					       City of Saskatoon
    CAPITAL BUDGET - 2004
   CAPITAL PLAN - 2005-2008
          Approved
CITY COUNCIL - December 15, 2003
                   APPROVED 2004 CAPITAL BUDGET
                     AND 2005-2008 CAPITAL PLAN

INTRODUCTION AND OVERVIEW
The 2004 Capital Budget/2005-2008 Capital Plan, totals $542,953,000.        The 2004 Capital
Budget, as approved by City Council on December 15, totals $100,913,000.

The focus of the 2004 Capital Budget is on land development, continuing maintenance of the
City’s assets, and expansion and maintenance at the Water and Wastewater Plants.

Land Development
   • Work will continue on the Willowgrove neighbourhood with the servicing of an
      additional 30 lots on Maguire Court, which will be ready for sale in 2004. In addition,
      work will also begin on preparing 45 lots on Greaves Court and 72 lots on Van Impe for
      anticipated sale in 2005 and 2006 respectively. Other work planned for 2004 includes the
      landscaping of the linear park within the first phase of development and the landscaping
      of the two major entrances to the neighbourhood, including decorative fencing, trees,
      shrubs, paving stones, and entrance signs. The City will be spending approximately
      $3,400,000 during this phase of development.

   •   The first phase of development of the Hampton Village neighbourhood will be
       undertaken jointly with Dundee Development Corporation and the City, immediately
       following the approval of the concept plan in early 2004. This new neighbourhood,
       located north of Dundonald and Westview neighbourhoods, will provide a mix of new
       and old neighbourhood concepts similar to Willowgrove. In addition to servicing 45
       City-owned lots and 4 City-owned multi-family parcels, work will also be undertaken to
       install a sanitary sewer lift station and force main, develop dry ponds within the
       neighbourhood, and upgrade the Dundonald dry pond to a wet pond. Additional
       landscaping of the Dundonald pond will proceed in 2004 as part of this project. The City
       will be spending approximately $7,400,000 on this initial phase of the development.

   •   2004 will see an additional 42 lots and one townhouse site being developed within the
       Briarwood neighbourhood on Brookdale Crescent. Development in this area will include
       the installation of wrought iron and masonry fencing along the park and Briarwood Road
       as has been installed in previous phases. 2004 will also see the completion of the final
       section of Briarwood Road, which is the main looping roadway within the
       neighbourhood. Work will begin on servicing an additional 32 lots within the
       Beechwood Crescent area for sale in 2005. The City will be spending approximately
       $2,000,000 for this phase of development.

   •   Servicing of the final phase of development in the Lakewood Suburban Centre will be
       undertaken in 2004. This phase will include additional opportunities for commercial and
       medium to high-density residential development. As well, a lift station will be
       constructed to service this area. A total of approximately $3,700,000 will be spent for
       this phase of development.


____________________________________________________
APPROVED 2004 CAPITAL BUDGET AND 2005-2008 CAPITAL PLAN                           December 15, 2003

Water and Wastewater Utility
The 2004 Capital Budget and the 2005-2008 Capital Plan include projects totaling $120,100,000
($17,300,000 in 2004) which are driven by regulatory demands from Saskatchewan Environment
and increased demands related to treatment quality, public safety, system capacity, security and
reliability, as identified in a recent report by the Administration. It is recommended that
$76,000,000 be borrowed to support this plan ($9,700,000 resulting from 2004 projects). Water
and Wastewater utility rate increases are being proposed to support the capital debt.

There are two major projects planned for 2004:
    • Saskatchewan Environment and Resource Management (SERM) has a regulatory
        requirement that the City, by 2005, construct a sludge recovery and disposal system at
        the Water Treatment Plant to eliminate sludge that is generated in the waterworks pre-
        treatment process that is currently being returned to the river in slurry form. This heavy
        precipitate (predominantly calcium carbonate) settles out on the riverbank. The total
        cost of construction of this facility (including the relocation of electrical towers) is
        estimated to be in excess of $12,000,000, of which $7,100,000 was previously approved.
        The 2004 budget reflects the remainder of the required funding ($4,974,000).
        Construction is planned to begin in the summer of 2004.

    •   The existing single line pipe, which transports sludge from the Wastewater Treatment
        Plant to the bio-solids handling facility is 20 years old and is near its capacity. In
        addition, it is subject to blockages resulting from a build-up of struvite (which is a by-
        product of the biological nutrient removal process). To ensure continued reliability, it is
        planned to construct a new twinned line pipe in 2004. The existing line will be used as a
        backup. Construction costs are estimated at $5,100,000.

Major Roadwork
In addition to land development and construction on behalf of the Water and Wastewater
Utilities, there are three major roadwork projects planned for 2004:
    • Construction will continue on the upgrade of Preston Avenue to a four-lane divided
        roadway. 2004 will be the second year of this two-year project, with construction from
        108th Street to 14th Street totaling $4,650,000. The 2004 work includes the realignment
        of 108th Street to a more southerly location, which will consolidate to a single intersection
        with a new University East Road. The University has agreed to fund the installation of
        new traffic signals at the intersection of Perimeter Road and Preston Avenue as well as
        provide trees in the center median.

   •    Reconstruction of the Circle Drive and 11th Street intersection is planned for 2004 with a
        total cost of $3,500,000. This project includes left turn bays, median construction,
        upgrading existing railway crossings, widening the existing road surfacing on 11th Street
        from Avenue W to Circle Drive and the addition of two southbound lanes on Circle Drive
        from Clancy Drive to 11th Street. The intersection is also relocated slightly to the west.
        This project will accommodate the demand at this intersection for the immediate future.
        This project will be subject to approval of a funding request under the Canada
        Saskatchewan Infrastructure Program for $1,700,000.




____________________________________________________
APPROVED 2004 CAPITAL BUDGET AND 2005-2008 CAPITAL PLAN                           December 15, 2003

   •   A grade separation will be constructed at the CNR Watrous Subdivision railway crossing
       at Clarence Avenue South. This project is in partnership with Canadian National
       Railway (CNR), with a total cost of $2,817,000. As identified in the partnership
       agreement approved by City Council in September, CNR will contribute $1,925,000.

LONG TERM CAPITAL ISSUES
In March of 2002, City Council received an update to the Ten Year Capital Funding Discussion
Paper (covering 2003-2012). This report identified that, while annual contributions from the
operating budget have increased by $7,000,000 since the initial ten-year report (in 1998), annual
capital requirements also increased (by $3,600,000). The 2002 report concluded that the annual
non-utility shortfall was $17,700,000.

In addition, the ten-year discussion paper noted a major shortfall ($13,540,000) in the annual
capital base for water, wastewater and storm sewer systems. While the Administration has
begun to address this shortfall, the Water and Wastewater Utilities, as noted earlier in this report,
are faced with substantial new capital demands driven by issues related to treatment quality,
public safety, system capacity, security and reliability, resulting in a capital plan totaling $120
million, funded through a combination of reserves, senior government grants and borrowing.

The Discussion Paper recommended the continuation of four practices currently followed by the
Administration: allocation of 1/3 of annual assessment growth to the annual capital base;
redirection of matured debt charges to the annual capital base; allocation of additional mill rate
contributions to the annual capital base; and the allocation of additional ad-hoc contributions to
the annual capital program. The 2004 Capital Budget has been prepared assuming only the
approval of the assessment growth contribution from the 2004 Operating Budget.

The Discussion Paper also recommended that outstanding capital needs be considered in the
event that there are any new funding initiatives from senior governments. Consistent with both
the funding shortfall in roadways and potential new funding initiatives, an administrative report
has been prepared recommending a link between priority transportation projects and the
dedication of a gas tax revenue to the City of Saskatoon that is currently being discussed at both
senior levels of government.

PLANNING PROCESS
The City of Saskatoon annually develops a five-year Capital Program. This is one of the pieces
of the City’s corporate planning process and flows from the City’s Strategic Plan and Corporate
Business Plans. The Capital Budget document is used to obtain approval of capital expenditures,
which include capital assets and significant one-time projects in excess of $25,000.

The capital budget process consists of the following general timeline:

       Capital Budget
          o August             Budget preparation
          o November           Administrative/Committee Reviews
          o December           Budget Committee Review & City Council Approval

____________________________________________________
APPROVED 2004 CAPITAL BUDGET AND 2005-2008 CAPITAL PLAN                  December 15, 2003

CAPITAL SUMMARIES (000’S)
Table 1 summarizes the 2003 and 2004 Capital Budgets by source of funds and expenditure
category.

                                         Table 1
                                Capital Budget Summary

                                                     2004 Budget    2003 Budget
       Source of Funds
       Province of Saskatchewan                             $ 0          $ 486
       Federation of Canadian Municipalities-Green
       Fund Grant                                            200              0
       Canada-Saskatchewan Infrastructure Program          5,167          3,133
       User Charges                                          350              6
       Contributions from Developers, Benefiting
       Property Owners and Other Users                     5,167          3,533
       Appropriations from Reserves                       77,527         60,233
       Taxation/Utility Contribution                       1,059             35
       Borrowing                                           9,117              0
       Library Reserves                                      650            100
       Centennial Auditorium Reserves                        900            435
       Saskatchewan Place Reserves                           430            275
       Subtotal                                         $100,567        $68,236
       Electrical Prepaid Services Recovery                  346            444
       Total                                            $100,913        $68,680

       Expenditure Category
       General Government                                 $ 3,333        $ 3,280
       Protection of Persons and Property                   1,896          2,005
       Transportation                                      27,006        23,854
       Environmental Health                               33,812         11,702
       Planning and Development                             3,881          2,246
       Recreation and Cultural Services                     4,105          2,938
       Property Purchases and Development                 16,200         12,720
       Electrical Utility Expansion/Replacement             8,116          8,681
       Library                                                650            100
       Centennial Auditorium                                  950            435
       Mendel Art Gallery                                     188              0
       Saskatchewan Place                                     430            275
       Subtotal                                         $100,567        $68,236
       Electrical Prepaid Street Lighting Costs               346            444
       Total                                            $100,913        $68,680




____________________________________________________
APPROVED 2004 CAPITAL BUDGET AND 2005-2008 CAPITAL PLAN                         December 15, 2003


Table 2 summarizes the 2004 Capital Budget and 2005 to 2008 Capital Plan by the following
type of expenditure:



                                           Table 2
                                       Expenditure Type

                                                              2004          2005      2006-2008
 Expenditure Type                                            Budget          Plan        Plan
 Infrastructure Replacement                                    $29,802       $36,931     $67,306
 Building Envelopes/Repair                                       5,792        12,558      38,566
 Equipment Replacement                                          10,810        10,298      35,405
 Support Systems                                                 3,136          3,015      6,670
 Prepaid Land Development                                       25,317        22,588      25,104
 Rejuvenation                                                    1,132          1,091      9,895
 City Growth/Planning                                           16,997        32,316      59,273
 Capital Expansion                                               7,927        17,709      63,315
                                                              $100,913      $136,506    $305,534



FUNDING SOURCES
Reserves

Annual contributions are made to designated capital reserves based on formulas and provisions
as described in the Capital Reserves Bylaw and City Policy. Table 3 reflects the sufficiency of
these reserves.

Based on ongoing and increasing pressures on the Transit Capital Projects Reserve, an
increase to the annual provision will be requested through the 2004 Operating Budget.
Administration has prepared a report recommending a rate increase to assist in funding operating
and capital pressures and at the same time, maintaining the current ratio of total fare revenue to
total operating costs at 39%. Until such time as the 2004 Transit Operating Budget is approved
by City Council, the following projects would be approved subject to the increased operating
provision:
        P671 Transit Auxiliary Vehicle/Equipment
        P1190 Passenger Data Program

As noted earlier, a utility borrowing plan has been established to assist with projected funding
insufficiencies in both the Waterworks Capital Projects Reserve and the Sewage Treatment
Capital Reserve.

Insufficiencies to the Storm, Surface and Water and Sewer Infrastructure Replacement
Reserves beyond 2005 will be the subject of future reports. Insufficiencies in the Civic Vehicles


____________________________________________________
APPROVED 2004 CAPITAL BUDGET AND 2005-2008 CAPITAL PLAN                        December 15, 2003

and Equipment Disposition and Acquisition Reserve and the Landfill Replacement Reserve
are currently being reviewed by Administration.

The Reserve for Capital Expenditures (RCE) has been established by City Council to provide
funding for discretionary capital projects. 2004 available funding is as follows:

        Projected January 1, 2004 Opening Balance:                             $508,800
        Contributions: Base Mill Rate Contribution                            4,493,500
                       1/3 of estimated assessment growth                       416,700
                       Debt Retirement                                                0
          Subtotal                                                          $5,419,000
        P1766 Centennial Park Return to Source                                  450,000
        Cap on Property Realized Reserve                                      3,915,400
        South Downtown Projects                                             (3,915,400)
        2002 Operating Surplus                                                1,000,000
        Minimum Balance Retained                                              (500,000)
          Balance available to fund discretionary projects                  $6,369,000


South Downtown Development

Discussions have continued throughout 2003 with respect to the development of the South
Downtown. As there are still uncertainties, projects initially identified within the 2004 Capital
Budget have been removed. These projects include expenditures associated with the Gathercole
Building (asbestos removal and underground duct wiring), design of the A.L. Cole Riverfront,
and removal of the 19th Street subway. It is anticipated that decisions will be made in 2004 that
will require funding. Accordingly, funds available from the Property Realized Reserve in excess
of $24,000,000, that are normally allocated to the Reserve for Capital Expenditures to fund
discretionary projects, have been reserved to provide funding for required South Downtown
projects. Any projects resulting from decisions related to the South Downtown will be the
subject of a further report and a supplemental budget submitted to City Council.


Provincial and Federal Funding Programs

The Canada Saskatchewan Infrastructure Program assisted with funding the Circle/
22nd/Confederation Grade Separation (provided in excess of $6,900,000), phase 1 of the upgrade
to Preston Avenue ($1,500,000), and the upgrade to Warman Road ($2,600,000). The City of
Saskatoon has received additional funding approval under this program for four additional
projects over the years 2004 through 2005, totaling in excess of $6,000,000. These projects
include:
        P653 Upgrade Preston, Phase II (108th St to 14th St)
        P876 Regional Waste Management Facility (approval is subject to an environmental
        assessment)
        P1522 Traffic Sound Attenuation, and
        P1583 Circle Drive Reconstruction – Millar/Northridge



____________________________________________________
APPROVED 2004 CAPITAL BUDGET AND 2005-2008 CAPITAL PLAN                          December 15, 2003

In addition to these projects, a funding request under this program for Project 2008 Circle Dr/11th
Street Intersection Improvements for $1,700,000 has been submitted under this program.

Saskatchewan Highways and Transportation (SHT) has provided funding for a number of
transportation projects throughout the years. While there are no projects identified in the 2004
Capital Budget that include funding from SHT, discussions are ongoing for future cost sharing
with projects such as the new river crossings (Project 993). A strategy has been developed
jointly with SHT to provide for the planning of the river crossings and associated roadways,
including strategic ties into the future outer perimeter roadway.

The Federation of Canadian Municipalities (FCM) manage and administer two programs
related to climate change, clean air and other green technologies. These programs provide the
opportunities for grants and/or low-interest loans. The 2004 Capital Budget reflects a grant of
$200,000 and a low-interest loan of $2,303,000 for Project 1154, Sludge Recovery and Disposal
at the Water Treatment Plant.



OPERATING BUDGET IMPACT
Capital projects within this budget will impact future City operating programs. Should all civic
projects be approved, the additional operating costs in 2005 are estimated to be $424,500. These
costs can be summarized in the following categories:


                 Mill Rate Impact                                 2005
                 Infrastructure Replacement                     $5,000
                 Rejuvenation                                   37,500
                 Prepaid Development                           135,700
                 City Growth/Planning                          162,900
                 Support Systems                                66,200
                 Capital Expansion                              17,200
                 Total                                        $424,500


Five projects submitted by the Board of Police Commissioners will impact on the mill rate in
2004 by $114,200, and in 2005 by $113,800. The most significant impact results from the
Central Avenue Reporting Centre (Project 2071).

Specific operating impacts are disclosed, at the project level, throughout the Capital Budget.




____________________________________________________
APPROVED 2004 CAPITAL BUDGET AND 2005-2008 CAPITAL PLAN                        December 15, 2003

APPROVED CAPITAL BUDGET PROJECTS
The capital plan consists of projects relating to civic departments, utilities, and boards and
commissions, which are funded by reserves, debt, and/or private donations. For ease of review,
these projects are reflected in the following tables:

       Table 4, Capital Projects Requiring Funding from the Reserve for Capital Expenditures
       Table 5, Civic Department Projects
       Table 6, Land Development Projects
       Table 7, Boards and Commission Projects
       Table 8, Water/Sewage Utility Projects
       Table 9, Storm Sewer Utility Projects
       Table 10, Transit Utility Projects
       Table 11, Electrical Utility Projects

Capital Projects – Discretionary Funding

Table 4 summarizes the 2004 projects with funding from the Reserve for Capital Expenditures.
Details for each project follow page 21.

In addition, this table identifies projects totaling $33,967,000 for 2005 (requiring funding from
the Reserve for Capital Expenditures totalling $29,980,000) and $96,567,000 for 2006-2008
($77,417,000 from the Reserve for Capital Expenditures).




____________________________________________________
                                                               SUFFICIENCY OF RESERVES (Table 3 - page 1 of 3)
                                                                CAPITAL RESERVES SUFFICIENCY FORECAST
                                                                         (In Thousands of Dollars)
I. GENERAL CAPITAL RESERVES
                                              Forecasted              2004              Balance       2005               Balance      2006-2008           Balance
                                                Jan 1/04         Source         Appl     Dec/04   Source         Appl     Dec/05    Source      Appl       Dec/08
Civic Departments
Affordable Housing Capital                            104              0       (104)         0         0            0          0         0           0          0
Auto Garbage Container Repl                           167            350       (300)       217       350         (300)       267      1,050       (900)       417
        1
Campsite                                               58              0         (11)       47         0          (15)        32         0         (70)       (38)
Civic Bldgs Comp Mtnce                              2,928           2,985     (3,067)     2,846     2,985     (3,317)      2,514      8,956     (8,594)     2,876
Civic Vehicles & Equip Repl.                        3,119           3,117     (4,006)     2,230     3,117     (3,000)      2,347      9,352     (9,000)     2,699
Civic Veh & Equip Disp/Acq'n                          560             52       (254)       358        52         (770)     (360)       155        (702)     (907)
Computer Equipment Repl                               121            563       (375)       309       563         (515)       357      1,689     (1,560)       486
CIS Systems Development                               610            140       (215)       535       140         (150)       525       420           0        945
Dedicated Lands                                       904             25           0       929        25            0        954        81           0      1,035
Dedicated Roadways                                    474             14           0       488        14            0        502        42           0        544
Electrical Distribution Extension                   2,437           2,190     (3,117)     1,510     2,190     (2,531)      1,169      6,572     (7,803)       (62)
Electrical Distribution Repl                       10,407           5,418     (4,743)    11,082     5,418     (4,772)     11,728     16,254    (12,860)    15,122
Fire Equipment Repl                                    23             67           0        90        67          (46)       111       201        (304)         8
Fire Apparatus                                         38              0           0        38        31            0         69      1,688       (450)     1,307
Forestry Farm Auditorium                                   0           5          (4)        1         5            0          6        14           0         20
Forestry Farm Development                              (1)            35         (33)        1        35          (35)         1       105        (105)         1
Golf Course Capital Reserve                           568            213       (420)       361       223         (265)       319       936        (438)       817
Grounds Maintenance Equipment Repl                    423            264       (253)       434       264         (261)       437       793        (829)       401
Heritage Fund Reserve                                 201             58         (95)      164        54           (9)       209       162         (26)       345
Infra Expansion - Transp                              926           1,570     (2,495)        1      1,570     (1,570)          1      4,710     (4,710)         1
Infra Repl - Storm                                     28           1,104     (1,132)        0      1,104     (6,783)     (5,679)     3,312    (11,080)   (13,447)
Infra Repl - Surface                                       0        6,625     (6,620)        5      6,625     (7,125)      (495)     19,875    (22,035)    (2,655)
Infra Repl - Parks                                     85            800       (875)        10       750         (756)         4      2,250     (2,253)         1
Infra Repl - W & S                                  1,240           6,554     (7,680)      114      6,554     (8,847)     (2,179)    19,661    (16,789)       693
Landfill Replacement                                  607            718       (543)       782       718      (1,817)      (317)      2,154       (750)     1,087
Landfill Bldg/Equip Repl                              120              0           0       120         0            0        120         0           0        120
Leisure Serv. Equip. Repl                             392             58         (49)      401        58         (120)       339       176        (240)       275
Park Enhancement Reserve                              319            106           0       425       106         (205)       326       317        (115)       528
Parking Capital Reserve                             1,271            106         (67)     1,310      106          (50)     1,366       318         (90)     1,594
Photocopy Machines Repl                               213             41       (200)        54        41            0         95       123           0        218
             1
Planning Levy                                          16            140         (60)       96        92          (60)       128       271        (180)       219
Public Works Bldgs Civic Facilities                    45             15           0        60        15            0         75        45           0        120
Sewage Coll & Treat Repl                            1,328            437       (663)      1,102      437         (529)     1,010      1,314     (2,266)        58
Sewage Treatment Capital                            1,098              0      (1,098)        0       705      (5,024)     (4,319)    11,132    (13,423)    (6,610)
Snow & Ice Mgmt                                     1,720             16         (20)     1,716       16            0      1,732        48           0      1,780
SNT Replacement Reserve2                                   0          10           0        10        15            0         25        70         (70)        25
Streetscape1                                          682           1,141     (1,173)      650      1,141        (771)     1,020      3,422     (4,449)        (7)
Traffic Noise Attenuation                                  0         500       (500)         0       500         (500)         0      1,500     (1,500)         0
Transit Capital Projects2                              15            500       (347)       168       500         (385)       283      1,500     (1,485)       298
Transit Vehicles Repl                               5,624           1,732     (1,150)     6,206     1,779     (3,360)      4,625      6,447     (7,955)     3,117
Water Supply Repl                                   1,878           1,121      (514)      2,485     1,121        (595)     3,011      3,522     (6,181)       352
Waterworks Capital Proj                             3,192           1,569     (4,761)        0      1,466    (25,608)    (24,142)     5,221    (49,153)   (68,074)
Weigh Scale Repl - Public Works                       181              0           0       181         0            0        181         0           0        181
                                      TOTAL        44,121          40,359    (46,944)    37,536    40,952    (80,091)     (1,603)   135,858   (188,365)   (54,110)



1
Applications include contributions to operations
2
Subject to operating budget approval
                                                              SUFFICIENCY OF RESERVES (Table 3 - page 2 of 3)
                                                               CAPITAL RESERVES SUFFICIENCY FORECAST
                                                                          (In Thousands of Dollars)
I. GENERAL CAPITAL RESERVES
                                             Forecasted              2004              Balance            2005             Balance     2006-2008         Balance
                                               Jan 1/04         Source         Appl     Dec/04        Source       Appl     Dec/05   Source      Appl     Dec/08
Boards and Commissions
Albert Comm Centre Repair                             64             18         (17)        65           18          (5)       78       54        (60)       72
Centennial Aud. Capital Exp3                          82              9           0         91           12           0       103       51          0       154
Centennial Aud. Equipment Repl                       130            171       (245)         56           175      (175)        56       546     (360)       242
Centennial Aud. Theatre Restoration                  123            199       (255)         67           20          (5)       82       103       (60)      125
Mendel Art Gallery Cap Expansion                      27              6          (8)        25            6         (25)        6       21        (27)        0
Mendel Art Gallery Cap Equip Repl                     57            114       (126)         45           115      (114)        46       482     (478)        50
            3
Police Radio                                              2         170         (72)       100           170        (40)      230       686     (784)       132
                            3
Police Facility Renovations                           31             16           0         47           16           0        63       750     (325)       488
Police Oper Equip & Tech Advances                    152            500       (597)         55           500      (462)        93     1,500    (2,344)     (751)
Public Library Capital Expan                       3,848            418       (550)      3,716           424          0      4,140    1,357    (1,200)     4,297
Public Library Equip Repl                            371            125       (100)        396           126      (100)       422       384     (300)       506
Public Library Francis Morrison Mtnce                173             90         (20)       243           164        (55)      352       524     (175)       701
Public Library JS Wood Mtnce                          15             19         (25)         9           19           0        28       61          0        89
Public Library Mayfair Mtnce                              6           6         (12)         0            6           0         6       20        (10)       16
Public Library Alice Turner Mtnce2                        0          28         (10)        18           29           0        47       91        (27)      111
Sask Place Equip Repl                                652            182       (430)        404           183      (165)       422       535     (863)        94


                                     TOTAL         5,733          2,071      (2,467)     5,337         1,983     (1,146)     6,174    7,165    (7,013)     6,326



2
Subject to operating budget approval
3
Reserve provision has become debt payment

     (continued from previous page)
II.   PREPAID LAND DEVELOPMENT RESERVES

The Prepaid Land Development Reserve Sufficiency Forecast (below) encompasses the Five Year
Development Plan approved by City Council on December 1, 2003.



                                                      PREPAID LAND DEVELOPMENT
                                                            Table 3 (page 3 of 3)
                                                  RESERVE SUFFICIENCY FORECAST - 2004
                                                         (In Thousands of Dollars)


                                Arterial     Trunk      Primary       Sewer       Direct      Parks & Rec.   Industrial   Community   TOTAL
                                 Road        Sewer     Watermain       Lift      Services         Levy         Parks        Centre
                                 Levy        Levy        Levy        Stations                                                Levy

Beginning 2004
 Balance                        5,691       12,048       4,846          50        15,517         1,839         591           0        40,582

Inflows :
  Lot Sales & Other
  Transfers                     2,247        2,695        601          202        11,527         2,222          19          399       19,912

Outflows :
 Capital Expenses               (1,300)     (4,014)       (767)       (1,659)     (12,890)      (1,486)         (32)          0       (22,148)


ENDING BALANCE                  6,638       10,729       4,680        (1,407)     14,154         2,575         578          399       38,346

                          The Prepaid Land Development Reserve Sufficiency Forecast above is based on the Five Year
                          Development plan approved by City Council on December 1, 2003. Based on projected lot sales and
                          capital expenditures for 2004, the reserve will be sufficient to meet 2004 requirements.
                                                         Table 4 (page 1 of 2)
                                             2004 Capital Budget / 2005-2008 Capital Plan
                           Capital Projects Requiring Funding From the Reserve For Capital Expenditures
                                                      (In Thousands of Dollars)
                                                                      2004 Budget            2005 Plan            2006-2008 Plan
                                                                           Financing             Financing               Financing
Project Number/Name                                                 Cost   Required      Cost    Required        Cost    Required

0631   TRAFFIC SAFETY IMPROVEMENTS                                    300          300     300             300     900          900
0653   UPGR PRESTON (14TH STREET-CPR TRACKS)                         4650          347       0               0       0            0
0877   CITY-WIDE RADIO TRUNKING SYST                                  155          155     225             225    2000         2000
0959   UPGRADE BOUNDARY ROADS                                         200          200       0               0       0            0
1046   PLAYGRD BLDGS/PADDLING POOL REPL                               445          445       0               0       0            0
1137   BICYCLE FACILITIES                                             200          200     200             200     600          600
1456   RAILWAY CROSSING SAFETY IMPROVEMENT                             50           50      75              75     225          225
1508   CITY ENTRANCE SIGNS                                             80           80     175             175     525          525
1512   NEIGHBORHOOD TRAFFIC MGMT                                      210          210     100             100     300          300
1527   UNIVERSITY BRIDGE REHAB                                         50           50    1800            1800       0            0
1565   PK DEV-UNIVERSITY HEIGHTS MULTI-DISTRICT-Soccer               1085          355    3338            2250       0            0
1565   PK DEV-UNIVSTY HEIGHTS MULTI-DISTRICT-Rdwy Enhance             108          108       0               0       0            0
1583   CIRCLE DRIVE RECONSTRUCTION-MILLAR/NORTHRIDGE                  300          300    3427            2960       0            0
1614   BACKFLOW PREVENTION DEVICES                                    231          231     232             232     232          232
1624   PARKS INFRASTRUCTURE CONDITION AUDIT                            30           30       0               0       0            0
1627   CITY ENTRANCES SHELTER BELT LANDSCAPING                        150          150     100             100       0            0
1726   FUTURE GROWTH - SECTOR PLANS                                    25           25       0               0       0            0
1779   TREAS UPGRADE REMIT/CASHIER SOFTWARE                           110           30       0               0       0            0
1799   PROPERTY REASSESSMENT 2005                                     130          130       0               0       0            0
1801   DATA CENTRE SECURITY                                           500          500     200             200     200          200
1804   CITY CENTENNIAL CELEBRATION                                     80           80       0               0       0            0
1806   FIRE - SCBA UNIT (BREATH'G APPAR)                               87           87      32              32      93           93
1817   MENDEL RENOVATION AND EXPANSION                                188          163    1100             275   11855         2900
1846   COMPENSATION MANAGEMENT SYSTEM                                  35           35       0               0       0            0
1895   CIRCLE DR/108TH ST OVERPASS REHAB                               35           35       0               0       0            0
1909   FIRE - THERMAL IMAGING CAMERA                                   45           45      45              45       0            0
1910   FIRE - RESCUE TOOL SYSTEM                                       45           45      90              90       0            0
1913   FIRE - HOSE AND HOSE EQUIPMENT                                  25           25       0               0      50           50
1918   FIRE - COMMUNICATIONS RENOVATIONS                               55           55       0               0       0            0
1920   FIRE - TURNOUT GEAR REPLACEMENT                                180          180       0               0       0            0
1938   PLAYSTRUCTURE UPGRDE AND REPL                                  150          150     150             150     450          450
1989   e-SERVICE ENHANCEMENT                                          250          100       0               0       0            0
1996   RIVERBANK SLOPE FAILURE                                         90           45       0               0       0            0
2008   CIRCLE DR/11TH ST INTERSECTION IMP'S                          3500          875       0               0       0            0
2033   NBHD PROFILES DEVELOPM'T & DISSEMINATION                        60           60     100             100      70           70
2034   LOCAL AREA PLAN IMPLEMENTATION                                 300          300     250             250     510          510
2036   CORPORATE MAPPING SERVICES SYSTEM UPGRADE                       36           36       0               0       0            0
2038   IDYLWYLD FREEWAY - RESURFACE NB RAMP                           127          127       0               0       0            0
2041   SPADINA CREEK BRIDGE                                            32           32       0               0       0            0
2048   FORESTRY FARM PARK & ZOO MASTER PLAN                            30           18     100             100     600          600
2071   POLICE CENTRAL AVENUE REPORTING CENTER                          92           92       0               0       0            0
2104   GHC/RINKS/ZOO - UPGRADE INFRASTRUCTURE                          50           50       0               0       0            0
2132   POLICE ADDITIONAL SPACE REQUIREMENTS                            50           50    1525            1365   25750        25750
2170   NEIGHBOURHOOD SAFETY                                            60           60      60              60      60           60
2181   RISK MGMT COMPUTER SYSTEM-REPLACEMENT                           60           60       0               0       0            0
2182   CORPORATE ENVIRONMENTAL MANAGEMENT SYS                          50           50       0               0       0            0
2183   KYOTO BASE LINE                                                 30           30       0               0       0            0


Allocation From Reserve For Capital Expenditures                    14751         6781   13624        11084      44420        35465




___________________________________________________________________________
                                                        Table 4 (page 2 of 2)
                                            2004 Capital Budget / 2005-2008 Capital Plan
                          Capital Projects Requiring Funding From the Reserve For Capital Expenditures
                                                     (In Thousands of Dollars)

                                                                     2004 Budget              2005 Plan          2006-2008 Plan
                                                                          Financing               Financing             Financing
Project Number/Name                                                Cost   Required        Cost    Required      Cost    Required

0537    TRANSIT - TERMINALS                                            0              0    1040          1000    1765         1300
0620    ARTL RD - BOYCHUK (8TH - HWY 16)                               0              0       0             0    4000         1000
0787    VICTORIA BRIDGE REHABILITATION                                 0              0    2834          2832       0            0
0819    TENNIS COURTS RESURFACE                                        0              0      28            28     225          225
0948    SIDEWALK/PATH RETROFIT-ARTL RD                                 0              0     100           100     300          300
0993    NEW RIVER CROSSINGS                                            0              0       0             0    5000         5000
1003    FIRE - EMERGENCY INFO MNGT SYST                                0              0       0             0     500          500
1036    TRAFFIC SIGNALS-NEW LOCATIONS                                  0              0      75            75     225          225
1457    CIRCLE DRIVE FEASIBILITY STUDY                                 0              0     300           300       0            0
1507    GUARDRAILS                                                     0              0      50            50     100          100
1523    CORPORATE MOBILE DATA SYSTEM                                   0              0      50            50     325          325
1526    CIRCLE DR BRIDGE REPAIR                                        0              0       0             0     240          240
1528    UNIVERSITY BRIDGE-PIGMENTED SEALER                             0              0     400           400       0            0
1551    BROADWAY BRIDGE REPAIRS                                        0              0      20            20     500          500
1553    IDYLWYLD BRIDGE ABUTMENTS                                      0              0      35            35       0            0
1555    WARMAN RD/CIRCLE DR BRIDGE REPAIR                              0              0      50            50     450          450
1584    CITY OF SASKATOON YARD CONSOLIDATION                           0              0     540           540    5700         5700
1599    RIVERBANK PARKS IRRIGATION                                     0              0     334           334     220          220
1613    DIEFENBAKER PARK ROAD                                          0              0     368           368       0            0
1622    WOODLAWN CEMETERY TREE REPLACEMENT                             0              0      73            73     187          187
1623    NUTANA MEDIANS IRRIGATION                                      0              0      77            77       0            0
1625    ROTARY PARK PARKING LOT                                        0              0      84            84       0            0
1628    ROTARY PARK MASTER PLAN                                        0              0      30            30       0            0
1693    FFP&ZOO RESURFACE ZOO PATHWAYS                                 0              0      40            40     120          120
1724    NEW NEIGHBOURHOOD DESIGN                                       0              0      70            70      30           30
1727    PLANNING DISTRICT REVIEW                                       0              0      50            40      50           40
1881    ELECTRONIC DOCUMENT MGMT SYS                                   0              0     305           305     400          400
1886    VICTORIA AVE RETAINING WALL                                    0              0      43            43       0            0
1911    FIRE - NEW STATION - EAST SASKATOON                            0              0    1935          1935       0            0
1914    FIRE - NEW STATIONS - WEST SASKATOON                           0              0       0             0    2335         2335
1917    FIRE - BEHAVIOR TRAINING FACILITY                              0              0      55            55       0            0
1919    FIRE - RADIO REPLACEMENT                                       0              0       0             0    1220         1220
1932    CITY HALL NORTH WING ELEVATOR                                  0              0     245           245       0            0
1952    JOHN AVANT PK BOARDWLK REMOVE                                  0              0      60            60       0            0
1963    CORPORATE ACCESSIBILITY POLICY                                 0              0      75            75       0            0
1977    LOCAL AREA NETWORK & DATA SECURITY                             0              0     130           130     240          240
1985    TIME AND ATTENDANCE TRACKING                                   0              0     325           325       0            0
1995    TRANSPORTATION POLICY INDEX MEASURES                           0              0      50            50       0            0
2000    25TH STREET EXTENSION/REHABILITATION                           0              0       0             0    8290         4210
2002    CIRCLE DR/COLLEGE DR INTERCHANGE                               0              0    9950          8555    3300         3800
2009    CIRCLE DRIVE BRIDGE WIDENING                                   0              0       0             0    6000         4430
2010    TRAFFIC DEMAND MGMT STRATEGY                                   0              0      50            50       0            0
2013    CIRCLE/DR AIRPORT DR GRADE SEPARATION                          0              0       0             0   10200         8630
2014    SURVEY EQUIPMENT PURCHASES                                     0              0      50            50     150          150
2040    UNDERWATER PIER INSPECTIONS                                    0              0       0             0      75           75
2075    CY FAC BOOKING & PROG REGISTRATION SYS                         0              0     130           130       0            0
2109    WINTERIZED RIVERBANK WASHROOMS                                 0              0     217           217       0            0
2112    SFH - MECHANICAL SYSTEM ASSESSMENT                             0              0      75            75       0            0


Total                                                              14751         6781     33967        29980    96567        77417




___________________________________________________________________________
APPROVED 2004 CAPITAL BUDGET AND 2005-2008 CAPITAL PLAN                     December 15, 2003

APPROVED CAPITAL BUDGET PROJECTS - cont’d

Civic Department Projects

Table 5 details the capital projects submitted by civic departments that are fully funded from
specific sources of funds, totaling $31,752,000. Most of this financing is from reserves
established to finance such projects. Project details follow page 21.




____________________________________________________
                                      Table 5
                  GENERAL CAPITAL PROJECTS - CIVIC DEPARTMENTS
                             (In Thousands of Dollars)

 Project                                                  2004     2005   '06-'08
 Number                      Project Title                Cost     Cost     Cost

            Community Services Department:
      706   Leis Serv - Facility Equip Repl                 49      120     240
     1748   Streetscape Furniture Purchase                   0        0     100
     2032   Commercial Space Data Development               25       15       0
     2064   Heritage Properties Identification              50        0       0
     2101   Golf Course Improvements & Equip Repl.         870      265     438
     2102   Sportsfield Development                          0      270     135
     2103   KPR: Landscape/Site Improvements               225        0       0
     2108   FFP & Zoo Redevelopmt of Eagle Enclosure        10       33       0
     2162   Streetscaping                                  772      500     440
     2163   Upgrading Existing Streetscaping                 0       60      60
     2164   Streetscape Lighting                             0        0      50
                                                          2001     1263    1463
            Corporate Services Department:
      855   High Volume Photocopier                        200        0       0
     1083   Corporate Network Equipment Repl               275      450    1200
     1778   Meter Reading Routing Software                   0       50       0
     1780   Corp Network Infrastructure                    100       65     360
     1798   Income Assessment Approach                     150       50      50
     1800   Mailing and Colour Printing Replacement        415        0       0
     1802   Procurement Study                               25      150       0
     1803   Electronic Phonebook and Org. Charts            40        0       0
                                                          1205      765    1610
          Fire & Protective Services Department:
      582 Fire Appar - Refurb/Repl/Add'l                     0       46      754
                                                             0       46      754
            Infrastructure Services Department:
      679   Grounds Mtnce-Equipment Repl                   253      261     829
      699   Artl Rd-8th St (Boychuk - CPR)                   0        0     515
      832   City Ent - Median Infra Rehab                  200      200     600
      835   Collector Road Preservation                   1000     1100    3750
      836   Arterial Road Preservation                    1900     1405    4500
      837   Lane Rehab & Drainage Improv                   175      175     645
      901   Park Upgrading-Neighborhood                    878      760    2287
     1041   Benchmark Rehabilitation                        30       30      90
     1135   Civic Bldgs Comp Maint Program                3037     3287    8504
     1356   V&E-Add'l Vehicles & Equipt                    214      220     702
     1357   V&E Repl't Vehicles & Equipt                  4006     3000    9000
     1491   Water and Sewer Design Standards                30        0       0
     1505   Traffic Signal Upgrade-Infra                   400      400    1200
     1506   Traffic Signing Replace-Infra                   80      100     300
     1513   Pavement Marking Program-Infra                 100      120     360
     1518   Parking Meter Purchases                         50       50      90
     1522   Traffic Sound Attenuation                      500     2398    1500
     1531   Local Roads Preservation                      1100     1000    4950
     1595   Park Ltg Upgrd-Neighbourhood                    55       55     110
     1615   Water Distribution System Preservation        2480     1765    2716
     1616   Waste Water Collection System Pres'n          2515     3415    8695
     1617   Primary Water Main System Preservation        1435     1485    3255
     1618   Waste Water Trunk Sewer Preservation          1210      260     780
     1631   Park Dev-Willowgrove Nbrhd                     547        0     165
     1632   Park Dev-Sutherland Infill                      24      199       0
     1633   Park Dev-Hughes Drive                          111        0       0
     1634   Park Dev-Lakewood Suburban District Park         0        0     584
     1677   Storm Water Mgmt Utility Billing (Area)        150        0       0
     1871   Demolition Elec Bldg-Ave B&19                    0      410       0
     1876   Tennis Court-Acrylic Surface                    30       30      90
     1890   Expressway Road Preservation                   210     1460    2700
     1900   Local Roads Deferred Maintenance Backlog      1155     1155    3000
     1999   Equipment Storage Shed - City Yards             40      550       0
     2011   Transportation Model Replacement                25      175       0
     2012   Clarence Ave/CNR Overpass                     2817        0       0
     2042   CN Industrial Road & Drainage Rest'n           345        0       0
                                                         27102    25465   61917
          Solid Waste Management (Utility Services Department):
      876 Regional Waste Mgnt Facility                    1144     3123     600
     1475 Auto'd Garbage Container Repl                    300      300     900
     1482 SW-Recycling Depots                                 0     160     150
                                                          1444     3583    1650

TOTAL COST                                               31752    31122   67394
APPROVED 2004 CAPITAL BUDGET AND 2005-2008 CAPITAL PLAN                     December 15, 2003

APPROVED CAPITAL BUDGET PROJECTS - cont’d

Land Development Projects

The land development projects in Table 6 include the financing of 2004 activity as approved by
City Council on December 01, 2003, with approval of the Five Year Development Plan.
Changes recommended and adopted by City Council when the development plan is next
reviewed may result in changes to projects in Table 6.

These would be resubmitted to City Council.

Table 6 summarizes the 2004 funded projects, totaling $23,442,000. Project details follow page
21.


Boards and Commission Projects

The Capital Budget relating to Boards and Commissions includes funded capital projects for the
Albert Community Centre, the Saskatoon Centennial Auditorium, Saskatoon Police Services,
Saskatoon Public Library and Saskatchewan Place. Table 7 summarizes the 2004 capital
projects totaling $2,716,000. Project details follow page 21.




____________________________________________________
                                       Table 6
                           LAND DEVELOPMENT PROJECTS
                              (In Thousands of Dollars)

 Project                                                   2004    2005    '06-'08
 Number                      Project Title                 Cost    Cost      Cost

      590   Land Dev't - Briarwood Sub                     2031     691        0
      593   Land Dev't - Hudson Bay Ind'l Sub                 0     466        0
      600   Land Dev't - Confed'n Park Sub                  731       0        0
      625   Tr Swr - Northeast Sector                       144       0      253
      626   Land Dev't - Subdivision Warranty               147       0        0
      627   Land Dev't - Subdivision Fencing                409       0        0
      634   Tr Swr - North Industrial                         0    4165     4058
      639   Land Dev't - Subdivision Buffers                 72       0        0
      655   Artl Rd - McOrmond (Hwy 5 - Perimeter Rd)       625       0        0
      656   Artl Rd - Attridge (Berini - Mcorm)               0       0      786
      668   Boulevard Development                            88      50      150
      681   Artl Rd - Taylor (McKer - CP Track)               0     773        0
      686   Prim Wtrmn-Southeast Sector                     717       0        0
      704   Tr Swr - Southeast Sector                      1284     619     2475
      748   Land Dev't - Gen Admin - Old Areas               76       0        0
      774   Land Dev't - C. N. Industrial Sub                 0    1629        0
      777   Prim Wtrmn - Stonebridge                         50    1600     1150
      778   Tr Swr - Stonebridge                            207    3065     9295
      947   Land Dev't - Univ Heights Sub                   138       0        0
     1057   Ind'l Area Blvd Tree Planting                    32      25       75
     1062   Land Dev't - Lakewood Suburban                 3656       0        0
     1164   Park Dev - Briarwood Nbrhd                       32     353        0
     1166   Park Dev - Arbor Creek Nbrhd                      0      32      323
     1390   Land Dev't - Dundonald Sub                       67       0        0
     1393   Land Dev't - Sutherland Sub                     224       0        0
     1396   Land Dev't - Willowgrove Sub                   3534     349        0
     1397   Land Dev't - Silverwood Ind                    1499       0        0
     1400   Land Dev't - Hampton Village Sub               3381    2292        0
     1401   Land Dev't - Stonebridge                        170     212        0
     1402   Land Dev't - Willows                             65       0        0
     1416   Tr Swr - Hampton Village                       4038       0        0
     1435   Primary Water Mains - North Industrial            0    1680     1790
     1458   Artl Rd - Hampton Village (33rd-Airport Dr)      25    1050        0

PREPAID PROJECTS TOTAL COST                                23442   19051   20355


                                        Table 7
                              BOARDS AND COMMISSION
                               (In Thousands of Dollars)

 Project                                                   2004    2005    '06-'08
 Number                      Project Title                 Cost    Cost      Cost

          Albert Community Centre:
      677 Albert Comm Centre Renos                           17       5        60
                                                             17       5        60
          Centennial Auditorium:
      740 Equipment Repair/Replacements                     245     175       360
     1820 Theatre Restoration                               705       5        60
                                                            950     180       420
            Police Services:
     1380   Computer System Integration                     100     150        0
     1382   Computer Server Integration                     150       0        0
     1389   Notebook Replacement                              0     200      400
     2028   Storage Area Network                              0       0      450
     2029   Network Upgrades                                 50       0      100
     2030   Backup Firewall For Op Continuity                95       0        0
     2065   Enhanced Systems Security                         0      50        0
     2066   Handheld Computers                                0       0      120
     2067   Desktop Network Computer Replace                  0       0      300
     2068   Geographical Positioning System                  25       0        0
     2070   Detention Video Storage System                    0       0      325
     2116   In-Car Notebook Computer                        125       0        0
     2119   Radio Replacement                                32      40      784
     2120   Dispatch Consul Furniture                        40       0        0
     2121   EDU-Bomb Suit Replacement                        27       0       27
     2122   Remote Mobile Investigator Replace                0       0      105
     2123   Firearms Replacement                              0       0       92
     2124   Camera Replacement                               25       0        0
     2125   Taser Gun                                         0      62        0
     2131   In-Car Video Capture & Retention                  0       0      750
                                                            669     502     3453
          Public Library:
      838 Equipment Replacement                             100     100      300
     1031 Alice Turner Branch                                 0       0     1200
     1758 South Downtown New Library Proj Planning          550       0        0
                                                            650     100     1500
          Saskatchewan Place:
     1812 Equipment Purchases                               430     165       863
                                                            430     165       863

BOARDS/COMMISSION TOTAL COST                               2716     952     6296
APPROVED 2004 CAPITAL BUDGET AND 2005-2008 CAPITAL PLAN                         December 15, 2003



APPROVED CAPITAL BUDGET PROJECTS – cont’d

The utility capital plan consists of projects relating to the Water, Sewage, Storm Sewer,
Electrical and Transit Utilities.


Water/Wastewater Utility Projects

Table 8 reflects the Water and Sewage Utility projects approved for 2004, consisting of projects
relating to the Water Utility for $10,630,000 and the Wastewater Utility for $6,738,000 a total in
2004 of $17,368,000.


Storm Sewer Utility Projects

Table 9 reflects the Storm Sewer Utility projects approved for 2004, totaling $925,000.


Transit Utility Projects

Table 10 lists the Transit Utility projects approved for 2004, totaling $1,497,000. Projects 671,
Transit Auxiliary Vehicle/Equipment ($160,000) and 1190, Passenger Data Program ($25,000)
have been approved subject to approval of the 2004 Operating Budget.

Details for all projects follow page 21.




____________________________________________________
                                         Table 8
                         WATER/WASTEWATER UTILITY PROJECTS
                                (In Thousands of Dollars)

Project                                                        2004    2005    '06-'08
Number                        Project Title                    Cost    Cost      Cost

            Water Utility:
      713   Reservoir - Pumping Capacity                           0    5840    1485
     1054   Asset Replacement                                    490     580    6181
     1055   Automatic Meter Reading Conv                         325     275     825
     1154   Sludge Recovery & Disposal                          4974       0       0
     1205   Chlorination System Upgrd                              0       0     448
     1208   New Intake Facility                                  200   10868       0
     1210   Filter Plant Upgrade/Expansion                         0    1330    6960
     1217   Low Lift Buildings                                     0       0    1753
     1220   Storage Facilities                                     0    2395       0
     1222   Disinfection System Upgrade                         1435       0       0
     1223   Operations Facilities Upgrade                        898       0       0
     1224   Site Expansion                                      2128    1188       0
     2191   Ave H Traffic Rerouting                                0     574       0
     2192   42nd St. Reservoir Roof Upgrade                      180     843       0
     2193   High Lift Pump Station/Reservoir                       0    2295   19127
     2194   Low Lift Pump & UV Facility                            0       0    7790
     2195   UV Disinfection System                                 0       0    5843
     2196   Sand Separator System Expansion                        0       0    3311
     2197   Water Conservation Study                               0       0     150
     2198   Ave H Reservoir Expansion                              0       0    1461
                                                               10630   26188   55334
            Wastewater Utility:
      687   Asset Replacement                                   648     514     1274
     1225   Sludge Disposal Facility Replacement                  0       0      992
     1227   Sludge Disposal - Maint/Staff Facility              198       0        0
     1234   Odour Abatement System                                0       0     8076
     1236   UV Disinfection System                                0       0     3938
     1240   Sewage Facilities Condition Asses                   180       0        0
     1241   Sludge Disposal Pipeline                           5112       0        0
     1242   Sludge Disposal Mixers                              150       0        0
     1243   Lift Station Upgrades                               450     303      909
     1244   Sludge Disposal Deep Storage Cell                     0     495        0
     1245   Grit & Screen Facility                                0    4226        0
     1246   Grit Pit Remediation                                  0       0      500
                                                               6738    5538    15689

WATER/WASTEWATER UTILITY TOTAL COSTS                           17368   31726   71023




                                          Table 9
                             STORM SEWER UTILITY PROJECTS
                                 (In Thousands of Dollars)

Project                                                        2004    2005    06-'08
Number                        Project Title                    Cost    Cost     Cost



     1000   Downtown Wtr/Swr Improvements                         0    5460     3938
     1619   Storm Sewer Trunk Preservation                      495    2110     5880
     1620   Storm Sewer Collection Preservation                 355    1050     2350
     1621   Storm Sewer Pond Preservation                        75      75      225

STORM SEWER TOTAL COST                                          925    8695    12393



                                           Table 10
                                      TRANSIT PROJECTS
                                   (In Thousands of Dollars)

Project                                                        2004    2005    06-'08
Number                        Project Title                    Cost    Cost     Cost



      583   Replace/Refurb Buses                                 90    2800     7895
      671   Auxiliary Veh/Equip                                 160     135      260
     1181   Fare Boxes                                         1000     500        0
     1190   Passenger Data Program                               25       0        0
     1192   Fuel System Improvements                             37      25      125
     1193   Innovative Pilot Projects                            25       0        0
     1194   Engine Overhaul                                     100     100      300
     2095   SNT Bus Purchases                                     0       0      180
     2097   Bus Seat Replacement                                 60      60       60
     2099   Planning and Scheduling System                        0      85      335

TRANSIT TOTAL COST                                             1497    3705    9155
APPROVED 2004 CAPITAL BUDGET AND 2005-2008 CAPITAL PLAN                           December 15, 2003

APPROVED CAPITAL BUDGET PROJECTS – cont’d

Electrical Utility Projects

Table 11 lists the Electrical Utility projects approved for 2004. The utility’s capital plan contains
work over several years. To assure the timely and cost effective progress of the work in the plan
period, materials and equipment may be committed in the budget year for delivery in the
following year. This will result in a spending commitment of funds budgeted for the plan period.

Table 11 identifies the Electrical Utility projects for 2004, totaling $8,462,000. Project details
follow page 21.




____________________________________________________
                                         Table 11
                              ELECTRICAL UTILITY PROJECTS
                                 (In Thousands of Dollars)

Project                                                    2004    2005   '06-'08
Number                        Project Title                Cost    Cost     Cost

            Electrical Lines:
      719   Feeder- 14.4 kV                                   0       0     280
      720   Capacitor Installations                         100       0     150
      722   Feeder - 25 kV Overhead                           0       0     665
      734   Residential Underground Replacement               0     500    1500
      736   Ind, Com, Inst Ext/Repl                        1000     500    1500
      739   Subdivision - City - Distribution                49     100     340
     1305   Feeder - Upgrade/Replacement                      0     110     330
     1308   Feeders - Conversion Intermed. S/S                0     400     500
     1311   Feeder - 25 kV - W. A. Friebel S/S              660     100     110
     1314   Feeder - 14.4 kV - N. Central - Ave C            50     200     900
     1315   North West Bulk Power Supply                      0       0    1504
     1316   Transmission Line Foundation Protection          50       0       0
     1317   Line - U/G Upgrade (Deadfront)                  100     400    1200
     1318   Feeder - Melville - Main St                     550     550    1550
     1319   Lines - Nutana Sub - 14.4 kV Upgrade            600     400     400
     1320   Annual Residential Services                     150     150     450
     1321   Feeders - South Downtown                        350     100       0
     1322   Feeder - Edmonton Avenue                          0      10     300
     1323   Feeder - Pleasant Hill                            0      10     310
     1341   Feeder - 14.4 kV - Brevoort Pk. Conv.           130       0       0
                                                           3789    3530   11989
            Electrical Substations:
      815   Substation - Pleasant Hill Upgr                  20       0       0
     1018   Substation Monitoring System                     80       0      50
     1019   Substation - W.J. Bunn Upgrade                    0       0     100
     1085   Substation - C. D. McGall Upgrade                10     120       0
     1152   Substation - J. R. Cowley                       900     775    1210
     1330   Substation - North Central                      200     100      30
     1332   Substation - (14.4/4.16 kV)-Service Life Ext      0      50     150
     1333   Substation - Ave C.-14.4 kV Switchgear            0       0      25
     1334   Substation - J. M. Taylor Upgrade               550       0     610
     1335   Substation - College Park                         0       0      20
     1336   Substation - 29th Street S/S                    125       0       0
                                                           1885    1045    2195
            Electrical Network:
      723   Network - Central Business District              175      0       0
     1260   Network Vault - Auditorium Ave.                    0     50    1104
     1261   Network Vault - 134 3rd Ave. S.                    0      0     550
     1262   Network Vault - 2nd Ave Ext SDD                   50    503    1006
     1263   Network Vault Infrastructure - Upgrade           200     90     270
     1264   Network - Transformer Upgrades                    80    130     260
     1266   General Network Extension                          0    100     100
                                                             505    873    3290
            Electrical Street Lighting:
      666   Arterials - SPC Area                               0     50     150
      825   Upgrade - City Area                               50     50     150
      931   Cable/Base Replacement-Centre Medium               0     50     150
     1016   Upgrade Residentials                             500    500    1500
     1174   Elec Subdiv - City - Street Ltg                  354    440    1414
     1280   COS - Lighting Upgrade                             0    100     300
                                                             904   1190    3664
          Electrical Meters:
      724 New and Replacement                                200    200      600
                                                             200    200      600
            Electrical Other:
      812   Automated Mapping System                         99      50      153
     1270   Remote Meter Data Acquisition                    50       0        0
     1272   Facility Comprehensive Maint Prog               550     250       10
     1275   Rev Meter Certification                         250      50      150
     1276   Electrical Shop - Test Equipment                100       0        0
     1281   Electrical System Power Supply Options           50       0        0
     1310   Electrical Utility - R & D                       80     100      300
                                                           1179     450      613

ELECTRICAL UTILITY TOTAL COST                              8462    7288   22351
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0537 TRANSIT-TERMINALS

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Sutherland Terminal                                              0            0            0            240             0          240
 South East Terminal                                              0            0           25            200             0          225
 Confederation Pk Terminal Improvements                           0           40            0              0             0           40
 Downtown Terminal                                                0        1,000        1,300              0             0        2,300
   Total GROSS COST DETAILS                                       0        1,040        1,325            440             0        2,805

FINANCING DETAILS
  Transit Capital Projects Reserve                                0         ( 40)         ( 25)       ( 440)             0        ( 505)
  Unfunded                                                        0     ( 1,000)      ( 1,300)             0             0      ( 2,300)
    Total FINANCING DETAILS                                       0     ( 1,040)      ( 1,325)        ( 440)             0      ( 2,805)


Project Description
This project involves the construction, capital maintenance of and improvements to off street transit terminals in new and existing
regional areas. Terminals reduce transfer time so that scheduled frequencies are maintained. In addition, pedestrian/vehicle conflicts
and vehicular congestion are reduced.

General Comments
The Sutherland terminal has been deferred until 2007 pending the development of the Suburban Center. A transfer point was created
in the northeast sector with the introduction of new routes and service enhancements in fall of 2003. It is anticipated that this will
sufficiently service transfer needs until 2007.

The South East terminal has been deferred due to the rate of residential development in the southeast area. The south east terminal
will not proceed before the year 2006. The existing terminal at the Circle Center Mall is expected to be sufficient to meet the expected
demand until 2006.

Confederation Terminal will require roadway resurfacing and improvements in 2005.

The Downtown terminal relocation is shown as construction commencing in 2005/2006. The potential exists for federal government
cost sharing for a portion of the project and a funding strategy for the balance of the project cost will be developed.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0582 FIRE APPAR - REFURB/REPL/ADD'L

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 FIRE APPARATUS - REPLACEMENT                                      0           46           70           593            91             800
   Total GROSS COST DETAILS                                        0           46           70           593            91             800

FINANCING DETAILS
  Fire Equip Repl Res                                              0        ( 46)         ( 70)       ( 143)         ( 91)        ( 350)
  Fire Apparatus Reserve                                           0            0             0       ( 450)             0        ( 450)
    Total FINANCING DETAILS                                        0        ( 46)         ( 70)       ( 593)         ( 91)        ( 800)


Project Description
This project provides the replacement, refurbishment, or addition of major pieces of fire fighting equipment, in accordance with the
Capital Reserves Bylaw.

General Comments
There are no vehicles requiring replacement in 2004.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0583 TRANSIT-REPLACE/REFURB BUSES

                                                           2004            2005          2006          2007         2008
                                                        BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 BUS REPLACEMENT                                                 90       2,800         2,650         3,200        2,045        10,785
   Total GROSS COST DETAILS                                      90       2,800         2,650         3,200        2,045        10,785

FINANCING DETAILS
  Transit Vehicle Replacement Res                             ( 90)     ( 2,800)     ( 2,650)      ( 3,200)      ( 2,045)     ( 10,785)
    Total FINANCING DETAILS                                   ( 90)     ( 2,800)     ( 2,650)      ( 3,200)      ( 2,045)     ( 10,785)


Project Description
This project provides for the scheduled replacement and/or refurbishment of existing buses in order to maintain an in-service fleet size
of 113 buses. This will be accomplished first by refurbishing buses when it makes economic sense to do so and second by purchasing
replacement buses. Any expansion of the in-service fleet size is included in Capital Project 584 - Additional Buses.

General Comments
The planned replacement schedule is as follows:

   2004 - 2 Buses Refurbished @ $45,000 each
   2005 - 7 Buses @ $400,000 each
   2006 - 6 Buses @ $400,000 each and 1 Bus @ $250,000
   2007 - 8 Buses @ $400,000 each
   2008 -2013 - 36 Buses @ $400,000 each, 1 Bus @ $250,000, 3 Buses Refurbished @ $45,000 each.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

0590 LAND DEV'T-BRIARWOOD SUB

                                                           2004           2005          2006          2007         2008
                                                        BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 1987 - A - Private                                            18            33             0             0             0              51
 Earth Work                                                   185             0             0             0             0             185
 Developer Shared Costs                                        32             0             0             0             0              32
 1998 - C4 - City (Beechdale)                                  90           658             0             0             0             748
 2002 - C3 - City (Brookdale)                               1,706             0             0             0             0           1,706
   Total GROSS COST DETAILS                                 2,031           691             0             0             0           2,722

FINANCING DETAILS
  Gen PPD-Services-Eng                                    ( 1,760)       ( 638)             0             0             0     ( 2,398)
  Gen PPD Services-Elec-SPC                                   ( 44)        ( 53)            0             0             0         ( 97)
  Property Realized Reserve                                 ( 227)             0            0             0             0       ( 227)
    Total FINANCING DETAILS                               ( 2,031)       ( 691)             0             0             0     ( 2,722)


Project Description
This project involves the construction of municipal services on city-owned and privately-owned land. Estimates for services to be
installed by the private owner are not shown.

General Comments
                           City     Private
         Year(s)           Lots     Lots

         1989              -        75
         1990              -        23
         1991              -        22
         1992              -        48
         1993              -        51
         1994              -        70
         1995              -        44
         1996              -        37
         1997              -        56
         1998              60       49
         1999              -        34
         2000              15       81
         2001              27       24
         2002              76       66
         2003              50       63
         2004              42       50
         2005              32       36

Property realized funding is for transition grading, landscaping adjacent to Beechmont within the swale, and telephone and gas and
electrical distribution costs in excess of that provided by the land development levy.

Prior Budget Approvals                 $5,802,000
Prior years' reflects construction in the A-Private area, B-Private area, C1-City (Brookmore), D-Private area, E-Private area, Swale
Design, Earth Work, Developer Shared Costs and C2-City (Beechmont), 1998-C4-City (Beechdale), Dev'r Share Enhance Nbrhd Trmt,
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                          PROJECT DETAILS ($'000s)

0590 LAND DEV'T-BRIARWOOD SUB

Powerline Relocation in the S.E. Sector and 2002-C3-City(Brookdale).
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0593 LAND DEV'T-HUDSON BAY IND'L SUB

                                                            2004            2005          2006          2007       2008
                                                         BUDGET            PLAN          PLAN          PLAN       PLAN    TOTAL
GROSS COST DETAILS
 2002 - B - City (Faithful Ave/Cres)                               0          466              0             0        0     466
   Total GROSS COST DETAILS                                        0          466              0             0        0     466

FINANCING DETAILS
  Gen PPD-Services-Eng                                             0       ( 466)              0             0        0   ( 466)
   Total FINANCING DETAILS                                         0       ( 466)              0             0        0   ( 466)


Project Description
This project involves the construction of municipal services on city-owned industrial land.

Prior Budget Approvals                 $3,846,000
Prior years' reflect the construction of the 1988 A Private, 2001 A City Area, 2002 B City (Faithful Ave/Cres).
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0600 LAND DEV'T-CONFED'N PARK SUB

                                                            2004            2005        2006         2007          2008
                                                         BUDGET            PLAN        PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 1998 - B - City (Blakeney)                                     731              0          0             0            0           731
   Total GROSS COST DETAILS                                     731              0          0             0            0           731

FINANCING DETAILS
  Gen PPD-Services-Eng                                        ( 713)             0          0             0            0        ( 713)
  Gen PPD Services-Elec-SPC                                     ( 18)            0          0             0            0          ( 18)
   Total FINANCING DETAILS                                    ( 731)             0          0             0            0        ( 731)


Project Description
This project involves the construction of municipal services on city-owned land and privately-owned land. Estimates for those services
to be installed by the private owner are not shown.

General Comments
              City         Private
        Year  Lots         Lots

         1996     -        -
         1997     -        18
         1998     -        36
         1999     -        -
         2003     28       17
         2004     42       -

Prior Budget Approvals                          $936,000
Prior years' reflects construction in the A-Private area and B-City (Blakeney) area.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

0620 ARTL RD-BOYCHUK(8TH-HWY 16)

                                                           2004           2005         2006          2007         2008
                                                        BUDGET           PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 8th/Briarwood Road                                              0            0        1,000             0             0        1,000
 Briarwood Rd/Taylor                                             0            0        1,000             0             0        1,000
 Taylor/Highway 16                                               0            0        2,000             0             0        2,000
    Total GROSS COST DETAILS                                     0            0        4,000             0             0        4,000

FINANCING DETAILS
  Arterial Road Reserve                                          0            0     ( 3,000)             0             0     ( 3,000)
  Unfunded                                                       0            0     ( 1,000)             0             0     ( 1,000)
    Total FINANCING DETAILS                                      0            0     ( 4,000)             0             0     ( 4,000)


Project Description
This project involves the relocation and upgrading of Boychuk Drive from 8th Street to Highway 16. This is required to provide access
to the Lakeview, Lakeridge, Lakewood, Briarwood and future subdivisions in the southeast sector.

Prior Budget Approvals                $3,553,000
Prior years' reflects the design and construction of 8th/Briarwood Road, design and construction of Taylor/Highway 16, design and
construction of Briarwood Rd/Taylor, Street Lighting-8th/Highway, and powerline relocation.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0625 TR SWR-NORTHEAST SECTOR

                                                           2004           2005          2006          2007         2008
                                                        BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 C'E'-Willow Grove Trunks E/W                                  144             0           0              0             0          144
 E'F - Willow Grove South Pond & Drainage                        0             0         253              0             0          253
Channel
   Total GROSS COST DETAILS                                    144             0         253              0             0          397

FINANCING DETAILS
  Trunk Sewer Reserve                                        ( 144)            0       ( 253)             0             0       ( 397)
    Total FINANCING DETAILS                                  ( 144)            0       ( 253)             0             0       ( 397)


Project Description
This project involves the extension of the storm and sanitary trunk sewers north, south and east from the Saguenay Dr river crossing to
facilitate approximately 1200 hectares of staged development in the northeast sector in the near future. In the long term, these trunks
will also facilitate approximately 1800 hectares of development in the east sector.

General Comments
Note:
The assumed order of development is Willowgrove, Pederson's Ravine, Springfield, Greenwood, Sunnyridge, Deerwood, Stoneridge
and Ag Canada. Trunks required for any given neighborhood may also be required for subsequent neighborhoods. Changing the order
of development will not necessarily delay a given project.

Section *                  Length              Size            Year
                                    (meters)          (mm)

River to A                           -                3050/1200       1980/84
AA'                                 900               3050/1200       1984/85
A'B                                 300               1800/525        1986
A'C'                                650               3050/1200       2000
B'-Erindale Basin                                                     1987/88/89
C'D                                 1450              3050/1200       Beyond 2008 (Required for East Sector)
C'E'                                630               1800/450        2003/2004 (Required for Willowgrove)
E-Willowgrove North Basin                                             Beyond 2008 (Required for North Willowgrove)
E'E                                 570               1650            Beyond 2008 (Required for North Willowgrove)
E'E                                 710               1350            Beyond 2008 (Required for North Willowgrove)
F-Willowgrove South BasinBasin                                2003/2006 (Required for South Willowgrove)
GH                                  950               1800/750        1987
HI                                  525               1500/675        1997
IJ                                  350               1050/600        1997
JJ'                                 200/820           1350/600        1998
J'K                                 1700               600            Beyond 2008 (Required for Springfield)
K' - Sunnyridge Basin               Basin                             2000 and Beyond 2008 (Required for Springfield)
K'L Sunnyridge Strm Trunk1300                  1500           Beyond 2008 (Required for Pederson's Ravine)
M - Lift Station                                                      Beyond 2008 (Required for Pederson's Ravine)
MI - Force Main                     1000              100             Beyond 2008 (Required for Pederson's Ravine)
KS,SN',N'K' & POND S                                                  Beyond 2008 (Required for Greenwood)
N'M, MO, & OP                                                         Beyond 2008 (Required for Sunnyridge)
NN', QO, NS & OP'                                                     Beyond 2008 (Required for Deerwood)
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0625 TR SWR-NORTHEAST SECTOR

RK'                             600           1500                      Beyond 2008 (Required for Springfield)
TF Willowgrove Ag Canada Storm Channel Open Channel                     Beyond 2008 (Required for South Willowgrove)

* A map indicating the location of the sections is available from the Infrastructure Services Department upon request.

Prior Budget Approvals              $23,730,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0626 LAND DEV'T-SUBDIVIS'N WARRANTY

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                    147             0             0              0             0            147
   Total GROSS COST DETAILS                                      147             0             0              0             0            147

FINANCING DETAILS
  Long Term Warranty Res                                       ( 117)            0             0              0             0        ( 117)
  Property Realized Reserve                                      ( 30)           0             0              0             0          ( 30)
    Total FINANCING DETAILS                                    ( 147)            0             0              0             0        ( 147)


Project Description
This project involves warranty work in prepaid subdivisions.

General Comments
In this project funding is provided for warranty construction after the issuance of the final acceptance certificate. Funding from the
Property Realized Reserve is for reconstruction of sidewalks that are damaged during home construction.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0627 LAND DEV'T-SUBDIVIS'N FENCING

                                                             2004            2005          2006     2007         2008
                                                          BUDGET            PLAN          PLAN     PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Internal Iron Fence - Briarwood                                 383              0           0         0            0          383
 Fencing - Willowgrove                                             4              0           0         0            0            4
 Fencing - Lakewood Suburban Centre                               22              0           0         0            0           22
    Total GROSS COST DETAILS                                     409              0           0         0            0          409

FINANCING DETAILS
  Fencing Reserve                                               ( 26)             0           0         0            0          ( 26)
  Property Realized Reserve                                   ( 383)              0           0         0            0        ( 383)
    Total FINANCING DETAILS                                   ( 409)              0           0         0            0        ( 409)


Project Description
This project involves the construction of fencing relating to various prepaid subdivisions.

General Comments
Property Realized funding is for masonary fencing along collector street flankage and neighbourhood boundry. Wrought iron fencing is
also placed along rear lot lines adjacent to municipal reserve and at the rear of lots on the south side of Beechmont.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

0631 TRAFFIC SAFETY IMPROVEMENTS

                                                              2004            2005          2006           2007          2008
                                                           BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 CONSTRUCTION                                                     300           300           300            300           300         1,500
   Total GROSS COST DETAILS                                       300           300           300            300           300         1,500

FINANCING DETAILS
  Res For Cap Expenditures                                     ( 300)             0             0              0             0         ( 300)
  Unfunded                                                          0        ( 300)        ( 300)         ( 300)        ( 300)       ( 1,200)
   Total FINANCING DETAILS                                     ( 300)        ( 300)        ( 300)         ( 300)        ( 300)       ( 1,500)


Project Description
This is a yearly project which includes various traffic/pedestrian safety improvements throughout the city including pedestrian corridor
and actuated signal installations and intersection improvements.

General Comments
The Traffic safety program proposed for the budget year includes the following:

1.        Pedestrian Facilities: including the provision of pedestrian actuated signals, pedestrian corridors, installation of pedestrian
     signals at existing traffic signal locations, audible pedestrian signals to assist the visually impaired and sidewalk ramp installations
     in existing sidewalks to improve mobility for the physically disabled.

2.       Roadway Geometric Improvements: improvements proposed at various locations throughout the city primarily at intersections
     and to be completed in conjunction with other surface or underground work proposed by the Infrastructure Services Department
     and the Urban Design Committee.

3.         Signing and Signal Improvements: work proposed to address specific safety issues including upgrading signing and signals at
     fire hall locations.

4.        High Collision Intersections: conduct an independent review of three high collision intersections per year. Geometric
     improvements to intersections based on the review to be completed in conjunction with SGI to improve the safety and collision
     rate.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0634 TR SWR-NORTH INDUSTRIAL

                                                              2004         2005          2006          2007          2008
                                                           BUDGET         PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 B'E - Silverwood Ind - Stage I                                   0            0              0       1,827             0          1,827
 EF - Silverwood Ind - Stage II                                   0            0              0           0         1,069          1,069
 DD'-Strm Trk Connect Basin 58th/63rd                             0        1,061              0           0             0          1,061
 GB-Temp Frce Main-Idywld - Wanuskewin                            0        1,095              0           0             0          1,095
 D'-Temp Storm Basin-Faithfull & 63rd St.                         0        2,009              0           0             0          2,009
 FH - Silverwood Industrial North of 71st Str.                    0            0              0           0         1,162          1,162
    Total GROSS COST DETAILS                                      0        4,165              0       1,827         2,231          8,223

FINANCING DETAILS
  Property Realized Reserve                                       0      ( 3,104)             0            0             0       ( 3,104)
  Trunk Sewer Reserve                                             0      ( 1,061)             0     ( 1,827)      ( 2,231)       ( 5,119)
    Total FINANCING DETAILS                                       0      ( 4,165)             0     ( 1,827)      ( 2,231)       ( 8,223)


Project Description
This project involves extending sanitary trunk sewers from the pollution control plant to Idylwyld Drive north of 60th Street and storm
trunk sewers from the river to the same point. These trunks are required to serve new and existing industrial areas in the northern part
of the city.

General Comments
Note: The assumed order of development is Silverwood Industrial south of Waneskewin Road, Silverwood Industrial north of
Waneskewin Road, Marquis Industrial east of Millar Avenue, Marquis Industrial east of Faithfull, Marquis Industrial east of Idylwyld, and
Marquis Industrial north of 71st Street. Trunks required for any given area may also be required for subsequent areas. Changing the
order of the development will not necessarily delay a given project.

                                  Length               Size
Section *                (meters)         (MM)                 Year(s)
AA'                               2075                 1500              1982/83
A'B                               700/475              3050/1500         1984/85
D - Storm Water Storage Basin     -                    -                 1987
D - Lift Station                  -                    -                 1987-90
BB'                               350                  3050/1500         Beyond 2008 (Required for Marquis Ind E of Millar)
B'E                               650                  1500/600          2007 (Required for Slvrwd Ind N of Waneskewin)
B'C                               400                  3050/1500         Beyond 2008 (Required for Marquis Ind E of Millar)
EF                                450                  1500/600          2008 (Required for Slvrwd Ind N of Waneskewin)
CC'                               610                  3050/1500         Beyond 2008 (Required for Marquis Ind E of Millar)
C'D'                              1300                 3050/1500         Beyond 2008 (Required for Marquis Ind E of Faithfull)
D'G                               600                  2100/1050         Beyond 2008 (Required for Marquis Ind E of Idylwyld)
DD'                               1000                 1200              2005 (Required for Marquis Ind E of Idylwyld)
JI                                1200                 2100/1050         Beyond 2008 (Required for Marquis Ind N of 71st St)
GB                                3300                 300               2005 (Required for Marquis Ind. Temporary
                                                                         Servicing)
D'                                   -                 -                 2005 (Required for Marquis Ind. Temporary
                                                                         Servicing)
FH                                  800                1350/525          Beyond 2008
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0634 TR SWR-NORTH INDUSTRIAL

* A map indicating the sections is available from the Infrastructure Services Department upon request.

Funding from Property Realized Reserve is subject to proportionate cost recovery with benefiting owners.

Prior Budget Approvals                       $9,246,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0639 LAND DEV'T-SUBDIVIS'N BUFFERS

                                                            2004            2005          2006          2007         2008
                                                         BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Buffers - Sutherland                                            46             0             0             0             0            46
 Buffers - Arbor Creek                                           26             0             0             0             0            26
   Total GROSS COST DETAILS                                      72             0             0             0             0            72

FINANCING DETAILS
  Buffers Strips Reserve                                       ( 26)            0             0             0             0         ( 26)
  Fencing Reserve                                                ( 3)           0             0             0             0           ( 3)
  Property Realized Reserve                                    ( 43)            0             0             0             0         ( 43)
    Total FINANCING DETAILS                                    ( 72)            0             0             0             0         ( 72)


Project Description
This project involves the construction of buffer strips adjacent to prepaid subdivisions. This may include grading, topsoil, seeding and
shelter belts. This project also involves reimbursement for costs incurred by the developer for berm construction.

General Comments
Funding is provided from the Property Realized Reserve for construction of a shelterbelt along the CPR tracks in Sutherland, a buffer
development adjacent to the tracks with a chain link fence, and seeding along 115th Street and bollards.
The fencing reserve also provides partial funding.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0653 UPGR PRESTON(14TH STREET-CPR TRACKS)

                                                             2004             2005           2006         2007        2008
                                                          BUDGET             PLAN           PLAN         PLAN        PLAN         TOTAL
GROSS COST DETAILS
 STREET LTG                                                       223            0                   0       0             0          223
 108th St to 14th St                                            4,427            0                   0       0             0        4,427
   Total GROSS COST DETAILS                                     4,650            0                   0       0             0        4,650

FINANCING DETAILS
  Elect Dist Extension Res                                       ( 24)           0                   0       0             0         ( 24)
  Res For Cap Expenditures                                     ( 347)            0                   0       0             0       ( 347)
  Private Donations                                            ( 110)            0                   0       0             0       ( 110)
  Government Infrastructure Program                          ( 2,866)            0                   0       0             0     ( 2,866)
  Transportation Infrastructure Expansion                    ( 1,303)            0                   0       0             0     ( 1,303)
    Total FINANCING DETAILS                                  ( 4,650)            0                   0       0             0     ( 4,650)
Project Description
This project involves the upgrading of Preston Ave from 14th Street to the CPR mainline crossing to a four lane divided roadway
standard.

General Comments
Preston Avenue is a major arterial roadway carrying an average daily traffic volume of 17,000 vehicles. A volume of 10,000 vehicles
per day is used to indicate when a roadway requires four laning. Traffic congestion presently occurs at College Drive, East Road,
108th Street and Perimeter Road intersections. Traffic volumes will continue to increase along Preston Avenue as future developments
occur within the University of Saskatchewan and Innovation Place. The recent construction of the regional retail center at Circle
Drive/Attridge Drive and the realignment of Preston Avenue to connect to the Attridge Drive Interchange continue to contribute to
increased traffic flows on Preston Avenue (Capital Project 1455). The reconstruction of Preston Avenue between Research Drive and
108th Street is now complete. The work planned for 2004 is the continuation of the four laning from 108th Street south of College
Drive, the four lane cross section will transition to meet the existing two lane cross section south of Field House Road. This will include
a realignment of 108th Street to a more southerly location and consolidating to a single intersection with the University's East Road.
This will necessitate the University's existing East Road to be moved north to match. The work in 2004 involves a contribution of
funding from the University ($110,000) to allow the work to proceed as planned. This project has been approved under the Canada
Saskatchewan Infrastructure Program; however, there is an outstanding request to revise the timing and allocation of funding between
this project and Project 1583 Circle Drive Reconstruction-Millar/Northridge.

Prior Budget Approvals                                   $1,555,000
Prior years' reflects design, street lighting and Research Dr to 108th St.

Operating Impact                                        Mill Rate                    Non-Mill Rate
Paved Streets                                              2,400
Sidewalks                                                    700
Drainage                                                                                   500
Street Cleaning/Sweeping                                    3,000
Snow and Ice Management                                     7,000
                                                        -------------                -------------
Total                                                    $13,100                          $500
                                                        =======                      =======
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0655 ARTL RD-MCORMOND(HWY 5-PERIMETER ROAD)

                                                               2004         2005          2006         2007          2008
                                                            BUDGET         PLAN          PLAN         PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Attridge/Nelson Rd                                             625              0            0             0             0          625
    Total GROSS COST DETAILS                                    625              0            0             0             0          625

FINANCING DETAILS
  Arterial Road Reserve                                       ( 625)             0            0             0             0       ( 625)
    Total FINANCING DETAILS                                   ( 625)             0            0             0             0       ( 625)


Project Description
This project involves the design and construction of a north-south arterial roadway from Highway 5 (College Dr) to the future north river
crossing (proposed Perimeter Road). This roadway is the main north-south arterial that will provide access to the University Heights
Suburban area. In the long term, this roadway will form part of the roadway network feeding the proposed Perimeter Road.

General Comments
In 2003 the section between Highway 5 and Attridge Drive was constructed to a 4 lanes status. The 2004 construction is for the initial 2
lanes between Attridge & Nelson Road.

Four laning from Nelson Road to the Perimeter Road section is planned for beyond the year 2008.

The construction in 2003 included a joint project with the Department of Highways to upgrade the intersection of McOrmond and
Highway 5.

Prior Budget Approvals                         $3,717,000
Prior years' reflects the Roadway - Attridge to Highway #5.

Operating Impacts                             Mill Rate                  Non-Mill Rate
Paved Streets                                 $ 667
Sidewalks                                         100
Street Cleaning/Sweeping                          541
Drainage                                                                  $ 143
Snow and Ice Management                          1,365
                                              -----------                ---------
         Total                                $ 2,673                    $ 143
                                              =======                    =====
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0656 ARTL RD-ATTRIDGE(BERINI-MCORM)

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Kenderdine/McOrmond                                              0            0          786              0            0          786
   Total GROSS COST DETAILS                                       0            0          786              0            0          786

FINANCING DETAILS
  Arterial Road Reserve                                           0            0       ( 786)              0            0        ( 786)
    Total FINANCING DETAILS                                       0            0       ( 786)              0            0        ( 786)


Project Description
This project involves the design and construction of Attridge Drive as an arterial roadway from Berini Drive to McOrmond Drive.
Attridge Drive is the main east-west arterial roadway serving Forest Grove, Erindale, North Sutherland, Dutch Growers, Silverspring,
Arbor Creek and future northeast sector subdivisions and as such is the connecting link to the Circle Drive Bridge. Future construction
is for the final 2 lanes between Kenderdine and McOrmond.

Prior Budget Approvals                $1,239,000
Prior years' reflects the Berini/Kenderdine (4 lanes) section and the Kenderdine/McOrmond section.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0666 ST LIGHTS-ARTERIALS-SPC AREA

                                                           2004           2005          2006         2007          2008
                                                        BUDGET           PLAN          PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Roadway Ltg Improvement                                         0           50           50            50            50          200
   Total GROSS COST DETAILS                                      0           50           50            50            50          200

FINANCING DETAILS
  Unfunded                                                       0         ( 50)        ( 50)         ( 50)        ( 50)        ( 200)
   Total FINANCING DETAILS                                       0         ( 50)        ( 50)         ( 50)        ( 50)        ( 200)


Project Description
This project involves the general upgrading of street lighting on existing roadways (not associated with the Infrastructure Services
Department roadway projects) within the Saskatchewan Power Corporation (SPC) franchise area. The cost estimate reflects the net
City contribution to SPC.

General Comments
The proposed work is dependant on actual roadway lighting requirements and scheduling as required by other agencies. Funding
requirements are reviewed on an annual basis.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0668 BOULEVARD DEVELOPMENT

                                                             2004              2005       2006          2007          2008
                                                          BUDGET              PLAN       PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                     88             50          50             50           50           288
   Total GROSS COST DETAILS                                       88             50          50             50           50           288

FINANCING DETAILS
  Parks and Recreation Levy                                     ( 88)          ( 50)       ( 50)         ( 50)         ( 50)        ( 288)
   Total FINANCING DETAILS                                      ( 88)          ( 50)       ( 50)         ( 50)         ( 50)        ( 288)


Project Description
This project involves boulevard tree planting in prepaid residential areas.

General Comments
The projected costs consist of the initial staking and planting costs, as well as watering costs for a three-year establishment period, and
an allowance for tree replacements that might be incurred during the three-year period.

The 2004 locations include new residential lots developed throughout the City.

Operating Impact
Year 2005                   $ 6,700 (2002 capital)
Year 2006                   $ 6,700 (2003 capital)
Year 2007                   $11,300 (2004 capital)
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0671 TRANSIT-AUXILIARY VEH/EQUIP

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Equipment Purchase                                            160           135           160           100             0             555
   Total GROSS COST DETAILS                                    160           135           160           100             0             555

FINANCING DETAILS
  Transit Capital Projects Reserve                           ( 160)       ( 135)        ( 160)        ( 100)             0        ( 555)
    Total FINANCING DETAILS                                  ( 160)       ( 135)        ( 160)        ( 100)             0        ( 555)


Project Description
This project involves the purchase/upgrade/replacement of non-fleet Transit System vehicles and equipment in accordance with the
Capital Reserves Bylaw.

General Comments
2004 includes:
         - Hoist #6 replacement                                           $ 90,000
         - Parts Washer replacement                                         40,000
         - Vacuum System overhauls                                          30,000
                                                                         $160,000

The Vacuum System is used on the fuel line to vacuum out the debris/garbage out of the buses during fueling and servicing. The
system was purchased in 1988. The life expectancy for industrial applications is 15 years. This overhaul will extend the life to 25
years.

The 2005 estimate is for:
        -Overhaul bus Wash                                               $ 50,000
        -Replace Garage Sweeper                                            85,000
                                                                         $135,000

The bus wash system is used to wash the exterior of the buses (approximately 100 duty cycles per day). Overhaul includes - bearings,
cylinders, motors, gearboxes and control units.

The garage sweeper is a parking lot style and can be used for wet or dry floors. The sweeper is used to maintain the interior of our
Transit bus storage area and shops. It was purchased in 1993 and its life expectancy is 10 years.

The 2006 estimate is
        -Tire regroover                                                  $ 25,000
        -Propane forklift                                                  60,000
        -Shop hose reels                                                   35,000
        -Overhaul brake lathe                                              25,000
        -Mechanical shop bead blaster                                      15,000
                                                                         $160,000

Special Note
This project is subject to operating budget approval.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0677 ALBERT COMM CENTER RENOS

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Interior Repairs                                                 5             5            0             0             0              10
 Electrical & Mechanical Systems Repairs                         12             0            0            10             0              22
 Exterior Repairs                                                 0             0           10             0            40              50
    Total GROSS COST DETAILS                                     17             5           10            10            40              82

FINANCING DETAILS
  Albert Comm Ctr Major Repair Res                            ( 17)          ( 5)        ( 10)         ( 10)         ( 40)         ( 82)
    Total FINANCING DETAILS                                   ( 17)          ( 5)        ( 10)         ( 10)         ( 40)         ( 82)


Project Description
This project involves identifying and completing the necessary major repair or replacement expenditures as required by the facility's
comprehensive maintenance program.

General Comments
The budgeted amount for 2004 represents replacement of the flooring on the main and second floors and in the loft. In addition, the
2004 funds will be used to upgrade the electrical panels on the main and basement floors, and to install backflow prevention devices on
the domestic water supply line.

Prior Budget Approvals                       $21,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0679 GROUNDS MTNCE-EQUIPMENT REPL

                                                           2004            2005          2006          2007         2008
                                                        BUDGET            PLAN          PLAN          PLAN         PLAN          TOTAL
GROSS COST DETAILS
 Equipment Purchase                                            253           261          268           276           285          1,343
   Total GROSS COST DETAILS                                    253           261          268           276           285          1,343

FINANCING DETAILS
  Grounds Mtnce Equip Repl Res                               ( 253)       ( 261)        ( 268)        ( 276)       ( 285)        ( 1,343)
   Total FINANCING DETAILS                                   ( 253)       ( 261)        ( 268)        ( 276)       ( 285)        ( 1,343)


Project Description
This project involves the purchase of replacement equipment in accordance with Capital Reserves Bylaw #6774. Replacements are
required as the units have reached or passed their scheduled life spans and are experiencing unacceptable maintenance and repair
costs, excessive downtime, and/or a loss in productivity.

General Comments
The pieces of equipment to be replaced will be disposed of by public auction, by public tender, or as trade-ins. The pieces of
equipment scheduled for replacement are as follows:
                                             Quantity                Total

Front end loader with auger attachment       1                           $42,000
Self propelled trencher                      1                           $ 9,000
Self propelled mower 50"                     1                           $15,000
Self propelled mower 6"                      1                           $18,000
Self propelled tractor 40-50 hp              1                           $45,000
Vehicle mtd/pulled fertilizer spreader       1                           $ 5,000
Vehicle mtd/pulled top dresser               1                           $25,000
Vehicle mtd/pulled stump cutter              1                           $50,000
Hand operated & shop equipment               several items               $44,400
                                                                         -----------

         TOTAL                                                           $253,400
                                                                         =======
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0681 ARTL RD-TAYLOR(MCKER-CP TRACK)

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 BRIARVALE/SLIMMON                                                0          773              0             0            0           773
   Total GROSS COST DETAILS                                       0          773              0             0            0           773

FINANCING DETAILS
  Arterial Road Reserve                                           0       ( 773)              0             0            0        ( 773)
    Total FINANCING DETAILS                                       0       ( 773)              0             0            0        ( 773)


Project Description
This project involves the extension of Taylor Street east of McKercher Drive to the C.P.R. tracks. This is required to provide access to
the Lakeview, Lakeridge, Lakewood and Briarwood subdivisions and is the only east-west arterial roadway south of 8th Street.

General Comments
Additional construction for the Slimmon to CP Tracks section is beyond 2008.

Prior Budget Approvals                        $2,318,000
Prior years' reflects the McKercher/Weyakwin section, Brudell/Boychuk section, design for the Weyakwin/Brudell section, and
construction for the Boychuk/Briarvale section.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0686 PRIM WTRMN-SOUTHEAST SECTOR

                                                            2004           2005          2006          2007         2008
                                                         BUDGET           PLAN          PLAN          PLAN         PLAN       TOTAL
GROSS COST DETAILS
 BD - Taylor St. (Briarvale East)                              717              0            0             0             0        717
   Total GROSS COST DETAILS                                    717              0            0             0             0        717

FINANCING DETAILS
  Primary Watermain Reserve                                  ( 717)             0            0             0             0     ( 717)
    Total FINANCING DETAILS                                  ( 717)             0            0             0             0     ( 717)


Project Description
This project involves the extension of primary water mains to the area east of Boychuk Drive and south of 8th Street. These primaries
will facilitate the development of residential neighborhoods in the South East Sector and the Lakewood Suburban Center.

Section *Length              Size             Year
                  (meters)          (mm)

AB                530/550           1050               1989 & 1996 Completion
BC                240               600                1996
BD                1200              1050               2004 & Beyond 2008 (Required for east end of Suburban Center)
DE                2500              500/600            Beyond 2008 (Required for Brookside)

* A map indicating the location of the sections is available from the Infrastructure Services Department upon request.

Prior Budget Approvals                        $991,000
Prior years' reflects the Weyakwin/Briarvale section.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0687 WWT- ASSET REPLACEMENT

                                                           2004            2005         2006          2007         2008
                                                        BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Sludge Cross Collector #3&#4                                    0           95             0            0             0               95
 Scum Rake #3,#4                                                 0            0             0          117             0              117
 Boiler #2                                                       0            0           147            0             0              147
 Longitudinal Rake #1, #2                                        0            0             0          290             0              290
 ScumRake #1, #2                                                 0            0             0          117             0              117
 Longitudinal Rake #3, #4                                        0            0             0          290             0              290
 Gas Dome Liner Digestor #1                                      0          219             0            0             0              219
 Gas Dome Liner Digestor #3                                      0            0           219            0             0              219
 Process Control/Comm Sys                                        0          200             0            0             0              200
 Chemical Feed Facility                                        408            0             0            0             0              408
 Preventive Maintenance System                                 130            0             0            0             0              130
 Security System                                               110            0             0            0             0              110
 Telemetry System                                                0            0             0            0            94               94
   Total GROSS COST DETAILS                                    648          514           366          814            94            2,436

FINANCING DETAILS
  Sewage Coll & Trtmnt Repl                                 ( 648)        ( 514)       ( 366)        ( 814)         ( 94)      ( 2,436)
   Total FINANCING DETAILS                                  ( 648)        ( 514)       ( 366)        ( 814)         ( 94)      ( 2,436)


Project Description
This project involves the replacement of various assets related to the Wastewater Utility in accordance with the Capital Reserves
Bylaw.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

0699 ARTL RD-8TH ST (BOYCHUK-CPR)

                                                             2004             2005          2006          2007          2008
                                                          BUDGET             PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Briargate/CPR                                                      0             0          515               0             0          515
    Total GROSS COST DETAILS                                        0             0          515               0             0          515

FINANCING DETAILS
  Arterial Road Reserve                                             0             0        ( 515)              0             0        ( 515)
    Total FINANCING DETAILS                                         0             0        ( 515)              0             0        ( 515)


Project Description
This project involves upgrading 8th Street, from Boychuk Drive eastward to CPR, to an arterial roadway. This is required to provide
access to Briarwood and future subdivisions. Funding in 2002 is for the completion of concrete and final lift of asphalt for the initial 2
lanes.

General Comments
The Briargate/CPR section is planned for the year 2006 with 2 lanes only.

Prior Budget Approvals                $836,000
Prior years' reflects the design and construction for the Boychuk/Briargate Road section.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0704 TR SWR-SOUTHEAST SECTOR

                                                           2004           2005          2006          2007         2008
                                                        BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 H - East Storm Basin (Hyde Wetlands)                           0            50            0             0              0           50
 DE - Sanitary Sewer                                            0           525          367             0              0          892
 E - Sanitary Swr Lift Station                                824             0            0             0              0          824
 EJ - Sanitary Sewer                                          460             0            0             0              0          460
 G - South West Basin (Hyde Wetlands)                           0             0        1,420             0              0        1,420
 KE - Sanitary                                                  0            44            0             0              0           44
 LG - Storm                                                     0             0            0           688              0          688
    Total GROSS COST DETAILS                                1,284           619        1,787           688              0        4,378

FINANCING DETAILS
  Sewage Lift Station Res                                   ( 824)            0             0             0             0       ( 824)
  Trunk Sewer Reserve                                       ( 460)       ( 619)      ( 1,787)        ( 688)             0     ( 3,554)
    Total FINANCING DETAILS                               ( 1,284)       ( 619)      ( 1,787)        ( 688)             0     ( 4,378)


Project Description
This project involves the extension of trunk sewers on Boychuk Drive from 8th Street to the area bounded by 8th Street on the north, to
Highway 16 on the south, Circle Drive on the west and the CPR on the east.

General Comments

                                    Length Size
    Section*                        (m)    (mm)                  Year

    AB                           1580        600/1200          1988/93/94/95
    AC Storm Water Storage,
        Basin & Lift Station     -           -                 1988/1994
    EF Storm Water Storage Basin -           -                 1988/1995/1997/1998
    H Hyde Wetlands East         -           -                 2004/Beyond 2008 (Required for Brookside)
    HJ Brookside Storm Trunk     450         1500              Beyond 2008 (Required for Rosewood & Brookside)
    BE Lakewood San. Trunk       800           600             1999/2001/2004(Required for Suburban Ctr W)
    DE Rosewood San. Trunk       1600        300/450           2005/2006 & Beyond 2008(Abandon Kngsmr Lift & Required
                                                               for Rosewood)
    E Lift Station Stage I          -        -                 2004 (Required for Suburban Ctr E)
    EJ Brookside San Trunk          1200     75/450/525        2004/Beyond 2008 (Required for Suburban Ctr East
                                                               & Brookside)
    B Trounce Pond                  -        -                 1996/2000/2001/2003
    G Hyde Wetlands West            -        -                 2006 (Required for Rosewood)
    E Lift Station Stage II         -        -                 Beyond 2008 (Required for Brookside)
    KE Storm Trunk                  200      1500              2001
    KE Sanitary                     350        200             2004 (Abandon Nemeiben Lift Station)
    LG Rosewood Strm Trunk          350      1500              2007 (Required for Rosewood)
    Drainage Master Plan            -        -                 2001
    Pond M - Taylor Street          -        -                 Beyond 2008 (Required for Brookside)
    Pond N - Briarwood Swale        -        -                 Beyond 2008 (Required for Brookside)
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

0704 TR SWR-SOUTHEAST SECTOR

* Maps indicating the location of the trunk sections, storm water storage basins, and lift stations are available from the Infrastructure
Services Department upon request.

Prior Budget Approvals               $7,202,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0706 LEIS SERV-FACILITY EQUIP REPL

                                                           2004            2005          2006          2007         2008
                                                        BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchase                                              49          120          120              0          120           409
   Total GROSS COST DETAILS                                      49          120          120              0          120           409

FINANCING DETAILS
  Leisure Svs Eq Repl Res                                     ( 49)       ( 120)        ( 120)             0       ( 120)         ( 409)
    Total FINANCING DETAILS                                   ( 49)       ( 120)        ( 120)             0       ( 120)         ( 409)


Project Description
This project involves the replacement of major pieces of equipment for the Leisure Services Branch of the Community Services
Department in accordance with the Capital Reserves Bylaw.

General Comments
The equipment scheduled for upgrading in 2004 are the Harry Bailey Aquatic Centre diving boards. This project involves the
replacement of the stands for the two, one-metre spring boards, refinishing the existing stands for the two, three-metre spring boards
and replacing the 4 springboards, which attach to the stands.

In 2005 the Archibald and Lions Arena zambonis, in 2006 the Cosmo and Kinsmen Arena zambonis, and in 2008 the ACT zamboni and
Saskatoon Field House and Harry Bailey Aquatic Centre Sound Systems are scheduled for replacement.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0713 WTP RESERVOIR-PUMPING CAPACITY

                                                            2004            2005         2006           2007         2008
                                                         BUDGET            PLAN         PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 WTP Reservoir (42 ST)- Pumphouse Upgr                             0       5,840              0        1,485              0        7,325
   Total GROSS COST DETAILS                                        0       5,840              0        1,485              0        7,325

FINANCING DETAILS
  Waterworks Capital Projects Reserve                              0     ( 5,840)             0     ( 1,485)              0      ( 7,325)
   Total FINANCING DETAILS                                         0     ( 5,840)             0     ( 1,485)              0      ( 7,325)


Project Description
This project involves expansion of the pump house building, modifications to the piping/valving system, and installation of two additional
pumps at the 42nd St. reservoir to meet the requirements of the distribution system for the the North Industrial area and north-east river
crossing primary watermain. Phase 2 involves further upgrades planned for 2007.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0719 ELEC FEEDER-14.4 KV

                                                           2004            2005         2006          2007           2008
                                                        BUDGET            PLAN         PLAN          PLAN           PLAN       TOTAL
GROSS COST DETAILS
 Upgr Ave C S/S 14.4 kV FDR #9                                    0            0           30           250             0           280
   Total GROSS COST DETAILS                                       0            0           30           250             0           280

FINANCING DETAILS
  Elect Dist Replacement Res                                      0            0         ( 30)       ( 250)             0        ( 280)
    Total FINANCING DETAILS                                       0            0         ( 30)       ( 250)             0        ( 280)


Project Description
This project provides for the extension, replacement and renovation of 14.4 kV feeders throughout the Electrical Distribution System.

General Comments
These projects are typically required due to higher electrical energy demands and the need to maintain sufficient confidence of supply.
The project components may be related to substations projects and/or other distribution projects.

The Melville feeder portion of this project is now budgeted under project 1318 Elec Feeders Melville Main Street.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0720 ELEC CAPACITOR INSTALLATIONS

                                                             2004           2005          2006          2007          2008
                                                          BUDGET           PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Capacitor Installations                                        100              0           50             50           50           250
   Total GROSS COST DETAILS                                     100              0           50             50           50           250

FINANCING DETAILS
  Elect Dist Extension Res                                    ( 100)             0         ( 50)         ( 50)         ( 50)        ( 250)
    Total FINANCING DETAILS                                   ( 100)             0         ( 50)         ( 50)         ( 50)        ( 250)


Project Description
The objective of this project is to provide power factor correction to reduce the peak electrical demand of the electrical distribution
system. Reducing the peak demand has the effect of reducing the cost of bulk power purchases. It is proposed to install additional
capacitors, and add automated switching facilities.

General Comments
Capacitor banks are installed on the electrical distribution lines to offset the reactive power effect of transformers, motors, and other
loads that result in poor power factors. The actual quantity of capacitors is determined by system checks during the anticipated
seasonal maximum that yields a summer peak and a winter peak. Switching of capacitors is now considered necessary as power
purchase cost is based on monthly peak demand and energy consumption. An automated capacitor-switching scheme allows better
tracking of capacitors need to actual system demand. Overcompensating in off peak periods results in unnecessary system losses and
unnecessary reactive currents flowing. Remote control or automatic control is suggested to be more cost effective than manual
seasonal switching.

It is proposed in 2004, that an automated capacitor switching facility be put in place prior to anticipated summers peak. Historically, the
summer peak occurs in July coincidental to maximum daily temperature maximum heat soak.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0722 ELEC FEEDER-25 KV OVERHEAD

                                                            2004               2005     2006          2007          2008
                                                         BUDGET               PLAN     PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Kenderdine Rd - (Park & SPSD)                                     0             0           0            0          400           400
 Kenderdine Rd- Attridge To Ag Station                             0             0           0           15          250           265
   Total GROSS COST DETAILS                                        0             0           0           15          650           665

FINANCING DETAILS
  Elect Customer Contribution                                      0             0           0             0       ( 400)        ( 400)
  Elect Dist Extension Res                                         0             0           0         ( 15)       ( 100)        ( 115)
  Elect Dist Replacement Res                                       0             0           0             0       ( 150)        ( 150)
    Total FINANCING DETAILS                                        0             0           0         ( 15)       ( 650)        ( 665)


Project Description
This project involves the installation and reconductoring of 25 kV feeders.

General Comments
An extension of the existing 25 kV feeder on Kenderdine Road will be required in the future to link with the line now in place on the
future Fedoruk Drive. At some time in the future, it is proposed to develop a High School fronting Attridge Drive & Kenderdine Road.
Extension of the existing 25 kV feeder will be required.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0723 ELEC NETWORK-CENTRAL BUS DIST

                                                           2004           2005          2006          2007         2008
                                                        BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Network Trans Vault                                          175              0            0             0            0           175
   Total GROSS COST DETAILS                                   175              0            0             0            0           175

FINANCING DETAILS
  Elect Dist Replacement Res                                ( 175)             0            0             0            0        ( 175)
    Total FINANCING DETAILS                                 ( 175)             0            0             0            0        ( 175)


Project Description
This project involves completing the electrical system network vault at 347 2nd Avenue South.

General Comments
In prior years, a development proposal on Block 146, civic address 347 2nd Avenue South, caused the construction of a vault to
provide service to the proposed new building. The development proposed failed with substantial construction having been completed.
However, the vault still requires additional facilities before it will be able to provide electrical service.

General area electrical load growth and other development proposals have occurred. It is intended in 2004, to complete the installation
of the necessary network transformers and ancillary equipment. Upon completion of the construction, this vault will be available to
provide electrical service. The transformers are being provided and installed under project # 1264 Electric Network Transformer
Upgrades. Secondary connection and ancillary equipment are part of this project.

Prior Budget Approvals                       $250,000
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

0724 ELEC METERS-NEW AND REPLACEMENT

                                                          2004            2005         2006          2007         2008
                                                       BUDGET            PLAN         PLAN          PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Meters                                                       200          200          200           200          200         1,000
   Total GROSS COST DETAILS                                   200          200          200           200          200         1,000

FINANCING DETAILS
  Elect Dist Extension Res                                   ( 53)         ( 53)        ( 53)         ( 53)        ( 53)       ( 265)
  Elect Dist Replacement Res                               ( 147)        ( 147)       ( 147)        ( 147)       ( 147)        ( 735)
    Total FINANCING DETAILS                                ( 200)        ( 200)       ( 200)        ( 200)       ( 200)      ( 1,000)


Project Description
This project involves providing meters, metering transformers and accessories for new services and replacing obsolete meters in the
City's electrical franchise area.

General Comments
Meters tend to become less accurate with time, resulting in a loss of revenue. Older style meters must be tested more frequently
according to Industry and Science Canada (Federal Government) standards, resulting in higher maintenance and operating costs.
Some old meters require considerably more time to test and calibrate and replacement parts are often unavailable.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

0734 ELEC RESIDENTIAL UNDERGRD REPL

                                                              2004             2005          2006           2007          2008
                                                           BUDGET             PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Cable Upgrade and Replacement                                       0          500            500           500            500         2,000
   Total GROSS COST DETAILS                                          0          500            500           500            500         2,000

FINANCING DETAILS
  Elect Dist Extension Res                                           0          ( 60)         ( 60)          ( 60)         ( 60)        ( 240)
  Elect Dist Replacement Res                                         0        ( 440)        ( 440)         ( 440)        ( 440)       ( 1,760)
    Total FINANCING DETAILS                                          0        ( 500)        ( 500)         ( 500)        ( 500)       ( 2,000)


Project Description
This project replaces and/or restores deteriorated insulated underground high voltage cables in residential areas throughout the City
Franchise area. Deterioration to the dielectric strength of the cable insulation occurs mainly from the presence of moisture in and
around the cable. Locations for replacements are determined each year based on the age of the system in an area and general cable
condition.

General Comments
The restoration process involves injecting the underground residential distribution cables with insulation restoration fluid, removing
moisture from within the cable and filling the internal voids to restrict return of moisture. The expected result is to restore the dielectric
strength of the cable insulation. This should greatly extend the service life of a cable and greatly reduce the high cost of replacement.
Cable injection should minimize the disturbance to private property fencing, landscaping, etc. and minimize the interruption of
pedestrian and vehicle traffic interruption compared to long runs of open trenches required for cable replacement. Assessment of this
process will be compared to cable replacement and anticipated restoration of service life.

In instances where restoration is not feasible or cost effective, replacement becomes the viable option. The amount of cable to be
replaced is dependent in part on the results of the inspections done for cable insulation restoration.

Cable injection began in 2001. It is suggested to inject 4.16 kV Underground Residential Distribution on approximately the basis of one
neighbourhood per year. The neighbourhoods of interest are Brevort Park, Nutana Suburban Centre, Eastview, Richmond Heights and
South Meadow Green.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0736 ELEC IND, COM, INST EXT/REPL

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                 1,000           500           500           500           500         3,000
   Total GROSS COST DETAILS                                   1,000           500           500           500           500         3,000

FINANCING DETAILS
  Elect Dist Extension Res                                   ( 200)        ( 100)        ( 100)        ( 100)        ( 100)         ( 600)
  Elect Dist Replacement Res                                 ( 800)        ( 400)        ( 400)        ( 400)        ( 400)       ( 2,400)
    Total FINANCING DETAILS                                ( 1,000)        ( 500)        ( 500)        ( 500)        ( 500)       ( 3,000)


Project Description
This project involves the extension & replacement of electrical services to various customers in industrial, commercial, and institutional
areas throughout the city including the Central Business District.

General Comments
The installation of individual distribution lines and transformers requested by customers are financed by the extension reserve, where
applicable, or depending on the circumstances, charged in full or in part to the customers. Replacements of lines and transformers
may be due to deterioration or overload.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                               PROJECT DETAILS ($'000s)

0739 ELEC SUBDIV-CITY-DISTRIBUTION

                                                               2004             2005          2006           2007           2008
                                                            BUDGET             PLAN          PLAN           PLAN           PLAN           TOTAL
GROSS COST DETAILS
 11th St W-Industrial                                                 0             0             0             50               0           50
 CNR Industrial Extension                                             0             0             0             50               0           50
 Holiday Pk & West Central Industrial                                 0             0             0             90               0           90
 Univ Hts-Suburban Ctr-Nelson                                         0           100           150              0               0          250
 Sutherland (A) - Adolph/115th                                       49             0             0              0               0           49
   Total GROSS COST DETAILS                                          49           100           150            190               0          489

FINANCING DETAILS
  Elect Dist Extension Res                                        ( 15)        ( 100)        ( 150)         ( 190)               0        ( 455)
  Cost Rec PPD Land Develop                                       ( 34)             0             0              0               0          ( 34)
    Total FINANCING DETAILS                                       ( 49)        ( 100)        ( 150)         ( 190)               0        ( 489)


Project Description
This project reflects the gross costs of installing electrical distribution services in prepaid subdivisions within the City Electrical
Franchise area and identifies the utility's capital reserve funding contribution and any funding from Sask. Tel.

General Comments
This project is dependent upon the actual development within each specific neighborhood & block.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0740 CENT AUD-EQUIPMENT REPAIR/REPLACEMENTS

                                                           2004           2005         2006          2007         2008
                                                        BUDGET           PLAN         PLAN          PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Tables/Chairs                                                 35            20          20            20           20           115
 Bars/Liquor Control                                           10            20          10            10           10            60
 Janitorial/Kitchen                                            25            10          15            30           20           100
 Office Management                                             20            30          30            30           30           140
 Permanent Curtains                                            25             0           0             0            0            25
 Security - Locks/Cameras                                      30            30          30            20           20           130
 East Stairs Outside                                            5             0           0             0            0             5
 Wayfinding Signage                                            50            50           0             0            0           100
 Presentation Module #2                                        15            15          15            15           15            75
 Audio Console                                                 30             0           0             0            0            30
   Total GROSS COST DETAILS                                   245           175         120           125          115           780

FINANCING DETAILS
  Auditorium Equipment Reserve                              ( 245)       ( 175)       ( 120)        ( 125)       ( 115)        ( 780)
   Total FINANCING DETAILS                                  ( 245)       ( 175)       ( 120)        ( 125)       ( 115)        ( 780)


Project Description
This project provides for the repair or replacements of Auditorium Equipment.

General Comments
Building repairs are not part of this project and are provided for under the Civic Buildings Comprehensive Maintenance Reserve, which
is under the jurisdiction of the Facilities Branch of the Infrastructure Services Department.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0748 LAND DEV'T-GEN ADMIN-OLD AREAS

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 General Admin                                                   76             0             0             0             0               76
   Total GROSS COST DETAILS                                      76             0             0             0             0               76

FINANCING DETAILS
  Gen PPD Services-General                                     ( 76)            0             0             0             0          ( 76)
   Total FINANCING DETAILS                                     ( 76)            0             0             0             0          ( 76)


Project Description
This project involves the general administration related to the completion of work in old prepaid areas. It includes the preparation of
as-built drawings, an update of the aerial photographs of old prepaid areas, an analysis of the operation of existing storm water
drainage ponds, and final inspections.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0774 LAND DEV'T-C.N. INDUSTRIAL SUB

                                                            2004            2005         2006           2007         2008
                                                         BUDGET            PLAN         PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 2005-B-City-Melville St                                           0       1,629              0             0             0        1,629
   Total GROSS COST DETAILS                                        0       1,629              0             0             0        1,629

FINANCING DETAILS
  Gen PPD-Services-Eng                                             0     ( 1,415)             0             0             0     ( 1,415)
  Gen PPD Services-Elec-SPC                                        0         ( 60)            0             0             0         ( 60)
  Property Realized Reserve                                        0       ( 154)             0             0             0       ( 154)
    Total FINANCING DETAILS                                        0     ( 1,629)             0             0             0     ( 1,629)


Project Description
This project involves the construction of municipal services on city-owned and privately-owned land.

General Comments
The land (north of Melville Street and west of Clarence Ave.) has been developed to fully service the Electrical Building. Additional
work required includes storm sewer construction to Melville, related street construction, and construction of a storm pond for storm
water runoff. Future funding for Melville Street is dependant on a Trunk Sewer being constructed for Stonebridge and a Servicing
Agreement being entered into with private developers

Prior Budget Approvals                          $3,358,000
Prior years' reflects the construction in the A-City area and boulevard development.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0777 PRIM WTRMN-STONEBRIDGE

                                                            2004           2005          2006          2007         2008
                                                         BUDGET           PLAN          PLAN          PLAN         PLAN       TOTAL
GROSS COST DETAILS
 AB - Circle Dr - Louise/Stonebridge                             50       1,550             0              0             0     1,600
 CD' - Lorne Ave. - Ruth/Melville                                 0          50         1,150              0             0     1,200
   Total GROSS COST DETAILS                                      50       1,600         1,150              0             0     2,800

FINANCING DETAILS
  Primary Watermain Reserve                                   ( 50)     ( 1,600)      ( 1,150)             0             0   ( 2,800)
    Total FINANCING DETAILS                                   ( 50)     ( 1,600)      ( 1,150)             0             0   ( 2,800)


Project Description
This project involves the extension of primary water mains to the proposed Southridge/Stonebridge neighborhoods. It will also allow an
increase flow rate to the Sask Water Corporation south east water line.

General Comments

                           Length            Size
Section *         (m)               (mm)               Year

AB                         2,000             600                2004/2005 (Required for East Neighborhood)
CD'                        1,200             600                2004/2005 (Required for Sask Water)
D'D                        1,700             500                Beyond 2008 (Required for West Neighborhood)

* A map indicating the location of the sections is available from the Infrastructure Services Department upon request.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0778 TR SWR-STONEBRIDGE

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 A - Sewage Pumping Station                                      60          900             0             0              0          960
 F-Jasper Ave. Sewage Pump Stn                                   25            0             0           900              0          925
 J - Storm Water Storage Basin                                   75        1,400             0             0              0        1,475
 GH - Tr Strm Sew - CN Rt of Wy                                   0           90         3,523             0              0        3,613
 HI - Tr Strm Sew - CN Rt of Wy                                   0           50             0         1,759              0        1,809
 IJ - CN Row Storm Force Main                                     0           25             0           888              0          913
 AL-Frc Mn-Preston/CNR/Melville/Brand                            22          500             0             0              0          522
 FM - Force Main - Jasper Lift/Taylor/Lorne                      25            0             0         1,075              0        1,100
 Lift Stn J - Storm Sewer                                         0          100         1,150             0              0        1,250
    Total GROSS COST DETAILS                                    207        3,065         4,673         4,622              0       12,567

FINANCING DETAILS
  Sewage Lift Station Res                                      ( 85)     ( 1,000)      ( 1,150)        ( 900)             0      ( 3,135)
  Trunk Sewer Reserve                                        ( 122)      ( 2,065)      ( 3,523)      ( 3,722)             0      ( 9,432)
    Total FINANCING DETAILS                                  ( 207)      ( 3,065)      ( 4,673)      ( 4,622)             0    ( 12,567)
Project Description
This project involves the extension of trunk sewers to the proposed Southbridge/Stonebridge neighborhoods. It will also improve storm
sewer services to the Avalon and Adelaide extensions.

This project is subject to further review of servicing and cost implications as well as approval of an overall neighborhood concept plan

General Comments
                                              Length Size
Section *                            (m)      (mm) Year

A - Stonebridge Lift Station          -        -         2004 (Required for East Neighborhood)
AB - Force Main                                                   Cancelled
BC - Force Main                                                   Cancelled
DE                                                                Cancelled
F - Jasper Ave Lift Station Improvements       -         -         2007 (Required for East Neighborhood)
J - Storm Water Storage Basin                  -         -        2004/Beyond 2008(Required for East Neighborhood)
GH                                             3100 900           2006 (Required for East Neighborhood)
HI                                             870       900      2007 (Required for East Neighborhood)
IJ                                             1900 600           2007 (Required for East Neighborhood)
JK                                             600       900      Beyond 2008 (Required for West Neighborhood)
AL - Force Main                                2770 300           2004 (Required for East Neighborhood)
FM - Force Main                                2180 450           2007 (Required for East Neighborhood)
N - Lorne Ave Lift Station Upgrade                                Beyond 2008 (Required for West Neighborhood)
NO - Force Main                                1170 600           Beyond 2008 (Required for West Neighborhood)
J - Storm Sewer Lift Station                                      2006 (Required for East Neighborhood)
* a map indicating the locations of the sections is available from the Infrastructure Services Department upon request.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

0787 VICTORIA BRIDGE REHABILITATION

                                                              2004             2005          2006           2007          2008
                                                           BUDGET             PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 REHAB STEEL STRUCTURE & DECKS                                       0        2,792               0              0             0        2,792
 Street Lighting                                                     0           42               0              0             0           42
    Total GROSS COST DETAILS                                         0        2,834               0              0             0        2,834

FINANCING DETAILS
  Elect Dist Extension Res                                           0           ( 2)             0              0             0           ( 2)
  Unfunded                                                           0      ( 2,832)              0              0             0      ( 2,832)
    Total FINANCING DETAILS                                          0      ( 2,834)              0              0             0      ( 2,834)


Project Description
This project involves the staged rehabilitation of the Traffic Bridge to ensure a 5 tonne load rating is maintained over the next 20 years.

General Comments
Consultant studies in 1986 and 1991 led to structural repairs and guardrail upgrade in 1992. The load limit has been reduced from 8 to
5 tonnes until the recommended final stage of rehabilitation can be accomplished. In 1996, the pedestrian walkway was reconstructed,
six new bearings installed, three new expansion joints installed, and new support piles installed at the south approach span. In 2001
the structure was resurfaced. In 2003 structural repairs were made to the railing, walkway and abutments as a result of
recommendations from consultant's studies completed in 2002.

The scope of this project is to extend the life of the existing structure as a vehicular traffic bridge. Closing this bridge would divert the
traffic to other bridges causing congested traffic levels.

The funding requested in 2005 is to enact the 2003 recommendations. A report will be submitted to the Planning and Operations
Committee detailing alternative options.

Prior Budget Approvals                $1,206,000
Prior years' reflects engineering inspections, members and guardrails, partial construction of walk and retaining walls, pier evaluation,
and design and some construction for the rehabilitation of steel structure and decks.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

0812 ELEC-AUTOMATED MAPPING SYSTEM

                                                          2004           2005         2006         2007          2008
                                                       BUDGET           PLAN         PLAN         PLAN          PLAN           TOTAL
GROSS COST DETAILS
 Implementation of GIS                                         49           50           51           52            50           252
 GIS Software/Hardware Upgrade                                 50            0            0            0             0            50
   Total GROSS COST DETAILS                                    99           50           51           52            50           302

FINANCING DETAILS
  Elect Dist Extension Res                                  ( 78)        ( 29)        ( 29)         ( 30)        ( 29)         ( 195)
  Elect Dist Replacement Res                                ( 21)        ( 21)        ( 22)         ( 22)        ( 21)         ( 107)
    Total FINANCING DETAILS                                 ( 99)        ( 50)        ( 51)         ( 52)        ( 50)         ( 302)


Project Description
This project provides for the data updating and entry of new elements into the proposed Geographic Information System (GIS).
Included is the provision for an increase in the number of licences to provide for a multi user environment.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0815 ELEC SUBSTN-PLEASANT HILL UPGR

                                                           2004           2005          2006          2007         2008
                                                        BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 TRANSFORMER UNIT 2                                             20             0            0             0             0           20
   Total GROSS COST DETAILS                                     20             0            0             0             0           20

FINANCING DETAILS
  Elect Dist Replacement Res                                 ( 20)             0            0             0             0         ( 20)
    Total FINANCING DETAILS                                  ( 20)             0            0             0             0         ( 20)


Project Description
This project provides for the landscaping around the perimeter of the Power Transformers and switchgear at the Pleasant Hill Electrical
Substation.

Prior Budget Approvals                       $200,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0819 TENNIS COURTS RESURFACE

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                     0           28           75            75            75            253
   Total GROSS COST DETAILS                                       0           28           75            75            75            253

FINANCING DETAILS
  Unfunded                                                        0        ( 28)         ( 75)         ( 75)        ( 75)        ( 253)
   Total FINANCING DETAILS                                        0        ( 28)         ( 75)         ( 75)        ( 75)        ( 253)


Project Description
This project involves the planned recapping (new asphalt base and acrylic protective coating) or decommissioning of various tennis
courts throughout the city.

General Comments
The Leisure Services Branch of the Community Services Department, in consultation with the former Asset Management Department,
completed a review of tennis court participation to determine an appropriate inventory of the number of courts required to meet current
and future demand. Analysis indicated an excess of tennis courts in Saskatoon.

The Administration developed a plan outlining a redevelopment program for those courts that should be retained along with
recommendations identifying those courts that should be decommissioned. This project continues the implementation of that plan to
ensure that tennis courts remain in safe playing condition. Once existing courts, identified as needing to be retained, are recapped,
annual ongoing maintenance is required which includes repairs to nets and fences, and periodic reapplication of the acrylic protective
coating.

In the plan, it was identified that when courts identified for decommissiong reached a stage where they had excessive cracking and
became a safety hazard, they would be decommissioned. The tennis courts in Parc Canada have now reached that stage and the
2005 planned expenditure relates to the decommissioning of these courts.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0825 ST LIGHTS-UPGRADE-CITY AREA

                                                           2004            2005          2006         2007          2008
                                                        BUDGET            PLAN          PLAN         PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Upgrades-Various Locations                                     50            50            50           50            50           250
   Total GROSS COST DETAILS                                     50            50            50           50            50           250

FINANCING DETAILS
  Elect Dist Extension Res                                    ( 50)        ( 50)         ( 50)         ( 50)         ( 50)       ( 250)
    Total FINANCING DETAILS                                   ( 50)        ( 50)         ( 50)         ( 50)         ( 50)       ( 250)


Project Description
This project involves the upgrading of street lighting on roadways (not associated with Infrastructure Services Dept roadway projects)
within the City electrical franchise area.

General Comments
The lighting upgrades noted are in response to public safety issues respecting roadway intersection, railway crossings and mid-block
lighting. A non-specific lighting upgrade has been included for lighting upgrades which require immediate attention in response to City
Council requests and public safety issues.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0832 CITY ENT - MEDIAN INFRA REHAB

                                                           2004            2005         2006          2007         2008
                                                        BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Street Medians                                                200          200           200          200           200         1,000
    Total GROSS COST DETAILS                                   200          200           200          200           200         1,000

FINANCING DETAILS
  Infrastructure Res - Surface                              ( 200)        ( 200)       ( 200)        ( 200)       ( 200)       ( 1,000)
    Total FINANCING DETAILS                                 ( 200)        ( 200)       ( 200)        ( 200)       ( 200)       ( 1,000)


Project Description
This project involves the redevelopment of various centre medians along major arterial streets. The work consists of curb replacement
where required, hard surfacing, installation of irrigation systems, tree planting, and containerized flower pots.

General Comments
Priorities are established annually in consultation with the various branches of the Infrastructure Services Department. The current
level of funding permits the rehabilitation of approximately two city blocks per annum. Prior years actual costs have been apportioned
approximately 75% for curb and utility replacements, and 25% for landscaping.

Previous work has been concentrated on Idylwyld Drive, College Drive, 8th Street (east of Cumberland Avenue), and 22nd Street West.
Proposed construction in 2004 will include Circle Drive (Northridge to Warman Road), to be done in conjunction with the roadway
upgrading. Possible future projects include Airport Drive and 8th Street from Cumberland Avenue to Lorne Avenue.

Operating Impact
Year 2005      $7,200 (2004 capital)
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0835 COLLECTOR ROAD PRESERVATION

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                  1,000        1,100         1,250          1,250         1,250          5,850
   Total GROSS COST DETAILS                                    1,000        1,100         1,250          1,250         1,250          5,850

FINANCING DETAILS
  Infrastructure Res - Surface                              ( 1,000)      ( 1,100)      ( 1,250)      ( 1,250)      ( 1,250)       ( 5,850)
    Total FINANCING DETAILS                                 ( 1,000)      ( 1,100)      ( 1,250)      ( 1,250)      ( 1,250)       ( 5,850)


Project Description
This project funds annual preservation programs to rehabilitate collectors, the roads that collect traffic from residential roads within each
neighborhood. The objective of this program is to minimize the life cycle cost of preserving the collector roads, subject to minimum
acceptable levels of service. This program has been in place since 1988.

General Comments
Collector roads represent about 16% of all of Saskatoon's roads. The proposed 2004 program was originally based on 1999 data but
has been updated from the 2003 condition rating where this information is available.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0836 ARTERIAL ROAD PRESERVATION

                                                           2004            2005         2006          2007         2008
                                                        BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Construction                                               1,900         1,405        1,500         1,500         1,500         7,805
   Total GROSS COST DETAILS                                 1,900         1,405        1,500         1,500         1,500         7,805

FINANCING DETAILS
  Infrastructure Res - Surface                            ( 1,900)     ( 1,405)      ( 1,500)      ( 1,500)     ( 1,500)       ( 7,805)
    Total FINANCING DETAILS                               ( 1,900)     ( 1,405)      ( 1,500)      ( 1,500)     ( 1,500)       ( 7,805)


Project Description
This project funds annual preservation programs to rehabilitate arterial roads, the high volume roads interconnecting neighbourhoods.
The objective is to minimize the life cycle cost of preserving these roads subject to minimum acceptable levels of service. This program
has been in place since 1981.

General Comments
Arterial roads represent about 20% of all Saskatoon's roads. Over the past several years, volumes, loads and the number of axles
(which accelerates deterioration) have been increasing. This, along with increasing treatment costs, will necessitate increases in
funding to sustain this infrastructure. The proposed 2004 program was originally based on 1999 data but has been updated from the
2003 condition rating where this information is available.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0837 LANE REHAB & DRAINAGE IMPROV

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Gravelled Lanes                                                  75           75            75             75            75              375
 Paved Lanes                                                      60           60            70            100           100              390
 Drainage Improvement                                             40           40            50             50            50              230
   Total GROSS COST DETAILS                                      175          175           195            225           225              995

FINANCING DETAILS
  Infrastructure Res - Surface                                ( 175)        ( 175)        ( 195)        ( 225)        ( 225)         ( 995)
    Total FINANCING DETAILS                                   ( 175)        ( 175)        ( 195)        ( 225)        ( 225)         ( 995)


Project Description
This project involves lane rehabilitation on both paved lanes and gravelled lanes. Restoration is to the original service level of load
capacity, ride and drainage.

Comments
A more selective process (hot spot program) has been implemented to rehabilitate gravel lanes.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

0838 LIBR-EQUIPMENT REPLACEMENT

                                                          2004           2005         2006          2007         2008
                                                       BUDGET           PLAN         PLAN          PLAN         PLAN        TOTAL
GROSS COST DETAILS
 EQUIPMENT PURCHASE                                          100           100          100          100           100              500
   Total GROSS COST DETAILS                                  100           100          100          100           100              500

FINANCING DETAILS
  Public Library Equip Repl                                ( 100)       ( 100)       ( 100)        ( 100)       ( 100)        ( 500)
   Total FINANCING DETAILS                                 ( 100)       ( 100)       ( 100)        ( 100)       ( 100)        ( 500)


Project Description
This project involves the replacement of equipment associated with the Public Library in accordance with Policy 03-019 (Equipment
Reserve Fund - Public Library).
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0855 HIGH VOLUME PHOTOCOPIER

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchase                                             200             0             0             0             0          200
   Total GROSS COST DETAILS                                     200             0             0             0             0          200

FINANCING DETAILS
  Photocopy Mach Repl Res                                    ( 200)             0             0             0             0        ( 200)
   Total FINANCING DETAILS                                   ( 200)             0             0             0             0        ( 200)


Project Description
This project involves the analysis of the copying and printing needs of the Corporation and the identification of appropriate equipment to
meet these needs. This will result in the replacement of the four central photocopiers/printers with current technology.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0876 REGIONAL WASTE MGNT FACILITY

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 ECO/DEPOT CENTRE                                               900             0           300           300              0         1,500
 Phase II Upgrade                                               244             0             0             0              0           244
 New Cell Development                                             0         3,123             0             0              0         3,123
   Total GROSS COST DETAILS                                   1,144         3,123           300           300              0         4,867

FINANCING DETAILS
  Landfill Replacement Reserve                                ( 543)     ( 1,657)         ( 300)        ( 300)             0      ( 2,800)
  Government Infrastructure Program                           ( 601)     ( 1,466)              0             0             0      ( 2,067)
    Total FINANCING DETAILS                                 ( 1,144)     ( 3,123)         ( 300)        ( 300)             0      ( 4,867)


Project Description
This project involves the continued upgrade and expansion of the Spadina Landfill.

General Comments
The phase 2 upgrade is planned for completion in 2004. This includes additional roadway construction to reconfigure the traffic flow, an
additional scale house and scale, fencing and landscaping.

The north mound cell closures including slope capping and landscaping are also planned for 2004.

Planned for 2005 is the first expansion phase to develop a new cell. This involves the installation of a ground water protection liner.

This project anticipates funding assistance from the Canada Saskatchewan Infrastructure Program. Prior years estimates identified
cost sharing of $466,000 and an additional $2,067,000 is shown in 2004 and 2005 for a total of $2,533,000.

Prior Budget Approvals - Leachate Collection System                        $2,184,000
                                 - Land                                      $853,000
                               - Phase 1 Upgrade                           $1,493,000
                               - Phase 2 Upgrade                             $773,000

Operating Impact            Pumping power costs for the leachate collection system           $5,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0877 CITY-WIDE RADIO TRUNKING SYST

                                                           2004           2005          2006          2007         2008
                                                        BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 CORPORATE INFRASTRUCTURE                                      145          125          250           750         1,000           2,270
 Fibre Link Transit and Fire                                    10          100            0             0             0             110
    Total GROSS COST DETAILS                                   155          225          250           750         1,000           2,380

FINANCING DETAILS
  Res For Cap Expenditures                                  ( 155)            0             0             0            0        ( 155)
  Unfunded                                                       0       ( 225)        ( 250)        ( 750)     ( 1,000)      ( 2,225)
   Total FINANCING DETAILS                                  ( 155)       ( 225)        ( 250)        ( 750)     ( 1,000)      ( 2,380)


Project Description
This project involves the expansion, upgrade and maintenance of the core infrastructure for the City's trunked radio system. The
trunking system infrastructure is a corporate resource that is shared by all user departments. The system provides radio
communications for Police, Fire, Utility Services, Infrastructure Services and several Leisure Services facilities.

General Comments
The 2004 funds will be used to complete required system changes to enhance radio coverage for the South East sector of the City. As
well, the air conditioning unit that controls the environment housing the trunking system equipment at the Saskatoon Tower is osbsolete
and needs to be replaced. Finally, the fibre link between the Saskatoon Tower and Fire Hall #1 will be designed in 2004 and installed in
2005.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

0901 PARK UPGRADING-NEIGHBORHOOD

                                                                 2004          2005          2006           2007          2008
                                                              BUDGET          PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Wiggins                                                          222             0              0             0              0           222
 Robert Hunter East                                               390             0              0             0              0           390
 Les Kerr                                                           0             0            593            33              0           626
 C. P. Seeley                                                     174             0              0             0              0           174
 Churchill                                                         37           200            123             0              0           360
 W. J. L. Harvey                                                    0             0              0            27            769           796
 Brevoort                                                          55           560              0             0              0           615
 Wilson                                                             0             0             16           161              0           177
 Meadowgreen                                                        0             0             30           535              0           565
   Total GROSS COST DETAILS                                       878           760            762           756            769         3,925

FINANCING DETAILS
  Elect Dist Extension Res                                         ( 3)          ( 4)          ( 9)           ( 6)         ( 19)          ( 41)
  Infrastructure Res-Parks                                      ( 875)        ( 756)        ( 753)         ( 750)        ( 750)       ( 3,884)
    Total FINANCING DETAILS                                     ( 878)        ( 760)        ( 762)         ( 756)        ( 769)       ( 3,925)


Project Description
This project involves upgrading of neighborhood parks throughout the City. This may include re-grading, re-seeding, re-landscaping,
lighting, additional planting, and the installation of irrigation, subsurface drainage systems, lighting, furniture, play equipment, or other
amenities as identified to the standards in parks which are being developed in newer areas. The redevelopment occurs following
consultation with the relevant community associations and other users.

General Comments
The 2004 funding will be used to upgrade Wiggins, Robert Hunter East, and C.P. Seeley Parks, and for the design of Brevoort and
Churchill Parks scheduled to be completed in 2005-2006. Future park upgrades are prioritized in consultation with the Community
Support Services Branch of the Community Services Department.

Operating Impact
Year 2005      Wiggins                          $ 6,000
               Rober Hunter East                $17,700
               C.P. Seeley                      $ 7,100
                                                -----------
                                                $30,800
                                                ======
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

0931 ST LT-CABLE/BASE REPL-CTR MED

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Centre Median Rehab                                               0           50           50            50            50           200
   Total GROSS COST DETAILS                                        0           50           50            50            50           200

FINANCING DETAILS
  Elect Dist Replacement Res                                       0        ( 50)         ( 50)         ( 50)         ( 50)        ( 200)
    Total FINANCING DETAILS                                        0        ( 50)         ( 50)         ( 50)         ( 50)        ( 200)


Project Description
This project involves the replacement of street lighting cable and deteriorated bases typically on the arterial roadway centre median.

General Comments
The work is intended to coincide with roadway enhancements to the centre median additions of left turn bays or other similar work on
the roadway.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

0947 LAND DEV'T-UNIV HEIGHTS SUB

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 2000 - C - Heath Avenue                                          13              0             0             0             0           13
 2002 - Heal Avenue & Nelson Road                                125              0             0             0             0          125
   Total GROSS COST DETAILS                                      138              0             0             0             0          138

FINANCING DETAILS
  Gen PPD-Services-Eng                                        ( 125)              0             0             0             0        ( 125)
  Property Realized Reserve                                     ( 13)             0             0             0             0          ( 13)
    Total FINANCING DETAILS                                   ( 138)              0             0             0             0        ( 138)


Project Description
This project is for the design and construction of municipal services on city land north of Attridge on proposed Nelson and Kenderdine
Road.

General Comments
Commercial and institutional municipal services were constructed in 1999 north of Attridge Drive on Kenderdine Road, on Heath
Avenue in 2000, and the remainder of Heal Avenue and Nelson Road in 2002/2003. Property realized funding is for the gas and
electrical servicing.

Prior Budget Approvals                         $7,369,000
Prior years reflects the construction in the A-City area, the overhead power line relocation, the site design/power line relocation, the B
Agriculture Canada area, C Heath Avenue, and Heal Avenue and Nelson Road.
                         2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

0948 SIDEWALK/PATH RETROFIT-ARTL RD

                                                             2004           2005         2006           2007        2008
                                                          BUDGET           PLAN         PLAN           PLAN        PLAN        TOTAL
GROSS COST DETAILS
 Construction                                                      0         100           100           100         100            400
   Total GROSS COST DETAILS                                        0         100           100           100         100            400

FINANCING DETAILS
  Unfunded                                                         0       ( 100)       ( 100)         ( 100)      ( 100)        ( 400)
   Total FINANCING DETAILS                                         0       ( 100)       ( 100)         ( 100)      ( 100)        ( 400)


Project Description
This project involves the design and construction of new sidewalks or pathways adjacent to existing arterial roadways or collector roads
that serve the City as a whole.

General Comments
The proposed funding is for these possible locations and will proceed only to the extent of funding:

-   Attridge Drive, Berini Drive to Kenderdine Road (north side)
-   Ave P at Rusholme, Lief Erickson Park
-   33rd Street, Avenue P to Edmonton Avenue (south side)
-   8th Street, Louise Avenue to Preston Avenue (south side)
-   Queen Street, 7th Avenue to Spadina Crescent (south side)
                          2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

0959 UPGRADE BOUNDARY ROADS

                                                              2004            2005          2006      2007          2008
                                                           BUDGET            PLAN          PLAN      PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Construction                                                     200              0           0           0            0          200
   Total GROSS COST DETAILS                                       200              0           0           0            0          200

FINANCING DETAILS
  Res For Cap Expenditures                                     ( 200)              0           0           0            0        ( 200)
   Total FINANCING DETAILS                                     ( 200)              0           0           0            0        ( 200)


Project Description
This project involves the upgrading of interim stage gravel roads throughout the city. Treatments could include seal treatment, recycled
asphalt, temporary hard surfacing, etc.

General Comments
Locations will be from the following list of projects to the extent of the approved funding.

Location                                       From               To
Lanyon Avenue                                  Rutherford Cres    113th Street
Central Avenue                                 City Limits        Earth Fill Site
Extension of 8th Street                        Briargate Road     Railway Tracks (or City Limits)
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

0993 NEW RIVER CROSSINGS

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Design                                                             0             0             0        2,500         2,500          5,000
   Total GROSS COST DETAILS                                         0             0             0        2,500         2,500          5,000

FINANCING DETAILS
  Unfunded                                                          0             0             0      ( 2,500)      ( 2,500)      ( 5,000)
   Total FINANCING DETAILS                                          0             0             0      ( 2,500)      ( 2,500)      ( 5,000)


Project Description
The scope of this project has been modified to now include the planning, design and ultimate construction of both a new south river
crossing corridor and a new north river crossing corridor. The new river crossings are required to fulfill the cross river travel demand as
the City grows to the 250,000 population level and form key components of a future perimeter road.

General Comments
This project involves the functional planning, design and ultimate construction of the southwest quadrant of Circle Drive, including the
south river crossing and for a river crossing and associated roadway corridor in the northeast quadrant, in the vicinity of 71st Street.
Due to the complexity of the project, it is necessary to carry it out in phases.

Previous studies have identified the need for two new river crossings within the next 15 to 20 years, with the first one required in the
next 6 to 10 year period. For projects of this magnitude, the amount of lead time for functional and detailed planning/design is
considerable. Recognizing this, the functional planning for the facilities needs to start in the short term. A strategy has been developed
jointly with Saskatchewan Highways and Transportation (SHT) to provide for the planning of the river crossings and associated
roadways, including strategic ties into the future outer perimeter roadway. In each of the phases of the planning process, specific links
and corridors will be examined with the intent of finalizing alignments, river crossing locations and acquisition of rights-of-way. This is a
joint project with SHT, with funding being provided by both SHT and the City of Saskatoon.

Two functional planning studies are currently underway. The first is for the proposed south river crossing and connecting roadways.
The second is for the north river crossing and perimeter highway linkages from Highway 11 South to Highway 16 West. These projects
are planned to be completed by late 2004 or early 2005.

This project now includes the scope of Capital Project No. 1524 - Perimeter Road Planning Study.

The funding identified in 2007 and 2008 is for the final planning and design of the south river crossing project.

Prior Budget Approvals                         $650,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1000 DOWNTOWN WTR/SWR IMPROVEMENTS

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN       TOTAL
GROSS COST DETAILS
 Stage 1 & 2 - 24th, River to 4th                                   0       5,460             0               0           0       5,460
 Stage 3 & 4 - 24th, 4th Ave/Ontario Ave                            0           0         3,938               0           0       3,938
   Total GROSS COST DETAILS                                         0       5,460         3,938               0           0       9,398

FINANCING DETAILS
  Infrastructure Res - Wtr & Sanswr                                 0     ( 1,912)     ( 1,313)               0           0     ( 3,225)
  Infrastructure Res - Storm Water                                  0     ( 3,548)     ( 2,625)               0           0     ( 6,173)
    Total FINANCING DETAILS                                         0     ( 5,460)     ( 3,938)               0           0     ( 9,398)


Project Description
This project includes the design and construction for the replacement of relief sewers and water mains in the downtown area to improve
capacity and replace mains which are in poor structural condition.

General Comments
Note: Other than the 24th Street Trunks, all work not yet completed will be identified as a separate project or be included in the Water
and Sewer Rehabilitation program.

Downtown Stage 1 & 2: 24th Street Trunks - Spadina to 4th Avenue
The 24th Street Trunks (Stages 1, 2 & 3) are required for the following reasons:
        -Increase capacity of the sanitary sewer system in the NE quadrant of downtown to allow for more high density residential.
        -Relieve storm flooding problems in the NE quadrant of downtown and along 2nd Avenue between 22nd and 25th Streets.
        -Increase capacity of the sanitary and storm sewer system in the Warehouse District, City Yards and along 1st, 2nd and 3rd
Avenues north of 24th Street to allow for more high density residential.
        -Increase capacity of the sanitary and storm sewer systems along the proposed 25th Street extension.

Downtown Stage 3: 24th Street Trunks - 4th Avenue to 1st Avenue
This project was previously called Stage 3 & 4. See Downtown Stage 1 & 2 for additional comments.

Downtown Stage 5: 22nd Street - Spadina to 2nd Avenue
These sewers will be replaced as required through the Storm Sewer Rehabilitation project.

South Downtown Stage 2A: Water and Sewer
This project will increase water and sewer system capacities in the South Downtown north of 19th Street and will replace piping in poor
condition. Approximately one half of this project is complete. The remainder of this project will be completed as part of the Water and
Sewer Replacement program.

Downtown Stage 4: 1st, 3rd & 4th Avenues - 23rd Street to 24th Street
Previously listed as Stage 6, this project will upgrade local sewers in poor condition and/or with poor hydraulics.

South Downtown Stage 2A: Storm Sewers
See South Downtown Stage 2A for comments.

South Downtown Stage 2B:
This project will bring local water and sewer services to the South Downtown south of 19th Street.

Prior Budget Approvals               $3,360,000
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1000 DOWNTOWN WTR/SWR IMPROVEMENTS

Prior years' reflects design for Stage 1&2-24th, River to 4th, design and construction of Stage 1A&1B South Downtown and
construction for Stage 2A-South Downtown.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1003 FIRE-EMERGENCY INFO MNGT SYST

                                                          2004           2005          2006         2007          2008
                                                       BUDGET           PLAN          PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Emergency Info Mgmt System                                      0            0         500              0            0          500
   Total GROSS COST DETAILS                                      0            0         500              0            0          500

FINANCING DETAILS
  Unfunded                                                       0            0       ( 500)             0            0        ( 500)
   Total FINANCING DETAILS                                       0            0       ( 500)             0            0        ( 500)


Project Description
This system is a replacement of the current Fire and Protective Services Computer Aided Dispatch System including software and
hardware.

General Comments
Due to advancements in technology, the current system no longer meets existing requirements. The new system would support
enhanced 911 interphase, would be compatible with the corporate information system and the GIS. The software will integrate all
emergency information management with state of the art reporting, statistical analysis, and department record keeping requirements.

Prior Budget Approvals                      $265,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                               PROJECT DETAILS ($'000s)

1016 ST LIGHTS-UPGRADE RESIDENTIALS

                                                               2004            2005          2006           2007           2008
                                                            BUDGET            PLAN          PLAN           PLAN           PLAN         TOTAL
GROSS COST DETAILS
 Phase II                                                          500           500           500            500           500          2,500
   Total GROSS COST DETAILS                                        500           500           500            500           500          2,500

FINANCING DETAILS
  Elect Dist Extension Res                                      ( 120)        ( 120)        ( 120)         ( 120)         ( 120)        ( 600)
  Elect Dist Replacement Res                                    ( 380)        ( 380)        ( 380)         ( 380)         ( 380)      ( 1,900)
    Total FINANCING DETAILS                                     ( 500)        ( 500)        ( 500)         ( 500)         ( 500)      ( 2,500)


Project Description
This project involves upgrading of street lighting to current standards, in primarily, older residential areas by the installation of additional
lights and replacing mercury vapor fixtures with energy efficient high pressure sodium fixtures.

General Comments
In 1997 City Council modified this project to be completed in two phases. The first phase accelerated the street lighting upgrades
(mercury vapour to high pressure sodium) by increasing the funding through 1999. The second phase began in 2000 and involves the
addition of new lights and the relocation of existing intermediate lights.

The following neighborhood areas are proposed for the continuation of the phase II lighting improvements in 2004.

         •    Mount Royal (started prior years)
         •    Riversdale (started prior years)
         •    Buena Vista (started prior years)
         •    Caswell Hill (budget permitting)
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1018 ELECT-SUBSTN MONITORING SYSTEM

                                                          2004            2005         2006          2007        2008
                                                       BUDGET            PLAN         PLAN          PLAN        PLAN         TOTAL
GROSS COST DETAILS
 Scada System Upgrade                                          80             0             0            0          50           130
   Total GROSS COST DETAILS                                    80             0             0            0          50           130

FINANCING DETAILS
  Elect Dist Extension Res                                   ( 40)            0             0            0        ( 50)         ( 90)
  Elect Dist Replacement Res                                 ( 40)            0             0            0            0         ( 40)
    Total FINANCING DETAILS                                  ( 80)            0             0            0        ( 50)       ( 130)


Project Description
This project involves the enhancement of the Supervisory Control and Data Acquisition (SCADA) system.

General Comments
In 2004, the existing SCADA system prime computer and fail over computer will be replaced and the latest proprietary software version
will be installed. Two portable terminals and a remote terminal will be added to facilitate SCADA interrogation outside of the secure
area or at a remote location. Additional peripheral equipment will be upgraded or added. This includes replacement printers and
additonal batteries for the uninterruptable power supply.

It is expected that in 2008/2009, a major upgrade of the head end equipment and software will be required.

This project will be reviewed on an annual basis.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1019 ELEC SUBSTN-W. J. BUNN UPGRADE

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 W. J. Bunn - Bldg, Switchgear, TX Upgrade                         0             0             0             0          100               100
   Total GROSS COST DETAILS                                        0             0             0             0          100               100

FINANCING DETAILS
  Elect Dist Extension Res                                         0             0             0             0        ( 100)        ( 100)
    Total FINANCING DETAILS                                        0             0             0             0        ( 100)        ( 100)


Project Description
This project provides for the replacement of the existing outdoor shelter clad switchgear (25kV) and provides for a new building to
handle the new equipment.

General Comments
The existing medium voltage switchgear expected useful life is considerably less than anticipated. Consequently, replacement is
required prior to the normal 30-year expectation.

It is proposed to design in 2008 the construction of a building and 25kV switchgear with construction in 2009. Transformation
upgrading is suggested for 2010. This proposal will be evaluated on an annual basis.

The actual electrical load growth is larger than the original design criteria anticipated. Consequently, larger capacity will be needed
meaning higher current ratings of switchgear, the need for a building and transformer capacity upgrade.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1031 LIBR-ALICE TURNER BRANCH

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 CONSTRUCTION                                                      0             0            0              0       1,200          1,200
   Total GROSS COST DETAILS                                        0             0            0              0       1,200          1,200

FINANCING DETAILS
  Public Lib Cap Exp'n Fund                                        0             0            0              0     ( 1,200)      ( 1,200)
   Total FINANCING DETAILS                                         0             0            0              0     ( 1,200)      ( 1,200)


Project Description
This two-phase project provides for construction of a new library to provide complete branch library service in the north east sector of
the city. The second phase would incorporate an additional 10,000 sq. ft.

General Comments
The second phase ($2,400,000) is reflected in the years 2008 and beyond 2008 ($1,200,000).

Prior Budget Approvals
First phase                                   $2,800,000
                         2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                               PROJECT DETAILS ($'000s)

1036 TRAFFIC SIGNALS-NEW LOCATIONS

                                                               2004             2005       2006          2007          2008
                                                            BUDGET             PLAN       PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                         0             75        75            75            75              300
   Total GROSS COST DETAILS                                           0             75        75            75            75              300

FINANCING DETAILS
  Unfunded                                                            0         ( 75)      ( 75)          ( 75)         ( 75)           ( 300)
   Total FINANCING DETAILS                                            0         ( 75)      ( 75)          ( 75)         ( 75)           ( 300)


Project Description
This project consists of the installation of new traffic signals at one location.

General Comments
Possible candidate locations for traffic signal locations are as listed below. These locations, as well as the other locations on the
priority list, will be evaluated annually.
                       Avenue C/Cynthia Street
                       Ruth Street/Lorne Avenue
                       Wanuskewin Road/Adilman Drive
                       33rd Street/7th Avenue
                       Thatcher Avenue/Marquis Drive
No locations are planned to be signalized in 2004 under this program.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1041 BENCHMARK REHABILITATION

                                                         2004           2005          2006         2007       2008
                                                      BUDGET           PLAN          PLAN         PLAN       PLAN       TOTAL
GROSS COST DETAILS
 Construction                                                 30           30           30            30        30          150
   Total GROSS COST DETAILS                                   30           30           30            30        30          150

FINANCING DETAILS
  Gen PPD-Services-Eng                                      ( 10)        ( 10)        ( 10)        ( 10)      ( 10)         ( 50)
  Infrastructure Res - Surface                              ( 10)        ( 10)        ( 10)        ( 10)      ( 10)         ( 50)
  Infrastructure Res - Wtr & Sanswr                         ( 10)        ( 10)        ( 10)        ( 10)      ( 10)         ( 50)
    Total FINANCING DETAILS                                 ( 30)        ( 30)        ( 30)        ( 30)      ( 30)       ( 150)


Project Description
This project encompasses the construction, replacement and maintenance of a network of benchmark monuments within the City that
provide essential horizontal and vertical control for private and public construction purposes.

General Comments
Included under the terms of this project are:
- Establishing and maintaining an electronic benchmark database layer within the Enterprise GIS framework
- Providing auxiliary GPS definitions for the benchmark network
- Replacement of damaged or destroyed monuments
- Regular inspection of monuments for condition assessment
- Vertical control verification
- Development and maintenance of information distribution and tracking formats
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1046 PLAYGRD BLDGS/PADDLING POOL REPL

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 A.H. Browne                                                    445              0            0              0            0           445
   Total GROSS COST DETAILS                                     445              0            0              0            0           445

FINANCING DETAILS
  Res For Cap Expenditures                                   ( 445)              0            0              0            0        ( 445)
   Total FINANCING DETAILS                                   ( 445)              0            0              0            0        ( 445)


Project Description
This project involves the replacement of the Recreation Unit/Paddling Pool at A.H. Browne. The condition of this facility has
deteriorated to the point where consideration may have to be given to closing it down if not replaced. This project is consistent with the
Condition Assessment Study done in 1999 by Infrastructure Services Department whereby the study recommended phased major
repairs be carried out to recreation units and paddling pools throughout the City to extend their useful life and that replacements be
undertaken only when absolutely necessary.

General Comments
The Recreation Unit and Paddling Pool at A.H. Browne are both in dire need of replacement and has reached the end of its useful life.
The Recreation Unit walls and base are rotting, the roof is leaking, the floor has a crack from one end to the other, and the grade beam
has failed. As for the paddling pool, the concrete curbs in several areas are no longer repairable, the water inlet requires replacement,
and there are several cracks throughout the whole pool area. Repairing the facility is not an option as it cannot be brought up to current
Building and Provincial Health Standards economically and Saskatoon Health Region will not allow the City to replace the paddling pool
and building without bringing it to current standards. Some of the Standards which need to be addressed include making the facility
fully accessible, installing a circulation and filtration system with automated water treatment system, providing a backflow prevention
system, and electrical upgrades. The type of water feature to be designed and constructed in this park (ie: Spraypool or paddling pool)
is determined from input at public meetings of the neighbourhood, which are coordinated by the Community Services Department,
Community Development Branch.

To date, the recreation unit buildings and pools at Sutherland (1999), Westmount (1998), North Park (1997), and Thornton Park (1996)
have been replaced. In addition to this, a number of upgrades and major repairs, as outlined in the Condition Assessment Study, have
been completed at facilities throughout the City. With these continuing repairs, A.H. Browne is the only full replacement currently
planned for the next five years.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1054 WTP-ASSET REPLACEMENT

                                                          2004           2005          2006         2007          2008
                                                       BUDGET           PLAN          PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Clarifiers #1- Mech Repl                                       0            0        2,083             0            0         2,083
 Filter Troughs (57/64)                                        50            0          900           900            0         1,850
 Ave H Reservoir Line                                           0            0          462             0            0           462
 High Lift Pump #9 Repair                                      90            0            0             0            0            90
 Preventive Maintenance System                                130            0            0             0            0           130
 64 Filter Plant Structural Wall                               60            0            0             0            0            60
 Low Lift Pump #5 Base                                         40            0            0             0            0            40
 Acadia Reservoir Chlorine Vent System                         60            0            0             0            0            60
 WTP Process Control System                                    60          190            0             0            0           250
 Filter Media                                                   0          240          240             0            0           480
 57 Plant Backwash Pump                                         0          150            0             0            0           150
 Acadia Reservoir Structural Repair                             0            0          320             0            0           320
 Low Lift Screens & Drive                                       0            0            0           447            0           447
 64 Filter Plant Influent Line                                  0            0            0             0          829           829
    Total GROSS COST DETAILS                                  490          580        4,005         1,347          829         7,251

FINANCING DETAILS
  Water Supply Repl Reserve                                ( 490)       ( 580)      ( 4,005)     ( 1,347)        ( 829)     ( 7,251)
   Total FINANCING DETAILS                                 ( 490)       ( 580)      ( 4,005)     ( 1,347)        ( 829)     ( 7,251)


Project Description
This project involves the replacement of various Water Treatment Plant equipment and assets (which have reached the end of their
useful life) in accordance with the Capital Reserves Bylaw. Revisions have been made to the components of this project as a result of
the revised long term capital development plan. The Timing of the West Basin repairs and cover has been deferred to 2011 to
accommodate funding of capital projects of higher priority.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1055 AUTOMATIC METER READING CONV

                                                           2004            2005         2006          2007         2008
                                                        BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Automatic Meter Reading Conversion                            325          275           275          275           275         1,425
   Total GROSS COST DETAILS                                    325          275           275          275           275         1,425

FINANCING DETAILS
  Waterworks Capital Projects Reserve                       ( 325)        ( 275)       ( 275)        ( 275)       ( 275)      ( 1,425)
   Total FINANCING DETAILS                                  ( 325)        ( 275)       ( 275)        ( 275)       ( 275)      ( 1,425)


Project Description
This project involves replacement of water meters with new encoded meters which have capability of remote and/or central reading.

General Comments
This project combines the need to replace the existing water meters due to obsolescence with meters designed for the proposed
implementation of an automatic meter reading system by the Treasurer's Branch within the next several years.

The project includes the eventual replacement of all residential and commercial meters to ensure that all meters are compatible with the
automatic meter reading technology. The timing of the meter replacements is based on current installation resources with estimated
completion in 2013. The 2004 estimate includes $50,000 towards the evaluation of a remote reading system.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1057 IND'L AREA BLVD TREE PLANTING

                                                             2004           2005          2006          2007          2008
                                                          BUDGET           PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                     32           25            25             25           25           132
   Total GROSS COST DETAILS                                       32           25            25             25           25           132

FINANCING DETAILS
  Industrial Park Dev Res                                      ( 32)         ( 25)         ( 25)         ( 25)         ( 25)        ( 132)
    Total FINANCING DETAILS                                    ( 32)         ( 25)         ( 25)         ( 25)         ( 25)        ( 132)


Project Description
This project includes the planting and establishment of boulevard trees in prepaid industrial areas in the City of Saskatoon.

General Comments
The projected costs consist of the initial staking and planting costs, as well as watering costs for a three-year establishment period, and
an allowance for tree replacements that might be incurred during the three-year period.

The 2004 locations include Preston Avenue as well as various other locations throughout the City.

Operating Impact
Year 2005                  $1,000 (2002 capital)
Year 2006                  $2,500 (2003 capital)
Year 2007                  $1,800 (2004 capital)
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1062 LAND DEV'T-LAKEWOOD SUBURBAN

                                                           2004           2005          2006          2007         2008
                                                        BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Suburban Ctre - Site Design                                    5              0               0          0             0            5
 2004-C2-City                                               3,651              0               0          0             0        3,651
   Total GROSS COST DETAILS                                 3,656              0               0          0             0        3,656

FINANCING DETAILS
  Gen PPD Services-Elect-City                                 ( 46)            0               0          0             0         ( 46)
  Gen PPD-Services-Eng                                    ( 3,435)             0               0          0             0     ( 3,435)
  Property Realized Reserve                                 ( 175)             0               0          0             0       ( 175)
    Total FINANCING DETAILS                               ( 3,656)             0               0          0             0     ( 3,656)


Project Description
This project involves the construction of municipal services on City owned land in Lakewood.

General Comments
The work involves the construction of direct services for the development of residential townhouses in the Lakewood neighbourhood.

Funding from the Property Realized Reserve is for signing and for telephone, gas and electrical servicing not provided from pre-paid
rates in a non-residential area.

Prior Budget Approvals                          $5,818,000
Prior years' reflects construction in the Heritage B-City area, the Lakewood Townhouse Design and Site Preparation, the Suburban
Centre Site Design, and C1 City (Suburban Centre).
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1083 CORPORATE NETWORK EQUIPMENT REPL

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Electronic Equipment Replacement                              275          450           400           400          400         1,925
   Total GROSS COST DETAILS                                    275          450           400           400          400         1,925

FINANCING DETAILS
  Computer Equipment Replac Res                             ( 275)        ( 450)       ( 400)        ( 400)        ( 400)      ( 1,925)
   Total FINANCING DETAILS                                  ( 275)        ( 450)       ( 400)        ( 400)        ( 400)      ( 1,925)


Project Description
This project provides for the replacement/upgrading of corporate servers for the ongoing operation of the corporate local area network,
corporate Internet access and the corporate database server environment. The upgrade of the Database Server operating system and
associated client licenses will be handled over 2003 and 2004.

General Comments
This project will enable the City to keep the client/server hardware environment operating at an acceptable level of performance and to
ensure there are adequate backup facilities.

Details
Corporate Backup                                               $ 50,000
Server Consolidation                                             75,000
Portal Server (for Electronic Service Delivery)                  50,000
Upgrade Server Licenses                                         100,000
Total                                                          $275,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1085 ELEC SUBSTN-C. D. MCGALL UPGR

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 C.D. McGall 14.4 kV Switchgear                                   10          120             0              0            0           130
   Total GROSS COST DETAILS                                       10          120             0              0            0           130

FINANCING DETAILS
  Elect Dist Extension Res                                       ( 5)        ( 60)            0              0            0          ( 65)
  Elect Dist Replacement Res                                     ( 5)        ( 60)            0              0            0          ( 65)
    Total FINANCING DETAILS                                    ( 10)       ( 120)             0              0            0        ( 130)


Project Description
This project replaces the existing 14.4 kV switchgear bank with 14.4 kV switchgear salvaged from the J. R. Cowley substation.

General Comments
This project will remove the entire existing four cell 14.4 kV switchgear bank. This equipment will be in excess of 40 years old. The
replacement switchgear cells from J. R. Cowley substation were installed in 1991 and have in excess of 20 years of service life
remaining.

This project is linked to project # 1152 Electrical Substation - J. R. Cowley. Project # 1152, will remove the switchgear from service.
Project # 1085 Elec Substation C.D. McGall Upgrade covers transportation and installation for return to service at C. D. McGall
substation.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1135 CIVIC BLDGS COMP MAINT PROGRM

                                                           2004            2005         2006          2007         2008
                                                        BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Boards and Agencies                                        1,092         1,097        1,038           991           986        5,204
 MAJOR MECHANICAL REFURBISHMENT                               353           332          410           436           747        2,278
 Pools                                                        685           472          433           431           343        2,364
 Program Facilities                                           391           690          373           310           159        1,923
 Recreation Facilities                                        452           676          635           597           555        2,915
 Maintenance Support                                           64            20           20            20            20          144
   Total GROSS COST DETAILS                                 3,037         3,287        2,909         2,785         2,810       14,828

FINANCING DETAILS
  Civic Bldgs Compr Mtce                                  ( 3,037)     ( 3,287)      ( 2,909)      ( 2,785)     ( 2,810)     ( 14,828)
    Total FINANCING DETAILS                               ( 3,037)     ( 3,287)      ( 2,909)      ( 2,785)     ( 2,810)     ( 14,828)


Project Description
This project involves planned expenditures from the Civic Buildings Comprehensive Maintenance Reserve for major replacements and
repairs in accordance with the comprehensive maintenance program.

General Comments
A comprehensive maintenance program includes a preventative maintenance element and identifies a scheduled refurbishment of the
major components of the facilities infrastructure. The preventative maintenance is necessary to ensure facilities are maintained to
established standards. The scope of the work involves all major categories of the infrastructure (i.e. electrical, mechanical, carpentry
and painting).
The facilities covered under the program are identified below:
Boards - Centennial Auditorium, Mendel Art Gallery & Conservatory, Saskatchewan Place, Libraries located in the Leisure Centers, and
various parks along the river bank.
Offices - City Hall, John Deere Building, Arthur Cooke Building, Police Services Building.
Pools - All indoor and outdoor pools, various parks containing spray pools and paddling pools.
Program Facilities - Avenue P complex, all Fire halls, Derrick Carrol Building, Transit Buildings.
Recreation Facilities - all Arenas, Saskatoon Field House, Forestry Farm Park & Zoo, various parks not having spray pools and
paddling pools.
Maintenance Support - Facility management programs.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1137 BICYCLE FACILITIES

                                                          2004           2005          2006         2007          2008
                                                       BUDGET           PLAN          PLAN         PLAN          PLAN           TOTAL
GROSS COST DETAILS
 CONSTRUCTION                                                 200          200          200           200          200           1,000
   Total GROSS COST DETAILS                                   200          200          200           200          200           1,000

FINANCING DETAILS
  Res For Cap Expenditures                                 ( 200)            0             0            0             0       ( 200)
  Unfunded                                                      0       ( 200)        ( 200)       ( 200)        ( 200)       ( 800)
   Total FINANCING DETAILS                                 ( 200)       ( 200)        ( 200)       ( 200)        ( 200)     ( 1,000)


Project Description
This project involves the implementation of the Comprehensive Bicycle Plan (2002) and Bicycle Facilities Network Plan (2003).

General Comments
Work to be undertaken in 2004 includes:
   • Review of the Bicycle Bylaw, Traffic Bylaw and Highway Traffic Act with respect to cycling.
   • Provision of bicycle parking racks on a request basis.
   • Preparation of a bicycle parking design guide.
   • Implement Bicycle Facilities Network Plan Route A3 - 14th Street (Sask Crescent to Preston Avenue), Cumberland Avenue
         (14th Street to College Drive).
   • Construct Westview - Airport Commuter Trail.

Prior Budget Approvals                                $125,000
Prior budget approvals are for design and construction.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1152 ELEC SUBSTN- J.R. COWLEY

                                                              2004               2005     2006        2007         2008
                                                           BUDGET               PLAN     PLAN        PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Upgrade & Replace 14.4 kV Switchgear                            900              665        0            0           0          1,565
 Building J. R. Cowley                                             0              110        0            0           0            110
 Cowley S/S - 3rd Transformer                                      0                0        0           10       1,200          1,210
   Total GROSS COST DETAILS                                      900              775        0           10       1,200          2,885

FINANCING DETAILS
  Elect Dist Extension Res                                     ( 150)           ( 240)       0        ( 10)       ( 800)      ( 1,200)
  Elect Dist Replacement Res                                   ( 750)           ( 535)       0            0       ( 400)      ( 1,685)
    Total FINANCING DETAILS                                    ( 900)           ( 775)       0        ( 10)     ( 1,200)      ( 2,885)


Project Description
This project involves the replacement of the 14.4 kV switchgear and a major upgrade to the substation.

General Comments
A new building was started in 2003 and will be complete and ready for the new switchgear in 2004.

The existing 14.4kV switchgear is at an advanced age except for several cells which were added at various times. This switchgear
does not have the full fault withstand capacity required with the upgrade of the Bulk Power system and the announcements from Sask
Power respecting new local generation.

The installation of new switchgear will start in 2004 and should be complete by 2005. The existing building will be demolished (2005)
once the original switchgear and accessories are removed.

This project is linked to project # 1085, Electric Substation - C. D. McGall.

Prior Budget Approval                          $420,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1154 WTP-SLUDGE RECOVERY & DISPOSAL

                                                            2004              2005       2006          2007          2008
                                                         BUDGET              PLAN       PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Construction                                                 4,974              0           0             0             0        4,974
   Total GROSS COST DETAILS                                   4,974              0           0             0             0        4,974

FINANCING DETAILS
  Borrowing                                                 ( 4,259)             0           0             0             0      ( 4,259)
  Operating Budget Downpm't                                   ( 495)             0           0             0             0        ( 495)
  Other                                                       ( 200)             0           0             0             0        ( 200)
  Snow & Ice Mgmt Reserve                                       ( 20)            0           0             0             0          ( 20)
   Total FINANCING DETAILS                                  ( 4,974)             0           0             0             0      ( 4,974)


Project Description
This project involves the design and construction of a sludge recovery and disposal system and related structure at the Water
Treatment Plant. Sludge generated in the waterworks pre-treatment process is currently being returned to the river in slurry form. It is
a heavy precipitate (predominantly calcium carbonate) which settles out on the riverbank. This project is required to meet Sask
Environment's regulatory requirements and hence the permit to operate.

The parameters used for process design and sizing of the dewatering units are 58,678 kg/d for Maximum Day Sludge, 27,942 kg/d for
Average Day, and a back wash effluent discharge rate of 700 cubic meters/hour.

General Comments
The revised estimate is based on the costs to locate the facility at the Water Treatment Plant. The processed sludge will be trucked
from the Plant to the Landfill for disposal. Other funding comes from Federation of Municipalities Green fund grant.

Operating Impact
                           Staffing and Operational Costs        $ 215,000
                           Debt Charges                             579,000
                                                                 -------------
                                                                 $ 794,000
                                                                 ========

Prior Budget Approvals               $8,119,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1164 PARK DEV-BRIARWOOD NBRHD

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Briarwood Park - Water Feature/Rec Unit                          32           353              0             0             0          385
    Total GROSS COST DETAILS                                      32           353              0             0             0          385

FINANCING DETAILS
  Parks and Recreation Levy                                     ( 32)       ( 353)              0             0             0        ( 385)
   Total FINANCING DETAILS                                      ( 32)       ( 353)              0             0             0        ( 385)


Project Description
This project involves the construction of neighbourhood parks in the Briarwood neighbourhood.

General Comments
This project involves the construction of a water feature and a recreation unit in Briarwood Park. The total estimated cost of this project
is $445,000 for a paddling pool and standard recreation unit. $385,000 is included in the current capital budget request and $60,000 is
being reallocated from prior budget approvals initially identified for a second play apparatus in the neighbourhood park. The
Community Development Branch of the Community Services Department has been in consolation with the Briarwood Community
Association, and the association is supportive of this reallocation of funds for the purpose of building a recreation unit and water feature
in Briarwood Park.

Prior Budget Approvals                         $1,420,000
Prior years' reflects the design and construction of the Briarwood Pocket Park, a play area, the Neighbourhood Park, and the Linear
Park.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1166 PARK DEV-ARBOR CREEK NBRHD

                                                           2004           2005          2006         2007          2008
                                                        BUDGET           PLAN          PLAN         PLAN          PLAN           TOTAL
GROSS COST DETAILS
 Arbor Creek - Water Feature                                     0           32          323              0            0           355
   Total GROSS COST DETAILS                                      0           32          323              0            0           355

FINANCING DETAILS
  Parks and Recreation Levy                                      0         ( 32)       ( 323)             0            0         ( 355)
   Total FINANCING DETAILS                                       0         ( 32)       ( 323)             0            0         ( 355)


Project Description
This project involves the construction of neighbourhood parks on city-owned land in the Arbor Creek neighbourhood.

General Comments
Estimates for services to be installed by the private developer are not shown. The water feature is to be designed in 2005 and
constructed in 2006; and the joint facilities construction are budgeted for beyond 2008.

Prior Budget Approvals                         $1,713,000
Prior years' reflects construction around the retention pond, construction of the Neighbourhood Park, Linear Park, and Pocket Parks at
Budz Crescent and Beckett Green.
                         2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                                PROJECT DETAILS ($'000s)

1174 ELEC SUBDIV-CITY-STREET LTG

                                                                2004             2005           2006           2007          2008
                                                             BUDGET             PLAN           PLAN           PLAN          PLAN          TOTAL
GROSS COST DETAILS
 Street Ltg - Rosewood                                                0            117            45              44            44            250
 ERINDALE N-KEEVIL CRES                                              94            117           117             143           143            614
 Street Ltg - Willow Grove Phase I & II &                            29             42           143             143           143            500
 Street Ltg - Hampton Village                                       115            164           143             143           143            708
 Sutherland (A) - Adolph/115th                                       12              0             0               0             0             12
 Sutherland Industrial - 107th Ext                                    0              0            20               0             0             20
 Lakewood Suburban                                                   52              0             0               0             0             52
 Willows                                                             52              0             0               0             0             52
    Total GROSS COST DETAILS                                        354            440           468             473           473          2,208

FINANCING DETAILS
  Elect Dist Extension Res                                         ( 42)          ( 62)          ( 56)          ( 56)         ( 56)         ( 272)
  Cost Rec PPD Land Develop                                      ( 312)         ( 378)         ( 395)         ( 417)        ( 417)        ( 1,919)
  Unfunded                                                             0              0          ( 17)              0             0           ( 17)
    Total FINANCING DETAILS                                      ( 354)         ( 440)         ( 468)         ( 473)        ( 473)        ( 2,208)


Project Description
This project reflects the gross costs of installing street lighting in prepaid subdivisions within the City and identifies the utility's capital
reserve funding contribution.

General Comments
On an annual basis this project is adjusted to reflect land development planning process.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1181 TRANSIT- FARE BOXES

                                                             2004            2005          2006         2007         2008
                                                          BUDGET            PLAN          PLAN         PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Fare Boxes                                                    1,000           500              0          0             0        1,500
   Total GROSS COST DETAILS                                    1,000           500              0          0             0        1,500

FINANCING DETAILS
  Transit Vehicle Replacement Res                           ( 1,000)        ( 500)              0          0             0      ( 1,500)
    Total FINANCING DETAILS                                 ( 1,000)        ( 500)              0          0             0      ( 1,500)


Project Description
This project involves the replacement of fare boxes with electronic fare boxes for the entire fleet.

General Comments
A bus automatic fare collection system feasibility study was conducted in 2003 and favorable recommendations were made. The
results of this study indicate that the information that would be gathered on route demographic and rider ship trends would be of great
importance for future route modifications or changes. Implementation is anticipated to begin in 2004 and completed in 2005.

Prior Budget Approvals                          $35,000
Prior budget approval was for the feasibility study and to determine the operational, maintenance, training, accounting requirements
and the preparation of a tender proposal.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1190 TRANSIT- PASSENGER DATA PROGRAM

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN          TOTAL
GROSS COST DETAILS
 Data Collection and Analysis                                    25             0             0             0            0           25
   Total GROSS COST DETAILS                                      25             0             0             0            0           25

FINANCING DETAILS
  Transit Capital Projects Reserve                            ( 25)             0             0             0            0         ( 25)
    Total FINANCING DETAILS                                   ( 25)             0             0             0            0         ( 25)


Project Description
This project involves the collection of passenger data by conducting riding counts during the summer, fall, and winter periods.
Passenger data is needed to properly plan routes and schedules to provide the best possible service to our customers.

Special Note
This project is subject to operating budget approval.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1192 TRANSIT- FUEL SYSTEM IMPROVEMENTS

                                                           2004            2005          2006          2007         2008
                                                        BUDGET            PLAN          PLAN          PLAN         PLAN          TOTAL
GROSS COST DETAILS
 Fuel System Upgrade                                             37           25          125              0              0        187
   Total GROSS COST DETAILS                                      37           25          125              0              0        187

FINANCING DETAILS
  Transit Capital Projects Reserve                            ( 37)         ( 25)       ( 125)             0              0      ( 187)
    Total FINANCING DETAILS                                   ( 37)         ( 25)       ( 125)             0              0      ( 187)


Project Description
This project involves updating the Transit Fueling System to adhere to legislative and regulatory standards. The work includes
upgrades to the pumps and the metering devices.

General Comments
Replace fuel dispensing system to provide continual accuracy in fuel dispensing, spill proofing (environmental issues).

2004- Repave the parking lot/damaged when the large fuel tank removed                      $ 37,000

2005 - Preliminary Work                                                                    $ 25,000

2006-    Replace Transit fuelling System                                                   $125,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1193 TRANSIT- INNOVATIVE PILOT PROJECTS

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Pilot Projects                                                      25           0             0             0             0             25
    Total GROSS COST DETAILS                                         25           0             0             0             0             25

FINANCING DETAILS
  Transit Capital Projects Reserve                                 ( 25)          0             0             0             0          ( 25)
    Total FINANCING DETAILS                                        ( 25)          0             0             0             0          ( 25)


Project Description
This project involves implementation of innovative transit pilot projects such as on-line teaching tutorials of an environmentally friendly
transit system, alternate fuels and other innovative transit proposals brought forward by the public and private sector. In 2004
additional funding is requested to address further innovative initiatives.

Prior Budget Approvals                          $100,000
In 2002, the alternative fuels biodiesel project was introduced.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1194 TRANSIT- ENGINE OVERHAUL

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Engine Overhaul                                               100           100           100           100          100              500
   Total GROSS COST DETAILS                                    100           100           100           100          100              500

FINANCING DETAILS
  Transit Capital Projects Reserve                           ( 100)       ( 100)        ( 100)        ( 100)        ( 100)        ( 500)
    Total FINANCING DETAILS                                  ( 100)       ( 100)        ( 100)        ( 100)        ( 100)        ( 500)


Project Description
This project involves the overhaul of transit bus engines as identified below. The life expectancy of an overhauled engine is 8 or 9
years.

General Comments
        2004 - 2008 - 6 engines each year $100,000/year
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1205 WTP-CHLORINATION SYSTEM UPGRD

                                                           2004           2005          2006          2007       2008
                                                        BUDGET           PLAN          PLAN          PLAN       PLAN    TOTAL
GROSS COST DETAILS
 Chlorination System Upgrade                                     0             0         212           236          0     448
   Total GROSS COST DETAILS                                      0             0         212           236          0     448

FINANCING DETAILS
  Waterworks Capital Projects Reserve                            0             0       ( 212)        ( 236)         0   ( 448)
   Total FINANCING DETAILS                                       0             0       ( 212)        ( 236)         0   ( 448)


Project Description
This project involves the modification and expansion of the chlorination system at the Water Treatment Plant.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1208 WTP-NEW INTAKE FACILITY

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 ADDITIONAL PUMP - Q. E. INTAKE                                 200      10,868               0             0            0       11,068
   Total GROSS COST DETAILS                                     200      10,868               0             0            0       11,068

FINANCING DETAILS
  Waterworks Capital Projects Reserve                        ( 200)    ( 10,868)              0             0            0     ( 11,068)
   Total FINANCING DETAILS                                   ( 200)    ( 10,868)              0             0            0     ( 11,068)


Project Description
This project involves the design and construction of a new upstream intake and pumphouse facility. The new intake structure will have
a design flow of 150 MIGD. The pumphouse will include a screen chamber, three screens, wet well, two vertical turbine pumps, and an
emergency generator. Also supply mains from the pumphouse to the Queen Elizabeth Power Station (QE) are required.

General Comments
Currently, in order to meet high demand it is necessary to use the low lift pumps located at the Water Treatment Plant in addition to the
intake and pumping system located at QE. With the location of several storm water outfalls between these two intakes, the quality of
raw water is jeopardized.

This project will ensure that all raw water intake will occur upstream of the City's storm sewer outfall structures. The Water Treatment
Plant lowlift pumps will then be used as a standby facility only. Also it will ensure that present raw water demands are met and provide
future capacity in accordance with the City's future growth study.

The construction has been deferred to 2005 to provide sufficient time to obtain land and the necessary approvals from the Federal
Department of Fisheries and Oceans, Sask Environment and the MVA.

Prior Budget Approvals            $1,294,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1210 WTP-FILTER PLANT UPGRADE/EXPANSION

                                                              2004            2005          2006          2007          2008
                                                           BUDGET            PLAN          PLAN          PLAN          PLAN          TOTAL
GROSS COST DETAILS
 Construction                                                       0        1,330         6,960               0             0        8,290
   Total GROSS COST DETAILS                                         0        1,330         6,960               0             0        8,290

FINANCING DETAILS
  Waterworks Capital Projects Reserve                               0      ( 1,330)      ( 6,960)              0             0      ( 8,290)
   Total FINANCING DETAILS                                          0      ( 1,330)      ( 6,960)              0             0      ( 8,290)


Project Description
This project involves the construction of a new filter bank to provide sufficient filtration capacity. The scope of this project has been
expanded as a result of the revised long term WTP expansion plans.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1217 WTP-LOW LIFT BUILDINGS

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN           TOTAL
GROSS COST DETAILS
 Low Lift Bldgs Upgrade                                            0            0             0        1,753              0          1,753
   Total GROSS COST DETAILS                                        0            0             0        1,753              0          1,753

FINANCING DETAILS
  Waterworks Capital Projects Reserve                              0            0             0     ( 1,753)              0        ( 1,753)
   Total FINANCING DETAILS                                         0            0             0     ( 1,753)              0        ( 1,753)


Project Description
This project involves the upgrade and expansion of the low lift pump house and related screen chamber facilities at the Water
Treatment Plant. These structures are over fifty years old and require roofing, ventilation, concrete, structural and mechanical
upgrades to extend their useful life.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1220 WTP-STORAGE FACILITIES

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Storage/Maintenance Facilities                                   0        2,395             0             0             0        2,395
   Total GROSS COST DETAILS                                       0        2,395             0             0             0        2,395

FINANCING DETAILS
  Waterworks Capital Projects Reserve                             0     ( 2,395)             0             0             0      ( 2,395)
   Total FINANCING DETAILS                                        0     ( 2,395)             0             0             0      ( 2,395)


Project Description
This project involves the construction of new stores/storage/maintenance facilities at the Water Treatment Plant. The current facilities
are within the exisiting buildings and the space is needed for the expanded filter bank for project # 1210 WTP - Filter Plant
Upgrade/Expansion).
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1222 WTP - DISINFECTION SYSTEM UPGRADE

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Disinfection Ssytem Upgrade                                  1,435              0             0             0             0        1,435
   Total GROSS COST DETAILS                                   1,435              0             0             0             0        1,435

FINANCING DETAILS
  Waterworks Capital Projects Reserve                      ( 1,435)              0             0             0             0     ( 1,435)
   Total FINANCING DETAILS                                 ( 1,435)              0             0             0             0     ( 1,435)

Project Description
This project involves the construction of an improved disinfection system at the Water Treatment Plant. It involves the installation of a
baffling system to improve the chlorine contact time and pH adjustment facilities in the West Basin. This project was identified as a
result of a study completed in 2003 and is required to meet chlorine disinfection objectives.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1223 WTP - OPERATIONS FACILITIES UPGRADE

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Operations Facilities Upgrade                                 898              0             0             0            0             898
   Total GROSS COST DETAILS                                    898              0             0             0            0             898

FINANCING DETAILS
  Waterworks Capital Projects Reserve                        ( 898)             0             0             0            0        ( 898)
   Total FINANCING DETAILS                                   ( 898)             0             0             0            0        ( 898)

Project Description
This project involves the construction of additional Water Treatment Plant space above the current filters to accommodate the
relocation of the Process Control Centre to address security issues and to provide improved and expanded shop facilities for the
Instrumentation and Electrical trades. This project is a result of the revised long term Water Treatment Plant site expansion plans.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1224 WTP - SITE EXPANSION

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Site Expansion                                             2,128         1,188              0             0            0        3,316
    Total GROSS COST DETAILS                                2,128         1,188              0             0            0        3,316

FINANCING DETAILS
  Borrowing                                                 ( 365)            0              0             0            0        ( 365)
  Operating Budget Downpm't                                   ( 40)           0              0             0            0          ( 40)
  Waterworks Capital Projects Reserve                     ( 1,723)     ( 1,188)              0             0            0      ( 2,911)
   Total FINANCING DETAILS                                ( 2,128)     ( 1,188)              0             0            0      ( 3,316)

Project Description
This project involves costs related to the expansion of the footprint of the existing Water Treatment Plant to accommodate the revised
long term expansion plans.

Operating Impact           2005 Debt Charges          $50,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1225 WWT- SLUDGE DISP FACILITY REPL

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Deep Cell #4A Asphalt Relining                                     0             0          233             0             0             233
 Deep Cell #4B Asphalt Relining                                     0             0            0           500             0             500
 Deep Cell #3                                                       0             0            0             0           259             259
   Total GROSS COST DETAILS                                         0             0          233           500           259             992

FINANCING DETAILS
  Sewage Coll & Trtmnt Repl                                         0             0       ( 233)        ( 500)        ( 259)           ( 992)
   Total FINANCING DETAILS                                          0             0       ( 233)        ( 500)        ( 259)           ( 992)


Project Description
This project involves replacement of asphalt lining with high density polyethelene liners in the decant cells and the asphalt relining of
the deep cells at the sludge disposal facilities.

General Comments
Appropriate maintenance of the sludge disposal facilities requires periodic repair of the sludge cells internal lining (which become
damaged due to erosion and freeze thaw cycles) in order to prevent ground water contamination.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1227 WWT- SLDGE DISP-MAINT/STAFF FAC

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 SDF - Maintenance/Staff Facility                                198             0             0              0             0             198
   Total GROSS COST DETAILS                                      198             0             0              0             0             198

FINANCING DETAILS
  Sewage Treatment Cap Reserve                                ( 198)             0             0              0             0           ( 198)
   Total FINANCING DETAILS                                    ( 198)             0             0              0             0           ( 198)


Project Description
This project involves the installation of a city waterline and the construction of an equipment washing facility at the remote sludge
disposal site.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1234 WWT- ODOUR ABATEMENT SYSTEM

                                                          2004          2005          2006         2007         2008
                                                       BUDGET          PLAN          PLAN         PLAN         PLAN     TOTAL
GROSS COST DETAILS
 Odour Abatement System - Plant                                 0            0            0          734       7,342      8,076
   Total GROSS COST DETAILS                                     0            0            0          734       7,342      8,076

FINANCING DETAILS
  Sewage Treatment Cap Reserve                                  0            0            0       ( 734)     ( 7,342)   ( 8,076)
   Total FINANCING DETAILS                                      0            0            0       ( 734)     ( 7,342)   ( 8,076)


Project Description
This project provides for the design and construction of an odour abatement system at the Wastewater Treatment Plant.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1236 WWT- UV DISINFECTION SYSTEM

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 UV Disinfection System                                             0             0         422         3,516               0        3,938
   Total GROSS COST DETAILS                                         0             0         422         3,516               0        3,938

FINANCING DETAILS
  Sewage Treatment Cap Reserve                                      0             0       ( 422)      ( 3,516)              0      ( 3,938)
   Total FINANCING DETAILS                                          0             0       ( 422)      ( 3,516)              0      ( 3,938)


Project Description
This project involves the design and construction of an ultra-violet disinfection system to replace the existing chlorination system at the
Wastewater Treatment Plant.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1240 WWT- SEWAGE FACILITIES CONDITION ASSESS

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Sewage Facilities Condition Assessment                        180             0             0             0            0           180
   Total GROSS COST DETAILS                                    180             0             0             0            0           180

FINANCING DETAILS
  Sewage Treatment Cap Reserve                              ( 180)             0             0             0            0        ( 180)
   Total FINANCING DETAILS                                  ( 180)             0             0             0            0        ( 180)


Project Description
This project involves a comprehensive evaluation of the mechanical and structural components ot the twenty-five lift stations located
throughout the sewage collection system, the identification of the long term replacement needs of the major equipment/facilities (eg.
pumps, difusers, blowers, grit removal unit, etc.) used in the Biological Nutrient Removal (BNR) process, and an evaluation of the
biosolids handling process and grit removal facilities. The scope of this project has been increased to include an evaluation of the
biosolids handling process and grit removal facilities.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1241 WWT- SLUDGE DISPOSAL PIPELINE

                                                             2004            2005         2006           2007          2008
                                                          BUDGET            PLAN         PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Sludge Disposal Upgrade                                      5,112              0             0             0             0        5,112
   Total GROSS COST DETAILS                                   5,112              0             0             0             0        5,112

FINANCING DETAILS
  Borrowing                                                 ( 4,493)             0             0             0             0      ( 4,493)
  Operating Budget Downpm't                                   ( 499)             0             0             0             0        ( 499)
  Sewage Treatment Cap Reserve                                ( 120)             0             0             0             0        ( 120)
   Total FINANCING DETAILS                                  ( 5,112)             0             0             0             0      ( 5,112)

Project Description
This project involves the construction of a double sludge pipeline from the Wastewater Treatment Plant to the Sludge Disposal Facility
located twelve kilometres north of the plant. The existing single line pipe is twenty years old and is subject to blockage due to a build-
up of struvite (i.e. a byproduct of the BNR process).

Operating Impact            2005 Debt Charges           $610,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1242 WWT- SLUDGE DISPOSAL MIXERS

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Sludge Disposal Mixers                                          150              0             0             0             0             150
   Total GROSS COST DETAILS                                      150              0             0             0             0             150

FINANCING DETAILS
  Sewage Treatment Cap Reserve                                ( 150)              0             0             0             0           ( 150)
   Total FINANCING DETAILS                                    ( 150)              0             0             0             0           ( 150)

Project Description
This project involves the purchase and installation of three portable sludge mixers to improve the efficiency of the liquid injection
process at the Sludge Disposal Facility.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1243 WWT- LIFT STATION UPGRADES

                                                          2004            2005         2006          2007         2008
                                                       BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Lift Station Upgrades                                        450          303           303          303           303        1,662
    Total GROSS COST DETAILS                                  450          303           303          303           303        1,662

FINANCING DETAILS
  Sewage Treatment Cap Reserve                             ( 450)        ( 303)       ( 303)        ( 303)       ( 303)      ( 1,662)
   Total FINANCING DETAILS                                 ( 450)        ( 303)       ( 303)        ( 303)       ( 303)      ( 1,662)

Project Description
This project involves the staged upgrading of seventeen sewage Lift Stations located throughout the City. This includes upgrading the
structures and equipment. The Spadina Lift Station is planned for upgrade in 2004.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1244 WWT- SLUDGE DISPOSAL DEEP STORAGE CELL

                                                              2004            2005          2006           2007          2008
                                                           BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Sludge Disposal Deep Storage Cell                                   0          495              0             0             0           495
   Total GROSS COST DETAILS                                          0          495              0             0             0           495

FINANCING DETAILS
  Sewage Treatment Cap Reserve                                       0       ( 495)              0             0             0        ( 495)
   Total FINANCING DETAILS                                           0       ( 495)              0             0             0        ( 495)

Project Description
This project involves the construction of an additional deep storage cell at the sludge disposal facility. The cell will provide an additional
8,000 cubic meters of capacity which is required to meet sludge processing and disposal demands.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1245 WWT- GRIT & SCREEN FACILITY

                                                          2004           2005         2006          2007         2008
                                                       BUDGET           PLAN         PLAN          PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Grit & Screen Facility                                         0       4,226              0            0            0        4,226
   Total GROSS COST DETAILS                                     0       4,226              0            0            0        4,226

FINANCING DETAILS
  Sewage Treatment Cap Reserve                                  0     ( 4,226)             0            0            0      ( 4,226)
   Total FINANCING DETAILS                                      0     ( 4,226)             0            0            0      ( 4,226)

Project Description
This project involves the expansion of the existing grit and screen facility at the Wastewater Treatment Plant to address process
capacity requirements and to provide odour control. The expanded facility is also required to accommodate liquid waste haulers and
Infrastructure Services collection system flushing trucks.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1246 WWT- GRIT PIT REMEDIATION

                                                            2004            2005          2006          2007         2008
                                                         BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Grit Pit Remediation                                              0            0          500              0             0             500
   Total GROSS COST DETAILS                                        0            0          500              0             0             500

FINANCING DETAILS
  Sewage Treatment Cap Reserve                                     0            0        ( 500)             0             0        ( 500)
   Total FINANCING DETAILS                                         0            0        ( 500)             0             0        ( 500)

Project Description
This project involves the remediation of the old grit disposal pit located on the Wastewater Treatment Plant site. The pit is used by
liquid waste haulers and Infrastructure Services sewage collection system flushing trucks.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1260 ELEC - NETWORK VAULT - AUDITORIUM AVE.

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Vault - Auditorium Ave.                                           0           50           450           654              0        1,154
   Total GROSS COST DETAILS                                        0           50           450           654              0        1,154

FINANCING DETAILS
  Elect Dist Extension Res                                         0         ( 50)       ( 150)        ( 300)              0        ( 500)
  Elect Dist Replacement Res                                       0             0       ( 300)        ( 354)              0        ( 654)
    Total FINANCING DETAILS                                        0         ( 50)       ( 450)        ( 654)              0      ( 1,154)


Project Description
This project involves the installation of a new vault complete with transformers, cables and all ancillary equipment. The location will be
immediately north of the existing vault on Auditorium Avenue and south of 22nd Street.

Load growth from both the existing customers and redevelopment potential within the plan period of the budget will require the
installation of more capacity.

General Comments
The Midtown Plaza and the existing adjacent customers loads are approaching the capacity of the existing system. There are two
parking lots, one between Auditorium Avenue and Idylwyld Drive and the other adjacent to Pacific Avenue and 22nd Street which can
readily be redeveloped. There are redevelopment proposals once again for at least one of the parking lots.

This project will be reviewed on an annual basis and is dependant on general load growth and redevelopment. This project provides for
a vault, transformers, one block length of primary and secondary cable and all ancillary equipment.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1261 ELEC - NETWORK VAULT - 134 3RD AVE. S.

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Vault - 134 3rd Avenue South                                      0             0             0           50           500           550
   Total GROSS COST DETAILS                                        0             0             0           50           500           550

FINANCING DETAILS
  Elect Dist Extension Res                                         0             0             0         ( 50)       ( 200)         ( 250)
  Elect Dist Replacement Res                                       0             0             0             0       ( 300)         ( 300)
    Total FINANCING DETAILS                                        0             0             0         ( 50)       ( 500)         ( 550)


Project Description
This project involves the installation of a new vault complete with transformers, cables and all ancillary equipment approximately in front
of 134 - 3rd Avenue South. Adjacent to the new Public School Board office, it has been proposed to redevelop the property
immediately north. Other development in the area and a proposal to convert the electrical overhead system will necessitate an
additional vault.

General Comments
This project will be reviewed on an annual basis and is dependent upon development and the ability or need to transfer existing
customers from the overhead system to the network. The project provides for a vault, three transformers, one block length of primary
and secondary cable and all ancillary equipment.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1262 ELEC - NETWORK VAULT - 2ND AVE EXT SDD

                                                            2004           2005          2006          2007         2008
                                                         BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Network Vault - 2nd Ave Ext SDD                                 50          503          503           503              0        1,559
   Total GROSS COST DETAILS                                      50          503          503           503              0        1,559

FINANCING DETAILS
  Elect Dist Extension Res                                    ( 50)       ( 190)        ( 190)        ( 190)             0        ( 620)
  Elect Dist Replacement Res                                      0       ( 313)        ( 313)        ( 313)             0        ( 939)
    Total FINANCING DETAILS                                   ( 50)       ( 503)        ( 503)        ( 503)             0      ( 1,559)


Project Description
This project involves the installation of a new vault, transformers and cables to supply the loads caused by the redevelopment of the
area south of 19th Street and adjacent to the proposed extension of 2nd Avenue. This area is referred to as the South Downtown
Development (SDD).

General Comments
At the time of this budget, there are no specific development plans, however, electric supply requirements may begin as early as the
end of 2004. It is anticipated that load density in this area will not be as high as other downtown areas and will not require the same
capacity as many of our existing downtown vaults. Options matching load requirements will be considered in the design. This project
is also to be coordinated with the South Downtown Feeder projects.

This project will be reviewed on an annual basis and is dependant upon redevelopment on the noted site and the extent the
redevelopment impacts the existing overhead system.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1263 ELEC - NETWORK VAULT INFRASTR. - UPGRADE

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Upgrade Network Vaults                                        200            90           90            90            90            560
   Total GROSS COST DETAILS                                    200            90           90            90            90            560

FINANCING DETAILS
  Elect Dist Extension Res                                    ( 95)        ( 40)         ( 40)         ( 40)        ( 40)        ( 255)
  Elect Dist Replacement Res                                ( 105)         ( 50)         ( 50)         ( 50)        ( 50)        ( 305)
    Total FINANCING DETAILS                                 ( 200)         ( 90)         ( 90)         ( 90)        ( 90)        ( 560)


Project Description
This project will cause the upgrading of the under sidewalk secondary network transformer vaults in the Central Business District.
Various structural upgrades and sidewalk grate repairs will be done.

General Comments
The first secondary network transformer vaults were installed in 1966. Subsequent vaults have been installed as development
occurred. There is currently a total of 15 network vaults. General deterioration of the structures necessitates repair and upgrades to
current standards. This will include the installation of ceiling support beams and replacement of sidewalk grates to accommodate
higher sidewalk loads and pedestrians walking over the surface as well as other structural elements. It is expected a minimum number
of two vaults per year will require upgrading or major maintenance. This project will be reviewed on an annual basis.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1264 ELEC - NETWORK -TRANSFORMER UPGRADES

                                                             2004          2005         2006         2007          2008
                                                          BUDGET          PLAN         PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Transformer Upgrades                                           80          130           130          130             0          470
   Total GROSS COST DETAILS                                     80          130           130          130             0          470

FINANCING DETAILS
  Elect Dist Extension Res                                    ( 26)         ( 26)        ( 26)        ( 26)            0        ( 104)
  Elect Dist Replacement Res                                  ( 54)       ( 104)       ( 104)       ( 104)             0        ( 366)
    Total FINANCING DETAILS                                   ( 80)       ( 130)       ( 130)       ( 130)             0        ( 470)


Project Description
This project will cause the upgrade of all secondary network transformers in the Central Business District with 14.4 kV high voltage
switches. The existing primary switches will be removed and replaced with new non-load break separable connectors. Each modified
transformer will also be overhauled and retested, restoring the transformer to a like new condition.

General Comments
There are currently 20 network transformers that require the replacement of the 14.4 kV primary switch with high voltage bushings in
order to bring these transformers up to current standards. The process of renovating these transformers will include:

         •   Removal of the core
         •   Complete internal inspection
         •   Removal of the high voltage switch
         •   Installation of new high voltage bushings
         •   Cleaning and repainting of the transformer
         •   Performance of standard tests with report

The transformer will be restored to a like new condition and is expected to perform as such.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1266 ELEC - GENERAL NETWORK EXTENSION

                                                              2004            2005          2006          2007           2008
                                                           BUDGET            PLAN          PLAN          PLAN           PLAN          TOTAL
GROSS COST DETAILS
 Network General Extension                                           0         100               0          100              0           200
   Total GROSS COST DETAILS                                          0         100               0          100              0           200

FINANCING DETAILS
  Elect Dist Extension Res                                           0       ( 100)              0       ( 100)              0        ( 200)
    Total FINANCING DETAILS                                          0       ( 100)              0       ( 100)              0        ( 200)


Project Description
This project involves expansion within the downtown network system that are not part of a specific development project. By
establishing our facilities at locations where development has begun but there is not yet specific customers, it ensures that facilities will
be in place when they are required and a cost benefit can be realized by coincidental construction with other municipal projects.

General Comments
This project will be reviewed annually and coordinated with other municipal projects as well as specific electrical projects in the
downtown network.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1270 ELEC-REMOTE METER DATA ACQUISITION

                                                           2004            2005         2006          2007         2008
                                                        BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Installation AMR System                                        50             0             0            0             0             50
    Total GROSS COST DETAILS                                    50             0             0            0             0             50

FINANCING DETAILS
  Elect Dist Extension Res                                    ( 50)            0             0            0             0           ( 50)
    Total FINANCING DETAILS                                   ( 50)            0             0            0             0           ( 50)


Project Description
This project involves the purchase of an Automatic Meter Reading (AMR) system to acquire data from revenue meters and transmit the
data to a central location.

General Comments
This project will have a minimum of two stages:
    1) The first stage is under way and will be the preparation of a Request for Proposals. This stage may require fact-finding
         missions and similar AMR system information searches. It is expected that the City revenue metering for water and electricity
         at minimum would jointly use this system. However, other agencies such as Sask. Power and Sask. Energy may wish to
         participate. This project will cover the acquisition of all the support facilities and personnel costs. This would include
         consulting fees, labor costs, computer software and hardware, communication equipment and costs associated with the
         revenue meters.
     2) The second stage will be the installation of an AMR system based on the consultants report.

A request for proposals will be forwarded to the suppliers of these systems. The selection and testing emphasis will be on timely
collection of revenue metering data with accuracy and communication reliability. The competing system technologies will be
considered respecting the impact on meter reading, billing and customer service.

The funding noted has been reduced from previous years to reflect expectations.

Prior Budget Approvals                       $100,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1272 ELEC-FACILITY COMPREHENSIVE MAINT PROG

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Bldg Mechanical System Upgrade                                  400             0              0             0            0           400
 Upgrade -Building & Grounds                                     150           250              0             0            0           400
 Storage Tank Shelters                                             0             0              0             0           10            10
   Total GROSS COST DETAILS                                      550           250              0             0           10           810

FINANCING DETAILS
  Elect Dist Extension Res                                    ( 270)        ( 110)              0             0         ( 10)        ( 390)
  Elect Dist Replacement Res                                  ( 280)        ( 140)              0             0             0        ( 420)
    Total FINANCING DETAILS                                   ( 550)        ( 250)              0             0         ( 10)        ( 810)


Project Description
This project involves the renovation and upgrading of the Utility Services - Electric System facilities located at Brand Road.

General Comments
It is proposed to develop plans to address a series of problems that will require upgrades and improvements to the Utility Services -
Electric System facilities. Within the Office area, the heating, ventilation, cooling system and other building infrastructure will require
major equipment replacement and modifications. This work will involve a combination of improving equipment operating efficiency and
replacement of worn out equipment. The lighting, air-handling motor drives, air conditioning compressors are examples of the issues of
concern. Stores Warehouse and Stores Yard requires facilities to permit the handling of more materials within the existing space. It is
expected that enhanced warehouse tiered storage and outdoor-tiered storage will be put in place and a cold storage building
constructed. Other issues that are to be considered include upgrades respecting site security, monitoring systems, which include the
fire alarm system and other building infrastructure systems.

An analysis of the energy use by the Electrical Operations Center conducted in 2001 identified areas of concern. These include the
mechanical system, lighting system, the building exterior skin, etc. Improvement to reduce unnecessary energy consumption and
waste of energy has started in 2002 but has not been completed.

This project will be reviewed on an annual basis.

Prior Budget Approvals                  $1,780,000
Prior years' reflects heating, ventilation, air conditioning controls upgrades, Stores Yard fencing, upgrading of task furniture, landscape
improvements and planning for the facility.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1275 ELEC-REV METER CERTIFICATION

                                                            2004            2005          2006          2007         2008
                                                         BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Phase II Accreditation - Meter Test                              0            50            50            50            50             200
 Meter Test Board                                               250             0             0             0             0             250
   Total GROSS COST DETAILS                                     250            50            50            50            50             450

FINANCING DETAILS
  Elect Dist Extension Res                                   ( 250)         ( 50)         ( 50)         ( 50)         ( 50)        ( 450)
    Total FINANCING DETAILS                                  ( 250)         ( 50)         ( 50)         ( 50)         ( 50)        ( 450)


Project Description
This project will put in place the equipment and programs necessary to comply with Measurement Canada Specifications required for
accreditation of the City Electric System Meter Shop.

General Comments
Measurement Canada has transferred to the private sector the verification of revenue meter accuracy. Accreditation of the City Electric
System staff and equipment is required to assure that meters can continue to be dealt with in an effective manner.

Phase II of the accreditation process will involve staff training, purchase of specialized equipment to completely implement this new
program.

Prior Budget Approval                $70,000

It is suggested an additional meter test board will be required to provide adequate testing capacity and redundancy of testing capability.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1276 ELECTRICAL SHOP - TEST EQUIPMENT

                                                             2004           2005          2006           2007         2008
                                                          BUDGET           PLAN          PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Facilities Upgrade - TX Shop                                   100              0             0             0             0           100
   Total GROSS COST DETAILS                                     100              0             0             0             0           100

FINANCING DETAILS
  Elect Dist Extension Res                                      ( 50)            0             0             0             0          ( 50)
  Elect Dist Replacement Res                                    ( 50)            0             0             0             0          ( 50)
    Total FINANCING DETAILS                                   ( 100)             0             0             0             0        ( 100)


Project Description
This project is to determine and then install the upgrades necessary for the transformer and relay test area. It is expected that fact
finding missions to other western electrical utilities and manufacturing plants would be done to identify the future needs. The objective
is to form a new infrastructure for the next ten years.

General Comments
It is expected that the equipment now in use to do general high voltage testing will be replaced, as it does not reliably operate due to
advanced age.

Relays are now being purchased which are exclusively electronic. Consequently, it is expected that some portable test sets and built in
test sets will be identified.

Modifications where needed as a result of the new equipment to the room or the building systems will not be part of this project.

Prior Budget Approvals                        $25,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1280 STREET LIGHTING - COS - LIGHTING UPGRADE

                                                           2004            2005          2006          2007         2008
                                                        BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Lighting Upgrade                                                 0          100          100           100           100           400
    Total GROSS COST DETAILS                                      0          100          100           100           100           400

FINANCING DETAILS
  Elect Dist Extension Res                                        0       ( 100)        ( 100)        ( 100)       ( 100)         ( 400)
    Total FINANCING DETAILS                                       0       ( 100)        ( 100)        ( 100)       ( 100)         ( 400)


Project Description
This project is to provide upgrades to existing roadways where the lighting is now considered to be below standard. This may be due to
roadway reclassification, traffic pattern changes, jurisdiction changes, or other causes. It is expected these lighting upgrades could be
on arterial roadways, highways within the City boundaries, or other roadways with higher traffic volumes.

General Comments
It is proposed to review the City of Saskatoon Lighting System and prepare a recommendation for upgrades extending over the next
five year period (2004 to 2008) and beyond as necessary.

Funding for this project is shown in total from the City Electric System Reserves. Additional funding may be available as projects are
identified in consultation with other agencies that would provide supplemental funding to meet their objectives. A potential cofunder
would be Department of Highways.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1281 ELECTRICAL SYSTEM POWER SUPPLY OPTIONS

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Investigate New Power Supply                                     50             0             0             0             0              50
    Total GROSS COST DETAILS                                      50             0             0             0             0              50

FINANCING DETAILS
  Elect Dist Extension Res                                     ( 50)             0             0             0             0         ( 50)
    Total FINANCING DETAILS                                    ( 50)             0             0             0             0         ( 50)


Project Description
This project is to investigate new power supply options for the City of Saskatoon Electric System. It will cover the cost of consulting
services to prepare cost benefit analyses of various power supply options and green power.

General Comments
The project started in 2003 with the investigation of a biomass cogeneration facility and that report will be complete in 2004. An
additional investigation will consider the gas produced at the Waste Water Treatment Plant as a fuel. It is expected that existing
customers may make additional proposals during the budget year. Consequently, there may be a requirement for post budget
adjustments.

This project will be reassessed on an annual basis.

Prior Budget Approvals                                 $100,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1305 ELEC FEEDER-UPGRD/REPLACEMENT

                                                           2004           2005          2006         2007          2008
                                                        BUDGET           PLAN          PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Construction                                                    0          110          110           110          110           440
   Total GROSS COST DETAILS                                      0          110          110           110          110           440

FINANCING DETAILS
  Elect Dist Replacement Res                                     0       ( 110)        ( 110)       ( 110)        ( 110)        ( 440)
    Total FINANCING DETAILS                                      0       ( 110)        ( 110)       ( 110)        ( 110)        ( 440)


Project Description
This project involves the upgrading, replacement and extension of primary and secondary circuits in predominantly residential areas.
This is to maintain system reliability and provide new services. Annual line inspections are undertaken to determine actual work
required.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1308 ELEC FEEDERS - CONVERSION INTERMED. S/S

                                                            2004            2005          2006          2007         2008
                                                         BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 4.16/14.4 kV - Garfield S/S                                       0         400           400              0            0           800
 4.16/14.4 kV - Avenue A                                           0           0             0              0           50            50
 4.16 kV/14.4 kV - 1st Avenue                                      0           0             0              0           50            50
    Total GROSS COST DETAILS                                       0         400           400              0          100           900

FINANCING DETAILS
  Elect Dist Extension Res                                         0       ( 100)        ( 100)             0       ( 100)         ( 300)
  Elect Dist Replacement Res                                       0       ( 300)        ( 300)             0            0         ( 600)
    Total FINANCING DETAILS                                        0       ( 400)        ( 400)             0       ( 100)         ( 900)


Project Description
The objectives of this project are to progressively convert the existing 4.16 kV primary distribution to 14.4 kV in the intermediate
substation (14.4/4.16 kV) service area. This project is related to project 1332 "Elec S/S (14.4/4.16 kV) Service Life Ext.". This project
does not include work within existing substations to lengthen the service life or other work within the substation. This project does not
include specific feeders primarily running through the service area to another load center.

General Comments
It is proposed to convert the overhead distribution primary system from 4.16 kV to 14.4 kV in the areas now supplied by the following
substations:
14th Street, Garfield, Montgomery, Ruth Street, Avenue A, 1st Avenue, Main Street, Avenue W, 29th Street and Lorne Avenue. Work
in 2004 will begin with Garfield Substation.

The intermediate substation equipment will typically be in excess of 40 years of age when conversion occurs. Project 1332 will provide
any substation equipment necessary to provide a reasonable service quality until the conversion is completed.

The actual work will be broken down into two basic components. The distribution and the 14.4 kV feeder extension (see project 1314
and 1318). The actual area being converted will include the distribution transformers, ancillary devices and down stream equipment.
Should there be costs from other Utilities, Agencies etc., these costs will be considered part of the distribution. The 14.4 kV feeder
extension will include poles, cabling and ancillary devices from the Supply bulk Substation switchgear supply lugs to its termination and
is not part of this project. This applies to the main run of circuit only.

The proposed schedule is based on the relative age of equipment, electrical demand load, area development and numbers of
customers being affected. The order noted is arbitrary and assessment is qualitative. Major equipment or component failure or other
unpredictable events can alter this schedule. Annual reassessment will be done.

Due to the interrelationships detailed examination of the long-range plan is necessary on a 5-year basis. The proposed schedule of
conversion is as follows:

1.       Years 2004 - 2005        Garfield S/S
2.       Years 2008 - 2016        Avenue A S/S
3.       Years 2008 - 2016        1st Avenue S/S
4.       Years 2009 - 2010        Montgomery S/S
5.       Years 2010 - 2016        C. D. McGall S/S
6.       Years 2012 - 2013        Ruth Street S/S
7.       Years 2012 - 2013        14th Street S/S
                    2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                    PROJECT DETAILS ($'000s)

1308 ELEC FEEDERS - CONVERSION INTERMED. S/S

8.     Years 2013 - 2016   29th Street S/S
9.     Years 2014 - 2015   Lorne Avenue
10.    Years 2014 - 2019   Avenue W S/S
11.    Years 2019 - 2021   Main Street S/S

Prior Budget Approvals               $100,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1310 ELECTRIC UTILITY - R & D

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 R & D Dist & Trans                                               40           50           50             50           50            240
 R & D Station & Apparatus                                        40           50           50             50           50            240
   Total GROSS COST DETAILS                                       80          100          100            100          100            480

FINANCING DETAILS
  Elect Dist Extension Res                                     ( 80)       ( 100)        ( 100)        ( 100)        ( 100)        ( 480)
    Total FINANCING DETAILS                                    ( 80)       ( 100)        ( 100)        ( 100)        ( 100)        ( 480)


Project Description
This project will fund this Utility's participation in research & development. The actions being proposed are to participate in Canadian
Electric Association technologies research committees and alternate power source projects.

General Comments
The technical interest groups being proposed are Distribution Assets Life Cycle Management (DALCM) and Life Cycle Management of
Substations, Equipment and Apparatus (LCMSEA). These two groups identify and manage research and development projects. The
members of these committees co-fund these projects.

The City of Saskatoon will be co-funding with other Canadian and United States Utilities. Some of these Utilities are: Sask. Power,
Manitoba Hydro, Hydro One, Aquila Networks Canada, Epcor, Enmos, BC Hydro, Toronto Hydro, Hydro Quebec, Newfoundland
Power, American Electric Power, New York State Electric & Gas Corp. and others.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1311 ELEC FEEDER - 25 KV - W. A. FRIEBEL S/S

                                                            2004           2005          2006          2007         2008
                                                         BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Friebel Feeder-25kV-To Attridge Dr.                           500             0             0            0              0           500
 Friebel Feeder-25 kV-To Fedoreck Dr.                           10           100             0            0              0           110
 Friebel Feeder-25 kV-115th Street                             150             0             0            0              0           150
 Friebel Feeder-25 kV-108TH                                      0             0            10          100              0           110
    Total GROSS COST DETAILS                                   660           100            10          100              0           870

FINANCING DETAILS
  Elect Dist Extension Res                                   ( 660)       ( 100)         ( 10)        ( 100)             0         ( 870)
    Total FINANCING DETAILS                                  ( 660)       ( 100)         ( 10)        ( 100)             0         ( 870)


Project Description
This project provides for new 25 kV distributions from the W. A. Friebel Substation, which has been proposed in project 1312 Electric
Substation - W. A. Friebel. These new 25 kV feeders will provide the Electrical Distribution within the University Heights area served by
the City's Electrical Distribution System.

General Comments
The four proposed distribution feeders will be used to provide service for the development being proposed between the river and
Sutherland, and Silverspring. These feeders will be tied to existing feeders out of W. J. Bunn Substation to provide backup. The
construction of these feeders will be dependant on development.

Construction of the first feeder to Circle Drive and Attridge was begun in 2002. It is expected that the permanent underground cables
for the lines running to new Preston Crossing complex with be installed in 2004. The changes and upgrades to these lines are a result
of the realignment of 108th Street, Preston Avenue Widening and Preston Crossing Development on either side of the roadway.

Prior budget approval               $250,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1314 ELEC FDR - 14.4 KV - N. CENTRAL - AVE C

                                                           2004           2005            2006        2007         2008
                                                        BUDGET           PLAN            PLAN        PLAN         PLAN         TOTAL
GROSS COST DETAILS
 14.4 kV Feeder-CBD Conversion FDR #1                           50          100              0            0          450           600
 14.4 kV Feeder-CBD Conversion FDR #2                            0          100              0            0          450           550
   Total GROSS COST DETAILS                                     50          200              0            0          900         1,150

FINANCING DETAILS
  Elect Dist Extension Res                                    ( 50)      ( 150)              0            0       ( 180)        ( 380)
  Elect Dist Replacement Res                                      0        ( 50)             0            0       ( 720)        ( 770)
    Total FINANCING DETAILS                                   ( 50)      ( 200)              0            0       ( 900)      ( 1,150)


Project Description
This project provides for the extension of two new 14.4 kV feeders. These two feeders will connect to both the Avenue C and North
Central substations. These two feeders will be use to convert the existing 4.16 kV overhead system to 14.4 kV operation.

General Comments
The existing Avenue A substation and the First Avenue substation are now at an advanced age. Major components at both substations
are over 40 years old. Maintenance due to the age of the equipment and unavailability of parts will become more difficult and
expensive. Also, major component failure can be expected due to the advanced age with resulting long repair times.

There are redevelopment proposals such as the Southeast Riversdale Design Plan which are directly impacted by the Avenue A
substation.

The general concept will reduce the number of front street overhead electrical lines and maintain overhead service in the lanes. This
work will be coordinated with existing and future streetscape upgrades.

This project is in conjunction with project 1308 Elec Feeders Conversion Intermed S/S.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1315 NORTH WEST BULK POWER SUPPLY

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 138 kV Feeder N. W.                                               0            0          752           752              0        1,504
   Total GROSS COST DETAILS                                        0            0          752           752              0        1,504

FINANCING DETAILS
  Elect Dist Extension Res                                         0            0       ( 300)        ( 300)              0       ( 600)
  Elect Dist Replacement Res                                       0            0       ( 452)        ( 452)              0       ( 904)
    Total FINANCING DETAILS                                        0            0       ( 752)        ( 752)              0     ( 1,504)


Project Description
This project is to build a new transmission line from the proposed Sask. Power QE19 west side loop to the City's existing bulk power
transmission line. It is suggested the connection point will be adjacent to the J. R. Cowley substation.

General Comments
Sask. Power is proposing to construct the westerly loop of a 138 kV transmission line. This announcement was included in the "Sask.
Power 10 year Transmission Development Plan" released May 2002. The proposed in service date is 2006.

The exact routing of the City's transmission line will be determined as part of a planning study in 2004. Construction is expected to
commence in 2006 and run through 2008.

This transmission line (bulk power supply) is needed to assure adequate capacity is available from the North West under major bulk
power system failure conditions.

Prior Budget Approvals              $50,000 Design
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1316 TRANSMISSION LINE FOUNDATION PROTECTION

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 138 kV Transmission Foundation                                   50              0             0             0             0            50
   Total GROSS COST DETAILS                                       50              0             0             0             0            50

FINANCING DETAILS
  Elect Dist Extension Res                                      ( 25)             0             0             0             0         ( 25)
  Elect Dist Replacement Res                                    ( 25)             0             0             0             0         ( 25)
    Total FINANCING DETAILS                                     ( 50)             0             0             0             0         ( 50)


Project Description
This project involves both an investigation of the extent of transmission line foundation corrosion or other metal failure modes and initial
mitigation. The structures of most interest are steel lattice installed in the late 1960's. There are three metal failure modes of interest;
mechanical, common corrosion (metal oxidization) and galvanic corrosion (due to stray electrical currents).

General Comments
The existing steel lattice transmission towers use a steel gillage as the foundation foot. These are direct buried below the normal frost
line. This project will expose some of these foundations to assess the level of corrosion or other deterioration. It is expected that a
series of sacrificial anodes will be installed around each tower to prevent or slow further galvanic corrosion. Other remedial measures
include installation of barricades for mechnical protection. The actual investigation to correct structural strength deterioration beyond
immediate needs will be under the project and budget based on the findings of the study. This project is to be coordinated with project
# 1154 WTP - Sludge Recovery & Disposal involving tower relocation.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1317 ELEC LINE - U/G UPGRADE (DEADFRONT)

                                                             2004           2005          2006           2007         2008
                                                          BUDGET           PLAN          PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Elec Line - U/G Upgrade (Deadfront)                            100           400           400           400           400         1,700
   Total GROSS COST DETAILS                                     100           400           400           400           400         1,700

FINANCING DETAILS
  Elect Dist Extension Res                                      ( 30)      ( 100)        ( 100)         ( 100)       ( 100)         ( 430)
  Elect Dist Replacement Res                                    ( 70)      ( 300)        ( 300)         ( 300)       ( 300)       ( 1,270)
    Total FINANCING DETAILS                                   ( 100)       ( 400)        ( 400)         ( 400)       ( 400)       ( 1,700)


Project Description
This project provides for the upgrade of existing live-front to dead-front switching cubicles in the underground system. This project is to
be completed over multiple years.

General Comments
In the older underground distribution areas, underground cable terminations were installed such that energized parts are exposed once
the cabinet is opened (i.e. live front). The newer installations tend to be manufactured with no energized parts exposed with the cabinet
open (i.e. dead-front). System adjustments and maintenance tend to cause longer outages to system customers where live-front
equipment is involved. Upgrading of the existing live-front equipment to dead-front is being considered. The object for upgrading is to
improve general system reliability and better manage/minimize customer outages. Equipment assessment will consider age of
installation, present condition, specific reliability issues and outage management improvement through upgrade. The schedule for
replacement will be for upgrades giving the best improvement to be first. The schedule for replacement has been amended to speed up
the transition.

In 2004, cubicle replacements will concentrate in the College Park, Meadowgreen and Eastview areas. Other locations may be
considered where maintenance or operational issues provide opportunity.

This project will be reviewed annually.

Prior Budget Approvals                        $25,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                               PROJECT DETAILS ($'000s)

1318 ELEC FEEDER - MELVILLE - MAIN ST.

                                                               2004               2005      2006       2007          2008
                                                            BUDGET               PLAN      PLAN       PLAN          PLAN         TOTAL
GROSS COST DETAILS
 14.4 kV Feeder Melville - Main (3 FDR'S)                          550             550       550         500           500         2,650
   Total GROSS COST DETAILS                                        550             550       550         500           500         2,650

FINANCING DETAILS
  Elect Dist Extension Res                                        ( 63)            ( 63)     ( 63)      ( 50)         ( 50)       ( 289)
  Elect Dist Replacement Res                                    ( 487)           ( 487)    ( 487)     ( 450)        ( 450)      ( 2,361)
    Total FINANCING DETAILS                                     ( 550)           ( 550)    ( 550)     ( 500)        ( 500)      ( 2,650)


Project Description
This project provides for the extension, replacement and renovation of 14.4 kV feeders from Melville Street Substation to the Main
Street Substation to supply higher electrical energy demands and to maintain sufficient confidence in supply.

General Comments
Three feeders will extend from the Melville Street Substation to the Main Street Substation. One feeder will follow a route from Melville
Street substation east of the river and primarily west of the Idylwyld Drive Freeway and then easterly to the Main Street Substation.
This feeder will be used for primary voltage conversions effectively parallel to the river. The other two feeders are dedicated to supply
Main Street Substation. The purpose is to transfer Main Street Substation from the Avenue C substation to the Melville Substation
thereby reducing the load on the heavily loaded Avenue C Substation.

This project is linked to project # 935 Electric Substation - Melville Street.

Prior Budget Approval                           $550,000.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1319 ELEC LINES - NUTANA SUB. - 14.4 KV UPGRD

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Nutana Suburban - Detailed Design                              600            0             0              0             0          600
 Nutana Suburban - 14.4 kV Conversion                             0          400           400              0             0          800
   Total GROSS COST DETAILS                                     600          400           400              0             0        1,400

FINANCING DETAILS
  Elect Dist Extension Res                                   ( 100)          ( 50)        ( 50)             0             0       ( 200)
  Elect Dist Replacement Res                                 ( 500)        ( 350)       ( 350)              0             0     ( 1,200)
    Total FINANCING DETAILS                                  ( 600)        ( 400)       ( 400)              0             0     ( 1,400)


Project Description
This project involves upgrades to the existing underground electrical distribution from 4.16 kV to 14.4 kV in Nutana Suburban
Neighborhood. Existing redevelopment along Preston Avenue will be supplied from the existing 14.4 kV system, which has already
been extended into the neighborhood. This system now supplies Market Mall.

General Comments
Nutana Suburban Neighborhood began development in approximately 1962. The development has been a combination of commercial
(Market Mall), institutional (two high schools), recreation complexes (private curling club, public indoor & outdoor facilities) and high
density residential (seniors high-rise & others). Redevelopment of the existing properties is likely to occur adjacent to Preston Avenue
and Adelaide Street.

A conversion is being considered for this area, as there are problems with the existing system beyond inadequate electrical capacity.
The existing cable and equipment is generally over thirty years old and some is about to exceed forty years of age. The cable will
require upgrading soon to limit failures due to normal aging.

The construction methods in the 1960's called for large numbers of switching/junction cubical which are now problematic respecting
general maintenance and tend to extend repair times under fault conditions. The current construction technique should reduce the
need for many of these cubicles. The newer style cubicles can be utilized for general upgrading required in other parts of the
distribution system.

This area has a relatively small number of service drops, as service tends to be concentrated in a number of large buildings.
Consequently, the number of connection points for cable and the number of transformers is relatively small.

A more detailed design has been prepared and the transition from 14.16 kV to 14.4 kV is anticipated to be in three stages. The estimate
has been adjusted in accordance with the detail design.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1320 ELEC - RESIDENTIAL SERVICES

                                                              2004            2005          2006          2007          2008
                                                           BUDGET            PLAN          PLAN          PLAN          PLAN          TOTAL
GROSS COST DETAILS
 Residential Services - 2004                                     150             0              0             0             0            150
 Residential Services                                              0           150            150           150           150            600
   Total GROSS COST DETAILS                                      150           150            150           150           150            750

FINANCING DETAILS
  Elect Dist Extension Res                                     ( 150)        ( 150)        ( 150)        ( 150)        ( 150)         ( 750)
    Total FINANCING DETAILS                                    ( 150)        ( 150)        ( 150)        ( 150)        ( 150)         ( 750)


Project Description
This project reflects the annual cost to provide the electrical distribution service for residential customers within the City of Saskatoon
Electrical Franchise Area.

General Comments
This project covers the electrical secondary service for each specific residential unit. These service extensions are single family house
typically but can include duplex, triplex, and quadiaplex residential buildings. The provision of the primary distribution system for a new
residential development will be by other projects.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1321 ELEC FEEDER - SOUTH DOWNTOWN

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Elec Feeder Relocation - 19th Street                            350             0              0             0             0              350
 Elec Feeder - Distribution SDT                                    0           100              0             0             0              100
   Total GROSS COST DETAILS                                      350           100              0             0             0              450

FINANCING DETAILS
  Elect Customer Contribution                                 ( 350)              0             0             0             0        ( 350)
  Elect Dist Extension Res                                         0          ( 75)             0             0             0          ( 75)
  Elect Dist Replacement Res                                       0          ( 25)             0             0             0          ( 25)
    Total FINANCING DETAILS                                   ( 350)        ( 100)              0             0             0        ( 450)


Project Description
This project involves the removal, relocation, and installation of electrical infrastructure in the South Downtown District. The project
includes cleaning the existing electrical infrastructure from the Gathercole Site and to relocate the required electric feeders to 19th
Street. This work is a result of the Gathercole Site redevelopment.

Servicing of any new developments in this area will also be covered under this project.

General Comments
Cost estimates include the removal of the transformers located inside the Gathercole Building. This work is to be coordinated with any
additional work in the South Downtown District. The project is also dependant upon land developments in the area.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1322 ELEC FEEDER - EDMONTON AVENUE

                                                          2004            2005         2006          2007         2008
                                                       BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Feeder 5 To Ave W                                               0           10          300             0             0             310
   Total GROSS COST DETAILS                                      0           10          300             0             0             310

FINANCING DETAILS
  Elect Dist Extension Res                                       0        ( 10)       ( 150)             0             0       ( 160)
  Elect Dist Replacement Res                                     0            0       ( 150)             0             0       ( 150)
    Total FINANCING DETAILS                                      0        ( 10)       ( 300)             0             0       ( 310)


Project Description
This project involves the creation and installation of a new 15kV primary feeder for supply to the Avenue W Substation. Both
underground and overhead options will be considered. The feeder is required as an alternate for Feeder #2 from the Edmonton
Avenue Substation.


General Comments
As Avenue C Substation shifts to predominantly a downtown supply, it's feeders to the other locations need to be replaced. New
feeders are required from other 15 kV substations as primary and/or backup supply for the 15 kV distribution. This project will be
coordinated with other feeder projects and infrastructure changes at Avenue C Substation (Capital Project 1333 Elec S/S - Ave C -
14.4 kV Switchgear).
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1323 ELEC FEEDER - PLEASANT HILL

                                                           2004           2005         2006          2007         2008
                                                        BUDGET           PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Elec Feeder - PH Feeder 6 to Ave W                              0           10          300             0            0           310
 14.4 kV Feeder - PH - Water Treatment                           0            0            0             0           10            10
   Total GROSS COST DETAILS                                      0           10          300             0           10           320

FINANCING DETAILS
  Elect Dist Extension Res                                       0        ( 10)       ( 150)             0         ( 10)       ( 170)
  Elect Dist Replacement Res                                     0            0       ( 150)             0             0       ( 150)
    Total FINANCING DETAILS                                      0        ( 10)       ( 300)             0         ( 10)       ( 320)


Project Description
This project involves the creation and installation of a new 15kV primary feeder for supply to the Avenue W Substation and the Water
Treatment Plant. Both underground and overhead options will be considered. The feeder to Avenue W Substation is required as an
alternate for Feeder #5 from the Pleasant Hill Substation.


General Comments
As Avenue C Substation shifts to predominantly a downtown supply, it's feeders to the other locations need to be replaced. New
feeders are required from other 15 kV substations as primary and/or backup supply for the 15 kV distribution. This project will be
coordinated with other feeder projects and infrastructure changes at Avenue C Substation (Capital Project 1333 Elec S/S - Ave C - 14.4
kV Switchgear).
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1330 ELEC SUBSTN-NORTH CENTRAL

                                                            2004            2005         2006           2007         2008
                                                         BUDGET            PLAN         PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Power Transformer - North Central                              200          100              0             0           30             330
   Total GROSS COST DETAILS                                     200          100              0             0           30             330

FINANCING DETAILS
  Elect Dist Extension Res                                     ( 50)         ( 50)            0             0         ( 30)        ( 130)
  Elect Dist Replacement Res                                 ( 150)          ( 50)            0             0             0        ( 200)
    Total FINANCING DETAILS                                  ( 200)        ( 100)             0             0         ( 30)        ( 330)


Project Description
This project will provide two additional 14.4 kV switchgear cells complete with breakers and relays in the years 2004 and 2005. This
project will provide for an additional 138/14.4 kV transformer, which provides the full transformation capacity for backup requirements of
the Avenue C Substation.

General Comments
Upon installation of the second Power Transformer, the North central substation will have sufficient transformation and distribution
capacity to provide an alternate supply of electrical power for the downtown.

Prior Budget Approval                         $10,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1332 ELEC S/S(14.4/4.16 KV)-SERVICE LIFE EXT

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Medium Voltage S/S Mitigration                                    0           50            50            50            50           200
   Total GROSS COST DETAILS                                        0           50            50            50            50           200

FINANCING DETAILS
  Elect Dist Extension Res                                         0         ( 20)        ( 20)          ( 20)        ( 20)          ( 80)
  Elect Dist Replacement Res                                       0         ( 30)        ( 30)          ( 30)        ( 30)        ( 120)
    Total FINANCING DETAILS                                        0         ( 50)        ( 50)          ( 50)        ( 50)        ( 200)


Project Description
This project involves reliably extending the service life of existing medium voltage substations (14.4/4.16 kV). The time in service for
these substations is either approaching 30 years or may have already exceeded 40 years. Technological change and economics are
leading to the eventual retirement of these stations. However, it is necessary to have a transition period, which may be ten years or
more. Prioritizing of the individual substations and determining practical service extension will be done. Major system equipment within
these substations can be expected to fail during this time period as the equipment useful/economic life is nearing its end or has been
exceeded. It is considered unreasonable to allow such failures to seriously compromise general system reliability. As equipment
failure is typically random, sufficient system redundancy, and reliable protective equipment must be in place.

General Comments
It is not generally considered economic to extend the existing system destined for retirement. Consequently, load transfers will be
necessary to other systems to assure redundancy at the 4.16 kV distribution level. This work will not be part of this project.
Redundancy within the substation will be to maintain sufficient transformation and distribution capacity to assure the system load can
be carried in the event of equipment failure.

The existing protective equipment within the Substations is usually of the same age as the other major equipment components.
Consequently, upgrades and/or replacements may be necessary on critical parts to provide a reasonable confidence of effective
operation.

This project will cover work within the individual substations and, where applicable, the dismantling of the substation and preparation of
the site for disposal of land. The actual cost recovery from land sales is expected to be included. However, environmental mitigation
may exceed the property value.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1333 ELEC S/S-AVE C-14.4 KV SWITCHGEAR

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Elec Substn-Ave C-Transformer                                      0            0             0             0            25            25
   Total GROSS COST DETAILS                                         0            0             0             0            25            25

FINANCING DETAILS
  Elect Dist Extension Res                                          0            0             0             0         ( 25)          ( 25)
    Total FINANCING DETAILS                                         0            0             0             0         ( 25)          ( 25)


Project Description
This project is a major upgrade of the electrical substation primary distribution system. This will involve the potential upgrading and/or
replacement of the switchgear and the infrastructure, which supports that system.

General Comments
This substation was built in 1980. However, one of the Power Transformers has been in service since 1957. This transformer must be
retired, as it is already over 40 years old. The switchgear although constructed in 1980 no longer has a ready source of replacement
parts. One breaker assembly has already been replaced due to serious damage interrupting a feeder electrical fault. There are serious
concerns in the ability of this equipment to maintain a reasonable confidence of operation into the future.

It is proposed to consider a number of alternatives respecting the upgrading of this substation. This will include the fundamental layout,
reuse and/or replacement of existing equipment.

On-line monitoring equipment has been added to the substation transformers and switchgear. A continual assessment of the
equipment condition will be performed and remedial actions will be scheduled on the basis of these assessments.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1334 ELEC S/S - J. M. TAYLOR UPGRADE

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN            TOTAL
GROSS COST DETAILS
 Bldg & Infrastructure                                           50              0            0             0             0              50
 14.4 & 4.16 kV Switchgear                                      500              0          400           200             0           1,100
 Power Transformer                                                0              0            0             0            10              10
   Total GROSS COST DETAILS                                     550              0          400           200            10           1,160

FINANCING DETAILS
  Elect Dist Extension Res                                    ( 120)             0         ( 75)         ( 40)         ( 10)        ( 245)
  Elect Dist Replacement Res                                  ( 430)             0       ( 325)        ( 160)              0        ( 915)
    Total FINANCING DETAILS                                   ( 550)             0       ( 400)        ( 200)          ( 10)      ( 1,160)


Project Description
This project involves the expansion and renovating of the existing building to accommodate expansion of the 14.4 kV switchgear and
upgrading of the 4.16 kV switchgear. To meet the expected increase in demand an additional 138 kV/14.4 kV transformer and the
necessary 138 kV switchgear are part of this project.

General Comments
The first stage of this project was begun in 1990 and effectively completed in 1995. This project was identified as part of a load
forecast extending out to the year 2021. The second stage is identified for years 2003 to 2005.

New 14.4 kV switchgear was installed in the first stage. It is presumed only additions to the existing switchgear are required. A
minimum of 6 additional cells is expected. Relaying will be upgraded to a common standard.

The existing 4.16 switchgear is in two generations 1965 & 1990. The oldest equipment will be 40 years old when this project
component starts. It is likely only replacement will be practical. The equipment dating from 1990 will likely require updating of relays
and modifications to meet the current standards.

This project will be assessed on an annual basis and will be dependent upon the load increases of the surrounding residential and
commercial neighborhoods.

A detail design is now complete, the 14.4 kV switchgear has been ordered, the major addition to the building is no longer necessary
and the budget has been adjusted accordingly.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1335 ELEC S/S - COLLEGE PARK

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 4.16 kV & 14.4 kV Switchgear                                      0             0             0             0           10               10
 Capacitors                                                        0             0             0             0           10               10
    Total GROSS COST DETAILS                                       0             0             0             0           20               20

FINANCING DETAILS
  Elect Dist Extension Res                                         0             0             0             0         ( 10)            ( 10)
  Elect Dist Replacement Res                                       0             0             0             0         ( 10)            ( 10)
    Total FINANCING DETAILS                                        0             0             0             0         ( 20)            ( 20)


Project Description
This project provides for upgrading of the existing transformation, supply and distribution switchgear and substation infrastructure.

General Comments
The College Park Substation equipment was manufactured and installed in 1969. It will have been in service for more than 30 years
when upgrading begins. It is expected that upgrades and replacement of basic infrastructure will be required. This includes the AC
System, DC system, remote telemeter unit (RTU), lighting, etc. The existing switchgear will be assessed. It is presumed that the 14.4
kV switchgear will be replaced and the 4.16 kV switchgear will be renovated.

The existing transformation does not allow for local voltage control. It is expected this would become a problem as distribution loads on
both the 14.4 kV system and 4.16 kV system grow. It is proposed to put in place equipment to facilitate the local voltage control at 4.16
kV.

Switchgear Shunt Capacitors are proposed to be installed in the substation to balance the power factor. At least two levels are
proposed of 2.4 MVA (Total 4.8 MVA).
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1336 ELEC S/S - 29TH STREET S/S

                                                             2004             2005          2006          2007          2008
                                                          BUDGET             PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 14.4 kV Primary Protection                                      125              0             0              0             0           125
   Total GROSS COST DETAILS                                      125              0             0              0             0           125

FINANCING DETAILS
  Elect Dist Extension Res                                       ( 10)            0             0              0             0          ( 10)
  Elect Dist Replacement Res                                   ( 115)             0             0              0             0        ( 115)
    Total FINANCING DETAILS                                    ( 125)             0             0              0             0        ( 125)


Project Description
This project provides 14.4 kV primary supply protection for the existing two power transformers.

General Comments
This substation 14.4 kV primary supply is also used for primary distribution supply. The existing protection scheme will likely result in
faults within the substation or its 4.16 kV distribution system causing the entire 14.4 kV feeder to be taken out of service. To rectify this
unacceptable situation, an interrupter is proposed for each transformer. The normal protection schemes for a power transformer is
expected. (i.e. differential, inverse, fast gas, etc.)

Detailed design and construction is proposed for 2004 to confirm equipment requirement and provide a detailed estimate.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1341 ELEC FDR. - 14.4 KV - BREVOORT PK. CONV.

                                                            2004          2005          2006          2007         2008
                                                         BUDGET          PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Taylor 14.4 kV Conv Brevoort Pk Comm                           130            0            0             0             0            130
   Total GROSS COST DETAILS                                     130            0            0             0             0            130

FINANCING DETAILS
  Elect Dist Extension Res                                     ( 30)           0            0             0             0         ( 30)
  Elect Dist Replacement Res                                 ( 100)            0            0             0             0       ( 100)
    Total FINANCING DETAILS                                  ( 130)            0            0             0             0       ( 130)


Project Description
The commercial area along the northern boundary and multi residential area along the western boundary of Brevoort Park are being
upgraded from 4.16 kV to 14.4 kV primary electrical distribution system. This is approximately the blocks with 7th Street, 8th Street,
Argyle Avenue, and Preston Avenue. The inner portion of Brevoort Park will retain the existing underground 4.16 kV primary electrical
distribution. This project has been underway since 2002 and will conclude in 2004.

General Comments
The northern boundary of Brevoort Park has seen significant load growth due to the upgrading of the commercial property fronting onto
8th Street. Brevoort Park general load growth for the single family and duplex residential continues but has been lower. The objective
of this project was to install new 14.4 kV capacity along the north and west perimeter and utilized the spare capacity that would be
made available on the 4.16 kV system for the remaining residential area. The new overhead 14.4 kV distribution system is now in place
within the most northerly and most westerly blocks of Brevoort Park and was concluded in 2003.

The majority of the work remaining for 2004 will be the following:

         •    seasonal repairs such as patch paving of lanes and parking lots dug up in late 2003 as part of equipment upgrades.
         •    the replacement of the underground cable for distribution feeder #12 extended from the J. M. Taylor Substation
         •    the installation of three dead front switching cubicles as part of the realignment of the 4.16 kV feeders within the
              neighbourhood.

Prior Budget Approvals                        $842,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                               PROJECT DETAILS ($'000s)

1356 V&E ADD'L VEHICLES & EQUIPT

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 EQUIPMENT PURCHASE                                              214           220           227            234          241          1,136
   Total GROSS COST DETAILS                                      214           220           227            234          241          1,136

FINANCING DETAILS
  V&E Acquisition/Disposal Reserve                            ( 214)        ( 220)        ( 227)         ( 234)        ( 241)      ( 1,136)
   Total FINANCING DETAILS                                    ( 214)        ( 220)        ( 227)         ( 234)        ( 241)      ( 1,136)


Project Description
This project provides for the purchase of additional fleet vehicles and equipment in accordance with Section 18.1 of the Capital
Reserves Bylaw #6774. These vehicles or pieces of equipment have been requested by various departments as additions to their
previous years permanently assigned complement. They are required due to increased demand resulting from the City's growth and/or
to provide improved service.

General Comments
The proposed purchases are as follows:

IS Facilities                    ¼ ton truck                                             1             $ 23,000
                                 ¾ ton van                                               2             $ 58,000

IS Parks                         1 ton water truck                                       1             $ 40,000

Police Services                  ¾ ton van                                               2             $ 58,000
                                 patrol car                                              1             $ 35,000
                                                                                                       -------------
TOTAL                                                                                                  $214,000
                                                                                                       =======

Where applicable, final approval of this project is subject to City Council's approval of the rental of the equipment in the appropriate
departmental Operating Budget.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1357 V&E REPL'T VEHICLES & EQUIPT

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 EQUIPMENT PURCHASE                                          4,006          3,000       3,000         3,000         3,000        16,006
   Total GROSS COST DETAILS                                  4,006          3,000       3,000         3,000         3,000        16,006

FINANCING DETAILS
  V&E Replacement Reserve                                  ( 4,006)      ( 3,000)     ( 3,000)      ( 3,000)      ( 3,000)    ( 16,006)
   Total FINANCING DETAILS                                 ( 4,006)      ( 3,000)     ( 3,000)      ( 3,000)      ( 3,000)    ( 16,006)


Project Description
This project involves the purchase of replacement fleet vehicles and equipment in accordance with Capital Reserves Bylaw #6774.
Replacements are required as the units are experiencing unacceptable maintenance and repair costs, excessive downtime, and/or a
loss in productivity, and have reached or passed their scheduled life spans.

General Comments
The units to be replaced will be disposed of as trades, by public auction, or by public tender. The units scheduled for replacement are
as follows:

Unit Type                  Quantity                           Estimated Cost
Minivan                    2                                    $ 50,000
¼ ton truck                2                                    $ 45,000
¾ ton truck                4                                    $ 116,000
½ ton truck                5                                    $ 125,000
¾ ton truck                4                                    $ 120,000
1 ton truck                4                                    $ 160,000
1 ton cube van             3                                    $ 360,000
12 yard dump truck         2                                    $ 280,000
Automated garbage truck    2                                    $ 560,000
Asphalt patching truck     1                                    $ 180,000
Sidewalk cleaning unit     1                                    $ 80,000
Asphalt roller             1                                    $ 150,000
Skid steer loader          1                                    $ 45,000
4 wheel sweeper            1                                    $ 280,000
Solid waste dozer          1                                    $ 650,000
Marked police patrol       11                                   $ 385,000
Unmarked police unit       10                                   $ 170,000
Major component rebuilds                                        $ 250,000
                                                                ---------------
Total                                                           $4,006,000
                                                                =========
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1380 POLICE COMPUTER SYSTEM INTEGRATION

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Computer System Integration                                    100          150              0             0             0             250
   Total GROSS COST DETAILS                                     100          150              0             0             0             250

FINANCING DETAILS
  Police Equipment & Technology Res                          ( 100)        ( 150)             0             0             0           ( 250)
   Total FINANCING DETAILS                                   ( 100)        ( 150)             0             0             0           ( 250)


Project Description
This project will consolidate all critical Police Service Operational Systems and Interfaces to operate on a one-server environment with
an online off-site stand-by server.

General Comments
The purpose of this project is to integrate the separate police systems and interfaces in our data centre, which presently run on a
number of different network servers, onto a common server with an online (offsite) redundant server.

Benefits include:
          • More secure environment to protect our more mission critical systems against downtime caused by environmental or
              human circumstances.
          • Increased processing performance and load balancing for future applications where voice, video, telephony, data, etc. will
              be shared over a common network.
          • More efficient management of a centralized systems architecture.

In normal operation, the stand-by server would share in the processing load. However, in the event of server failure the other would
take over all processing at a continued acceptable level of service, until such time as the malfunctioning machine is repaired and
brought back online.

Operating Impact
Additional backup server support and software licenses; 2004 $10,000.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1382 POLICE COMPUTER SERVER INTEGRATION

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Equipment Purchases                                           150              0            0             0             0          150
   Total GROSS COST DETAILS                                    150              0            0             0             0          150

FINANCING DETAILS
  Police Equipment & Technology Res                          ( 150)             0            0             0             0        ( 150)
   Total FINANCING DETAILS                                   ( 150)             0            0             0             0        ( 150)


Project Description
The Police Service Microsoft Windows Based Systems and Applications will be consolidated into one server environment with an online
off-site stand-by server. This will provide a more secure operating environment for our MS Office and Windows based operational
systems.

General Comments
The purpose of this project is to integrate the separate Microsoft Windows based, office and police application, systems in the Police
data centre, which presently run on a number of different network servers, onto a common server with an online (offsite) redundant
server.
This will provide a number of benefits such as:

         •   More secure environment to protect the MS Windows based mission critical and office systems against downtime caused
             by environmental or human circumstances.
         •   Increased processing performance and load balancing for future applications where voice, video, telephony, data, etc. will
             be shared over a common network.
         •   More efficient management of a centralized systems architecture.

In normal operation, the stand-by server would share in the processing load. However, in the event of server failure the other would
take over all processing at a continued acceptable level of service, until such time as the malfunctioning machine is repaired and
brought back online.

This project began in 2003 and will be completed in 2004.

Prior Budget Approvals                       $100,000

Operating Impact
Additional stand-by server support and software licenses $15,000 in 2004.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1389 POLICE NOTEBOOK REPLACEMENT

                                                          2004            2005         2006          2007         2008
                                                       BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Notebook Replacement                                            0         200           200          100           100           600
   Total GROSS COST DETAILS                                      0         200           200          100           100           600

FINANCING DETAILS
  Police Equipment & Technology Res                              0       ( 200)       ( 200)        ( 100)       ( 100)        ( 600)
   Total FINANCING DETAILS                                       0       ( 200)       ( 200)        ( 100)       ( 100)        ( 600)


Project Description
The current in-car notebook computers have an anticipated useful life of 3 - 5 years. This project addresses the eventual replacement
of these assets.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1390 LAND DEV'T-DUNDONALD SUB

                                                          2004            2005         2006          2007         2008
                                                       BUDGET            PLAN         PLAN          PLAN         PLAN           TOTAL
GROSS COST DETAILS
 2001 E City Hughes                                            67             0            0             0            0            67
   Total GROSS COST DETAILS                                    67             0            0             0            0            67

FINANCING DETAILS
  Gen PPD-Services-Eng                                       ( 88)            0            0             0            0          ( 88)
  Gen PPD Services-Elec-SPC                                     21            0            0             0            0             21
   Total FINANCING DETAILS                                   ( 67)            0            0             0            0          ( 67)


Project Description
This project involves the construction of municipal services on City and privately owned land in the Dundonald neighbourhood.
                                              City               Private
                   Year                       Lots               Lots

                 1997                       51                -
                 1998                       -                 -
                 1999                       49                -
                 2001                       0                 17
                 2003                       68                0



Prior Budget Approvals                        $3,025,000
Prior years' reflects C1 City (Sumner), C2 City (Nixon & McCann), D Private, and E City Hughes.
                         2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1393 LAND DEV'T-SUTHERLAND SUB

                                                            2004           2005         2006       2007         2008
                                                         BUDGET           PLAN         PLAN       PLAN         PLAN        TOTAL
GROSS COST DETAILS
 1998 - A - City                                               224                 0       0           0            0          224
   Total GROSS COST DETAILS                                    224                 0       0           0            0          224

FINANCING DETAILS
  Gen PPD Services-Elect-City                                  ( 44)               0       0           0            0          ( 44)
  Gen PPD-Services-Eng                                       ( 108)                0       0           0            0        ( 108)
  PRR - University Land Agreements                             ( 72)               0       0           0            0          ( 72)
   Total FINANCING DETAILS                                   ( 224)                0       0           0            0        ( 224)


Project Description
This project involves the construction of municipal services on city owned land.

                  Year              City
                                    Lots

                  2000              -
                  2001              -
                  2002              -
                  2003              135
                  2004                30

General Comments
Funding from the Property Realized Reserve is for the paving of the lanes south of the CPR and connection/street improvements north
of the CPR, which are in excess of the land development levy.

Prior Budget Approvals                        $2,757,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1396 LAND DEV'T-WILLOWGROVE SUB

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Site Design and Replot                                          30             0              0              0            0            30
 Earth Fill & Enhanced Features                               1,336             0              0              0            0         1,336
 2004-A2-City Maguire/Greaves                                   828           349              0              0            0         1,177
 2004-A3-City Van Impe                                        1,340             0              0              0            0         1,340
    Total GROSS COST DETAILS                                  3,534           349              0              0            0         3,883

FINANCING DETAILS
  Gen PPD Services-Elect-City                                   ( 25)         ( 27)            0              0            0          ( 52)
  Gen PPD-Services-Eng                                      ( 2,043)        ( 322)             0              0            0      ( 2,365)
  Gen PPD Services-Elec-SPC                                   ( 100)              0            0              0            0        ( 100)
  Property Realized Reserve                                 ( 1,366)              0            0              0            0      ( 1,366)
    Total FINANCING DETAILS                                 ( 3,534)        ( 349)             0              0            0      ( 3,883)


Project Description
This project involves the design of the Willowgrove Subdivision in the University Heights Suburban Development Area. All studies,
aerial contours, sound study, heritage/architectural investigations and replots are included.

General Comments
The construction of municipal services on city owned land within the Willowgrove neighborhood is planned in 2002, 2003, 2004, and
2005. The Earth Fill & Enhanced Features component is for the enhancement to the main entrance of the Willowgrove neighborhood
and Stensrud Road.

The Van Impe component includes construction of water and sewer and utilities only until demand warrants surface construction.

Funding from the Property Realized Reserve is for:
1) design, aerial contours, sound study, heritage/archeological investigations, subdivisions, servicing plans, linear park plan, village
square concept, and architectural controls.
2) earth fill and enhancements which are in excess of the land development levy. Enhancements include decorative and pedestrian
lighting and streetscape, enhanced masonry external fencing, wrought iron internal fencing and grade markers.

Year              City Lots

2002                  0
2003                217
2004                 30
2005                 45

Prior Budget Approvals                 $7,779,000
Prior years' reflect site design and replot , A-City and Earth Fill and Enhanced Features
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1397 LAND DEV'T-SILVERWOOD IND

                                                             2004            2005         2006           2007          2008
                                                          BUDGET            PLAN         PLAN           PLAN          PLAN        TOTAL
GROSS COST DETAILS
 2002 - B - City Arthur                                       1,439              0             0             0             0        1,439
 Earth Fill & Enhanced Features                                  60              0             0             0             0           60
   Total GROSS COST DETAILS                                   1,499              0             0             0             0        1,499

FINANCING DETAILS
  Gen PPD-Services-Eng                                      ( 1,439)             0             0             0             0      ( 1,439)
  Property Realized Reserve                                     ( 60)            0             0             0             0          ( 60)
    Total FINANCING DETAILS                                 ( 1,499)             0             0             0             0      ( 1,499)


Project Description
This project involves the construction of municipal services on city owned land within the Silverwood Industrial Area and utility servicing
not covered within the Prepaid rates.

General Comments
Funding from the Property Realized Reserve is for the planting of trees adjacent to the Silverwood Golf Course and for entrance
treatment.

Prior Budget Approvals                        $3,825,000
Prior years' reflect A City Wanuskewin, B City and Earth Fill and Enhanced Features
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1400 LAND DEV'T-HAMPTON VILLAGE SUB

                                                            2004           2005          2006           2007         2008
                                                         BUDGET           PLAN          PLAN           PLAN         PLAN        TOTAL
GROSS COST DETAILS
 2003 - B - Private                                              0            63              0             0            0           63
 2004 - A2 - City                                            2,752         2,229              0             0            0        4,981
 Site Design and Survey                                        157             0              0             0            0          157
 Earth Fill and Enhanced Features                              472             0              0             0            0          472
    Total GROSS COST DETAILS                                 3,381         2,292              0             0            0        5,673

FINANCING DETAILS
  Gen PPD Services-Elect-City                                ( 102)       ( 145)              0             0            0        ( 247)
  Gen PPD-Services-Eng                                     ( 2,306)     ( 2,069)              0             0            0      ( 4,375)
  Gen PPD Services-Elec-SPC                                    ( 22)        ( 78)             0             0            0        ( 100)
  Property Realized Reserve                                  ( 951)             0             0             0            0        ( 951)
    Total FINANCING DETAILS                                ( 3,381)     ( 2,292)              0             0            0      ( 5,673)


Project Description
This project involves the construction of municipal services on city-owned and privately-owned land.

General Comments
Funding from the Property Realized Reserve is for:
1) the design change to allow additional lots to receive water and sewer connection on 37th Street. Funding is for the difference in cost
between a standard connection and a connection constructed within a paved street. Other Property Realized Reserve funding includes
items not within the Prepaid rates for medians, parcel utility services and lane paving.
2) concept plan, storm water management and parks conceptual plan as well as survey costs.
3) establishment of an earth fill site, temporay road, landscaping of the Dundonald pond to accomodate Hampton Village, other
neighborhood enhancements, and the construction of the storm sewer mains between Hampton Village and Dundonald.

Prior Budget Approvals              $620,000

                           City     Private
         Year(s) Lots      Lots

         2003               58       0
         2004               45      75
         2005              100      75
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1401 LAND DEV'T-STONEBRIDGE

                                                            2004           2005          2006             2007    2008
                                                         BUDGET           PLAN          PLAN             PLAN    PLAN    TOTAL
GROSS COST DETAILS
 2004 -A - Private                                             170           212             0               0       0     382
   Total GROSS COST DETAILS                                    170           212             0               0       0     382

FINANCING DETAILS
  Gen PPD Services-Elect-City                                  ( 83)      ( 103)             0               0       0   ( 186)
  Gen PPD-Services-Eng                                         ( 42)        ( 53)            0               0       0     ( 95)
  Gen PPD Services-Elec-SPC                                    ( 45)        ( 56)            0               0       0   ( 101)
   Total FINANCING DETAILS                                   ( 170)       ( 212)             0               0       0   ( 382)


Project Description
This project is for the construction of municipal services on privately developed and city owned land.

General Comments

         Year(s)                    Private
                                    Lots

         2004                       100
         2005                       125
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1402 LAND DEV'T-WILLOWS

                                                           2004            2005         2006    2007    2008
                                                        BUDGET            PLAN         PLAN    PLAN    PLAN    TOTAL
GROSS COST DETAILS
 2004 - A - Priv                                                 65             0          0       0       0      65
   Total GROSS COST DETAILS                                      65             0          0       0       0      65

FINANCING DETAILS
  Gen PPD Services-Elect-City                                 ( 46)             0          0       0       0    ( 46)
  Gen PPD-Services-Eng                                        ( 19)             0          0       0       0    ( 19)
   Total FINANCING DETAILS                                    ( 65)             0          0       0       0    ( 65)
Project Description
This project involves the construction of municipal services on privately owned land

General Comments

         Year              Lots
         2004              43
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1416 TR SWR-HAMPTON VILLAGE

                                                            2004            2005            2006       2007       2008
                                                         BUDGET            PLAN            PLAN       PLAN       PLAN           TOTAL
GROSS COST DETAILS
 Storm Water Storage Basin - Stage I                           1,000            0              0          0           0           1,000
 Force Main AB - Hampton - 33rd Str.                           1,103            0              0          0           0           1,103
 Lift Station A - Residential                                    750            0              0          0           0             750
 Pond H - Dundonald Upgrade                                      300            0              0          0           0             300
 Sanitary Trunk JK - Ave M 22nd to 23rd Str                       85            0              0          0           0              85
 Strm Trnk CB-Hampton W to Hampton                               800            0              0          0           0             800
    Total GROSS COST DETAILS                                   4,038            0              0          0           0           4,038

FINANCING DETAILS
  Sewage Lift Station Res                                      ( 750)           0              0          0           0           ( 750)
  Trunk Sewer Reserve                                        ( 3,288)           0              0          0           0         ( 3,288)
    Total FINANCING DETAILS                                  ( 4,038)           0              0          0           0         ( 4,038)


Project Description
This project involves the extension of trunk sewers to the proposed Hampton Village neighborhood.

General Comments
This project is subject to the approval of the Airport Authority and the neighborhood concept plan.

Section                             Length             Size                         Year
                                    (meters)           (mm)

A Lift Station                      3650               350               2004 (Required for Residential Phase II)
AB Force Main                                                            2005 (Required for Residential Phase II)
C Storm Water Storage Basin         Basin                                2002/2004 (Required for Residential Phase II)
D Storm Water Storage Basin         Basin                                Beyond 2008(Required for Residential Phase II)
E Storm Water Basin                 Basin                                Beyond 2008(Required for Residential Phase I & Ind.)
F Lift Station                                                           Beyond 2008(Required for Industrial)
FG Force Main                       3000               200               Beyond 2008(Required for Industrial)
H Dundonald Pond                                                         2004(Required for Residential)
JK San. Trunk                       110                600               2004(Required for Residential)
CD Strm Trunk                       900                1050              2004(Required for Residential)
EI Strm Trunk                       500                525               Beyond 2008(Required for Residential)

Prior Budget Approvals              $210,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1435 PRIMARY WATER MAINS - NORTH INDUSTRIAL

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 AB - PWM - Faithful - Circle/51st                                  0       1,630               0            0              0         1,630
 BC - PWM - Idylwyld - 51st/60th St                                 0          50               0        1,790              0         1,840
   Total GROSS COST DETAILS                                         0       1,680               0        1,790              0         3,470

FINANCING DETAILS
  Primary Watermain Reserve                                         0     ( 1,680)              0     ( 1,790)              0      ( 3,470)
    Total FINANCING DETAILS                                         0     ( 1,680)              0     ( 1,790)              0      ( 3,470)


Project Description
This project involves the extension of primary water mains to the North Industrial area and Agriplace. It will allow additional industrial
development and will increase system reliability.

General Comments
Section                     Length Size        Year

AB                          1820     600       2005               Req'd for Phase I Marquis Ind.
BC                          1950     600       2006/2007          Req'd for Phase I Marquis Ind.
CD                          1600     600       Beyond 2008        Req'd for completion of Marquis Ind.

Prior Budget Approvals              $70,000
Prior years' reflect AB-PWM-Faithful - Circle/51st, design.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1456 RAILWAY CROSSING SAFETY IMPROVEMENT

                                                           2004           2005          2006          2007         2008
                                                        BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 CONSTRUCTION                                                   50           75            75            75           75              350
   Total GROSS COST DETAILS                                     50           75            75            75           75              350

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 50)            0            0             0             0          ( 50)
  Unfunded                                                        0        ( 75)        ( 75)         ( 75)         ( 75)        ( 300)
   Total FINANCING DETAILS                                    ( 50)        ( 75)        ( 75)         ( 75)         ( 75)        ( 350)


Project Description
This project serves as a fund for the installation of railway crossing improvements undertaken by Canadian National and Canadian
Pacific Railways at level crossings within city limits. Under the current funding agreement with Transport Canada and the railways,
each party is responsible for a percentage of the costs associated with safety upgrades done at level crossings, ie., gates and
automated warning systems.

General Comments
These crossing improvements are typically mandated by Transport Canada through the issuance of a "Notice of Order" and as such the
city is required to participate in funding a portion of the improvement. Locations in 2004 include Idylwyld Drive and 25th Street, 22nd
Street between Avenues G and F, 11th Street and Circle Drive and the pedestrian crossing at 43rd Street, Assiniboine Drive and
Warman Road. It should also be noted that changing regulations by Transport Canada have resulted in increased funding
requirements as the warrant system for railway gate installations has changed.

Prior Budget Approvals                       $100,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1457 CIRCLE DRIVE FEASIBILITY STUDY

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Study                                                             0          300             0             0             0           300
   Total GROSS COST DETAILS                                        0          300             0             0             0           300

FINANCING DETAILS
  Unfunded                                                         0       ( 300)             0             0             0        ( 300)
   Total FINANCING DETAILS                                         0       ( 300)             0             0             0        ( 300)


Project Description
This project involves the detailed review and eventual implementation of long-term network improvements in the vicinity of Circle Drive
north corridor. The intent is to modify the roadway network in order to relieve congestion on Circle Drive between Millar Avenue and
Airport Drive.

General Comments
A consultant has been hired to review the current operation of the Circle Drive corridor and devise feasibility long-term network options.
This project will review those options in detail and recommend the best solution(s) to be brought forward for possible implementation.
Circle Drive currently has an Average Annual Daily Traffic (AADT) of 44,000 vehicles. The AADT is expected to grow to 50,000
vehicles in the near future. Without major network modifications the congestion will continue to increase and the roadway will operate
at an unacceptable level of service.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1458 ARTL RD-HAMPTON VILLAGE (33RD-AIRPRT DR)

                                                             2004            2005         2006        2007        2008
                                                          BUDGET            PLAN         PLAN        PLAN        PLAN         TOTAL
GROSS COST DETAILS
 East Collector - Airport Dr.                                     25        1,050              0         0             0        1,075
   Total GROSS COST DETAILS                                       25        1,050              0         0             0        1,075

FINANCING DETAILS
  Arterial Road Reserve                                        ( 25)     ( 1,050)              0         0             0     ( 1,075)
    Total FINANCING DETAILS                                    ( 25)     ( 1,050)              0         0             0     ( 1,075)
Project Description
This project is for the construction of an arterial roadway between 33rd street and Airport Drive.

General Comments
The construction planned in 2005 is for the initial 2 lanes or an ultimate 4 lane roadway extending along the north perimeter of the
neighborhood between the east collector and Airport Drive. The remaining roadway constructed in the future will be a 2 lane roadway
from 33rd Street to the east collector and will be subject to the development of the adjacent industrial lands( not shown).

The project is subject to approval by the Airport Authority and the Hampton neighborhood concept plan.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1475 AUTO'D GARBAGE CONTAINER REPL

                                                           2004           2005         2006          2007         2008
                                                        BUDGET           PLAN         PLAN          PLAN         PLAN           TOTAL
GROSS COST DETAILS
 EQUIPMENT PURCHASE                                           300          300           300           300          300           1,500
   Total GROSS COST DETAILS                                   300          300           300           300          300           1,500

FINANCING DETAILS
  Auto Garbage Container Repl Res                           ( 300)       ( 300)       ( 300)        ( 300)       ( 300)         ( 1,500)
   Total FINANCING DETAILS                                  ( 300)       ( 300)       ( 300)        ( 300)       ( 300)         ( 1,500)


Project Description
This project involves the replacement of the existing automated containers (as a result of fires and non warranty damage) and
conversion of lane containers (300 gallon) to front street individual containers (100 gallon).

General Comments
There are approximately 10,000 lane containers and 28,000 front street containers in the system and each year approximately 1,000
require replacement, most of which are the lane containers. It is estimated that approximately 1200 front steet containers will be
purchased each year for conversions. Lane containers made available from conversion areas will be used for replacement purposes
whenever possible which in turn will free up funding for additional front street conversions.
Conversion efforts will focus on areas where excessive container damage and fires occur and where Community approval is received.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1482 SW-RECYCLING DEPOTS

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                      0          160          150               0            0           310
   Total GROSS COST DETAILS                                        0          160          150               0            0           310

FINANCING DETAILS
  Landfill Replacement Reserve                                     0       ( 160)        ( 150)              0            0        ( 310)
    Total FINANCING DETAILS                                        0       ( 160)        ( 150)              0            0        ( 310)


Project Description
This project involves the construction of additional public recycling drop-off depots. The depots will be approximately one half acre sites
to adequately allow the collection trucks to maneuver. The sites are designed to include gravelled areas and some paving, drainage,
fencing, signage and landscaping. Items accepted at the depots are paper, tin cans, beverage and milk containers, and clothing.

General Comments
The site selection process has proven to be onerous and a major hindrance to construction plans. This project is intended to extend
the life of the landfill.

Prior Budget Approval                         $489,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1491 WATER AND SEWER DESIGN STANDARDS

                                                            2004           2005          2006           2007         2008
                                                         BUDGET           PLAN          PLAN           PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Design                                                          30             0            0             0             0            30
   Total GROSS COST DETAILS                                      30             0            0             0             0            30

FINANCING DETAILS
  Infrastructure Res - Wtr & Sanswr                           ( 30)             0            0             0             0         ( 30)
    Total FINANCING DETAILS                                   ( 30)             0            0             0             0         ( 30)

Project Description
This project involves the study and revision of current water and sewer design standards.

General Comments
Funding in 2004 will be used to re-write the water and sewer portion of the standards design manual.

Prior Budget Approvals                        $100,000
The study involved using the prior years funding to hire a consultant to determine what the appropriate design flow units should be for
the sanitary sewers for the City of Saskatoon.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1505 TRAFFIC SIGNAL UPGRADE-INFRA

                                                              2004            2005          2006           2007          2008
                                                           BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 CONSTRUCTION                                                     400           400           400           400           400          2,000
   Total GROSS COST DETAILS                                       400           400           400           400           400          2,000

FINANCING DETAILS
  Infrastructure Res - Surface                                 ( 400)        ( 400)        ( 400)         ( 400)        ( 400)      ( 2,000)
    Total FINANCING DETAILS                                    ( 400)        ( 400)        ( 400)         ( 400)        ( 400)      ( 2,000)


Project Description
This project involves major rehabilitation of the City's traffic signal system and a program of life cycle replacement of major electronic
and hardware components.

General Comments
The City currently has 213 intersections under traffic signal control, with 110 of these intersections under central computer control. The
age of the equipment and electronics at the intersections date back to the 1980's. Due to the importance of reliability in safety and
operation of the traffic signals, there is a need to upgrade the existing aging infrastructure with current technologies. The intent of this
program goes beyond regular maintenance provided by the operating budget.

In 2002, the City purchased a modern Advanced Traffic Management System (ATMS) and began converting intersections from the
aging Integrated Traffic Control System (ITCS) to the ATMS. The conversion to the ATMS includes full inventory assessment of
intersection components, replacement of the traffic signal controller and any outdated components and continuous monitoring of
intersection operations. The operation of intersections through the ATMS provides a level of reliability, documentation, and optimization
not capable with the existing ITCS. Complete conversion to the ATMS will relieve the City of the outdated ITCS and its components,
allowing for more reliable operation and easier alteration of existing intersection controls.

The intent of this program goes beyond regular "maintenance" provided by the Operating Budget. As part of past components of this
program, high priority has been given to replacement of conflict monitors, traffic signal heads, pedestrian pushbuttons and poles and
cables in order to ensure effective and reiable operation of intersection traffic signal control. In 2004 the focus will be to upgrade all of
the conflict monitors to the latest versions and ensure compliance with industry specifications, replace outdated pushbutton technology
with reliable and user friendly equipment and continue with replacement of the smaller 200mm diameter signal heads with 300mm
diameter heads (including upgrading from hanging to bracketed connections at the pole arm).
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                               PROJECT DETAILS ($'000s)

1506 TRAFFIC SIGNING REPLACE-INFRA

                                                               2004            2005       2006          2007          2008
                                                            BUDGET            PLAN       PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                       80            100       100           100           100              480
   Total GROSS COST DETAILS                                         80            100       100           100           100              480

FINANCING DETAILS
  Infrastructure Res - Surface                                   ( 80)        ( 100)     ( 100)        ( 100)        ( 100)            ( 480)
    Total FINANCING DETAILS                                      ( 80)        ( 100)     ( 100)        ( 100)        ( 100)            ( 480)


Project Description
This project involves upgrading and rehabilitation of the City's traffic signs.

General Comments
This program will develop and implement the following programs on an annual basis:

1) Stop and yield sign program - replace stop and yield signs to ensure that all such signs meet minimum reflectivity and visibility
standards.
2) Arterial Roadway Sign Program - review, assess, and replace the City's regulatory and warning signs on major arterial roads.
3) As-builts - prepare as-built drawings in a digital format, compatible with the City's GIS system, for all programs.
4) Street name plate replacement program.
5) Pedestrian/School signing replacement program.
6) Guide sign and overhead sign structure replacement program.
7) Tree trimming program to ensure adequate visibility of control devices at intersections.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1507 GUARDRAILS

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Spadina Crescent                                                  0           50           50            50              0             150
   Total GROSS COST DETAILS                                        0           50           50            50              0             150

FINANCING DETAILS
  Unfunded                                                         0        ( 50)         ( 50)         ( 50)             0       ( 150)
   Total FINANCING DETAILS                                         0        ( 50)         ( 50)         ( 50)             0       ( 150)


Project Description
This project involves the replacement of sections of guardrail that have deteriorated to the point where structural integrity is
compromised as well as the installation of guardrail at locations in the City where abutting water bodies or other roadside obstacles
pose a potential hazard to errant vehicles or the public.

General Comments
The locations identified for replacement in 2005 and 2006 are for sections of guardrail on the Idylwyld Freeway between the river
crossing and Clarence Avenue. There are also several locations along Spadina Crescent where guardrails would improve the safety of
the roadway. In addition, locations such as the Idylwyld Drive/51st Street interchange have roadways adjacent to water bodies which
may require treatment.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1508 CITY ENTRANCE SIGNS

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                     60           175           175           175           175           760
 Design                                                           20             0             0             0             0            20
   Total GROSS COST DETAILS                                       80           175           175           175           175           780

FINANCING DETAILS
  Res For Cap Expenditures                                      ( 80)            0             0             0             0           ( 80)
  Unfunded                                                          0       ( 175)        ( 175)        ( 175)        ( 175)         ( 700)
   Total FINANCING DETAILS                                      ( 80)       ( 175)        ( 175)        ( 175)        ( 175)         ( 780)
Project Description
This project is a program for the installation of city entry signs welcoming the traveling public to the city of Saskatoon. A combination of
signs and/or landscaping will be placed at the Airport exit, major highway entrances into the city, minor but significant secondary
entrances into the city and at highway overpasses.

General Comments
The 2004 proposal will include the completion of Airport Drive City Entry sign and the design of major highway entry signs.

Airport Drive Sign
This component includes the construction of a Saskatoon entry feature at the exit to the Saskatoon airport near Airport Drive and 45th
Street. The entry feature will include signage, landscaping and lighting. While the site has been identified as a "primary" sign location
in the Highway Entry Features Concept Plan, the scale of the signage has been reduced to reflect the fact that Airport Drive is not a
highway and the travel speeds are only 60 kilometers per hour.

In 2003, this sign was estimated to cost $100,000 and included funding from a private source of $25,000. To date, no private funding
contribution has been committed. Due to the scope of the project, a more accurate cost estimate based on detailed design, and the
lack of private funding , a supplementary budget request of $60,000 is required.

Design
This component involves designing a scaled up version of the airport city entry sign, increased in size to reflect highway driving speeds
and its increased set back from the road. The extent of landscaping will be reduced to reflect the prairie landscape.

Prior Budget Approval                                            $125,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1512 NEIGHBORHOOD TRAFFIC MGMT

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                   210          100           100           100           100           610
   Total GROSS COST DETAILS                                     210          100           100           100           100           610

FINANCING DETAILS
  Res For Cap Expenditures                                   ( 210)             0            0             0             0         ( 210)
  Unfunded                                                        0        ( 100)       ( 100)        ( 100)        ( 100)         ( 400)
   Total FINANCING DETAILS                                   ( 210)        ( 100)       ( 100)        ( 100)        ( 100)         ( 610)


Project Description
This project involves the mitigation of shortcutting, speeding and safety issues through the use of traffic calming measures on local
roadways which parallel major routes. It also involves management of traffic through neighborhoods as a result of special events (an
example would be the closure of Broadway Avenue, for extended periods, for special events such as the Fringe) and all roadway
narrowings/bulbing that is carried out in the vicinity of schools.

General Comments
Over the last decade, traffic volumes on many of the City's expressways and arterials has increased to the point that motorists are
looking for less congested, alternate routes. This has resulted in traffic flows increasing on local roadways which parallel major routes.
These typically represent residential streets which were never intended to carry traffic flows beyond what the immediate residential area
would generate. Other problems on residential roadways are occurring besides this shortcutting. Traffic speed and pedestrian safety
issues are also becoming more prevalent.

Neighborhoods under review include:
        Nutana
        Varsity View/Brunskill
        Pleasant Hill
        Caswell Hill
        Brevoort Park

The need for traffic calming measures near schools has been identified and an accelerated program of review and implementation was
presented to City Council in 2001. The program proposes a three year schedule of school review and measure implementation in order
that every school receives a thorough review and necessary measures on a timely basis. Following this initiative, funding would return
to previous levels.

School/playground speed zone signing measures are addressed in P2006.

Operating Impact                              $2,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1513 PAVEMENT MARKING PROGRAM-INFRA

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN      TOTAL
GROSS COST DETAILS
 CONSTRUCTION                                                  100          120           120           120            120     580
   Total GROSS COST DETAILS                                    100          120           120           120            120     580

FINANCING DETAILS
  Infrastructure Res - Surface                              ( 100)        ( 120)       ( 120)        ( 120)        ( 120)    ( 580)
    Total FINANCING DETAILS                                 ( 100)        ( 120)       ( 120)        ( 120)        ( 120)    ( 580)


Project Description
This project involves the installation and rehabilitation of permanent pavement markings that have been installed on
freeway/expressway and arterial roadways over the last 20 years.

General Comments
There is no provision for this work in any operating budgets and rehabilitation/maintenance of the markings has only been conducted
under the arterial resurfacing program. Many of the permanent markings which have been installed have exceeded their design life and
in areas of heavy travel, such as weave areas and at intersections, the markings are completely gone.

The program includes the following activities:

1) Review, assess and replace permanent markings on freeway/expressway roadways as required.
2) Review, assess and replace permanent markings on arterial roadways as required.
3) Review, assess and replace crosswalk and stop line markings on the above roads.
4) Review, assess and replace guideline, continuity line and chevrons on the above roads.
5) Placement of semi-permanent markings on roadways rehabilitated by arterial resurfacing and micro surfacing.

This is intended to be an on-going, annual program.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1518 PARKING METER PURCHASES

                                                           2004           2005          2006         2007         2008
                                                        BUDGET           PLAN          PLAN         PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Parking Meter Purchases                                        50           50              30         30           30           190
   Total GROSS COST DETAILS                                     50           50              30         30           30           190

FINANCING DETAILS
  Parking Reserve                                            ( 50)         ( 50)        ( 30)        ( 30)         ( 30)       ( 190)
   Total FINANCING DETAILS                                   ( 50)         ( 50)        ( 30)        ( 30)         ( 30)       ( 190)


Project Description
This project provides for the purchase of electronic parking meters and related equipment.

General Comments
The parking meter purchases may be placed on:
        19th Street, between 2nd and 1st Avenues
        11th Street (south side), between Broadway and Dufferin Avenues
        10th and Main Streets, between Broadway and Dufferin Avenues
         24th Street, between Ontario and 1st Avenues
        2nd Avenue, between 26th and King Streets
        Queen Street, between 2nd and 3rd Avenues
        Pay and Display Units to be placed in all surface lots

Additional heavy duty housing will also be purchased. These housing units will replace less vandal proof housing in areas that have
been susceptable to theft.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1522 TRAFFIC SOUND ATTENUATION

                                                              2004            2005          2006           2007          2008
                                                           BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Design and Construction                                          500        2,398            500           500            500         4,398
   Total GROSS COST DETAILS                                       500        2,398            500           500            500         4,398

FINANCING DETAILS
  Government Infrastructure Program                                 0      ( 1,265)             0              0             0       ( 1,265)
  Traffic Noise Attenuation Cap Res                            ( 500)        ( 500)        ( 500)         ( 500)        ( 500)       ( 2,500)
  Unfunded                                                          0        ( 633)             0              0             0         ( 633)
    Total FINANCING DETAILS                                    ( 500)      ( 2,398)        ( 500)         ( 500)        ( 500)       ( 4,398)
Project Description
This project involves the design and construction of sound attenuation devices to reduce the negative impacts of vehicle related noise
on abutting residential properties.

General Comments
Complaints regarding traffic noise have been received from a number of areas within the city. The traffic sound attenuation project is
designed to address those residential areas that are adjacent to high volume roadways. A number of the locations currently warrant
sound attenuation, which are prioritized to receive attenuation in the coming years. Those areas that currently fall below the current
level of 65 dBA (Ldn) will continue to be studied and added to the list of outstanding locations which may require attenuation.
The construction of sound attenuation walls began in 2003 at the first three locations identified in the following list, as a result of sound
modeling work completed. Infrastructure Services will also take advantage of opportunities to construct small scale localized earth
berms over the next five years by coordinating with the Earth Fill-Site operating program.
The following list of locations shows areas where noise attenuation has been requested and studies have taken place. It is estimated
that $18,000,000 is required to complete all noise attenuation on the list.
Location                                                                    Area Affected
1) Idylwyld Freeway, Ruth to Glasgow (constructed 2003)                     East side of Idylwyld Freeway
2) Warman Road, 7th to Circle Drive (constructed 2003)                      East side of Warman Road
3) Warman Road, Assiniboine Drive to Primrose Drive
   (constructed 2003)                                                       East side of Warman Road
4) Idylwyld Freeway, Taylor to Ruth                               West side of Idylwyld Freeway
5) Circle Drive, Warman to Bridge                                           North and South side of Circle Drive
6) Idylwyld Freeway, River to 8th Street                                    East and West side of Idylwyld Freeway
7) Circle Drive, College Drive to 14th Street                               East side of Circle Drive
8) College Drive, Circle Drive to East City Limits                          North and South side of College Drive
9) Highway 16, Boychuk Drive to Circle Drive                                North side of Highway 16
10) Circle Drive, Circle Drive to Clarence Avenue                           North side of Circle Drive
11) Circle Drive, 8th Street to 14th Street                                 East and West side of Circle Drive
12) Wanuskewin Drive, 51st Street to Adilman Drive                          East side of Wanuskewin Drive
13) Circle Drive, 22nd Street to 33rd Street                                East and West side of Circle Drive
14) 22nd Street, Deifenbaker Drive to West City Limit                       North and South side of 22nd Street
15) Circle Drive, 11th Street to 22nd Street                                East side of Circle Drive

Prior Budget Approvals          $1,250,000
Operating Impact       Bridges/Subways/RRX's/Overpasses                     $3,500
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1523 CORPORATE MOBILE DATA SYSTEM

                                                             2004            2005           2006          2007          2008
                                                          BUDGET            PLAN           PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Infrastructure Equipment                                           0            50          225             50            50           375
    Total GROSS COST DETAILS                                        0            50          225             50            50           375

FINANCING DETAILS
  Unfunded                                                          0         ( 50)        ( 225)          ( 50)         ( 50)        ( 375)
   Total FINANCING DETAILS                                          0         ( 50)        ( 225)          ( 50)         ( 50)        ( 375)
Project Description
This project involves the purchase and implementation of a corporate wireless (radio) system infrastructure to provide mobile data
connectivity on a citywide basis.

General Comments
This project will provide individual departments with field access to information residing on corporate and departmental networks.
Network connectivity or the "LAN" will be accessible from the field. Cost of the core system infrastructure hardware required to support
radio communications from field devices will be funded corporately. Funding of radio modems and field computing devices will be the
responsibility of individual departments.

Background
With the phenomenal growth in use and application of computer technology, there is an increasing need to access information stored
on various computers throughout the corporation. Computer networks (LANS) have essentially addressed this issue for computers in
the office environment. However, the increasing reliance on computerization means that staff working in the field require computer
access to effectively do their jobs. For Public Safety, Public Utility and core services, timely access to information is required for cost
effective delivery of services, and in emergency situations, can save lives. A corporate multi-department committee is currently
planning for the shared use of this service.

Public Safety Issues
The Police Service has just completed replacing all of its old mobile data terminals with new laptops and is paying monthly charges to
Sask Tel for a cellular digital packet data service.

The Fire and Protective Services Department currently operates an Emergency Information Computer System that provides the radio
dispatchers at Central Alarm Headquarters, rapid access to vital information. The Fire Department intends to provide the same
information directly to fire apparatus during an emergency response. In many instances, vital information would be available to fire
fighters before the apparatus arrived on scene.

Utility & Public Service Issues
With the advances in technology, more portable and handheld computing devices are being used to record and upload information for
utility billing, building or site inspections and collecting other field data. Deployment of GIS (Geographic Information System) and GPS
(Global Positioning System) technology will provide a significant amount of mapping and other infrastructure data, as well as the ability
to provide automatic vehicle location to enhance Police dispatching. Field access to this information would benefit all utility and public
safety operations.

All of these applications share a common requirement. They require a wireless (radio) infrastructure for mobile devices to connect with
departmental and corporate computer information resources.
Prior Budget Approvals               $50,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1526 CIRCLE DR BRIDGE REPAIR

                                                              2004           2005          2006          2007          2008
                                                           BUDGET           PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                       0            0          240               0            0              240
   Total GROSS COST DETAILS                                         0            0          240               0            0              240

FINANCING DETAILS
  Unfunded                                                          0            0        ( 240)              0            0        ( 240)
   Total FINANCING DETAILS                                          0            0        ( 240)              0            0        ( 240)


Project Description
This project involves rehabilitation to the Circle Drive Bridge.

General Comments
2006 construction involves the replacement of expansion joints to coincide with the widening of the bridge (P2009).

Prior Budget Approvals               $200,000
Prior years' funding was to evaluate the condition of the bridge and to repair asphalt surfaces, barrier curbs, sidewalks and railings.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1527 UNIVERSITY BRIDGE REHAB

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Pier Repairs                                                   50        1,800              0             0            0        1,850
   Total GROSS COST DETAILS                                     50        1,800              0             0            0        1,850

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 50)            0             0             0            0          ( 50)
  Unfunded                                                        0     ( 1,800)             0             0            0      ( 1,800)
   Total FINANCING DETAILS                                    ( 50)     ( 1,800)             0             0            0      ( 1,850)


Project Description
This project involves pier repairs.

General Comments
The University Bridge was constructed in 1917 and is 82 years old. During 1972, a new concrete deck was constructed to permit
current legal highway loads. In 1957, the heavy concrete railing was removed and a steel railing was installed.

In 1957, the original face of pier G-H was wrapped with a concrete overlay 2 to 5 inches thick. This facing is cracked below the water
line and delaminated above water level. The nosing concrete at this pier is deteriorating and requires resurfacing. Pier E-F is also
showing substantial deterioration with loss of section in the ice zone which needs to be strengthened.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1528 UNIVERSITY BRIDGE-PIGMENTED SEALER

                                                            2004           2005            2006    2007         2008
                                                         BUDGET           PLAN            PLAN    PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Pigmented Sealer - Arches/Piers/Walkway                          0          400              0        0            0            400
   Total GROSS COST DETAILS                                       0          400              0        0            0            400

FINANCING DETAILS
  Unfunded                                                        0       ( 400)              0        0            0          ( 400)
   Total FINANCING DETAILS                                        0       ( 400)              0        0            0          ( 400)


Project Description
This project involves the pigmented sealing of selected areas of the University Bridge.

General Comments
The rehabilitation work done in 1998 and 1999 was completed without application of pigmented sealer. The pigmented sealer is
installed to improve the appearance of the structure as well as offering protection to the structure.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1531 LOCAL ROADS PRESERVATION

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                 1,100         1,000         1,650         1,650         1,650          7,050
   Total GROSS COST DETAILS                                   1,100         1,000         1,650         1,650         1,650          7,050

FINANCING DETAILS
  Infrastructure Res - Surface                              ( 1,100)      ( 1,000)      ( 1,650)      ( 1,650)      ( 1,650)      ( 7,050)
    Total FINANCING DETAILS                                 ( 1,100)      ( 1,000)      ( 1,650)      ( 1,650)      ( 1,650)      ( 7,050)


Project Description
This project funds annual preservation programs to rehabilitate local residential roads. The objective is to minimize the life cycle cost of
preserving the local roads, subject to minimum acceptable levels of service. This program has been in place since 1996.

General Comments
Local roads represent about 57% of all of Saskatoon's roads. The primary program focus is on preservation of the road surface -
because these roads typically experience low volumes and low loads, the original road structure remains adequate while the surface
ages. The proposed 2004 program was originally based on 1999 data but has been updated from the 2003 condition rating where this
information is available.
                         2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1553 IDYLWYLD BRIDGE ABUTMENTS

                                                          2004           2005         2006         2007          2008
                                                       BUDGET           PLAN         PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Construction                                                   0           35            0             0            0             35
   Total GROSS COST DETAILS                                     0           35            0             0            0             35

FINANCING DETAILS
  Unfunded                                                      0        ( 35)            0             0            0         ( 35)
   Total FINANCING DETAILS                                      0        ( 35)            0             0            0         ( 35)


Project Description
This project addresses the drainage problem at the riverbank below the abutments at each end of the Idylwyld Bridge and drainage
below the approach ramps between the north end of the bridge and 20th Street.

General Comments
Re-armouring of the side slopes to the river at each bridge abutment occurred November 2002 on an emergency basis under the
Bridges/Subways/RRX/Overpasses operating program (Subvote 25-22).

The remaining cost components of this project are:

Repair drainage system at each bridge abutment                                                   $ 25,000
Repair asphalt splash pads below free falling deck drains below approach ramps                     10,000

Total Project Estimate                                                                            $35,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1555 WARMAN RD/CIRCLE DR BRIDGE REPAIR

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Construction                                                     0           50          450              0             0          500
   Total GROSS COST DETAILS                                       0           50          450              0             0          500

FINANCING DETAILS
  Unfunded                                                        0         ( 50)       ( 450)             0             0        ( 500)
   Total FINANCING DETAILS                                        0         ( 50)       ( 450)             0             0        ( 500)


Project Description
This project involves removing the existing asphalt wearing surface of the bridge deck, doing the required deck repairs, replacing the
waterproofing membrane and resurfacing.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1565 PK DEV-UNIVERSITY HEIGHTS MULTI-DISTRICT

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Park Design and Construction                                    460         1,088              0              0             0        1,548
 Indoor Soccer Complex                                             0         2,250              0              0             0        2,250
 Roadway enhance/serv/ped flow                                   108             0              0              0             0          108
 Outdoor Soccer Artificial Fields                                625             0              0              0             0          625
    Total GROSS COST DETAILS                                   1,193         3,338              0              0             0        4,531

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 463)             0              0              0             0       ( 463)
  Parks and Recreation Levy                                   ( 730)      ( 1,088)              0              0             0     ( 1,818)
  Unfunded                                                         0      ( 2,250)              0              0             0     ( 2,250)
   Total FINANCING DETAILS                                  ( 1,193)      ( 3,338)              0              0             0     ( 4,531)


Project Description
This project involves the development of the multi-district park on city-owned land in the University Heights Suburban Area. The City of
Saskatoon is working in partnership with the sectors of health, education, recreation and sport, and the library, in a new integrated
services model for the delivery of services on municipal reserve. The University Heights Multi-district park will serve as the "center of
community" for residents living in the University Heights Suburban Area. Subject to finalization of the University Heights Concept Plan
and available funding from the various sectors, this is a five to ten year development for the construction of integrated facilities, both
indoor and outdoor, that will provide community recreation programs (i.e. water, walking, wellness/fitness, and classroom activity),
soccer, education, health, and library services.

The first component of development starting in 2004 is the park that will include two outdoor artificial grass fields and two natural grass
fields. Increase in participation in the outdoor soccer program has resulted in an over-utilization of existing outdoor natural grass fields
during peak season and a shortfall of fourteen outdoor fields to meet league and practice schedules. The Saskatoon Soccer Centre
(Saskatoon and District Soccer and Saskatoon Youth Soccer Associations) is proposing to develop the two artificial outdoor fields at a
cost of $2.5 million. The development of the artificial grass field extends the outdoor season from March to late November. The usage
on one artificial field is the equivalent to usage on six premier quality natural grass fields. The Saskatoon Soccer Centre is requesting
25% ($625,000) of the capital cost for these fields with the remaining funds to be financed from the soccer community.

The second component of development starting in 2005 is construction of an indoor soccer facility with a full sized international artificial
grass pitch and three hard surface floor pitches. The cost of the complex is $9 million. The Saskatoon Soccer Centre is requesting
25% ($2.25 million) of the capital cost for the indoor facility with the remaining funds to be financed from the soccer community and
other fundraising initiatives. The soccer complex will serve the City's growing participation in soccer for adults and youth. The indoor
program growth rate has resulted in the need for a second indoor facility.

General Comments
Prior funding provided for the conceptual planning and public input process. The 2004 budget provides for the design and construction
of the first phase of the park development.

Roadway enhancement, servicing and pedestrian flow - 2004
During 2004, Nelson Road will be completed between its current terminus near St. Joseph High School and Lowe Road. This roadway
provides for general traffic movements with the University Heights Suburban center and particularly the developments at the University
Heights Multi-District Park. There will be increased intensity and concentrated use in this land area with two high schools, a soccer
complex, health services and community recreation. As a result of the technical review of the proposed concept design, revisions to
the Nelson Road design will feature two modern roundabouts and landscaping to assist in providing a safe pedestrian/vehicle
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1565 PK DEV-UNIVERSITY HEIGHTS MULTI-DISTRICT

environment. As well, an integrated pedestrian access system will be provided. Due to the revisions to the concept plan, there will be
additional services costs associated with the proposal that are not funded from prepaid reserves.

Outdoor Soccer Artificial Fields - 2004
The project involves the construction of one-110 yard x 70 yard artificial grass soccer pitch and one-150 yard x 70 yard artificial grass
soccer/youth football field, field lighting, portable aluminum spectator stands (seating 1,000), fenced compound with controlled access
and natural grass and gravel for non-playing surfaces.

Indoor Soccer Facility - 2005
This facility consists of the construction of a 166,285 square foot steel building with 24,522 square foot second floor mezzanine and
spectator area and 1,080 linear foot walking track and spectator viewing platform. The facility includes one-110 yard x 70 yard artificial
grass pitch, three- 150 foot x 80 foot hard surface floor/pitches, concession (serve indoor and outdoor), lounge, weight training area,
offices and administration. The cost of the facility is 9.0 million.

Related Capital Project
Consultations to determine the program usage and activity space requirements for stakeholders and residents in order to develop the
concept design (size and configuration) for the indoor and outdoor facilities for the municipal reserve were approved under Capital
Project 1733 (University Heights Multi-Facility) in 2002 for $75,000.

Operating Impact                     $ 64,300

Prior Budget Approvals               $ 50,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1583 CIR DR RECONSTRUCTION-MILLAR/NORTHRIDGE

                                                            2004            2005         2006           2007         2008
                                                         BUDGET            PLAN         PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Millar Ave to Northridge Dr                                    300        3,427              0             0             0        3,727
   Total GROSS COST DETAILS                                     300        3,427              0             0             0        3,727

FINANCING DETAILS
  Res For Cap Expenditures                                   ( 300)            0              0             0             0       ( 300)
  Government Infrastructure Program                               0       ( 467)              0             0             0       ( 467)
  Unfunded                                                        0     ( 2,960)              0             0             0     ( 2,960)
   Total FINANCING DETAILS                                   ( 300)     ( 3,427)              0             0             0     ( 3,727)


Project Description
This project involves the reconstruction of Circle Drive between Millar Avenue and Northridge Drive.

General Comments
This road is a major corridor through the commercial district in north Saskatoon. Over the past several years, volumes, loads and the
number of axles (which accelerates deterioration) have been increasing. Surface distresses have been increasingly evident over the
past few years and some maintenance efforts have been made to sustain the surface a few years longer.

Funding requested in 2004 provides for an interim rehabilitation of the most deteriorated sections to maintain an acceptable level of
service.

This project has been approved under the Canada Saskatchewan Infrastructure Program; however, there is an outstanding request to
revise the timing and allocation of funding between this project and Project 653 Upgrade Preston (14th Street-CPR Tracks).

Prior Budget Approvals                                   $325,000
Prior years' reflects a detailed review and design of the roadway to consider geometric changes as well as an interim rehabilitation of
the most deteriorated sections of the roadway.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1584 CITY OF SASKATOON YARD CONSOLIDATION

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Servicing                                                         0          540            0             0              0           540
 Buildings                                                         0            0        1,800         3,000            900         5,700
   Total GROSS COST DETAILS                                        0          540        1,800         3,000            900         6,240

FINANCING DETAILS
  Unfunded                                                         0       ( 540)      ( 1,800)      ( 3,000)        ( 900)      ( 6,240)
   Total FINANCING DETAILS                                         0       ( 540)      ( 1,800)      ( 3,000)        ( 900)      ( 6,240)


Project Description
This project consists of the reconfiguration and consolidation of the City Yards, north of the new 25th Street extension. The project will
include the decommissioning of buildings and operational facilities south of the new 25th Street and establishing new facilities on the
north side of 25th Street.

General Comments
The project will be staged over five years. The first stage is an environmental assessment of the new property acquisition and
developing a master plan of the yards layout. The environmental assessment has been completed. The master plan of the yards
layout is scheduled to be completed in 2003. Construction will then take place over the next four years, coordinated with the extension
of 25th street.

Prior Budget Approvals               $50,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1595 PARK LTG UPGRD-NEIGHBOURHOOD

                                                           2004            2005         2006          2007         2008
                                                        BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Design                                                          5             5            5             5             0            20
 Construction                                                   50            50           50            50             0           200
   Total GROSS COST DETAILS                                     55            55           55            55             0           220

FINANCING DETAILS
  Elect Dist Extension Res                                      ( 7)          ( 7)         ( 7)         ( 7)            0          ( 28)
  Private Donations                                           ( 48)         ( 48)        ( 48)        ( 48)             0        ( 192)
    Total FINANCING DETAILS                                   ( 55)         ( 55)        ( 55)        ( 55)             0        ( 220)


Project Description
This project involves the provision of park pathway lighting to existing neighbourhood parks, where the community has expressed a
strong desire for such lighting and where the park is not in the ten-year plan for general upgrading under the Neighbourhood Park
Upgrading project (901).

General Comments
The City is increasingly receiving requests from Community Associations, who are concerned for public safety, to provide pathway
lighting in neighbourhood parks. Willingness by communities to contribute to funding can potentially expand the amount of lighting that
can be provided in any year.

Possible projects in 2004 include pathways in Pacific and Rochdale Parks.

Operating Impact
Is to be determined based on actual construction, which results from requests by Community Associations.

Special Note
This project is contingent on funding to be provided by Community Associations.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1599 RIVERBANK PARKS IRRIGATION

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Kinsmen Park                                                     0          220           220              0            0           440
 Rotary Park                                                      0          114             0              0            0           114
   Total GROSS COST DETAILS                                       0          334           220              0            0           554

FINANCING DETAILS
  Unfunded                                                        0       ( 334)        ( 220)              0            0        ( 554)
   Total FINANCING DETAILS                                        0       ( 334)        ( 220)              0            0        ( 554)


Project Description
This project involves the installation of automated irrigation systems in Kinsmen and Rotary Parks over the next two (2) years. This will
provide for full irrigation coverage in Kinsmen Park, and the replacement of an old and failing manual watering system in Rotary Park.
The automated systems facilitate night watering of the Parks, allowing uninterrupted daytime use of the park, and the uninterrupted
application of water to maintain a high quality of turf in areas receiving intense public use.

General Comments
The project results from the implementation of recommendations made in studies conducted by the City and the Meewasin Valley
Authority and the deteriorating condition of the old systems and technology in both Kinsmen and Rotary Parks. As well, there is
increasing concern voiced by the public regarding the condition of the non-irrigated portions of Kinsmen Park.

Prior Budget Approvals               $274,000
Prior budget approvals reflect the design and construction of the systems in Kiwanis Park and Friendship Park.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1613 DIEFENBAKER PARK ROAD

                                                           2004            2005          2006         2007          2008
                                                        BUDGET            PLAN          PLAN         PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                     0         368              0              0            0          368
   Total GROSS COST DETAILS                                       0         368              0              0            0          368

FINANCING DETAILS
  Unfunded                                                        0       ( 368)             0              0            0       ( 368)
   Total FINANCING DETAILS                                        0       ( 368)             0              0            0       ( 368)


Project Description
This project includes repairing the "ring" roadway, and the two one-way access roads in Diefenbaker Park.

General Comments
The condition of the roadways in Diefenbaker Park has continued to deteriorate over the past 10 years. Repeatedly, the roads have
been patched with operating budget funds to maintain a serviceable condition. However, the roadbed continues to breakdown and any
surface repairs including an attempt to resurface with recycled asphalt have failed to provide an acceptable solution. Public complaints
continue to mount and only a reconstruction project will address the concerns.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1614 BACKFLOW PREVENTION DEVICES

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction - Parks                                            183           183           183              0             0           549
 Construction - Facilities                                        48            49            49              0             0           146
   Total GROSS COST DETAILS                                      231           232           232              0             0           695

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 231)             0             0              0             0        ( 231)
  Unfunded                                                         0        ( 232)        ( 232)              0             0        ( 464)
   Total FINANCING DETAILS                                    ( 231)        ( 232)        ( 232)              0             0        ( 695)


Project Description
This project involves installing testable backflow prevention devices on service connections to the City's potable water supply.

General Comments
Over the past years, there have been cases in Canada where municipal domestic water supplies have been contaminated by various
sources. The City has taken and is taking steps to ensure potable water systems are being protected against possible contamination at
connection points.

One potential area for contamination is through connections to the municipality's irrigation systems. Prior to 1990, irrigation systems
were designed and constructed without testable backflow devices. Currently, there are 87 park irrigation systems located in the City's
park system that require the installation of backflow prevention devices. It is planned to complete the installations over a 4-year period.

In terms of civic facilities, the other areas that need to be addressed are the connections to the domestic supply and to the fire sprinkler
systems located throughout the City's facilities that were constructed before the waterworks bylaw was changed. It is planned to
complete these installations over a 4-year period as well.

Prior Budget Approvals               $232,000

Operating Impact
Year 2005      $ 5,000
Year 2006      $ 5,000
Year 2007      $ 5,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1615 WATER DISTRIBUTION SYSTEM PRESERVATION

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Network Management                                             135          135           135            135           135           675
 Preservation Program                                         2,345        1,630         1,500            811             0         6,286
   Total GROSS COST DETAILS                                   2,480        1,765         1,635            946           135         6,961

FINANCING DETAILS
  Infrastructure Res - Wtr & Sanswr                        ( 2,480)      ( 1,765)      ( 1,635)        ( 946)        ( 135)      ( 6,961)
    Total FINANCING DETAILS                                ( 2,480)      ( 1,765)      ( 1,635)        ( 946)        ( 135)      ( 6,961)


Project Description
This project is an annual program to undertake major rehabilitation and replacement of water mains and appurtenances in the water
distribution system.

General Comments
The network management component of this project involves the evaluation and planning to manage capacity in relation to demand,
and the overall condition of the water distribution system.

The preservation program involves the project level design, construction administration and construction/contract activities to deliver the
annual major rehabilitation and replacement programs. Future years' budget reflects the costs to replace mains that are anticipated to
reach the end of their economic life in the respective year.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1616 WASTE WATER COLLECTION SYSTEM PRES'N

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Network Management                                             165          165           165           165           165           825
 Preservation Program                                         2,350        3,250         3,200         2,500         2,500        13,800
   Total GROSS COST DETAILS                                   2,515        3,415         3,365         2,665         2,665        14,625

FINANCING DETAILS
  Infrastructure Res - Wtr & Sanswr                        ( 2,515)      ( 3,415)      ( 3,365)      ( 2,665)      ( 2,665)     ( 14,625)
    Total FINANCING DETAILS                                ( 2,515)      ( 3,415)      ( 3,365)      ( 2,665)      ( 2,665)     ( 14,625)


Project Description
This project is an annual program to undertake major rehabilitation and replacement of waste water sewer mains and appurtenances in
the waste water collection system.

General Comments
The network management component of this project involves the evaluation and planning to manage the capacity in relation to demand,
and the overall condition of the waste water collection system. The plan is to have in place, by 2004, an asset management framework
to optimize the expenditures on the rehabilitation and replacement of waste water collection systems and appurtenances.

The preservation program involves the project level design, construction administration and construction/contract activities to deliver the
annual major rehabilitation and replacement programs.

This program is a mix of replacement, spot repair, manhole rehabilitation and sewer service connection rehabilitation.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1617 PRIMARY WATER MAIN SYSTEM PRESERVATION

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Network Management                                              35           35            35             35            35           175
 Preservation Program                                         1,400        1,450         1,450            850           850         6,000
   Total GROSS COST DETAILS                                   1,435        1,485         1,485            885           885         6,175

FINANCING DETAILS
  Infrastructure Res - Wtr & Sanswr                        ( 1,435)      ( 1,485)      ( 1,485)        ( 885)        ( 885)      ( 6,175)
    Total FINANCING DETAILS                                ( 1,435)      ( 1,485)      ( 1,485)        ( 885)        ( 885)      ( 6,175)


Project Description
This project is an annual program to undertake major rehabilitation and replacement of the pipelines and appurtenances in the large
diameter transmission system.

General Comments
The network management component of this project involves the evaluation and planning to manage the capacity in relation to demand,
and the overall condition of the primary water main system. The work on this network will focus on demand/capacity modeling and
cathodic protection.

The preservation program involves the project level design, construction administration and construction/contract activities to deliver the
annual major rehabilitation and replacement programs on the primary water distribution system.

The program in 2004 will continue to focus on corrosion protection on the primary water mains to control corrosion failures, a common
cause of leaks on these large diameter mains. It will take approximately until 2006 to complete the cathodic protection retrofit. A
second component of the program includes the replacement and retrofitting of control valves/chambers to provide for the shutdown and
isolation of the primary water main for maintenance and operations. Funding in the amount of $750,000 has been allocated to the
reconstruction of the primary water main on 8th Street from Saskatchewan Crescent to Lorne Avenue. This reconstruction will address
the condition of the water main as well as the risk associated with its proximity to overpass structures and waste water sewer mains.

Additional Information
For the redevelopment of the A. L. Cole site and adjacent lands:
P1871 proposes the demolition of the former City Electrical Building in 2005.
P1710 (A.L. Cole Site Master Plan) included the 19th Street location in the design plan funded in prior years.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1618 WASTE WATER TRUNK SEWER PRESERVATION

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Network Management                                             110           110           110           110           110           550
 Preservation Program                                           400           150           150           150           150         1,000
 58th Street Forced Sewer Main                                  200             0             0             0             0           200
 Capacity Improvements - 24th Street                            500             0             0             0             0           500
   Total GROSS COST DETAILS                                   1,210           260           260           260           260         2,250

FINANCING DETAILS
  Infrastructure Res - Wtr & Sanswr                        ( 1,210)        ( 260)        ( 260)        ( 260)        ( 260)      ( 2,250)
    Total FINANCING DETAILS                                ( 1,210)        ( 260)        ( 260)        ( 260)        ( 260)      ( 2,250)


Project Description
This project is an annual program to undertake major rehabilitation and replacement of waste water trunk sewers and appurtenances in
the large diameter waste water collection system.

General Comments
The network management component of this project involves the evaluation and planning to manage the capacity in relation to demand,
and the overall condition of the waste water trunk sewer system. The planning work will focus on demand/capacity modeling and the
inspection of critical trunk sewers.

The preservation program involves the project level design, construction administration and construction/contract activities to deliver the
annual major rehabilitation and replacement programs on the large diameter waste water trunk sewers.

Prior years funding has been directed at rehabilitation of the Preston Avenue and Gray Avenue trunk sewers. In 2004 and 2005 priority
will be placed on analyzing and repairing, as required, the interceptor pipe adjacent to the river.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1619 STORM SEWER TRUNK PRESERVATION

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Network Management                                              30           30            30            30            30            150
 Preservation Program                                           465        2,080         1,930         1,930         1,930          8,335
   Total GROSS COST DETAILS                                     495        2,110         1,960         1,960         1,960          8,485

FINANCING DETAILS
  Infrastructure Res - Storm Water                           ( 495)      ( 2,110)      ( 1,960)      ( 1,960)      ( 1,960)      ( 8,485)
    Total FINANCING DETAILS                                  ( 495)      ( 2,110)      ( 1,960)      ( 1,960)      ( 1,960)      ( 8,485)


Project Description
This project is an annual program to undertake major rehabilitation and replacement of trunk storm sewer mains and appurtenances in
the large diameter storm sewer collection system.

General Comments
The network management component of this project involves the evaluation and planning to manage the capacity in relation to demand
and the overall condition of the large diameter storm sewer trunk collection system. Currently there is no network management system
in place dedicated to regularly inspecting network condition and evaluating capacity bottlenecks. This project includes the study of the
capacity of the storm sewer system including overland drainage in conjunction with collection and pond capital preservation.

The preservation program involves the project level design, construction administration and construction/contract activities to deliver the
annual major rehabilitation and replacement programs.

Based upon deficient funding in the Storm Water Management Utility in 2004, only minor emergency repairs will be completed.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1620 STORM SEWER COLLECTION PRESERVATION

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Network Management                                             100          150            100           100           100           550
 Preservation Program                                           255          700            550           550           550         2,605
 East Riverbank Stabilization                                     0          200            200           200             0           600
   Total GROSS COST DETAILS                                     355        1,050            850           850           650         3,755

FINANCING DETAILS
  Infrastructure Res - Storm Water                           ( 355)      ( 1,050)        ( 850)        ( 850)        ( 650)      ( 3,755)
    Total FINANCING DETAILS                                  ( 355)      ( 1,050)        ( 850)        ( 850)        ( 650)      ( 3,755)


Project Description
This project is an annual program to undertake major rehabilitation and replacement of storm sewer mains and appurtenances and the
east riverbank sub drain system in the small diameter storm sewer and subsurface collection systems.

General Comments
The network management component of this project involves the evaluation and planning to manage the capacity in relation to demand
and the overall condition of the small diameter storm sewer collection system. Currently there is no network management system in
place dedicated to regularly inspecting network condition and evaluating capacity bottlenecks. This project includes the study of the
capacity of the storm sewer system including overland drainage in conjunction with trunk and pond capital preservation. A computer
model will be developed to ensure that proposed improvements in one area of the collection system do not negatively impact other
areas.

The preservation program involves the project level design, construction administration and construction/contract activities to deliver the
annual major rehabilitation and replacement programs.

Specific projects are not planned for 2004 due to deficient funding in the Storm Water Management Utility.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1621 STORM SEWER POND PRESERVATION

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Preservation Program                                             75           75            75            75            75           375
   Total GROSS COST DETAILS                                       75           75            75            75            75           375

FINANCING DETAILS
  Infrastructure Res - Storm Water                             ( 75)         ( 75)        ( 75)          ( 75)        ( 75)        ( 375)
    Total FINANCING DETAILS                                    ( 75)         ( 75)        ( 75)          ( 75)        ( 75)        ( 375)


Project Description
This program is an annual program to undertake major rehabilitation of storm water retention ponds and appurtenances. There are 14
storm retention ponds, 9 are wet and 5 are dry. An annual program of pond rehabilitation is required to ensure continued protection of
private property from storm events and ensure water quality.

General Comments
The network management component of this project involves the study of the capacity of storm ponds including overland drainage in
conjunction with trunk and storm sewer collection capital preservation. A computer model will be developed to ensure that proposed
improvements in one area of the collection system do not negatively impact other areas.

The preservation program involves the project level design, construction administration and construction/contract activities to deliver the
annual rehabilitation programs. The rehabilitation includes:

1) Sediment Removal - Depending on the silt load from the runoff and catchment area, both the wet and dry ponds need to be dredged
out when sediment levels impede the outlets and the pond volume no longer provides acceptable storage capacity.

2) Revetment Rehabilitation - Replacement of revetment around the shorelines that is lost due to water action and natural erosion.

3) Mechanical and Pump Replacement - Some of the ponds have pump facilities to operate spray heads, creek features and
recirculation/aeration systems. These pumps and wet wells require replacement every 5 to 10 years.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1622 WOODLAWN CEMETERY TREE REPLACEMENT

                                                           2004            2005         2006          2007         2008
                                                        BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Tree Replacement Program                                         0          73            73            73           41           260
   Total GROSS COST DETAILS                                       0          73            73            73           41           260

FINANCING DETAILS
  Unfunded                                                        0        ( 73)         ( 73)        ( 73)         ( 41)        ( 260)
   Total FINANCING DETAILS                                        0        ( 73)         ( 73)        ( 73)         ( 41)        ( 260)

Project Description
This project involves the planned replacement of approximately 350 trees that will be removed from the Woodlawn Cemetery's urban
forest over the next several years.

General Comments
On January 1, 2003 the City began a Tree Pruning program at the Woodlawn Cemetery. The program was initiated as a part of the
Urban Forestry program's plan to maintain the health of Saskatoon's urban forest. Trees with significant dieback, decay, disease, or
those that pose a threat to public safety are removed. In addition, elm pruning and the removal of hazard elms remains a critical
component of the City's Dutch Elm Disease prevention strategy. Currently the Cemetery has an inventory of approximately 3,500 trees,
of which 2,300 are American Elm trees. Prior to the commencement of the work, the City Arborist evaluated all the trees and has
recommended that approximately 350 trees (approximately 200 elms) be removed over the next three years.

Many of the trees in Woodlawn Cemetery, approximately 1,300, have tree stands/plaques in front of them identifying that the particular
tree has been dedicated to someone who lost their life in the War. Many of these dedicated trees are in the vicinity of other family
members who have been interred at Woodlawn. Therefore, it is important to replace the tree in the same location as it was removed.
Some of the trees that have already been removed are ones that have been dedicated (identified by had a tree stand/plaque in front of
the tree). Thus, there is some urgency for replacing the trees in an expeditious fashion.

The reforestation process will begin in the fall of 2003, with the replacement of 15 trees along Memorial Avenue. The funding for these
replacements involves the re-allocation of some operating funds along with a matching Heritage Fund grant, approved by City Council
on June 23, 2003. The balance of the trees will be replaced (when funds are approved) over the next three (3) to five (5) years at a
rate of approximately fifty (50) trees per year.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1623 NUTANA MEDIANS IRRIGATION

                                                            2004            2005          2006          2007         2008
                                                         BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Design and Construction                                           0           77             0             0              0              77
   Total GROSS COST DETAILS                                        0           77             0             0              0              77

FINANCING DETAILS
  Unfunded                                                         0        ( 77)             0             0              0        ( 77)
   Total FINANCING DETAILS                                         0        ( 77)             0             0              0        ( 77)


Project Description
This project involves the development and installation of irrigation services on four centre medians in the Nutana area.

General Comments
Issue Paper #5 of the Nutana Local Area Plan (Nutana - Parks and Open Space relates to the deficiency of parks space in the Nutana
area) identified the need to get citizens involved in the City of Saskatoon's green space environment. The paper specifically states that:

         "Park and green space maintenance and urban forestry initiatives that maintain and develop this resource are supported and
         encouraged by this plan. In addition, initiatives that help residents maintain and develop boulevards through planting and
         gardening are encouraged. Citizen use of the boulevards can build a sense of community and reduce maintenance costs for
         the City."

On February 18, 2003, a meeting was held with the Median Partners that included representatives from the Community Services
Department, the Parks Branch and residents from the Nutana area. At the meeting it was agreed that the Parks Branch would supply 4
oak barrel planters and 200 feet of hose to the residents as a pilot project for the 2003 summer season. The Community Association
then purchased an additional 10 oak barrel planters from the Parks Branch.

Additional meetings were held with the Community Services Department, the Parks Branch and representatives from the Nutana
Community Association Median Partners and it was decided that to further enhance the boulevards, a Capital Budget item would be
submitted in 2004 for the installation of irrigation services on 4 center medians. This would allow the residents to manually water the
oak barrels, the turf, and the in-ground flowerbeds.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1624 PARKS INFRASTRUCTURE CONDITION AUDIT

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Condition Audit                                                30             0             0             0            0            30
   Total GROSS COST DETAILS                                     30             0             0             0            0            30

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 30)            0             0             0            0         ( 30)
   Total FINANCING DETAILS                                    ( 30)            0             0             0            0         ( 30)

Project Description
This project involves conducting a condition assessment of the infrastructure components of the parks in the City's parks system, and
modifying the Parks Infrastructure Inventory Management System to facilitate monitoring and tracking of asset condition and long-range
forecasting of asset replacements.

General Comments
The Internal Auditor has recommended in his May 2003 Parks Maintenance Audit Report that a parks infrastructure condition audit be
undertaken to determine the current condition of all of the Parks infrastructure components in the City's Parks system. This information
will be used to prepare the long-term infrastructure replacement, refurbishment, and upgrading requirements plan as well as identify the
funding requirements to support the plan.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1625 ROTARY PARK PARKING LOT

                                                           2004           2005          2006         2007          2008
                                                        BUDGET           PLAN          PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Design and Construction                                         0           84             0             0            0             84
   Total GROSS COST DETAILS                                      0           84             0             0            0             84

FINANCING DETAILS
  Unfunded                                                       0         ( 84)            0             0            0         ( 84)
   Total FINANCING DETAILS                                       0         ( 84)            0             0            0         ( 84)


Project Description
This project involves the redesign and subsequent paving of the Rotary Park parking lot.

General Comments
The issue of dust abatement for the Rotary Park Parking lot has been discussed and dealt with in a variety of ways over the years.

The issue came before City Council on May 20, 2003 as a communication from the Park Terrace Condominium Association and
Council recommended, "that the matter be referred to the Administration for a report to the 2004 Capital Budget meeting". The
Administration's report was brought forward to City Council on August 11, 2003 and was subsequently referred to the Budget
Committee for consideration during the 2004 Capital Budget. The funding provides for the redesign and subsequent paving of the
parking lot.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1627 CITY ENTRANCES SHELTER BELT LANDSCAPING

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Design and Construction                                       150           100             0              0             0          250
   Total GROSS COST DETAILS                                    150           100             0              0             0          250

FINANCING DETAILS
  Res For Cap Expenditures                                   ( 150)            0             0              0             0       ( 150)
  Unfunded                                                        0       ( 100)             0              0             0       ( 100)
   Total FINANCING DETAILS                                   ( 150)       ( 100)             0              0             0       ( 250)


Project Description
This project involves the design and installation of appropriate landscaping along the entrance roadways into the City.

General Comments
This project would provide funding to design, install, and establish landscaping such as trees, shrubs, shelter belt replacements, and
other landscaping materials that would make the entrance roadways more aesthetically appealing to motorists as they come into the
City of Saskatoon.

Locations for 2004 to be considered include:

         1) Airport Drive
         2) 22nd St & Circle Drive Overpass
         3) Shelterbelts - south of 8th St to Highway 16
                          - east of Wanuskewin Road

Operating Impact           To be determined based upon actual construction.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1628 ROTARY PARK MASTER PLAN

                                                           2004            2005        2006        2007         2008
                                                        BUDGET            PLAN        PLAN        PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Design                                                           0           30          0            0            0           30
   Total GROSS COST DETAILS                                       0           30          0            0            0           30

FINANCING DETAILS
  Unfunded                                                        0        ( 30)          0            0            0         ( 30)
   Total FINANCING DETAILS                                        0        ( 30)          0            0            0         ( 30)


Project Description
This project involves the establishment of a long term master plan for Rotary Park.

General Comments
The Rotary Park Master Plan would provide a plan identifying future park programming and special event usage that would guide park
development in Rotary Park. The funding would provide for the development of a plan encompassing input received from the
Meewasin Valley Authority, the Community Services Department, and other interested parties.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1631 PARK DEV-WILLOWGROVE NBRHD

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Neighbourhood Park                                              547              0             0          165              0           712
   Total GROSS COST DETAILS                                      547              0             0          165              0           712

FINANCING DETAILS
  Elect Dist Extension Res                                        ( 6)            0             0             0             0            ( 6)
  Property Realized Reserve                                     ( 40)             0             0             0             0          ( 40)
  Parks and Recreation Levy                                   ( 501)              0             0        ( 165)             0        ( 666)
    Total FINANCING DETAILS                                   ( 547)              0             0        ( 165)             0        ( 712)


Project Description
This project involves the construction of neighbourhood parks or city-owned land in the Willowgrove neighbourhood.

General Comments
Phase 1 of the Linear Park is to be constructed in 2004. During the design phase, there were two options considered for irrigating the
park, irrigating the street frontages only or irrigating the entire park. The option selected by the Developer and reflected in this budget
is to irrigate the entire park. The Property Realized Reserve will provide the required additional funding.

The 2007 funds reflect the design and construction of the Village Square.

Operating Impact
Year 2005                            $29,500

Prior Budget Approvals               $56,000
Prior budget approvals reflect the design of Phase 1 of the Linear Park.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1632 PARK DEV-SUTHERLAND INFILL

                                                            2004            2005          2006          2007       2008
                                                         BUDGET            PLAN          PLAN          PLAN       PLAN    TOTAL
GROSS COST DETAILS
 Neighbourhood Park                                              24          199              0               0       0     223
   Total GROSS COST DETAILS                                      24          199              0               0       0     223

FINANCING DETAILS
  Parks and Recreation Levy                                    ( 24)       ( 199)             0               0       0   ( 223)
   Total FINANCING DETAILS                                     ( 24)       ( 199)             0               0       0   ( 223)


Project Description
This project involves the construction of a neighbourhood Pocket Park in the Sutherland Infill subdivision.

General Comments
The Pocket Park is to be designed in 2004 and constructed in 2005.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1633 PARK DEV-HUGHES DRIVE

                                                           2004           2005         2006          2007     2008
                                                        BUDGET           PLAN         PLAN          PLAN     PLAN    TOTAL
GROSS COST DETAILS
 Neighbourhood Park                                               111         0            0             0       0     111
   Total GROSS COST DETAILS                                       111         0            0             0       0     111

FINANCING DETAILS
  Parks and Recreation Levy                                     ( 111)        0            0             0       0   ( 111)
   Total FINANCING DETAILS                                      ( 111)        0            0             0       0   ( 111)


Project Description
This project involves the construction of a neighbourhood Pocket Park in the Hughes Drive subdivision.

General Comments
The Pocket Park is to be constructed in 2004.

Operating Impact
Year 2005      $5,100 (2004 capital)

Prior Budget Approvals               $16,000
Prior budget approvals reflect the design of the Pocket Park.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1634 PARK DEV-LAKEWOOD SUBURBAN DISTRICT PARK

                                                           2004           2005          2006          2007       2008
                                                        BUDGET           PLAN          PLAN          PLAN       PLAN        TOTAL
GROSS COST DETAILS
 Park Design and Construction                                     0            0         584              0          0          584
   Total GROSS COST DETAILS                                       0            0         584              0          0          584

FINANCING DETAILS
  Parks and Recreation Levy                                       0            0       ( 584)             0          0        ( 584)
   Total FINANCING DETAILS                                        0            0       ( 584)             0          0        ( 584)


Project Description
This project involves the construction of a district park on city-owned land in the Lakewood Suburban Area.

General Comments
The 2006 funding provides for the design and construction of Phase 1 of the District Park. Phase 2 is to be developed beyond 2008.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1677 STORM WATER MGMT UTILITY BILLING

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Design & Implementation (Area Based)                          150              0            0             0             0          150
   Total GROSS COST DETAILS                                    150              0            0             0             0          150

FINANCING DETAILS
  Infrastructure Res - Storm Water                           ( 150)             0            0             0             0        ( 150)
    Total FINANCING DETAILS                                  ( 150)             0            0             0             0        ( 150)

Project Description
The Storm Water Management Utility Billing (Area Based) project involves modifications to the appropriate billing system to allow billing
of parcel owners for storm water management based on parcel area. This project also includes an integrity check of the data for billing
purposes.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1693 FFP&ZOO RESURFACE ZOO PATHWAYS

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Resurface Zoo Pathways                                            0           40            40            40            40           160
   Total GROSS COST DETAILS                                        0           40            40            40            40           160

FINANCING DETAILS
  Unfunded                                                         0         ( 40)        ( 40)          ( 40)        ( 40)        ( 160)
   Total FINANCING DETAILS                                         0         ( 40)        ( 40)          ( 40)        ( 40)        ( 160)


Project Description
This project was initiated to resurface the asphalt pathways at the Zoo and to upgrade in areas of heavy vehicle use. Infrastructure
Services has undertaken an assessment of the asphalt pathways and has provided a plan for the most effective course of action for a
resurfacing program.

General Comments
The pathways are a maximum of 9 to 10 feet in width, vehicle travel from service trucks has caused the pathway surface to extensively
degenerate to the point where each spring there are large cracks in the asphalt which make it hazardous for older and infirm visitors
and frustrating for people pushing strollers. This project is a customer service improvement for visitors visiting the Zoo. It is expected
that the pathways will have a life expectancy of 15 to 20 years before replacement or resurfacing is necessary.

Prior Budget Approvals               $120,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1724 NEW NEIGHBOURHOOD DESIGN

                                                            2004            2005         2006           2007         2008
                                                         BUDGET            PLAN         PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 New Neighbourhood Design                                          0           70           30              0             0          100
   Total GROSS COST DETAILS                                        0           70           30              0             0          100

FINANCING DETAILS
  Unfunded                                                         0        ( 70)         ( 30)             0             0        ( 100)
   Total FINANCING DETAILS                                         0        ( 70)         ( 30)             0             0        ( 100)


Project Description
Concern over increasing costs and the unsustainability of conventional development practices has led many cities in North America to
look at alternative development practices. The New Neighbourhood Designs Study (Project 1850) was completed in 2002, and
provides a review of issues, best practices and possible directions for Saskatoon, including a set of recommendations towards
increasing the fiscal, environmental and social sustainability of neighbourhood development and greater choice and opportunity in how
our new neighbourhoods are built. The Blakeney Crescent demonstration project applied some of this theory to a real-life scenario.

"Smart growth" is evolving as a key strategy to manage future growth, and Saskatoon's Plan Saskatoon process and Development Plan
establishes a solid "smart growth" vision for the shape of the future city and its neighbourhoods. There is a gap between that vision and
conventional development practices that needs to be addressed by amending regulatory policies and tools that affect the range and mix
of allowable uses, the design of roads and other infrastructure, and the location and provision of neighbourhood services, including
schools, open space and commercial developments. City Council is to receive a report on the Smart Growth Study which includes a
model for implementation.

The study recommends that the City formally adopt "smart growth" guidelines to guide future development, including defining
measurable outcomes for all elements of development that impact upon meeting the goal of more sustainable development. City
Council will receive this report in early 2004 for information and discussion.

With the direction of City Council, and in active consultation with civic and community stakeholders, this project will develop
performance objectives for new neighbourhoods, and where necessary, recommend amendments to policy and regulatory standards, to
enable the City of Saskatoon to provide a range of choices for new neighbourhood development that reflects the goals of the
Development Plan.

General Comments
Subject to the direction of City Council on adopting smart growth principles and strategies, the project will occur over 18 months, and
will include the following components:

1.       Performance Measures: in consultation with City Departments, the Developer's Liaison Committee and Saskatoon School
         Boards, define, develop and propose appropriate performance measures for roads, lanes, parks, housing types and mix,
         neighbourhood commercial and other specific neighbourhood amenities like pocket parks, institutional residential uses, and
         schools.

2.       Performance Outcomes: in consultation with City Council, define performance outcomes for future development in the City
         through a model which allows City Council to place varying degrees of importance to the performance measures identified in
         Step 1.

3.       Process for Review: establish a review process for submissions from developers related to the performance outcomes
         established for new neighbourhoods.
                  2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                      PROJECT DETAILS ($'000s)

1724 NEW NEIGHBOURHOOD DESIGN

4.   Review Current Standards: identify those standards which may require change (including possible amendments to the City's
     Subdivision Bylaw, Zoning Bylaw and Development Plan) in order to better achieve performance outcomes proposed by City
     Council.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1726 FUTURE GROWTH - SECTOR PLANS

                                                          2004           2005          2006         2007          2008
                                                       BUDGET           PLAN          PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 East Sector                                                   25             0            0             0            0           25
   Total GROSS COST DETAILS                                    25             0            0             0            0           25

FINANCING DETAILS
  Res For Cap Expenditures                                   ( 25)            0            0             0            0         ( 25)
   Total FINANCING DETAILS                                   ( 25)            0            0             0            0         ( 25)


Project Description
This project constitutes the next phase of the Future Growth Study, 1999. The Future Growth Study recommended that more detailed
sector plans for each recommended growth sector be undertaken. The sector plans will examine in more detail the technical
challenges and opportunities towards developing new Suburban Development Areas in the West, North East, and East growth sectors.
Factors to be examined would include configuration of new neighbourhoods, transportation linkages with existing and proposed road
networks, location of Suburban Centres, protection of natural areas, provision and cost of new water, storm and sanitary systems,
development of new district and multi-district parks and transit service.

General Comments
The project will be jointly managed by Municipal Engineering and City Planning Branches and consist of three phases over a three year
period. It is expected that an external consultant will be hired to undertake the above work.

Efficiencies gained on the West and North East Sector Plans have allowed us to reduce the capital budget request for the East Sector
from $85,000 to $25,000.

Prior Budget Approval                       $200,000 for the West Sector Plan
                                            $125,000 for the North East Sector Plan
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1727 PLANNING DISTRICT REVIEW

                                                            2004           2005          2006          2007         2008
                                                         BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Planning District Review                                         0           50            50             0             0          100
   Total GROSS COST DETAILS                                       0           50            50             0             0          100

FINANCING DETAILS
  Other                                                           0         ( 10)        ( 10)             0             0          ( 20)
  Unfunded                                                        0         ( 40)        ( 40)             0             0          ( 80)
   Total FINANCING DETAILS                                        0         ( 50)        ( 50)             0             0        ( 100)


Project Description
This project reviews the Saskatoon Planning District's boundaries and land use controls in cooperation with the R.M. of Corman Park
No. 344.

General Comments
The release and endorsement of the Future Growth Study has precipitated the need to undertake a comprehensive review of the
Saskatoon Planning District Development Plan and Zoning Bylaw. The comprehensive review would include analysis and
recommendations including the following components:
- existing boundaries and area
- District Development Plan
- District Zoning Bylaw
- 1.6 kilometre buffer
- country residential subdivision
- golf course communities
- extension of urban services into Planning District
- Treaty Land Entitlements and Compatible Land Use Agreements
- multi-parcel development

This project would be in cooperation with the R.M. of Corman Park, with an anticipated contribution of $10,000 per year to the project.
Proceeding with the various components of the project is subject to final approval by City Council and the Council of Corman Park.

Prior Budget Approval               $100,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1748 STREETSCAPE FURNITURE PURCHASE

                                                             2004            2005          2006          2007         2008
                                                          BUDGET            PLAN          PLAN          PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Downtown Streetscape Furniture                                     0             0            0                 0     100           100
   Total GROSS COST DETAILS                                         0             0            0                 0     100           100

FINANCING DETAILS
  Streetscape Reserve                                               0             0            0                 0   ( 100)       ( 100)
    Total FINANCING DETAILS                                         0             0            0                 0   ( 100)       ( 100)


Project Description
This project includes the purchase and installation of miscellaneous streetscape furniture in non-streetscape project areas within the
three Business Improvement Districts. Items include garbage cans, benches, bike racks, poster columns, etc.

General Comments
Future furniture purchase and installation will include the extension of furniture into non-streetscape areas.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1758 SOUTH DOWNTOWN NEW LIBRARY PROJ PLANNING

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Project Planning                                                550             0             0              0             0          550
   Total GROSS COST DETAILS                                      550             0             0              0             0          550

FINANCING DETAILS
  Public Lib Cap Exp'n Fund                                   ( 550)             0             0              0             0        ( 550)
   Total FINANCING DETAILS                                    ( 550)             0             0              0             0        ( 550)

Project Description
This planning project involves contracting consultants to provide the Library Board with legal, architectural and other advice to assist in
the project's conceptual design and preparatory steps. The estimates for construction costs are not known at this time.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1778 METER READING ROUTING SOFTWARE

                                                          2004            2005         2006          2007         2008
                                                       BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Routing Software Purchase                                       0           50            0             0             0              50
   Total GROSS COST DETAILS                                      0           50            0             0             0              50

FINANCING DETAILS
  Elect Dist Replacement Res                                     0        ( 20)            0             0             0            ( 20)
  Sewage Coll & Trtmnt Repl                                      0        ( 15)            0             0             0            ( 15)
  Water Supply Repl Reserve                                      0        ( 15)            0             0             0            ( 15)
    Total FINANCING DETAILS                                      0        ( 50)            0             0             0            ( 50)


Project Description
This project provides for the purchase of meter reading routing software in order to automate the establishment and sequencing of
meter reading routes in a GIS based environment.

General Comment
Re-routing is necessary to maintain balanced, efficient routes resulting in a more efficient meter reading process. Manually creating
and managing meter routes is a time consuming, complex process. Re-routing has been done once in the past ten years. Involved in
the process were the 13-meter readers, route administrator and the section manager. As the Corporation migrates toward automated
meter reading, rerouting will have to be done more frequently.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1779 TREAS UPGRADE REMIT/CASHIER SOFTWARE

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Software Upgrade/Replacement                                  110             0             0             0            0          110
   Total GROSS COST DETAILS                                    110             0             0             0            0          110

FINANCING DETAILS
  Elect Dist Replacement Res                                  ( 39)            0             0             0            0          ( 39)
  Res For Cap Expenditures                                    ( 30)            0             0             0            0          ( 30)
  Sewage Coll & Trtmnt Repl                                   ( 15)            0             0             0            0          ( 15)
  Water Supply Repl Reserve                                   ( 24)            0             0             0            0          ( 24)
  Infrastructure Res - Storm Water                              ( 2)           0             0             0            0            ( 2)
    Total FINANCING DETAILS                                 ( 110)             0             0             0            0        ( 110)


Project Description
This project provides for the upgrade of software for the Cashier and Remittance Processing systems.

General Comments
The software currently being using by both Treasurer's and Planning is a cash register system that allows for payments to automatically
upload into various civic applications. The software is currently running under Microsoft Windows NT but was written to run under
Microsoft Windows 95. The software was purchased in early 1998 and is several versions behind, and will most likely be
unsupported in the near future.

The software that is utilized by the Treasurer's Office to process payments paid by mail, night deposit or at financial institutions was
acquired in December of 1998 and is running under a Microsoft Windows 95 version. The current version of operating system that is
standard for the City of Saskatoon is Microsoft Windows NT and next year the departments will be upgrading to Microsoft Windows
XP. Due to using an old version of operating system some of the software functionality has been lost. The software currently being
used will not be supported after 2004.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1780 CORP NETWORK INFRASTRUCTURE

                                                            2004            2005          2006          2007         2008
                                                         BUDGET            PLAN          PLAN          PLAN         PLAN            TOTAL
GROSS COST DETAILS
 Equipment Purchase                                             100            65          120           120           120            525
   Total GROSS COST DETAILS                                     100            65          120           120           120            525

FINANCING DETAILS
  Computer Equipment Replac Res                              ( 100)         ( 65)        ( 120)        ( 120)       ( 120)          ( 525)
   Total FINANCING DETAILS                                   ( 100)         ( 65)        ( 120)        ( 120)       ( 120)          ( 525)


Project Description
This project involves enhancements to the corporate network infrastructure in civic facilities, the implementation of network
management tools and the replacement of the Corporate Network Backbone.

General Comments
The upgrade to this private network will allow CIS to provide effective backup services without encroaching into the online daily
production.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1798 INCOME ASSESSMENT APPROACH

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Income Assessment Approach                                    150            50           50              0            0            250
    Total GROSS COST DETAILS                                   150            50           50              0            0            250

FINANCING DETAILS
  Other                                                     ( 150)         ( 50)         ( 50)             0            0       ( 250)
   Total FINANCING DETAILS                                  ( 150)         ( 50)         ( 50)             0            0       ( 250)


Project Description
This project provides for the continuation to the income assessment approach for commercial and industrial properties, funded by a
direct levy on commercial and industrial properties.

General Comments
Based on the premise that this property class will contribute funds to cover the incremental costs of moving to this assessment model,
the Saskatoon Combined Business Group (SCBG) have agreed to fund $450,000 towards this activity between 2002 and 2006. The
2004 funding continues to recognize the agreement with the SCBG.

This multi-year data-gathering and inspection program for commercial and industrial properties is required for the planned
implementation of the income approach to values for these properties by 2009.

Prior Year Funding         $200,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1799 PROPERTY REASSESSMENT 2005

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Property Reassessment                                          130             0             0             0             0          130
   Total GROSS COST DETAILS                                     130             0             0             0             0          130

FINANCING DETAILS
  Res For Cap Expenditures                                   ( 130)             0             0             0             0       ( 130)
   Total FINANCING DETAILS                                   ( 130)             0             0             0             0       ( 130)

Project Description
This project is to provide funding for the 2005 Property Reassessment ordered by the Saskatchewan Assessment Management Agency
(SAMA) and legislated by the Province of Saskatchewan.

General Comments
The 2004 budget includes costs for research, programming changes, preparation of the assessment roll, preparation of preliminary
notification and preview of proposed values with property owners, preparation of assessment notices for all assessed owners, and the
defence of values as required in a timely manner.

Over the course of the next several months the Office of the City Assessor will be working with advisory committees, within Saskatoon,
made up of members of the public to assist in ensuring fair and equitable values under the rules of assessment as set forth by SAMA.
In addition, in the spring of 2004, preliminary letters of proposed values will be sent to all assessed property owners relating to their
proposed 2005 assessment values. This will provide the taxpayers of the City of Saskatoon with the opportunity to contact this office
should they have issues or concerns with their proposed values, prior to the official assessment notices being sent in the fall of 2004.
This process will enable discussion with the assessment department prior to property owners having the need to appeal should they
have concerns.

These new steps are being integrated to assist in moving forward towards a fair, open, understandable and defensible assessment
system for property owners in this City.

Details:

Printing Notices, preliminary letters, paper, mailing costs, reassessment
brochures, and etc.                                                                         $90,000
Advisory Committees, public information kiosks, etc for preview program                     $20,000
Possible additional overtime for preview, appeals, supplementaries
during appeal time, etc.                                                                    $20,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1800 MAILING AND COLOUR PRINTING REPLACEMENT

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchase                                             415              0             0             0             0          415
   Total GROSS COST DETAILS                                     415              0             0             0             0          415

FINANCING DETAILS
  Productivity Impvm't Loan                                   ( 415)             0             0             0             0        ( 415)
    Total FINANCING DETAILS                                   ( 415)             0             0             0             0        ( 415)


Project Description
This project provides for the replacement of the mailing and highlight colour printing systems.

General Comments
The current equipment was purchased in 1998 and is coming to the end of its useful life. The equipment is no longer current, the
maintenance contracts expired in October 2003, the failure rate is increasing and parts are becoming harder to find. The highlight
colour printing system now requires servicing on a weekly basis. The mailing system is regularly breaking down and was recently out
of service for almost two weeks, resulting in no Utility Bills being mailed to customers. This in turn impacted collections staff as late
payment charges are calculated from the date of the billing run and not the mailing date.

The project will be funded through a Productivity Improvement Loan (PIL) and cost recovered through user Operating Budget over a
five-year period commencing in 2005.

Auto mailer Mailing System                    $ 90,000
Highlight Colour Printer                       325,000
Total                                        $415,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1801 DATA CENTRE SECURITY

                                                           2004            2005         2006          2007         2008
                                                        BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Data Centre Security                                          500          200           200             0             0          900
   Total GROSS COST DETAILS                                    500          200           200             0             0          900

FINANCING DETAILS
  Res For Cap Expenditures                                  ( 500)             0            0             0             0        ( 500)
  Unfunded                                                       0        ( 200)       ( 200)             0             0        ( 400)
   Total FINANCING DETAILS                                  ( 500)        ( 200)       ( 200)             0             0        ( 900)


Project Description
This project provides for the purchase and installation of equipment needed to develop a second data centre location.

General Comments
In 2002 Prosser and Associates performed an audit on Disaster Recovery and Contingency Planning. In order to address the
recommendations made in the report from an IT perspective, the CIS Branch recommends splitting the Data Centre between the
current location on the 4th floor of City Hall and developing a second Data Centre in the Post Office building on 4th Avenue. Equipment
and production will be split between the two data centers. In the case of a disaster at one of the data centers, the second one will be
able to continue with production processing, albeit at a lower level of performance. The proposed project provides for a network router
to be installed in the new data centre in the Post Office building, which will provide high-speed access back to the data centre at City
Hall, and for the purchase of a second Storage Area Network. These two major pieces of equipment are required to effectively split the
processing power between the two locations and recover data in the case of a disaster at one of the data centers.

Details
Storage Area Network (Disk Storage)                   $200,000 (first of 3 annual payments)
Router                                                 100,000
Raised Floor                                            10,000
Climate Control                                        100,000
Physical Security                                       25,000
UPS                                                     25,000
Wiring (Fiber and Ductwork)                             25,000
Equipment Racks                                         15,000
         Total                                        $500,000


Operating Impact
2005 Annual Maintenance - Router                               $15,000
2007 Annual Maintenance - Storage Area Network                 $65,000


Special Note
Proceeding with this project in 2004 the City will be committed to the second and third annual payments as budgeted in 2005 and 2006.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1802 PROCUREMENT STUDY

                                                            2004            2005         2006           2007         2008
                                                         BUDGET            PLAN         PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Consulting                                                      25            0              0             0             0           25
 New System                                                       0          150              0             0             0          150
   Total GROSS COST DETAILS                                      25          150              0             0             0          175

FINANCING DETAILS
  C.I.S. Development Reserve                                   ( 25)       ( 150)             0             0             0        ( 175)
   Total FINANCING DETAILS                                     ( 25)       ( 150)             0             0             0        ( 175)


Project Description
This project provides for the hiring of a consultant to review the City' procurement process, which may result in the implementation of a
new or upgraded purchasing system.

General Comments
Over the past few years, the way companies procure goods and services has been changing. With the advent of Corporate Purchasing
Cards and procurement over the Web, the City needs to take a closer look at how it procures goods and services. There is also an
opportunity for the City to implement electronic requisitioning and move away from the paper process currently used. Phase I of this
project, in 2004, will provide for the hiring of a consultant, and based on the consultants recommendation Phase II, in 2005, will provide
for the replacement or upgrade of the current purchasing system (if required).

Details for 2004                              Details for 2005
Consulting                 $25,000            New System       $150,000
Total                      $25,000            Total            $150,000

Operating Impact
2005 Annual Maintenance $25,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1803 ELECTRONIC PHONEBOOK AND ORG. CHARTS

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Purchase & Implementation of Software                            40             0             0             0             0            40
   Total GROSS COST DETAILS                                       40             0             0             0             0            40

FINANCING DETAILS
  C.I.S. Development Reserve                                   ( 40)             0             0             0             0          ( 40)
   Total FINANCING DETAILS                                     ( 40)             0             0             0             0          ( 40)


Project Description
This project provides for the purchase and implementation of software that will enable the City to have a current and up-to-date
electronic phone book and organizational structure available to all staff in the Intranet.

General Comments
The current internal phone book is out of date at the time of publishing and the ability to publish and distribute corporate organizational
charts is lacking. Both of these processes are very manual and time consuming. This project will allow the City to access data
electronically from the Human Resource system for both the on-line phone book and organizational charts. With a requirement to still
publish a paper copy phone book, the amount of manual effort to do this will be greatly reduced. Some of the features of this software
are as follows:
          - Automating the process for creating organizational charts, as well as maintaining and analyzing accurate human resource
          information.
          - Uses existing human resource data to create flexible, secure, web-based (internet and intranet) org charts for hierarchy,
          reporting relationships, head counts, etc.
          - Use to distribute accurate phone lists and other employee data that can be searched also.
          - Can be accessed by JAWS® for Windows screen reading software for the visually impaired. This is needed in order to
          support the visually impaired staff member who works on the information desk in the foyer of City Hall.
          - Provides various levels of security for viewing, and can control ability to copy data to the end-user's desktop.

Details:
Software                             $30,000
Consulting                            10,000
Total                                $40,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1804 CITY CENTENNIAL CELEBRATION

                                                             2004            2005        2006          2007          2008
                                                          BUDGET            PLAN        PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Planning and Facilition                                          80             0            0             0             0             80
   Total GROSS COST DETAILS                                       80             0            0             0             0             80

FINANCING DETAILS
  Res For Cap Expenditures                                     ( 80)             0            0             0             0           ( 80)
   Total FINANCING DETAILS                                     ( 80)             0            0             0             0           ( 80)


Project Description
This project reflects funding for the City of Saskatoon Centennial celebration in 2006. In 2004, the Committee will be launching the
planning and facilitation stage including marketing, public consultation, education, event planning, and private sponsorship recruitment.

General Comments
Marketing
$40,000 for logo development, media kits, communication kits for the public/private sponsors, video resources, and merchandise
development, etc.

Public Engagement
$10,000 to begin the process of engaging the general public about the centennial year. Includes town hall meetings, facilitation, focus
groups, and other forms of public consultation.

Education/Communications
$10,000 toward special education and public relations resources: e.g. written publication on the history of the area and curriculum
development for schools.

Event Planning
$10,000 toward building an events package: this ties into the above two and may include a 2004 mini-event.

Special Projects
$10,000 for special projects and recognitions, e.g., Prince Albert Centennial, etc.

These activities will also allow the Committee to begin to seek private donations and sponsorships to defray the actual costs of the
City's centennial celebrations.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1806 FIRE-SCBA UNIT(BREATH'G APPAR)

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Self Contained Breathing Apparatus                             87            32           29              0             64         212
   Total GROSS COST DETAILS                                     87            32           29              0             64         212

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 87)            0             0             0            0          ( 87)
  Unfunded                                                        0        ( 32)         ( 29)             0        ( 64)        ( 125)
   Total FINANCING DETAILS                                    ( 87)        ( 32)         ( 29)             0        ( 64)        ( 212)


Project Description
This project provides for the replacement of fire fighter self contained breathing apparatus (SCBA), which have reached the end of their
service life.

General Comments
Firefighter self contained breathing apparatus units have a normal service life of fifteen years and must be replaced as per Compressed
Gas Association Regulation C-6.2-1996, Section 9.2, Service Life which states: "A cylinder must be condemned at the termination of a
15 year period following the original manufacturer's test date, and regardless of the last retest date".

Fire and Protective Services currently have 88 masks and 205 cylinders that need to be replaced on a rotational basis.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                          PROJECT DETAILS ($'000s)

1812 SK PLACE-EQUIPMENT PURCHASES

                                                        2004           2005         2006         2007         2008
                                                     BUDGET           PLAN         PLAN         PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Bobcat                                                      30           0            0             0           0            30
 Folding Chairs                                              45          45           40            40          40           210
 Computers                                                   30           0           20             0           0            50
 Concession - Heaters & Poppers                               0           0           40            40          40           120
 Custodial Equipment                                          0          20            0             0           0            20
 Electrical Equipment                                         0           0           20            20          20            60
 Forklift - 10 Ton                                            0          60            0            85           0           145
 Forklift (15 ton)                                            0           0          120             0           0           120
 Forklift (2.5 ton)                                           0           0            0             0          28            28
 Ice Decking System                                           0           0            0            30           0            30
 Ice Resurfacer                                               0           0            0            65           0            65
 Office Furniture & Equipment                                 0           0            0             0          20            20
 Score Clock                                                300           0            0             0           0           300
 Sound System                                                 0           0            0             0         150           150
 Spotlights                                                  25           0            0             0           0            25
 Staging                                                      0           0            0            25           0            25
 Tables & Draping System                                      0          10           10             0           0            20
 Video Equipment                                              0          30            0             0           0            30
 Vehicles                                                     0           0           10             0           0            10
    Total GROSS COST DETAILS                                430         165          260           305         298         1,458

FINANCING DETAILS
  Sask Place Equipment Repl Res                          ( 430)       ( 165)       ( 260)       ( 305)       ( 298)      ( 1,458)
   Total FINANCING DETAILS                               ( 430)       ( 165)       ( 260)       ( 305)       ( 298)      ( 1,458)


Project Description
This project reflects equipment replacement purchases at Sask Place in accordance with Sask Place Reserve Fund Policy 01-0006.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1817 MENDEL RENOVATION AND EXPANSION

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Renovation & Expansion                                         188        1,100         5,302         6,303            250       13,143
   Total GROSS COST DETAILS                                     188        1,100         5,302         6,303            250       13,143

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 163)            0             0             0             0         ( 163)
  Other                                                         ( 25)      ( 825)      ( 3,977)      ( 4,728)        ( 250)       ( 9,805)
  Unfunded                                                          0      ( 275)      ( 1,325)      ( 1,575)             0       ( 3,175)
   Total FINANCING DETAILS                                    ( 188)     ( 1,100)      ( 5,302)      ( 6,303)        ( 250)     ( 13,143)


Project Description
This project includes the renovation and expansion of the Mendel Art Gallery, including the required design phases. The Mendel Art
Gallery needs a significant scope of facility alterations and additions to enable it to continue honoring its mandate in the immediate and
the longer-term.

To date the Mendel has completed a fundraising feasibility study, conducted by Ketchum Canada Inc., which indicates a favorable
outcome, and a Facility Development Plan with the guidance of Lundholm Associates Architects, a Toronto consulting firm with a
specialty in museum facility planning. The Facility Development Plan has been approved, the Mendel's Board and will be used to
identify and give priority to a logical sequence of facility upgrading and expansion.

The next step, planned for 2004, is the Schematic Design Phase. A 'call for proposals' will be prepared and submitted to attract
interested and qualified architectural firms. Once selected the architectural firm will develop solutions and schematic drawings for the
architectural, mechanical and electrical systems (based on the approved conceptual design), including a site development concept, a 3-
D model and/or computer generated images for the proposed facility, a cost estimate for the complete project, and a phasing plan to
accommodate the Mendel Art Gallery's continued operation during most of the construction period.

General Comments
The Mendel Art Gallery opened in 1964 (almost 40 years ago), boasting an award winning architectural design and a unique riverbank
park setting. Though it continues to function well in some areas, there are many serious problems with the existing building. Some of
these developed over time as art collections and programs have grown, the building and its systems have aged and museum practices
have changed. Other problems can be characterized as inherent shortcomings in the planning of the original building or the addition
added in 1975. There are problems of function/usage, location relationships, circulation/access, quantity of space, quality of space,
and technical performance (i.e. environmental controls). Combined, these shortcomings threaten the organization's continued ability to
fulfill its stated mandate and basic responsibilities. The Mendel's five-year capital plan addresses both the existing facility needs and
the required capacity to see us through the next 30 to 40 years of operation.

The Mendel's Facility Development Plan is based on a functional analysis of the existing operations and building leading to an
articulation of the spatial, functional and technical needs. This analysis is also influenced by an awareness of general development of
conceptual alternatives for the building upgrades and expansion. The alternatives were than analyzed and reviewed by the Gallery
Board and staff, and then subjected to a cost/benefit analysis by the consultant. A preferred option was selected and further developed
as the framework for the Mendel's five-year capital plan.

For this capital project, the Mendel hopes to attract significant funding from the private sector and all three levels of government. A
fundraising strategy is under development and a private and public fundraising campaign will be officially launched once the Schematic
Planning Phase has been completed. In order for this project to move forward the City of Saskatoon is being asked to cover the costs
of the Schematic Planning Phase planned for 2004.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                               PROJECT DETAILS ($'000s)

1820 CENT AUD-THEATRE RESTORATION

                                                               2004              2005     2006      2007          2008
                                                            BUDGET              PLAN     PLAN      PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Seating                                                           700              0        0          0             0          700
 Colour Scroller                                                     0              0        0         15             0           15
 Upgrade Lighting Console                                            0              0        0          0             5            5
 Stage Monitor Processing                                            0              0        0         20             0           20
 Microphones                                                         5              5        0          0             0           10
 Stage Wireless Com                                                  0              0       20          0             0           20
   Total GROSS COST DETAILS                                        705              5       20         35             5          770

FINANCING DETAILS
  Borrowing                                                     ( 400)               0        0          0             0       ( 400)
  Auditorium Theatre Restoration Res                            ( 255)            ( 5)    ( 20)      ( 35)          ( 5)       ( 320)
  Other                                                           ( 50)              0        0          0             0         ( 50)
   Total FINANCING DETAILS                                      ( 705)            ( 5)    ( 20)      ( 35)          ( 5)       ( 770)


Project Description
This project reflects theatre restoration as identified in the Arnott Report.

General Comments
A Theatre Restoration Reserve has been established by adding $1.50 per ticket on all tickets sold relating to theatre events. It is
recommended that this project be completed in one year and the funds be borrowed internally in such a manner that there is no impact
on the mill rate. The borrowed amount will be repaid through the current provision to the Centennial Auditorium Theatre Restoration
Reserve. When the debt is repaid, the provision for the Centennial Auditorium Theatre Restoration Reserve will be reallocated back to
this reserve. The remaining source of funding ($50,000) is the estimated proceeds from the sale of the existing seats.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1846 COMPENSATION MANAGEMENT SYSTEM

                                                           2004            2005        2006          2007         2008
                                                        BUDGET            PLAN        PLAN          PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Software Purchase & Implementation                             35             0           0             0            0            35
   Total GROSS COST DETAILS                                     35             0           0             0            0            35

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 35)            0           0             0            0         ( 35)
   Total FINANCING DETAILS                                    ( 35)            0           0             0            0         ( 35)

Project Description
This project provides for replacement of the Salary Administration software.

General Comments
The current software used for the salary program is built on old technology and is not compatible with the new technology Microsoft
Windows XP. The new software would provide a sophisticated decision-support system for planning, analyzing, monitoring and
executing compensation programs.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1871 DEMOLITION ELEC BLDG-AVE B&19

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Design                                                            0           20              0             0             0           20
 Demolition                                                        0          390              0             0             0          390
   Total GROSS COST DETAILS                                        0          410              0             0             0          410

FINANCING DETAILS
  Elect Dist Replacement Res                                       0       ( 410)              0             0             0        ( 410)
    Total FINANCING DETAILS                                        0       ( 410)              0             0             0        ( 410)


Project Description
This project provides for the demolition of the former City Electrical Buildings located at Avenue B and 19th Street. The buildings will
be demolished and the land prepared for potential inclusion for sale as a package with the A.L. Cole site.

General Comments
A Phase II Site assessment has been completed on the property and determined that remedial site measures are not required. The
balance of the funding will be used to complete an asbestos assessment in the building and develop a plan for removal in preparation
for demolition. There is a 24-inch water line running under the building, which will have to be relocated, by the Public Works branch of
the Infrastructure Services Department prior to demolition.

Additional Information
For the redevelopment of the A.L. Cole site and adjacent lands:
P1710 (A.L. Cole Site Master Plan) included the 19th Street location in the design plan funded in prior years.
P1617 proposes to move the water main under the former City Electrical Building in 2005 to prepare the building site for development.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1876 TENNIS COURT-ACRYLIC SURFACE

                                                              2004            2005           2006          2007          2008
                                                           BUDGET            PLAN           PLAN          PLAN          PLAN          TOTAL
GROSS COST DETAILS
 Surface Coating                                                    30            30            30            30             30           150
   Total GROSS COST DETAILS                                         30            30            30            30             30           150

FINANCING DETAILS
  Civic Bldgs Compr Mtce                                         ( 30)         ( 30)         ( 30)          ( 30)         ( 30)        ( 150)
    Total FINANCING DETAILS                                      ( 30)         ( 30)         ( 30)          ( 30)         ( 30)        ( 150)


Project Description
This project provides for the reapplication of the acrylic protective coating to existing tennis courts to prevent deterioration of the asphalt
base, and reapplication of the court lines.

General Comments
In the 1998 Operating Budget, City Council approved an annual provision to the Civic Buildings Comprehensive Maintenance Reserve
in the amount of $30,000, which was intended to be used for tennis court surface coating to prevent deterioration and extend the useful
life of the tennis court. The reserve provision was not intended to fund any major reconstruction or upgrading of a tennis court.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1881 ELECTRONIC DOCUMENT MGMT SYS

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Hardware & Software Implementation                                0         305           100           250            50           705
   Total GROSS COST DETAILS                                        0         305           100           250            50           705

FINANCING DETAILS
  Unfunded                                                         0       ( 305)       ( 100)        ( 250)          ( 50)       ( 705)
   Total FINANCING DETAILS                                         0       ( 305)       ( 100)        ( 250)          ( 50)       ( 705)


Project Description
This capital project provides for the installation of an electronic document management system throughout the corporation in order to
manage the electronic records of all staff and to decrease the volume and cost of storing and retrieving paper records. The system has
now been implemented in the City Clerk's Office.

General Comments
The project was started in 2000 as a project of the City Clerk's Office. In 2002 the initial phase of the project, which relates mostly to
the requirements of the City Clerk's Office has been completed. In 2004 the project will become a corporate project under management
of the Corporate Information Services Branch. A consultant will be retained to confirm whether the software chosen meets the needs of
the entire corporation. Once the software is chosen, it will become part of the standard operating desktop suite of products available on
all civic computers.

Consulting                                    $30,000
Server Hardware                                75,000
Backup/Archive                                 75,000
Foremost Licenses (100)                        50,000
Sharepoint PS Licences (750)                   75,000
                                             $305,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1886 VICTORIA AVE RETAINING WALL

                                                              2004            2005          2006          2007           2008
                                                           BUDGET            PLAN          PLAN          PLAN           PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                        0           43              0             0             0             43
   Total GROSS COST DETAILS                                          0           43              0             0             0             43

FINANCING DETAILS
  Unfunded                                                           0        ( 43)              0             0             0          ( 43)
   Total FINANCING DETAILS                                           0        ( 43)              0             0             0          ( 43)


Project Description
This project involves the rehabilitation of the retaining wall on Victoria hill at the base of Nutana Collegiate. The wall is showing signs of
severe deterioration and will require rehabilitation, replacement or elimination.

General Comments
Funding requested in 2005 is for the design and selective demolition and repair of the existing wall.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1890 EXPRESSWAY ROAD PRESERVATION

                                                          2004           2005          2006         2007          2008
                                                       BUDGET           PLAN          PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Construction                                                 210        1,460          900           900          900         4,370
   Total GROSS COST DETAILS                                   210        1,460          900           900          900         4,370

FINANCING DETAILS
  Infrastructure Res - Surface                             ( 210)     ( 1,460)        ( 900)       ( 900)        ( 900)      ( 4,370)
    Total FINANCING DETAILS                                ( 210)     ( 1,460)        ( 900)       ( 900)        ( 900)      ( 4,370)


Project Description
This project funds annual preservation programs to rehabilitate high-volume, limited access expressways. The objective is to minimize
the life cycle cost of preserving the expressways, subject to minimum acceptable levels of service. This program has been in place
since 1999.

General Comments
Expressways represent approximately 7% of Saskatoon's roads by surface area. Over the past several years, volumes, loads and the
number of axles (which accelerates deterioration) have been increasing. The structural condition of these roads is being monitored
along with surface condition. The proposed 2004 program was originally based on 1999 surface data and 2001/2002 structural data
and has been updated from 2003 condition rating where this information is available.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1895 CIRCLE DR/108TH ST OVERPASS REHAB

                                                             2004            2005      2006          2007         2008
                                                          BUDGET            PLAN      PLAN          PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Resurfacing Structure                                            35              0        0             0            0             35
   Total GROSS COST DETAILS                                       35              0        0             0            0             35

FINANCING DETAILS
  Res For Cap Expenditures                                     ( 35)              0        0             0            0          ( 35)
   Total FINANCING DETAILS                                     ( 35)              0        0             0            0          ( 35)


Project Description
This project involves removing the asphalt wearing surface and repairing any concrete delaminations, replacing the waterproofing
membrane and resurfacing with a polymer modified asphalt, raising the expansion joint bulkheads to improve ride and reduce impact
loads, and installing lateral restraint to bearings at the abutments.

General Comments
The asphalt wearing surface is in poor condition. The existing deck joints need replacement. There is some evidence of lateral
movement at abutments and the girders are deteriorating.

In 2004 repair includes resurfacing the structure near the abutments, extending the expansion joints and applying permanent pavement
markings.

Prior Budget Approvals                          $40,000
Prior years' funding allowed for the rehabilitation design which is proceeding.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1900 LOCAL ROADS DEFERRED MAINTENANCE BACKLOG

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Construction                                                1,155         1,155         1,500         1,500              0        5,310
   Total GROSS COST DETAILS                                  1,155         1,155         1,500         1,500              0        5,310

FINANCING DETAILS
  Infrastructure Res - Surface                             ( 1,155)      ( 1,155)     ( 1,500)       ( 1,500)             0      ( 5,310)
    Total FINANCING DETAILS                                ( 1,155)      ( 1,155)     ( 1,500)       ( 1,500)             0      ( 5,310)


Project Description
This project is an annual preservation program required for 5-10 years to reduce the deferred maintenance liability relating to local
roads. The objective of this program is to carry out restoration of those roads displaying excessive cracking or pavement deformations.
This program has been in place since 1998.

General Comments
This program is intended to reduce the deferred maintenance liability identified when the condition of the local road network was first
evaluated in 1995. The primary focus is on restoration of the roads, returning them to a near-new condition. The proposed 2004
program was originally based on 1999 data but has been updated from 2003 condition rating where this information is available.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1909 FIRE - THERMAL IMAGING CAMERA

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Thermal Imaging Camera                                           45           45             0                0          0            90
   Total GROSS COST DETAILS                                       45           45             0                0          0            90

FINANCING DETAILS
  Res For Cap Expenditures                                     ( 45)             0            0                0          0          ( 45)
  Unfunded                                                         0         ( 45)            0                0          0          ( 45)
   Total FINANCING DETAILS                                     ( 45)         ( 45)            0                0          0          ( 90)


Project Description
This project is to place on each front line fire apparatus, one (1) thermal imaging camera by the year 2005.

General Comments
The purchase of these cameras (3 in 2004) will increase the department's capabilities in search and rescue techniques when victims
are lost or trapped. It also gives the fire fighter increased accuracy in detecting hidden and smoldering fires, thus preventing excessive
damage. This will be the third year of this acquisition project.

Prior Budget Approvals (4 cameras)                     $70,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1910 FIRE - RESCUE TOOL SYSTEM

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Rescue Tool System                                               45            90             0              0             0          135
   Total GROSS COST DETAILS                                       45            90             0              0             0          135

FINANCING DETAILS
  Res For Cap Expenditures                                      ( 45)            0             0              0             0          ( 45)
  Unfunded                                                          0        ( 90)             0              0             0          ( 90)
   Total FINANCING DETAILS                                      ( 45)        ( 90)             0              0             0        ( 135)


Project Description
This project provides for the planned purchase and replacement of vehicle extrication hydraulic rescue tools.

General Comments
In addition to required replacement due to age and service life, this project will equip all front line rescue equipped pumpers with up-to-
date rescue tools and provide an increased capability for efficient and timely response to rescue incidents in all areas of the city.
Rescue tools are used to extract victims from entrapment caused by vehicle accidents or other situations.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1911 FIRE - NEW STATION - EAST SASKATOON

                                                              2004             2005          2006           2007             2008
                                                           BUDGET             PLAN          PLAN           PLAN             PLAN      TOTAL
GROSS COST DETAILS
 New Fire Station - East Saskatoon                                    0       1,935               0              0              0       1,935
   Total GROSS COST DETAILS                                           0       1,935               0              0              0       1,935

FINANCING DETAILS
  Unfunded                                                            0     ( 1,935)              0              0              0    ( 1,935)
   Total FINANCING DETAILS                                            0     ( 1,935)              0              0              0    ( 1,935)


 Project Description
This project provided for the purchase of a fully-equiped apparatus and the construction of a standard fire station to be located in
Lakewood Suburban centre.

General Comments
Standard NFPA 1710 establishes benchmark response times of 4 minutes for the "first-in" unit or single unit response and 8 minutes for
all apparatus dispatched to a full first alarm assignment. This standard specifies safe and effective emergency response standards for
all services provided by Saskatoon Fire and Protective Services (SFPS) in the City of Saskatoon. In order to maintain the benchmark
4 and 8-minute response times for Sutherland, Fire Station No. 5 will remain in its existing location.

The Lakewood Suburban Centre location would provide service within the 4-minute first-in response to East College Park, Briarwood,
and Lakeridge in addition to being able to provide the same response into the new growth areas of Rosewood and Brookside. It would
also be strategically placed to contribute to the 8-minute full first alarm response on the east side of the City in compliance with NFPA
1710.

Placement of the fire station is key to the effective and efficient delivery of emergency services to residents in all areas of the City. This
fire station will be a standard fire station, and will be staffed by hiring 20 additional fully equipped firefighters, and by the purchase of a
new fully equipped apparatus.

A report previously tabled at Council on October 6, 2003, dealt with the justification of the need for this fire station.

Prior Budget Approvals                          $225,000 Purchase of Land

Operating Impact
The cost of 20 additional fully equipped firefighters is $1,045,605 annually and the impact to the operating budget for station and
equipment is estimated to be $93,400 per year on a continual basis.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1913 FIRE - HOSE AND HOSE EQUIPMENT

                                                             2004             2005        2006          2007          2008
                                                          BUDGET             PLAN        PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchase                                                25             0          25               0          25             75
   Total GROSS COST DETAILS                                        25             0          25               0          25             75

FINANCING DETAILS
  Res For Cap Expenditures                                      ( 25)             0            0              0            0         ( 25)
  Unfunded                                                          0             0        ( 25)              0        ( 25)         ( 50)
   Total FINANCING DETAILS                                      ( 25)             0        ( 25)              0        ( 25)         ( 75)


Project Description
This project provides for the replacement of fire fighting hose and the purchase of hard hose reel systems.

General Comments
Fire & Protective Services are currently expected to maintain a specified amount of various sizes of fire hose on all fire apparatus. This
is to provide one complete exchange load for each fire apparatus and maintain a small inventory of fire hose so that damaged and
destroyed fire hose can be replaced immediately on site.

Current inventory consists of the following different sizes and types of fire hose:
         • 24 mm single jacket weeping fire hose
         • 45 mm double woven jacket rubber lined fire hose
         • 65 mm double woven jacket rubber lined fire hose
         • 100 mm rubber supply line fire hose
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1914 FIRE - NEW STATIONS -WEST SASKATOON

                                                              2004             2005          2006           2007             2008
                                                           BUDGET             PLAN          PLAN           PLAN             PLAN     TOTAL
GROSS COST DETAILS
 New Fire Station - West Saskatoon                                    0             0          200         1,935              200      2,335
   Total GROSS COST DETAILS                                           0             0          200         1,935              200      2,335

FINANCING DETAILS
  Unfunded                                                            0             0       ( 200)       ( 1,935)           ( 200)   ( 2,335)
   Total FINANCING DETAILS                                            0             0       ( 200)       ( 1,935)           ( 200)   ( 2,335)


Project Description
This project would see the construction of two new fire stations - one in Northwest Saskatoon, and one in Southwest Saskatoon closer
to the higher risk areas. One of the apparatus and necessary staff from the existing Station #2 would be relocated to the new
southwest location. Dividing the existing Station #2 into two stations would enhance the department's ability to meet the national
standard emergency response times as required by National Fire Protection Association Standard (NFPA).
General Comments
Standard NFPA 1710 establishes benchmark response times of 4 minutes for the "first-in" unit or single unit response and 8 minutes for
all apparatus dispatched to a full first alarm assignment. This standard specifies safe and effective emergency response standards for
all services provided by Saskatoon Fire and Protective Services (SFPS) in the City of Saskatoon.

Northwest Development Area
To meet the future response benchmarks in the new area of Hampton Village we need to construct a fire station between Junor Avenue
and Avenue W on 33rd Street. Two possible sites in this vicinity have been identified and further study is ongoing. This general
location would also provide improved response times to the existing areas of Dundonald, Westview, Hudson Bay Park and the new
area of Hampton Village. This location would also enhance the required 8-minute full first alarm assignment in all areas west of
Warman Road/Wanuskewin Drive and north of 22nd Street.

The estimated cost of land, design and construction of a station in this area would be $1,300,000 plus the purchase of a fire engine and
the staff to operate the station on a continual basis.

Montgomery Place Extension
Studies indicate that the construction of another fire station in the vicinity of Circle Drive and 11th Street would have a positive impact
on response times in the neighbourhoods of Fairhaven, Parkridge, Montgomery Place, Southwest Industrial, and Holiday Park. This
would also complement the 8-minute full first alarm assignments on the entire southwest side of the city in cooperation with existing
Fire Stations No. 1 and 2. Looking to the future, this station would contribute to the 8-minute response benchmark into the Exhibition
and CN Industrial areas, once construction of the south Circle Drive Bridge is completed.

The estimated cost of land, design and construction would be $1,500,000 as it is envisioned that this station would include a training
area and storage space for department reserve apparatus and equipment.

A report previously tabled at Council on October 6, 2003, dealt with the justification of the need for this fire station.

Operating Impact:                     $93,400 per year for each station and equipment on a continual basis.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1917 FIRE - BEHAVIOUR TRAINING FACILITY

                                                             2004            2005         2006           2007          2008
                                                          BUDGET            PLAN         PLAN           PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Fire Behaviour Training Facility                                  0            55             0             0             0            55
    Total GROSS COST DETAILS                                       0            55             0             0             0            55

FINANCING DETAILS
  Unfunded                                                         0         ( 55)             0             0             0          ( 55)
   Total FINANCING DETAILS                                         0         ( 55)             0             0             0          ( 55)


Project Description
This project stems from an internationally known program called the Compartment Fire Behaviour Training Program, and this training
involves live fire.

General Comments
This project will enhance our operational capabilities in fire fighting with the purchase of a flashover training compartment which will
provide the safest most effective live fire training available to date. This training provides firefighters with the most realistic of fire
conditions taking the fire up to and through flashover. It provides firefighters with knowledge of the signs leading up to flashover and
how to tactically manage the atmosphere to avoid flashover, backdrafts and fire gas ignitions. The benefits of the program will have far
reaching effects not only for the safety of our personnel, but also on how business is conducted.

The system consists of:

         Material for construction of training compartment                $38,000
         Equipment for operation of training compartment                  $17,000

Operating impact            $15,000 Consists of protective gear, waste fuel to burn, and drywall replacement after burn.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

1918 FIRE - COMMUNICATIONS RENOVATIONS

                                                          2004           2005         2006         2007         2008
                                                       BUDGET           PLAN         PLAN         PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Communications Renovations                                   55             0            0             0            0              55
   Total GROSS COST DETAILS                                   55             0            0             0            0              55

FINANCING DETAILS
  Res For Cap Expenditures                                  ( 55)            0            0             0            0            ( 55)
   Total FINANCING DETAILS                                  ( 55)            0            0             0            0            ( 55)


Project Description
This project reflects the acquisition of accessory equipment necessary to supplement the computer aided dispatch system and the
trunked radio system currently in use in the communications and information management division.

General Comments
A study has been done by Occupational Health and Safety, and it was determined that adjustable ergnomical furnishings are essential
and required by OHS to maintain efficiency and promote workplace well being. These furnishings will allow dispatchers to operate at
any function level independent of each other.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1919 FIRE - RADIO REPLACEMENT

                                                            2004            2005          2006          2007         2008
                                                         BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Radio Replacement Program                                         0            0          480           740              0        1,220
   Total GROSS COST DETAILS                                        0            0          480           740              0        1,220

FINANCING DETAILS
  Unfunded                                                         0            0        ( 480)        ( 740)             0      ( 1,220)
   Total FINANCING DETAILS                                         0            0        ( 480)        ( 740)             0      ( 1,220)


Project Description
This project provides for the replacement of all current portable and mobile radios within the Fire and Protective Services Department.

General Comments
Currently the field portables are eight years old, are reaching the end of their useful life and the warranty has now expired. The mobile
radios in vehicles are reaching fours years old and have a life expectancy of six or seven years. As maintenance requirements are
expected to increase, this plan would provide for the timely replacement of all radios.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1920 FIRE - TURNOUT GEAR REPLACEMENT

                                                            2004            2005           2006      2007          2008
                                                         BUDGET            PLAN           PLAN      PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Fire - Turnout Gear Replacement                                180              0            0           0            0          180
    Total GROSS COST DETAILS                                    180              0            0           0            0          180

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 180)             0            0           0            0        ( 180)
   Total FINANCING DETAILS                                    ( 180)             0            0           0            0        ( 180)


Project Description
This project involves the purchase of replacement turnout gear for Fire Fighting staff.

General Comments
A program of replacement of turnout gear has been ongoing within the Fire & Protective Services Department over the past number of
years. Due to the costs involved, the current program will take a number of years to complete and the current issue of gear is
deteriorating faster than it can be replaced through the current program. At this time it has become an Occupational Health and Safety
issue and requires replacement of a large number (103 sets) of turnout gear.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1932 CITY HALL NORTH WING ELEVATOR

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Purchase & Installation                                            0          245              0             0             0            245
   Total GROSS COST DETAILS                                         0          245              0             0             0            245

FINANCING DETAILS
  Unfunded                                                          0       ( 245)              0             0             0        ( 245)
   Total FINANCING DETAILS                                          0       ( 245)              0             0             0        ( 245)


Project Description
This project involves the installation of an elevator car and machinery into the vacant elevator shaft on the North Side of City Hall.

General Comments
Only one elevator was installed when the North Side addition to City Hall was constructed in 1984. Current building use results in the
existing elevator performance to be below the minimum industry standard. City Hall staff and visitors have complained for some time
that the existing elevator is too slow. The elevator machinery manufacturer conducted an analysis of the existing single elevator
installation. It revealed a round trip time of 81 seconds which is considered a poor performance rating.

The existing elevator cannot be modified sufficiently to raise its performance level above the current service level. The only option
available to improve elevator service in the building is to add a second elevator. A spare elevator shaft was included in the original
construction of the North Side to allow for the future addition of a second elevator. The addition of a second elevator to the North side
would cut the elevator grouping's round trip time in half and provide a good overall performance rating.

Operating Impact
Year 2006      $6,300
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1938 PLAYSTRUCTURE UPGRDE AND REPL

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 General Repairs                                                  60           60            60             60            60           300
 Replace/Rebuild Playstructures                                   90           90            90             90            90           450
   Total GROSS COST DETAILS                                      150          150           150            150           150           750

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 150)             0             0             0             0         ( 150)
  Unfunded                                                         0        ( 150)        ( 150)        ( 150)        ( 150)         ( 600)
   Total FINANCING DETAILS                                    ( 150)        ( 150)        ( 150)        ( 150)        ( 150)         ( 750)


Project Description
This project involves the repair and modification of the City's 109 play structures located throughout the City's playgrounds to address
safety concerns, and the phased rebuilding or replacement of old structures that cannot be repaired.

General Comments
The budgeted amount for general repairs represents funds to repair and modify various play structures as recommended by Marsh
Canada, a consultant who was retained to assess the condition of all the play structures throughout the City. The replace/rebuilt
component will be allocated on a priority basis to the replacement and rebuilding of specific structures that are heavily utilized but can
no longer be repaired.

Prior Budget Approvals $450,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1952 JOHN AVANT PK BOARDWLK REMOVE

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                       0           60             0              0             0            60
   Total GROSS COST DETAILS                                         0           60             0              0             0            60

FINANCING DETAILS
  Unfunded                                                          0        ( 60)             0              0             0         ( 60)
   Total FINANCING DETAILS                                          0        ( 60)             0              0             0         ( 60)


Project Description
The project provides for taking corrective action to deal with the hazardous condition of the wooden boardwalk in John Avant Park.

General Comments
The park was developed and built around 1991, and subsequently turned over to the City to be maintained. In the mid 1990's it
became apparent that there was significant vertical movement of the supporting structure of the wooden boardwalk on the south side of
the storm water retention pond.

In 1998, a consultant retained to do a geotechnical investigation reported that the observed distress on the structure was most likely
due to a combination of factors including frost heave and ice jacking of the piles as well as erosion and settlement of the abutment fills.
Measurements taken at the time of maintenance and inspection show that there is significant ongoing movement every year. The
boardwalk slopes anywhere from 7.5 " to 10" from inside to outside over its approximate 8' span.

It is proposed that the existing boardwalk, abutments and concrete pilings be removed in the winter of 2005. In the spring of 2006, the
area will be restored and an asphalt pathway installed a short distance from the lake. The cost to remove the boardwalk and restore the
area complete with an asphalt pathway is estimated at $60,000.

If the decision were to retain the existing boardwalk, the cost to remove and replace it with a more stable structure is estimated at
$150,000. However, given the unstable soil conditions and the likelihood of further maintenance/safety issues in the long term, even
with a new installation, it is recommended that the boardwalk not be replaced.
                         2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                               PROJECT DETAILS ($'000s)

1963 CORPORATE ACCESSIBILITY POLICY

                                                            2004            2005          2006          2007         2008
                                                         BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Policy & Guidelines Development                                   0           75             0             0             0            75
   Total GROSS COST DETAILS                                        0           75             0             0             0            75

FINANCING DETAILS
  Unfunded                                                         0        ( 75)             0             0             0         ( 75)
   Total FINANCING DETAILS                                         0        ( 75)             0             0             0         ( 75)

Project Description
This project consists of the development of a comprehensive policy on the issue of accessibility for the City of Saskatoon.

General Comments
The policy will identify a vision, key strategies to achieve that vision, key stakeholders, and desired outcomes. Such a policy
development will require research, public consultations, preparing an implementation plan and developing a sustainable resource plan
to implement the City's role in pursuing the policy directive.

Currently a number of access-related service initiatives have been undertaken throughout City departments. These include:
    • handicapped access to, and in, facilities, both for the public and employees,
    • provision of special needs transit services,
    • audible pedestrian signals,
    • disabled parking zones,
    • installation of sidewalk ramps,
    • special emphasis on winter sidewalk conditions,
    • an active Employment Equity Program,
    • provision of special needs leisure programs,
    • administering civic grants to external agencies supporting special needs clients,
    • zoning and development bylaws which encourage accessible housing.
A comprehensive policy is required to set desired benchmarks, identify gaps and set priorities to address accessibility issues on a city-
wide basis.

A consultant will be hired to carry out this project.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1977 LOCAL AREA NETWORK & DATA SECURITY

                                                            2004           2005          2006          2007         2008
                                                         BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Local Area Network & Data Security                               0          130          205             35             0             370
   Total GROSS COST DETAILS                                       0          130          205             35             0             370

FINANCING DETAILS
  Unfunded                                                        0       ( 130)        ( 205)         ( 35)             0           ( 370)
   Total FINANCING DETAILS                                        0       ( 130)        ( 205)         ( 35)             0           ( 370)


Project Description
This project provides for the improved physical and electronic security of Information Technology to ensure no unauthorized access to
City applications and data as identified in the Prosser and Associates Security Audit Report.

General Comments
The need to improve the security of the computing environment and protect the City from unauthorized access is based on a growing
concern in the industry. A lot of this concern originates from the events where organizations have had their computing environments
compromised by hackers. It is estimated that electronic attacks are costing North American businesses billions of dollars annually (IT
World article).

The Audit Report recommended the CIS Department improve the physical and electronic security of IT assets and to ensure there is no
unauthorized access to City applications and data. To establish a comprehensive system security architecture across the entire
organization and to provide the foundation for a well controlled, managed and secure environment. Corporate information security
policies, standards and guidelines are required to reduce the risk of unauthorized access and system unavailability.

Objectives:
• Physical security of IT assets
• Logical access to network and applications
• Vulnerability testing
• Intrusion monitoring
• Network access and desktop management


In 2005 it is proposed to purchase hardware which would give the corporation intrusion protection rather than intrusion detection.

Operating Impact            2006 Content management annual maintenance               $20,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1985 TIME AND ATTENDANCE TRACKING

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Time and Attendance Tracking                                      0         325              0             0             0          325
   Total GROSS COST DETAILS                                        0         325              0             0             0          325

FINANCING DETAILS
  Unfunded                                                         0       ( 325)             0             0             0       ( 325)
   Total FINANCING DETAILS                                         0       ( 325)             0             0             0       ( 325)


Project Description
This project involves the implementation of a time and attendance tracking system for the City of Saskatoon. The current HR/Payroll
system does not have a comprehensive time and attendance-tracking module (T&A). The T&A system will be integrated into the
current HR/Payroll system in order to provide a seamless environment for the capture and reporting of staff attendance and time on the
job.

General Comments
Time and attendance systems address the growing needs of management to schedule and allocate workers' time efficiently. The
system collects time and leave information from a variety of sources and locations. It is a cost effective method of tracking accurate
and consistent format of information; decentralized data capture with centralized control.

Features and benefits include:
    • Flexibility to address the needs of a corporation (up-front for absence or shift scheduling, central entry point for payroll and
        leave information, and after the fact employee absence tracking).
    • Time and leave information can be collected from a variety of sources and locations (intranet, internet, network, card swipe
        system, etc.).
    • Payroll submissions can be routed to corporate payroll, using common interface.
    • Leave data is maintained in the T&A system and used for attendance tracking, using either a standard report delivered by the
        vendor, or developed ad-hoc reports via queries to address specific corporate or departmental needs. (Examples include at-a-
        glace summary, or leave patterns to determine rates for controllable vs. non-controllable absences).
    • Most have built-in workflow or approval process (with audit trail) and interface with applications as needed (corporate payroll,
        general ledger account number validation, etc).

Project cost breakdown
Software                                                                        $ 150,000
Hardware                                                                           25,000
Consulting                                                                        100,000
Staffing                                                                           50,000
                                                                                 $325,000

Operating Impact
Annual Maintenance                                     $27,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1989 e-SERVICE ENHANCEMENT

                                                            2004            2005         2006           2007         2008
                                                         BUDGET            PLAN         PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 E-Government Strategy                                          100             0             0             0             0          100
 Portal Development                                             150             0             0             0             0          150
   Total GROSS COST DETAILS                                     250             0             0             0             0          250

FINANCING DETAILS
  C.I.S. Development Reserve                                 ( 150)             0             0             0             0        ( 150)
  Res For Cap Expenditures                                   ( 100)             0             0             0             0        ( 100)
   Total FINANCING DETAILS                                   ( 250)             0             0             0             0        ( 250)


Project Description
City Council has discussed, on a number of occasions, various concepts pertaining to how the City interacts with its customers. The
City of Saskatoon conducted a comprehensive Customer Service Survey and Analysis, which indicated a demand for the delivery of
certain services on-line. The recommendations to pursue on-line services were approved by Senior Management and City Council. It
is acknowledged that customers do not necessarily want to come to City Hall to do their City business or, conversely, when they do
come to City Hall, they do not appreciate that they may have to deal with more than one staff member on the issues they need to have
addressed. The purpose of this project is to enhance the City's Internet site to allow for Electronic Service Delivery (ESD), to both
internal and external customers.

General Comments
In 2004 this project represents funding for a project that will enable the City to provide services on the WEB based on the Electronic
Service Delivery Strategy developed by outside consultants, with direction from the Electronic Service Delivery Committee.

Also, this project will cover funding to purchase WEB Portal Software and implementation services. This Portal will enable a number of
key functions, which include:
          • Personalization
          • Application Integration
          • Business Intelligence
          • Online Payment Engine
          • Search Engine
          • Content Management
          • Security and Administration Tools

Proposed expenditures for 2004 are as follows:

Portal Software and Implementation Services                      150,000 (Funded)
Develop ESD Solutions                                                     100,000 (Unfunded)
Total                                                                   $250,000

Prior Budget Approvals $270,000

Operating Impact                     $20,000 (Annual maintenance for Portal Software)
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

1995 TRANSPORTATION POLICY INDEX MEASURES

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Design                                                           0           50             0             0            0            50
   Total GROSS COST DETAILS                                       0           50             0             0            0            50

FINANCING DETAILS
  Unfunded                                                        0        ( 50)             0             0            0          ( 50)
   Total FINANCING DETAILS                                        0        ( 50)             0             0            0          ( 50)


Project Description
This project is an extension of the Integrated Transportation Policy Study in that performance indicators are required in order to
evaluate the extent of the success of the policies. The measures would be used on a regular basis after that time and conducted
through the annual operating budgets. The recent Traffic Control Audit confirmed that these indices are required in order to report on
performance of the City's transportation network.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

1996 RIVERBANK SLOPE FAILURE

                                                             2004           2005          2006           2007         2008
                                                          BUDGET           PLAN          PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Landscape, Lighting & Walk Repair                                90             0             0             0             0               90
   Total GROSS COST DETAILS                                       90             0             0             0             0               90

FINANCING DETAILS
  Res For Cap Expenditures                                     ( 45)             0             0             0             0         ( 45)
  Private Donations                                            ( 45)             0             0             0             0         ( 45)
    Total FINANCING DETAILS                                    ( 90)             0             0             0             0         ( 90)


Project Description
The purpose of this project is to reconstruct some of the soft and hard landscape features that were present at this site prior to slope
failure.

General Comments
The 2004 funding will provide for final grading of the site damaged by the landslip, including placing topsoil over the entire area and
seeding it to dryland grass. It will also complete replacement of the asphalt walkway, and walkway and bridge lighting. The project will
re-install, in accordance with new planting design, the plant material that was present prior to the landslip.

Meewasin Valley Authority has agreed to provide funding of $45,000 to this project.

Prior Budget Approvals                       $610,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

1999 EQUIPMENT STORAGE SHED-CITY YARDS

                                                             2004             2005          2006          2007          2008
                                                          BUDGET             PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Equipment Storage Shed                                            40          550              0              0             0           590
   Total GROSS COST DETAILS                                        40          550              0              0             0           590

FINANCING DETAILS
  V&E Acquisition/Disposal Reserve                              ( 40)        ( 550)             0              0             0        ( 590)
   Total FINANCING DETAILS                                      ( 40)        ( 550)             0              0             0        ( 590)


Project Description
This project consists of constructing a new garage at the City Yards on the parking lot adjacent to the existing truck shed. The garage
will be used for housing vehicles and equipment. The project includes a proposed structure similar in size, design and construction to
the "patrol shed" and also includes the relocation of the existing parking lot (84 serviced stalls) to the old asphalt plant site (estimated
room for approximately 150 stalls).

Prior Budget Approvals                       $15,000
Prior budget approvals were for determining the needs of the Public Works Branch at the City Yards and providing a more accurate
estimate.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2000 25TH STREET EXTENSION/REHABILITATION

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 1st Ave/Spadina - Construction                                    0             0       3,000              0              0           3,000
 1st Ave/Spadina - Streetscape                                     0             0       1,400              0              0           1,400
 1st Ave/Idylwyld - Construction                                   0             0           0          2,900              0           2,900
 1st Ave/Idylwyld - Streetscape                                    0             0           0            990              0             990
   Total GROSS COST DETAILS                                        0             0       4,400          3,890              0           8,290

FINANCING DETAILS
  Arterial Road Reserve                                            0             0             0       ( 120)              0        ( 120)
  Elect Dist Extension Res                                         0             0         ( 30)         ( 30)             0          ( 60)
  Streetscape Reserve                                              0             0     ( 1,370)        ( 960)              0      ( 2,330)
  Transportation Infrastructure Expansion                          0             0             0     ( 1,570)              0      ( 1,570)
  Unfunded                                                         0             0     ( 3,000)      ( 1,210)              0      ( 4,210)
    Total FINANCING DETAILS                                        0             0     ( 4,400)      ( 3,890)              0      ( 8,290)


Project Description
This project involves the rehabilitation, geometric improvements and streetscaping of the existing 25th Street, between 1st Avenue and
the University Bridge and the extension of 25th Street from 1st Avenue to Idylwyld Drive as a four lane divided arterial roadway.

The project would be staged dependant upon funding and implementation of the Warehouse Local Area Plan. One stage of this project
involves the rehabilitation of 25th Street from the University Bridge to 1st Avenue. This will include a curb-to-curb reconstruction of the
roadway that expands the width and provides additional left turn storage bays. In addition, this component of the project will be
streetscaped. The original design proposed the widening of the roadway to be taken off the south side, but after public consultations
the design was changed to take equal portions off both sides. This resulted in a cost increase to the project from previous estimates.

The other stage of the project involves extending 25th Street to Idylwyld Drive complete with streetscape treatments.

General Comments
As a major arterial roadway, 25th Street is one of the major roadways leading into and out of the Central Business District. The current
operational capacity of 25th Street during peak hours is at capacity and improvements are required.

The extension of 25th Street to Idylwyld Drive has been identified in the City's future transportation network. This connection will
provide an efficient and safe link to and from Idylwyld Drive and provide access to adjacent land.

Notes
Capital Project No. 1749 (25th Street Streetscape Project) has been combined into this project.

Prior Budget Approvals              $220,000
Prior funding was for streetscape and geometric design and for a geotechnical and environmental investigation.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2002 CIRCLE DR/COLLEGE DR INTERCHANGE

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                       0       9,900         2,800               0             0       12,700
 Power Line Relocate                                                0           0           200               0             0          200
 Street Lighting                                                    0          50           300               0             0          350
    Total GROSS COST DETAILS                                        0       9,950         3,300               0             0       13,250

FINANCING DETAILS
  Gen PPD Services-General                                          0            0           500              0             0           500
  Transportation Infrastructure Expansion                           0     ( 1,395)             0              0             0      ( 1,395)
  Unfunded                                                          0     ( 8,555)      ( 3,800)              0             0    ( 12,355)
    Total FINANCING DETAILS                                         0     ( 9,950)      ( 3,300)              0             0    ( 13,250)


Project Description
This project involves the preparation of the detailed design and construction for the grade separation of Circle Drive and College Drive.

General Comments
This intersection currently carries 58,200 vehicles per day and is ranked fifth on the highest volume intersections in the City. All four
intersections which currently carry more daily traffic than this intersection are already grade separated.

The funding requirements and phased construction of the interchange is as follow:

Year     Funding Requirement         Description
2005             $4,560              Construction of 6 Lane Structure
                                     (no roadwork included except for completion of College Drive median)
                      340            Relocation of Primary Water Main
                       50            Street Lighting Associated with the Structure
                    5,000            Construction of Roadworks to make the Interchange Completely Functional

2006                  200            Relocation of the 25kV Powerline
                      300            Street Lighting Associated with Roadworks
                    1,500            Balance of Perimeter Roadworks and Augmentation
                    1,300            Sound Attenuation Construction
                      500            General Prepaid Engineering Services Reserve Repayment,
                                     Re., Fill Material in 2003

Financing
At it's meeting on March 10, 2003, City Council approved the excavation and hauling of fill material from the Willowgrove
neighbourhood (P1396) to the planned Circle Drive/College Drive interchange location in order to construct the approach
embankments. The General Prepaid Engineering Services Reserve was used as the interim funding source for this work at an
estimated cost of $500,000. The General Prepaid Engineering Services Reserve will be repaid from the other proposed funding
sources for 2006.

Prior Budget Appprovals                                 $750,000
The work in 2003 involved the detailed roadway geometric design, the detailed design of the overpass bridge structure and placement
of embankment fill material for the overpass structure. The construction of an interchange at this location can be phased and
incrementally built. The ultimate interchange will require the relocation of an existing 25 kV distribution line.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2008 CIRCLE DR/11TH ST INTERSECTION IMP'S

                                                            2004              2005        2006              2007      2008
                                                         BUDGET              PLAN        PLAN              PLAN      PLAN         TOTAL
GROSS COST DETAILS
 Design & Construction                                        3,500              0            0                0          0         3,500
   Total GROSS COST DETAILS                                   3,500              0            0                0          0         3,500

FINANCING DETAILS
  Res For Cap Expenditures                                   ( 875)              0            0                0          0        ( 875)
  Government Infrastructure Program                        ( 1,700)              0            0                0          0      ( 1,700)
  Transportation Infrastructure Expansion                    ( 925)              0            0                0          0        ( 925)
    Total FINANCING DETAILS                                ( 3,500)              0            0                0          0      ( 3,500)


Project Description
This project involves the widening of the existing intersection at Circle Drive and 11th Street, including left turn bays, median
construction and upgrading existing railway crossings. As well, widening the existing road surfacing on 11th Street from Avenue W to
Circle Drive including concrete curbing, and the addition of two southbound lanes on Circle Drive from Clancy Drive to 11th Street, will
be completed as part of the intersection improvements.

General Comments
Due to the completion of the Circle Drive and 22nd Street Interchange and the expansion of retail/commercial/industrial properties
within the southwest quadrant of the City (including properties outside of the City limits), the demand on this intersection has increased.
The narrow width of the existing intersection only allows for one lane of traffic in each direction on 11th Street. This causes delays for
through vehicles, some of which proceed through the intersection on the shoulder in a dangerous manner. The existing railway warning
controls crossing 11th Street are too narrow to accommodate roadway widening and will require removal and upgrading. These
improvements will improve the traffic flow through the intersections, increase safety by reducing delay and provide a safer railway
crossing through use of automated gates.

This project will be subject to approval of a request for funding under the Canada Saskatchewan Infrastructure Program.


Operating Impact                                                 Mill Rate                  Non-Mill Rate

Snow and Ice Management                                          $4,600
Paved Street Maintenance                                          1,900
Sidewalk Maintenance                                                500
Street Cleaning/Sweeping                                          1,500
Drainage                                                                                           400
                                                                 ---------                  ------------
                                                                 $8,500                           $400
                                                                 =====                      =======
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2009 CIRCLE DRIVE BRIDGE WIDENING

                                                              2004            2005          2006           2007          2008
                                                           BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Design & Construction                                               0             0        6,000               0             0        6,000
   Total GROSS COST DETAILS                                          0             0        6,000               0             0        6,000

FINANCING DETAILS
  Transportation Infrastructure Expansion                            0             0     ( 1,570)               0             0      ( 1,570)
  Unfunded                                                           0             0     ( 4,430)               0             0      ( 4,430)
    Total FINANCING DETAILS                                          0             0     ( 6,000)               0             0      ( 6,000)


Project Description
This project will allow for the widening of Circle Drive from Attridge Drive to Millar Avenue including the modification of the existing
structures of Circle Drive bridge using a cantilever design to add a third lane in both directions, including detailed design, structural
girders and concrete decking, barriers, driving surface, lighting, signing and pavement markings.

General Comments
Due to the expansion of the residential properties in the south and east, and the increasing commercial/industrial properties to the
north, the demand of vehicular traffic crossing this bridge is increasing. Currently, morning and afternoon peak periods result in
extremely congested conditions. The addition of a third lane in both directions will allow all traffic to/from Attridge Drive an independent
lane crossing the bridge. This will aid in the reduction to the congestion resulting from the merging of traffic from three to two lanes on
both sides of the bridge. Expansion joints of existing lanes will be replaced in 2006 as described in P1526.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

2010 TRAFFIC DEMAND MGMT STRATEGY

                                                          2004           2005          2006         2007          2008
                                                       BUDGET           PLAN          PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Strategy Development                                            0          50             0             0            0            50
    Total GROSS COST DETAILS                                     0          50             0             0            0            50

FINANCING DETAILS
  Unfunded                                                       0        ( 50)            0             0            0         ( 50)
   Total FINANCING DETAILS                                       0        ( 50)            0             0            0         ( 50)


Project Description
Transportation Demand Management (TDM) is a general term for strategies that result in more efficient use of transportation resources.
There are examples of successful TDM programs in use throughout North America (cycling improvements, transit incentives, employee
programs) that may be appropriate for a medium sized city such as Saskatoon. This project proposes to identify potential TDM tools
and the evaluation of the level of success that they could have if implemented in Saskatoon.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2011 TRANSPORTATION MODEL REPLACEMENT

                                                           2004            2005          2006          2007         2008
                                                        BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchase                                              25            0             0             0             0           25
 System Development                                               0          175             0             0             0          175
   Total GROSS COST DETAILS                                      25          175             0             0             0          200

FINANCING DETAILS
  Transportation Infrastructure Expansion                     ( 25)       ( 175)             0             0             0        ( 200)
    Total FINANCING DETAILS                                   ( 25)       ( 175)             0             0             0        ( 200)


Project Description
This project involves the purchase of a new transportation demand forecasting software package, staff training and the eventual
development of a new City Transportation Model using the new software.

General Comments
Currently, a software package known as Tmodel/2® is used to forecast travel demands and analyze the impacts of various land use
and network scenarios. The City's transportation model using Tmodel/2® was developed in 1990 and is still in use today. Since then,
more sophisticated software packages have been developed. Tmodel/2® is an old DOS based software which is now outdated. As
multi-million dollar decisions are being based upon the output of the model, it is crucial that the model be replaced with a newer model
to accurately reflect today's and projected travel demands.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

2012 CLARENCE AVE/CNR OVERPASS

                                                           2004           2005            2006        2007        2008
                                                        BUDGET           PLAN            PLAN        PLAN        PLAN        TOTAL
GROSS COST DETAILS
 Construction                                               2,817             0                  0       0            0        2,817
   Total GROSS COST DETAILS                                 2,817             0                  0       0            0        2,817

FINANCING DETAILS
  Arterial Road Reserve                                    ( 650)             0                  0       0            0        ( 650)
  Private Donations                                      ( 1,925)             0                  0       0            0      ( 1,925)
  Transportation Infrastructure Expansion                  ( 242)             0                  0       0            0        ( 242)
    Total FINANCING DETAILS                              ( 2,817)             0                  0       0            0      ( 2,817)

Project Description
This is a joint project with Canadian National Railway (CNR) and the City of Saskatoon to construct a grade separation of the CNR
Watrous Subdivision railway crossing at Clarence Avenue South.

General Comments
The partnership agreement for this project was approved by City Council on September 22, 2003. The total project cost is $2,817,000
with the CNR contributing $1,925,000.

Operating Impact                            Mill Rate                             Non-Mill Rate

Snow and Ice Management                       1,500
Paved Street Maintenance                        700
Sidewalks                                       200
Street Cleaning/Sweeping                        600
Bridges/Subways/RRX's/Overpasses              1,500 in Year 1 increasing
                                                     to $5,920 in Year 10
Drainage                                                                                  200
                                            ---------                             ------------
                                            $4,500                                      $200
                                            =====                                 =======
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2013 CIRCLE DR/AIRPORT DR GRADE SEPARATION

                                                             2004            2005         2006          2007         2008
                                                          BUDGET            PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Construction                                                      0             0          200             0      10,000         10,200
   Total GROSS COST DETAILS                                        0             0          200             0      10,000         10,200

FINANCING DETAILS
  Transportation Infrastructure Expansion                          0             0            0             0      ( 1,570)      ( 1,570)
  Unfunded                                                         0             0       ( 200)             0      ( 8,430)      ( 8,630)
    Total FINANCING DETAILS                                        0             0       ( 200)             0    ( 10,000)     ( 10,200)
Project Description
This project involves the construction of a grade separation at Circle Drive and Airport Drive.

General Comments
This intersection carries 43,800 vehicles daily and is among the highest volume intersections in the city. Furthermore, of the thirteen
major transportation projects awaiting implementation, this intersection is ranked fourth on the priority list.

Although it is generally accepted that under existing conditions the implementation of this project could be delayed until beyond 2008,
there are development scenarios that could change the implementation date. For instance, the proposed Hampton Village
development on the west side and the corresponding construction of Cynthia Street extension would increase traffic at this location
which would accelerate the need for an interchange.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

2014 SURVEY EQUIPMENT PURCHASES

                                                          2004           2005         2006          2007         2008
                                                       BUDGET           PLAN         PLAN          PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Equipment Purchases                                            0           50           50            50           50              200
   Total GROSS COST DETAILS                                     0           50           50            50           50              200

FINANCING DETAILS
  Unfunded                                                      0         ( 50)        ( 50)        ( 50)         ( 50)       ( 200)
   Total FINANCING DETAILS                                      0         ( 50)        ( 50)        ( 50)         ( 50)       ( 200)


Project Description
The provision of engineering survey services for design, construction and record keeping purposes requires digital survey and GPS
equipment compatable for data integration with the corporate GIS system. This project provides for the amortization of new and
replacement Total Station and GPS systems and the associated equipment required for engineering survey operations.

Special Note
There is a report to City Council pending, which is recommending the creation of a Survey Equipment Reserve. Upon approval, the
source of funding will be changed from Unfunded to Survey Equipment Reserve.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2028 POLICE STORAGE AREA NETWORK

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchase                                                 0             0          250           100           100            450
   Total GROSS COST DETAILS                                         0             0          250           100           100            450

FINANCING DETAILS
  Police Equipment & Technology Res                                 0             0       ( 250)        ( 100)        ( 100)         ( 450)
   Total FINANCING DETAILS                                          0             0       ( 250)        ( 100)        ( 100)         ( 450)


Project Description
This project will provide storage space for historical records and offsite duplicate copy for backup and continuity of service. It provides
an expanded and redundant repository for data for Windows file system, Databases, Unix filespace and raw space for IBM/Informix
Database. For Windows and SIMS, this space will provide the capacity to store future text, scanned documents, and select
voice/video data clips.

Operating Impact
The operating budget is estimated to increase by $10,000 per year to cover dark fibre optic usage costs. Expected increases of $5,000
per year for service contract agreements and repair of hardware after the 3 year warranty period has expired.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2029 POLICE NETWORK UPGRADES

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Equipment Purchases                                             50             0             0          100             0           150
   Total GROSS COST DETAILS                                      50             0             0          100             0           150

FINANCING DETAILS
  Police Equipment & Technology Res                           ( 50)             0             0       ( 100)             0        ( 150)
   Total FINANCING DETAILS                                    ( 50)             0             0       ( 100)             0        ( 150)


Project Description
This project provides for the upgrading and replacement of obsolete and over extended network infrastructure.

General Comments
Using modern network technology will provide greater capacity for the network infrastructure. This will increase the speed of server-to-
server communications, optimize the network desktop clients, and provide required capacity to handle new data such as streaming
audio/video over our network. Also allow for upgrades to wireless handheld and other mobile devices.

Operating Impact
The operating budget is expected to increase by $2,500 per year beginning in 2005 to cover support costs and another $5,000 per year
beginning in 2008. Warranty repair will cover the first year of the hardware.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2030 POLICE BACKUP FIREWALL FOR OP CONTINUITY

                                                             2004            2005          2006           2007        2008
                                                          BUDGET            PLAN          PLAN           PLAN        PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchases                                               95             0             0             0            0            95
   Total GROSS COST DETAILS                                        95             0             0             0            0            95

FINANCING DETAILS
  Police Equipment & Technology Res                             ( 95)             0             0             0            0         ( 95)
   Total FINANCING DETAILS                                      ( 95)             0             0             0            0         ( 95)


Project Description
This project deals with eliminating the single point of failure of the Police Services computer system firewall.

General Comments
With the increase in off-site police locations the police service will need to purchase a "cluster" configured backup firewall. Clustering
the firewall means less downtime for all outside connections. Connections such as off-site stations and offices, vehicle laptops, city hall
applications and CPIC will be accessed in a quicker and more protected manner.

Operating Impact
Additional software licensing and hardware maintenance costs               $2,000
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

2032 COMMERCIAL SPACE DATA DEVELOPMENT

                                                          2004            2005         2006          2007         2008
                                                       BUDGET            PLAN         PLAN          PLAN         PLAN        TOTAL
GROSS COST DETAILS
 Design                                                        25           15             0             0            0               40
   Total GROSS COST DETAILS                                    25           15             0             0            0               40

FINANCING DETAILS
  Operating Fund Contrib'n                                   ( 25)        ( 15)            0             0            0         ( 40)
   Total FINANCING DETAILS                                   ( 25)        ( 15)            0             0            0         ( 40)


Project Description
This project involves the development of a system for the on-going collection and maintenance of commercial and industrial land and
floor-space data, on a City-wide basis.

General Comments
This project will create a database detailing the location, size and use of commercial/industrial land and floor-space in the City of
Saskatoon. The database will remain current through the use of updates from city business processes, including business licensing,
building permits and assessment information. This information will be available to internal and external users through the enhancement
of geographic information systems, providing reliable data for analysis and projections in planning for commercial and industrial
development. This project is funded through the Business License Program, as approved by City Council on February 24, 2003.

Prior Budget Approvals             $35,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2033 NBHD PROFILES DEVELOPM'T & DISSEMINATION

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Design                                                          60          100            60            10             0          230
   Total GROSS COST DETAILS                                      60          100            60            10             0          230

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 60)            0             0             0             0          ( 60)
  Unfunded                                                        0       ( 100)         ( 60)         ( 10)             0        ( 170)
   Total FINANCING DETAILS                                    ( 60)       ( 100)         ( 60)         ( 10)             0        ( 230)


Project Description
The use of demographic and development information in policy formulation, program planning and program delivery is essential both
internally and in the larger community. This project enhances this function. The budget reflects a personnel resource to focus on
analysing data, creating the profiles, and developing a web base for the Profiles. The budget also reflects as much as $10,000 per year
in the first two years for additional data.

The Neighbourhood Profiles and related reports have been funded from the operating budget with existing staff and about $6,000 worth
of data purchased each year. The Neighbourhood Profiles have been an important tool for monitoring physical and social development.
Council Committees and several recent audits have called for ongoing monitoring of quality of life, housing and race relations
indicators. Given the increased expectations for monitoring, this project develops a comprehensive indicator model that increases the
information available for decision-making.

The demands of monitoring to evaluate policy and programs require making sense of information. This project will tie together
preliminary work on performance indicators to produce a monitoring and reporting system that describes the strengths and weaknesses
of the community and provide a tool for guiding the community's response to our common challenges. The City's model of indicators
monitors nine features of community life from demographics to employment, education to land use at the neighbourhood level. In
addition, the City of Saskatoon is a partner in the Federation of Canadian Municipalities Quality of Life Reporting System that monitors
similar features of community life for Saskatoon and 20 other Canadian Municipalities. Together these indicators show us that in the
late 1990's Saskatoon's strengths were our economy, affordability and community participation and our weakness were in crime, justice
and health. At the local level, indicators map neighbourhoods most in need. This project will update these indicators and focus
reporting on policy and program areas of concern to city council.

The need for monitoring and evidence based decision-making is shared with other community partners. Collaboration of community
partners has highlighted the need for integrated data and analysis tools, analytical resources and a common framework for monitoring
community status and the impact of policy and programs. Currently, individual partners are resourcing in house analysis and sharing
data but are not benefiting from a comprehensive analysis of indicators and monitoring. This project will combine resources with
partners such as the Saskatoon Health Region to provide analyses that benefit the Community as a whole.

The research and analyses generated through this project will result in the enhanced Neighbourhood Profiles featuring analysis of local
quality of life trends and will be shared with partners and the public through a web based application. Partners and the public will be
able to view information on the city and its people, download and print this information in text, graphics and maps. This enhances the
community's ability to acquire and use information for community and economic development initiatives. Finally, the project will create a
comprehensive monitoring system and report to support policy and spending decisions on public policy.

Project 2031 (Demographic Search Tool) is now combined with this project.

General Comments
1. Data development: obtain and analyse a broader range of socio-economic data related planning decisions and policy development.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2033 NBHD PROFILES DEVELOPM'T & DISSEMINATION

Specifically we will be acquiring data that enhances our ability to monitor the housing, social and economic circumstances of Saskatoon
people.
2. Information dissemination: this project makes a broad range of information available to corporate and public clients through a web
based application.
3. Products: Enhanced Neighbourhood Profiles, Community Quality of Life Indicators, and web based information and mapping.
4. Contribute to intersectoral cooperation by sharing and analyzing data with Community Partners.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2034 LOCAL AREA PLAN IMPLEMENTATION

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 LAP Implementation                                            300           250           190           160           160         1,060
   Total GROSS COST DETAILS                                    300           250           190           160           160         1,060

FINANCING DETAILS
  Res For Cap Expenditures                                   ( 300)            0             0             0             0        ( 300)
  Unfunded                                                        0       ( 250)        ( 190)        ( 160)        ( 160)        ( 760)
   Total FINANCING DETAILS                                   ( 300)       ( 250)        ( 190)        ( 160)        ( 160)      ( 1,060)


Project Description
This project involves the implementation of the approved Local Area Plans developed under Capital Project #1852. This project
includes funds to finish the implementation of the Pleasant Hill Local Area Plan as well as continue with implementation of the following
Local Area Plans:
     • Sutherland
     • Nutana
     • King George
     • Caswell Hill
     • Warehouse District
     • Airport Industrial
     • West Industrial

General Comments
In November 2002, City Council directed Administration "to prepare future budgets for these resources in a manner which reduces
ongoing request from the Reserve for Capital Expenditures in an amount of $210,000 ($60,000 from project No. 1852 and $150,000
from project No. 2034) to an ongoing request from general revenue at the rate of $60,000 per year starting in Budget year 2004"
(recommendation 7, File No. PL4110-10). This process has started with a $60,000 transfer from project No. 1852 for 2004.

Seven Local Area Plans have been adopted by City Council since 1998. Local Area Plans contain recommendations that are intended
to improve a local neighbourhood over the medium to long term. Each Local Area Plan requires resources, usually over and above
normal operating resources, to fulfill the recommendations of each Local Area Plan.

Implementation is important to sustain and improve conditions within Saskatoon's core neighbourhoods and generate greater
confidence amongst residents in the future of these important areas of Saskatoon.

Prior Budget Approvals              $300,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2036 CORPORATE MAPPING SERVICES SYSTEM UPGRD

                                                            2004          2005          2006          2007         2008
                                                         BUDGET          PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Research & Info Resource Ctr Upgrd                               36            0           0             0             0            36
   Total GROSS COST DETAILS                                       36            0           0             0             0            36

FINANCING DETAILS
  Res For Cap Expenditures                                     ( 36)            0           0             0             0         ( 36)
   Total FINANCING DETAILS                                     ( 36)            0           0             0             0         ( 36)


Project Description
The Corporation is adopting a new software standard for GIS. The Research & Information Resource Centre Section of the City
Planning Branch requires the purchase of software licenses for professional and technical staff in order to continue providing mapping
services within the GIS environment. The new software standard and data handling requirements necessitate computer upgrades.

This project also includes the upgrade of work surfaces for two staff.

General Comments
The Research & Information Resources Centre Section of the City Planning Branch develops, analyzes and maintains data in support
of Corporate, public and Departmental planning and community development initiatives. This role includes processing graphic data for
map products, maintaining the Corporate site database and producing a variety of map based graphic products for Corporate and
public clients. The products required by business processes such as land development and GIS development extend the current
software and hardware compliment of the section to the limit.

Operating Impact                     $4,725 for annual software support costs
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

2038 IDYLWYLD FREEWAY - RESURFACE NB RAMP

                                                          2004           2005          2006         2007          2008
                                                       BUDGET           PLAN          PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Resurface NB Ramp                                            127             0            0             0            0          127
   Total GROSS COST DETAILS                                   127             0            0             0            0          127

FINANCING DETAILS
  Res For Cap Expenditures                                 ( 127)             0            0             0            0        ( 127)
   Total FINANCING DETAILS                                 ( 127)             0            0             0            0        ( 127)

Project Description
This project involves the removal and replacement of the existing asphalt wearing surface and protective membrane. As well, there is a
small amount of deck repair that is required.

Comments
Resurfacing and membrane replacement of this ramp was last done in 1995. Emergency repair of asphalt that had been shoved in the
curbside right hand lane was completed in 2002.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2040 UNDERWATER PIER INSPECTIONS

                                                             2004             2005          2006          2007          2008
                                                          BUDGET             PLAN          PLAN          PLAN          PLAN      TOTAL
GROSS COST DETAILS
 Inspections - Consultants                                          0             0             0              0           75       75
    Total GROSS COST DETAILS                                        0             0             0              0           75       75

FINANCING DETAILS
  Unfunded                                                          0             0             0              0         ( 75)    ( 75)
   Total FINANCING DETAILS                                          0             0             0              0         ( 75)    ( 75)

Project Description
Inspection of all river piers is required to ensure the capacity of river crossings as well as monitor scour around the piers.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2041 SPADINA CREEK BRIDGE

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Repair                                                          32             0            0             0             0            32
   Total GROSS COST DETAILS                                      32             0            0             0             0            32

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 32)             0            0             0             0          ( 32)
   Total FINANCING DETAILS                                    ( 32)             0            0             0             0          ( 32)

Project Description
This project involves repairing the Spadina Creek Bridge including the repair and/or replacement of spindles, patching soffit and
miscellaneous patching, power washing and pigmented sealer as well as cobbles to abutments.

General Comments
The Spadina Creek Bridge is in need of architectural reestablishment. This project has been put forward as the result of a request from
the Municipal Heritage Advisory Committee.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2042 CN INDUSTRIAL ROAD & DRAINAGE REST'N

                                                           2004           2005          2006          2007         2008
                                                        BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Road Rehabilitation                                           290             0            0             0             0          290
 Ditch Drainage Restoration                                     55             0            0             0             0           55
    Total GROSS COST DETAILS                                   345             0            0             0             0          345

FINANCING DETAILS
  Infrastructure Res - Surface                              ( 290)             0            0             0             0       ( 290)
  Infrastructure Res - Storm Water                            ( 55)            0            0             0             0         ( 55)
    Total FINANCING DETAILS                                 ( 345)             0            0             0             0       ( 345)

Project Description
This project involves repairs to surface drainage followed by the reconstruction of the complete road surface on Edson Street between
Portage and Jasper Avenues as well as a section of Portage Avenue and a section of Jasper Avenue.

General Comments
The road surface of Edson Street between Portage and Jasper Avenue is in poor overall condition. Poor surface drainage, a high
water table and hearvy truck traffic have caused an 80% structural failure of which 30% has "blown out". As well, a section of Portage
Avenue and a portion of Melville Street have failed completely as a result of the increased trucking in this industrial area. Numerous
culverts were not properly installed and ditch elevations are not to a proper grade to enable adequate surface drainage.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2048 FORESTRY FARM PARK & ZOO MASTER PLAN

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Master Plan Development                                         30            0             0             0             0            30
 Master Plan Implementation                                       0          100           200           200           200           700
   Total GROSS COST DETAILS                                      30          100           200           200           200           730

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 18)             0            0             0             0          ( 18)
  Heritage Fund Reserve                                       ( 12)             0            0             0             0          ( 12)
  Unfunded                                                        0        ( 100)       ( 200)        ( 200)        ( 200)        ( 700)
   Total FINANCING DETAILS                                    ( 30)        ( 100)       ( 200)        ( 200)        ( 200)        ( 730)


Project Description
The scope of this project expanded to include public consultation to update the Forestry Farm Park and Zoo Master plan. City Council
approved the Forestry Farm Park and Zoo Program Plan in 1989. Since the completion of this plan the complexity of usage issues has
increased and interest in providing programs and services in the park by stakeholder interest groups has resulted in the emergence of
special events, new programs, and re-adaptive use of the Superintendent's Residence as a commercial venture. Additionally, since the
site is a National Historic Site (approved in 1994), the City and Parks Canada have signed a Commemorative Integrity Statement. This
agreement recognizes the City needs to take into account all the resources and uses of the site in its planning and operational
decisions and that heritage objectives will be reflected in future planning. An updated program plan is required to provide a
comprehensive framework for future development of an integrated site. The key elements will require a consultant be contracted to
conduct substantial public consultation and be responsible to:
      • Survey key stakeholder groups to identify specific concerns or issues, services provided and future vision as a provider of
          service at the site;
      • Organize and facilitate public meetings to obtain input from the community and interest groups building upon the common
          vision which will now include the commemorative integrity statement;
      • Integrate the stakeholder service plans (recreation, heritage, botanical, and zoological) into a final program plan;
      • Build consensus and integrate recreation, historical, botanical and zoological themes into an integrated program plan that
          provides a shared vision for the site by all the stakeholders. The plan will be used to prepare the concept plan and master
          plan for future development of the site;
      • Identify adaptive re-use of the bunkhouse;
      • Ensure the program plan and concept plan reflects the Commemorative Integrity Statement and the Historic Landscape
          survey and study; and
      • Define conservation and presentation plan that details specific actions.

General Comments
Starting in 2005, subject to finalization of the Master Plan and funding approval, implementation will include such things as design and
construction of a new parking lot, visitor entrance to the zoo and admission booth.

Project 2049 (Forestry Farm Park & Zoo Parking Lot) is now combined with this project.

Prior Budget Approvals              $40,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2064 HERITAGE PROPERTIES IDENTIFICATION

                                                             2004             2005          2006          2007          2008
                                                          BUDGET             PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Heritage Properties Identification                                50             0             0              0             0            50
   Total GROSS COST DETAILS                                        50             0             0              0             0            50

FINANCING DETAILS
  Heritage Fund Reserve                                         ( 50)             0             0              0             0          ( 50)
   Total FINANCING DETAILS                                      ( 50)             0             0              0             0          ( 50)


Project Description
This project involves the identification of significant heritage buildings, structures and properties in Saskatoon, including City-owned
properties, in accordance with recognized standards. In consultation with the respective property owners, these properties will then be
reviewed for appropriate actions, including possible designation as municipal heritage property, placement on the heritage holding
bylaw, or other methods of conservation and/or recognition.

General Comments
A general scanning of significant heritage properties in the City was last undertaken about 25 years ago. This resulted in Bylaw 6770,
the City's heritage "Holding Bylaw", which identified 42 properties in the City that are thought to have heritage merit. Demolition of
these properties is subject to City Council review. In anticipation of the City's Centenary in 2006 and emerging heritage programs from
senior levels of government, a comprehensive review of important heritage properties is considered appropriate at this time.

This project will develop updated criteria for the identification of significant heritage properties based on nationally recognized
standards. The criteria will be applied to the City as a whole to provide a current list of significant heritage properties, including a re-
evaluation of the properties now listed in the Holding Bylaw. An action plan will be developed to determine if these properties are best
suited for designation as municipal heritage property, for placement in the Holding Bylaw, or other methods of conservation or
interpretation. Appropriate consultation with property owners, the heritage community and the general public will be included.

The action plan would be intended for implementation by the Administration in due course.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2065 POLICE ENHANCED SYSTEMS SECURITY

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Equipment Purchases                                              0           50             0             0             0            50
   Total GROSS COST DETAILS                                       0           50             0             0             0            50

FINANCING DETAILS
  Police Equipment & Technology Res                               0         ( 50)            0             0             0         ( 50)
   Total FINANCING DETAILS                                        0         ( 50)            0             0             0         ( 50)


Project Description
This project provides for enhanced security measures for access to and to communicate between internal, external and national police
information systems.

General Comments
The purpose of this project is to adopt the national standards in user authentication and information access and communication within
the police community and their new partners. This will become a mandatory requirement of the CPIC Renewal project and the
Canadian Public Service Information Network (CPSIN).

It is expected the RCMP will become the certificate authority of choice for the Saskatoon Police Service. This will involve becoming a
member of their Public/Private Key Infrastructure (PKI) which will include strong user authentication (using an assigned security device)
and secured communications (using Virtual Private Networks (VPNs) and data encryption techniques).

Operating Impact
Support and replacement of the user security devices                     $5,000
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2066 POLICE HANDHELD COMPUTERS

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchases                                                0             0           40            40            40              120
   Total GROSS COST DETAILS                                         0             0           40            40            40              120

FINANCING DETAILS
  Police Equipment & Technology Res                                 0             0         ( 40)         ( 40)         ( 40)        ( 120)
   Total FINANCING DETAILS                                          0             0         ( 40)         ( 40)         ( 40)        ( 120)


Project Description
This project provides for remote access using handheld wireless devices.

General Comments
Officers on foot or bike patrol duties presently have no computer access. Handheld computer devices would provide such access,
allowing Officers to be out within the community rather than continuously attending police vehicles or in the police station to utilize
computer information systems. This figure is based on $2,500 per unit and quantities of 15 units.

Operating Impact
Usage agreements and repair of hardware and license costs                  $10,000
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

2067 POLICE DESKTOP NETWORK COMPUTER REPLACE

                                                          2004           2005          2006         2007          2008
                                                       BUDGET           PLAN          PLAN         PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Equipment Purchases                                             0            0         100           100          100           300
   Total GROSS COST DETAILS                                      0            0         100           100          100           300

FINANCING DETAILS
  Police Equipment & Technology Res                              0            0       ( 100)       ( 100)        ( 100)        ( 300)
   Total FINANCING DETAILS                                       0            0       ( 100)       ( 100)        ( 100)        ( 300)


Project Description
The current in-house desktop computers have an anticipated useful life of 5 - 7 years. This project addresses the eventual replacement
of these assets.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2068 POLICE GEOGRAPHICAL POSITIONING SYSTEM

                                                             2004           2005          2006           2007         2008
                                                          BUDGET           PLAN          PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchases                                              25             0             0             0             0              25
   Total GROSS COST DETAILS                                       25             0             0             0             0              25

FINANCING DETAILS
  Police Equipment & Technology Res                            ( 25)             0             0             0             0            ( 25)
   Total FINANCING DETAILS                                     ( 25)             0             0             0             0            ( 25)


Project Description
This project provides for the technology to track the movement of police vehicles, display them on a Communication Centre map and
retain information for future possible analysis.

General Comments
The Geographic Positioning System (GPS) will capture the location coordinate of the vehicle on an ongoing basis. The coordinate will
be fed to in-car notebook for uploading to our host computer over the radio network. The host computer will store this information in the
police data for future possible analysis and send the latest vehicle coordinate on to the Communication's map server for vehicle display
on a fleet wall map.

Not only does this provide a higher degree of officer safety, but also data analysis in the case of high speed chase re-creation, follow-
up on public complaints, etc.

On the in-car notebook, the system would be able to display on an electronic city map, the position of the vehicle in relation to the
address calling for service on a dispatch.

Prior Budget Approvals               $15,000

Operating Impact
Equipment maintenance and software subscription costs $2500 in 2004
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2070 POLICE DETENTION VIDEO STORAGE SYSTEM

                                                              2004             2005       2006          2007          2008
                                                           BUDGET             PLAN       PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Detention Storage System                                            0             0        325              0             0          325
   Total GROSS COST DETAILS                                          0             0        325              0             0          325

FINANCING DETAILS
  Police Fac Renovation Res                                          0             0     ( 325)              0             0        ( 325)
   Total FINANCING DETAILS                                           0             0     ( 325)              0             0        ( 325)


Project Description
This project provides for an upgrade to the present Detention video storage and retrieval system.

General Comments
Installation of this equipment will provide the Service with the following benefits:

         •    Long term storage of visual events occurring in the Detention Centre.
         •    A visual record of the condition of prisoners at the intake and release stage.
         •    A visual record of the actions of prisoners while in custody.
         •    A visual record of the actions taken by our police officers during the booking, holding and release stages of a prisoner's
              stay in the Detention Centre.
         •    A reduction in the time with respect to Public Complaints Investigation
·
Operating Impact
Yearly operating costs and maintenance of the system of approximately $4,000 and possibly $40,000 in staffing costs to manage the
system and handle requests from the justice system.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2071 POLICE CENTRAL AVENUE REPORTING CENTER

                                                             2004           2005           2006        2007          2008
                                                          BUDGET           PLAN           PLAN        PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Community Police Station                                         92             0            0             0            0            92
   Total GROSS COST DETAILS                                       92             0            0             0            0            92

FINANCING DETAILS
  Res For Cap Expenditures                                     ( 92)             0            0             0            0          ( 92)
   Total FINANCING DETAILS                                     ( 92)             0            0             0            0          ( 92)

Project Description
This project provides for the establishment of a police reporting center in Sutherland.
General Comments
The 2004 funds will be used to renovate the Sutherland Fire Hall to accommodate a Central Avenue reporting center which would be
accessible to the public for 10 hours of the day, seven days a week.
Operating Impact
2004
The Central Avenue reporting center will be staffed with one position. Four police constables will be hired in 2004 to properly cover the
position 365 days per year.
          Staffing costs     $85,200 (fall hire 4 recruits)
          Operating costs $ 4,000 (May-Dec)
                             $89,200
2005
          Staffing cost endload      $101,600
          Operating cost endload $ 2,000
                                     $103,600
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2075 CY FAC BOOKING & PROG REGISTRATION SYS

                                                             2004            2005          2006           2007    2008
                                                          BUDGET            PLAN          PLAN           PLAN    PLAN         TOTAL
GROSS COST DETAILS
 Web Enable New System                                             0          130              0             0         0          130
   Total GROSS COST DETAILS                                        0          130              0             0         0          130

FINANCING DETAILS
  Unfunded                                                         0        ( 130)             0             0         0       ( 130)
   Total FINANCING DETAILS                                         0        ( 130)             0             0         0       ( 130)


Project Description
This project involves the replacement of the Facility Booking and Program Registration systems in the Leisure Services Branch of the
Community Services Department.

General Comments
In 2003, Stage 1 of the project was approved to implement appropriate replacements for these two functional systems and deploy them
into the City's existing client server network (either through purchase or in-house development).

In 2005, Stage II of the project includes provision for "Online Internet-based" program registrations.

Costs are as follows:

Stage II - 2005
e-connect Module Implementation         $76,800
Hardware Costs                           10,000
Consulting and Training                   9,000
Staff Backfill Requirements              15,000
Annual Maintenance Fee                   19,200
Grand Total Stage II                   $130,000

Prior Budget Approval                                           $158,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2095 SNT- BUS PURCHASES

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 SNT Bus Purchases                                                0             0           90            90             0            180
   Total GROSS COST DETAILS                                       0             0           90            90             0            180

FINANCING DETAILS
  SNT - Replacement Reserve                                       0             0        ( 35)         ( 35)             0          ( 70)
  Other                                                           0             0        ( 55)         ( 55)             0        ( 110)
   Total FINANCING DETAILS                                        0             0        ( 90)         ( 90)             0        ( 180)


Project Description
This project provides for the scheduled replacement of existing lift-equipped buses used in the delivery of Special Needs
Transportation.

General Comments
The life expectancy of the lift-equipped buses is between five (5) and seven (7) years depending on the preventive maintenance
schedule, hours of running time, and kilometers operated. A replacement plan has been set up for the buses based on their life
expectancy. In order to achieve the extended life above five years (5), the vehicles will be staged for service to ensure hours and
kilometers are spread out and that the older and higher mileage vehicles are sold or used as back up.

Other funding consists of the City making application for cost sharing under the Provincial Transit for Disabled Fund (TDF).

Special Note
This project is subject to operating budget approval and establishment of a SNT Replacement Reserve provision.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2097 TRANSIT- BUS SEAT REPLACEMENT

                                                            2004            2005          2006          2007        2008
                                                         BUDGET            PLAN          PLAN          PLAN        PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchases                                              60           60            60            0             0          180
   Total GROSS COST DETAILS                                       60           60            60            0             0          180

FINANCING DETAILS
  Transit Vehicle Replacement Res                              ( 60)         ( 60)         ( 60)           0             0        ( 180)
    Total FINANCING DETAILS                                    ( 60)         ( 60)         ( 60)           0             0        ( 180)


Project Description
This Project provides for the replacement of all bus seats with high quality seats over a 3-year period.

General Comments
These high quality seats are built for the severe wear and tear, which the bus and the operator put on them. The quality of these new
seats would allow saving on maintenance costs which are becoming very costly to maintain and some of the repair parts are hard to
obtain due to obsolescence. The new seats are also ergonomically friendly and will aid in the prevention of back problems which will
result in less workers' compensation claims.

The plan is to replace 25 seats per year at an estimated cost of $60,000 for the next three years. In three years 85% of the seats for
the entire bus fleet will be replaced with the balance to be replaced when new buses are purchased.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2099 TRANSIT- PLANNING AND SCHEDULING SYSTEM

                                                            2004           2005          2006          2007         2008
                                                         BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Transit Planning & Scheduling System                             0           85          155           180              0          420
   Total GROSS COST DETAILS                                       0           85          155           180              0          420

FINANCING DETAILS
  Transit Capital Projects Reserve                                0         ( 85)       ( 155)        ( 180)             0        ( 420)
    Total FINANCING DETAILS                                       0         ( 85)       ( 155)        ( 180)             0        ( 420)


Project Description
This project involves purchasing and implementing software tools and products designed to increase productivity, accurateness and
accountability of each respective area of Transit Planning and Scheduling, Customer Service and Operations.

General Comments
Purchase and implementation of software tools and products designed to increase productivity, accurateness and accountability of
each respective area of Transit Planning and Scheduling, Customer Service and Operations.

The current runcutting method consisting of a combination of a DOS based program and manual manipulation to produce routing and
operator signups will be replaced in order to produce accurate routing and schedules.

The current customer route information system, Teleride, will be replaced with an information system that draws route, run and stop
information directly from a runcutting, routing and scheduling system providing up-to-date route schedule information, accurate next bus
information and general, route-specific or stop-specific service bulletins to the public.

Transit planning software will be implemented to easily identify more efficient vehicle and staff deployment, allow scenario modeling
and trend analysis reducing costly changes, ridership collection and analysis, forecasting and longe-range transit planning.

All the information delivery channels: the information, planning and dispatch operator bidding sytems must rely on the same backend
runcutting/routing/scheduling system to guarantee consistency and accuracy of all transit related information.

The implementation of an operator signup, dispatch and timekeeping software, will be dependent on review of the
Dispatch/Payroll/Charter Team and appropriate interface development between the above software components and the internal
development of the Payroll/Dispatch/Charter system.

Transit Services purchased and implemented Trapeze PASS, a demand responsive scheduling software for its Para transit service
in 2002, which already houses and utilizes the City of Saskatoon base map. The experience with Trapeze has been very positive
throughout implementation, training and support of the PASS product.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2101 GOLF COURSE IMPROVEMENTS & EQUIP REPL.

                                                            2004            2005         2006          2007          2008
                                                         BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Golf Course Equipment Replacement                              145          145           147           147           144           728
 WWGC Irrigation System                                         450            0             0             0             0           450
 HPGC Asphalt Entrance Road                                      95            0             0             0             0            95
 HPGC Asphalt East Parking Lot                                   95            0             0             0             0            95
 SWGC Asphalt Parking Lot                                        85            0             0             0             0            85
 WWGC Asphalt Parking Lot                                         0          120             0             0             0           120
   Total GROSS COST DETAILS                                     870          265           147           147           144         1,573

FINANCING DETAILS
  Productivity Impvm't Loan                                  ( 450)             0            0             0             0        ( 450)
  Golf Course Capital Reserve                                ( 420)        ( 265)       ( 147)        ( 147)        ( 144)      ( 1,123)
    Total FINANCING DETAILS                                  ( 870)        ( 265)       ( 147)        ( 147)        ( 144)      ( 1,573)


Project Description
During 1998, City Council approved the Golf Course Program value-for-money audit recommendation that management develop a
long-term capital plan with sufficient cash flow to fund and finance capital replacement expenditures for the three municipal golf courses
(Holiday Park, Silverwood and Wildwood golf courses). In response to the audit recommendations, in March 2002 City Council
approved the Golf Course Capital Reserve (Bylaw No. 8110). The purpose of the reserve is to finance long-term capital plans that
included replacement of equipment and vehicles, and expansion and redevelopment of course facilities and services.

General Comments
The capital projects for 2004 are:

Equipment Replacement
       Holiday Park:
            Greens Mower                                        $26,000
            Rough Mower                                          21,500
            Utility Carts (2)                                    11,200
       Silverwood:
            Greens Mower                                         26,000
            Fairway Mower                                        30,800
       Wildwood:
            Greens Mower                                         26,000
            Roto Tiller                                           3,500

Irrigation System at Wildwood Golf Course
It is anticipated the design of a comprehensive irrigation system at Wildwood Golf Course will be completed in 2003 ($50,000 prior
year's approval). A new system will replace the existing system, which has proven to be inadequate. An enhanced irrigation system
will improve the condition of the course and increase customer satisfaction.

New Entrance off Fletcher Road at Holiday Park Golf Course
This project involves the relocation of Holiday Park Golf Course's entrance off Fletcher Road. In addition to the main roadway being in
desperate need of repair, problems such as traffic congestion and safety issues have been raised. During the summer, this section of
road has a high volume of traffic from golfers and ball players. It has been determined to relocate the entrance to the golf course based
on ongoing upgrades and it's long-term plan. The long-term plan includes the construction of a new clubhouse facility, which based on
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2101 GOLF COURSE IMPROVEMENTS & EQUIP REPL.

its preliminary design, would make an entrance road off of Fletcher Road more accessible and convenient for golf course patrons.

Asphalt Parking Lots at Holiday Park, Silverwood and Wildwood Golf Courses
This project involves the design, construction, asphalting and line painting of the parking lots, which are currently gravelled. The
enhanced parking lots would be more aesthetically pleasing, provide a better parking surface definition and improve service to the high
volume of golf course patrons.

Special Note
Funding for the irrigation system at the Wildwood Golf Course is a productivity improvement loan, subject to City Council's approval in
early 2004. The loan will be repaid through a $2.00 green fee premium charged to the adult base.

Operating Impact (non-mill rate)             $ 30,000 annually for increased water consumption at Wildwood Golf Course due to
                                             irrigation

                                             $ 4,800 annually for asphalt maintenance for the new entrance off Fletcher Road

                                             $ 4,800 annually for asphalt maintenance for the Holiday Park Golf Course parking lot

                                             $ 4,300 annually for asphalt maintenance for the Silverwood Golf Course parking lot
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2102 SPORTSFIELD DEVELOPMENT

                                                             2004             2005          2006          2007          2008
                                                          BUDGET             PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Sportsfield Development                                            0          270           135               0             0           405
   Total GROSS COST DETAILS                                         0          270           135               0             0           405

FINANCING DETAILS
  Private Donations                                                 0          ( 65)         ( 20)             0             0          ( 85)
  Park Enhancement Reserve                                          0        ( 205)        ( 115)              0             0        ( 320)
    Total FINANCING DETAILS                                         0        ( 270)        ( 135)              0             0        ( 405)


Project Description
This project involves the upgrading and development of Sportsfields to address current and future programming needs for soccer,
softball/slo-pitch and baseball facilities. The project will assist in the development of three Sportsfields.

General Comments
As part of a long-term development program focusing on the continued redevelopment of the City's Sportsfields, staff are working in
conjunction with the Sportsfields Planning Committee (consisting of representatives from Sportsfields user groups) to identify both
immediate and long-term facility development priorities and requirements, including location. The cost estimate to construct a
sportsfield is $135,000 per field which includes design. This project will require financial contribution from the sportsfield user group.
The financial contribution will be the subject of further discussion with the participating groups.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2103 KPR: LANDSCAPE/SITE IMPROVEMENTS

                                                           2004            2005          2006          2007         2008
                                                        BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Design and Construction                                       225              0            0             0             0          225
   Total GROSS COST DETAILS                                    225              0            0             0             0          225

FINANCING DETAILS
  Productivity Impvm't Loan                                  ( 225)             0            0             0             0        ( 225)
    Total FINANCING DETAILS                                  ( 225)             0            0             0             0        ( 225)
Project Description
As part of the Kinsmen Park Rides Development Plan, site improvements include provision for general site grading and landscaping
(site drainage, planting trees, shrubs, grass, etc.), paved walkways, planters, improved fencing and site furnishings (benches, tables,
garbage receptacles, etc.). The proposed improvements will enhance the general condition of the facility for the enjoyment of patrons
visiting the rides.

General Comments
The Kinsmen Park Rides operates a self-financing program in accordance with City of Saskatoon Policy C03-003 (Reserves for Future
Expenditures).

Special Note
Funding for this project is a productivity improvement loan, to be repaid through an increase in Kinsmen Park Ride fees, as approved
by City Council's on December 1, 2003.

Operating Impact (non-mill rate)
                                    $ 1,200 annually for maintenance of new furnishings
                                    $ 1,600 annually for maintenance of landscaping
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2104 GHC/RINKS/ZOO - UPGRADE INFRASTRUCTURE

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Analysis of Underground Utility Service                           50             0             0              0             0               50
   Total GROSS COST DETAILS                                        50             0             0              0             0               50

FINANCING DETAILS
  Res For Cap Expenditures                                      ( 50)             0             0              0             0         ( 50)
   Total FINANCING DETAILS                                      ( 50)             0             0              0             0         ( 50)


Project Description
This purpose of this project is to determine the current condition and life expectancy of underground utility services (water, sanitary
sewer and storm drainage lines) serving the five City-operated indoor rinks, the Saskatoon Zoo and Forestry Farm Park, and the
various facilities within the Gordon Howe Complex. Consultant services are required to inspect and determine the remaining life span
of the utility infrastructure and to provide cost estimates for replacing/upgrading the existing services.

General Comments
The five City-operated indoor rinks, the Saskatoon Zoo and Forestry Farm Park, and various facilities within the Gordon Howe Complex
and related utility services are aging. Kinsmen Arena was opened in 1961and is the oldest of the City-operated rinks. A number of
facilities located in the Gordon Howe Complex were first developed as early as 1960. A section of the water line from Avenue P
(located at the north end of the field at Gordon Howe Bowl) serving the Holiday Park Golf Course has experienced a number of breaks
over the last few years. The Saskatoon Zoo has also experienced several breaks this fall.

Repair/replacement costs for underground utility services located within the facility's property line do not qualify for funding under the
Civic Building Major Repair Reserve. Repair costs are the responsibility of the respective individual facilities. Currently there is no
provision to fund these expenses.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2108 FFP & ZOO REDEVELOPMT OF EAGLE ENCLOSURE

                                                           2004            2005          2006          2007         2008
                                                        BUDGET            PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Design and Construction                                         10           33             0             0             0           43
   Total GROSS COST DETAILS                                      10           33             0             0             0           43

FINANCING DETAILS
  Forestry Farm Park Development Res                          ( 10)            0             0             0             0         ( 10)
  Unfunded                                                        0        ( 33)             0             0             0         ( 33)
   Total FINANCING DETAILS                                    ( 10)        ( 33)             0             0             0         ( 43)


Project Description
This project involves the demolition of the existing cave and replacement with a new gunite shelter and new interior landscaping for the
eagles. Additional funds through the 2004 capital project will allow for the completion of Phase 1 of the project, which is the
construction of the cliff. Phase 2 consists of the completion of the stream and pond within the enclosure and upgrading of the attached
isolation area.

General Comments
A project estimate of $35,000 was provided by an external consultant based on the program specifications identified for the
redevelopment of the interior of the eagle enclosure. During 2003 a more detailed concept design for the program specifications was
prepared. At the detail design stage the estimate increased to $78,000. The original estimate did not include the electrical cost of
$5,000.

The original estimated cost of $35,000 was funded through the Forestry Farm Park Development Reserve.

Prior Budget Approvals              $35,000
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2109 WINTERIZED RIVERBANK WASHROOMS

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Design and Construction                                           0          217              0             0             0           217
   Total GROSS COST DETAILS                                        0          217              0             0             0           217

FINANCING DETAILS
  Unfunded                                                         0        ( 217)             0             0             0        ( 217)
   Total FINANCING DETAILS                                         0        ( 217)             0             0             0        ( 217)


Project Description
This project involves the construction of a year-round (winterized) washroom facility located in the vicinity of the Mendel Art Gallery and
Shakespeare on the Saskatchewan Festival facility. A core washroom facility would serve the needs of riverbank pedestrian traffic (i.e.
walkers, runners, bird watchers) and cross-country skiers during the winter season. The core washroom facility will have male, female,
and family washroom areas. The facility could be built in proximity of a year-round permanent facility being explored with stakeholders
(i.e. Nordic Ski club and Shakespeare on the Saskatchewan Festival) that would allow for a seasonal washroom add-on in response to
anticipated increased demand during the summer. There appears to be adequate land space to build a facility (core and add-on) above
the 1-500 year flood elevation as required by City zoning standards.

General Comments
A 714 square foot year-round core facility contains one male and two female stalls and the family washroom have one stall that permits
access by either male or female adult with children. The cost for the core facility is estimated at $217,000.

The 325 square foot add-on seasonal facility to accommodate Shakespeare on the Saskatchewan Festival use contains three female
and two male stalls costing $86,700. This portion contains two adjoining areas on either side of the core facility and is capable of partial
winter shutdown to reduce operating costs. Interested stakeholders and partners would fund these add-on seasonal washrooms.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2112 SFH - MECHANICAL SYSTEM ASSESSMENT

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Study                                                             0           75              0             0             0            75
   Total GROSS COST DETAILS                                        0           75              0             0             0            75

FINANCING DETAILS
  Unfunded                                                         0         ( 75)             0             0             0         ( 75)
   Total FINANCING DETAILS                                         0         ( 75)             0             0             0         ( 75)


Project Description
This project involves an assessment of the Mechanical System at the Saskatoon Field House.

General Comments
The Saskatoon Field House was built as part of the Canada Summer Games Legacy in 1979. The facility served as a venue for track
and field during the Summer Games and continues to meet the competitive program needs of that sport. The facility has evolved from
a competitive special use track and field/sporting venue to a multi-use sport and physical fitness/wellness venue that serve the
competitive sport participant, general public and people with health conditions. The City of Saskatoon's strategic alliance with
Saskatoon Regional Health (1995) and In Motion Health Promotion Strategy (1999) have resulted in the Saskatoon Field House serving
as a primary program delivery location where preventative and rehabilitative fitness/wellness programs are provided to the general
public and people with existing health conditions.

The significant changes in use of the Saskatoon Field House has resulted in the need to examine air standards required for each
program area and to identify economical mechanical methods to comply with these needs. The mechanical system's ability to supply
sufficient quantity and quality of air should be based on the participant numbers, the health condition of the participants, and the space
function. Because this facility has experienced, and will continue to experience, programming changes and growth in participant use,
there is a need to do an assessment of the total mechanical HVAC (heating, ventilating and air conditioning) system.

This assessment will require expertise from a number of areas and will include air balance testing, temperature monitoring, air quality
testing, and an assessment of mechanical system's ability to meet the requirements. The assessment will make recommendations on
the changes required to the HVAC system to meet current and projected programming needs.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2116 POLICE IN-CAR NOTEBOOK COMPUTER

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Additional In-car Notebook Computers                          125             0             0             0            0             125
   Total GROSS COST DETAILS                                    125             0             0             0            0             125

FINANCING DETAILS
  Police Equipment & Technology Res                         ( 125)             0             0             0            0           ( 125)
   Total FINANCING DETAILS                                  ( 125)             0             0             0            0           ( 125)


Project Description
This project provides for 10 additional notebooks and mounts/docking stations to outfit the Community Liaison Officers (CLO's), patrol
spares and additions to the police vehicle pool.

General Comments
Community Liaison Officers require an in-car notebook system to assist in Community Problem-Solving and in focused policing issues
within their assigned areas.

Similar to the patrol units, these notebooks are expected to add efficiencies to the CLO duties by enabling them to access police
information and communicate electronically while out in the community.

This project began in 2003 and will be completed in 2004.

Prior Budget Approvals              $25,000 two notebooks purchased

Operating Impact
Additional CDPD radio charges, software licensing and hardware maintenance costs: $3,000 in 2003; $8,200 in 2004.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2119 POLICE RADIO REPLACEMENT

                                                             2004           2005          2006           2007         2008
                                                          BUDGET           PLAN          PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchases                                              32            40          360           424              0           856
   Total GROSS COST DETAILS                                       32            40          360           424              0           856

FINANCING DETAILS
  Police Radio Reserve                                         ( 32)         ( 40)       ( 360)         ( 424)             0        ( 856)
   Total FINANCING DETAILS                                     ( 32)         ( 40)       ( 360)         ( 424)             0        ( 856)


Project Description
This project provides for the replacement of police radio equipment.

General Comments
As the radio fleet ages and warranties and their extensions expire, replacements are required. This plan assumes a 7 year warrantied
period followed by an additional year off warranty before an unacceptable level of failure is expected to begin to occur. It allows for an
early replacement of 10% of expiring stock, (in the eighth year of that stock's service), to buffer premature fleet failures.

The roll over of the radio fleet is best done on a rotating basis rather than a wholesale change of stock. This allows time for
programming and installation and spreads out the user learning curve. For example the Mobile fleet will undergo a major change
beginning in 2005 with the majority being renewed in 2006. The Portable fleet will begin renewal in 2007 with another major inventory
replacement expected to occur in 2009.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2120 POLICE DISPATCH CONSUL FURNITURE

                                                            2004               2005    2006         2007         2008
                                                         BUDGET               PLAN    PLAN         PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchase                                               40             0         0            0             0           40
   Total GROSS COST DETAILS                                       40             0         0            0             0           40

FINANCING DETAILS
  Police Radio Reserve                                         ( 40)             0         0            0             0         ( 40)
   Total FINANCING DETAILS                                     ( 40)             0         0            0             0         ( 40)


Project Description
This project provides for the replacement of the dispatch consul furniture.

General Comments
The present dispatch furniture was introduced in 2000 to accommodate the needs at that time which involved three monitors and
computers to operate the CAD and Radio system. The needs have grown beyond the capabilities of this furniture as it can not hold all
of the present equipment. The two issues are space for needed equipment and the weight of this equipment.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2121 POLICE EDU-BOMB SUIT REPLACEMENT

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchases                                              27             0             0             0           27              54
   Total GROSS COST DETAILS                                       27             0             0             0           27              54

FINANCING DETAILS
  Police Equipment & Technology Res                            ( 27)             0             0             0        ( 27)          ( 54)
   Total FINANCING DETAILS                                     ( 27)             0             0             0        ( 27)          ( 54)


Project Description
This project will allow for the Backup Explosives Disposal Technician to be adequately equipped to provide support to the Primary
Explosives Technician in the event of an incident. The project will also allow funds to be in place for the replacement of the current
Primary Bomb Suit which was purchased in 2001 and has a serviceable life of 7 years.

General Comments
Members of the Explosives Disposal Unit are the designated responders to high risk incidents involving improvised explosives devices
or suspicious packages. These members are able to respond to these incidents with a higher degree of safety than the regular patrol
members because of their special training and equipment.

Presently only one serviceable bomb suit is available for use. For any incident requiring a backup technician at the immediate scene or
in the event of a rescue of the primary technician there is no serviceable suit available.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2122 POL REMOTE MOBILE INVESTIGATOR REPLACE

                                                              2004            2005          2006          2007           2008
                                                           BUDGET            PLAN          PLAN          PLAN           PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchase                                                  0            0              0             0          105              105
   Total GROSS COST DETAILS                                          0            0              0             0          105              105

FINANCING DETAILS
  Police Equipment & Technology Res                                  0            0              0             0        ( 105)        ( 105)
   Total FINANCING DETAILS                                           0            0              0             0        ( 105)        ( 105)
Project Description
This project provides for the replacement purchase of a Remote Mobile Investigator to aid in police investigation and other situations
where there may be a potential danger to police and other emergency personnel.

General Comments
The remote Mobile Investigator (RMI) is a six-wheeled w/wo track electrical powered piece of equipment. It is remote controlled and
equipped with cameras allowing the operator to stay out of harm's way while the RMI can go into a building, up or down stairs, and
approach a suspect or suspicious package with no danger to anyone.

It is equipped with a two-way intercom allowing the operator to speak and hear a suspect. It is also equipped with various telescopic
arms and claw hands capable of lifting 80 kg and applying pressures of 9 - 27 kg. This allows it to pickup and deal with suspicious
packages.

Its major advantage is the ability to approach a package, move it to a safe position, and destroy it with a water discharge. This unit
would not only benefit the Explosive Disposal Unit, but would also benefit the following:
                                  • Arson & Fire Detail
                                  • Emergency situations involving hazardous goods
                                  • Hostage incidents
                                  • Entry of unstable buildings after an explosion, etc.

The presently utilized Police Mobile Investigator was a prototype purchased in 1997. Since the acquisition of this unit it has been
returned to the inventor for major overhauls on several occasions. Costs associated to repair since delivery is in excess of $18,000.

Even with the service work the unit does not function in a reliable manner thus jeopardizing the safety of Officers utilizing it. Since
delivery this unit has not completed a single mission training or operation with out some type of breakdown.

The proposed unit for replacement has been developed by a well-known manufacturer of RMI's and is presently utilized by most major
centers. The unit has been found to be reliable and easily maintained by those agencies.

The present unit is usable but not reliable. The possibility of selling of this unit to another police agency is questionable due to the
reliability issue. The possibility of sale to other than police is unknown.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2123 POLICE FIREARMS REPLACEMENT

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchase                                                0             0           92              0             0             92
   Total GROSS COST DETAILS                                        0             0           92              0             0             92

FINANCING DETAILS
  Police Equipment & Technology Res                                0             0         ( 92)             0             0         ( 92)
   Total FINANCING DETAILS                                         0             0         ( 92)             0             0         ( 92)


Project Description
This project provides for the replacement of the firearms in the marked vehicles in the Policing Services Division and the training of
members in the use of these firearms.

General Comments
Members of the Policing Services Division are the uniformed first responders to calls for service from the public. The issuing of modern
weapons to replace the presently issued police shotgun will reduce the liability of the officer and the Saskatoon Police Service. The
Policing Services Division is responsible for responding to emergency calls for service. These people are the first responders to
serious calls, which may include calls involving firearms and weapons.

Presently the Policing Services Division marked cars are equipped with in-car pump action shotgun. The majority of the shotguns are
twenty years old with ammunition that has pellets that spread in a funnel type pattern.

The Saskatoon Police Service is looking at replacing these present firearms with a more suitable firearm for an urban setting. New
advances in ammunition and firearm technology are allowing for the development of single shot weapons that are a viable alternative to
the shotgun. The use of a single shot firearm would complement the developing policy of the S.P.S. on Rapid Intervention-Immediate
Deployment. This Policy is to deal with situations such as the Columbine High School shootings. Due to the fact that the S.P.S.
maintains only a part-time ERT team, uniformed Officers are first on the scene. By expanding their choice of defensive weapons with a
modern, technologically advanced option will increase the potential to successfully resolve a dangerous incident while limiting liability.

Project estimates include the purchase of 34 firearms, vehicle mounts and training ammunition.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2124 POLICE CAMERA REPLACEMENT

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Equipment Purchase                                              25             0             0             0            0            25
   Total GROSS COST DETAILS                                      25             0             0             0            0            25

FINANCING DETAILS
  Police Equipment & Technology Res                           ( 25)             0             0             0            0          ( 25)
   Total FINANCING DETAILS                                    ( 25)             0             0             0            0          ( 25)


Project Description
This project provides for the replacement of Identification Section cameras.

General Comments
The cameras presently in use in the Identification Section are wearing out and are becoming more susceptible to breakdown. Repairs
are costly and increasingly difficult since the models used were first put on the market in 1990 and are now obsolete. It is a reasonable
quality camera but was designed for amateur use and not intended for specialized police use.

This project proposes the purchase of 10 replacement cameras. The recommended models are more rugged, lightweight, produce a
higher quality photograph and are compatible with existing flash units.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2125 POLICE TASER GUN

                                                             2004           2005          2006           2007         2008
                                                          BUDGET           PLAN          PLAN           PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Equipment Purchase                                                0            62             0             0             0            62
   Total GROSS COST DETAILS                                        0            62             0             0             0            62

FINANCING DETAILS
  Police Equipment & Technology Res                                0         ( 62)             0             0             0         ( 62)
   Total FINANCING DETAILS                                         0         ( 62)             0             0             0         ( 62)


Project Description
This project provides for the supply of 34 tasers for Policing Services members.

General Comments
Members of the Policing Services Division are the uniformed, first responders to calls for service from the public. The availability of 34
tasers, accessible in the patrol vehicle would allow police members a less than lethal use of force option. Many times, officers are
faced with people who are mentally unstable, deranged, hostile or violent. The availability of the taser could bring such situations to a
safe conclusion.

Reasons for the purchase of these items:
•      Less than lethal force option
•      Total incapacitation
•      Officer and public safety

The Taser is a less than lethal use of force option in dealing with people who are a risk to themselves, others and the police. Presently
members are equipped with their expandable baton, pepper spray and their sidearm. A baton requires that members must be in close
contact with the suspect in order to deliver the required blows.

Pepper spray not only requires close contact (five to seven feet) but does not effectively stop all people. The taser has a range of 21
feet and of 400 people tested in one study, 95.55% were totally incapacitated. Due to a number of factors, our present use of force
options do not have the same success rates of total incapacitation. This use of force has been shown to be an effective tool to protect
the public and police officers from those who would do others harm.

Project estimates include the purchase of tasers, projectile consumables and holsters.

Operating Impact
Periodic maintenance of tasers, replacement of compressed nitrogen cartridge.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2131 POLICE IN-CAR VIDEO CAPTURE & RETENTION

                                                              2004            2005          2006          2007          2008
                                                           BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 In-car Video System                                                 0             0         150            300           300             750
    Total GROSS COST DETAILS                                         0             0         150            300           300             750

FINANCING DETAILS
  Police Equipment & Technology Res                                  0             0       ( 150)        ( 300)        ( 300)         ( 750)
   Total FINANCING DETAILS                                           0             0       ( 150)        ( 300)        ( 300)         ( 750)


Project Description
This project provides for the installation of an in-car video system in police vehicles.

General Comments
Not unlike Geographic Positioning System (GPS), in-car video provides one more source of officer safety and accountability.

Initial year is for the request for proposal (RFP) and vendor solution(s) field evaluation phase, capacity planning and video management
processing functional requirements. Projections are based on $10,000 per vehicle with possible dual camera split screen (front & back)
feed.

Capabilities of the system include archiving information by date, time, unit, and officer. Multi-year storage retention, retrieval, and
reproduction will all be possible. The final phase of project will deal with Saskatoon Information Management System (SIMS)
integration.

Operating Impact
The operating budget is estimated to increase by $150,000 per year for equipment support, supplies (in-car - removable disc storage &
in-house - disc and tape media & storage), software licensing and technical & operations support staff.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2132 POLICE ADDITIONAL SPACE REQUIREMENTS

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Temporary Space - Leasehold                                      50          275             0              0            0            325
 Main Facility Renovations - Phase 1                               0        1,250             0              0            0          1,250
 Main Facility Renovations - Phase 2                               0            0         2,800          1,350            0          4,150
 Training Facility                                                 0            0         4,500              0            0          4,500
 Headquarters Expansion                                            0            0         1,100          6,000       10,000         17,100
   Total GROSS COST DETAILS                                       50        1,525         8,400          7,350       10,000         27,325

FINANCING DETAILS
  Productivity Impvm't Loan                                         0       ( 160)             0             0             0         ( 160)
  Res For Cap Expenditures                                      ( 50)            0             0             0             0           ( 50)
  Unfunded                                                          0     ( 1,365)      ( 8,400)      ( 7,350)     ( 10,000)      ( 27,115)
    Total FINANCING DETAILS                                     ( 50)     ( 1,525)      ( 8,400)      ( 7,350)     ( 10,000)      ( 27,325)

Project Description
This project provides a phased approach to meeting the current space requirements of the Saskatoon Police Service as outlined in the
10-year Police Facilities Plan completed by Carruthers Shaw and Partners Limited, Architects, in 2002.
General Comments
The Consultant indicates in their report that the existing Headquarters buildings will require substantial remediation and expansion if it is
to meet the current needs of the Saskatoon Police Services.

 2004 funds would be used to design the necessary leasehold improvements in the Post Office building needed to accommodate
temporary space until the Phase 2 main facility renovation is complete.

In 2005, the leasehold improvements would be completed as well as the design and construction of the Phase 2 main facility
renovations.

Operating Impact
It is estimated that operating costs (lease costs, cleaning, etc.) will increase by approximately $52,000 per year related to temporary
leased space.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2162 STREETSCAPING

                                                             2004            2005          2006          2007          2008
                                                          BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 22nd St: 4th Ave. to Spadina Crescent                           692             0             0             0             0           692
 3rd Avenue Master Plan                                           20             0             0             0             0            20
 23rd St Pk Mall: Post Office Building                            35             0             0             0             0            35
 23rd St Pk Mall: 3rd Ave to 4th Ave                               0             0             0            20             0            20
 Friendship Park Promenade                                        25           500             0             0             0           525
 20th St: Extension Avenue E to H                                  0             0           400             0             0           400
 20th St: Master Plan Ave. H to Ave. P                             0             0             0             0            20            20
    Total GROSS COST DETAILS                                     772           500           400            20            20         1,712

FINANCING DETAILS
  Elect Dist Extension Res                                      ( 15)            0             0              0             0          ( 15)
  Parking Reserve                                               ( 17)            0             0              0             0          ( 17)
  Streetscape Reserve                                         ( 725)        ( 250)        ( 400)          ( 20)         ( 20)      ( 1,415)
  Private Donations                                             ( 15)       ( 250)             0              0             0        ( 265)
    Total FINANCING DETAILS                                   ( 772)        ( 500)        ( 400)          ( 20)         ( 20)      ( 1,712)


Project Description
This project includes the design and construction of comprehensive streetscape projects within the Downtown, Broadway, and
Riversdale Business Improvement Districts. The priority of projects over the next number of years will be determined by the need to
coordinate streetscape projects with underground utility replacement programs, the South Downtown Riverbank development, the
development of Block 146 and with opportunities to create more on-street parking facilities and increase parking revenues, and improve
pedestrian and vehicular safety.

Streetscape component of projects previously reported in project numbers 1140, 1736, 1739 and 1746 have been combined into this
project.

General Comments
22nd Street: 4th Avenue to Spadina Crescent
                           nd             th
This project will turn 22 Street from 4 Avenue to Spadina Crescent into an angled parking mall, adding approximately 17 new parking
                                                                                                                                          th
stalls and will result in increased parking metre revenues. The project will improve the pedestrian and vehicular traffic aspects of the 5
Avenue and Spadina Crescent intersections. Street and pedestrian lighting levels will be improved. The design process will include
consultation with the adjacent property owners and The Partnership.

3rd Avenue Master Plan
This project involves the preparation of a long-term streetscape master plan that will address issues of roadway design, additional on-
street parking, underground utilities, overhead utilities, and street and pedestrian lighting. The design process will include consultation
with the adjacent property owners and The Partnership.

23rd Street Parking Mall: Post Office Building
This project includes the removal of the mail drop off bay, corner bulbing, sidewalk expansion and the addition of approximately five on-
street parking stalls. The project is contingent upon Canada Post proceeding with interior renovations and the creation of an exterior
pedestrian ramp on the sidewalk and their investment of $15,000 on sidewalk adjustments.

Friendship Park Promenade
This project has been brought forward in scheduling due to the desire to coordinate this project with the South Downtown Riverbank
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2162 STREETSCAPING

Project. The 2004 allocation includes the preparation of a design. The 2005 allocation includes construction but is currently contingent
on a $250,000 matching contribution from the Meewasin Valley Authority.

Operating Impact on Mill Rate                                  $4,800 additional cost for street lighting
                                                                  675 for irrigation system
                                                                  625 for tree maintenance
                                                                  617 for planter bed maintenance

Operating Impact funded through Streetscape Reserve            $2,500 for furniture maintenance
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2163 UPGRADING EXISTING STREETSCAPING

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Broadway Streetscape Upgrades                                    0           30              0           30             0            60
 20th Street Streetscape Upgrades                                 0           30              0            0            30            60
   Total GROSS COST DETAILS                                       0           60              0           30            30           120

FINANCING DETAILS
  Streetscape Reserve                                             0         ( 60)             0        ( 30)         ( 30)        ( 120)
    Total FINANCING DETAILS                                       0         ( 60)             0        ( 30)         ( 30)        ( 120)


Project Description
This project includes the re-examination of previously completed streetscape projects in order to add components and correct
deficiencies in order to further enhance the street.

The Upgrading Streetscape component of projects previously reported under project numbers 1140 and 1745 have been combined into
this project.

General Comments
Future Broadway streetscape upgrading will look at further improvements along Broadway Avenue and immediately adjacent areas
within the Broadway Business Improvement District.
         th
Future 20 Street streetscape upgrading will look at further additions or corrections to the portion of streetscape already complete or
minor improvements beyond the area already completed.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2164 STREETSCAPE LIGHTING

                                                              2004            2005          2006           2007          2008
                                                           BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Victoria Brdg Architectural Lighting                                0             0             0              0           50                50
   Total GROSS COST DETAILS                                          0             0             0              0           50                50

FINANCING DETAILS
  Streetscape Reserve                                                0             0             0              0         ( 50)          ( 50)
    Total FINANCING DETAILS                                          0             0             0              0         ( 50)          ( 50)


Project Description
This project includes the addition or upgrading to pedestrian and streetlights. It also includes the provision of architectural lighting to
highlight significant downtown architectural landmarks or structures.

The lighting component previously reported under project number 1741 has been combined with this project.

General Comments
The Victoria Bridge project includes the replacement of old Christmas light decorations with new architectural lighting to highlight the
historical features of the bridge.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2170 NEIGHBOURHOOD SAFETY

                                                            2004            2005          2006          2007          2008
                                                         BUDGET            PLAN          PLAN          PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Risk Assessments/Safety Audits                                   60           60            60              0             0          180
   Total GROSS COST DETAILS                                       60           60            60              0             0          180

FINANCING DETAILS
  Res For Cap Expenditures                                     ( 60)             0             0             0             0          ( 60)
  Unfunded                                                         0         ( 60)         ( 60)             0             0        ( 120)
   Total FINANCING DETAILS                                     ( 60)         ( 60)         ( 60)             0             0        ( 180)


Project Description
Through the Local Area Planning process and regular contract with other neighbourhoods, safety has been identified as a high priority.
This project funds Risk Assessments and Safety Audits based on the principles of Crime Prevention Through Environmental Design
(CPTED) in identified neighbourhoods.

General Comments
CPTED is a tool available to the City of Saskatoon that addresses crime prevention and citizen's perceptions of their safety in a holistic
manner. Engaging residents of the neighbourhood in procedures of Risk Assessment and Safety Audits often leads to practical
solutions for problems in neighbourhoods, parks and business districts.

CPTED principles are evolving as a key strategy to address neighbourhood safety using issue identification, problem solving, solution
generation and partnerships involving the community, Saskatoon Police Services, other civic departments, Business Improvements
(BIDs), and external stakeholders. These partnerships are crucial to attaining a sustainable and effective solution to safety issues in an
area.

Six of the approved Local Area Plans recommend some level of application of CPTED principles through:
     • Risk Assessments of the neighbourhood/area;
     • Safety Audits of specific areas in a neighbourhood;
     • Safety issue identification;
     • Community participation; and
     • Implementation, monitoring, and evaluation of CPTED recommendations.

This process was started in 2003 through an application of reallocated funds in project 1852 (Nhbrhd Study/Local Area Plan) to conduct
a safety audit of the Pleasant Hill neighbourhood, approved by City Council January 6, 2003.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2181 RISK MGMT COMPUTER SYSTEM-REPLACEMENT

                                                           2004           2005         2006          2007         2008
                                                        BUDGET           PLAN         PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Software/hardware                                              60            0             0            0             0            60
   Total GROSS COST DETAILS                                     60            0             0            0             0            60

FINANCING DETAILS
  Res For Cap Expenditures                                   ( 60)            0             0            0             0          ( 60)
   Total FINANCING DETAILS                                   ( 60)            0             0            0             0          ( 60)


Project Description
This project provides for the replacement of the obsolete Risk Management database and the Risk Management computers which run
the database.

General Comments
The existing Risk Management database was installed in the late 1980's and is now obsolete. This database contains all of the City''s
information on claims and is used extensively to provide information to other Departments on problem areas of their operations,
particularly regarding water and sewer main breaks. The Risk Management computers which run the software are also outdated and
must be replaced.

The proposed budget includes:
        Software                    $45,000
        Hardware                      15,000
                                    -----------
         Total                      $60,000

Operating Budget Impact
The operating budget will increase by $1,500 per year starting in 2005 to cover annual maintenance and support from the vendor.
                      2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                          PROJECT DETAILS ($'000s)

2182 CORPORATE ENVIRONMENTAL MANAGEMENT SYS

                                                        2004           2005         2006         2007         2008
                                                     BUDGET           PLAN         PLAN         PLAN         PLAN        TOTAL
GROSS COST DETAILS
 EMS Development                                             50            0            0            0            0              50
   Total GROSS COST DETAILS                                  50            0            0            0            0              50

FINANCING DETAILS
  Res For Cap Expenditures                                 ( 50)           0            0            0            0         ( 50)
   Total FINANCING DETAILS                                 ( 50)           0            0            0            0         ( 50)

Project Description
This project involves retaining a consultant to develop an overarching Environmental Management System (EMS) to serve as a
framework for the development of departmental systems. An EMS will strive to remove uncertainty and inconsistency by managing
disruption and waste, ensure compliance with regulations, improve corporate reputation, address due diligence issues, and work
towards environmental objectives and targets.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2183 KYOTO BASE LINE

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Consultiing Services                                           30             0             0             0            0            30
   Total GROSS COST DETAILS                                     30             0             0             0            0            30

FINANCING DETAILS
  Res For Cap Expenditures                                    ( 30)            0             0             0            0          ( 30)
   Total FINANCING DETAILS                                    ( 30)            0             0             0            0          ( 30)

Project Description
This project involves retaining a consultant to establish 1990 baseline emmissions data in order to determine the Kyoto protocol
emissions reduction goal.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2191 WTP - AVE H TRAFFIC REROUTING

                                                           2004           2005          2006          2007         2008
                                                        BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Ave H Traffic Rerouting                                          0         574             0             0             0          574
   Total GROSS COST DETAILS                                       0         574             0             0             0          574

FINANCING DETAILS
  Waterworks Capital Projects Reserve                             0      ( 574)             0             0             0        ( 574)
   Total FINANCING DETAILS                                        0      ( 574)             0             0             0        ( 574)

Project Description
This project involves roadway construction around the expanded Water Treatment Plant site. It is a result of the revised long term Plant
expansion plans.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                             PROJECT DETAILS ($'000s)

2192 WTP - 42ND ST. RESERVOIR ROOF UPGRADE

                                                            2004            2005          2006          2007         2008
                                                         BUDGET            PLAN          PLAN          PLAN         PLAN    TOTAL
GROSS COST DETAILS
 42nd St. Reservoir Roof Upgrade                                180           843              0             0          0     1,023
   Total GROSS COST DETAILS                                     180           843              0             0          0     1,023

FINANCING DETAILS
  Waterworks Capital Projects Reserve                         ( 180)       ( 843)              0             0          0   ( 1,023)
   Total FINANCING DETAILS                                    ( 180)       ( 843)              0             0          0   ( 1,023)

Project Description
This project involves a major upgrade to the roof and an internal structural repair at the 42nd Street Reservoir.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                           PROJECT DETAILS ($'000s)

2193 WTP - HIGH LIFT PUMP STATION/RESERVOIR

                                                          2004            2005         2006          2007         2008
                                                       BUDGET            PLAN         PLAN          PLAN         PLAN        TOTAL
GROSS COST DETAILS
 HL Pump Stn/Reservoir                                           0       2,295       19,127              0            0       21,422
   Total GROSS COST DETAILS                                      0       2,295       19,127              0            0       21,422

FINANCING DETAILS
  Waterworks Capital Projects Reserve                            0     ( 2,295)   ( 19,127)              0            0    ( 21,422)
   Total FINANCING DETAILS                                       0     ( 2,295)   ( 19,127)              0            0    ( 21,422)


Project Description
This project involves the design and construction of a new High Lift Pump Station and local storage Reservoir at the Water Treatment
Plant. This is a result of the revised long term plant expansion plans and relates directly to the planned implementation of the
Ultraviolet disinfection system.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2194 WTP - LOW LIFT PUMP & UV FACILITY

                                                            2004           2005          2006          2007          2008
                                                         BUDGET           PLAN          PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 LL Pump and UV Facility                                          0             0          835        6,955              0        7,790
   Total GROSS COST DETAILS                                       0             0          835        6,955              0        7,790

FINANCING DETAILS
  Waterworks Capital Projects Reserve                             0             0       ( 835)      ( 6,955)             0      ( 7,790)
   Total FINANCING DETAILS                                        0             0       ( 835)      ( 6,955)             0      ( 7,790)

Project Description
This project involves the conversion of the existing High Lift Pump facility at the Water Treatment Plant to accommodate new Low Lift
Pumps and to provide a structural housing for the installation of UV equipment. This project is a result of the revised long term plant
expansion plans.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2195 WTP - UV DISINFECTION SYSTEM

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN      TOTAL
GROSS COST DETAILS
 UV Disinfection System                                             0             0             0          626         5,217       5,843
   Total GROSS COST DETAILS                                         0             0             0          626         5,217       5,843

FINANCING DETAILS
  Waterworks Capital Projects Reserve                               0             0             0        ( 626)      ( 5,217)    ( 5,843)
   Total FINANCING DETAILS                                          0             0             0        ( 626)      ( 5,217)    ( 5,843)

Project Description
This project involves the design, supply and installation of Ultraviolet disinfection equipment. This is the last phase of the
implementation of the new UV process.
                        2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                              PROJECT DETAILS ($'000s)

2196 WTP - SAND SEPARATOR SYSTEM EXPANSION

                                                             2004            2005          2006           2007          2008
                                                          BUDGET            PLAN          PLAN           PLAN          PLAN         TOTAL
GROSS COST DETAILS
 Sand Separator System Expansion                                    0             0             0        3,311               0        3,311
   Total GROSS COST DETAILS                                         0             0             0        3,311               0        3,311

FINANCING DETAILS
  Waterworks Capital Projects Reserve                               0             0             0      ( 3,311)              0     ( 3,311)
   Total FINANCING DETAILS                                          0             0             0      ( 3,311)              0     ( 3,311)

Project Description
This project involves the relocation and expansion of the existing sand separator facilities to the new intake location (refer to Project
1208). This is required as a result of the revised long term Water Treatment Plant capital expansion plans.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2197 WTP - WATER CONSERVATION STUDY

                                                           2004           2005          2006          2007         2008
                                                        BUDGET           PLAN          PLAN          PLAN         PLAN         TOTAL
GROSS COST DETAILS
 Water Conservation Study                                         0            0            0             0          150           150
   Total GROSS COST DETAILS                                       0            0            0             0          150           150

FINANCING DETAILS
  Waterworks Capital Projects Reserve                             0            0            0             0       ( 150)         ( 150)
   Total FINANCING DETAILS                                        0            0            0             0       ( 150)         ( 150)

Project Description
This project involves the development and implementation of a comprehensive water conservation initiative. The current capital plans
address water quality, reliability and plant security issues. Future expansion beyond 2008 will be driven primarily by capacity demands
(due to population growth) and an effective conservation strategy will be necessary to extend the life of the Water Treatment Plant.
                       2004 CAPITAL BUDGET /2005-2008 CAPITAL PLAN
                                            PROJECT DETAILS ($'000s)

2198 WTP - AVE H RESERVOIR EXPANSION

                                                           2004            2005         2006          2007          2008
                                                        BUDGET            PLAN         PLAN          PLAN          PLAN        TOTAL
GROSS COST DETAILS
 Ave H Reservoir Expansion                                        0            0             0             0       1,461         1,461
   Total GROSS COST DETAILS                                       0            0             0             0       1,461         1,461

FINANCING DETAILS
  Waterworks Capital Projects Reserve                             0            0             0             0     ( 1,461)      ( 1,461)
   Total FINANCING DETAILS                                        0            0             0             0     ( 1,461)      ( 1,461)

Project Description
This project involves the expansion of the existing Avenue H Reservoir to provide adequate local storage capacity (i.e. at the Water
Treatment Plant). This is required as a result of the revised long term plant expansion plans.

				