value Fuel Cost Operating hours per year Assumption Radiant adjustment to heat loss Part Load Percentage Existing Heating Efficiency = = = = = = = = 20 1,600 103 $1.45 2,400 80% 25% 65% feet MBtu/hr Mbh/CCF /CCF hours Therefore, savings are anticipated as followed: Annual Existing Heating Use Annual Proposed Heating Use Annual Proposed Heating Savings at 100% 14,339 7,456 6,883 CCF CCF CCF => => => $20,749 $10,789 $9,959 In addition to thermal energy savings, electric savings are obtained by eliminating hot water pumps, and reducing motor capacity (HP) from Unit Heater to Infra Red burner. The following formula is used to calculate existing and post-retrofit electric consumption related to garage heating system, Page 17 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown kWh = Capacity (HP) x Qty x 0.746 x hours / (motor efficiency x1000) Electric Savings Existing UH-Hydronic Hot Water Pumps UH – Fan - Storage/Welding UH – Fan - Workshop Proposed IR - Storage/Weldding IR - Workshop Capacity (HP) 5 1/4 1/8 Capacity 1/30 1/30 Quantity 2 6 10 Quantity 18 5 2400 2400 85% 85% Savings 1,264 351 25,241 Hours 2400 2400 2400 Motor efficiency 85% 85% 85% kWh 21,064 3,160 2,633 Electric Rate $0.12 Operation Cost => => => => => kWh $2,443.07 $366.46 $305.38 $146.58 $40.72 $2,927.61 4.5.4 FIM 7: Maintenance Savings from Traffic Lighting System Upgrade Facilities: Across the Township of Orangetown Description: Maintenance cost savings will be obtained from the existing lighting fixtures that are proposed to be replaced with new LED efficient lighting fixtures which have longer life time. How M&V will be performed: Maintenance cost savings are calculated based on the lamp life period. Savings analysis for this measure is presented in Exhibit C-Appendix C-1 Page 18 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Article 5: Baseline Utility Consumption Data @Highway Department Billing Period Start End 1/25/2008 2/25/08 12/26/2007 1/25/08 11/26/2007 12/26/07 10/24/2007 11/26/07 9/24/2007 10/24/07 8/23/2007 9/24/07 7/25/2007 8/23/07 6/22/2007 7/25/07 5/23/2007 6/22/07 4/24/2007 5/23/07 3/26/2007 4/24/07 2/23/2007 3/26/07 1/25/2007 2/23/07 12/26/2006 1/25/07 11/27/2006 12/26/06 10/25/2006 11/27/06 9/25/2006 10/25/06 8/24/2006 9/25/06 7/25/2006 8/24/06 6/26/2006 7/25/06 5/24/2006 6/26/06 4/25/2006 5/24/06 3/27/2006 4/25/06 2/24/2006 3/27/06 07-08 TOTAL Electric Electricity Demand Use (KWH) (KW) 21,012 70 18,906 69 23,652 71 14,592 62 13,062 56 13,932 57 14,976 61 15,822 60 13,092 54 10,992 50 13,848 57 19,614 71 21,360 78 19,704 74 17,862 67 17,778 62 12,144 55 11,454 51 14,400 52 14,016 55 13,152 52 11,172 48 12,636 56 21,282 68 193,500 71 Electric Service Amount $3,325 $2,846 $3,319 $1,996 $1,878 $2,128 $2,549 $2,649 $2,322 $1,847 $2,221 $3,018 $2,431 $2,746 $2,583 $2,054 $1,845 $2,054 $2,426 $2,566 $2,184 $1,282 $1,345 $2,445 $30,098 Total Service Amount $12,592 $11,586 $13,001 $6,304 $2,196 $2,320 $2,701 $2,827 $2,507 $2,879 $6,484 $11,877 $12,275 $9,895 $7,435 $4,570 $2,666 $2,180 $2,539 $2,688 $2,334 $2,012 $3,484 $9,768 $77,275 Gas Use Gas Service (CCF) Amount 6,278 $9,267 5,642 $8,740 6,284 $9,682 3,068 $4,308 208 $318 118 $192 89 $152 104 $178 104 $185 640 $1,032 2,718 $4,263 5,989 $8,860 6,678 $9,844 4,793 $7,149 3,583 $4,852 1,856 $2,516 630 $821 83 $126 73 $113 72 $123 91 $149 487 $730 1,548 $2,139 5,352 $7,322 31,242 $47,177 Energy Rates Min Max Average 07-08 Electric Rate Gas Rate $0.11 $1.30 $0.18 $1.78 $0.16 $1.51 Energy cost savings for Highway department are calculated using average blended rate for 2007 – 2008. Normalized Heating Consumption Normal HDD 1045 890 729 405 144 8 0 0 29 252 528 880 4910 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual CCF 7,219 6,162 5,064 2,854 1,074 146 92 92 290 1,810 3,693 6,093 34,588 Page 19 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown @ Wastewater Treatment Plant Billing Period Start End 6/22/2007 7/25/07 5/23/2007 6/22/07 4/24/2007 5/23/07 3/26/2007 4/24/07 2/23/2007 3/26/07 1/25/2007 2/23/07 12/26/2006 1/25/07 11/27/2006 12/26/06 10/25/2006 11/27/06 9/25/2006 10/25/06 8/24/2006 9/25/06 7/25/2006 8/24/06 6/26/2006 7/25/06 5/24/2006 6/26/06 4/25/2006 5/24/06 3/27/2006 4/25/06 2/24/2006 3/27/06 1/26/2006 2/24/06 12/27/2005 1/26/06 11/23/2005 12/27/05 10/25/2005 11/23/05 9/23/2005 10/25/05 8/24/2005 9/23/05 7/25/2005 8/24/05 07-08 TOTAL Electric Electricity Demand Use (KWH) (KW) 141,400 238 130,900 238 135,800 259 147,000 308 138,600 336 214,900 336 168,000 315 157,500 315 165,200 287 137,200 224 133,000 238 137,900 259 130,900 245 144,900 238 131,600 266 132,300 266 162,400 280 156,100 301 156,100 294 183,400 308 148,400 287 145,600 231 138,600 245 141,400 245 1,807,400 336 Electric Service Amount 18,622 18,442 17,643 18,516 17,233 17,150 17,876 17,670 13,776 15,609 18,268 18,827 19,247 18,395 10,488 9,224 13,734 14,086 19,701 18,622 20,387 26,246 17,937 19,637 $209,633 Total Service Amount $18,750 $18,568 $17,770 $24,798 $26,858 $28,396 $25,600 $22,860 $18,401 $17,294 $18,406 $18,955 $19,383 $18,551 $11,192 $11,618 $19,607 $20,655 $27,257 $27,809 $24,871 $27,165 $18,066 $19,768 $256,656 Gas Use Gas Service (CCF) Amount 79 $128 74 $125 72 $127 4,015 $6,282 6,536 $9,625 7,660 $11,246 5,220 $7,725 3,870 $5,190 3,458 $4,625 1,319 $1,685 101 $138 93 $127 89 $135 104 $156 477 $704 1,745 $2,394 4,293 $5,873 4,468 $6,569 4,654 $7,556 5,701 $9,188 2,769 $4,484 565 $918 102 $129 104 $131 32,497 $47,024 Energy Rates Elec. Rate Gas Rate Min $0.07 $1.26 Max $0.18 $1.77 Average $0.12 $1.45 Energy cost savings for Wastewater Treatment Plant are calculated using average blended rate for 2007 – 2008. Normalized Heating Consumption Normal HDD 1045 890 729 405 144 8 0 0 29 252 528 880 4910 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual mmBtu 726 620 509 287 108 14 9 9 29 182 371 613 3,479 CCF 7,052 6,019 4,946 2,787 1,047 141 87 87 281 1,767 3,606 5,952 33,772 Page 20 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown @ Greenbush Building Billing Period Start End Electricity Use (KWH) 4,895 4,582 4,463 4,946 5,826 6,711 9,868 10,114 6,272 4,815 4,217 5,024 4,678 3,937 4,706 4,364 3,863 5,600 11,586 10,297 8,227 3,658 3,701 4,786 71,733 Electric Demand (KW) 27 26 27 29 40 42 46 49 45 38 30 27 26 26 25 27 27 32 50 48 47 29 28 26 49 Electric Service Amount 828 742 689 746 949 1,291 1,850 1,904 1,377 1,033 749 819 579 619 715 571 690 1,150 2,134 2,057 1,561 491 462 605 $12,977 Gas Use (CCF) 3,080 2,746 2,859 1,936 112 8 8 7 8 378 1,669 2,954 3,889 2,599 1,841 1,597 551 9 8 7 51 560 1,028 2,754 15,765 Gas Service Amount 4,575 4,333 4,389 2,682 185 25 25 24 26 616 2,576 4,321 5,628 4,013 2,606 2,187 710 22 20 20 83 816 1,468 3,730 $23,779 Total Service Amount 5,404 5,074 5,078 3,427 1,133 1,316 1,875 1,928 1,403 1,649 3,325 5,141 6,206 4,633 3,321 2,758 1,400 1,171 2,154 2,077 1,643 1,307 1,930 4,335 $36,755 1/25/2008 2/25/2008 12/26/2007 1/25/2008 11/26/2007 12/26/2007 10/24/2007 11/26/2007 9/24/2007 10/24/2007 8/23/2007 9/24/2007 7/25/2007 8/23/2007 6/22/2007 7/25/2007 5/23/2007 6/22/2007 4/24/2007 5/23/2007 3/26/2007 4/24/2007 2/23/2007 3/26/2007 1/25/2007 2/23/2007 12/26/2006 1/25/2007 11/27/2006 12/26/2006 10/25/2006 11/27/2006 9/25/2006 10/25/2006 8/24/2006 9/25/2006 7/24/2006 8/24/2006 6/26/2006 7/24/2006 5/24/2006 6/26/2006 4/25/2006 5/24/2006 3/27/2006 4/25/2006 2/24/2006 3/27/2006 07-08 TOTAL Energy Rates Elec. Rate Gas Rate Min $0.12 $1.29 Max $0.22 $3.46 Average $0.18 $1.51 Energy cost savings for Greenbush Building are calculated using average blended rate for 2007 – 2008. Normalized Heating Consumption Normal HDD 1045 890 729 405 144 8 0 0 29 252 528 880 4910 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual mmBtu 382 325 267 149 54 4 1 1 12 93 194 322 1,804 CCF 3,706 3,158 2,590 1,445 522 42 13 13 116 904 1,879 3,123 17,511 Page 21 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown @ Town Hall Building Billing Period Start End 1/24/2008 2/22/2008 12/21/2007 1/24/2008 11/21/2007 12/21/2007 10/23/2007 11/21/2007 9/21/2007 10/23/2007 8/22/2007 9/21/2007 7/24/2007 8/22/2007 6/21/2007 7/24/2007 5/22/2007 6/21/2007 4/23/2007 5/22/2007 3/23/2007 4/23/2007 2/22/2007 3/23/2007 1/24/2007 2/22/2007 12/22/2006 1/24/2007 11/22/2006 12/22/2006 10/24/2006 11/22/2006 9/22/2006 10/24/2006 8/23/2006 9/22/2006 7/24/2006 8/23/2006 6/22/2006 7/24/2006 5/23/2006 6/22/2006 4/24/2006 5/23/2006 3/24/2006 4/24/2006 2/23/2006 3/24/2006 07-08 TOTAL Electric Electricity Demand Use (KWH) (KW) 43,740 109 67,920 157 60,360 157 57,360 165 84,840 187 93,000 192 101,760 181 110,640 214 94,320 196 69,960 202 61,800 170 58,320 170 57,840 170 63,600 170 57,360 170 60,360 193 65,880 193 88,080 205 113,040 230 116,760 235 90,840 230 62,520 175 62,040 172 56,040 169 904,020 214 Electric Service Amount 6,518 9,275 8,068 7,188 10,618 11,766 14,356 15,719 14,395 10,790 9,109 8,211 6,472 8,139 7,812 7,469 8,538 13,354 16,404 18,147 13,341 6,304 5,793 6,197 $126,013 Total Service Amount 9,604 15,125 13,184 9,661 10,762 11,887 14,477 15,856 14,536 11,539 12,904 13,309 13,030 12,674 10,730 9,471 8,861 13,457 16,508 18,263 13,504 7,068 7,433 9,911 $152,845 Gas Use Gas Service (CCF) Amount 2,070 3,085 3,776 5,851 3,299 5,116 1,750 2,472 84 144 67 122 67 122 72 137 75 141 461 749 2,412 3,795 3,428 5,099 4,415 6,558 3,048 4,536 2,173 2,918 1,493 2,003 238 323 66 104 66 104 68 116 101 163 511 764 1,178 1,640 2,688 3,714 17,561 $26,832 Energy Rates Elec. Rate Gas Rate Min $0.09 $1.34 Max $0.16 $1.90 Average $0.14 $1.53 Energy cost savings for Town Hall/ Police Department are calculated using average blended rate for 2007 – 2008. Normalized Heating Consumption Normal HDD 1045 890 729 405 144 8 0 0 29 252 528 880 4910 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual mmBtu 425 363 299 169 65 11 7 7 19 108 218 359 2,051 CCF 4,124 3,523 2,899 1,643 631 104 73 73 185 1,050 2,120 3,485 19,909 Page 22 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown @ Parks and Recreational Building Billing Period Start 2/7/2008 1/9/2008 12/7/2007 11/6/2007 10/9/2007 9/7/2007 8/7/2007 7/9/2007 6/6/2007 5/7/2007 4/6/2007 3/8/2007 2/7/2007 1/8/2007 12/8/2006 11/7/2006 10/6/2006 9/8/2006 8/7/2006 7/10/2006 6/8/2006 5/8/2006 4/7/2006 3/9/2006 07-08 End 3/10/2008 2/7/2008 1/9/2008 12/7/2007 11/6/2007 10/9/2007 9/7/2007 8/7/2007 7/9/2007 6/6/2007 5/7/2007 4/6/07 3/8/07 2/7/07 1/8/07 12/8/06 11/7/06 10/6/06 9/8/06 8/7/06 7/10/06 6/8/06 5/8/06 4/7/2006 TOTAL Electricity Use (KWH) 3,348 3,168 3,636 3,312 3,492 4,932 4,608 4,680 5,256 4,644 4,320 3,348 3,528 3,807 3,933 3,852 4,500 4,392 5,436 5,436 5,940 4,824 4,896 3,960 48,744 Electric Demand (KW) 16 16 19 19 20 22 21 22 21 22 21 20 20 21 21 20 21 24 26 26 24 29 31 29 22 Electric Service Amount 565 540 590 529 530 752 816 845 903 806 740 584 597 583 602 601 678 816 1,001 980 1,102 646 632 569 $8,202 Gas Use (CCF) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Gas Service Amount 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 Total Service Amount 565 540 590 529 530 752 816 845 903 806 740 584 597 0 1,185 601 678 816 1,001 980 1,102 646 632 569 $8,202 Energy Rates Elec. Rate Gas Rate Min $0.13 NA Max $0.19 NA Average $0.17 NA Energy cost savings for Parks & Recreation Department are calculated using average blended rate for 2007 – 2008. The building use Oil#2 for heating. There was one delivery for the year 2006-2007 (878.9 gal @$2.42). Normalized Heating Consumption Normal HDD 1045 890 729 405 144 8 0 0 29 252 528 880 4910 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Annual mmBtu 31 26 21 12 4 0 0 0 1 7 16 26 144 Oil #2 gal 219 187 153 85 30 2 0 0 6 53 111 185 1,031 Page 23 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Article 6: Utility Rate Structures and Escalation Rates Utility costs used for Savings calculations will be based on the utility rates and rate escalation percentages provided in the tables below. The rate identified below is a stipulated rate known as the “floor rate”, and is shown below for each utility. An escalation rate (noted below for each utility) applied per Annual Period will be applied to the below stipulated utility rates. Electrical Energy Rate (ERkWh): The minimum Electrical Energy Rates used to calculate the electrical cost savings for each of the CLIENT’S facilities is described in Table 6.1. This is the weighted average rate based on 2006 and 2007 data from Orange and Rockland as presented in Article 5. This rate shall be known as the floor electrical energy rate. Average Fuel Rate (AFR): The minimum Average Fuel Rate (AFR) used to calculate the fuel cost savings for each of the CLIENT’S facilities is described in Table 6.1. The AFR was obtained from natural gas bills from Orange and Rockland utility. This rate, converted to a per CCF basis shall be known as the floor average fuel rate throughout the term of this agreement. Parks & Recreation building use Oil #2 for heating. Floor average fuel rate is determined by the last delivery received. Table 6.1: Energy Rates Electric Rate $/kWh $0.16 $0.12 $0.18 $0.14 $0.17 Gas Rate $/CCF $1.51 $1.45 $1.51 $1.53 NA Oil #2 Rate $/Gal NA NA NA NA $2.42 Orangetown Facilities Highway Department Wastewater Treatment Plant Greenbush/Library Town Hall Parks & Recreation Utility Cost Inflation Rate (UCI): The Utility Cost Inflation (UCI) rate used to calculate future year escalated floor rates shall be 3.0 % per year. This value shall remain in effect throughout the term of this Agreement and will not be measured, monitored or adjusted. Page 24 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Article 7: Contracted Baseline Operating Data 7.1 Facility Operating Characteristics The following data of this article outlines the operating characteristics that are required to be implemented under the FIM Work. This specific configuration of operating practices is the Contracted Baseline. The Guaranteed Savings provided under this Agreement are based on the efficiencies gained by implementing the FIM Work and implementing specific configurations of operating practices defined in this Exhibit. 7.2 Baseline Operating Hours, Operating Temperatures, Occupancy Schedules Table 7.2.1 Day of Week Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday Operating Hours Highway Department 24 24 24 24 24 24 24 24 Town Hall/ Police Department 24 24 24 24 24 24 24 24 Wastewater Treatment Plant 24 24 24 24 24 24 24 24 Parks & Recreation 24 24 24 24 24 24 24 24 Greenbush & Library 24 24 24 24 24 24 24 24 Table 7.2.2 Day of Week Monday Tuesday Wednesday Thursday Friday Saturday Sunday Holiday Winter Operating Temperatures Town Hall/ Wastewater Highway Police Treatment Department Department Plant 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 72 Parks & Recreation 72 72 72 72 72 72 72 72 Greenbush & Library 72 72 72 72 72 72 72 72 Change in occupancy and operation shall not affect the savings calculations Page 25 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown 7.3 Facility Stipulated Lighting Hours Operating hours were derived after extensive discussion with facilities personnel, and are stipulated for use with energy saving calculations. Table 7.3.1 below shows the lighting operating hours for each space group and are used for lighting upgrades (FIM 3) calculations. Table 7.3.1: ANNUAL LIGHTING OPERATING HOURS BY FACILITY ANNUAL LIGHTING OPERATING HOURS BY FACILITY HIGHWAY DEPARTMENT OFFICES & CONFERENCE ROOM EXITS SIGNS HALLWAYS & LOBBY KITCHEN & RESTROOMS SHOP & TRUCK GARAGES JANITOR & BOILER ROOM TOWN HALL OFFICES & CONFERENCE ROOM EXITS SIGNS HALLWAYS & LOBBY KITCHEN & RESTROOMS TELECOM ROOM POLICE DEPARTMENT-OLD OFFICES & RESTROOMS EXITS SIGNS HALLWAYS & LOBBY POLICE DEPARTMENT-NEW OFFICES & RESTROOMS EXITS SIGNS HALLWAYS & LOBBY BOILER ROOM ADMINISTRATIVE OFFICES WASTEWATER TREATMENT PLANT BUILDING 4 – WELDING BUILDING 5 – AUTOGARAGE BUILDING 6 – DEWATERING PLANT EXITS SIGNS PARKS & RECS OFFICES & RESTROOMS GREENBUSH LIBRARY 2600 8760 2600 2600 4368 780 2600 8760 8760 2600 8760 3120 8760 8760 5460 8760 8760 780 2600 3120 3120 3120 8760 3120 3120 hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs hrs (12 hrs/day, M-F) (12 hrs/day, M-F) (12 hrs/day, M-F) (3 hrs/day, M-F) (10 hrs/day, M-F) (12 hrs/day, M-F) (12 hrs/day, M-F) (12 hrs/day, M-F) (15 hrs/day, M-Su) (12 hrs/day, M-F) (10 hrs/day, M-F) (10 hrs/day, M-F) (10 hrs/day, M-F) (12 hrs/day, M-Su) (3 hrs/day, M-F) (10 hrs/day, M-F) (10 hrs/day, M-F) BUILDING DEPARTMENT 3120 Where sensors installed: 50% reduction of stipulated hours Page 26 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Table 7.3.2 below shows the lighting operating hours for traffic lights used for traffic lighting upgrade (FIM 7) calculations. Table 7.3.2: ANNUAL LIGHTING OPERATING HOURS Percentage Operating ON Hours 55% 4818 5% 438 40% 3504 55% 4818 5% 438 40% 3504 5% 438 17% 1489 85% 7446 15% 1314 12" Red Ball 12" Yellow Ball 12" Green Ball 8" Red ball 8" Yellow Ball 8" Green Ball Red Arrow Green Arrow Ped Stop Ped Walk Quantity 27 17 17 159 177 177 N 14 44 40 Page 27 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Appendix C-1: Lighting Details 1 – Wastewater Treatment Plant Buildings FL. # Room Description BUILDING 4 WELDING WELDING WELDING OFFICE SENSOR SAVINGS BUILDING 5 AUTO GARAGE AUTO GARAGE AUTO GARAGE OFFICE PARTS ROOM BATHROOM SENSOR SAVINGS BUILDING 6 ENTIRE BUILDING ENTIRE BUILDING ENTIRE BUILDING ENTIRE BUILDING ENTIRE BUILDING BUILDING 7 ENTIRE BUILDING 2LF34T12 INDUSTRIAL 9 72 2LF32-LO-WH-REFL 48 QHE2X32T8UNVISLSC FO32/841/XP/ECO3 SKSLw/WP/4-2UBS 2LF34T12 INDUSTRIAL 2LF96T12 INDUSTRIAL 2LF32T8 VT 2X20W EXIT 100A 18 5 6 1 4 72 158 61 40 100 2LF32-LO-WH-REFL 4LF32-LO-8FT-WH-REFL-KIT LEAVE AS IS NEW LED BB 25W CFL 48 95 61 2 25 XTEU2RWEM MLM25SWWPD QHE2X32T8UNVISLSC QHE4X32T8UNVISLSC FO32/841/XP/ECO3 FO32/841/XP/ECO3 SKSLw/WP/4-2UBS SKSLw/WP/8-4UBS 250W MH 2LF34T12 INDUSTRIAL 2LF96T12 INDUSTRIAL 2LF34T12 INDUSTRIAL 2LF96T12 INDUSTRIAL 2LF34T12 INDUSTRIAL 1 53 3 4 2 4 295 72 158 72 158 72 NEW 4LF32T8-HI 2LF32-LO-WH-REFL 4LF32-LO-8FT-WH-REFL-KIT 2LF32-LO-WH-REFL 4LF32-LO-8FT-WH-REFL-KIT 2LF32-LO-WH-REFL WS 156 48 95 48 95 48 G16-432-UV-2HI-E-PS-WG QHE2X32T8UNVISLSC QHE4X32T8UNVISLSC QHE2X32T8UNVISLSC QHE4X32T8UNVISLSC QHE2X32T8UNVISLSC IWSZP3P-WH FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 SKSLw/WP/4-2UBS SKSLw/WP/8-4UBS SKSLw/WP/4-2UBS SKSLw/WP/8-4UBS SKSLw/WP/4-2UBS Existing Fixture Description 400W MH 2LF34T12 INDUSTRIAL 2LF96T12 INDUSTRIAL 2X20W EXIT 2LF96T12 INDUSTRIAL Exist. Exist. Qty. Fix Wts 10 8 12 1 1 458 72 158 40 158 Replacement Fixture Description NEW 6LF32T8-HI 2LF32-LO-WH-REFL 4LF32-LO-8FT-WH-REFL-KIT NEW LED BB 4LF32-LO-8FT-WH-REFL-KIT WS Repl. Fix Wts 224 48 95 2 95 Fixture / Ballast G16-632-UV-2HI-E-PS-WG QHE2X32T8UNVISLSC QHE4X32T8UNVISLSC XTEU2RWEM QHE4X32T8UNVISLSC IWSZP3P-WH FO32/841/XP/ECO3 SKSLw/WP/8-4UBS Lamp / Sensor FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 SKSLw/WP/4-2UBS SKSLw/WP/8-4UBS Reflector / PowerPack Page 28 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown MAINTENANCE SAVINGS FORM FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE F34T12 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3120 TOTAL QUANTITY OF LAMPS 192 MATERIAL & LABOR COST LAMP COST LABOR COST $ 1.50 $ 5.00 LAMP LIFE (YRS) 6 Total Feet 768 LAMP TYPE F96T12 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 12,000 3120 TOTAL QUANTITY OF LAMPS 46 MATERIAL & LABOR COST LAMP COST LABOR COST $ 4.50 $ 5.00 LAMP LIFE (YRS) 4 Total Feet 368 TOTAL $ 6.50 TOTAL $ 9.50 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 6.50 192 $ 1,248.00 YEARS 6 AN. SAVINGS $ 194.69 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 9.50 46 $ 437.00 YEARS AN. SAVINGS 4 $ 113.62 FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE U-LAMP ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3400 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 6.50 $ 5.00 LAMP LIFE (YRS) 6 LAMP TYPE 25 - 100 WATT INCANDESCENT ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 750 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 0.50 $ 2.50 LAMP LIFE (YRS) 0.09 TOTAL $ 11.50 TOTAL $ 3.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 11.50 0 $ - YEARS 6 AN. SAVINGS $ - ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 3.00 0 $ - YEARS AN. SAVINGS 0.09 $ - FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE 250 - 400 WATT METAL HALIDE ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3120 TOTAL QUANTITY OF LAMPS 10 MATERIAL & LABOR COST LAMP COST LABOR COST $ 18.00 $ 10.00 LAMP LIFE (YRS) 6.41 LAMP TYPE 250 - 400 WATT HIGH PRESSURE SODIUM ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 24,000 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 15.00 $ 10.00 LAMP LIFE (YRS) 2.74 TOTAL $ 28.00 $ TOTAL 25.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 28.00 10 $ 280.00 YEARS 6.41 AN. SAVINGS $ 43.68 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 25.00 0 $ - YEARS AN. SAVINGS 2.74 $ - TOTAL ANNUAL SAVINGS: $ 351.99 Page 29 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown 2 – Highway Department FL. # Room Description ADMIN AREA FOYER LOBBY LOBBY OPEN OFFICE AREA OFFICE SENSOR SAVINGS HALL HALL HALL HALL HALL OFFICE SENSOR SAVINGS KITCHEN SENSOR SAVINGS STORAGE SENSOR SAVINGS SUPERVISOR OFFICE SENSOR SAVINGS CONFERENCE ROOM SENSOR SAVINGS MEETING ROOM SENSOR SAVINGS MENS ROOM SENSOR SAVINGS WOMENS ROOM SENSOR SAVINGS UTILITY ROOM SENSOR SAVINGS 100A 1 100 2x60A GLOBE 1 120 2x60A GLOBE 1 120 2X4 4LF32T8 12 112 2X4 4LF32T8 4 112 2X4 4LF32T8 4 112 2X4 4LF32T8 6 112 2X4 4LF32T8 6 112 2X2 2LUT8 2X4 4LF32T8 2X20W EXIT 1X4 2LF32T8 2x60A GLOBE 2X4 4LF32T8 1 6 5 1 2 5 61 112 40 61 120 112 2X2 2LUT8 2X2 2LUT8 2X20W EXIT 2X4 4LF32T8 2X4 4LF32T8 1 2 1 9 4 61 61 40 112 112 2LF17-REFL 2LF17-REFL NEW LED BB 2LF32-M4-REFL 2LF32-M4-REFL WS 2LF17-REFL 2LF32-M4-REFL NEW LED BB LEAVE AS IS 2x13W CFL A 2LF32-M4-REFL WS 2LF32-M4-REFL CS500 2LF32-M4-REFL WS 2LF32-M4-REFL WS0 2LF32-M4-REFL WS0 2LF32-M4-REFL CS1000 2x13W CFL A WS 2x13W CFL A WS 25W CFL 25 1 26 26 55 55 55 55 55 30 55 2 61 26 55 SKB13EAPWWPD QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC OMNIDT500 QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC OMNIDT1000 SKB13EAPWWPD IWSZP3P-WH SKB13EAPWWPD IWSZP3P-WH MLM25SWWPD FO32/841/XP/ECO3 MP120A FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 MP120A FO32/841/XP/ECO3 FO32/841/XP/ECO3 30 30 2 55 55 QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC XTEU2RWEM QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC XTEU2RWEM FO17/841XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO17/841XP/ECO3 FO17/841XP/ECO3 Existing Fixture Description Exist. Exist. Qty. Fix Wts Replacement Fixture Description Repl. Fix Wts Fixture / Ballast Lamp / Sensor Page 30 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown GARAGE AREA HALL HALL JANITOR SENSOR SAVINGS BOILER ROOM SENSOR SAVINGS BATHROOM SENSOR SAVINGS LOCKER ROOM SENSOR SAVINGS CAFETERIA SENSOR SAVINGS OFFICE SENSOR SAVINGS TOOL ROOM TOOL ROOM TOOL ROOM OFFICE SENSOR SAVINGS SHOP OFFICE / PARTS SENSOR SAVINGS SHOP SHOP SHOP SHOP SHOP 2 SHOP 3 SHOP 4 TRUCK GARAGE TRUCK GARAGE TRUCK GARAGE TRUCK GARAGE SHOP 3 WELDING SHOP WELDING SHOP WELDING SHOP SIGN SHOP BOILER ROOM SENSOR SAVINGS SIGN OFFICE TIRE SHOP 2LF96T8 INDUSTRIAL 2LF96T8 INDUSTRIAL 6 2 112 112 2X20W EXIT 100A 2LF96T8 INDUSTRIAL 250W MH 2X20W EXIT 100A 250W MH 2X20W EXIT 200A 2LF96T8 INDUSTRIAL 250W MH 2LF96T12HO 250W MH 2LF96T12HO 2LF96T8 INDUSTRIAL 2LF96T8 INDUSTRIAL 100A 1 1 2 19 1 2 6 2 10 20 8 6 4 4 1 8 2 40 100 112 295 40 100 295 40 200 112 295 227 295 227 112 112 100 2LF32T8 INDUSTRIAL 12 61 1X4 2LF32T8 WRAP 200A 2LF96T8 INDUSTRIAL 1X4 2LF32T8 WRAP 1 1 2 4 61 200 112 61 1X4 2LF32T8 4 61 1X4 2LF32T8 6 61 200A 2 200 200A 2 200 200A 2 200 2X20W EXIT 200A 100A 2 6 1 40 200 100 NEW LED BB NEW 2LF32T8 STRIP 25W CFL WS 65W CFL TS NEW 2LF32T8 STRIP WS NEW 2LF32T8 STRIP WS LEAVE AS IS CS500 LEAVE AS IS WS LEAVE AS IS NEW 2LF32T8 STRIP 61 48 SS-23248-NR-UNV QHE2X32T8UNVISNSC FO32/841/XP/ECO3 FO32/841/XP/ECO3 61 IWSZP3P-WH 61 OMNIDT500 MP120A 48 48 65 2 48 25 XTEU2RWEM SS-23248-NR-UNV MLM25SWWPD IWSZP3P-WH TCP 28965 TD200 SS-23248-NR-UNV IWSZP3P-WH SS-23248-NR-UNV IWSZP3P-WH FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 2LF32-8FT-WH-REFL-KIT 55 LEAVE AS IS WS LEAVE AS IS CS1000 NEW LED BB 25W CFL 2 25 61 61 IWSZP3P-WH OMNIDT1000 XTEU2RWEM MLM25SWWPD QHE2X32T8UNVISNSC G16-432-UV-2HI-E-PS-WG XTEU2RWEM MLM25SWWPD G16-432-UV-2HI-E-PS-WG XTEU2RWEM MP120A 2LF32-8FT-WH-REFL-KIT 55 NEW 4LF32T8-HI NEW LED BB 25W CFL NEW 4LF32T8-HI NEW LED BB 156 2 25 156 2 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 NEW 4LF32T8-8FT-INDUSTRIAL G16-432-UV-2HI-E-PS-WG 95 4LF32-8FT-WH-REFL-KIT 95 NEW 4LF32T8-HI 156 QHE4X32T8UNVISLSC G16-432-UV-2HI-E-PS-WG QHE4X32T8UNVISLSC G16-432-UV-2HI-E-PS-WG QHE4X32T8UNVISLSC QHE4X32T8UNVISLSC QHE4X32T8UNVISLSC MLM25SWWPD TD200 QHE4X32T8UNVISLSC QHE4X32T8UNVISLSC FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 4LF32-8FT-WH-REFL-KIT 95 NEW 4LF32T8-HI 156 4LF32-8FT-WH-REFL-KIT 95 4LF32-8FT-WH-REFL-KIT 95 4LF32-8FT-WH-REFL-KIT 95 25W CFL TS 4LF32-8FT-WH-REFL-KIT 95 4LF32-8FT-WH-REFL-KIT 95 25 FO32/841/XP/ECO3 FO32/841/XP/ECO3 Page 31 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown MAINTENANCE SAVINGS FORM FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE F32T8 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3120 TOTAL QUANTITY OF LAMPS 280 MATERIAL & LABOR COST LAMP COST LABOR COST $ 2.50 $ 5.00 LAMP LIFE (YRS) 6 Total Feet 1120 LAMP TYPE F96T12 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 12,000 8760 TOTAL QUANTITY OF LAMPS 102 MATERIAL & LABOR COST LAMP COST LABOR COST $ 4.50 $ 5.00 LAMP LIFE (YRS) 1 Total Feet 816 TOTAL $ 7.50 TOTAL $ 9.50 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 7.50 280 $ 2,100.00 YEARS 6 AN. SAVINGS $ 327.60 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 9.50 102 $ 969.00 YEARS AN. SAVINGS 1 $ 707.37 FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE U-LAMP ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3120 TOTAL QUANTITY OF LAMPS 8 MATERIAL & LABOR COST LAMP COST LABOR COST $ 6.50 $ 5.00 LAMP LIFE (YRS) 6 LAMP TYPE 25 - 100 WATT INCANDESCENT ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 750 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 0.50 $ 2.50 LAMP LIFE (YRS) 0.09 TOTAL $ 11.50 TOTAL $ 3.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 11.50 8 $ 92.00 YEARS 6 AN. SAVINGS $ 14.35 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 3.00 0 $ - YEARS AN. SAVINGS 0.09 $ - FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE 250 - 400 WATT METAL HALIDE ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 8760 TOTAL QUANTITY OF LAMPS 37 MATERIAL & LABOR COST LAMP COST LABOR COST $ 18.00 $ 10.00 LAMP LIFE (YRS) 2.28 LAMP TYPE 250 - 400 WATT HIGH PRESSURE SODIUM ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 24,000 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 15.00 $ 10.00 LAMP LIFE (YRS) 2.74 TOTAL $ 28.00 $ TOTAL 25.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 28.00 37 $ 1,036.00 YEARS 2.28 AN. SAVINGS $ 453.77 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 25.00 0 $ - YEARS AN. SAVINGS 2.74 $ - TOTAL ANNUAL SAVINGS: $ 1,503.09 Page 32 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown 3 – Town Hall FL. # Room Description NEW BUILDING HALL HALL LINE UP ROOM LINE UP ROOM BREAK ROOM SENSOR SAVINGS BREAK ROOM REPORTS SENSOR SAVINGS C.I.R.T. MENS LOCKER MENS BATHROOM SENSOR SAVINGS MENS BATHROOM SENSOR SAVINGS MENS BATHROOM SENSOR SAVINGS SUPERVISOR LOCKER SENSOR SAVINGS WOMENS LOCKER SENSOR SAVINGS WOMENS BATHROOM SENSOR SAVINGS WOMENS BATHROOM SENSOR SAVINGS FITNESS SENSOR SAVINGS FITNESS SENSOR SAVINGS MENS BATHROOM SENSOR SAVINGS MENS BATHROOM SENSOR SAVINGS MENS BATHROOM SENSOR SAVINGS WOMENS BATHROOM SENSOR SAVINGS WOMENS BATHROOM SENSOR SAVINGS WOMENS BATHROOM 2LF32T8 1 61 LEAVE AS IS 61 2X4 3LF32T8 1 89 2LF32-WH-REFL 55 QHE2X32T8UNVISNSC FO32/841/XP/ECO3 2X2 2LUT8 1 61 2LF32T8 1 61 LEAVE AS IS CS500 2LF17-REFL 30 61 OMNIDT500 QHE2X32T8UNVISNSC MP120A FO17/841XP/ECO3 2X4 3LF32T8 1 89 2LF32-WH-REFL 55 QHE2X32T8UNVISNSC FO32/841/XP/ECO3 2X2 2LUT8 1 61 2X4 3LF32T8 6 89 2LF32-WH-REFL CS1000 2LF17-REFL 30 55 QHE2X32T8UNVISNSC OMNIDT1000 QHE2X32T8UNVISNSC FO32/841/XP/ECO3 MP120A FO17/841XP/ECO3 2X2 2LUT8 3 61 2LF32T8 2 61 LEAVE AS IS CS500 2LF17-REFL 30 61 OMNIDT500 QHE2X32T8UNVISNSC MP120A FO17/841XP/ECO3 2X4 3LF32T8 2 89 2X2 2LUT8 8 61 2X2 2LUT8 3 61 2LF32T8 3 61 LEAVE AS IS CS1000 2LF17-REFL WS 2LF17-REFL CS500 2LF32-WH-REFL 55 30 30 61 OMNIDT1000 QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC OMNIDT500 QHE2X32T8UNVISNSC FO17/841XP/ECO3 MP120A FO32/841/XP/ECO3 MP120A FO17/841XP/ECO3 2X4 3LF32T8 3 89 2LF32-WH-REFL 55 QHE2X32T8UNVISNSC FO32/841/XP/ECO3 LOCKED 2X2 2LUT8 2X2 2LUT8 15 1 61 61 2LF17-REFL 2LF17-REFL 30 30 QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC FO17/841XP/ECO3 FO17/841XP/ECO3 VENDING MACHINE 2X4 3LF32T8 1 3 400 89 2X2 3LUT8 2X2 3LUT8 2X2 3LUT8 2X4 3LF32T8 2X2 3LUT8 12 12 1 8 4 89 89 89 89 89 3LF17-REFL 3LF17-REFL 3LF17-REFL 2LF32-WH-REFL 3LF17-REFL WS VENDING MISER 2LF32-WH-REFL WS 216 55 47 47 47 55 47 QHE3X32T8UNVISNSC QHE3X32T8UNVISNSC QHE3X32T8UNVISNSC QHE2X32T8UNVISNSC QHE3X32T8UNVISNSC IWSZP3P-WH VM150 QHE2X32T8UNVISNSC IWSZP3P-WH FO32/841/XP/ECO3 FO17/841XP/ECO3 FO17/841XP/ECO3 FO17/841XP/ECO3 FO32/841/XP/ECO3 FO17/841XP/ECO3 Existing Fixture Description Exist. Exist. Qty. Fix Wts Replacement Fixture Description Repl. Fix Wts Fixture / Ballast Lamp / Sensor Page 33 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown SENSOR SAVINGS HALL BOILER ROOM SENSOR SAVINGS BOILER ROOM SENSOR SAVINGS HALL POLICE ENTRY STAIRS ADMIN OFFICE ADMIN OFFICE CHIEF SENSOR SAVINGS BATHROOM SENSOR SAVINGS BATHROOM SENSOR SAVINGS CAPTAIN SENSOR SAVINGS OFFICE SENSOR SAVINGS OFFICE SENSOR SAVINGS DECT FRONT OFFICE OPEN OFFICE AREA SEARGENT SENSOR SAVINGS SEARGENT SENSOR SAVINGS LIEUTENANT SENSOR SAVINGS HALL STORAGE SENSOR SAVINGS MENS BATHROOM SENSOR SAVINGS WOMENS BATHROOM SENSOR SAVINGS OPEN OFFICE AREA STORAGE PRINT SENSOR SAVINGS OFFICE SENSOR SAVINGS OFFICE SENSOR SAVINGS OFFICE SENSOR SAVINGS 2X4 3LF32T8 4 89 2X2 3LUT8 4 89 2X2 3LUT8 4 89 2X4 3LF32T8 2X2 2LUT8 2X4 3LF32T8 9 1 2 89 61 89 2X2 2LUT8 2 61 2X2 2LUT8 2 61 2X2 3LUT8 2X4 3LF32T8 3 1 89 89 2X4 3LF32T8 3 89 2X2 3LUT8 1 89 3LF17-REFL WS 2LF32-WH-REFL WS 3LF17-REFL 2LF32-WH-REFL WS 2LF17-REFL WS 2LF17-REFL WS 2LF32-WH-REFL 2LF17-REFL 2LF32-WH-REFL WS 3LF17-REFL WS 3LF17-REFL WS 2LF32-WH-REFL WS 55 47 47 55 30 55 30 30 47 55 55 47 QHE3X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC IWSZP3P-WH QHE3X32T8UNVISNSC QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC IWSZP3P-WH QHE3X32T8UNVISNSC IWSZP3P-WH QHE3X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC IWSZP3P-WH FO32/841/XP/ECO3 FO17/841XP/ECO3 FO17/841XP/ECO3 FO32/841/XP/ECO3 FO17/841XP/ECO3 FO32/841/XP/ECO3 FO17/841XP/ECO3 FO17/841XP/ECO3 FO17/841XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO17/841XP/ECO3 2X4 3LF32T8 2X4 3LF32T8 2X4 3LF32T8 2 9 2 89 89 89 2LF32T8 2 61 2X4 3LF32T8 3 89 2X4 3LF32T8 3 89 2LF32T8 1 61 LEAVE AS IS WS 2LF32-WH-REFL WS 2LF32-WH-REFL WS LEAVE AS IS WS 2LF32-WH-REFL 2LF32-WH-REFL 2LF32-WH-REFL 55 55 55 61 IWSZP3P-WH QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 55 55 61 IWSZP3P-WH QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC IWSZP3P-WH FO32/841/XP/ECO3 FO32/841/XP/ECO3 2X2 3LUT8 1 89 2X2 3LUT8 2X4 3LF32T8 2X4 3LF32T8 2X2 3LUT8 2X4 3LF32T8 2X4 3LF32T8 13 1 5 1 5 7 89 89 89 89 89 89 2X2 3LUT8 3 89 3LF17-REFL TS 3LF17-REFL 2LF32-WH-REFL 2LF32-WH-REFL 3LF17-REFL 2LF32-WH-REFL 2LF32-WH-REFL WS 3LF17-REFL 47 47 55 55 47 55 55 47 QHE3X32T8UNVISNSC TD200 QHE3X32T8UNVISNSC QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC QHE3X32T8UNVISNSC QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC IWSZP3P-WH QHE3X32T8UNVISNSC FO17/841XP/ECO3 FO17/841XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO17/841XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO17/841XP/ECO3 2LF32T8 9 61 LEAVE AS IS 61 CS500 OMNIDT500 MP120A Page 34 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown MAINTENANCE SAVINGS FORM FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE F34T12 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3120 TOTAL QUANTITY OF LAMPS 100 MATERIAL & LABOR COST LAMP COST LABOR COST $ 1.50 $ 5.00 LAMP LIFE (YRS) 6 Total Feet 400 LAMP TYPE F32T8 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3120 TOTAL QUANTITY OF LAMPS 147 MATERIAL & LABOR COST LAMP COST LABOR COST $ 2.50 $ 5.00 LAMP LIFE (YRS) Total Feet 6 588 TOTAL $ 6.50 TOTAL $ 7.50 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 6.50 100 $ 650.00 YEARS 6 AN. SAVINGS $ 101.40 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 7.50 147 $ 1,102.50 YEARS 6 AN. SAVINGS $ 172.35 FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE U-LAMP ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3120 TOTAL QUANTITY OF LAMPS 80 MATERIAL & LABOR COST LAMP COST LABOR COST $ 6.50 $ 5.00 LAMP LIFE (YRS) 6 LAMP TYPE 25 - 100 WATT INCANDESCENT ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 750 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 0.50 $ 2.50 LAMP LIFE (YRS) 0.09 TOTAL $ 11.50 TOTAL $ 3.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 11.50 80 $ 920.00 YEARS 6 AN. SAVINGS $ 143.52 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 3.00 0 $ - YEARS 0.09 AN. SAVINGS $ - FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE 250 - 400 WATT METAL HALIDE ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3400 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 18.00 $ 10.00 LAMP LIFE (YRS) 5.88 LAMP TYPE 250 - 400 WATT HIGH PRESSURE SODIUM ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 24,000 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 15.00 $ 10.00 LAMP LIFE (YRS) 2.74 TOTAL $ 28.00 $ TOTAL 25.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 28.00 0 $ - YEARS 5.88 AN. SAVINGS $ - ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 25.00 0 $ - YEARS 2.74 AN. SAVINGS $ - TOTAL ANNUAL SAVINGS: $ 417.27 Page 35 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown 4 – Parks & Recreation FL. # Room Description FRONT OFFICE KITCHEN OFFICE SENSOR SAVINGS OFFICE SENSOR SAVINGS OFFICE SENSOR SAVINGS CONFERENCE ROOM SENSOR SAVINGS OFFICE SENSOR SAVINGS OFFICE SENSOR SAVINGS BATHROOM SENSOR SAVINGS HALL 2x60A GLOBE 1 120 60A 1 60 2X4 4LF34T12 1 144 1X4 2LF34T12 1 72 2X4 4LF34T12 WRAP 1 144 2X4 4LF34T12 WRAP 1 144 2X4 4LF34T12 WRAP 4 144 Existing Fixture Description 2X4 4LF34T12 WRAP 2X4 4LF34T12 WRAP 2X4 4LF34T12 WRAP Exist. Exist. Qty. Fix Wts 4 1 1 144 144 144 Replacement Fixture Description 4LF32-LO 4LF32-LO 4LF32-LO WS 4LF32-LO WS 4LF32-LO WS 4LF32-LO WS 2LF32-LO WS 2LF32-WH-REFL WS 13W CFL A WS 2x13W CFL A 26 13 55 48 95 95 95 Repl. Fix Wts 95 95 95 Fixture / Ballast QHE4X32T8UNVISLSC QHE4X32T8UNVISLSC QHE4X32T8UNVISLSC IWSZP3P-WH QHE4X32T8UNVISLSC IWSZP3P-WH QHE4X32T8UNVISLSC IWSZP3P-WH QHE4X32T8UNVISLSC IWSZP3P-WH QHE2X32T8UNVISLSC IWSZP3P-WH QHE2X32T8UNVISNSC IWSZP3P-WH SKB13EAPWWPD IWSZP3P-WH SKB13EAPWWPD FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 Lamp / Sensor FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 Page 36 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown MAINTENANCE SAVINGS FORM FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE F34T12 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3120 TOTAL QUANTITY OF LAMPS 54 MATERIAL & LABOR COST LAMP COST LABOR COST $ 1.50 $ 5.00 LAMP LIFE (YRS) 6 Total Feet 216 LAMP TYPE F96T12 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 12,000 3400 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 4.50 $ 5.00 LAMP LIFE (YRS) 4 Total Feet 0 TOTAL $ 6.50 TOTAL $ 9.50 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 6.50 54 $ 351.00 YEARS 6 AN. SAVINGS $ 54.76 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 9.50 0 $ - YEARS AN. SAVINGS 4 $ - FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE U-LAMP ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3400 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 6.50 $ 5.00 LAMP LIFE (YRS) 6 LAMP TYPE 25 - 100 WATT INCANDESCENT ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 750 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 0.50 $ 2.50 LAMP LIFE (YRS) 0.09 TOTAL $ 11.50 TOTAL $ 3.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 11.50 0 $ - YEARS 6 AN. SAVINGS $ - ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 3.00 0 $ - YEARS AN. SAVINGS 0.09 $ - FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE 250 - 400 WATT METAL HALIDE ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3400 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 18.00 $ 10.00 LAMP LIFE (YRS) 5.88 LAMP TYPE 250 - 400 WATT HIGH PRESSURE SODIUM ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 24,000 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 15.00 $ 10.00 LAMP LIFE (YRS) 2.74 TOTAL $ 28.00 $ TOTAL 25.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 28.00 0 $ - YEARS 5.88 AN. SAVINGS $ - ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 25.00 0 $ - YEARS AN. SAVINGS 2.74 $ - TOTAL ANNUAL SAVINGS: $ 54.76 Page 37 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown 5 – Greenbush a) Department of Public Work FL. # Room Description OPEN OFFICE AREA HEARING ROOM HEARING ROOM HALL HALL STIARS MENS ROOM SENSOR SAVINGS MENS ROOM SENSOR SAVINGS WOMENS ROOM SENSOR SAVINGS OPEN OFFICE AREA OPEN OFFICE AREA 2X4 4LF34T12 2X4 4LF34T12 9 5 144 144 100A 4 100 100A 1 100 NEW 2LF32-WRAP WS NEW 2LF32-WRAP WS 2LF32-WH-REFL 2LF32-WH-REFL 55 55 48 48 WW-D12-232-UV-1SI-E IWSZP3P-WH WW-D12-232-UV-1SI-E IWSZP3P-WH QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 Existing Fixture Description 2X4 4LF34T12 2X4 4LF34T12 1X4 4LF34T12 2X20W EXIT 4LF34T12 STRIP 1LF34T12 STRIP 2X4 4LF34T12 Exist. Exist. Qty. Fix Wts 6 4 4 1 2 1 1 144 144 144 40 144 43 144 Replacement Fixture Description 2LF32-WH-REFL 2LF32-WH-REFL 2LF32-NLO NEW LED BB 4LF32-LO 1LF32-LO 2LF32-WH-REFL Repl. Fix Wts 55 55 55 2 95 26 55 Fixture / Ballast QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC XTEU2RWEM QHE4X32T8UNVISLSC QHE1X32T8UNVISLSC QHE2X32T8UNVISNSC FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 Lamp / Sensor FO32/841/XP/ECO3 FO32/841/XP/ECO3 FO32/841/XP/ECO3 Page 38 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown MAINTENANCE SAVINGS FORM FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE F34T12 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3120 TOTAL QUANTITY OF LAMPS 129 MATERIAL & LABOR COST LAMP COST LABOR COST $ 1.50 $ 5.00 LAMP LIFE (YRS) 6 Total Feet 516 LAMP TYPE F96T12 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 12,000 3400 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 4.50 $ 5.00 LAMP LIFE (YRS) 4 Total Feet 0 TOTAL $ 6.50 TOTAL $ 9.50 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 6.50 129 $ 838.50 YEARS 6 AN. SAVINGS $ 130.81 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 9.50 0 $ - YEARS AN. SAVINGS 4 $ - FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE U-LAMP ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3400 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 6.50 $ 5.00 LAMP LIFE (YRS) 6 LAMP TYPE 25 - 100 WATT INCANDESCENT ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 750 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 0.50 $ 2.50 LAMP LIFE (YRS) 0.09 TOTAL $ 11.50 TOTAL $ 3.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 11.50 0 $ - YEARS 6 AN. SAVINGS $ - ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 3.00 0 $ - YEARS AN. SAVINGS 0.09 $ - FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE 250 - 400 WATT METAL HALIDE ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3400 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 18.00 $ 10.00 LAMP LIFE (YRS) 5.88 LAMP TYPE 250 - 400 WATT HIGH PRESSURE SODIUM ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 24,000 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 15.00 $ 10.00 LAMP LIFE (YRS) 2.74 TOTAL $ 28.00 $ TOTAL 25.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 28.00 0 $ - YEARS 5.88 AN. SAVINGS $ - ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 25.00 0 $ - YEARS AN. SAVINGS 2.74 $ - TOTAL ANNUAL SAVINGS: $ 130.81 Page 39 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown b) Library FL. # 1 STACKS 1 STACKS 1 DESK 2 CONFERENCE ROOM 2 HALL 2 BATHROOM 2 SENSOR SAVINGS 2 BATHROOM 2 SENSOR SAVINGS 2 OPEN OFFICE AREA 2 KITCHEN 2 OFFICE 2 SENSOR SAVINGS 2 STORAGE 2 SENSOR SAVINGS 2 STORAGE 2 SENSOR SAVINGS STAIRS 40A WALL SCONCE 3 40 2LF34T12 STRIP 1 72 2LF34T12 STRIP 3 72 2X4 3LF32T8 2X4 3LF32T8 2X4 3LF32T8 10 1 2 89 89 89 2X2 2LUT8 1 61 2LF17-REFL WS 2LF32-WH-REFL 2LF32-WH-REFL 2LF32-WH-REFL WS 2LF32-LO WS 2LF32-LO WS 13W CFL A 13 48 48 55 55 55 30 QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC IWSZP3P-WH QHE2X32T8UNVISLSC IWSZP3P-WH QHE2X32T8UNVISLSC IWSZP3P-WH SKB13EAPWWPD FO32/841XP/ECO3 FO32/841XP/ECO3 FO32/841XP/ECO3 FO32/841XP/ECO3 FO32/841XP/ECO3 FO17/841XP/ECO3 Room Description Existing Fixture Description 2X4 3LF32T8 2X2 2LUT8 2X4 3LF32T8 2X4 3LF32T8 2X4 3LF32T8 2X4 3LF32T8 Exist. Exist. Qty. Fix Wts 55 6 2 3 2 1 89 61 89 89 89 89 Replacement Fixture Description 2LF32-WH-REFL 2LF17-REFL 2LF32-WH-REFL 2LF32-WH-REFL 2LF32-WH-REFL 2LF32-WH-REFL Repl. Fix Wts 55 30 55 55 55 55 Fixture / Ballast QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC QHE2X32T8UNVISNSC Lamp / Sensor FO32/841XP/ECO3 FO17/841XP/ECO3 FO32/841XP/ECO3 FO32/841XP/ECO3 FO32/841XP/ECO3 FO32/841XP/ECO3 Page 40 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown MAINTENANCE SAVINGS FORM FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE F32T8 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3120 TOTAL QUANTITY OF LAMPS 228 MATERIAL & LABOR COST LAMP COST LABOR COST $ 2.50 $ 5.00 LAMP LIFE (YRS) 6 Total Feet 912 LAMP TYPE F96T12 ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 12,000 3400 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 4.50 $ 5.00 LAMP LIFE (YRS) 4 Total Feet 0 TOTAL $ 7.50 TOTAL $ 9.50 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 7.50 228 $ 1,710.00 YEARS 6 AN. SAVINGS $ 266.76 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 9.50 0 $ - YEARS AN. SAVINGS 4 $ - FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE U-LAMP ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3120 TOTAL QUANTITY OF LAMPS 14 MATERIAL & LABOR COST LAMP COST LABOR COST $ 6.50 $ 5.00 LAMP LIFE (YRS) 6 LAMP TYPE 25 - 100 WATT INCANDESCENT ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 750 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 0.50 $ 2.50 LAMP LIFE (YRS) 0.09 TOTAL $ 11.50 TOTAL $ 3.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 11.50 14 $ 161.00 YEARS 6 AN. SAVINGS $ 25.12 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 3.00 0 $ - YEARS AN. SAVINGS 0.09 $ - FILL IN HIGHLIGHTED CELLS ONLY FILL IN HIGHLIGHTED CELLS ONLY LAMP TYPE 250 - 400 WATT METAL HALIDE ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 20,000 3400 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 18.00 $ 10.00 LAMP LIFE (YRS) 5.88 LAMP TYPE 250 - 400 WATT HIGH PRESSURE SODIUM ANNUAL LAMP LIFE LAMP LIFE ANNUAL HOURS 24,000 8760 TOTAL QUANTITY OF LAMPS 0 MATERIAL & LABOR COST LAMP COST LABOR COST $ 15.00 $ 10.00 LAMP LIFE (YRS) 2.74 TOTAL $ 28.00 $ TOTAL 25.00 ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 28.00 0 $ - YEARS 5.88 AN. SAVINGS $ - ANNUAL MAINTENANCE COST COST QTY TOTAL COST $ 25.00 0 $ - YEARS AN. SAVINGS 2.74 $ - TOTAL ANNUAL SAVINGS: $ 291.88 Page 41 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown 6 – Traffic Lights Retrofit Actual Watts 12" Red Ball 12" Yellow Ball 12" Green Ball 8" Red ball 8" Yellow Ball 8" Green Ball Red Arrow Green Arrow Ped Stop Ped Walk 135 69 69 135 69 69 40 40 30 30 Quantity 27 17 17 159 177 177 N 14 44 40 672 Percentage Same size Savings ON Watts kWh 55% 11 16,131 5% 18 380 40% 12 3,395 55% 6.5 98,439 5% 11.5 4,458 40% 9 37,212 5% 8 0 17% 7 688 85% 13 5,570 15% 13 894 Total 167,166 Guaranty factor 95% Annual Energy Savings 158,800 Annual Cost Savings $25,811 Traffic Lights Operation and Maintenance Savings The Town of Orangetown has a fixed annual contract for Operation & Maintenance for about $40,500. SIEMENS estimate that a reduction of at least 20% can be achieved due to higher life time. Existing O&M = $40,500 Savings O&M = $8,100 Page 42 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Appendix C-2: Calculation Details Table C-2.1: Trickling Filter Re-Circulating Pump Replacement – Wastewater Treatment Plant Title Project Site Discription Given Energy Efficient Motor Upgrade Waste Water Treatment Plant - TF recirculation Pump Orangetown, NY Calculate energy savings with replacement of old, inefficient 3-Phase motors with new, Premium efficient motors. Electrical Energy Cost Electrical Demand Cost Existing Motor Size Existing Motor Efficiency Existing Motor Voltage Existing Load RPM Existing Hours of use Existing Motor kW Select one method of loading: ( New Motor Size New Motor Efficiency New Motor Voltage New Load RPM New Hours of use New Motor kW Select one method of loading: ( 60 hp x 0 amps x 0.746 kW/hp x load factor 460 volts x sq rt of 3) / 75% 75% 85% 80% 6 months (Estimated) (Estimated) (Estimated) (Estimated) (Estimated) 0.75 = 0.85 pf = = = = = = = 75 hp x 0 amps x 0.746 kW/hp x load factor 460 volts x sq rt of 3) / 60 hp 93% 460 885 2,492 34 kW 0.75 = 0.85 pf == = = = = = = = = $0.116 $0.00 75 83% 460 885 8,760 42 $/kWh $/kW hp (From Rate Schedule) (From Rate Schedule) (From Site survey) OK (From measurement or nameplate) (From Site survey or nameplate) (From measurement or nameplate) (From Site survey) hrs kW 0 kW 41.96 kW 0 kW (From Site survey) OK (From measurement or nameplate) (From Site survey or nameplate) (From measurement or nameplate) (From Site survey) 0 kW 33.57 kW 0 kW Assumption Existing Motor Load Factor New Motor Load Factor Power Factor Demand Utilization Factor Peak Load Months Motor (kW) = Speed Ratio Correction Factor = Existing Energy Use (kWh)= Existing Demand Use (kW) = New Energy Use (kWh) = New Demand Use (kW) = Total Savings (kWh, kW) = = = = = = Formula (Motor Horsepower x 0.746 (kW/HP) x Load Factor) = or = (Motor Amperage x Volts x 1.732) / (Power Factor) ((New RPM)/(Existing RPM)) ^ 3 (Existing kW /Existing Efficiency) x Hours of Use (Existing kW /Existing Efficiency) x Peak Load Months x Utilization factor (New kW /New Efficiency) x Hours of Use x Speed Ratio Correction Factor (New kW /New Efficiency) x Peak Load Months x Utilization factor x Speed Ratio Correction Factor (kWh existing - kWh new) x $/kWh + (kW existing - kW new) x $/kW Calculation Speed Ratio Correction Factor = ((New RPM) / (Existing RPM)) ^ 3 Speed Ratio Correction Factor = (( 885 )/( 885 )) ^ 3 Existing Energy = Existing kW Exist. Eff Existing Energy = 41.96 / 0.83 x Existing Demand = Existing kW Exist. Eff Existing Demand = 41.96 / 0.83 x New Energy = New kW New Eff New Energy = 33.57 / 0.93 x New Demand = New kW New Eff New Demand = 33.57 / 0.93 x Total Savings = (( Existing Energy New Energy Total Savings = (( 442,881 89,953 )*( Annual Existing Costs (kWh) Annual Existing Costs (kW) Annual Existing Costs $ Annual New Costs (kWh) Annual New Costs (kW) Annual New Costs $ 100% Annual Savings (kWh) Annual Savings (kW) Total Savings $ 442,881 kWh/yr 243 kW/yr $51,368 $0 $51,368 $10,433 $0 $10,433 $40,935 $0 $40,935 = oper hrs 8760 Pk Load Mo Util factor 6 x 80% oper hrs Speed Factor 2492 1.00 Pk Load Mo Util factor 6 x 80% $/kWh Ex. Demand $0.12 )) + (( + 242.7 = = = Speed Factor 1.00 = New Demand 173.3 )*( 1.00 442,881 kWh 242.7 kW 89,953 kWh 173.3 kW $/kWh $0.00 )) = $40,935 Result 89,953 kWh/yr 173.3 kW/yr 352928 kWh/yr 69.4 kW/yr 80% of existing Page 43 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Table C-2.2: Belt Filter Press Feed Pump Replacement – Wastewater Treatment Plant Title Project Site Discription Given Energy Efficient Motor Upgrade Waste Water Treatment Plant - BFP Feed Pump Orangetown, NY Calculate energy savings with replacement of old, inefficient 3-Phase motors with new, Premium efficient motors. Electrical Energy Cost Electrical Demand Cost Existing Motor Size Existing Motor Efficiency Existing Motor Voltage Existing Load RPM Existing Hours of use Existing Motor kW Select one method of loading: ( New Motor Size New Motor Efficiency New Motor Voltage New Load RPM New Hours of use New Motor kW Select one method of loading: ( 20 hp x 0 amps x 0.746 kW/hp x load factor 230 volts x sq rt of 3) / 75% 75% 85% 80% 6 months (Estimated) (Estimated) (Estimated) (Estimated) (Estimated) 0.75 = 0.85 pf = = = = = = = 20 hp x amps x 0.746 kW/hp x load factor 230 volts x sq rt of 3) / 20 hp 92% 230 1800 1,664 11.2 kW 0.75 = 0.85 pf == = = = = = = = = $0.116 $0.00 20 88% 230 1740 3,328 11.2 $/kWh $/kW hp (From Rate Schedule) (From Rate Schedule) (From Site survey) OK (From measurement or nameplate) (From Site survey or nameplate) (From measurement or nameplate) (From Site survey) hrs kW kW 11.19 kW 0 kW (From Site survey) OK (From measurement or nameplate) (From Site survey or nameplate) (From measurement or nameplate) (From Site survey) kW 11.19 kW 0 kW Assumption Existing Motor Load Factor New Motor Load Factor Power Factor Demand Utilization Factor Peak Load Months Motor (kW) = Speed Ratio Correction Factor = Existing Energy Use (kWh)= Existing Demand Use (kW) = New Energy Use (kWh) = New Demand Use (kW) = Total Savings (kWh, kW) = = = = = = Formula (Motor Horsepower x 0.746 (kW/HP) x Load Factor) = or = (Motor Amperage x Volts x 1.732) / (Power Factor) ((New RPM)/(Existing RPM)) ^ 3 (Existing kW /Existing Efficiency) x Hours of Use (Existing kW /Existing Efficiency) x Peak Load Months x Utilization factor (New kW /New Efficiency) x Hours of Use x Speed Ratio Correction Factor (New kW /New Efficiency) x Peak Load Months x Utilization factor x Speed Ratio Correction Factor (kWh existing - kWh new) x $/kWh + (kW existing - kW new) x $/kW Calculation Speed Ratio Correction Factor = ((New RPM) / (Existing RPM)) ^ 3 Speed Ratio Correction Factor = (( 1800 )/( 1740 )) ^ 3 Existing Energy = Existing kW Exist. Eff Existing Energy = 11.19 / 0.88 x Existing Demand = Existing kW Exist. Eff Existing Demand = 11.19 / 0.88 x New Energy = New kW New Eff New Energy = 11.19 / 0.92 x New Demand = New kW New Eff New Demand = 11.19 / 0.92 x Total Savings = (( Existing Energy New Energy Total Savings = (( 42,271 22,479 )*( Annual Existing Costs (kWh) Annual Existing Costs (kW) Annual Existing Costs $ Annual New Costs (kWh) Annual New Costs (kW) Annual New Costs $ 100% Annual Savings (kWh) Annual Savings (kW) Total Savings $ 42,271 kWh/yr 61.0 kW/yr $4,903 $0 $4,903 $2,607 $0 $2,607 $2,295 $0 $2,295 = oper hrs 3328 Pk Load Mo Util factor 6 x 80% oper hrs Speed Factor 1664 1.11 Pk Load Mo Util factor 6 x 80% $/kWh Ex. Demand $0.12 )) + (( + 61.0 = = = Speed Factor 1.11 = New Demand 64.8 )*( 1.11 42,271 kWh 61.0 kW 22,479 kWh 64.8 kW $/kWh $0.00 )) = $2,295 Result 22,479 kWh/yr 64.8 kW/yr 19791 kWh/yr -3.9 kW/yr 47% of existing Page 44 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Table C-2.3: Primary Sludge Pump Replacement – Wastewater Treatment Plant Title Project Site Discription Given Energy Efficient Motor Upgrade Waste Water Treatment Plant - Primary Sludge Pump Orangetown, NY Calculate energy savings with replacement of old, inefficient 3-Phase motors with new, Premium efficient motors. Electrical Energy Cost Electrical Demand Cost Existing Motor Size Existing Motor Efficiency Existing Motor Voltage Existing Load RPM Existing Hours of use Existing Motor kW Select one method of loading: ( New Motor Size New Motor Efficiency New Motor Voltage New Load RPM New Hours of use New Motor kW Select one method of loading: ( 20 hp x 0 amps x 0.746 kW/hp x load factor 230 volts x sq rt of 3) / 75% 75% 85% 80% 6 months (Estimated) (Estimated) (Estimated) (Estimated) (Estimated) 0.75 = 0.85 pf = = = = = = = 20 hp x amps x 0.746 kW/hp x load factor 230 volts x sq rt of 3) / 20 hp 94% 230 1170 8,760 11.2 kW 0.75 = 0.85 pf == = = = = = = = = $0.116 $0.00 20 92% 230 1170 8,760 11.2 $/kWh $/kW hp (From Rate Schedule) (From Rate Schedule) (From Site survey) OK (From measurement or nameplate) (From Site survey or nameplate) (From measurement or nameplate) (From Site survey) hrs kW 0 kW 11.19 kW 0 kW (From Site survey) OK (From measurement or nameplate) (From Site survey or nameplate) (From measurement or nameplate) (From Site survey) 0 kW 11.19 kW 0 kW Assumption Existing Motor Load Factor New Motor Load Factor Power Factor Demand Utilization Factor Peak Load Months Motor (kW) = Speed Ratio Correction Factor = Existing Energy Use (kWh)= Existing Demand Use (kW) = New Energy Use (kWh) = New Demand Use (kW) = Total Savings (kWh, kW) = = = = = = Formula (Motor Horsepower x 0.746 (kW/HP) x Load Factor) = or = (Motor Amperage x Volts x 1.732) / (Power Factor) ((New RPM)/(Existing RPM)) ^ 3 (Existing kW /Existing Efficiency) x Hours of Use (Existing kW /Existing Efficiency) x Peak Load Months x Utilization factor (New kW /New Efficiency) x Hours of Use x Speed Ratio Correction Factor (New kW /New Efficiency) x Peak Load Months x Utilization factor x Speed Ratio Correction Factor (kWh existing - kWh new) x $/kWh + (kW existing - kW new) x $/kW Calculation Speed Ratio Correction Factor = ((New RPM) / (Existing RPM)) ^ 3 Speed Ratio Correction Factor = (( 1170 )/( 1170 )) ^ 3 Existing Energy = Existing kW Exist. Eff Existing Energy = 11.19 / 0.92 x Existing Demand = Existing kW Exist. Eff Existing Demand = 11.19 / 0.92 x New Energy = New kW New Eff New Energy = 11.19 / 0.94 x New Demand = New kW New Eff New Demand = 11.19 / 0.94 x Total Savings = (( Existing Energy New Energy Total Savings = (( 106,897 104,727 )*( Annual Existing Costs (kWh) Annual Existing Costs (kW) Annual Existing Costs $ Annual New Costs (kWh) Annual New Costs (kW) Annual New Costs $ 100% Annual Savings (kWh) Annual Savings (kW) Total Savings $ 106,897 kWh/yr 58.6 kW/yr $12,399 $0 $12,399 $12,147 $0 $12,147 $252 $0 $252 = oper hrs 8760 Pk Load Mo Util factor 6 x 80% oper hrs Speed Factor 8760 1.00 Pk Load Mo Util factor 6 x 80% $/kWh Ex. Demand $0.12 )) + (( + 58.6 = = = Speed Factor 1.00 = New Demand 57.4 )*( 1.00 106,897 kWh 58.6 kW 104,727 kWh 57.4 kW $/kWh $0.00 )) = $252 Result 104,727 kWh/yr 57.4 kW/yr 2170 kWh/yr 1.2 kW/yr 2% of existing Page 45 of 46 Siemens Building Technologies, Inc. All Measures Exhibit C – Performance Assurance Town of Orangetown Table C-2.4: Secondary Sludge Pump Replacement – Wastewater Treatment Plant Title Project Site Discription Given Energy Efficient Motor Upgrade Waste Water Treatment Plant - Secondary Sludge Pump Orangetown, NY Calculate energy savings with replacement of old, inefficient 3-Phase motors with new, Premium efficient motors. Electrical Energy Cost Electrical Demand Cost Existing Motor Size Existing Motor Efficiency Existing Motor Voltage Existing Load RPM Existing Hours of use Existing Motor kW Select one method of loading: ( New Motor Size New Motor Efficiency New Motor Voltage New Load RPM New Hours of use New Motor kW Select one method of loading: ( 15 hp x 0 amps x 0.746 kW/hp x load factor 430 volts x sq rt of 3) / 75% 75% 85% 80% 6 months (Estimated) (Estimated) (Estimated) (Estimated) (Estimated) 0.75 = 0.85 pf = = = = = = = 15 hp x amps x 0.746 kW/hp x load factor 430 volts x sq rt of 3) / 15 hp 93% 430 1760 8,760 8.4 kW 0.75 = 0.85 pf == = = = = = = = = $0.116 $0.00 15 83% 430 1760 8,760 8.4 $/kWh $/kW hp (From Rate Schedule) (From Rate Schedule) (From Site survey) OK (From measurement or nameplate) (From Site survey or nameplate) (From measurement or nameplate) (From Site survey) hrs kW 0 kW 8.393 kW 0 kW (From Site survey) OK (From measurement or nameplate) (From Site survey or nameplate) (From measurement or nameplate) (From Site survey) 0 kW 8.393 kW 0 kW Assumption Existing Motor Load Factor New Motor Load Factor Power Factor Demand Utilization Factor Peak Load Months Motor (kW) = Speed Ratio Correction Factor = Existing Energy Use (kWh)= Existing Demand Use (kW) = New Energy Use (kWh) = New Demand Use (kW) = Total Savings (kWh, kW) = = = = = = Formula (Motor Horsepower x 0.746 (kW/HP) x Load Factor) = or = (Motor Amperage x Volts x 1.732) / (Power Factor) ((New RPM)/(Existing RPM)) ^ 3 (Existing kW /Existing Efficiency) x Hours of Use (Existing kW /Existing Efficiency) x Peak Load Months x Utilization factor (New kW /New Efficiency) x Hours of Use x Speed Ratio Correction Factor (New kW /New Efficiency) x Peak Load Months x Utilization factor x Speed Ratio Correction Factor (kWh existing - kWh new) x $/kWh + (kW existing - kW new) x $/kW Calculation Speed Ratio Correction Factor = ((New RPM) / (Existing RPM)) ^ 3 Speed Ratio Correction Factor = (( 1760 )/( 1760 )) ^ 3 Existing Energy = Existing kW Exist. Eff Existing Energy = 8.39 / 0.83 x Existing Demand = Existing kW Exist. Eff Existing Demand = 8.39 / 0.83 x New Energy = New kW New Eff New Energy = 8.39 / 0.93 x New Demand = New kW New Eff New Demand = 8.39 / 0.93 x Total Savings = (( Existing Energy New Energy Total Savings = (( 88,576 79,052 )*( Annual Existing Costs (kWh) Annual Existing Costs (kW) Annual Existing Costs $ Annual New Costs (kWh) Annual New Costs (kW) Annual New Costs $ 100% Annual Savings (kWh) Annual Savings (kW) Total Savings $ 88,576 kWh/yr 48.5 kW/yr $10,274 $0 $10,274 $9,169 $0 $9,169 $1,105 $0 $1,105 = oper hrs 8760 Pk Load Mo Util factor 6 x 80% oper hrs Speed Factor 8760 1.00 Pk Load Mo Util factor 6 x 80% $/kWh Ex. Demand $0.12 )) + (( + 48.5 = = = Speed Factor 1.00 = New Demand 43.3 )*( 1.00 88,576 kWh 48.5 kW 79,052 kWh 43.3 kW $/kWh $0.00 )) = $1,105 Result 79,052 kWh/yr 43.3 kW/yr 9524 kWh/yr 5.2 kW/yr 11% of existing Page 46 of 46 Siemens Building Technologies, Inc. All Measures

Related docs
Guaranteed
Views: 2  |  Downloads: 0
card credit guaranteed uk
Views: 17  |  Downloads: 0
The Guaranteed Investment Contract (GIC)
Views: 4  |  Downloads: 0
ARTICLES
Views: 5  |  Downloads: 1
Featured Article
Views: 69  |  Downloads: 0
Articles Of Confederation Summary
Views: 1070  |  Downloads: 4
i article summary
Views: 0  |  Downloads: 0
Articles
Views: 27  |  Downloads: 0
premium docs
Other docs by dave Mo
O Keeffe v Snyder _ADv of chattels
Views: 868  |  Downloads: 12
Spivey v Battaglia_Brief
Views: 376  |  Downloads: 7
Short Summary of US History: 1900 to 2006
Views: 930  |  Downloads: 12
dv105k
Views: 146  |  Downloads: 0
Vogt Peterson Breifs
Views: 424  |  Downloads: 4
Glossary-Indian
Views: 757  |  Downloads: 26
Acquisition by capture
Views: 163  |  Downloads: 0
Perrin_Evidence
Views: 354  |  Downloads: 29
Deep Calls to Deep
Views: 187  |  Downloads: 0
de165
Views: 112  |  Downloads: 0
I Will Enter His Gates
Views: 950  |  Downloads: 5
dv100
Views: 254  |  Downloads: 1
Slattery Betterton
Views: 214  |  Downloads: 0
Blue Skies and Rainbows
Views: 428  |  Downloads: 2