					Item                                                                     Quantity   Rate       Amount
 No
       BILL 1
       PRELIMINARIES
       NOTES
       NOTES:
       The agreement is to be the JBCC Series 2000 Principal
       Building Agreement prepared by the Joint Building Contract
       Committee July 2007 edition 5.0 code 2101

       The ASAQS Preliminaries (November 2007 Edition) published
       by the Association of South African Quantity Surveyors for use
       with the said JBCC Principal Building Agreement shall be
       deemed to be incorporated herein.

       Tenderers are referred to the abovementioned documents for
       the full intent and meaning of each clause thereof. These
       clauses are hereinafter referred to by clause number and
       heading only.

       Where standard clauses or alternatives are not entirely
       applicable to this contract such modifications, corrections or
       supplements as will apply are given under each relevant clause
       heading and such modifications, corrections or supplements
       shall take precedence notwithstanding anything contrary
       contained in the abovementioned documents.

       Where any item is not relevant to this specific contract such
       item is marked N/A, signifying "not applicable".

       PREAMBLES FOR TRADES

       The Model Preambles for Trades (1999 Edition) as published
       by the Association of South African Quantity Surveyors shall be
       deemed to be incorporated in these Bills of Quantities and no
       claims arising from brevity of description of items fully
       described in the said Model Preambles will be entertained.
       Supplementary preambles are incorporated in these Bills of
       Quantities to satisfy the requirements of this project. Such
       supplementary preambles shall take precedence over the
       provisions of the said Model Preambles. The contractor's
       prices for all items throughout these Bills of Quantities must
       take account of and include for all of the obligations,
       requirements and specifications given in the said Model
       Preambles and in any supplementary preambles.




                                                 Carried to Collection                     R
       Section No. 1
       SECTION 4A - PRELIMINARIES
       Bill No. 1
       Preliminaries
       2010J023
       Cuff


                                                         -1-
    SECTION A : PRINCIPAL BUILDING
    AGREEMENT

    Definitions (A1)

A        Definitions and Interpretation                              Item

    Objective and Preparation (A2-A14)

B        Offer, acceptance and performance obligations               Item

C        Documents                                                   Item

D        Design Responsibility                                       Item

E        Employer's Agents                                           Item

F        Contractor's Site Representative                            Item

G        Compliance with laws and regulations                        Item

H        Works Risk                                                  Item

J        Indemnities                                                 Item

K        General Insurances                                          Item

L        Special Insurances                                          Item

M        Effecting Insurances                                        Item

N        Assignment                                                  Item

P        Security                                                    Item

    Execution (A15- A23)

Q        Preparation for and execution of the works                  Item

R        Site and Access                                             Item

S        Specific security and access restrictions apply. Refer
         Section C of Preliminaries.                                 Item




                                             Carried to Collection          R
    Section No. 1
    SECTION 4A - PRELIMINARIES
    Bill No. 1
    Preliminaries
    2010J023
    Cuff


                                                      -2-
A       Contract Instructions

        Supervision by the Principal Agent and other Agents is
        intended as a means of checking the interpretation of work
        done and providing clarification and further information
        where required during the progress of the work.
        Supervision shall not in any way relieve the contractor of
        his responsibility for ensuring that the work is carried out
        satisfactorily in all aspects, in good time and in accordance
        with the contract. Although the principal Agent and the
        other Agents will make spot checks from time to time on
        dimensions and levels as the work proceeds, checking of
        the setting out, dimensions levels and positioning for all
        items is the contractors responsibility and should any
        errors occur during the course of or be found after
        completion of the Works, the cost of remedying same will
        be for the Contractor's account.                                Item

B       Setting out of the Works                                        Item

C       The contractor shall notify the principal agent if any
        encroachments of adjoining buildings, structures,
        boundries, etc. exist in order that the necessary
        arrangements may be made for the rectification of any
        such encroachments.                                             Item

D       Temporary Works and Plant                                       Item

E       Nominated subcontractors                                        Item

F       Selected subcontractors                                         Item

G       Employer's Direct Contractors                                   Item

H       Contractor's domestic subcontractors Completion (A24-
        A30)                                                            Item

    Completion (A24-A30)

J       Practical Completion                                            Item

K       Works Completion                                                Item

L       Final Completion                                                Item

M       Nothing in clause 26 shall be construed so as to restrict or
        remove in any way the contractor's liability for any latent
        defects and any insufficiencies in the works or materials
        nor to prescribe the employers common law rights in any
        way.                                                            Item


                                             Carried to Collection             R
    Section No. 1
    SECTION 4A - PRELIMINARIES
    Bill No. 1
    Preliminaries
    2010J023
    Cuff


                                                     -3-
A       Latent defects liability period                                 Item

B       Sectional Completion Revision of date for Practical
        completion. The removal and replacement of materials
        and/or workmanship that do not conform to the description
        shall not constitute grounds for an extension of the
        construction period nor for an adjustment to the contract
        sum.                                                            Item

C       Penalty for late or noncompletion                               Item

    Payment (A31- A35)

D       Interim Payment - Notwithstanding this or any other
        clause, materials and goods stored off site shall not be
        included in the amount authorised for payment.                  Item

E       Material on site shall be paid to the maximum as
        determined by the Employers Financier.                          Item

F       Clause 31.9 : Replace "seven (7) calendar days" with
        "fourteen (14) calendar days."                                  Item

G       Adjustment to the Contract Value
        All fluctuations in costs, with the exception of fluctuations
        in the rate of Value Added Tax, shall be for the account of
        the contractor. Where prices are submitted by the
        contractor or n/s subcontractor during the progress of the
        works in respect of contract instructions or in regard to a
        claim under the terms of the contract and notwithstanding
        the fact that such prices may be used in an interim
        payment certificate, there is to be no presumption of
        acceptance. Should the principal agent wish to accept any
        such prices prior to the issue of the Final Payment
        Certificate, it shall be in writing. CPAP is not applicable.    Item

H       Recovery of expense or loss                                     Item

J       Final Account and Final Payment                                 Item

K       Payment to other parties                                        Item

    Termination (A36- A39)

L       Termination by Employer - Contractor's default                  Item

M       Termination by Employer - Loss and damage                       Item

N       Termination by Contractor - Employer's default                  Item



                                             Carried to Collection             R
    Section No. 1
    SECTION 4A - PRELIMINARIES
    Bill No. 1
    Preliminaries
    2010J023
    Cuff


                                                     -4-
A        Termination - cessation of the works                           Item

    Disputes (A40)

B        Settlement of Disputes                                         Item

C        Clause 41.0 - Post Tender Provisions - The required post
         tender information shall be inserted in the post tender
         provisions after consultation with the contractor.             Item

D        Contract Agreement (A41-A42)                                   Item

E        Clause 42.0 - Contractual Agreement. The required
         information of the contracting parties and the amount of
         the accepted contract sum shall be inserted in the
         contractual agreement for signature of the agreement by
         the contracting parties.                                       Item


    SECTION B - PRELIMINARIES

    Definitions and interpretation

F        Clause 1.0 - Definitions and interpretation                    Item

    Documents

G        Clause 2.1 - Checking of documents                             Item

H        Clause 2.2 - Provisional bills of quantities
         These bills of quantities are in multiple procurement format
         - are provisionally measured and the subsequent trades
         are budgetary allowances and selected/ nominated
         subcontract amounts.                                           Item

J        Clause 2.3 - Availability of construction documentation
         The budgetary allowances and Selected/nominated
         subcontract amounts allocated for subsequent trades
         included in this document will be separately procured,
         based on multiple procurement of subcontractors during
         the construction period.                                       Item

    Previous work and adjoining properties

K        Clause 3.1 - Previous work - dimensional accuracy              Item

L        Clause 3.2 - Previous work - defects                           Item

M        Clause 3.3 - Inspection of adjoining properties                Item



                                              Carried to Collection            R
    Section No. 1
    SECTION 4A - PRELIMINARIES
    Bill No. 1
    Preliminaries
    2010J023
    Cuff


                                                       -5-
    Samples, shop drawings and manufacturer's instructions

A       Clause 4.1 - Samples of materials                              Item

B       Clause 4.2 - Workmanship samples                               Item

C       Clause 4.3 - Shop drawings                                     Item

D       Clause 4.4 - Compliance with manufacturer's instructions       Item

    Deposits and fees

E       Clause 5.1 - Deposits and fees                                 Item

    Temporary services

F       Clause 6.1 - Water                                             Item

G       Clause 6.2 - Electricity                                       Item

H       Clause 6.3 - Telecommunication facilities                      Item

J       Clause 6.4 - Ablution facilities                               Item

    Prime cost amounts

K       Clause 7.1 - Responsibility for prime cost amounts             Item

    Special attendance on n/s subcontractors

L       Clause 8.1 - Special attendance                                Item

    General

M       Clause 9.1 - Protection of the works                           Item

N       Clause 9.2 - Protection/isolation of existing/sectionally
        occupied works                                                 Item

P       Clause 9.3 - Security of the works                             Item

Q       Clause 9.4 - Notice before covering work                       Item

R       Clause 9.5 - Disturbance                                       Item

S       Clause 9.6 - Environmental disturbance                         Item

T       Clause 9.7 - Works cleaning and clearing                       Item

U       Clause 9.8 - Vermin                                            Item


                                               Carried to Collection          R
    Section No. 1
    SECTION 4A - PRELIMINARIES
    Bill No. 1
    Preliminaries
    2010J023
    Cuff


                                                      -6-
A        Clause 9.9 - Overhand work                                      Item

    Schedule of variables

    Information necessary for elections and completion of those
    clauses contained in the schedule which are necessary for
    tender purposes is given in Section 2 : "Contract Data EC"

    SECTION C: SPECIFIC PRELIMINARIES

B        Where warranties for materials and/or workmanship are
         called for, the contractor shall obtain a written warranty,
         addressed to the employer, from the firm supplying the
         materials and/or doing the work and shall deliver same to
         the principal agtent on the certified completion of the
         contract. The warranty shall state that workmanship,
         materials and installation are warranteed for a specified
         period from the date of final completion and that any
         defects that may arise during the specified period shall be
         made good at the expense of the firm supplying the
         materials and/or doing the work, upon written notice to do
         so. The warranty will not be enforced if the work is
         damaged by defects in the construction of the building in
         which case the responsibility for replacement shall rest
         entirely with the contractor.                                   Item

    SHOP DRAWINGS

C        The contractor and/or nominated/selected sub-contractor
         shall prepare and submit, at his own expense, three (3)
         copies of shop drawings of all fabricated work, working or
         setting out drawings shop details and schedules to the
         principal agent for approval prior to commencement of
         manufacture. Correction of shop drawings shall not
         constitute a change in scope of work unless the contractor
         notifies the principal agent in writing within seven (7) days
         and shall not proceed with fabrication until so authorized
         by the architect.                                               Item




                                              Carried to Collection             R
    Section No. 1
    SECTION 4A - PRELIMINARIES
    Bill No. 1
    Preliminaries
    2010J023
    Cuff


                                                      -7-
    SAMPLES

A       Samples are physical examples furnished by the
        contractor to illustrate materials, equipment or
        workmanship and to establish standards by which the work
        will be judged. The contractor shall furnish without delay
        such samples and "mock ups" as may be called for by the
        architect who may reject all material and workmanship not
        corresponding with the approved samples. Samples must
        be submitted in duplicate or as instructed and must allow a
        reasonable time for their consideration. Samples must be
        properly labelled with the project name and location,
        contractor's name, the type, finish composition of
        materials date of submission and the contract document
        reference in which the project is identified.                 Item

    OVERTIME

B       Should overtime be required to be worked for any reason
        whatsoever, the costs of such overtime are to be borne by
        the contractor unless the principal agent has specifically
        authorized in writing, prior to the execution thereof, that
        costs for such overtime are to be borne by the employer.      Item

    CO-OPERATION OF CONTRACTOR FOR COST
    CONTROL

C       It is specifically agreed that the contractor accepts the
        obligation of assisting the professional consultants in
        implementing proper cost control in an effort to prevent
        the final building cost from exceeding the budget. It is
        specifically agreed that the professionals and the
        contractor will endeavour to agree and sign off variations
        within sixty days of them arising.                            Item

    PROPRIETARY BRANDED PRODUCTS
D       The contractor shall take delivery of, handle, store, use
        apply and/or fix all proprietary branded products in strict
        accordance with the manufacturer's instruction after
        consultation with the manufacturer's authorized
        representative.                                               Item

    AS-BUILT DRAWINGS

E       The position of construction breaks and the extent of
        individual concrete pours are to be recorded by the
        contractor on the structural engineer's drawings and are to
        be submitted to the principal agent and the structural
        engineer for their records.                                   Item


                                             Carried to Collection           R
    Section No. 1
    SECTION 4A - PRELIMINARIES
    Bill No. 1
    Preliminaries
    2010J023
    Cuff


                                                      -8-
    SITE INSTRUCTIONS

A       Site instructions issued on site are to be recorded in
        triplicate in a site instruction book which is to be
        maintained on site by the contractor.                         Item

    LABOUR RECORD

B       At the end of each week the contractor shall provide the
        principal agent with a written record, in schedule form,
        reflecting the number and description of tradesmen and
        labourers employed by him and all subcontractors on the
        works each day.                                               Item

    PLANT RECORD

C       At the end of each week the contractor shall provide the
        principal agent with a written record, in schedule form,
        reflecting the number, type and capacity of all plant,
        excluding hand tools, currently used on the works.            Item

    HEALTH AND SAFETY ACT (Act 85 of 1993)
D       Compliance with the current Occupation Health and Safety
        Act and all relevant and applicable regulations, especially
        the Construction Health & Safety Act, (as amended) for the
        duration of the contract.                                     Item

    HIV AND AIDS POLICY

E       Observation of all legislation, policies and by-laws
        regulating the "AIDS" endemic and "HIV" prevention,
        treatment and observation.                                    Item

    NON CESSION OF MONIES

F       The contractor shall not cede nor assign his rights or
        claims to any monies due or to become due under this
        contract and no purported cession or assignment will be
        recognised without the written consent of the employer.       Item

    INSPECTION BY ARCHITECT

G       The Architect shall make such visits to the Works as he
        may from time to time deem necessary. In the event of any
        matter arising which the Contractor considers of such
        importance that the Architect must be consulted, every
        reasonable attempt shall be made by the Contractor to
        communicate with him before proceeding with the point at
        issue.                                                        Item


                                             Carried to Collection           R
    Section No. 1
    SECTION 4A - PRELIMINARIES
    Bill No. 1
    Preliminaries
    2010J023
    Cuff


                                                      -9-
A       It must, however, be borne in mind that the Architect is
        employed, to ensure correct compliance with the terms of
        this contract, proper building procedures in accordance
        with the best traditions of the various trades and adequate
        finishes as specified and to his satisfaction. The Architect
        is thus in no way responsible for any act or omission on the
        part of the Contractor which may result in any patent or
        latent defects in materials or workmanship, breach or
        neglect of any local regulations. The Contractor therefore
        remains at all times responsible for any neglect, deviation
        or wrong act, whether the same be discovered before or
        after the final certificate, or any other certificate is issued.   Item

    SETTING OUT OF BUILDINGS

B       A registered Land Surveyor shall set out the works, gather
        all relevant data such as datum levels, platform heights
        etc. and hand this information to the Principal Agent in an
        electronic format. The contractor shall submit on a weekly
        basis and updated "Schedule of Information Required" to
        all parties concerned, indicating dates upon which such
        information and details are required in relation to the
        building programme. Timeous advanced notice is to be
        given by the contractor for information or drawings which
        are required on site. The contractor shall be responsible
        for the timeous notification to the Quantity Surveyor to
        enable him to call for tenders for all work to be executed
        by selected sub-contractors and shall, therefore, notify the
        quantity surveyor in writing at least fourteen (14) days prior
        to required availability date of these tender documents. No
        claim whatsoever will be afterwards admitted due to the
        contractor having failed to comply with this condition.            Item




                                              Carried to Collection               R
    Section No. 1
    SECTION 4A - PRELIMINARIES
    Bill No. 1
    Preliminaries
    2010J023
    Cuff


                                                       -10-
    DRAWINGS AND DIMENSIONS

A       Upon receipt of detail drawings for any works, the
        contractor shall, before putting that work in hand, ascertain
        that the dimensions given on the detail drawings
        correspond with the dimensions of any work already built.
        In the event of a discrepancy between the detail drawings
        and the work already built, the discrepancy, shall be
        brought to the principal agent's attention who shall decide
        the procedure. All drawings, whatever their origin, are to
        be issued to the site, or to any other designated person or
        persons, only through the principal agent's office and shall
        bear the principal agent's office stamp and signature. An
        up to date register of all drawings issued to the contractor
        shall be kept on the works. Any other drawings used on the
        site will be used at the contractor's risk and should any
        work be incorrect due to the use of unauthorised drawings,
        the cost of rectifying such work shall be for the contractor's
        account. All drawings used on the works shall be properly
        mounted on suitable sheet material, or otherwise
        protected and kept in good condition. Any drawings
        becoming bleached or otherwise obscured so that they
        cannot be properly read shall be returned to the principal
        agent for replacement, as any errors due to misreading of
        damaged or obscured drawings shall be made good by the
        contractor at his own expense.                                   Item

    INJURY TO PERSONS OR PROPERTY

B       The Contractor shall in terms of the Compensation for
        Occupational Injuries and Diseases Act, 1993 (Act 130,
        1993) (COID Act) be registered with the Director General
        of the Department of Labour as an Employer by the name
        in which the accepted tender was submitted and for the
        intended line of business pertaining to the Contract and the
        relevant COID Act Section 83 Assessments shall be kept
        fully paid up throughout the duration of the Contract. The
        Contractor must allow under this clause for all
        requirements as specified in the Compensation for
        Occupational Injuries and Diseases Act, 1993 (Act 130,
        1993) and must fully adhere to all requirements and should
        allow to comply with all the relevant Legislation, as well as
        C.S.I.R Internal Services Health and Safety Specification -
        Annexure A. A safety audit will be done on a regular basis
        of all requirements.                                             Item




                                             Carried to Collection              R
    Section No. 1
    SECTION 4A - PRELIMINARIES
    Bill No. 1
    Preliminaries
    2010J023
    Cuff


                                                     -11-
    MEDIA RELEASES, ADVERTISING, ETC

A       All right of publication of articles in the media, together with
        any advertising relating to, or in any way connected with
        this project shall vest in the employer. The contractor,
        together with his sub-contractors shall not, without the
        written consent of the employer, cause any statement or
        advertisement to be printed, screened or aired by the
        media.                                                             Item

    SECURITY

B       The site is within a security village. The contractor will be
        subject to the rules of the estate as it may apply and
        change from time to time. Working hours are restricted.
        The current allpicable rules form part of this tender
        document and is attached. Workers, supervisors,
        suppliers, sub-contractors may be required to register and
        pay for a contractor's access card                                 Item

    PRIME COST AMOUNTS
C       Notwithstanding any information to the contrary in the
        contract document or preliminaries, references to "Prime
        Cost" or "PC" shall mean the cost at which an item or
        material is obtained inclusive of delivery to site and
        exclusive of value added tax. Unless otherwise stated
        installation is not included in the Prime Cost and the
        contractor is to include this in his rate. The prime Cost
        does not include any allowance for wastage and refers to
        cost per net measurable unit. The contractor is to allow for
        wastage, shrinkage, bulking etc.                                   Item




                                               Carried to Collection              R
    Section No. 1
    SECTION 4A - PRELIMINARIES
    Bill No. 1
    Preliminaries
    2010J023
    Cuff


                                                       -12-
Section No. 1

SECTION 4A - PRELIMINARIES

Bill No. 1

Preliminaries

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                            -1-

                                                               -2-

                                                               -3-

                                                               -4-

                                                               -5-

                                                               -6-

                                                               -7-

                                                               -8-

                                                               -9-

                                                              -10-

                                                              -11-

                                                              -12-




                                 Carried to Final Summary            R
Section No. 1
SECTION 4A - PRELIMINARIES
Bill No. 1
Preliminaries
2010J023
Cuff


                                            -13-
Item                                                                       Quantity   Rate       Amount
 No
       BILL NO 1
       ALTERATIONS
       SUPPLEMENTARY PREAMBLES

       View site

       Before submitting his tender the contractor shall visit the site
       and satisfy himself as to the nature and extent of the work to be
       done and the value of the materials contained in the buildings
       or portions of the buildings to be demolished. No claim for any
       variations of the contract sum in respect of the nature and
       extent of the work or of inferior or damaged materials will be
       entertained

       General

       Water supply pipes and other piping that may be encountered
       and found necessary to disconnect or cut, shall be effectually
       stopped off or grubbed up and removed, and any new
       connections that may be necessary shall be made with proper
       fittings, to the satisfaction of the principal agent

       Making good of finishes shall include making good of the brick
       and concrete surfaces onto which the new finishes are applied,
       where necessary

       The contractor will be required to take all dimensions affecting
       the existing buildings on the site and he will be held solely
       responsible for the accuracy of all such dimensions where used
       in the manufacture of new items (doors, windows, fittings, etc)

       Removing of material shall include loading and carting away to
       a dump-site located by the contractor. It shall include any
       dimping fees etc

       Old materials

       Old materials resulting from the alterations and demolitions are
       to be removed from the site unless otherwise specified




                                                 Carried to Collection                       R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 1
       Alterations
       2010J023
       Cuff


                                                         -14-
Notices

Special care is to be experienced not to interfere unnecessarily
with any electrical or telephone installations that may be met
with and due notice is to be given to the Principal Agent when
any disconnections or removal of wires, fittings, etc are
necessary and the contractor is to afford every facility to the
electricians carrying out this work

Demolitions

All demolition work is to be carried out in accordance with the
Local By-laws and to the requirements of the requirements of
the Local Health Authorities. The contractor is to allow for
giving notices and paying any fees related to municipal
requirements

All demolition work is to be carried out in strict accordance with
the instructions and to the satisfaction of the Principal Agent

Temporary coverings, Screens etc.

The contractor will be held responsible for any damage to
property or goods in the existing buildings due to his not having
taken adequate precautions, and all damage caused is to be
made good at the contractors own expense. The contractor
must provide for all necessary screens, partitions, tarpaulins,
barriers, signage, demarcation etc. to protect the work and
prevent any nuisance from dust as may be required or directed.


Damage to persons or property

The contractor will be held responsible for any damage to
persons or property and for the safety of the structures and he
is to allow for protecting and indemnifying persons using the
existing buildings from injury by virtue of the building
operations, including providing necessary barriers, signs, etc.

Setting out

All dimensions affecting work in the existing buildings are to be
taken on the site and the contractor will be responsible for
taking correct sizes of all new work, the sizes given in this bill
are approximate.




                                           Carried to Collection     R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 1
Alterations
2010J023
Cuff


                                                   -15-
Making good

Prices for all works described throughout the Bills of Quantities
are to include for making good, whether specifically mentioned
or not in all trades except Painting, unless otherwise described.

The contractor must make good to existing work damaged or
disturbed through alterations and to existing work remaining
after doors, screens, fittings, walls, etc are removed, by fitting in
short lengths of skirtings, architrave's, etc. and taking out and
making good suspended ceilings and floors on necessary
joists etc. Plaster finishing to walls and ceilings and rendering
floor tiles, etc, to floors for facing up walls with brickwork cut,
toothed and bonded to existing with facing bricks, quarry tiles
or common brickwork to receive finishing, unless otherwise
described

All materials in making good are to match existing and the work
is to be left complete and perfect in every respect.

Fixing in position

Fixing new and re-fixing existing materials is to include for
cutting and fitting over existing skirtings, cornices, quadrants,
etc. or for cutting existing work and for finishing up to new and
for making good as previously described

Re-fixing existing materials is to include for all necessary
cutting to suit, forming mitres, fair ends, etc, for supplying short
lengths of new materials to make up for any deficiencies and
for supplying new screws, nails, etc. as is necessary.

Junction of new and existing

Making good at junctions of new and existing works is to
include for piercing out, cutting through and removing short
lengths of existing materials and for jointing to match existing.

Credit For old Materials

Provision is made in the final summary to quote the value of
materials in summary to be taken into consideration when
adjudicating the tenders. The rates below are to be free of said
values. Only items marked as "(Credit)" to be taken into
consideration

REMOVAL OF EXISTING WORK




                                            Carried to Collection       R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 1
Alterations
2010J023
Cuff


                                                     -16-
    Break down and remove brickwork etc

A        One brick wall with facebrick finish one side (Gables)       m2    15

    Hack up and remove

B        Surface bed 100mm thick, level and compact to receive
         new surface bed                                              m2    40

C        Surface bed 100mm thick, excavate and remove in situ
         material, level and compact to receive new surface bed
         85mm lower than before                                       m2    44

D        Conrete strip footing 600 x 300mm                            m      5

    Take up / hack up / hack off, remove and prepare to receive
    new finish

E        Ceramic floor tiles                                          m2     9

F        Ceramic wall tiles                                           m2    12

G        Stretch carpets                                              m2    79

    Carefully take out and remove sanitary fittings and taps
    and prepare water supply pipes and waste pipes for new
    fiittings to be installed later, including temporary plugging
    and blocking off (Credit)

H        Wash hand basin on and including wall bracket, with two
         pillar taps                                                  No     1

J        Wash hand basin on and including pedestal, with two pillar
         taps                                                       No       1

K        WC Pan and Cistern                                           No     2

L        Built-in PVC bath and mixer / taps                           No     1

M        Shower undertile stopcocks / mixer, shower arm and rose      No     2

N        Sink and mixer                                               No     1

    Take down and set aside for re-use

P        Single timber door                                           No     3

Q        Carefully remove Main Roof structure (approx 140m2)
         including Roof Coverings and wood work to be kept aside
         for later use (Credit)                                            Item


                                              Carried to Collection               R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 1
    Alterations
    2010J023
    Cuff


                                                     -17-
    Take down or out and remove including cutting, grinding
    etc as may be required

A       Gypsum ceilings and brandering                                   m2   125

B       Sheet metal roof cladding (Credit)                               m2   179

C       Steel balustrades (Credit)                                       m     22

D       Single timber door (Credit)                                      No     1

E       Sliding alumimium door size 3250 x 2125mm high
        including removal of precast concrete lintel and including
        temporary propping of overhead brickwork
        (Credit)                                                         No

F       Glazed steel window size 600 x 900 mm high from one
        brick wall with facebrick one side and plaster other side
        including removal of precast concrete lintel, clay sloping sill
        and prepare to receive new aluminium window (elsewhere)
        and including temporary propping of overhead brickwork          No      2

G       Glazed steel window size 1700 x 2125 mm high from one
        brick wall with facebrick one side and plaster other side
        including removal of precast concrete lintel, clay sloping sill
        and prepare to receive new aluminium window (elsewhere)
        and including temporary propping of overhead brickwork          No      1

H       Glazed steel window size 1500 x 1500 mm high from one
        brick wall with facebrick one side and plaster other side
        including removal of precast concrete lintel, clay sloping sill
        and prepare to receive new aluminium window (elsewhere)
        and including temporary propping of overhead brickwork          No      1

J       Glazed steel window size 2500 x 1500 mm high from one
        brick wall with facebrick one side and plaster other side
        including removal of precast concrete lintel, clay sloping sill
        and prepare to receive new aluminium window (elsewhere)
        and including temporary propping of overhead brickwork          No      1

K       Kitchen floor and wall cabinets (Credit)                              Item

L       Toiletroll holders, soapdishes, curtain tracks, mirrors, towel
        rails etc (Credit)                                                    Item

M       Carport roof steel structure (approximately 40m2) including
        supports, brackets etc (Credit)                                       Item

N       Patio steel roof structure (approximately 30m2) including
        supports, brackets etc (Credit)                                       Item


                                             Carried to Collection                   R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 1
    Alterations
    2010J023
    Cuff


                                                     -18-
    Take out and remove and set aside for later re-fitment in
    same position

A        Sliding door size 3250 x 2125mm high including protectoin
         of bottom sliding track during construction and including
         removal of top track and precast concrete lintel and
         prepare to receive new aluminium sliding folding door
         (elsewhere) and including temporary propping of overhead
         brickwork
                                                                      No     3

    Chisel out and remove, and prepare for new brickwork

B        Single steel door frame                                      No     1

C        Single steel door frame and prepare opening to receive
         new aluminium door (elsewher)                                No     1

    Carefully disassemble and set aside for later re-installation


D        Wardrobe 3250mm long x 2470mm high                           No   1.00

    Cut into existing and remove

E        100mm Thick concrete surface bed and excavate 400mm
         deep below for new foundation 700mm wide x 230mm
         thick (elsewhere) inlcuding backfill, making good surface
         bed and screeds                                              m      6

F        100mm Thick concrete surface bed and demolish and
         remove patio foundation wall average 800mm high              m     12

G        Half brick wall with facebrick finish both sides in small
         panel to accommodate staircase protrution size 1000 x
         500mm high(including cutting into existing and making
         good all finishes)                                           No     1

H        One brick wall with facebrick finish both sides in panel to
         accommodate window (includding cutting into existing and
         making good all finishes)                                   m2      8

    Cut into and leave remaining in place

J        Cut into existing roof sheeting through purlins              m     12




                                              Carried to Collection               R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 1
    Alterations
    2010J023
    Cuff


                                                      -19-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 1

Alterations

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -14-

                                                              -15-

                                                              -16-

                                                              -17-

                                                              -18-

                                                              -19-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 1
Alterations
2010J023
Cuff


                                           -20-
Item                                                                            Quantity   Rate       Amount
 No
       BILL 2
       EARTHWORKS ( PROVISIONAL)
       SUPPLEMENTARY PREAMBLES

       Engineer's Specification

       Refer to the specifications prepared by Ellis Engineers dated 5
       March 2010

       Net measurements

       All units of measurement are net and no allowance have been
       made for bulking

       Nature of ground

       The nature of the ground is assumed to be loose sandy/ clay
       material, therefore "earth", but possibly interspersed with "hard
       rock" or "soft rock"

       Carting away of excavated material

       Descriptions of carting away of excavated material shall be
       deemed to include loading excavated material onto trucks
       directly from the excavations or, alternatively, from stock piles
       situated on the building site, paying any fees levied by the
       authorities including estate management, etc

       EXCAVATION, FILLING, ETC OTHER THAN BULK


       Excavation in earth not exceeding 2m deep (

  A         Trenches and Holes                                             m3         13

  B         Holes for underpinning alongside and below existing
            foundations (over-excavation to allow for 1m wide
            workspace included). Rate to include risk of collapse of
            sides.                                                         m3         18

       Extra over trench and hole excavations in earth for
       excavation in (including allowance for excavation for raft
       foundation)

  C         Soft rock                                                      m3          1



                                                  Carried to Collection                           R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 2
       Earthworks
       2010J023
       Cuff


                                                          -21-
A        Hard rock                                                     m3     1

    Extra over underpinning excavations in earth for
    excavation in

B        Soft rock                                                     m3     2

C        Hard rock                                                     m3     1

    Extra over all excavations for carting away (Rafts
    excavation elsewhere)

D        Surplus material from excavations and/or stock piles on
         site to a dumping site located by the contractor.             m3    20

    Risk of collapse of excavations (Rafts excavation
    elsewhere)

E        Sides of trench and hole excavations not exceeding 1,5m
         deep                                                          m2    41

    Keeping excavations free of water (Rafts excavation
    elsewhere)

F        Keeping excavations free of all water other than
         subterranean water                                                 Item

    Earth filling obtained from the excavations and/or
    prescribed stock piles on site compacted to 95% Mod
    AASHTO density (Rafts excavation elsewhere)

G        Backfilling to trenches, holes, etc                           m3    19

    SOIL POISONING

    Soil insecticide (Under Rafts is measured elsewhere)

H        To bottoms and sides of trenches etc                          m2    64




                                               Carried to Collection               R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 2
    Earthworks
    2010J023
    Cuff


                                                      -22-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 2

Earthworks

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -21-

                                                              -22-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 2
Earthworks
2010J023
Cuff


                                           -23-
Item                                                                       Quantity   Rate       Amount
 No
       BILL 3
       CONCRETE, FORMWORK AND
       REINFORCEMENT
       SUPPLEMENTARY PREAMBLES

       Cost of tests

       The costs of making, storing and testing of concrete test cubes
       as required under clause 7 "Tests" of SABS 1200 G shall
       include the cost of providing cube moulds necessary for the
       purpose, for testing costs and for submitting reports on the
       tests to the architect. The testing shall be undertaken by an
       independent firm or institution nominated by the contractor to
       the approval of the architect. (Test cubes are measured
       separately)

       Formwork

       Description of formwork shall be deemed to include use and
       waste only (except where described as "left in" or "permanent"),
       for fitting together in the required forms, wedging, plumbing and
       fixing to true angles and surfaces as necessary to ensure easy
       release during stripping and for reconditioning as necessary
       before re-use

       The vertical strutting shall be carried down to such construction
       as is sufficiently strong to afford the required support without
       damage and shall remain in position until the newly constructed
       work is able to support itself.

       Formworks to soffits of solid etc shall be deemed to be slabs
       not exceeding 250mm thick unless otherwise described

       Formwork to sides of bases, pile caps, ground beams, etc will
       only be measured where it is prescribed by the engineer for
       design reasons. Formwork necessitated by irregularity or
       collapse of excavated faces will not be measured and the cost
       thereof shall be deemed to be included in the allowance for
       taking the risk of collapse of the sides of the excavations,
       provision for which is made in "Earthworks"




                                                 Carried to Collection                       R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 3
       Concrete Formwork & Reinforcement
       2010J023
       Cuff


                                                         -24-
    UNREINFORCED CONCRETE

    25MPa/19mm concrete

A        Aprons, vanities, seats, etc                                 m3    1

B        Surface beds                                                 m3    3

C        Surface beds, in patching                                    m3    1

    REINFORCED CONCRETE

    25MPa /19mm concrete

D        Strip footings and column footings                           m3    6

E        Underpinning of existing foundations                         m3    8

F        Slabs including beams and inverted beams                     m3   20

G        Stairs and landings                                          m3    2

    TEST BLOCKS

H        Making and testing of three 150 x 150 x 150mm concrete
         strength test cubes per set                                  No   20

    CONCRETE SUNDRIES

    Finishing top surfaces of concrete smooth with a steel
    trowel

J        Surface beds, slabs, etc                                     m2   13

    ROUGH FORMWORK (DEGREE OF ACCURACY
    III)
    Rough formwork to sides

K        Underpinning footings                                        m2   16

L        Upstand beams                                                m2

M        Edges, risers, ends and reveals not exceeding 300mm
         high or wide. (Note edge of slab where supported in centre
         of 230mm brickwall is not measured.)                         m    107

N        Sloping and stepped outer edges of stairs not exceeding
         300mm high extreme                                           m    15



                                              Carried to Collection              R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 3
    Concrete Formwork & Reinforcement
    2010J023
    Cuff


                                                     -25-
    Rough formwork to soffits

A        Slabs propped up not exceeding 3,50m high                 m2     105

B        Landings                                                  m2       1

C        Stairs with sloping soffits propped up not excedding 3,50m
         high                                                       m2      7

    Rough formwork to sides and soffits

D        Beams and inverted beams propped up not exceeding
         3.5m high                                                 m2      16

    SLEEVES

    0,6mm uPVC sleeves for pipes exceeding 100mm and not
    exceeding 200mm diameter

E        Sleeves exceeding 250mm and not exceeding 500mm
         long                                                      No      10

    REINFORCEMENT

    Mild steel reinforcement to structural concrete work

F        8 mm Diameter bars MS                                       t

    High tensile steel reinforcement to structural concrete
    work

G        32mm Diameter bars                                          t   3.139

H        25mm Diameter bars                                          t

J        20mm Diameter bars                                          t

K        16mm Diameter bars                                          t

L        12mm Diameter bars                                          t

M        10mm Diameter bars                                          t




                                           Carried to Collection                 R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 3
    Concrete Formwork & Reinforcement
    2010J023
    Cuff


                                                   -26-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 3

Concrete Formwork & Reinforcement

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -24-

                                                              -25-

                                                              -26-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 3
Concrete Formwork & Reinforcement
2010J023
Cuff


                                           -27-
Item                                                                         Quantity   Rate       Amount
 No
       BILL 4
       PRECAST CONCRETE
       SUPPLEMENTARY PREAMBLES

       Sizes:

       Blocks, sills, etc measured linear shall be made in suitable
       lengths. Large size setting out drawings shall be prepared
       where necessary and submitted to the architect for approval
       before moulds are made

       General:

       Where kerbstones, blocks, etc are laid in ground descriptions
       shall be deemed to include necessary excavation, filling in and
       ramming

       PRECAST CONCRETE
       Precast lintels 75x110mm

  A         Standard precast concrete lintels                            m         42




                     Carried Forward to Summary of Section No. 2                               R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 4
       Precast Concrete
       2010J023
       Cuff


                                                        -28-
Item                                                                            Quantity   Rate       Amount
 No
       BILL 5
       MASONRY
       SUPPLEMENTARY PREAMBLES

       BRICKWORK

       Sizes in descriptions

       Where sizes in descriptions are given in brick units, "one brick"
       shall represent the length and "half brick" the width of a brick

       Hollow walls etc

       Descriptions of hollow walls shall be deemed to include leaving
       every fifth perpend of the bottom course of the external skin
       open as a weep hole.

       Walls in two skins described as "bagged and sealed" shall be
       deemed to include having the outer face of the inner skin
       bagged with 1:6 cement and sand mixture and sealed with two
       coats "Brixeal" bitumen emulsion waterproofing coating.

       Face bricks

       Face Bricks shall be ordered timeously to obtain uniformity in
       size and colour. Face Bricks to be selected from three pallets
       simultaneosly to avoid to ensure uniformity of colour.

       Pointing

       Descriptions of recessed pointing to fair face brickwork and
       face brickwork shall be deemed to include square recessed,
       hollow recessed, weathered pointing, etc

       FOUNDATIONS

       Brickwork of NFP bricks in class II mortar

  A         230m Brick walls                                               m2         23

  B         Mass brickwork in Piers and Columns                            m3          1

       SUPERSTRUCTURE




                                                 Carried to Collection                            R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 5
       Masonry
       2010J023
       Cuff


                                                         -29-
    Brickwork of NFP bricks in class II mortar

A        Mass brickwork in Piers and Columns                            m3    9

B        Chimneys                                                       m3

C        115mm walls                                                    m2   24

D        230mm Walls                                                    m2   110

E        230mm Walls in bricking up openings                            m2    2

    BRICKWORK SUNDRIES

    Brickwork reinforcement

F        75mm Wide reinforcement built in horizontally                  m    104

G        150mm Wide reinforcement built in horizontally                 m    282

    Turning pieces

H        115mm Wide turning piece to lintels etc                        m    28

    Built-in Braai.

J        Built-in Braai unit including flue and cowl at PC of R 4,000
         including delivery                                             No

    FACE BRICKWORK

    Facebrick with square recessed horisontal and vertical
    joints pointed maximum 10mm deep.(PC Amount
    R1,800.00 per thousand delivered)

K        Extra over brickwork for face brickwork in foundations         m2   18

L        Extra over brickwork for face brickwork                        m2   131

M        Extra over brickwork for face brickwork in bricking up
         openings                                                       m2    2

N        Brick-on-edge window sill set sloping                          m    12

P        Brick-on-edge lintel exposed on face and 110mm soffit          m    20

Q        Brick-on-edge lintel exposed on face and 110mm soffit, in
         existing wall where precast lintel removed, including
         making good of joint with facebrick finishes above             m     8



                                              Carried to Collection                R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 5
    Masonry
    2010J023
    Cuff


                                                      -30-
    STONE WALL LININGS ETC

    150mm Wide rough cut slate lining of 10mm to 20mm thick
    random size natural slate dry pack lining ) Contract rate to
    include material at Prime Cost of R 450/m2 delivered,
    labour, adhesive, jointing, wall ties as required, mark-up

A        On Walls                                                      m2    5

    PAVING

    110 x 220 x 50mm Brick pavers (PC amount R 130.00/m2)
    on 50mm riversand on approved weedkiller, including
    preparation.

B        Paving to falls, including edges, cutting etc                 m2   63




                                               Carried to Collection             R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 5
    Masonry
    2010J023
    Cuff


                                                         -31-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 5

Masonry

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -29-

                                                              -30-

                                                              -31-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 5
Masonry
2010J023
Cuff


                                           -32-
Item                                                                           Quantity   Rate       Amount
 No
       BILL 6
       WATERPROOFING
       SUPPLEMENTARY PREAMBLES

       Waterproofing

       Waterproofing of roofs, basements, etc shall be laid under a ten
       year guarantee. Waterproofing to roofs shall be laid to even
       falls to outlets etc with necessary ridges, hips and valleys.
       Descriptions of sheet or membrane waterproofing shall be
       deemed to include additional labour to turn-ups and turn-downs


       DAMP-PROOFING OF WALLS AND FLOORS

       One layer of 375 micron "Consol Plastics Brickgrip DPC"
       embossed damp proof course.

  A         In walls                                                      m2         13

  B         Under Cills                                                   m2          8

       One layer of 250 micron "Gunplas USB Green " waterproof
       sheeting sealed at laps with "Gunplas Pressure Sensitive
       Tape".

  C         Under Floors                                                  m2         40

  D         Under screeds                                                 m2         14

       WATERPROOFING TO BALCONIES

       One layer Derbigum Cover Grade CG3 and one layer CG4
       torch on waterproofing Membrane with 75mm side laps
       and 100mm end laps on concrete or screed surfaces, by
       approved specialist being a member of the Gauteng
       Waterproofing Association. Installation to carry a ten year
       guarantee

  E         On concrete floors                                            m2         14

  F         Seal edges at junction with parapet or balustrade including
            counter flashing                                              m           8

       WATERPROOFING TO WALLS, PARAPETS, ETC



                                                Carried to Collection                            R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 6
       Waterproofing
       2010J023
       Cuff


                                                        -33-
    Three coat "Fibre seal" fibre reinforced Acrylic
    waterproofing per manufacturer's specification

A        On parapet walls including 85mm turn down to bottom of
         top corbelling course                                        m2   20

B        On walls and floors of showers                               m2   15

C        Stepped Flashings Above Existing Roof                        m     8

    JOINT SEALANTS ETC

    Silicone sealing compound including backing cord, bond
    breaker, primer, etc

D        5 x 10mm In joints between tiles and sanitary fitting or
         worktop, etc                                                 m    18




                                              Carried to Collection             R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 6
    Waterproofing
    2010J023
    Cuff


                                                      -34-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 6

Waterproofing

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -33-

                                                              -34-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 6
Waterproofing
2010J023
Cuff


                                           -35-
Item                                                                          Quantity   Rate       Amount
 No
       BILL NO ?
       ROOF COVERINGS
       User note

       Where battens for roof coverings form part of the plate nailed
       timber roof truss design it shall be included under the roof
       construction in the "Carpentry and Joinery" trade and not under
       this trade

       ROOF SHEETING

       User note

       The fixing recommendations of the manufacturer of the tiles
       used for the specific region and/or situation are to be
       incorporated as supplementary preambles

       Roof sheeting fixed with no 14 Topspeed Hex Head screws
       with neoprene gasket washers at 600mm centres to
       specification to timber purlins (purlins elsewhere).

  A         Corrugated Roof Sheeting obtained from removal of
            previous roof structure to be used on new roof structure,
            with a pitch not exceeding 25°                               m2       138




                     Carried Forward to Summary of Section No. 2                                R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 7
       Roof Coverings
       2010J023
       Cuff


                                                        -36-
Item                                                                              Quantity   Rate       Amount
 No
       BILL 7
       CARPENTRY AND JOINERY
       SUPPLEMENTARY PREAMBLES

       Roofs

       Roof trusses to be designed and constructed with soft wood
       structural timber to include for live loads, wind loads and to take
       tile roof covering, purlins and fibre cement of gysum
       plasterboard ceilings with brandering. Each roof truss shall
       have all its members accurately cut and close butted together
       and rigidly fixed by CSIR approved patented galvanized metal
       spiked connectors, fixed on both sides of each intersection by
       an approved method, all in accordance with the manufacturer's
       instructions.

       The design, manufacture and transportation of the roof trusses,
       bracing, etc. shall be under the control of a registered Engineer
       in accordance with SABS 0243 and it shall be required from the
       manufacturer of the trusses to lodge a written guarantee that
       his construction has been designed by a qualified Structural
       Engineer and that he is in possession of a capability certificate
       issued by the Institute for Timber Construction an approved by
       the Repressentative/agent.

       The tenderer's attention is drawn to the fact that the tender
       drawings only represent the overall size and bearing points of
       the trusses and not the required design.

       Erection must be carried out as described in "The Erection and
       Bracing of Timber Roof Trusses" published by the Truss Plate
       Association of South Africa Ltd. and the National Timber
       Research Institute, CSIR.

       Descriptions of roof trusses shall be deemed to include for
       desigh, manufacture, supply, hoisting and fixing in position,
       trimming ends, notching, etc. and for any temporary bracing.



       SKIRTINGS

  A         Re construct Roof to L shaped first floor size 11,7m X
            9,5m X 1200mm high overall inculding any extra beams
            and batterns as per plan                                         No          1



                                                  Carried to Collection                             R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 8
       Carpentry & Joinery
       2010J023
       Cuff


                                                          -37-
    Wrought Meranti

A        19 x 75mm Skirting
                                                                        m    81

    DOORS AND FRAMES ETC

    Roll-up Chromadek

B        Manual push-up overhead garage door size 5200 x
         2125mm high overall (PC R 6,000 installed and finished)
         (D5)                                                           No    1

    Wrought Meranti

C        Single 40mm hollw core / semi-solid presses masonite
         door size 813 x 2032mm high overall (PC of R 400)              No    7

D        Frame for single door                                          No    7

    Re-use existing door including planing and sanding as
    required

E        Single hollow core / semi-solid door                           No    3

    SUNDRY FITTINGS.

    Duct covers of 10mm x 300mm Everite Fibre Cement
    "Nutec Flatsheet" screwed on, spaced 325mm centres
    vertically.

F        Cover to opening 300 x 2500mm high (Provisional)               No    4




                                                Carried to Collection             R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 8
    Carpentry & Joinery
    2010J023
    Cuff


                                                       -38-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 8

Carpentry & Joinery

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -37-

                                                              -38-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 8
Carpentry & Joinery
2010J023
Cuff


                                           -39-
Item                                                                       Quantity   Rate       Amount
 No
       BILL 8
       CEILINGS, PARTITIONS AND ACCESS
       FLOORING
       SUPPLEMENTARY PREAMBLES

       Descriptions:

       Items described as "nailed" shall be deemed to be fixed with
       hardened steel nails or pins or shot pinned to brickwork or
       concrete or Bolted to steel trusses.

       Items described as "plugged" shall be deemed to include
       screwing to fibre, plastic or metal plugs at not exceeding
       600mm centres, and where described as "bolted" the bolts
       have been given elsewhere

       CEILINGS
       6,4mm Gypsum ceiling boards nailed to and including
       38x38mm SAP brandering at 400mm intervals fixed to
       timber, including brackets, hangers, jointing strips, etc.

  A         Horizontal ceilings                                       m2         65

       6.5mm Tapered edge Gypsum ceiling boards nailed to and
       including 38x38mm SAP brandering to bottom of timber
       trusses at 400mm intervals, Apply 48mm RhinoTape over
       joints and FibaTape over butt joints and apply one coat
       minimum 3mm RhinoLite or similar skim coat to a smooth
       and even polished finish

       Cornices

  B         75mm Coved cornice                                        m        115

       SUNDRIES

       75mm Glasswool insulation laid flat on brandering
       between beams

  C         On ceilings                                               m2         65




                       Carried Forward to Summary of Section No. 2                           R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 9
       Ceilings Partitions and Access Flooring
       2010J023
       Cuff


                                                        -40-
Item                                                                          Quantity   Rate       Amount
 No
       BILL 9
       IRONMONGERY
       SUPPLEMENTARY PREAMBLES

       Finishes to ironmongery

       Where applicable finishes to ironmongery are indicated by
       suffixes in accordance with the following list:
       BS Satin bronze lacquered CH Chromium plated
       SC Satin chromium plated
       SE Silver enamelled
       GE Grey enamelled
       AS Anodised silver
       AB Anodised bronze
       AG Anodised gold
       ABL Anodised black
       PB Polished brass
       PL Polished and lacquered
       PT Epoxy coated
       SD Sanded

       HINGES, BOLTS, ETC

       Brass

  A         3mm X 120mm Ballbearing Hinge (PC R 80.00 per pair)          No         10

       LOCKS

       Brass / Chromium Plated

  B         Cylinder sashlock (PC of R 100.00)                           No         10

  C         Double Cylinder (PC of R 110.00)                             No         10

       HANDLES

       Brass

  D         Handle Pair (PC of R 200.00)                                 No         10

       BATHROOM FITTINGS

       Accessories

  E         Toilet roll holders (PC Amount R 200.00)                     No          3


                                                 Carried to Collection                          R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 10
       Ironmongery
       2010J023
       Cuff


                                                        -41-
A        Soapdish (PC Amount R 120.00)                             No    8

B        Towel rail (PC Amount R 300.00)                           No    8

C        Shaving Mirror (PC Amount R 750.00)                       No

D        Hand Towel rail (PC Amount R 200.00)                      No    4

E        Glass shelve (PC Amount R 400.00)                         No    2

    PELMETS AND CURTAIN TRACKS.

    "Yakota Clipper" Curtain tracks with wall mounting
    brackets plugged to brick walls.

F        Double track                                              m    32

    SUNDRIES

    Brass

G        3x32mm dividing strip                                     m     5

H        Brass machnetic doorstop (PC R 75.00)                     No   10




                                           Carried to Collection             R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 10
    Ironmongery
    2010J023
    Cuff


                                                  -42-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 10

Ironmongery

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -41-

                                                              -42-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 10
Ironmongery
2010J023
Cuff


                                           -43-
Item                                                                           Quantity   Rate       Amount
 No
       BILL 10
       METALWORK
       SUPPLEMENTARY PREAMBLES.

       Hot dip galvanising of mildsteel by single immersion of
       components to be in accordance with SANS 121 (ISO 1461)
       standards as set out by the Hot Dip Galvanizers Association of
       Southern Africa (Tel: 011-458 7900). Care must be taken not to
       damage galvanizing or necessitate welding over galvanized
       areas since touch-up or repairing and spray painting with silver
       paint will not be accepted.

       ALUMINIUM

       Approved windows and sliding or sliding/folding doors
       with glasing per AAAMSA standards (unless otherwise
       stated) with frames in "Bronze" powdercoating to SANBS
       ANP3055 and with paintable acrylic sealant on both sides
       between frame and steel member / plaster. Installation after
       curing of plastering. Protect against damage after
       installation. No 'touch-ups' allowed. Profiles, glazing and
       installation to conform to AAAMSA standards.

  A         Window size 600 x 900mm high overall of one top hung
            section including adjustable friction stay and window catch
            . Refer drawing attached - W1                               No            3

  B         Single sliding door in size 1700 x 2125mm high overall
            including sliding mechanism, handles, flush bolts and
            cylinder lockset. Refer drawing attached - W2                 No          1

  C         Window size 2500 x 1500mm high overall of two top hung
            opening sections and three fixed panes including
            adjustable friction stay and window catch . Refer drawing
            attached - W3                                                 No          1

  D         Window size 1500 x 1500mm high overall of one top hung
            opening sections and two fixed panes including adjustable
            friction stay and window catch . Refer drawing attached -
            W4                                                        No              1

  E         Window size 3000 x 1500mm high overall of two top hung
            opening sections and three fixed panes including
            adjustable friction stay and window catch .                   No          1




                                                Carried to Collection                            R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 11
       Metalwork
       2010J023
       Cuff


                                                        -44-
A       Window size 1500 x 900mm high overall of one top hung
        opening sections and one fixed pane including adjustable
        friction stay and window catch . Refer drawing attached -
        W5                                                           No   2

B       Window size 900 x 2125mm of one fixed pane. Refer
        drawing attached - W6                                        No   1

C       Single door size 1100 x 2125mm high overall including
        handles and cylinder lock. Refer drawing attached - D1       No   2

D       Sliding/folding door in four leaves size 3000 x 2125mm
        high overall including sliding mechanism, handles, flush
        bolts and cylinder lockset . Refer drawing attached - D2 &
        D3                                                           No   2

E       Sliding/folding door in four leaves size 3750 x 2125mm
        high overall including sliding mechanism, handles, flush
        bolts and cylinder lockset . Refer drawing attached - D2 &
        D3                                                           No

    Re-use existing

F       Alunimium Sliding door previously set-aside including
        servicing and sealant                                        No   3

    STEEL GATES, SCREENS, ETC

    Palisades

G       Palisade panel 3,20 x 2,00m high formed of 30 x 30 x
        3mm L section verticals at 150mm centres on 75 x 50 x
        2.5mm bottom, middle and top rail with ends built into
        brikwork or bolted on including end-brackets, etc            No   2




                                            Carried to Collection             R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 11
    Metalwork
    2010J023
    Cuff


                                                   -45-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 11

Metalwork

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -44-

                                                              -45-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 11
Metalwork
2010J023
Cuff


                                           -46-
Item                                                                       Quantity   Rate       Amount
 No
       BILL 11
       PLASTERING
       SCREEDS

       1:4 Cement screeds wood floated on concrete

  A        25mm Thick on floors                                       m2       172

  B        25mm Thick on treads                                       m2          8

  C        Average 80mm thick on floors to falls and currents on
           waterproof sheeting (elsewhere)                            m2

  D        Average 40mm Thick on floors to falls                      m2         39

  E        75 X 75mm Triangular fillet                                m           8

       INTERNAL PLASTER
       Wood Floated Cement plaster on brickwork

  F        On walls                                                   m2       243

  G        On existing facebrick walls                                m2         74

  H        On walls in patching                                       m2          4

   J       On narrow widths                                           m2         16

       Cement plaster on concrete

  K        On ceilings                                                m2       105

   L       On sides and soffits of beams                              m2          9

       EXTERNAL PLASTER

       Wood Floated Cement plaster on brickwork

  M        On walls                                                   m2         11

  N        On columns                                                 m2         72

  P        On narrow widths                                           m2         20




                                              Carried to Collection                          R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 12
       Plastering
       2010J023
       Cuff


                                                      -47-
    Cement plaster on concrete

A       On ceilings                                             m2

B       On sides and soffits of beams                           m2   8




                                        Carried to Collection            R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 12
    Plastering
    2010J023
    Cuff


                                               -48-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 12

Plastering

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -47-

                                                              -48-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 12
Plastering
2010J023
Cuff


                                           -49-
Item                                                                         Quantity   Rate       Amount
 No
       BILL 12
       PLUMBING AND DRAINAGE
       (PROVISIONAL)
       SUPPLEMENTARY PREAMBLES

       uPVC pipes and fittings:

       Soil, waste and vent pipes and fittings shall be solvent weld
       jointed

       uPVC pressure pipes and fittings:

       Pipes for water supply shall be of the class stated

       Pipes of 40mm diameter and smaller shall be plain ended with
       solvent welded uPVC loose sockets and fittings

       Pipes of 50mm diameter and greater shall have sockets and
       spigots with push in type integral rubber ring joints. Bends shall
       be uPVC and all other fittings shall be cast iron, all with similar
       push-in type joints

       Copper pipes:

       Pipes shall be hard drawn and half-hard pipes of the class
       stated. Class 0 (thin walled hard drawn) pipes shall not be
       bent. Class 1 (thin walled half-hard), class 2 (half-hard) and
       class 3 (heavy walled half-hard) pipes shall only be bent with
       benders with inner and outer formers. Fittings to copper waste,
       vent and anti-syphon pipes, capillary solder fittings and
       compression fittings shall be "Cobra Watertech" type. Capillary
       solder fittings shall comply with ISO 2016. Only compression
       fittings shall be used in walls or in ground

       Reducing fittings

       Where fittings have reducing ends or branches they are
       described as "reducing". In the case of pipes with diameters
       not exceeding 60mm only the largest end or branch size is
       given. Should the contractor wish to use other fittings and
       bushes or reducers he may do so on the understanding that no
       claim in this regard will be entertained. In the case of pipes
       with diameters exceeding 60mm all sizes are given and no
       claim for extra bushes, reducers, etc will be entertained




                                                  Carried to Collection                        R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 13
       Plumbing and Drainage
       2010J023
       Cuff


                                                          -50-
Exposed concrete surfaces

Exposed surfaces of concrete stormwater channels, cover
slabs, inspection eye marker slabs, gulley tops, cleaning eye
tops, catchpits, inspection chambers, etc shall be finished
smooth with plaster

Excavations

No claim for rock excavation will be entertained unless the
contractor has timeously notified the quantity surveyor thereof
prior to backfilling

"Soft rock" and "hard rock" shall be as defined in "Earthworks"

Laying, backfilling, bedding, etc. of pipes

Pipes shall be laid and bedded and trenches shall be carefully
backfilled in accordance with manufacturers' instructions

Where no manufacturers' instructions exist pipes shall be laid in
accordance with clauses 5.1 and 5.2 of each of the following:
SABS 1200 L : Medium-pressure pipelines
LD : Sewers
LE : Stormwater drainage
Pipe trenches etc shall be backfilled in accordance with clauses
3, 5.5, 5.6, 5.7 and 7 of SABS 1200
DB : Earthworks (Pipe trenches)
Pipes shall be bedded in accordance with clauses 3.1 to 3.4.1,
5.1 to 5.3 and 7 of SABS 1200
LB : Bedding (Pipes).
Unless otherwise described bedding of rigid pipes shall be
class B bedding

Wire gratings

Descriptions of gutter outlets etc shall be deemed to include
wire balloon gratings

Flush pans

Flush pans shall have straight or side outlets and "P" or "S"
traps as necessary

Stainless steelbasins, sinks, wash troughs, urinals, etc.

Units shall have standard aprons on all exposed edges and
tiling keys against walls where applicable




                                          Carried to Collection     R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 13
Plumbing and Drainage
2010J023
Cuff


                                                  -51-
    Waste unions

    Descriptions of waste unions shall be deemed to include rubber
    or vulcanite plugs and chains fixed to fittings

    Steel sectional water tanks

    Tanks shall comply with SABS CKS 114

    Rainwater disposal

    Description of "suspended" deem to include patent metal
    hangers as "Plumblink" Pear-shaped hanger bracket or similar
    of galvanised threaded rod let into soffit of concrete slab and
    other end fastened to galvanised strap around rainwater pipe
    suspended not exceeding 1m below soffit, including holes and
    bolting, not exceeding 1m apart.

    RAINWATER DISPOSAL

    uPVC Pipes

A        110mm Pipes vertically in brickwork                           m    12

    Extra over uPVC pipes for fittings

B        110mm bend                                                    No   12

    "Fulbore" cast iron outlets

C        100mm Vertical outlet                                         No    2

    0,6mm Chromadek or similar pre-painted sheet steel / alloy
    gutters and rainwater pipes

D        150 x 130mm OG roof gutters                                   m    14

E        Extra over gutter for angle                                   No    1

F        Extra over gutter for stopped end                             No    4

G        Extra over gutter for outlet for 85mm pipe                    No    3

H        75mm Diameter rainwater pipes                                 m    16

J        Extra over rainwater pipe for shoe                            No    3

K        Extra over rainwater pipe for eaves or plinth offset          No    3

    SOIL DRAINAGE (PROVISIONAL)


                                               Carried to Collection             R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 13
    Plumbing and Drainage
    2010J023
    Cuff


                                                      -52-
    Concrete gulleys with cast Iron Grid

A        Gulley not exceeding 500mm deep                            No    1

    Underground quality PVC pipes

B        110mm Pipes laid in trenches not exceeding 1.00m deep      m    10

    Extra over PVC pipes for fittings

C        110mm ABC cleaning eye in end of pipe                      No    1

D        110mm Bend                                                 No    5

E        110mm Access junction                                      No    2

F        110mm Access pipe                                          No    1

    Concrete encasement

G        Encase soil pipe in 300 x 300 x 20MPa concrete including
         3 x Y10 top rebar and 3 x Y 10 bottom rebar and R 8
         Stirrups @ 500c/c                                          m     2

    SANITARY FITTINGS, ETC

    NOTE: Prime Cost (PC) Amounts below include waste
    fittings, connectors, traps, ballcocks etc. Contractor to
    allow for taking delivery, installation, testing,
    commissioning

    Stainless Steel

H        1600 x 450mm Double bowl sink (PC of R R 1,500) sunk
         into worktop .                                             No    2

J        450mm Drop-in prep bowl (PC of R R 1,000)                  No    1

K        Single Bowl washtrough (PC of R 1500.00) hung to
         brickwork                                                  No

    White Vitreous China

L        Close coupled WC suite with toilet seat (PC of R 1500.00) No     3

M        Drop-in or sit-on basin (PC of R 1200.00)                  No    5




                                            Carried to Collection             R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 13
    Plumbing and Drainage
    2010J023
    Cuff


                                                     -53-
    Composite Granite

A        Bath size 1700 x 700mm (PC of R 8,000.00) free standing
         with centre outlet                                      No

    PVC/Acrylic

B        Built-in oval bath 1400 x 1400mm (PC of R 2000.00)          No

    TAPS, VALVES, ETC

    NOTE: Prime Cost (PC) Amounts below include delivery,
    Contractor to allow for taking delivery, installation, testing
    and commissioning

    Chromium Plated

C        15mm Shower mixer, arm and rose (PC R 1500) plus
         shower trap and outlet (PC R 350)                           No   3

D        20mm Bath mixer (PC R 1500)                                 No

E        20mm Bath mixer (PC R 3000)                                 No

F        15mm Topfix WHB Mixer (PC of R 900 each)                    No   5

G        15mm Sink mixer (PC of R 1200.00)                           No   2

H        15mm Bibtaps ( PC of R 200.00 each) (Washtrough)            No

    SANITARY PLUMBING

    Waste water removal system from sanitary fitting to
    connection with external sewer system / discharge into
    gulley, including testing of system.

J        For one cluster servicing 2 x WHB, 1 x WC, 1 x shower on
         ground floor IN EXISTING BATHROOM plus 1 x WC and
         2 x WHB, 1 x bath & 1 x Prep Bowl on first floor (exist
         bathr @ bedr 3 on GF and Bedr 4, Kitchen on 1st flr)     No

K        For one cluster servicing 2 x WHB, 1 x WC, 1 x shower on
         ground floor IN EXISTING BATHROOM (exist bathr @
         bedr 3 on GF)                                            No      1

L        For one cluster servicing 1 x WHB, 1 x WC, 1 x shower on
         ground floor IN EXISTING BATHROOM (shared bathroom
         on GF)and 1 x washtrough on GF (washtrough positioned
         on eastern wall inside garage)                           No



                                             Carried to Collection            R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 13
    Plumbing and Drainage
    2010J023
    Cuff


                                                    -54-
A        For one cluster servicing 1 x WHB, 1 x WC, 1 x shower on
         ground floor IN EXISTING BATHROOM (shared bathroom
         on GF)and 1 x prep bowl on 1F                            No        1

B        For one cluster servicing 1 x Prep Bowl on GF plus 1 x WC
         and 2 x WHB, 1 x shower and 1 x bath on first floor (pool
         area on GF and Main Bedr on 1st flr)                      No

C        For one cluster servicing 1 x WC, 1 x WHB and 1 x
         shower on first floor (Bedr on 1st flr)                       No   1

D        For one cluster servicing 1 x sink on first floor (Kitchen)   No   1

    WATER SUPPLIES

    Hot and cold water supply in Galvanized mild steel or
    Class 2 Copper or NHBRC approved alternative piping
    from point of entry into building up to termination at
    sanitary fitting, including routing via electric water heaters,
    including testing

E        For one cluster servicing 2 x WHB, 1 x WC, 1 x shower on
         ground floor IN EXISTING BATHROOM plus 1 x WC and
         2 x WHB, 1 x bath & 1 x Prep Bowl on first floor (exist
         bathr @ bedr 3 on GF and Bedr 4, Kitchen on 1st flr)     No

F        For one cluster servicing 2 x WHB, 1 x WC, 1 x shower on
         ground floor IN EXISTING BATHROOM (exist bathr @
         bedr 3 on GF)                                            No        1

G        For one cluster servicing 1 x WHB, 1 x WC, 1 x shower on
         ground floor IN EXISTING BATHROOM (shared bathroom
         on GF)and 1 x washtrough on GF (washtrough positioned
         on eastern wall inside garage)                           No

H        For one cluster servicing 1 x WHB, 1 x WC, 1 x shower on
         ground floor IN EXISTING BATHROOM (shared bathroom
         on GF)and 1 x prep bowl on 1F                            No        1

J        For one cluster servicing 1 x Prep Bowl on GF plus 1 x WC
         and 2 x WHB, 1 x shower and 1 x bath on first floor (pool
         area on GF and Main Bedr on 1st flr)                      No

K        For one cluster servicing 1 x WC, 1 x WHB and 1 x
         shower on first floor (Bedr on 1st flr)                       No   1

L        For one cluster servicing 1 x sink on first floor (Kitchen)   No   1

    ELECTRIC WATER HEATERS



                                               Carried to Collection            R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 13
    Plumbing and Drainage
    2010J023
    Cuff


                                                       -55-
    "Kwikot"

A       200 Litre "Econoflow" Vertical floor/wall mounted electric
        water heater including vacuum breaker and pressure relief
        valve per manufacturer's specification.                    No   1




                                          Carried to Collection             R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 13
    Plumbing and Drainage
    2010J023
    Cuff


                                                  -56-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 13

Plumbing and Drainage

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -50-

                                                              -51-

                                                              -52-

                                                              -53-

                                                              -54-

                                                              -55-

                                                              -56-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 13
Plumbing and Drainage
2010J023
Cuff


                                           -57-
Item                                                                         Quantity   Rate       Amount
 No
       BILL 13
       TILING
       SUPPLEMENTARY PREAMBLES

       WALL TILING

       Provide the Prime Cost amount of R150,00/m² for 300 x
       600mm ceramic tiles fixed with tile adhesive to plaster
       (plaster elsewhere) flush pointed with jointing compound.


  A         On walls                                                    m2         63

  B         On narrow widths                                            m2          7

  C         Cut tile skirting 100mm high (Provisional)                  m          10

       Provide the Prime Cost amount of R100,00/m for 300 x
       75mm listello tiles fixed with porcelain tile adhesive to
       plaster (plaster elsewhere) flush pointed with waterproof
       jointing compound.

  D         On walls                                                    m          42

       Polished Aluminium trims, listello's etc

  E         Corner trim PC of R 45 per metre                            m          27

  F         12mm Listello PC of R 40 per metre                          m




                                                Carried to Collection                          R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 14
       Tiling
       2010J023
       Cuff


                                                         -58-
    FLOOR TILING

    Provide the Prime Cost amount of R150,00/m² for 300 x
    300mm non-slip ceramic floor tiles, laid at 45 degree angle
    flush pointed with tinted jointing compound.

A        On floors and landings                                     m2   211

B        On risers or skirtings 85mm high                           m     8

C        On treads 250mm wide                                       m    15

D        On risers 170mm high                                       m    16

E        On threshold 245mm wide to balcony edge, protruding
         15mm over plaster face                                     m     8

    Provide the Prime Cost amount of R900,00/m² for 25 x
    25mm mosaic tiles fixed with tile adhesive to screed
    (screed elsewhere) flush pointed with waterproof jointing
    compound.

F        On floors to falls and currents                            m2    4




                                            Carried to Collection              R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 14
    Tiling
    2010J023
    Cuff


                                                   -59-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 14

Tiling

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -58-

                                                              -59-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 14
Tiling
2010J023
Cuff


                                           -60-
Item                                                                    Quantity   Rate       Amount
 No
       BILL 14
       GLAZING
       TOPS, SHELVES, DOORS, MIRRORS, ETC

       6mm Silvered float glass copper backed mirrors with
       polished edges holed for and fixed with chromium plated
       dome capped mirror screws with rubber buffers to plugs in
       brickwork or concrete

  A        Mirror 400x600mm high                                   No          5




                     Carried Forward to Summary of Section No. 2                          R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 15
       Glazing
       2010J023
       Cuff


                                                   -61-
Item                                                                      Quantity   Rate       Amount
 No
       BILL 15
       PAINTWORK
       PAINTWORK ETC TO NEW WORK

       ON PLASTERBOARD

       One coat primer and two coats "Dulux Trade 65" PVA
       emulsion paint in colours which have a value of 7 or less
       on the Munsell system in accordance with SABS 1091

  A         On ceilings and cornices                                 m2         82

       ON FIBRE CEMENT

       One coat primer and two coats "Dulux Weathershield" PVA
       emulsion paint in colours which have a value of 7 or less
       on the Munsell system in accordance with SABS 1091

  B         On Nutec covers                                          m2          3

       ON FLOATED PLASTER

       One coat primer and two coats "Dulux Trade 65" or similar
       approved PVA emulsion paint in colours which have a
       value of 7 or less on the Munsell system in accordance
       with SABS 1091

  C         On ceilings and beams                                    m2       121

  D         On raking soffits of stairs                              m2         20

       One coat primer and two coats "Dulux Weathershield" PVA
       emulsion paint in colours which have a value of 7 or less
       on the Munsell system in accordance with SABS 1091

  E         On exterior walls and columns                            m2         79

       One coat primer and two coats "Dulux Trade 100" or
       similar approved PVA emulsion paint in colours which
       have a value of 7 or less on the Munsell system in
       accordance with SABS 1091

  F         On internal walls                                        m2       187

       ON METAL



                                             Carried to Collection                          R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       Bill No. 16
       Painting
       2010J023
       Cuff


                                                    -62-
    Clean, prepare and apply two coats alkyd enamel paint in
    colours which have a value of more than 7 on the Munsell
    system in accordance with SABS 1091

A        On Palisades                                              m2   27

    ON WOOD

    One coat acrylic wood primer and three coats "Dulux pearl
    glo" super acrylic pva white.

B        On doors and door frames                                  m2   31

C        On existing or re-used doors and door frames              m2   11

D        On skirtings and architraves not exceeding 300mm wide     m    81




                                           Carried to Collection             R
    Section No. 2
    SECTION 4B - BUILDING WORKS
    Bill No. 16
    Painting
    2010J023
    Cuff


                                                  -63-
Section No. 2

SECTION 4B - BUILDING WORKS

Bill No. 16

Painting

SUMMARY

                                                            Page         Amount
                                                             No
Total Brought Forward from Page No.                           -62-

                                                              -63-




              Carried Forward to Summary of Section No. 2            R
Section No. 2
SECTION 4B - BUILDING WORKS
Bill No. 16
Painting
2010J023
Cuff


                                           -64-
       Section No. 2

       SECTION 4B - BUILDING WORKS

       SECTION SUMMARY - SECTION 4B - BUILDING WORKS

Bill                                                                  Page         Amount
No                                                                     No
   1   Alterations                                                      -20-

   2   Earthworks                                                       -23-

   3   Concrete Formwork & Reinforcement                                -27-

   4   Precast Concrete                                                 -28-

   5   Masonry                                                          -32-

   6   Waterproofing                                                    -35-

   7   Roof Coverings                                                   -36-

   8   Carpentry & Joinery                                              -39-

   9   Ceilings Partitions and Access Flooring                          -40-

 10    Ironmongery                                                      -43-

 11    Metalwork                                                        -46-

 12    Plastering                                                       -49-

 13    Plumbing and Drainage                                            -57-

 14    Tiling                                                           -60-

 15    Glazing                                                          -61-

 16    Painting                                                         -64-




                                           Carried to Final Summary            R
       Section No. 2
       SECTION 4B - BUILDING WORKS
       2010J023
       Cuff




                                                      -65-
Item                                                                      Quantity   Rate       Amount
 No
       BILL 1
       PROVISIONAL SUMS
       Note:

       All cost price items and provisional sums will be nett and no
       Builder's discount will be applicable

       BUDGETARY ALLOWANCES

       Budgetary amount

  A         Allow the budgetary amount of R 10,000 for builders work
            to be quantified                                                  Item               10,000 00

  B         Allow the budgetary amount of R 10,000 for re-erecting the
            canopy on 1st floor including necessary modifications             Item               10,000 00

       Contingencies

  C         Allow the amount of R 15,000 for contingencies.                   Item               15,000 00

       BUILDERS WORK

       Kitchen Cupboards

  D         Allow the amount of R 45,000.00 for suipply and
            installation of kitchen and scullery cupboards and tops,
            shelving etc .                                                    Item               45,000 00

  E         Profit                                                            Item

  F         Attendance                                                        Item

       Bedroom Cupboards/ wardrobes

  G         Allow the amount of R 20,000.00 for the supply and
            installation of wardrobes, including re-installation of
            existing                                                          Item               20,000 00

  H         Profit                                                            Item

   J        Attendance                                                        Item




                                                  Carried to Collection                     R
       Section No. 3
       SECTION 4C - PROVISIONAL SUMS
       Bill No. 1
       Provisional Sums
       2010J023
       Cuff


                                                          -66-
    Vanities

A        Allow the amount of R 12,000 for supply and installation of
         vanity cupboards and tops                                      Item       12,000 00

B        Profit                                                         Item

C        Attendance                                                     Item

    Balustrades

D        Allow the amount of R 14,000.00 for design, supply and
         installation of painted steel handrails etc.                   Item       14,000 00

E        Profit                                                         Item

F        Attendance                                                     Item

    Gas Installation

G        Allow the amount of R 5,000.00 for gas installation and
         cage                                                           Item        5,000 00

H        Profit                                                         Item

J        Attendance                                                     Item

    Shower doors

K        Allow the amount of R 6,000 for the supply, installation and
         sealant to shower doors                                        Item        6,000 00

L        Profit                                                         Item

M        Attendance                                                     Item

    Skylights

N        Allow the amount of R 8,000 for the supply, installation and
         sealant of skylight                                            Item       Not Priced

P        Profit                                                         Item

Q        Attendance                                                     Item

    ELECTRICAL WORK




                                             Carried to Collection             R
    Section No. 3
    SECTION 4C - PROVISIONAL SUMS
    Bill No. 1
    Provisional Sums
    2010J023
    Cuff


                                                     -67-
    Internal Electrical installation

A        Allow the amount of R 50,000.00 for the domestic electrical
         installation including light fittings                         Item       50,000 00

B        Profit                                                        Item

C        Attendance                                                    Item

    Underfloor Heating

D        Allow the amount of R 7,000.00 for the supply and
         installation of underfloor heating                            Item        7,000 00

E        Profit                                                        Item

F        Attendance                                                    Item

    Airconditioning

G        Allow the amount of R 15,000.00 for the supply and
         installation of airconditioning                               Item       Not Priced

H        Profit                                                        Item

J        Attendance                                                    Item

    Stoves and Extractors

K        Allow the amount of R 12,000.00 for stoves and extractors.    Item       12,000 00

L        Profit                                                        Item

M        Attendance                                                    Item

    EXTERNAL WORK
    Water supply and reticulation

N        Allow the amount of R 15,000.00 for water supply mains,
         site reticulation and garden taps, etc
                                                                       Item       Not Priced

P        Profit                                                        Item

Q        Attendance                                                    Item




                                            Carried to Collection             R
    Section No. 3
    SECTION 4C - PROVISIONAL SUMS
    Bill No. 1
    Provisional Sums
    2010J023
    Cuff


                                                    -68-
    Pool

A          Allow the amount of R 48,000.00 for swimming pool
           including filters and pump, heat pump
                                                                     Item       Not Priced

B          Profit                                                    Item

C          Attendance                                                Item

    Heat Pump for pool

D          Allow the amount of R 10,000.00 for pool heat pump        Item       Not Priced

E          Profit                                                    Item

F          Attendance                                                Item




                                             Carried to Collection          R
    Section No. 3
    SECTION 4C - PROVISIONAL SUMS
    Bill No. 1
    Provisional Sums
    2010J023
    Cuff


                                                    -69-
Section No. 3

SECTION 4C - PROVISIONAL SUMS

Bill No. 1

Provisional Sums

SUMMARY

                                                       Page         Amount
                                                        No
Total Brought Forward from Page No.                      -66-

                                                         -67-

                                                         -68-

                                                         -69-




                            Carried to Final Summary            R
Section No. 3
SECTION 4C - PROVISIONAL SUMS
Bill No. 1
Provisional Sums
2010J023
Cuff


                                        -70-
          FINAL SUMMARY

Section                                                                     Page         Amount
  No                                                                         No
    1     SECTION 4A - PRELIMINARIES                                          -13-

               Less credit for old materials listed in Bill 1 Alterations     Item


          Sub-total                                                                  R

    2     SECTION 4B - BUILDING WORKS                                         -65-

          Add: VAT @ 14%                                                             R

    3     SECTION 4C - PROVISIONAL SUMS                                       -70-




                                                Carried to Form of Tender            R



          2010J023
          Cuff



                                                              -71-

				