									        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                     ALL CHANGES ARE SHOWN IN RED
                               LETTING                                          ENGINEER'S  DESIGN
                                DATE                                             ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT    5A FUNDS                                                                                CONTRACT
               FM #             MO/YR                  DESCRIPTION               PHASE 52 MANAGER FIRM       METHOD PROPROSED     PROPOSED        COMMENTS                 RESIDENT OFFICE      COUNTY       PHASE 62     DURATION




                                          US 41 (SR 685)
                                                                                                                                                              G/W
                                                         FROM KENNEDY BLVD                                                                      255828-1 Permit
                                                       TO VIOLET ST                                                                                expiration
    1      255508-1             Apr-06                 RESURFACING               $6,900,000   JSN    KIS                                           4/22/2010                  OAKPARK         HILLSBOROUGH   $700,000

                                           CR 39 (ALEXANDER ST)

                                                                       FROM N
                                            OF I-4 (SR 400) TO N OF KNIGHTS
                                          GRIFFIN
                                                                        NEW
                                              ROAD CONSTRUCTION FOR
    2      255585-1              Jul-11          ALEXANDER ST BYPASS                          LAC   OWE                                                                       OAKPARK         HILLSBOROUGH   $1,703,065

                                                                                                                                                Permit expiration
                                                                                                                                               3/29/2010




                                            SR 676 (CAUSEWAY BL) FROM 1/4 MI
                                              W OF US 41 TO 1/4 E OF US 301                                                                                   Rail
    3      255599-1             Apr-06         ADD LANES & RECONSTRUCT          $21,391,000   LAC    PIT    A+B NO EXCUSE BONUS   $1,500,000         Issues              TAMPA CONSTRUCTION   HILLSBOROUGH      $0        F 1000
                                              SR 600 (HILLS AVE) AT 22ND ST
    4      255769-1              Jul-08              TRAFFIC SIGNALS             $310,500     EES           ADVANCED PRODUCTION                   Plans on shelf         TAMPA CONSTRUCTION   HILLSBOROUGH      $0

                                          US 301 (SR 41)

                                                       FROM S OF TPA BYPSS
                                               CANAL TO N OF FOWLER AVE
    5      255793-1             Oct-12         ADD LANES & RECONSTRUCT          $25,303,594   RES                                                                        TAMPA CONSTRUCTION   HILLSBOROUGH      $0

                                          SR 60 (KENNEDY BLVD)

                                                              FROM WOODLYN
                                                  AVE TO S BREVARD AVE
    6      255803-1              Jul-06               RESURFACING                $1,674,091   SJC   SRD                                                                  TAMPA CONSTRUCTION   HILLSBOROUGH      $0




                                          SR 600 (GANDY BLVD)


                                                          FROM E END OF
                                              BRIDGE TO DALE MABRY HWY                                      A+B NO EXCUSE BONUS   $1,200,000
    7      255822-2             Jun-06       WIDEN/RESURFACE EXIST LANES        $12,775,005   ASP   AME         funding dropped    dropped         G/W 403737-1               OAKPARK         HILLSBOROUGH   $1,118,731




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                    1 OF 31                                                                                                    1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                       ALL CHANGES ARE SHOWN IN RED
                               LETTING                                        ENGINEER'S  DESIGN
                                DATE                                           ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT     5A FUNDS                                                                                   CONTRACT
               FM #             MO/YR                  DESCRIPTION             PHASE 52 MANAGER FIRM       METHOD PROPROSED      PROPOSED       COMMENTS                     RESIDENT OFFICE      COUNTY       PHASE 62     DURATION




                                           SR 60 (KENNEDY BLVD)

                                                             FROM E OF                                                                                  BIDS
                                                 KENNEDY DRWBRDG TO                                                                            REJECTED /
                                                    CHANNELSIDE DR                                                                           REBID IN 04/2006
    8      255828-1             Apr-06               RESURFACING               $922,145     SJC   URS                                        AS G/W 255508-1                    OAKPARK         HILLSBOROUGH    $55,000

                                           SR 597 (DALE MABRY)

                                                              FROM WATERS
                                                  AVE TO FLETCHER AVE
    9      255833-1             Aug-07                RESURFACING              $8,217,720   MHS   VOL                                                                      TAMPA CONSTRUCTION   HILLSBOROUGH      $0

                                           US 92 (SR 600)AT BAY TO BAY BLVD

   10      255842-1             Dec-06                INTERSECTION (MINOR)     $576,840     MHS   CUM                                           G/W 415201-1               TAMPA CONSTRUCTION   HILLSBOROUGH      $0


                                           SR 582 (FOWLER AVE)



                                                         FROM NEBRASKA AVE
                                           TO SR 685 (FLORIDA AVE)


                                                                        ADD
   11      255846-1              Jun-17           LANES & RECONSTRUCT           $1,458      TAD                                                                            TAMPA CONSTRUCTION   HILLSBOROUGH      $0
                               12/1/2005
                                TO BE      US 41 (SR 45) FROM KENNEDY BLVD
                                RELET            TO HILLSBOROUGH AVE
   12      255853-1             04/2007               RESURFACING             $29,900,000   JDJ                                                                                 OAKPARK         HILLSBOROUGH   $1,056,227

                                                                                                                                                  Verizon has
                                                                                                                                              advised that they
                                                                                                                                             need 9 full months
                                                                                                                                              to relocate before
                                                                                                                                                   the start of
                                                                                                                                             construction. R/W
                                                                                                                                             will try to certify the
                                                                                                                                                needed parcels
                                                                                                                                               first which might
                                                                                                                                             allow the project to
                                           SR 574 (MLK BLVD)                                                                                  stay on schedule.
                                                                                                                                                 Otherwise, the
                                                        FROM W OF HIGHVIEW                                                                      project may be
                                                RD TO E OF PARSONS AVE                                                                          delayed several
   13      255893-2             Jan-08         ADD LANES & RECONSTRUCT         $9,762,751   EES   HOW      INC/DIS. MILESTONES    $500,000           months.               TAMPA CONSTRUCTION   HILLSBOROUGH      $0

                                           SR 574 (MLK BLVD)

                                                        FROM E OF PARSONS
                                                AVE TO E OF KINGSWAY R.
   14      255893-3              Jul-11        ADD LANES & RECONSTRUCT         $4,994,325   EES                                                                                 OAKPARK         HILLSBOROUGH      $0




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                  2 OF 31                                                                                                      1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                      ALL CHANGES ARE SHOWN IN RED
                               LETTING                                       ENGINEER'S  DESIGN
                                DATE                                          ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT        5A FUNDS                                                                                CONTRACT
               FM #             MO/YR                  DESCRIPTION            PHASE 52 MANAGER FIRM       METHOD PROPROSED         PROPOSED       COMMENTS                  RESIDENT OFFICE      COUNTY       PHASE 62     DURATION

                                           SR 574 (MLK BLVD) FROM KINGSWAY
                                           RD TO MCINTOSH ROAD


                                                             ADD LANES AND
   15      255893-4             Oct-15                RECONSTRUCT            $19,437,516   MEC                                                                                                 HILLSBOROUGH
                                           SR 574 (MLK BLVD)
                                                                                                                                                    DESIGN
                                                       FROM QUEEN PALM DR                                                                        ADOPTED / NO
                                                    TO WILLIAMS RD                                                                              CONSTRUCTION
   16      255893-5              Jul-11        ADD LANES & RECONSTRUCT                     LAC                                                     ESTIMATE                    OAKPARK         HILLSBOROUGH      $0



                                          SR 52



                                             FROM CR 581 (BELLAMY BRO) TO
                                          OLD PASCO RD


                                                                     ADD
                                          LANES AND RECONSTRUCT




   17      256243-2             May-14            SIDEWALK ON BOTH SIDES     $13,330,000   JDJ                                                                                 OAKPARK               PASCO    $725,060

                                          SR 52




                                             FROM OLD PASCO RD TO I-75



                                                        ADD LANES AND
   18      256243-3             May-14                RECONSTRUCT             $2,837,250   CAR                                                                                 OAKPARK               PASCO       $0

                                          SR 52 (SCHRADER HWY)


                                                      FROM W OF SUNCOAST
                                               PKWY TO E OF US 41 (SR 45)
   19      256323-1             May-14         ADD LANES & RECONSTRUCT       $57,571,800   EES                                                                                 OAKPARK               PASCO    $3,930,498




                                            US 41 (SR 45) FROM TOWER RD TO                                                                      targeted by utility
                                          RIDGE RD                                                                                               department for
                                                               ADD LANES &                                                                          advanced
   20      256324-1             Dec-08               RECONSTRUCT             $15,431,626   GMJ   WAD     A + B / NO EXCUSE BONUS   $1,000,000       relocations                OAKPARK               PASCO    $1,562,453




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                  3 OF 31                                                                                                     1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                              ALL CHANGES ARE SHOWN IN RED
                               LETTING                                           ENGINEER'S  DESIGN
                                DATE                                              ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT      5A FUNDS                                                                     CONTRACT
               FM #             MO/YR                   DESCRIPTION               PHASE 52 MANAGER FIRM       METHOD PROPROSED       PROPOSED     COMMENTS          RESIDENT OFFICE      COUNTY      PHASE 62     DURATION

                                          US 41 (SR45)



                                                      FROM RIDGE ROAD TO
                                          NORTH OF SR 52



                                                          ADD LANES AND
   21      256324-2             Oct-15                 RECONSTRUCT               $14,465,052   MWS                                                                                           PASCO


                                          SR 52



                                                                   FROM US 41
                                           (SR 45) TO CR 581 (BELLAMY BROS)




   22      256334-1             Mar-15             ADD LANES & RECONSTRUCT       $71,520,000   EES                                                                     OAKPARK               PASCO      $0

                                          US 301 (SR 41)

                                                           FROM SR 39 TO S OF
                                           CR 54
                                                                          ADD
   23      256422-2             Oct-11             LANES & RECONSTRUCT           $25,200,000   GMJ    PIT                                                         TAMPA CONSTRUCTION         PASCO      $0


                                          US 19 (SR 55)


                                                           FROM N OF SR 580 TO
                                          N OF CR 95


   24      256774-2             Mar-15        ADD LANES AND RECONSTRUCT          $83,117,475   ASP                                                                     OAKPARK           PINELLAS      $0.00




                                          US 19 (SR 55)


                                                              FROM N OF
                                             WHITNEY RD TO S OF SEVILLE DR                                                                        GOES WITH
   25      256881-1             Sep-08       BELLEAIR INTERCHANGE (MAJOR)        $67,208,079   ASP   CBI     A + B NO EXCUSE BONUS   $6,500,000    256881 2            OAKPARK           PINELLAS    $5,808,080




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                     4 OF 31                                                                                         1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                     ALL CHANGES ARE SHOWN IN RED
                               LETTING                                          ENGINEER'S  DESIGN
                                DATE                                             ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT        5A FUNDS                                                                          CONTRACT
               FM #             MO/YR                  DESCRIPTION               PHASE 52 MANAGER FIRM       METHOD PROPROSED         PROPOSED       COMMENTS              RESIDENT OFFICE      COUNTY     PHASE 62     DURATION




                                           US 19 (SR 55)



                                                         FROM S OF SEVILLE DR                                                            Bonus
                                                TO SR 60                                                                              Programmed
                                            RECONSTRUCT US 19 W/ FRONTAGE                                                             on Segment    GOES WITH
   26      256881-2             Sep-08        ROAD, SEVILLE INTERCHANGE         $62,344,126    ASP   HWL    A + B NO EXCUSE BONUS         One        256881 1                 OAKPARK           PINELLAS   $6,312,344
                                           US 19 (SR 55)


                                                         FROM N OF SUNSET
                                             POINT RD TO S OF COUNTRYSIDE
                                                          BLVD                                                                                       ENTERPRISE
   27      256890-1             Sep-06         ADD LANES & RECONSTRUCT          $39,214,671    ASP   POS       A + B Inc/Dis Bonus     $4,000,000   INTERCHANGE               OAKPARK           PINELLAS   $4,493,500


                                           SR 682 (PIN BAYWAY)



                                                     FROM W OF SR 679 TO SR
                                           699 (GULF BLVD)


                              ReLet Date                              BRIDGE                                INC/DIS. MILESTONES A+B                 Permit Expires
   28      256903-1            2/21/2007              REPLACEMENT               $43,653,215    ASP   URS              BONUS            $1,500,000      12/22/08       CLEARWATER CONSTRUCTION   PINELLAS   $3,132,582

                                           SR 694 (GANDY BLVD)


                                                       FROM W OF 9TH ST
                                               NORTH E OF 4TH ST NORTH
   29      256931-2             Feb-14         ADD LANES & RECONSTRUCT          $89,675,200    ASP   POS                                                                      OAKPARK           PINELLAS   $8,070,768

                                           CR 296 CONNECTOR

                                                             FROM E OF 40TH
                                                   ST TO W OF 28TH ST
   30      256994-1             Nov-09          NEW ROAD CONSTRUCTION           $55,891,825    TAD   HWL    A + B / NO EXCUSE BONUS    $5,000,000                             OAKPARK           PINELLAS   $2,790,078
                                            CR 296 CONNECTOR FROM NB I-275
                                           (RAMP P) TO WB SR 692 (CR 296)

                                                            NEW ROAD
   31      256994-2              Jul-08              CONSTRUCTION               $16,468,049    TAD   HWL     ADVANCE PRODUCTION                                               OAKPARK           PINELLAS   1,522,822
                                             SR 686 (ROOSEVELT)FROM N OF
                                              ULMERTON RD TO E OF 40TH ST
   32      256995-1             Apr-14          NEW ROAD CONSTRUCTION           $102,723,005   TAD   URS                                                                      OAKPARK           PINELLAS   $9,245,070
                                           SR 686 (ROOSEVELT) AT 49TH STREET

                                                            NEW ROAD
   33      256996-1             Sep-11                CONSTRUCTION              $43,246,560    TAD                                                                            OAKPARK           PINELLAS   $2,553,314

                                           SR 686 (ROOSEVELT)

                                                       FROM 49TH ST BRIDGE
                                           TO N OF ULMERTON RD
                                                               NEW ROAD
   34      256997-1             May-14               CONSTRUCTION               $38,782,800    TAD   PAR                                                                      OAKPARK           PINELLAS   $3,539,900




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                      5 OF 31                                                                                              1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                       ALL CHANGES ARE SHOWN IN RED
                               LETTING                                          ENGINEER'S  DESIGN
                                DATE                                             ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT       5A FUNDS                                                                              CONTRACT
               FM #             MO/YR                  DESCRIPTION               PHASE 52 MANAGER FIRM       METHOD PROPROSED        PROPOSED       COMMENTS                 RESIDENT OFFICE       COUNTY     PHASE 62     DURATION
                                          CR 296 AT I-275 INTERCHANGE

                                                                 ADD LANES
   35      256998-1              Jul-11              & RECONSTRUCT              $67,483,150   TAD   HWL                                                                  INTERSTATE CONSTRUCTION   PINELLAS   $5,174,666

                                           ULMERTON RD (SR 688)




                                                    FROM OAKHURST AVE TO
                                               119TH AVE TRAFFIC CONTROL
   36      257050-2             Mar-12               DEVICES/SYSTEM              $513,360     TAD   REY                                                                         OAKPARK            PINELLAS    124,000

                                          US 19 (SR 55)


                                                        FROM N OF 49TH ST
                                                TO S OF 126TH AVE N
                                           RECONSTRUCT US 19 W/ FRONTAGE
                                               ROAD; 118TH AND 110TH
   37      257070-1             Jun-06            INTERCHANGES                  $70,605,263   ASP   HDR     A+B NO EXCUSE BONUS      $3,000,000                                 OAKPARK            PINELLAS   $6,200,000   F 955

                                           SR 590

                                                 FROM E OF CR 611 TO MAIN ST                                                                       Permit expiration
   38      257077-1             Jun-06               RESURFACING                 $1,196,720   JSN   TYL                                               5/18/2010         CLEARWATER CONSTRUCTION    PINELLAS      $0
                                          SR 699 (GULF BLVD)

                                                            FROM SR 666 TO
                                                      COLONY CIRCLE
   39      257129-1              Jul-06                RESURFACING               $1,645,875   EES   TBE       Advance Production                                        CLEARWATER CONSTRUCTION    PINELLAS      $0

                                                                                                                                                  ADVERTISED
                                          SR 582 (TARPON AVE)



                                               FROM ALT US 19 TO HUEY AVE




                                                                                                                                                           G/W
   40      257135-1             Feb-06                            RESURFACING    $2,115,647   JSN   GOM      A + B NO Excuse Bonus                    257137-1          CLEARWATER CONSTRUCTION    PINELLAS      $0

                                                                                                                                                  ADVERTISED




                                           ALT US 19 (SR 595)

                                                                 FROM N OF
                                               MERES BLVD TO PASCO CO/L                                                                                    G/W
   41      257137-1             Feb-06               RESURFACING                 $4,626,180   JSN   GOM       A + B Inc/Dis Bonus     $400,000        257137-1          CLEARWATER CONSTRUCTION    PINELLAS      $0
                                           SR 688 (ULMERTON RD)

                                                                 FROM W OF
                                                 38TH ST TO W OF I-275
                                               ADD LANES & RECONSTRUCT
   42      257147-1              Jul-10                 2.137 MI                $23,175,852   TAD           ADVANCE PRODUCTION                                                  OAKPARK            PINELLAS   $2,115,135




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                     6 OF 31                                                                                                    1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                          ALL CHANGES ARE SHOWN IN RED
                               LETTING                                          ENGINEER'S  DESIGN
                                DATE                                             ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT    5A FUNDS                                                                     CONTRACT
               FM #             MO/YR                  DESCRIPTION               PHASE 52 MANAGER FIRM       METHOD PROPROSED     PROPOSED     COMMENTS         RESIDENT OFFICE      COUNTY       PHASE 62     DURATION

                                           SR 688 (ULMERTON RD)

                                                              FROM EL
                                            CENTRO/RANCHERO TO W OF US 19
   43      257154-1             Mar-07        ADD LANES & RECONSTRUCT            $9,486,250   TAD   ECD     A+B NO EXCUSE BONUS   $1,000,000               CLEARWATER CONSTRUCTION   PINELLAS        $0

                                           SR 688 (ULMERTON RD)

                                                            FROM E OF 119TH
                                             ST TO W OF LONG BRANCH CANAL                                   A+B NO EXCUSE BONUS
   44      257155-1              Jul-09        ADD LANES & RECONSTRUCT          $16,296,305   TAD   REY     ADVANCE PRODUCTION    $1,000,000               CLEARWATER CONSTRUCTION   PINELLAS        $0


                                          US 41 (SR 45)

                                                       FROM SR 44 TO SR 200
                                          ADD LANES & RECONSTRUCT

   45      257165-1             Aug-13                               5.834 MI   $50,112,000   JSN   POS                                                            OAKPARK               CITRUS   $4,149,273


                                          US 19 (SR 55)




                                                FROM W CORNFLOWER TO W
                                          FOSS BARGE CANAL BRIDGE:


                                                                 REHAB
                                             EXISTING/CONSTRUCT ADJACENT
   46      257167-2             Aug-07                  BRIDGE                  $36,850,539   ASP               DESIGN BUILD                                       OAKPARK               CITRUS   $3,483,869

                                           US 41 (SR 45)

                                                                 FROM
                                          ORANGE AVE TO WATSON ST

                                                            ADD LANES &
   47      257179-1             Jan-19               RECONSTRUCT                $10,453,558   JSN                                                                  OAKPARK               CITRUS   $1,356,450
                                           SR 44 (GULF TO LAKE)


                                             FROM W OF 10TH AVE TO E OF CR
                                                         486
   48      257182-2             Jan-07               RESURFACING                 $2,194,500   JSN   DYE                                                       TAMPA CONSTRUCTION         CITRUS      $0

                                          SR 200

                                                          FROM US 41 (SR 45)
                                                TO N OF E MILLWOOD LN
   49      257188-2             Nov-11         ADD LANES & RECONSTRUCT          $11,594,000   JSN                                                             TAMPA CONSTRUCTION         CITRUS      $0

                                           US 19 (SR 55)


                                                              FROM CR 490
                                                   (YULEE RD) TO CR 44
   50      257193-1             Sep-06                RESURFACING                $4,665,926   MES    TEI                                                      TAMPA CONSTRUCTION         CITRUS      $0




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                    7 OF 31                                                                                       1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                         ALL CHANGES ARE SHOWN IN RED
                               LETTING                                            ENGINEER'S  DESIGN
                                DATE                                               ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                   CONTRACT
               FM #             MO/YR                  DESCRIPTION                 PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED   COMMENTS         RESIDENT OFFICE      COUNTY       PHASE 62     DURATION

                                          CR 578 (CO LINE RD)

                                                                  FROM US 19 TO
                                          EAST RD

   51      257298-2             Dec-07            ADD LANES & RECONSTRUCT         $13,404,324   MHS   BOY                                                         OAKPARK          HERNANDO      $1,830,481
                                          CR 578 (CO LINE RD)


                                                        FROM EAST RD TO
                                                      MARINER BLVD
   52      257298-3             May-14          ADD LANES & RECONSTRUCT           $14,024,625   MES   BOY                                                         OAKPARK          HERNANDO      $1,262,216

                                          CR 578 (CO LINE RD)


                                                     FROM MARINER BLVD TO
                                                   SUNCOAST PARKWAY
   53      257298-4             May-14          ADD LANES & RECONSTRUCT           $22,175,208   MES   WAD                                                         OAKPARK          HERNANDO      $1,995,768

                                          CR 578 (CO LINE RD)


                                                          FROM SUNCOAST
                                             PARKWAY TO US 41 AT AYERS RD
   54      257298-5             Nov-13         ADD LANES & RECONSTRUCT            $19,683,600   MES   HOW                                                         OAKPARK          HERNANDO      $2,021,197

                                           US 98 (SR 703/COBB) FROM SR 50 TO
                                          US 98
                                                            ADD LANES &
                                          RECONSTRUCT

   55      257299-2             Mar-16                        4.491 MI            $41,385,000   JSN   HWL                                                         OAKPARK          HERNANDO      $3,187,143
                                           PARK RD

                                                            FROM I-4 (SR 400)
                                                     TO SAM ALLEN RD
   56      257862-2             May-09          ADD LANES & RECONSTRUCT            $3,962,109   LAC   AME                                                    TAMPA CONSTRUCTION   HILLSBOROUGH      $0


                                          SAM ALLEN ROAD



                                                  FROM ALEXANDER ST TO PARK
                                           RD    2 TO 4 LANES




   57      257862-3             Mar-14          SIDEWALKS ON BOTH SIDES           $24,975,594   LAC                                                          TAMPA CONSTRUCTION   HILLSBOROUGH      $0
                                                DADE CITY RAILS TO TRAILS
   58      258080-2             Jun-06                 BIKE PATH                   $406,000     MEC   TBE                                                    TAMPA CONSTRUCTION         PASCO       $0        F 130




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                     8 OF 31                                                                                       1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                ALL CHANGES ARE SHOWN IN RED
                               LETTING                                       ENGINEER'S  DESIGN
                                DATE                                          ESTIMATE  PROJECT DESIGN      ALTERNATE CONTRACT   5A FUNDS                                                                               CONTRACT
               FM #             MO/YR                     DESCRIPTION         PHASE 52 MANAGER FIRM          METHOD PROPROSED    PROPOSED      COMMENTS               RESIDENT OFFICE         COUNTY       PHASE 62     DURATION




                                           I-275 (SR 93)

                                                           FROM HOWARD                                                                         G/W: 258399-1
                                               FRANKLAND BR TO HIMES AVE                                                                      LINKS STAGE II
   59      258398-1             Jun-06          ADD LANES & RECONSTRUCT      $160,800,001   MWS   STAG2HO        A+B INC/DIS     $8,000,000   NORTHBOUND          INTERSTATE CONSTRUCTION   HILLSBOROUGH   $11,519,139 F 1685




                                          I-275 (SR 93)
                                                                                                                                                         G/W:
                                                            FROM HOWARD                                                                       258399-2 LINKS
                                               FRANKLAND BR TO HIMES AVE                                                                         STAGE III
   60      258398-2              Jul-10        ADD LANES & RECONSTRUCT       $47,700,000    MWS   STAG2HO      A + B / INC/DIS   $1,550,000    SOUTHBOUND         INTERSTATE CONSTRUCTION   HILLSBOROUGH   $5,795,533   F 1685




                                          I-275 (SR 93)

                                                          FROM HOWARD                                                                         PROJECT IS ON
                                            FRANKLAND BR TO HILLSBOROUGH                                                                       HOLD UNTIL
                                                        RIVER                                      STAG2                                       FUNDS ARE
   61      258398-3              Jul-12        ITS FREEWAY MANAGEMENT         $1,878,169    WLW     HO                                          AVAILABLE                OAKPARK            HILLSBOROUGH    $376,575




                                          I-275 (SR 93)
                                                                                                                                                         G/W:
                                                                FROM HIMES                                                                    258398-1 LINKS
                                               AVE TO HILLSBOROUGH RIVER                                                                         STAGE II
   62      258399-1             May-06          ADD LANES & RECONSTRUCT      $71,981,677    MWS   STAG2PO        A+B INC/DIS                  NORTHBOUND          INTERSTATE CONSTRUCTION   HILLSBOROUGH   $7,975,334




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                    9 OF 31                                                                                                  1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                          ALL CHANGES ARE SHOWN IN RED
                               LETTING                                           ENGINEER'S  DESIGN
                                DATE                                              ESTIMATE  PROJECT DESIGN      ALTERNATE CONTRACT        5A FUNDS                                                                                 CONTRACT
               FM #             MO/YR                  DESCRIPTION                PHASE 52 MANAGER FIRM          METHOD PROPROSED         PROPOSED        COMMENTS              RESIDENT OFFICE         COUNTY       PHASE 62      DURATION




                                           I-275 (SR 93)

                                                                 FROM HIMES
                                               AVE TO HILLSBOROUGH RIVER
                                               LINKS STAGE III SOUTHBOUND                                                                                         G/W
   63      258399-2              Jul-10        ADD LANES & RECONSTRUCT           $75,060,000    MWS   STAG2PO         A+B INC/DIS         $1,550,000       258398 2         INTERSTATE CONSTRUCTION   HILLSBOROUGH   $9,477,168
                                                                                                                                                         work added to
                                           I-4 (SR 400) FROM W OF 14TH ST TO E                                                                              existing
                                                         OF 50TH ST                                                                                       construction
   64      258401-2             Apr-06    ITS FREEWAY MANAGEMENT DEVICES          DROPPED       WLW    PAR                                                  contract               OAKPARK            HILLSBOROUGH       $0
                                          I-275 (SR 93)

                                                             FROM US 41 TO
                                                    HILLS/PASCO CO/L
                                               ADD LANES & RECONSTRUCT                                             A + B NO EXCUSE                      PERMITS EXPIRE
   65      258413-1              Jul-12                 15.542 MI                $24,526,440    LAC    POS       ADVANCE PRODUCTION       $3,000,000       JULY 2008               OAKPARK            HILLSBOROUGH   $2,141,717




                                          I-4/SELMON EXPRESSWY

                                                            FROM SELMON
                                                 EXPRESSWAYTO 7TH AVE                                           A + B NO EXCUSE BONUS /
   66      258415-1             Aug-09          NEW ROAD CONSTRUCTION            $198,585,800   MWS    POS       ADVANCE PRODUCTION       $15,000,000      G/W 258415-2     INTERSTATE CONSTRUCTION   HILLSBOROUGH   $14,745,780




                                          I-4/SELMON EXPRESSWY


                                                  FROM 7TH AVE TO I-4                                           A + B NO EXCUSE BONUS /                            G/W
   67      258415-2             Aug-09          NEW ROAD CONSTRUCTION            $77,649,897    MWS    PAR       ADVANCE PRODUCTION                        258415-1         INTERSTATE CONSTRUCTION   HILLSBOROUGH   $7,425,180


                                          I-4/SELMON EXPRESSWY




                                                             Z MOVEMENT




   68      258415-3              Jul-10           INTERCHANGE (MAJOR)            $115,301,499   MWS    POS                                                                  INTERSTATE CONSTRUCTION   HILLSBOROUGH   $8,134,000




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                         10 OF 31                                                                                                     1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                       ALL CHANGES ARE SHOWN IN RED
                               LETTING                                          ENGINEER'S  DESIGN
                                DATE                                             ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                      CONTRACT
               FM #             MO/YR                     DESCRIPTION            PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED   COMMENTS         RESIDENT OFFICE         COUNTY       PHASE 62     DURATION


                                          I-275 (SR 93)



                                                   FROM FLORIBRASKA AVE
                                          TO OSBORNE ST




   69      258642-3             Oct-13                     WIDEN BRIDGE          $2,945,670   MWS    KIS                                                                           HILLSBOROUGH


                                          I-275 (SR 93)



                                                   FROM HILLSBOROUGH TO
                                          YUKON AVE




   70      258660-2             Nov-13                   WIDEN BRIDGE           $11,160,000   MWS    KIS                                                                           HILLSBOROUGH


                                           I-75 (SR 93A)




                                                       FROM S OF PROGRESS
                                           BLVD TO SR 60




                                                      RIGID PAVEMENT
                                          REHABILITATION
   71      258661-1             Nov-08       Project Length: 4.225 MI 6 LANES   $15,750,000   RES   PRD                                                  INTERSTATE CONSTRUCTION   HILLSBOROUGH      $0


                                           I-75 (SR 93A)




                                           RIGID PAVEMENT REHABILITATION
   72      258661-2             Nov-12                       BRIDGE WORK          $1,240      JSN   PRD                                                  INTERSTATE CONSTRUCTION   HILLSBOROUGH      $0

                                          I-75 (SR 93)

                                                      FROM CR 54 TO SR 52
   73      258736-2              Jul-12        ADD LANES & RECONSTRUCT          $55,236,838   MWS   GOM                                                  INTERSTATE CONSTRUCTION      PASCO       $4,971,315




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                   11 OF 31                                                                                       1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                          ALL CHANGES ARE SHOWN IN RED
                               LETTING                                             ENGINEER'S  DESIGN
                                DATE                                                ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT       5A FUNDS                                                                                CONTRACT
               FM #             MO/YR                     DESCRIPTION               PHASE 52 MANAGER FIRM       METHOD PROPROSED        PROPOSED       COMMENTS                 RESIDENT OFFICE         COUNTY       PHASE 62   DURATION


                                          I-275 (SR 93)



                                                               FROM 62ND
                                          AVE N TO N OF GANDY BLVD




   74      258883-1             Dec-06         RIGID PAVEMENT REHABILITATION        $6,980,600   MHS   WAS     A+B   NO EXCUSE BONUS     $750,000                           INTERSTATE CONSTRUCTION     PINELLAS     $921,846

                                          6TH AND 7TH ST

                                                         FROM 6TH ("C" AVE TO
                                               301) AND 7TH ("B" AVE TO 301)                                    LUMP SUM / ADVANCE
   75      403569-1             Aug-06                  SIDEWALK                    $496,415     MEC   AME         PRODUCTION                                                 TAMPA CONSTRUCTION         PASCO          $0

                                          US 98 (SR 700)

                                                                   FROM US
                                              41 (BROAD ST) TO YONTZ RD
                                          INTERSECTION
   76      403724-1             Oct-06                         RESURFACING          $1,256,809   LAC   TYL                                                                    TAMPA CONSTRUCTION       HERNANDO         $0

                                          SR 590


                                                          (PHILIPPE PW) FROM
                                           CR 638 TO SR 580


   77      403726-1              Jul-07                RESURFACING                  $1,304,400   ASP   TYL     ADVANCED PRODUCTION                                         CLEARWATER CONSTRUCTION      PINELLAS        $0

                                          US 301 (SR 39)

                                                          FROM S OF TRUCK
                                                   ROUTE TO POND AVE
   78      403727-1             Jun-06               RESURFACING                    $857,000     GMJ   ICG                                                                    TAMPA CONSTRUCTION         PASCO          $0




                                          SR 573 (DALE MABRY)

                                                                                                                                                    Oct. Bids Rejected,
                                           FROM MACDILL AFB TO GANDY BLVD                                                                           Project is now G/W
   79      403737-1             Jun-06             RESURFACING                      $3,089,298   EES   VOL     LUMP SUM / LANE RENTAL    $50,000         255822-2                  OAKPARK            HILLSBOROUGH      $0


                                           I-75 (SR 93A)

                                                                  AT SR 574 (MLK
                                          BLVD)
                                                                                                                                                      G/W 258662 1
                                                      ADD SECOND LEFT TURN                                                                           Permit expiration
   80      403758-1             Jan-06      LANE SB OFF RAMP TO EB MLK BLVD         $1,800,000   LAC   TYL                                              5/26/2010           INTERSTATE CONSTRUCTION   HILLSBOROUGH   $160,404




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                       12 OF 31                                                                                                    1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                ALL CHANGES ARE SHOWN IN RED
                               LETTING                                          ENGINEER'S  DESIGN
                                DATE                                             ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                              CONTRACT
               FM #             MO/YR                  DESCRIPTION               PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED     COMMENTS                RESIDENT OFFICE        COUNTY       PHASE 62     DURATION
                                              US 301 (SR 41) AT MCINTOSH RD
                                               ADD SOUTHBOUND LEFT AND
                                            NORTHBOUND RIGHT TURN LANES
                                            IMPROVE RT RADIUS FOR TRUCKS
                                             REALIGN MCINTOSH RD APPROX                                                                     Permit Expiration
   81      403760-1             Aug-06                    1000FT                 $1,019,922   EES   VOL                                        11/06/2009           TAMPA CONSTRUCTION     HILLSBOROUGH      $0
                                           SR 574 (MLK BLVD)

                                                                  AT SR
                                                   574A/SAMMONDS RD
   82      403761-1             Sep-08            REALIGN SAMMONDS RD            $474,918     RES                                                                   TAMPA CONSTRUCTION     HILLSBOROUGH      $0

                                            SR 574 (MLK BLVD) AT MCINTOSH RD                                                                Permit Expiration
   83      403763-1             Sep-06          ADD WB RIGHT TURN LANE           $438,901     EES   VOL                                        12/29/2008           TAMPA CONSTRUCTION     HILLSBOROUGH      $0

                                           ALT US 19 (SR 595)

                                                             FROM PINELLAS
                                                   CO/L TO US 19 (SR 55)
                                                       WIDEN ROAD
   84      403766-1              Jul-12                  0.878 MI                $1,236,000   JSN   VOL                                                          CLEARWATER CONSTRUCTION       PASCO         $0

                                           SR 60 (ADAMO DR)

                                                            FROM US 301 TO
                                                   FALKENBURG RD
                                           ADD THRU LANE(S)

   85      405525-2             May-14                            1.913 MILES   $16,734,000   LAC    PIT                                                            TAMPA CONSTRUCTION     HILLSBOROUGH      $0


                                          MOVEABLE BRIDGE REHABILITATION




   86      405755-2             Feb-07                     WELCH'S CAUSEWAY      $1,358,500   JJJ                                                                   BRIDGE MAINTENANCE       PINELLAS        $0

                                           US 19 (SR 55)


                                                             FROM W GREEN
                                                  ACRES TO W JUMP CT
   87      405822-2             May-14         ADD LANES & RECONSTRUCT          $11,400,000   ASP   GOM                                                                  OAKPARK               CITRUS     $1,026,000

                                          US 19 (SR 55)

                                                                    FROM
                                           W JUMP CT TO W FORT ISLAND TRAIL
   88      405822-3             Jan-15        ADD LANES & RECONSTRUCT           $30,212,400   EES                                                                        OAKPARK               CITRUS     $2,676,584

                                          US 19 (SR 55)


                                                         FROM W FORT ISLAND
                                           TRAIL TO NE 1ST TERRACE

                                                                      MEDIAN
   89      405822-4             Jun-06              RECONSTRUCTION               $2,171,700   ASP   AMC                                                             TAMPA CONSTRUCTION         CITRUS        $0        F 190




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                   13 OF 31                                                                                                 1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                           ALL CHANGES ARE SHOWN IN RED
                               LETTING                                         ENGINEER'S  DESIGN
                                DATE                                            ESTIMATE  PROJECT DESIGN    ALTERNATE CONTRACT   5A FUNDS                                                                         CONTRACT
               FM #             MO/YR                  DESCRIPTION              PHASE 52 MANAGER FIRM        METHOD PROPROSED    PROPOSED   COMMENTS             RESIDENT OFFICE        COUNTY       PHASE 62     DURATION




                                            DRYER AVE FROM TROTTER RD TO
                                                    INDIAN ROCKS
   90      406060-1             Feb-06                SIDEWALK                  $800,000     MES   URS             LUMP SUM                 G/W 406060-2    CLEARWATER CONSTRUCTION     PINELLAS        $0

                                          INDIAN ROCKS ROAD



                                                        FROM SUNCOAST
                                          HOSPITAL TO DRYER AVE


                                                                                                                                                    G/W
   91      406060-2             Feb-06                    SIDEWALK              $100,000     MES   TBE             LUMP SUM                   406060-1      CLEARWATER CONSTRUCTION     PINELLAS        $0


                                          US 19 (SR 55)


                                                     FROM HAINES BAYSHORE
                                           BLVD TO 54TH AVE N


   92      406255-2             Feb-06     TRAFFIC CONTROL DEVICES/SYSTEM       $3,900,000   BBB                                                                    OAKPARK             PINELLAS     $700,000
                                          SR 52 (MERIDIAN AVE)

                                                            FROM 21ST ST TO
                                                          SR 533
   93      406550-1             Jan-08                 RESURFACING              $1,805,507   SJC   SRD                                                         TAMPA CONSTRUCTION         PASCO         $0
                                              US 41 (FLORIDA AVE) AT HANNA
                                                         AVENUE
   94      406631-1             Jun-13           ADD LEFT TURN LANE(S)                       RES                                                               TAMPA CONSTRUCTION     HILLSBOROUGH      $0

                                           I-4 (SR 400) WIM


                                            FROM W OF KINGSWAY RD TO E OF
                                                     BAKERS BRANCH
   95      406738-2             Jan-07      MCCO WEIGH STATION STATIC/WIM      $21,961,720   EES   REY                                                              OAKPARK           HILLSBOROUGH   $2,351,250
                                          I-275 (SR 93)

                                                                   FROM 54TH
                                                    AVE S TO 54TH AVE N
   96      407233-4             Oct-06          ITS FREEWAY MANAGEMENT          $3,514,336   WLW   TBE     Advance Production                                       OAKPARK             PINELLAS     $1,285,887   F 325




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                      14 OF 31                                                                                         1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                        ALL CHANGES ARE SHOWN IN RED
                               LETTING                                              ENGINEER'S  DESIGN
                                DATE                                                 ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT     5A FUNDS                                                                              CONTRACT
               FM #             MO/YR                     DESCRIPTION                PHASE 52 MANAGER FIRM       METHOD PROPROSED      PROPOSED     COMMENTS                  RESIDENT OFFICE      COUNTY       PHASE 62     DURATION

                                          I-275 (SR 93)


                                                        FROM S SUNSHINE
                                                     SKYWAY BR TO
                                           54TH AVE S


                                                                ITS FREEWAY                                                                                  GW
   97      407233-5              Jul-08                   MANAGEMENT                 $5,818,502   WLW   URS     ADVANCE PRODUCTION                    407233 6                   OAKPARK           PINELLAS     $1,689,676

                                          I-275 (SR 93)


                                                     FROM I-75 TO S SUNSHINE
                                           SKYWAY

                                                                   ITS
   98      407233-6             Sep-11            FREEWAY MANAGEMENT                 $3,750,821   WLW   URS                                                                      OAKPARK           PINELLAS     $1,140,667

                                          I-275 (SR 93)

                                                                  FROM BEARSS
                                           AVE TO I-75
                                                                              ITS                               ADVANCE PRODUCTION /
   99      407233-7              Jul-10           FREEWAY MANAGEMENT                 $5,328,004   WLW   URS          LUMP SUM                                                    OAKPARK         HILLSBOROUGH   $1,505,354

                                           I-75 PASCO (NB)


                                          REST AREA REPLACEMENT
                                                                         REST
  100      407944-1             Aug-08                     AREA # 42                 $9,393,750   EES               DESIGN BUILD                                                 OAKPARK               PASCO    $679,250

                                           I-75 PASCO (SB)


                                          REST AREA REPLACEMENT
  101      407944-2             Aug-08                    REST AREA # 53             $9,450,000   EES               DESIGN BUILD                                                 OAKPARK               PASCO    $679,250

                                          SR 50 (CORTEZ BLVD)

                                                                  FROM
                                           MARINER BLVD TO SUNCOAST PKWY
  102      407951-2             Apr-14       ADD LANES & RECONSTRUCT                 $8,044,050   MES   ICG                                                                      OAKPARK          HERNANDO      $723,964

                                          SR 50 (CORTEZ BLVD)

                                                                  FROM US
                                                  19 TO MARINER BLVD
                                               ADD LANES & RECONSTRUCT
  103      407951-3             Mar-11                   3.877 MI                   $14,912,400   MES   TBE                                                                      OAKPARK          HERNANDO      $1,361,129

                                          SR 56

                                                                  FROM CR 581TO
                                          MORRIS BRIDGE RD                                                                                         Project will most
                                                                                                                                                   likely be built by
  104      408074-1             May-14             NEW ROAD CONSTRUCTION            $21,599,280   MES                                             Private Developers             OAKPARK               PASCO       $0




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                        15 OF 31                                                                                                1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                       ALL CHANGES ARE SHOWN IN RED
                               LETTING                                              ENGINEER'S  DESIGN
                                DATE                                                 ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT        5A FUNDS                                                                             CONTRACT
               FM #             MO/YR                     DESCRIPTION                PHASE 52 MANAGER FIRM       METHOD PROPROSED         PROPOSED     COMMENTS              RESIDENT OFFICE         COUNTY       PHASE 62     DURATION




                                           I-75 (SR 93A)


                                            FROM FOWLER AVE TO CR 581 (BB
                                                    DOWNS BLVD)                                                                                                 G/W:
  105      408459-2             Sep-08        ADD LANES & RECONSTRUCT               $58,725,001   MWS   PAR     A + B / NO EXCUSE BONUS                 408459-3         INTERSTATE CONSTRUCTION   HILLSBOROUGH   $7,108,285




                                           I-75 (SR 93A)

                                                                     FROM CR
                                           581 (BB DOWNS BL) TO I-275/I75 APEX                                                                              G/W:
  106      408459-3              Jul-10        ADD LANES & RECONSTRUCT              $50,400,001   MWS   URS     A + B / NO EXCUSE BONUS   $8,000,000    408459-2         INTERSTATE CONSTRUCTION   HILLSBOROUGH   $4,954,646

                                           I-75 (SR 93)

                                                               FROM S OF
                                          HILLSBOROUGH CL TO CR 54

                                                                 ADD LANES &
  107      408459-4             Oct-10                    RECONSTRUCT               $54,600,000   MWS   POS                                                              INTERSTATE CONSTRUCTION      PASCO       $5,604,000


                                           I-75 (SR 93)




                                                               FROM
                                               HILLSBOROUGH/PASCO TO
                                           PASCO/HERNANDO CO/L


                                                          WETLAND MITIGATION                                                                                 G/W
  108      408459-7             Oct-10               FOR I-75 WIDENING                            MWS   POS                                             408459-2         INTERSTATE CONSTRUCTION   HILLSBOROUGH

                                           I-75 (SR 93A)

                                                                        AT CR 581
                                          (BB DOWNS BLVD)

  109      408460-1              Jul-06                    INTERCHANGE (MAJOR)      $34,247,784   LAC   URS     A+B/NO EXCUSE BONUS       $3,000,000                     INTERSTATE CONSTRUCTION   HILLSBOROUGH   $3,784,848   F 490




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                         16 OF 31                                                                                                   1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                        ALL CHANGES ARE SHOWN IN RED
                               LETTING                                           ENGINEER'S  DESIGN
                                DATE                                              ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT      5A FUNDS                                                                                 CONTRACT
               FM #             MO/YR                    DESCRIPTION              PHASE 52 MANAGER FIRM       METHOD PROPROSED       PROPOSED       COMMENTS                  RESIDENT OFFICE         COUNTY       PHASE 62   DURATION




                                             I-75 (SR 93A) AT CR 581 (BB DOWNS
                                            BLVD)                                                                                                        Consultant
                                                                                                                                                 Grouping with Seg
                                                                                                                                                  1 / stand alone
  110      408460-3             Apr-06                  MITIGATION PLANS          $235,000     LAC                                                   const proj           INTERSTATE CONSTRUCTION   HILLSBOROUGH   $136,751
                                              PLANT CITY RAILROAD FREIGHT
                                            TOWER
                                                                    BUILDING
  111      408557-1             Feb-06           REPAIR/REHABILITATION            $399,500     SJC                 DESIGN BUILD                                             TAMPA CONSTRUCTION      HILLSBOROUGH      $0

                                            I-175 (SR 594)

                                                                 FROM W END
                                                 OF BR #150140 TO 4TH ST S
  112      408726-1             Jan-07        RIGID PAVEMENT REHABILITATION       $2,309,450   TAD   AGM     A+B   NO EXCUSE BONUS    $300,000                           CLEARWATER CONSTRUCTION      PINELLAS        $0


                             RELET




                                            I-375 (SR 592)

                                                               FROM E END OF
                                            BR# 150128 TO 4TH ST N

                                     01 /                RIGID PAVEMENT                                                                                FULL
  113      408730-1              2006                  REHABILITATION             $1,633,825   TAD   FDA                                            OVERSIGHT            CLEARWATER CONSTRUCTION      PINELLAS        $0




                                            SR 39 (BUCHMAN HWY)


                                                                            AT
                                            HILLSBOROUGH RIVER

                                                                                                                                                   G/W 419256-1
                                                                                                                                                 Letting will move in
  114      408932-1             Oct-09                BRIDGE-REPLACEMENT          $4,998,000   JDJ                                                approx one year           TAMPA CONSTRUCTION         PASCO          $0

                                            SR 688 (ULMERTON RD)

                                                               FROM WILD
                                            ACRES RD TO ELCENTRO/RANCHERO
  115      409154-1             Mar-11         ADD LANES & RECONSTRUCT            $7,153,200   TAD   URS                                                                         OAKPARK              PINELLAS     $652,908




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                      17 OF 31                                                                                                   1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                              ALL CHANGES ARE SHOWN IN RED
                               LETTING                                             ENGINEER'S  DESIGN
                                DATE                                                ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT       5A FUNDS                                                                                        CONTRACT
               FM #             MO/YR                     DESCRIPTION               PHASE 52 MANAGER FIRM       METHOD PROPROSED        PROPOSED       COMMENTS                     RESIDENT OFFICE           COUNTY       PHASE 62     DURATION

                                           SR 688 (ULMERTON RD)

                                                                    FROM W
                                          OF LONG BRANCH CNL TO E OF WILD
                                          ACRES RD
                                                                ADD LANES &
  116      409155-1             May-14              RECONSTRUCT                    $15,151,650   TAD   ECD                                                                              OAKPARK               PINELLAS     $1,363,648
                                              CR 470 (GOSPEL ISLE) OVER
                                                  HENDERSON LAKE                                                                                                               TAMPA CONSTRUCTION / RALPH
  117      409207-1             Mar-06        REPLACE LOW LEVEL BRIDGE              $2,266,000   JRE   JSR     INCENTIVE/DISINCENTIVE    $200,000                                       MALPESO                CITRUS         $0

                                          I-4 (SR 400)

                                                                  FROM CR 579 TO
                                           PARK RD

  118      409366-2             Feb-06             ITS FREEWAY MANAGEMENT           $5,900,000   WLW   TBE                                                                              OAKPARK             HILLSBOROUGH   $1,100,000




                                           I-4 (SR 400)

                                                              FROM PARK RD TO                                                                                       G/W
                                          POLK CO/L                                                                                                   409366 4 will be
                                                                                                                                                       moved to 2009
  119      409366-3             Jun-07          ITS FREEWAY MANAGEMENT              $1,484,947   WLW   URS                                          fiscal year for letting             OAKPARK             HILLSBOROUGH   $476,206




                                          I-4 (SR 400)

                                                                    FROM
                                           HILLSBOROUGH CO/L TO 1 MI WEST                                                                                          G/W
                                          US RT 27                                                                                                    409366 3 will be
                                                                    ITS                                                                                moved to 2009
  120      409366-4             Jun-07          FREEWAY MANAGEMENT                  $8,836,587   WLW   URS                                          fiscal year for letting             OAKPARK                 POLK       $6,965,970

                                           I-75 (SR 93A)

                                                                    FROM
                                          US 301 (BRANDON) TO FOWLER AVE

                                                                  ITS
  121      410909-1             Feb-06           FREEWAY MANAGEMENT                 $7,280,000   WLW   TBE                                                                              OAKPARK             HILLSBOROUGH   $1,400,000

                                           I-75 (SR 93A)


                                            FROM FOWLER AVE TO BRUCE B
                                          DOWNS BLVD
                                                                 ITS
  122      410909-2              Jul-12       FREEWAY MANAGEMENT                    $3,762,893   WLW                                                                                    OAKPARK             HILLSBOROUGH   $755,196




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                       18 OF 31                                                                                                            1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                  ALL CHANGES ARE SHOWN IN RED
                               LETTING                                               ENGINEER'S  DESIGN
                                DATE                                                  ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                       CONTRACT
               FM #             MO/YR                     DESCRIPTION                 PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED    COMMENTS              RESIDENT OFFICE      COUNTY       PHASE 62   DURATION




                                           I-75 (SR 93A)

                                                                      FROM
                                              BRUCE B DOWNS BLVD TO I-275
                                                      (PASCO CO)                                                                                     G/W 410909
  123      410909-3              Jul-08        ITS FREEWAY MANAGEMENT                 $1,440,001   WLW                                           4 AND 410909 5            OAKPARK         HILLSBOROUGH   $129,601



                                           I-75 (SR 93)

                                                                 FROM I-275
                                           (PASCO CO/L) TO HERNANDO CO/L

                                                                ITS FREEWAY
                                                          MANAGEMENT
                                                                                                                                                  G/W 410909 3
  124      410909-4              Jul-11                                               $5,208,084   WLW                                           AND 410909 5              OAKPARK               PASCO    $460,256




                                          I-75 (SR 93)

                                                               FROM PASCO CO/L
                                          TO N OF SR 50
                                                                                                                                                           G/W
                                                              ITS FREEWAY                                                                        410909 3 AND
  125      410909-5              Jul-11                   MANAGEMENT                  $1,101,375   WLW                                             410909 4                OAKPARK          HERNANDO      $103,605

                                          I-75 (SR 93)


                                           FROM MANATEE CO/L TO US 301 (SO
                                          OF BRANDON)
                                                                      ITS
  126      410909-6              Jul-12        FREEWAY MANAGEMENT                     $3,031,801   WLW                LUMP SUM                                             OAKPARK         HILLSBOROUGH   $276,743

                                          I-75 (SR 93)

                                                                        FROM I-275
                                           TO HILLSBOROUGH CO/L

                                                               ITS FREEWAY
  127      410909-7              Jul-11                   MANAGEMENT                  $1,302,600   WLW                                                                     OAKPARK           MANATEE      $114,704

                                          SR 618 (SELMON EXWY)


                                            FROM E OF DELANEY CREEK TO I-75
                                                     (BRIDGE #487)
  128      410988-1             Jan-07               RESURFACING                      $627,001     CAR                                                                TAMPA CONSTRUCTION   HILLSBOROUGH      $0




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                        19 OF 31                                                                                        1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                    ALL CHANGES ARE SHOWN IN RED
                               LETTING                                         ENGINEER'S  DESIGN
                                DATE                                            ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                                    CONTRACT
               FM #             MO/YR                    DESCRIPTION            PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED        COMMENTS                  RESIDENT OFFICE         COUNTY       PHASE 62     DURATION

                                          I-75 (SR 93)

                                                                    FROM
                                             PASCO/HERNANDO CO/L TO SR 50
  129      411011-2             Sep-13         ADD LANES & RECONSTRUCT         $83,434,995   MWS                                $2,742,000                            INTERSTATE CONSTRUCTION    HERNANDO      $6,528,608

                                          I-75 (SR 93)

                                                             FROM SR 50 TO
                                                HERNANDO/SUMTER CO/L
  130      411012-2             Oct-11         ADD LANES & RECONSTRUCT         $83,455,350   MWS                                                                      INTERSTATE CONSTRUCTION    HERNANDO      $6,839,494

                                          I-75 (SR 93)

                                                               FROM SR 52
                                                TO PASCO/HERNANDO CO/L
  131      411014-2              Jul-12        ADD LANES & RECONSTRUCT         $70,262,850   MWS                                $2,709,000                            INTERSTATE CONSTRUCTION      PASCO       $6,247,104

                                          US 19 (SR 55)

                                                      AT EMERALD OAKS DRIVE
  132      411210-1             Apr-09        TRAFFIC OPS IMPROVEMENT           $562,500     TAD                                                                        TAMPA CONSTRUCTION         CITRUS         $0
                                          SR 575 (CENTRAL AVE)

                                                              FROM US 301TO
                                                      HERNANDO CO/L
  133      411325-1             May-06                 RESURFACING              $1,432,440   MES   HEG          LUMP SUM                                                TAMPA CONSTRUCTION         PASCO          $0


                                                                                                                                                Project will be
                                                                                                                                                delayed if it is
                                                                                                                                                decided to add
                                                                                                                                             sidewalk to project,
                                                                                                                                               due to easement
                                                                                                                                              negotiations with
                                                                                                                                                R/R . There is
                                          SR 580 (BUSCH BLVD)                                                                                 discussion about
                                                                                                                                               making the S/W
                                                              FROM DALE                                                                       project a separate
                                                MABRY HWY TO HIMES AVE                                                                       contract so this one
  134      411331-1             Nov-06              RESURFACING                 $1,481,810   JSN   BAY                                        will not be delayed       TAMPA CONSTRUCTION      HILLSBOROUGH      $0

                                           SR 674

                                                                   FROM E OF
                                              CR 579 TO KATIE STANALAND RD
  135      411333-1             Mar-08                RESURFACING               $4,891,500   MES   WIS          LUMP SUM                                                TAMPA CONSTRUCTION      HILLSBOROUGH      $0

                                          US 41 (SR 45)

                                                            FROM GOWERS
                                              CORNER CREEK TO S OF CR 578
  136      411334-1             Dec-07              RESURFACING                 $4,565,400   JDJ                LUMP SUM                                                TAMPA CONSTRUCTION         PASCO       $399,342




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                  20 OF 31                                                                                                     1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                          ALL CHANGES ARE SHOWN IN RED
                               LETTING                                              ENGINEER'S  DESIGN
                                DATE                                                 ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT     5A FUNDS                                                                                   CONTRACT
               FM #             MO/YR                   DESCRIPTION                  PHASE 52 MANAGER FIRM       METHOD PROPROSED      PROPOSED       COMMENTS                  RESIDENT OFFICE         COUNTY       PHASE 62     DURATION


                                             SR 60 (CLEVELAND)



                                                                     FROM
                                             MYRTLE ST TO FREDRICA LANE


                                                                                                                                                   DROPPED / NOW
  137      411336-1            Droppped            RESURFACING 5 LANES               $2,019,287    JSN                                              A LAP PROJECT          CLEARWATER CONSTRUCTION      PINELLAS        $0

                                             US 92 (SR 600)

                                                                   FROM EUREKA
                                                     SPRINGS RD TO SR 566
  138      411337-1             May-07                    RESURFACING               $19,342,950    LAC   VOL                                                                       OAKPARK            HILLSBOROUGH   $2,090,000
                                             I-75 (SR 93A) AT CSX RR

                                                                    BRIDGE-
  139      411536-1              Jul-08            REPAIR/REHABILITATION             $2,200,500    JJJ   JPG        DESIGN BUILD        $300,000                              BRIDGE MAINTENANCE      HILLSBOROUGH


                                             SR 60 (MEMORIAL HWY)



                                                       FROM I-275 TO SPRUCE ST




                                                                      INTERCHANGE
  140      412531-1             Oct-14                        MAJOR                 $136,710,000   MWS                                                                      INTERSTATE CONSTRUCTION   HILLSBOROUGH   $5,544,551

                                             SKYWAY/CROSSTOWN

                                                                       SKYWAY
                                             BRIDGE REPAIR

  141      412598-1             May-06                          BRIDGE # 150189      $898,810      JJJ   PAR                                                                  BRIDGE MAINTENANCE        PINELLAS
                                              LOCK ST FROM 21ST ST TO US 301                                    ADVANCE PRODUCTION /
  142      413377-1              Jul-08          SIDEWALK ON NORTH SIDE              $244,125      KRB               LUMP SUM                                                 TAMPA CONSTRUCTION         PASCO          $0

                                             SR 533 (LAKELAND RD)
                                                                                                                                                    Letting date has
                                                          FROM US 301 S SIDE                                                                         been moved to
                                                DADE TO US 301 N SIDE DADE                                                                         avoid conflicts with
  143      413394-1          01 or 02/2007            RESURFACING                    $1,567,500    EES   CUM                                            403727-1              TAMPA CONSTRUCTION         PASCO          $0

                                             SR 60 (BRANDON BLVD)

                                                                 FROM E OF
                                             VALRICO RD TO W TURKEY CREEK RD                                                                       Permit Expiration
  144      413395-1             Apr-06                RESURFACING                    $6,200,000    LAC   JCI                                           4/7/2010               TAMPA CONSTRUCTION      HILLSBOROUGH      $0        F 260




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                        21 OF 31                                                                                                       1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                   ALL CHANGES ARE SHOWN IN RED
                               LETTING                                         ENGINEER'S  DESIGN
                                DATE                                            ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT     5A FUNDS                                                                              CONTRACT
               FM #             MO/YR                  DESCRIPTION              PHASE 52 MANAGER FIRM       METHOD PROPROSED      PROPOSED      COMMENTS                 RESIDENT OFFICE        COUNTY       PHASE 62   DURATION

                                           US 41 (TAMIAMI TRL)

                                                         FROM 100' N OF 15TH
                                                AVE TO BULL FMWS CREEK
  145      413399-1              Jul-07              RESURFACING                $8,246,279   GMJ   HEG           Lump Sum                                              TAMPA CONSTRUCTION     HILLSBOROUGH      $0

                                           SR 60 (HOPEWELL RD)




                                                     FROM CLARANCE GORD
                                          TO POLK CO/L


                                                              RESURFACING 4
  146      413405-1             Sep-07                     LANES                $3,641,450   LAC   KCA          LUMP SUM                                               TAMPA CONSTRUCTION     HILLSBOROUGH      $0

                                          SR 580 (BUSCH BLVD)
                                                                                                                                                Rebuild Rail
                                                               FROM W OF                                                                       Crossing to be
                                              FLORIDA AVE TO E OF 56TH ST                                                                    added to project at
  147      413407-1              Jul-07               RESURFACING              $11,076,720   JSN   GCI       Advance Production                  Nebraska              TAMPA CONSTRUCTION     HILLSBOROUGH      $0
                                          SR 590 (NE COACHMAN)

                                                                    AT OLD
                                              COACHMAN RD TO COACHMAN
                                                         CROSSING
  148      413412-1             Jan-08                 RESURFACING              $778,945     MES   VES          LUMP SUM                                            CLEARWATER CONSTRUCTION     PINELLAS        $0
                                              I-275 (SR 93) FROM I-75 S TO
                                                  SUNSHINE SKYWAY its                                                                          FUNDS AND
                                               COMMUNICATION SYSTEM                                                                           ACTIVITIES TRA
  149      414745-1             Oct-11          TELECOM INFRASTRUCTURE          DROPPED      WLW                                               TO 410909 2                  OAKPARK             MANATEE         $0


                                                CITY OF TAMPA TRAFFIC
                                           SURVEILLANCE SYSTEM



                                           TRAFFIC CONTROL DEVICES



                                                           INSTALL TRAFFIC
  150      414991-1              Jul-09           MONITORING SYSTEM             $1,912,500   BBB                                                                            OAKPARK           HILLSBOROUGH   $337,500
                                                  US 19 (SR 55) AT SR 60
  151      414998-1             May-06       INTERSECTION (MAJOR) INTERIM       $2,100,000   ASP   HWL                                                              CLEARWATER CONSTRUCTION     PINELLAS        $0      F 300

                                           US 98 (SR 50/SR 700)

                                                               FROM CR 541
                                           (SPRING LAKE) TO E OF CROOM RD
  152      415185-1             Sep-06               RESURFACING                $9,676,700   EES   KCI                                                                 TAMPA CONSTRUCTION      HERNANDO         $0
                                          SR 686 (ROOSEVELT)

                                                              FROM E OF CR
                                                   611TO ULMERTON RD
  153      415190-1             Apr-07                RESURFACING               $1,567,501   TAD   CUM                                                              CLEARWATER CONSTRUCTION     PINELLAS        $0




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                   22 OF 31                                                                                                  1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                   ALL CHANGES ARE SHOWN IN RED
                               LETTING                                            ENGINEER'S  DESIGN
                                DATE                                               ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT       5A FUNDS                                                                         CONTRACT
               FM #             MO/YR                  DESCRIPTION                 PHASE 52 MANAGER FIRM       METHOD PROPROSED        PROPOSED     COMMENTS             RESIDENT OFFICE        COUNTY       PHASE 62   DURATION

                                          US 92 (SR 600)

                                                                FROM W
                                               VASCONIA TO KENNEDY BLVD
  154      415201-1             Dec-06       RIGID PAVEMENT REHABILITATION         $2,658,039   MHS   TYL                                           g/w 255842-1       TAMPA CONSTRUCTION     HILLSBOROUGH      $0
                                          I-275 (SR 93)

                                                              FROM 26TH AVE
                                                     S TO 5TH AVE
  155      415202-1            Jan-07       RIGID PAVEMENT REHABILITATION          $6,917,900   JSN   FDA     A + B, NO EXCUSE BONUS   $1,000,000                   CLEARWATER CONSTRUCTION     PINELLAS        $0
                             DEFERRED       SR 582 (FOWLER AVE) AT 19TH ST
  156      415217-1           TO 05/07     CONSTRUCT/RECONSTRUCT MEDIAN            $200,000     SJC                                                 g/w 416858-1       TAMPA CONSTRUCTION     HILLSBOROUGH      $0

                                          US 19 (SR 55)

                                                                  FROM SUNRAY
                                           DR TO SR 54

  157      415233-2             Sep-07                        SIDEWALK             $2,010,951   MEC                                                                 CLEARWATER CONSTRUCTION       PASCO         $0


                                          US 19



                                                              FROM SR 54 TO
                                          MARINE PARKWAY


                                                                       SIDEWALK
  158      415233-3              Jul-07                   BOTH SIDES               $1,358,750   MEC                                                 G/W 415233-1    CLEARWATER CONSTRUCTION       PASCO         $0

                                          DRAINAGE IMPROVEMENT ON SR 594,
                                          651, 686, 60


                                                            REHAB EXISTING
                                             DRAINAGE STRUCTURES AND/OR
  159      415333-1              Jul-07                 PIPES                      $469,585     SJC   OME                                                           CLEARWATER CONSTRUCTION     PINELLAS        $0

                                              PINELLAS COUNTY DRAINAGE
                                           IMPROVEMENTS




  160      415334-1             Jun-07             SR 595, SR 60, SR 694            $83,077     SJC   OME                                                           CLEARWATER CONSTRUCTION     PINELLAS        $0

                                          US 301 (SR 43)

                                                                 FROM SUN
                                          CITY CENTER BLVD TO GIBSONTON DR
                                              ADD LANES & RECONSTRUCT
  161      415489-1                                    10.200 MI                                GMJ   HDR                                                                   OAKPARK           HILLSBOROUGH




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                      23 OF 31                                                                                             1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                   ALL CHANGES ARE SHOWN IN RED
                               LETTING                                           ENGINEER'S  DESIGN
                                DATE                                              ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                                CONTRACT
               FM #             MO/YR                  DESCRIPTION                PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED      COMMENTS                 RESIDENT OFFICE        COUNTY       PHASE 62     DURATION


                                          US 301 (SR 43)



                                                            FROM BALM RD TO
                                          GIBSONTON DR




  162      415489-2             Apr-07           ADD LANES & RECONSTRUCT         $55,306,623   GMJ                                                                          OAKPARK           HILLSBOROUGH   $5,530,662

                                          US 301 (SR 43)

                                                              FROM BALM
                                           ROAD TO GIBSONTON DR ADD LANES
  163      415489-2             May-07            AND RECONSTRUCT                $55,306,623   GMJ   HDR                                                                    OAKPARK           HILLSBOROUGH   $5,530,662

                                          PINELLAS COUNTY




                                                FRIENDSHIP TRAIL BIKEPATH



                                                                FROM WEEDON
                                           ISLAND TRAIL TO GANDY FRIENDSHIP
  164      415737-1              Jul-11                   TRAIL                   $6,750,000   ASP                                                                  CLEARWATER CONSTRUCTION     PINELLAS        $0
                                              82ND AVE AT SR 693 (66TH ST)
  165      415740-1              Jul-09          INTERSECTION (MAJOR)             $416,250     EES                                                                  CLEARWATER CONSTRUCTION     PINELLAS        $0


                                          SAFETY HARBOR



                                                  DOWNTOWN PEDESTRIAN
                                           CONNECTION (SIDEWALKS)




                                            EAST SIDE OF PHILLIPPE PARKWAY
  166      415742-1              Jul-09        TO CHURCH TO JEFFERSON              $90,000     JSN                                                                  CLEARWATER CONSTRUCTION     PINELLAS        $0




                                          US 19 (SR 55)




                                                                  At ST THOMAS
                                          CHURCH                                                                                             Letting received no
                                                                                                                                              bidders,adding to
                                                                                                                                              District Ops Push
                                                                                                                                             Button contract For
  167      416297-1             RELET              ADD LEFT TURN LANE             $106,740     RES                                              January 2006           TAMPA CONSTRUCTION         CITRUS        $0




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                    24 OF 31                                                                                                 1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                ALL CHANGES ARE SHOWN IN RED
                               LETTING                                            ENGINEER'S  DESIGN
                                DATE                                               ESTIMATE  PROJECT DESIGN    ALTERNATE CONTRACT       5A FUNDS                                                                        CONTRACT
               FM #             MO/YR                     DESCRIPTION              PHASE 52 MANAGER FIRM        METHOD PROPROSED        PROPOSED     COMMENTS         RESIDENT OFFICE         COUNTY       PHASE 62     DURATION
                                              SR 618 (SELMON XPWY) DECK
                                           REPLACEMENT
                                                                    BRIDGE-                                   DESIGN BUILD/INCENTIVE-
  168      416361-1             Aug-07          REPAIR/REHABILITATION             $27,039,125   JJJ   JPG     DISINCENTIVE MILESTONES   $2,487,500                INTERSTATE CONSTRUCTION   HILLSBOROUGH   $3,703,431
                                              SR 618 (SELMON XPWY) DECK
                                                      REPLACEMENT                                             DESIGN BUILD/INCENTIVE-
  169      416361-2             Aug-09       BRIDGE-REPAIR/REHABILITATION         $53,016,250   JJJ   JPG     DISINCENTIVE MILESTONES   $1,303,813                INTERSTATE CONSTRUCTION   HILLSBOROUGH   $7,551,889


                                          SR 54




                                                            FROM CR 577 TO US
                                          301


                                                                     ADD
  170      416561-2             Apr-15            LANES & RECONSTRUCT               $1,000      MEC                                                                                            PASCO


                                          I-275 (SR 93)



                                                            FROM N END OF
                                           SKYWAY TO S END OF SKYWAY




  171      416641-1              Jul-06                 BRIDGE PAINTING            $4,090,130   JJJ   SDW                                                           BRIDGE MAINTENANCE        PINELLAS        $0                 400
                                              I-275 (SR 93) FROM N END OF
                                           SKYWAY BRDG TO S END OF SKYWAY
  172      416641-2             Jun-06                     BRDG                    $1,725,000   SDW                                                                 BRIDGE MAINTENANCE        PINELLAS     $300,000

                                           ST LEO UNIVERSITY



                                                COMMUNITY ACCESS
  173      416653-2             Jun-06             SAFETY PROJECT                  $600,000     GMJ   CUM                                                           TAMPA CONSTRUCTION         PASCO          $0


                                          I-75 (SR 93)




                                                             FROM N OF SR 52 TO
                                           NE OF CR 577


                                                               CONSTRUCT
  174      416727-1             Jun-06            THRIE BEAM GUARDRAIL             $1,700,000   SJC   OWE                                                           TAMPA CONSTRUCTION         PASCO          $0        F 165




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                       25 OF 31                                                                                              1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                          ALL CHANGES ARE SHOWN IN RED
                               LETTING                                             ENGINEER'S  DESIGN
                                DATE                                                ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                 CONTRACT
               FM #             MO/YR                   DESCRIPTION                 PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED   COMMENTS         RESIDENT OFFICE      COUNTY       PHASE 62   DURATION




                                          SR 50




                                                   FROM LOCKHART RD TO
                                          KETTERING RD


                                                                             ADD
                                           LANES & RECONSTRUCT




  175      416732-1             Apr-15                            2.022 MI           $1,367      MES                                                                                     PASCO

                                          SR 600 (HILLS AVE)



                                                           FROM NEBRASKA AVE
                                           TO 50TH ST


                                                                        SAFETY
  176      416803-1             May-07                     PROJECT                  $857,946     EES   AIM                                                    TAMPA CONSTRUCTION   HILLSBOROUGH      $0


                                          SR 597 (DALE MABRY)




                                                    FROM HUMPHREY ST TO
                                          VAN DYKE RD


                                                                   UPDATE
                                             INTERSECTION SIGNALIZATION AT
  177      416816-1              Jul-10            TWELVE LOCATIONS                 $2,486,250   MHS           ADVANCE PRODUCTION                             TAMPA CONSTRUCTION   HILLSBOROUGH      $0

                                          US 98 (SR 700)



                                                    FROM SEGNARO DR TO
                                          PASCO/HERNANDO


                                                               RESURFACING 2
  178      416833-1             Aug-07                      LANES                   $239,140     CAR                                                          TAMPA CONSTRUCTION         PASCO       $0

                                           US 98 (SR 35)



                                                     FROM CR 54 TO US 301
  179      416839-1             Dec-08                RESURFACING                   $6,044,625   SJC                                                          TAMPA CONSTRUCTION         PASCO       $0




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                      26 OF 31                                                                                  1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                  ALL CHANGES ARE SHOWN IN RED
                               LETTING                                            ENGINEER'S  DESIGN
                                DATE                                               ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                            CONTRACT
               FM #             MO/YR                     DESCRIPTION              PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED     COMMENTS                RESIDENT OFFICE        COUNTY       PHASE 62   DURATION

                                          US 301



                                                  FROM UNCLE TOM RD TO
                                           BLOOMINGDALE RD




  180      416841-1              Jul-08                RESURFACING                 $4,053,375   CAR                                                                   TAMPA CONSTRUCTION     HILLSBOROUGH      $0

                                           ALT US 19 (SR 595)




                                                                   FROM 4TH                                                                    Letting date has
  181      416851-1             Sep-08         ST TO 58TH ST RESURFACING           $6,489,000   JSN                                              been moved        CLEARWATER CONSTRUCTION     PINELLAS        $0


                                          US 92 (SR 600)



                                                     FROM CENTRAL AVE TO                                                                           PHASE
                                          NEBRASKA AVE                                                                                           DROPPED
                                                                                                                                                 BECAUSE
                                                                                                                                                 ACTIVITIES
                                                                    RIGID                                                                     ARE BEING DONE
  182      416852-1              Jul-07         PAVEMENT REHABILITATION            DROPPED      JRE                                            UNDER 2586601          TAMPA CONSTRUCTION     HILLSBOROUGH      $0

                                          I-275 (SR 93)




                                                          FROM HOWARD
                                            FRANKLIN BRIDGE TO NB AND SB
                                          BRIDGE


                                                                        REPAIR
  183      416857-1             Mar-06                      /REHAB                 $5,107,965   JJJ    JJJ                                                            BRIDGE MAINTENANCE     HILLSBOROUGH


                                          SR 582 (FOWLER AVE)




                                                                 FROM W OF
                                           30TH ST TO W OF RIVERHILLS




  184      416858-1             May-07               RESURFACING        6 LANES    $7,414,276   SJC   AIM                                        g/w 415217-1         TAMPA CONSTRUCTION     HILLSBOROUGH      $0




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                     27 OF 31                                                                                             1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                  ALL CHANGES ARE SHOWN IN RED
                               LETTING                                             ENGINEER'S  DESIGN
                                DATE                                                ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                           CONTRACT
               FM #             MO/YR                  DESCRIPTION                  PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED   COMMENTS                 RESIDENT OFFICE        COUNTY       PHASE 62   DURATION


                                           US 41 (SR 45)




                                                FROM SANTA FE RD TO SR 676




  185      416859-1             Dec-08                       RESURFACING            $3,223,125   LAC   AIM                                                            TAMPA CONSTRUCTION     HILLSBOROUGH      $0

                                           SR 674 (SUN CITY BL) AT US 301




  186      416860-1             Jan-08                     RESURFACING              $191,312     GMJ                                                                  TAMPA CONSTRUCTION     HILLSBOROUGH      $0

                                           SR 60 AT SR 39 (CR 39)




  187      416951-1             Mar-06                         LIGHTING             $135,000     EES   OWE          Lump Sum                                          TAMPA CONSTRUCTION     HILLSBOROUGH      $0


                                          SR 686 (ROOSEVELT)



                                                            FROM E OF US 19 TO W
                                          OF 49TH ST       LIGHTING


                                                                 INSTALL 92
  188      416952-1             Dec-06       LIGHTING POLES ON BOTH SIDES           $821,371     SJC   OWE          LUMP SUM                                       CLEARWATER CONSTRUCTION     PINELLAS        $0

                                          US 19 (SR 55)



                                                                    AT CR 488
                                           (DUNNELL)




  189      416956-1             Apr-06                 TRAFFIC SIGNALS              $234,119     ASP   OWE                                                            TAMPA CONSTRUCTION         CITRUS        $0      F 40



                                          US 19 (SR 55)




                                                          FROM S OF SPRING
                                           HILL DR TO N OF TOUCAN TRAIL

                                                                                                               LUMP SUM / ADVANCE                             G
  190      417440-1              Jul-07                    LIGHTING                 $904,384     SJC   OWE        PRODUCTION                   / W 417464-1           TAMPA CONSTRUCTION      HERNANDO         $0




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                      28 OF 31                                                                                                 1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                             ALL CHANGES ARE SHOWN IN RED
                               LETTING                                             ENGINEER'S  DESIGN
                                DATE                                                ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                      CONTRACT
               FM #             MO/YR                   DESCRIPTION                 PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED   COMMENTS            RESIDENT OFFICE        COUNTY       PHASE 62   DURATION




                                          US 19 (SR 55)




                                                     FROM N OF TOUCAN TRAIL
                                           TO S OF SR 50

                                                                                                                                                       G/W
  191      417464-1              Jul-07                              LIGHTING       $1,418,536   SJC   OME          LUMP SUM                    417440-1         TAMPA CONSTRUCTION      HERNANDO         $0


                                          SR 54



                                                                     FROM US 19
                                           TO GUNN HIGHWAY




  192      418235-1              Jul-11             TRAFFIC SIGNAL UPDATE           $3,486,000   MHS                                                          CLEARWATER CONSTRUCTION       PASCO         $0

                                           SR 50 (Cortez Blvd)



                                                                  AT WEEPING
                                          WILLOW




  193      418803-1             Jun-06               SAFETY PROJECT                 $100,000     SJC                                                             TAMPA CONSTRUCTION      HERNANDO         $0      F 60 days

                                          UPPER TAMPA BAY TRL PEDESTRIAN
                                          UNDERPASS / OVERPASS



                                            FROM APPROX 500' W OF SHELDON
                                                  RD OVER CHANNEL A
                                            TO APPROX 500' E OF SHELDON RD
  194      418811-1              Jul-10            OVER CHANNEL A                   $1,032,000   GMJ                                                             TAMPA CONSTRUCTION     HILLSBOROUGH      $0


                                          US 19 (SR 55)




                                               CONTINUOUS RIGHT TURN LANE




  195      418860-2              Jul-10                          2005 EARMARK      $21,600,000   MEC   HDR                                                    CLEARWATER CONSTRUCTION       PASCO         $0
  196      419150-1             Oct-07      I-275 (SR93) NB and SB Skyway Bridge    $413,030     JJJ                                                             BRIDGE MAINTENANCE       PINELLAS
                                              I-75 (SR 93) FROM N OF SR 50 TO
                                                 HERNANDO/SUMTER CO/L
  197      419196-1              Jul-08                  GUARDRAIL                  $1,080,000   SJC                                                             TAMPA CONSTRUCTION      HERNANDO         $0

                                            I-75 (SR 93A) FROM MANATEE/HILLS
  198      419197-1              Jul-08    CO/L TO 2 MI S OF SR 674 GUARDRAIL       $1,518,750   GMJ                                                             TAMPA CONSTRUCTION     HILLSBOROUGH      $0




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                      29 OF 31                                                                                         1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                                     ALL CHANGES ARE SHOWN IN RED
                               LETTING                                            ENGINEER'S  DESIGN
                                DATE                                               ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                               CONTRACT
               FM #             MO/YR                    DESCRIPTION               PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED      COMMENTS                  RESIDENT OFFICE        COUNTY       PHASE 62   DURATION


                                           US 301 (SR 43)



                                                                FROM
                                          BLOOMINGDALE AVE TO FALKENBURG
                                          RD


  199      419198-1              Jul-07                  SKID HAZARD OVERLAY       $641,330     GMJ                                                                      TAMPA CONSTRUCTION     HILLSBOROUGH      $0


                                          I-75 (SR 93)


                                                                                                                                                                                                    PASCO
                                                    FROM CR 577 TO
                                           PASCO/HERNANDO CO/L


  200      419200-1              Jul-08                               GUARDRAIL    $861,750     SJC                                                                      TAMPA CONSTRUCTION


                                          US 19 (SR 55)




                                              VARIOUS MEDIAN CLOSURES

                                                                                                                                                                                                  PINELLAS

                                                         LOCATIONS AT 298TH
                                               AVE, N AND S OF TAMPA RD,
                                           HIGHLAND BLVD


  201      419201-1             Feb-08             INTERSECTION (MINOR)            $326,100     PMR                                                                   CLEARWATER CONSTRUCTION

                                           I-275 (SR 93) FROM .3 MI S OF 38TH
                                          AVE TO 26TH AVE S
                                                                                                                                                                                                  PINELLAS


  202      419202-1              Jul-07                           GUARDRAIL        $415,234     JSN                                                                   CLEARWATER CONSTRUCTION




                                          SR 39 (BUCHMAN HWY)

                                                                                                                                                                                                    PASCO

                                                  FROM S OF SPOTO RD TO GALL
                                           BLVD
                                                                                                                                                     G/W 408932-
                                                                                                                                              1, Letting will move
  203      419256-1              Jul-08                            RESURFACING     $1,501,875   JDJ                                               out one year           TAMPA CONSTRUCTION




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                     30 OF 31                                                                                                1/18/2011
        FDOT DISTRICT SEVEN WORK PROGRAM
                                                                                                                                                      ALL CHANGES ARE SHOWN IN RED
                               LETTING                                         ENGINEER'S  DESIGN
                                DATE                                            ESTIMATE  PROJECT DESIGN   ALTERNATE CONTRACT   5A FUNDS                                                                 CONTRACT
               FM #             MO/YR                DESCRIPTION                PHASE 52 MANAGER FIRM       METHOD PROPROSED    PROPOSED   COMMENTS         RESIDENT OFFICE      COUNTY       PHASE 62   DURATION
                                              US 98 (SR 50A & 700) FROM
                                          CLEVELAND AVE TO MILDRED AVE

                                                                                                                                                                                HERNANDO


  204      419257-1             Sep-08                 RESURFACING              $933,750     MES                                                          TAMPA CONSTRUCTION

                                          SR 39 (BUCHMAN HWY)




                                                      FROM N OF I-4 TO PASCO                                                                                                   HILLSBOROUGH
                                           CO/L


  205      419258-1             Sep-08                 RESURFACING              $5,242,500   MES                                                          TAMPA CONSTRUCTION




D:\Docstoc\Working\pdf\f13b80e9-55ef-46fc-b1e8-bb1658ae1c62.xls                                                  31 OF 31                                                                                  1/18/2011

								
To top