                               We have a great pleasure presenting our company for your review and favorable consideration.
                               Tanootas Taban Engineering and Construction Company (TEC) was established in 1996 by a group of
                               engineers experienced in the filed of oil and gas industries.
                               TEC has been active in the field of installation and commissioning of industrial complexes in many levels
                               from subcontracting to complete turn key basis.
                                Also this company is active in supplying of internals of reactors , towers and filters by himself
                               design and manufacturing and European manufacturer's products.
        About us               From large projects to small schemes, all members of our company will do full effects emphasizing on
                               better quality and time schedule as target with the time team work.
                               We proudly assure you that the company is also fully proposed to meet any requirement for the tasks
                               that will be assigned to us and we are capable and qualified to perform engineering and mechanical
                               erection works based on oil and gas project experience sincerely looking forward to an opportunity to
                               serve you satisfactorily, we remain.
                               Sincerely yours


      Latest News              Fields:
                                        News title
                                        Date
                                        Text News
                                        picture
     Last Projects     Fields:
                                Project name
                                Client
                                Location
                                Short summary
                                Original Contract price


                       Projects Name : OSBL Phases 9 & 10
                       Client : OIEC
                       Location : South Pars field Development Phases9 & 10 - OSBL.
                       Short summary : Civil, Equipment, Installation & Erection, Steel Structure, Above Ground Piping, U/G
                       Piping, Electrical, Instrumentation, Painting & Insulation and Pricommissioning......
                       Original Contract price :
                       Progress Status : 95%
                       Date of start : Feb. 2006         Date of completion : Sep. 2007
                       Type of contract : Lump Sum.
                       Material procurement : By OIED
                       Fields:
                            News title
                            Date
 Newsletter register        Text News
                            News Source




Main meno
About us      Activities            Projects             Products             Download   News & Archieve    Contact us        Photo Gallery




                              Company History
                                   o Our factory
                              Managers introduction
                              Units introduction
                              Management message
                              Future vision

                              Company History:
                               Introduction
                               We have a great pleasure presenting our company for your review and favorable consideration.
                               Tanootas Taban Engineering and Construction Company (TEC) was established in 1996 by a group of
                               engineers experienced in the filed of oil and gas industries.
                               TEC has been active in the field of installation and commissioning of industrial complexes in many levels from
                               subcontracting to complete turn key basis.
                                Also this company is active in supplying of internals of reactors , towers and filters by himself design
   About us                    and manufacturing and European manufacturer's products.
                               From large projects to small schemes, all members of our company will do full effects emphasizing on better
                               quality and time schedule as target with the time team work.
                               We proudly assure you that the company is also fully proposed to meet any requirement for the tasks that
                               will be assigned to us and we are capable and qualified to perform engineering and mechanical erection
                               works based on oil and gas project experience sincerely looking forward to an opportunity to serve you
                               satisfactorily, we remain.
                               Sincerely yours,


                              Managers introduction:
                                    o Managing Director:
                                        M.H. Tajik Rostami
                               ‫؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟؟‬
                Units introduction:
                 ‫؟‬

                Management message:
                 ‫؟‬

                Future vision:
                 ‫؟‬


                Fields:
                     o Title
                     o text

                Activities of the company
                 -Basic and detail, design Procurement &Construction of oil, Gas, petrochemical & industries plants. (EPC
                 Projects)
Activities       -Erection and installation of static equipments.
                 -Erection and commissioning of steam boilers.
                 -Erection and commissioning of fired heaters.
                 -Installation and commissioning of rotating equipments.
                 -Installation and commissioning of turbo generators & compressors.
                 -Design, material supply, fabrication and erection of storage tanks.
                 -Renovation and rehabilitation of the plants.
                 -Design and supplying of internals of vessels.
                 -Revamping and maintenance of industrial plants.
                 -Supply of skilled workers.
                 -Construction supervision
                             Fields:
                                  o Title
                                  o text

                         Engineering
                         Procurement
                         construction
                         Engineering            ?
                         Procurement            ?
                         Construction           ?
                         Projects in progress
    Projects             Done projects
Projects fields:         Future projects
                         Workshop equipment
     Projects
        Name
     Location           Projects in progress               ‫؟‬
     Short
        summary          Done projects              Projects Name : Flare Erection
     Original                                       Location : South Pars Filed Development phase 6, 7, 8
        Contract                                     Assaluyeh
        price                                        Short summary : LPG and Phase 6, 7, 8 flare stack erection
     Progress                                       Original Contract price : 750,000 USD
        Status                                       Progress Status : 95%
     Date of start                                  Date of start : 1 July 2005        Date of completion : 15
     Type of                                        Feb. 2006
                                                     Type of contract : Lump Sum
        contract
                                                     Material procurement : By TIJD/JV
     Material
        procurement
                                                     Projects Name : Steam Reformer
                                                     Client : Petrochemical Industries Development Management
                                                     Company (PIDEMCO)
                                                     Location : Kharg Island
Short summary : Erection of Steam Reformer Including of
6500 Tons of Equipment and materials
Original Contract price : 11,000,000,000 Rls
Progress Status : 100 %
Date of start : Jun. 1998         Date of completion : Dec.
1999
Type of contract : Lump Sum
Material procurement : By Owner

Projects Name : Heat recovery Boiler Installation
Client : Azarab
Location : Kish Island
Short summary : Erection and commissioning of one unit
heat recovery boiler with the capacity of 90 ton/hr
Original Contract price : 5,000,000,000 Rls
Progress Status : 100 %
Date of start : Oct. 2002         Date of completion : Nov.
2003
Type of contract : Lump Sum
Material procurement : by Azarab

Projects Name : Boiler Installation
Client : Mapna Boiler
Location : South Pars Filed Mobin petrochemical Assaluyeh
Short summary : Erection and pre commissioning of three
units boilers (Capacity of each boiler is 90 Ton/hr)
Original Contract price : 6,650,000,000 Rls
Progress Status : 60%
Date of start : July 2005         Date of completion : Mar.
2006
Type of contract : Lump Sum
Material procurement : By Azarab

Projects Name : Qatran Project
Client : MESBAH ENERGY Co
Location : Arak
Short summary : Design and Fabrication of Random Packing
and accessories of 6 Towers Including Gas Injection Support
Plates,Liquid Distributors and Hold down Grids
Original Contract price : 420,000,000 Rls
Progress Status : 100 %
Date of start : Jan. 2002        Date of completion : April
2002.
Type of contract : Fixed
Material procurement : By Contractor

Projects Name : Caspian Sea Republics Oil Swap
Client : SINOPEC Eng. Incorp . (China)
Location : Tehran Refinery
Short summary : Civil work, foundation, equipment
installation above ground and under ground piping, steel
structure fabrication and erection, electrical installation,
painting and insulation.
Original Contract price : 3,100,000 USD
Date of start : Aug. 2002         Date of completion : Oct.
2003
Type of contract : Lump sum
Material procurement : by client

Projects Name : Boiler Erection
Client : AZARAB _ TIJD/JV
Location : South Pars Filed Development Phase 6,7 & 8.
Assaluyeh
Short summary : Erection of One Unit with the capacity of
165 Ton/hr.
Original Contract price : 2,000,000,000 RLS.
Progress Status : 100%
Date of start : Aug. 2005         Date of completion : Aug.
2006
Type of contract : Lump Sum.
Material procurement : By AZARAB

Projects Name : Fabrication DUCT & STACK
Client : MASBA/MAPNA
Location : Tanootas workshop
Short summary : Material Procurement, Fabrication
Including Insulation and Piping.
Original Contract price : 7,500,000,000 RLS.
Progress Status : 100%
Date of start : July 2004         Date of completion : july
2005
Type of contract : Unit rate.
Material procurement : By Contracto

Projects Name : Boiler Instalation
Client : AZARAB/MAPNA
Location : Mobin Petrochemical Complex Assaluyeh
Short summary : Erection and Commissioning of six units of
Heat Recovery Boiler. (Capacity of each Boiler is 180 Ton/hr)
Original Contract price : 5,000,000 USD.
Progress Status : 100%
Date of start : Oct. 2003         Date of completion : Sep.
2005.
Type of contract : Lump Sum.
Material procurement : By AZARAB

Projects Name : Equipment Instalation
Client : AGIP - HYUNDAI
Location : South Pars Filed Development phase 4 & 5.
Short summary : Installation of all static and Rotary
Equipment of South Pars Field Development Project phase 4
&5
Original Contract price : 8,700,000 USD.
Progress Status : 100%
Date of start : 24 Dec. 2002         Date of completion :
May. 2004
Type of contract : Unit rate.
Material procurement : By HYUNDAI

Projects Name : Internal of Marun Towers
Client : AZARAB
Location : Bandar Imam
Short summary : Design and Fabrication of internals of
Tower
Original Contract price : 405,000 Eur.
Progress Status : 100%
Date of start : Nov. 2001         Date of completion : July
2002
Type of contract :
Material procurement : By Contractor

Projects Name : Pipe Shop Construction and Extension
Work
Client : AGIP - HYUNDAI
Location : South Pars Field Development phases 4 & 5
Short summary : Design, Material Procurement, Fabrication
and Erection of 8 shops of 9,000 m^2 total area
Original Contract price : 1,260,000 USD.
Progress Status : 100%
Date of start : Aug. 2002         Date of completion : Nov.
2002
Type of contract : Lump Sum.
Material procurement : By Contractor

Projects Name : Equipment Instalation
Client : TOTAL - HYUNDAI
Location : South Pars Field Development phases 2 & 3.
Short summary : Installation of more than 17,000 Tons of
static and dynamic Equipments of whole the process and
offsite areas.
Original Contract price : 5,200,000 USD.
Progress Status : 100%
Date of start : Sep. 2000         Date of completion : Aug.
2002
Type of contract : Unit rate.
Material procurement : By HYUNDAI

Projects Name : Chahnimeh-Zahedan Water Pipeline
Client : SAPTA Co.
Location : Zahedan
Short summary : Design and Supply
Original Contract price : 3,017,670,000 RLS.
Progress Status : 100%
Date of start : Sep. 2001         Date of completion : Jan.
2002
Type of contract :
Material procurement : By Contractor

Projects Name : Third Aromatic Plant Heat Exchangers.
Client : AZARAB
Location : Bandar MAhshahr
Short summary : Mechanical Forming of U Tubes
Original Contract price : 285,000,000 RLS.
Progress Status : 100%
Date of start : Sep. 2001         Date of completion : Nov.
2001
Material procurement : By Owner

Projects Name : Bandar Imam MTBE Project.
Client : PIDEC Co.
Location : Bandar Imam.
Short summary : Design, Fabrication and supply of internals
of 6 Vessels.
Original Contract price : 201,000,000 RLS.
Progress Status : 100%
Date of start : Aug. 2001         Date of completion : Sep.
2001
Material procurement : By Contractor

Projects Name : Natural Gas Network.
Client : Tehran Oil Refining Company.
Location : Tehran
Short summary : Basic and Detail Engineering of Natural Gas
and Fuel Gas Network Development of Heaters and Boilers.
Original Contract price : 109,000,000 RLS.
Progress Status : 100%
Date of start : 25 Oct. 2000        Date of completion : 25
Jan. 2001
Type of contract : Lump Sum.

Projects Name : Trays of Khangiran Gas Refinery.
Client : AZARAB
Location : Sarakhs
Short summary : Design, Fabrication and Supply of Material
of Chimney Trays for 4 Towers
Original Contract price : 365,000,000 RLS.
Progress Status : 100%
Date of start : 30 Sep. 2000        Date of completion : 25
Dec. 2000
Material procurement : By Contractor

Projects Name : Orumieh Sugar Factory Expansion.
Client : Orumieh Sugar Company
Location : Orumieh
Short summary : Power Plant Expansion Including 2 No. 40
and 15 Tons Capacity Super Heat Boilers, Three Turbo
Generators, Central Panel, Substations, Feed Water Pumps
and Dearator.
Original Contract price : 3,000,000,000 RLS
Progress Status : 100%
Date of start : Jun. 1999         Date of completion : Aug.
2000
Type of contract : Lump Sum.
Material procurement : By Owner.

Projects Name : Bandar Imam MTBE Reactors.
Client : AZARAB
Location : Bandar Imam
Short summary : Design, Fabrication and Supply of Internals
of 7 Nos. Reactors.
Original Contract price : 61,750 USD & 79,800,000 RLS
Progress Status : 100%
Date of start : Nov. 1998         Date of completion : Aug.
1999
Type of contract : Fixed
Material procurement : By Contractor

Projects Name : Bandar Imam MTBE Vessels.
Client : AZARAB
Location : Bandar Imam
Short summary : Design, Fabrication and Supply of Internals
of 19 No. Vessels.
Original Contract price : 159,680 USD & 167,520,000 RLS
Progress Status : 100%
Date of start : Jun. 1999         Date of completion : Feb.
2000
Material procurement : By Contractor
Projects Name : Top and Support Grids, Screens and
Baskets.
Client : AZARAB
Location : Khangiran Gas Co.
Short summary : Design and Supply of Top and Support
Grids, Inlet and Outlet Basket.
Original Contract price : 127,000 USD & 160,400,000 RLS
Progress Status : 100%
Date of start : Jun. 1999         Date of completion : Feb.
2000
Type of contract : Fixed
Material procurement : By Contractor

Projects Name : Steam Reformer
Client : Petrochemical Industries Development Manegment
Company (PIDEMCO)
Location : Kharg Island
Short summary : Erection of Steam Reformer Including of
6,500 Tons of Equipment and Materials.
Original Contract price : 11,000,000,000 RLS
Progress Status : 100%
Date of start : Jun. 1998         Date of completion : Dec.
1999
Type of contract : Lump Sum.
Material procurement : By Owner.

Projects Name : Installation and Commissioning of Test
Facilities of IRAN Heavy Diesel.
Client : Iran Heavy Diesel
Location : Amol
Short summary : Erection and Installation of Test Facilities
Including: Generators, Transformers, Switchgear,
Instruments, Cooling Water Piping, Fuel and Oil Piping and
Pumps, Blowers and Ducts.
Original Contract price : 3,500,000,000 RLS
Progress Status : 100%
Date of start : Jun. 1998         Date of completion : Mar.
1999
Type of contract : Unit rate.
Material procurement : Around 3% By Contractor.

Projects Name : Vacum Tower Revamping.
Client : Tehran Refinery.
Location : Tehran
Short summary : Detail Engineering of Additional or
Modification of Piping System, Heat Exchanger,
Foundations and Cost Estimation.
Original Contract price : 890,000,000 RLS.
Progress Status : 100%
Date of start : Feb. 1997         Date of completion :
Oct. 1997

Projects Name : Piping and Pumps Installation
Client : Zahedin Chemical Complex
Location : Qom
Short summary : Inter Connection Piping, Pumps
Installation, Fire Water and Plant Water Piping.
Original Contract price : 1,500,000,000 RLS.
Progress Status : 100%
Date of start : Nov. 1996          Date of completion : Feb.
1997
Type of contract : Lump Sum.
Material procurement : By Owner.

Projects Name : No. 3 Alkylation Reconstruction Cost
Estimation.
Client : Abadan Refinery / AZARAB
Location : Ababdan
Short summary : Inspection, Issuing of Maintenance Memos
and Cost Estimation of the Maintenance and Renovation of
the Alkylation No.3 and 12 No. Respective Units of Abadan
Refinery.
Original Contract price : 300,000,000 RLS
Progress Status : 100%
Date of start : Sep. 1996         Date of completion : April
1997

Projects Name : Internals of C2+Recovery Plants
Client : AZARAB / NARGAN
Location : Bandar Imam + Assaluyeh
Short summary : Design and Fabrication of Internals of 13
Vessels of Maron project and towers of assaluieh project
Original Contract price : 419,730,000 RLS
Progress Status : 100%
Date of start : Nov. 2002         Date of completion : May.
2003
Type of contract : Lump Sum.
Material procurement : By Contractor

Projects Name : Double Seal of Storage Tank
Client : Tehran Oil Refining Company.
Location : Tehran
Short summary : Replacing of Existing of tank 2014 by a new
double seal compatible with MTBE.
Original Contract price : 199,000,000 RLS
Progress Status : 100%
Date of start : 17 Oct. 2001        Date of completion : 17
Jan. 2002
Material procurement : By Contractor

Projects Name : Environmental Project
Client : Esfahan Refinery
                                                              Location : Esfahan
                                                              Short summary : Enginnering, Procurment and
                                                              construction for: - Manual and Automatic Fire
                                                              Extinguishers for Electrical Ubstation and 48 Floating
                                                              Roof Storage Tans with Ozene friendly Gas(CFI) -
                                                              Replacement of CFC system with Ozene friendly Gases
                                                              for Condensate Units an
                                                              Original Contract price :
                                                              Progress Status : 2%
                                                              Date of start : 5 May 2007           Date of completion
                                                              : 5 May 2009

              Future projects

              Workshop equipment                                     Fields:
                                                                      Equipment status
                                                                        Type
                                                                        Capacity
                                                                        quantity

                                                              List No 1 ( plz attach)
              Factory products
                   o Fields:
                           Our factory
                                   Text
                                   picture
                              Production Experiences and photos
Products                           products
                           Hse program
                                       TABLE OF CONTENTS
                                           o Number
                                           o section
                                QA/QC program
                        Title
                        text
                  The best quality award
                  Shop equipment list
                        Number
                        Description
                        Spec
                        Quantity (No)
                  Factory address
                        Name of factory
                        Address:
                        Managing Director.
                        Tel NO.
                        Fax NO.
                        Web site.
                        E-mail.

   Factory equipments
        o Fields:
                Type
                Capacity
                quantity

   Factory products                          Our Factory
                                              As we explain we are going to get all of our golden
                                              opportunities and grow to be the best. For get this hard
                                              target we need some facilities and accessories. One of
                                              these is our factory which we create. We have our
                                              production there e.g. Internals...

   Factory equipments                        List No 2 (attach)
              projects data
              factory resume
              company resume

              projects data                           ?

              factory resume                          Name of Factory .
                   o fields:                           TANOOTAS Engineering & Construction factory.
                            name of factory           Address:
                            address                   Our factory is located in puinak St, puinak Sq,25th
                            managing director         kilometer of Tehran-Varamin road . We have our
                            tel no                    production there e.g. Internals.
                            fax no                    Managing Director.
                            Web site                  M.H. Tajik Rostami
                            E-mail.                   Tel NO.
                                                       (+9821)) 88747736              (+9821)) 88747736-6
                                                       Fax NO.
Download                                               (+9821)) 88747778
                                                       Web site.
                                                       Www.tanootas.com
                                                       Www.tanootas.net
                                                       Www.tanootas.ir
                                                       E-mail.
                                                       Info@Tanootas.com
                                                       Info@Tanootas.net
                                                       Info@Tanootas.ir

              company resume                          Activities of the company
                  o fields:                            -Basic and detail, design Procurement &Construction of oil,
                          activities of the company   Gas, petrochemical & industries plants. (EPC Projects)
                          engineering                 -Erection and installation of static equipments.
                          procurement                 -Erection and commissioning of steam boilers.
                          Construction                -Erection and commissioning of fired heaters.
                                                       -Installation and commissioning of rotating equipments.
                                                   -Installation and commissioning of turbo generators &
                                                   compressors.
                                                   -Design, material supply, fabrication and erection of
                                                   storage tanks.
                                                   -Renovation and rehabilitation of the plants.
                                                   -Design and supplying of internals of vessels.
                                                   -Revamping and maintenance of industrial plants.
                                                   -Supply of skilled workers.
                                                   -Construction supervision.


 News &         company `s news
                     o fields:
 Archive                     title
                             text
                             date
                             picture
                Factory
                Company
                contact with management
                factory                           Name of Factory .
                     o fields:                     TANOOTAS Engineering & Construction factory.
                             Name of Factory      Address:
                             Address.             Our factory is located in puinak St, puinak Sq,25th
                             Managing Director.   kilometer of Tehran-Varamin road . We have our
                             Tel NO.              production there e.g. Internals.
Contact us                   Fax NO               Managing Director.
                             Web site.            M.H. Tajik Rostami
                             E-mail.              Tel NO.
                                                   (+9821)) 88747736              (+9821)) 88747736-6
                                                   Fax NO.
                                                   (+9821)) 88747778
                                                   Web site.
                                                   Www.tanootas.com
                                                   Www.tanootas.net
                                         Www.tanootas.ir
                                         E-mail.
                                         Info@Tanootas.com
                                         Info@Tanootas.net
                                         Info@Tanootas.ir

   Company                              Name of Company :
       o Fields:                         TANOOTAS TABAN Engineering & Construction.
                  Name of Company       Type of Company :
                  Type of Company       Private joint stock.
                  Registered NO, Year   Registered NO, Year:
                  Grade & field         122773, 1996
                  Address               Grade & field:
                  Managing Director     2 , Sanat
                  Tel NO
                  Fax NO                Address:
                  Web site              Unit 91, No. 50,7th. St. Sarafraz St, Beheshti Ave. Tehran,
                  E-mail                15876, IRAN .
                                         Managing Director:
                                         M.H. Tajik Rostami
                                         Tel NO:
                                         (+9821)) 88747736               (+9821)) 88500153-6
                                         Fax NO:
                                         (+9821)) 88747778
                                         Web site:
                                         Www.tanootas.com
                                         Www.tanootas.net
                                         Www.tanootas.ir
                                         E-mail:
                                         Info@Tanootas.com
                                         Info@Tanootas.net
                                         Info@Tanootas.ir

   contact with management              Tel:
                                  Fax:
                                  Email:
Photo gallery      exhibitions
                   Visits
                   Permits
Bottom links
  Factory      Organization       Manpower         News        Cv of key    Project   Hse program   equipment
                                   status                     personnel`s   product



   Factory                Fields:
                               o Our factory
                                     Text
                                     picture
                               o Production Experiences and photos
                                     products
                               o Hse program
                                         TABLE OF CONTENTS
                                              Number
                                              section
                              o    QA/QC program
                                        Title
                                        text
                              o    The best quality award
                              o    Shop equipment list
                                        Number
                                        Description
                                        Spec
                                        Quantity (No)
                              o    Factory address
                                        Name of factory
                                        Address:
                                        Managing Director.
                                        Tel NO.
                                        Fax NO.
                                     Web site.
                                     E-mail.

                  Fields:
Organization           o Company Organization
                              Company Organization chart
                       o Typical site organization
                              Typical site organization
 Manpower         Fields:
                       o Staff
  status                      Total number of Staff
                                       CATEGORY
                                       DISCIPLINE
                                       CURRENT STAFF
                                       STAFF TO BE MOBILLIZEDWITHIN ONE MONTH
                       o Work force
                              List of work force
                                       JOB TRAINE
                                       CURRENT NUMBER
                                       WORKER TO BE MOBILLIZED WITHIN ONE MONTH
   News           Company news
                       o Fields:
                              Title
                              Text
                              Date
                              Picture




  CV of key       dr.tajik
                  Experience
 personnel's
   Project        Product
                  Project location
  products
Hse program      TABLE OF CONTENTS
                     o Fields:
                             Number
                             section
equipment        Equipment status